17671 (2) POST THIS CARD NEAR FRONT OF BUILDING, PERMITNUMBER
CITY OF CUPERTINO 17671
INSPECTION DIVISION
JOB INSPECTION RECORD
PERMIT EXPIRATION
JOB ADDRESS ✓"-'-��a-� UNIT# LOT •' -
1/ / PERMIT EXPIRES IF WORK
OwrvER ,�'l,b. l •B CONTRACTOR $, G, IS NOT STARTED WITHIN
INSPECTION DATE INSPECTOR SPECTION RECORD 180 DAYS OF PERMIT ISSU-
p .FOUNDATION i ANCE OR 180 DAYS FROM
NOTE: - 'LASTCALLED INSPECTION.
UFER ' ALL GRADING AND DRAINAGE SHALL BE INSTALLED
PREGUNITE TO COMPLY WITH THE APPROVED PLANS AND CITY OF PERMIT VALIDATION
CUPERTINO STANDARDS.
GARAGE SLABS
POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED �A➢D
UNDERGROUND /SLAB i ; MAK 2 5 19'89 .
PLUMBING
ELECTRICAL City of Cupm lDoISSUANCE DATE
MECHANICAL BLDG. ELEcr PLG. I MECR
❑ 1 ❑ ❑
DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED BUILDING PERMIT
INFORMATION
WOOD FLOOR VALUATION SIFT,
PLUMBING '
MECHANICAL '
ELECTRICAL - PERMIT TO
FRAMING ecli-ICd
STORIES TYPE CONSTH.
INSULATION
- UCC GROUP RES UNITS
PLACE NO SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED 5
ROOF NOTE:NO FINAL INSP.SHALL BE MADE BEFORE sn,FT FLOORAREA TOTAL ACREAGE
. DIAPHRAGM - THE CONSTRUCTION TAX IS PAID -
BUILDING USE
ROOF SHEATHING REs IND CON PB On...
APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED FINALSDATE INSP. ❑ 11 F-1 El El
ASSESSORS PARCEL NO
ROUGH SAN.#
PLUMBING ELECT..ENERGY
' TRACT NO, PARCEL NO
TUBS&SHOWER PAN PLUMBING ENERGY
MECHANICAL MECH.ENERGY
ELECTRICAL ! ACC DATE ACC FILE NO
BUILDING ENERGY
FRAMING ELECT.FINAL TEST
ZONING ENG.SITE NO,
INSULATION PLUMBING
GAS TEST GAS
MECHANICAL - FIRE SPRINK. ENERGY T-24
COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING Y ❑ NE] •Y ❑ NC]
- EXTERIOR SHEAR. ELECTRICAL RELEASE FLOOD ZONE A L U C.
INTERIOR SHEAR FIRE DEPT. 1:1ND Y0 NEI
SHEETROCK GRADE FEESUMMARY
EXTERIOR LATH', BUILDING
INTERIOR LATH TEMPORARY APP BUILDING
SCRATCH COAT ELECTRIC PLAN CHECK
GAS FEE
NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE
OCCUPANCY OF BUILDING IS NOT PERMITT ED UNTIL BUILDING FINAL IS SIGNED BY BUILDING INSPECTOR. MICROFILM
_g
w ELECTRIC ARRANGE FOR INSPECTION BY PHONING 252-4505, �"� �Qd
F ONE WORKING DAY BEFORE REQUIRED INSPECTION. '4 PLUMBING
°z PLEASE GIVE JOB ADDRESSWHEN PHONING:
- SEE PERMIT FOR EXPIRATION.DATE - MECHANICAL
IMPORTANT! CONST.TAX
PLEASE READ REVERSE SIDE BEFORE TOTAL /7`, 00
CALLING FOR FINAL INSPECTION.
OFFICE COPY