Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
S 1605 (2)FILL IN INFORMATION WITHIN RED LINES Is USE BALL POINT PEN ONLY
I�C�TYOFCUPERTINO BUILD NO-ELLc'I'RIUAt. •y; Ab0
BUILDING DIVISION APPLICATION/PERMIT I e �.er rP.rNl.MoonrFrm rncN,G.LCHArtrsrreICALTlnN V\
a357&5 0oK
NAME::
CONTACT: PHONE:
Gerry Ploof/Director of Purchasing ❑ Consultant Fees Paid by Applicant (Initial)
zaZ
�00 ay -in
UU
Z a1
. I nnan than nth I aril Eecnaed milder � ens to v (ecmn,2ndn •
- y a provisions o p 6
withS ion 01H oPDivisiun3nfthcBusin sand ProfessionsCalc,andmylicenscis
full muceand effect.
License Class Lic.4
Dal, Comharmr
". '..
. 1.""".."" T""...... .
PERMIT ISSUANCE
APPLIANCES - RESIDEN LIAL
�?h
co Z
r ARCHITECT'S DECLARATION
I understand any plans shall be used as public records
PANELS'
UP TO 200 AMPS
Aj W
y�,%^4
Y a a
O a U
3Oi
t�"
6
Licensed Pmb,,maal
OWNER -BUILDER DECLARATION ^
• I hereby affirm that I am exempt from the Contractors License Law for the
following reason (Section ]U31.5. Business and Professions Code. Any city or county
which nbrims a perl ,, consumer, alter, improve, demolish, or repair any awcmre
ml
prior to its issuance, also requires the applicant for such permit to file coined..aemenl
halhe is licensed pursuant to the provisions of the Contractors License Law (Chapter 9
201-10WANES
OVER 1000AMPS
SIGNS ELECTRICAL
SPECIAL CIRCUTDMISC
(ammmdndng with Section ptx%p nfDlvision3 of the Business amA Pro[essiona Codo)or
TP.MP. MGTEROR POIAINST
y o
'if LL�
p ^ w
, 0
H.t
that he is exempt therefrom sad the hash, far the mllcged exemption. Any vimun er of
Section 0031$ by any appludinfo rtarmil sumesa theapplicnnl IIIpenaltyef
col aore than Eve hundred delta,, ($50H.
❑ I, as owner of the property, or illy employees with wages as their said compensation,
will do the work, andthc,harcmre is not Intended arnBeum for sale( See. 7044, Business
-
POWER DEVICES
SWIMMING POOL ELECTRIC
G
F 3
and professions Cade: The Contem or'a License Law does not apply 10 an owner of
property who builds or improves thereon, and who does ,such wlack hit. elf or through
his own employees, provided that such improvements are not amended or offered for
OUTLETS -SWITCHES -FIXTURES
NEW RESIDENTIAL ELECTR SQ FI',
ale. It, hcwever, the building or impmvanenm is sold within one year artompletionthe
covinumbuilifir will have the burden of proving that he did not build or improve for pur-
401VII-i 2
pose"salene
Fj.T ref the pmpeny, om exclusively wnwcung with licwswl cnnvacmrs m
eproject
STIA
rostrum the (Sea 9044, Business and P..feasions Code :)']me Coahaaods Li-
es
se Law donot apply to an owner of property who builds or improves thereon,andQTY.'
y -
PLUMBINGPERMIT
who eentraets fnrsneh proteins with a contmaags) limosed pursuant um the Contractor's
w
PERMIT ISSUANCE
License Law.
I an cxentlurdcr SA ,B&P C for this
_
ALTER- DRAIN & VNN'1'- WATER (EA)
0 � Date06/15�r
a, WORKER'S COMPENSATION DECLARATION
BACK PLOW PROTECT. DEVICE
BUILDING PERMIT INFO `
BLDG ELECT PLUMB MECH
$"_ stirt-
JOB DESCRIPTION
RESIDENTIAL:
DWL ❑KITCHENREMODEL
ADDITION ❑PLUMBING REPIPE.
❑MULTI-UNIT ❑STRUCTURAL
MODIFICATION
El INTERIOR El CHIMNEY REPAIR
IMPROVEMENT 0 SWIMMING POOLS
❑ BATH REMODEL/REPAIR ❑ DEMOLITIONS
❑ OTHER
SQ. IT. FLOOR A
1 ��
PEE
erebY affirm under penelry of perju one of the following deolnmliane:
❑ I have and will maintain aCertificateofCovsevuoself-insure for Workers Compeo-
D S-PLO Op, ARE
OND.
anion, as provided for by Section 3100 of the Labor Coal for the performnncc of the
work for which this permll is issued.
FI
I
ES- 'LRA
El 1 have and will malnhin Workers G urvabsedon Inamhnce, as required by Section
3900 of the Lehr Corp. for the performance of the work for which this permit is issued.
G
-
A.' Tm - IN 4 T TS
C
-HA.SYSTEM-OVFR4(. Ro
My Worker's Compensation Insurance carrier and Policy number are
Coca: PolicyNo.:
IfEASEIINDIISTRL WASTE. INTERCE
CERTIFICATE OF EXEMPTION FROM WORKERN
COMPENSATION INSURANCE
L „r.p,p
('Phis section need not he dompletel ifthe permit is for one hundred dollars($100)
or leas.)
SEWER - SANITARY - STORM EA. 200 Ff.
`
livelong islxsued. ],hall'Compr-
Loy anythatlathe performance fiand rite alk for chric subject
not employ any person in any manner w m In M1momd nuhjecl m the Workers' Comperr
WATER HEATER WNENT/ELECTR
z
sagon Laws of California. Date
1
4 OAppleton
F
os z
w�
ll'^'
© W
Ca
m
U Z
NOTICE TO APPLICAN'C If, after making this Certificate of Bxemptiam you should
become subject to the Worker's Compensation provisions of the Labor Code, you mush
fonhwith comply with such provisions or this permit shall be deemed revoked
CONSTRUCTION LENDING AGENCY
s Thereby u[finn that 0ere isnamxWdinn lendin6 nguncy for the performance of
the work for which this permit is issued [Sec. 3097, Cie C)
Leaders Name
WATER SYS'fEMITREATING
WATER SERVICE
NEW RESIDENTIAL PLMN. SQ. Pr.
-
_ Y
Lender's Address
I relify that l h ,ad this uppl t ad , t, that theanowe infromalm test
correct. 1 agree entropy 'th all city mat my mcbramideand.r r 1-aw,milan, In
building cionsfirefire, and hrcby author prevemelisca of this city to coma upon the
-
QTY. j MECHANICAL PERMIT
'
- ' FEB ;
t
PERMIT ISSUANCE
F-t
•
have incremental prnpermy for inspection purposes.
(We) agree to save indemnify and keep harmless the City of Cushman against
AITFRORADDTOMECH.
r
Ilabilidesjudgmenla, costs and expenses which may in any wayaccmeagainst avid City
in nnsegvence of the greeting of this pennir.
AIR HANDLING UNI'i-TO 10,000 C IND
m
APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON; POINT
SOURCE REGULATIONS.
AIR HANDLING UNIT (OVER III,000 CFM)
-
'
Signalmerf AppwhasConuador Dam
EXHAUST HOOD(W/DUCT)
HAZARDOUS MATERIALS DISCLOSURE
Will the applicant or future building occupant more or handle hazardous material
ABATING ON] r(TO 100.000 BTU)
'C3
as defined by the Cupertino Municipal Code Chapter 9.12, and the Health sad Safety
Cade, Section 25532(01
Yes
HEATING UNIT (OVER 100,000 BTU)
VENTILATION FAN (SINGLE RESID)
Will the applima e or Chard building cuzupant use equipment or devices which
t r harardos, air content name as defined by rho Bay Area Air Quality Management.
BOILER-COMP(3HP OR I(NI,(NIB BTU)
BOILER -COME (OVER 100.000 BTU)
D atricYt
❑Yes KIT.
AIRCONDITUNER
i
I have sand the hawNaus mherhdsmonomers under Chapter ra95 ofrhe Cad i-
NEW RESIDENTIAL MFCIL SQ. FT.
_
-
Rada Health & Safey COd4 Sections 25505, 25533 and 25534. I unde sUaa Wal if the
buildingIncanotcurrentlyhavearenanbthe is myreinout lilytonotify Ihborcupant
❑ DEMOLITION
❑ FOOD SERVICE
$/SQ. HE
n as I, e d 6 BUI1DINGDiVj�fj1aq-1ESS, v* v r V=
PLANCHECK FEE L 0
ENERGY FEE S /�
GRADING FEE
SOILS PEE
PAID
nt Receipt#
IsIx
TOTAL:
ELECT(IC FEE`UOW
PLUMBI e FEE
MECHANICAL FEE
CONS 'IRUC'rION')AN
HOUSING MITIGATION FEE
PAID
- Dore Receipt#
OFFICE
•
•
Brian Kangas Foulk
Engineers • Surveyors • Planners
December 10, 1998
960069-50
Chuck Schoenberger
O'Brien Group
2001 Windward Way, Suite 200
San Mateo, CA 94404
Subject: Oak Valley —Foundation Verification
Dear Chuck,
On December 10, 1998 we performed a field survey of the location of the foundation forms for the
buildings being constructed on Lot 4-18 and Lot 4-287respectively, of the Oak Valley project in Cupertino.
The results of that survey clearly shown that the location of the foundation forms are consistent and in
conformance with the design location of that building as said location is shown on the plans prepared by
our firm.
This letter is intended to provide you with the verification of that unit per our survey. If there are any other
questions concerning that location please do not hesitate to call.
Sincerely,
(� x (ram.
BRIAN KANGAS FOULK
Charles R. Ciardi P.L.S. 7321
Project Manager
Survey Department
o
CHARLES R, CIARDI T
* EXP.9/30/01
a ✓+. No. 7321 .QG
C
540 Price Avenue 9 Redwood City, CA 94063 • (650) 482-6300 9 FAX (650) 482.6399
I
Jan-04-99 02:25P ENGINEERING WEST 408 295 1570 P.01
ENGINEERING WEST INC. Faxed to Frank Culum
OAK VALLEY DEVELOPMENT CUPERTINO, CA. 1-04-99 1 page
1(550)237 - 0075
DATES AT WHICH EACH ELEMENT OF EACH BUILDING WAS OBSERVED
AND FOUND IN SUBSTANTIAL CONFORMANCE WITH THE DRAWINGS.
N.O. : CONSTRUCTION NOT COMPLETELY OBSERVED
N.A. . NO ASPECTS OF CONSTRUCTION OBSERVED.
N.I.C. = NOT IN CONTRACT. NO ASPECTS OF CONSTRUCTION OBSERVED.
e CORRECTIONS REO'D. LIST GIVEN TO CONTRACTOR.
Constriction release 9H
hasel
Lot
I Plan
Base
GARAGE
I F n.
1st floor
Roofply
Ext ply
Basic frmg.
11/13198
12molga
1
13
5C
6
2
09/28/08
10/09/98
11/00/98
11/13/98
12/15/98
1
14
2A
2
1
15
5D
5
1
15
1C
1
1
17
2C
2
1
15
BE
6
3
12/14/98
IZ24198
1
20
4B
4
3/BONUS
12/22/98
11
23
3A
3
11
24
6D
6
11
25
1 60
5
3
12/23/96
i1
26
1 2B
2
1
27
4A
4
1
25
69
6
3
12/14/98
1104M
29
7A
7
2
11/13/08
12/10/98
1
F1
30
3C
3
3
11 N 3/98
12/10/98
1
31
58
5
1
32 1
2D 1
2
NOV 16 '9e '_0:34 BKF—REC4400D CITY
P.2/2
I
I
I
w Brian Kwgas Foulk
Engineers • Surveyors • Pianners
November 13, 1998
960069-30
Chuck Schoenberger
O'Brien Group
2001 Windward Way, Suite 200
San Mateo, CA 94404
Subject: Oak Valley — Foundation Verification
Dear Chuck,
On November 11, 1998 we perfanned a bold survey of the location of the foundatinn forms for the
buildings being constructed on Lot 4-12, Lot 4-29, and Lot 4.30, respectively, of the Oak Valley projoct in
Cupertino.
The results of that survey clearly shown that the location of the foundation forms are consistent and in
conformance with the design location of that building as said location is shown on the plans prepared b;'
our firm.
This letter is intended to provide you with the verification of that unit per our survey. If there are any other
questions concerning that location please do not hesitate to call.
Sincerely,
Ff
�4 .
0
8RA0tEY A, 81t80 'y
RIAN KANGAS FOULK
1=!. [Y.R 3J31/02 'µ
Bradlev A. Bilbo P.L.S, 6141
Na g141 �Q J
Project Manager
l� /
Tt,
Survey Department
Of' C At\Fy�
54C Price Avenu. • Redwocd City, CA S4063 - (650)4B2.8300 • FAA 6501482.6399
Brian Kangas Faulk
Engineers • Surveyors • Planners
A
•
December 10, 1998
960069-50
Chuck Schoenberger
O'Brien Group
2001 Windward Way, Suite 200
San Mateo, CA 94404
Subject: Oak Valley —Foundation Verification
Dear Chuck,
J�OT 28
On December_10,-1998-we.performed a field survey of the location of the foundation forms for the
buildinis being constructed on Lot 4-18 and Lot 4-28, respectively, of the Oak Valley project in Cupertino.
The results of that survey clearly shown that the location of the foundation forms are consistent and in
conformance with the design location of that building as said location is shown on the plans prepared by
our firm.
This letter is intended to provide you with the verification of that unit per our survey. If there are any other
questions concerning that location please do not hesitate to call.
Sincerely,
BRIAN KANGAS FOULK
Charles R. Ciardi P.L.S. 7321
Project Manager
Survey Department
CIiEXP. 9 R. CIARD)I
EXP.9 * /30/Ol 'f
m. No.7321
I
C
540 Price Avenue • Redwood City, CA 94063 9 (650) 482-6300 • FAX (650) 482-6399
-- -- P.O1
408.296 1570
.' �3-99 02:49P ENGINEER:LNG WEST
ENGINEERING WEST INC.
OBSERVATION CHART
OAK VALLEY DEVELOPMENT CUPERTINO, CA. PAGE 1 OF 2
FAX TO PAT BURKE STRAUSS BROB.
0E-03-99 0E-03.99
Bb0 237 •007E 405 267' • 1923
EACH BUILDING WAS
ICH EACH COMPONENT OF
HART
FOUND IN SUBSTANTIAL
THISDANDCONFORMANCE WITH THE DRAWINGS.
LEGEND ■ CON;STRUCTION NOT COMPLETELY OBSERVED
N �O. ■ CORRECTIONS REO'D. LIST GIVEN TO CONTRACTOR.
FDN. STEEL REINFORCING, HOLDOWN ANCHOR BOLT OBSERVATION
1ST FLOOR = UNDIaRFLOOR FRAMING OBSERVATION
PLYWOOD NAILING OBSERVATION
ROOF PLY.
.,, ,.,. UAenwARE OBSERVATION
•
(1) - LOT 13 PLAN EC FUN. (Orrn.a vr,,v,y, — - -
(2) - LOT 25 PLAN SC
GONZO: ITEM 0 10 (NE=D TO GROUT BELOW STEEL FRAME COLUMNS).
(3) - LOT 27 PLAN 40
NEED TO VERIFY FLOOR NAILING ONCE SHREET ROCK IS REMOVED.
(4) - LOT 2S PLAN 2D
NEED TO BUILD LOW ROOF 0 REAR PORCH.
(5) - LOT 26 PLAN 2D
ADD DOUBLE SHEAR WALL
0
Consulting Engineers and Scientists
425 ROLAND WAY
z OAKLAND, CA 94621
r (510) 568-4001
Date PI I
Hours Charged To Project Z Nuclear Density Tests
Field Task NuMber TH I T %+- Concrete Cylinders y'
THE FOLLOWING WAS NOTED:
DATE
Joe NO.
7
L8'/G 7-
/2/ //
PROJECT
LOCATION
-/ rlG
OONIRAOT
OWNER
WEATHER ' ..
TEMP. 5ZPat AM
UG -r-a �,
Gs at PM
PRESENT AT SITE
n ' r,I�
I4h 1-4t ,- I�/` /, ]r-. / I„I1 rl-I.• is In�{C. iv IIII �. �:� Al
C-.Li 17C•/C ')CC'I C,{<G I I ed r-t, If
. I . ., I r, _t , I. I l ,. I— .,—I
COPIES TO
rA, r: <.\\ I- .7V, Jr C_�— ���Cc.�-/�, /'i;��,'Y J�7 r"I'I F//-��n.C'G /---7 C'1I
'iC) CC 1.1 I^11-77,111Gi
I ( i/e 1. , f ,/ `r 11 -' C coo -T
TU C'e�1Cr'PI-c )lc,,--l'IteJ ,J
9 r>. 7pD0SIGNED���
CLIENT
67-
MAY-25-88 10:48 FROM:COAST INSULATION, ID:406 288 3786 PAGE 2/2
Ila
INSULATION CER71FlCA710N
T, :s'S -= ` fir:'7w b xr. L-zaWeC in cardomave with the current energy regulations,
3cx ie, Trtte 24, State of die jb%us�dmg located at
F — 1�Ct t]w9!' CORNINQ` Thickr Frypo ' ,.�.5. -�
R-Value `
::nr oe�Ls CORNINs� ndcivress Type 3 /z a-V4. l 3
9A-5 Mas rer -Q QBHIHSa._ Th clmeftType V91ue d
I � I
37lYti ,g _ ,s C(SRNIN� TWdvless we qi Fl-Yaks
+�9x gas ss S4 FL Covered / 5 ::PL- # gags Used l '
AF SEAc -r ?4ST A FD: YES NO
LICENSE # _
DATE:
COAST IN U ON CONTRACTORS, INC. LICENSE #
TITLE:
DATE: _
•
O'BRIEN
GROU P
Patrick Burke
From: Jim Ripley[SMTP:ripleydg@pacbell.net]
'Sent: Monday, March 08, 1999 2:26 AM
To: PAT BURKE
Subject: OAK VALLEY
Pat Burke
Oak Valley
Cupertino, CA.
Reference: Linear parkway planting.
Pat,
All plantings within the linear park are consistent with the landscape
construction documents prepared by this office and reviewed by the city
on March 1998 and conform with the preliminary approval douments.
James A. Ripley
Ripley Design Group, Inc.
•
FINAL PLANNING SIGN OFF
DATE �Za 6/ 5
SIGNATURE
2001 WINWARD WAY, SUITE 200, SAN MATEO, CALIFORNIA 94404-2473 TELEPHONE (650) 377-0300 FACSIMILE (650) 349-2442
LJ
Il
C�
0
Brian Kangas Faulk
Engineers • Surveyors • Planners
December 10, 1998
960069-50
Chuck Schoenberger
O'Brien Group
2001 Windward Way, Suite 200
San Mateo, CA 94404
Subject: Oak Valley — Foundation Verification
Dear Chuck,
On December 10, 1998 we performed a field.survey.of-the location of the foundation forms for the
buildings being constructed on Lot 4.18 and Lot 4-28,.respectively, of the Oak Valley project in Cupertino.
The results of that survey clearly shown that the location of the foundation forms are consistent and in
conformance with the design location of that building as said location is shown on the plans prepared by
our firm.
This letter is intended to provide you with the verification of that unit per our survey. If there are any other
questions concerning that location please do not hesitate to call.
Sincerely,
SAND
BRIAN KANGAS FOULK CHARLES R. CIARDI ='
Charles R. Ciardi P.L.S. 7321 EXP. 9/30/01 'f
Project Manager Q
sNo.1321
Survey Department rgl
F OF r h\-\F
540 Price Avenue • Redwood City, CA 94063 • (6501482-6300 • FAX (650) 482.6399
Consulting Engineers and Scientists
425 ROLAND WAY
OAKLAND, CA 94621
, (510) 568-4001
TO c'' l >,„
Date L�1'/'PII 1 1J� ll I l 7g7 ({ /-,-, V
Hours Charged To Project '7- Nuclear Density Teats
FWk Number -rH I TLI 2 Concrete Cylinders
THE FOLLOWING WAS NOTED:
DATE
JOB NO.
PRQ ECT
LOCATION
c �l rIG
CONTRACT
OWNER
WEATHER
TEMP. jVat AM
r, Jej-ce, .F'
Gs at PM
PRESENT AT SrTE
.-4
7e
_J 'J
111 1. t I!, , .. �. i.. r.,/
,Q.il', _._ObSe,- Je 7-f.lnl— nr/ rrrr.l��-Tn. 1.
\ rCl ,. -'rt' N .I- I) l-fr If (^ it G/C ItCCI C1P(I '-d
�n�r IGI-CA 1/16{fI tr, i.T rCLI--,r,� 1-,.r, IA (P-0e,,!- rn. r� r �
IYr( ''ro(- mil! >I r�( ,�n, Iy of / (�CL
e /-f:mn ,arc._?e., i'.1 J(r,( orl. /- if-'t
T c�'Ce' .-G< ( I .G e
-i r-T_.-) , 4.,1-, 1.
/�I7/`f' �C� ' �i•:1$ AcdoI GJb7'J,11, r. c,I„
"'f- rN \ ;11-< LaJ-II VPr ' Fv T1v
V
�"-' I I-), ,i TL' fl'!� lei 'e I-[ t J/C"^T-r1 Lf, c I )--
s
COPIES TO. [FO CE LD o Lf' o
SIGNED : ��
CLIENT
u
Dail lo-Aey 6 N/Av wWA Pe w/Ahev7' .VNLX�`
INSTALLATION CERTIFICATE (page 1 of 4) — CF-611
Ah '
An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The
information provided on this form is required; however, use of this form to provide the information is optional.) After
completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at
occupancy, per Section 10-103(b).
HVA - SYMMS:
Heating Equipment
Equip, 11 of
Type (pkg. ' CEC Certified Mrr Name Identical
Efficiency Duct Duct or Heating Heating
AFUE, etc.)' Location Piping Load ` Capacity
m 9AAdm7o -1.7
9109 !p—
t�le dA. 7—�`-
Cooling Equipment
Equip. CEC Certified Compressor s of
Efficiency
Duct
Cooling Cooling
Type (pkg. Unit Mfr Name and Identical
(SEER etc.)'
. .
Location Duct
._—_._• v....,...
Load Capacity
rn'WhA rRtullvy
- �- -- � - �i.
� (� r T
T3L7JL— �— �O S�°+a2 ��
1. >_ reads greater than or equal to.
I, the undersigned, verify that equipment listed above is; 1) is the actual equipment installed, 2) equivalent to or more
efficient than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy
Vciency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for
inufactured devices (from the Appliance Efficiency Regulations or Part.6), where applicable.
Signature, Date
Distribution IfRecir-
Heater CEC Certified Mfr Type (Std, eulation,
Type - Name & Model Number Point -or --Use) Control Ty,
LaQIQ,�i/.n qy 412,00
Installing Subcontractor (Co. Name)
OR General Contractor (Co. Name) OR Owner
0 of Rated' Tank Effi- External
critical Lnput(kW Volume eiencys Standby' Insulation
-. n,.dhA f.Annjal (EF. RE) Lass fY.) R-value
2 For small gas storage (rated input oriels than or equal l0 75,000 Btw1u), electric resistance and heat pump water heaters, list Energy Factor.
For large gat storage water heaters (rated input of greater than 75,000 BrWhr), list Recovery Efficiency, Standby Loss and Rated InpuL
For instantaneous gas water heaters, list Recovery Efficiency and Rated Input
Faucets & Shower Heads:
All faucets and showerheads installed are certified to the Commission, pursuant to Title 24. Part 6, Subchapter 2, Section
Ill.
1, the undersigned, verify that equipment listed above my signature: I) is the actual equipment installed; 2) is equivalent
to or more efficient than that specified in the certificate of compliance (Form CF-IR) submitted for compliance with the
Energy Ej1ciency Standards for residential buildings; and 3) the equipment meets or exceeds the appropriate requirements
for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable.
Signature, Date,
COPY TO: Building Department
Building Owner at Occupancy
0
Installing Subcontractor (Co. Name) OR
General Contractor (Co. Name) OR Owner
A-o:.�d Morrh 1. 1996
408 295 1570
03-99 02:49P ENGINEERILNG WEST
P,Ol
• ENGINEERING WEST C.
OBSERVATION CHART
OAK VALLEY DEVELOPMENT CUPERTINO, CA. PAGE / OF 2
FAX TO PAT BUR=8TRAU8s BR06.05-07-9Y650 237 ' • 1923
CH EACH COMPONENT OF EACH GUIL
THIS CHART
INDICATES IN SUBSTANTIAL AT ICONFORMANCE WITH THE DRAWINGS`DIN3 WAS
OBSFOUND
LEGEND a CONSTRUCTION NOT COMPLETELY OBSERVED
N.C. ■ CORRECTIONS REQ'D. LIST GIVEN TO CONTRACTOR.
FDN. a STEEL REINFORCING, HOLDOWN ANCHOR BOLT OBSERVATION
1ST FLOOR = UNDIERFLOOR FRAMING OBSERVATION
e^^a 01 v PLYWOOD NAILING OB nmwsaF oRSERVATION
•
(2) • LOT 25 PLAN SC
GONZO: ITEM 0 10 ( NEED TO GROUT BELOW STEEL FRAME COL
(3)' LOT 27 PLAN 4C
NEED TO VERIFY FLOOR NAILING ONCE SHREET ROCK IS REMOVED.
(4) • LOT 26 PLAN 2D REAR PORCH.
NEED TO BUILD LOW ROOF
(5)' LOT 26 PLAN 2D
ADD DOUBLE SHEAR WALL
•
---lop" Morrh 1. 1996
0
07BRIEN
GROUP
YN IYn YYI AV
From: Jim Ripley(SMTP:ripleydg@pacbell.not]
Sent: Monday, March 08, 1999 2:26 AM
To: PAT BURKE
Subject: OAK VALLEY
• Pat Burke
Oak Valley
Cupertino, CA,
Reference: Linear parkway planting,
Pat,
All plantings within the linear park are consistent with the landscape
construction documents prepared by this office and reviewed by the city
on March 1998 and conform with the preliminary approval douments.
James A. Ripley
Ripley Design Group, Inc.
n
L i
2001 WINWARD WAY
0
SUITE 200, SAN MATEO, CALIFORNIA 94404-2473 TELEPHONE (650) 377-0300 FACSIMILE (650) 349-2442
R nviaad Marrh 1. 1996
•
•
8 - aa�ar reel;, , r-
sns Pwhgw alft,_ . M ftnaz CA S45M
INSULATION CERTIFICATION
This 15 to certify that trlsulatfon has been installed in conformance► With the current energy reguiadons,
California Administrative Code, Title 24, State of California, the buildin13 located ar.
SRE ADDRESS:,, t }� ( /. 11 n . f
FLOORS:
p y
Manufacturer OWEN$ P(1Ruiur_ Thlckness/Type! (f r r ^Value f �7 �j
EXTERIOR WALLS: ���—TadL'aLC'
Manufacturer OVYENc r r+RNIf�G :_ 7hlcknoss/Ty_ R-Value_
CEILINGS:
BATTS: Manutarzlr rtr 1 — �;
Thiclmass/ry. e -_ % �([ R-Value ��l � a/
BLOWN: Manufacturer ��yS CORNING ThicknesslT r �'"` 7
YP8 .�� r! R-Value
• WeightlBeg as Sq. Ft. Covered # Bags Used
AIR INFILTRATION SEALANT INSTALLED; YES9 �NjO
GENERAL CONTRACTOR � (ifs %
BY: ICENSE #
TITLE: "�''9Pf�r`
DATE:
COAST INSU ON CONTRACTORS, INC. LICENSE #
BY: - TITLE- 0
DATE:
E/E 8owd BBLE BBZ eov'oI NoTIVIrIGNI ,LGV00:W08d b9zEL BB-CO-NnP