CC Resolution No. 4322
q RESOLUTION N0. 4322
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
~PPEOVING PARCEL MAP OF PROPERTY LOCATED AT THE SOUTHEAST
CORNER OF DE ANZA BOULEVARD AND ROUTE 280; DEVELOPER,
SOBRATO-BERG; AUTHORIZING THE CITY ENGINEER TO SIGN THE
PARCEL MAP; AUTHORIZING EXECUTION OF AGREEMENT IN CONNEC-
TION WITH IMPROVEMENT OF SAID PROPERTY
WHEREAS, there has been presented to the City Council for approval of the
parcel map and improvement plans of property located on the east side of North
De Anza Boulevard south of Route 280; and
WHEREAS, there has been presented to the City Council a proposed agreement
for the construction of streets, curbs, and gutters, and for other improvements
and letter of credit has been deposited to cover fee as set forth in Exhibit "A"
and improvements have beed deferred until the Public Hearing on North De Anza
Boulevard Assessment District 76-14 has been held.
NOW, THEREFORE, BE IT RESOLVED THAT ,
a. Said parcel map and improvement plans herein referred to are hereby
approved. • _
b. The offer of dedication for street areas and easements is hereby accepted.
c. The City Engineer is hereby authorized to sign said improvement plans.
d. The City Engineer and the City Clerk are hereby authorized to sign said
parcel map.
e. The Mayor and the City Clerk are hereby authorized to execute the agree-
ment herein referred to.
f. The deferred agreement shall be recorded with the County Recorder.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 16th day of November , 1976, by the following vote:
Vote Members of the City Council
I
AYES: Frolich, Jackson, Nellis, 0'Keefe, Meyers '
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST: APPROVED:
/s/ Wm. E. Ryder /s/ Robert W. Meyers
City Clerk Mayor, City of Cupertino
Exhibit "A"
Resolution No. 4322
,
EXHIBIT "A"
SCHEDULE OF BOND, FEES, AND DEPOSITS
DEVELOPMENT: Industrial
Sobrato-Berg
LOCATION: Southeast Corner of De Anza Boulevard and Route.280
A. Faithful Performance Bond $ Deferred
B. Labor and Material Bond . $ Deferred
C. Checking and Inspection Fee $ 26,715.00
D. Indirect City Expenses $ 4,010.00
E. Map Filing Fees (4@$5.00) " $ 20.00
F. Map Checking Fee $ 20.00
G. Development Maintenance Deposit $ 1,000.00
H. Storm Drainage Deposit $ 137,700.00
I. One Year Power Cost $ 91.00
J. Tree Fees $ N.A.