CC Resolution No. 3730 RESOLUTION N0. 3730
A RESOLUTION OF THE~CITY COUNCIL OF THE CITY OF CUPERTINO
I AUTHORIZING THE MAYOR AND THE CITY CLERK TO~EXECUTE AN
AGREEMENT~ BETWEEN THE CITY OF CUPERTINO AND THE CITY OF
SAN JOSE FOR A COOPERATIVE PROJECT TO INSTALL STORM DRAIN
FACILITIES AND FOR RESURFACING OF A
PORTION OF BOLLINGER ROAD
WHEREAS, the City of San Jose is proposing to construct certain storm
drain facilities on $ollinger Road between Avondale and Calabazas Creek;
and
WHEREAS, a portion of Bollinger Road is within the corporate limits of
the City of Cupertino, and ~
WHEREAS, Cupertino and San Jose have both had flooding problems on Bol- .
linger Road in the area between Avondale and Blaney, and the City is desirous
of having said storm drain facilities put in at the same time as' the balance
of the project withiri the'corporate limits of San Jose is constructed; and
WHEREAS, Cupertino is desirous of having said portion of Bollinger Road
within the corporate limits of Cupertino resur.faced at the same time as the
balance of the project within the corporate limits of San Jose is resurfaced;
and
WHEREAS, there has been presented to the City Council an agreement by and
between the City of Cupertino and the City 'of San Jose for the resurfacing of
Bollinger Road and the provisions and conditions therein have been approved
by the Director of Public Works and the City Attorney;
• NOWr THEREFORE, BE IT RESOLVED that the Mayor and the City Clerk are
hereby authorized to execute the agreement hereiri referred to in behalf of
the City of Cupertino. ~
PASSED AND ADOPTED at a regular meeting of the City Council of the City
of Cupertino this 4th day of Sentember , 1974, by the following vote:
Vote Members of the City Council
AYES: Frolich, Jackson, Meyers, Nellis, Sparks
NOES~ None
ABSENT: None
ABSTAIN: None
ATTESTt APPROVED:
/s/ Wm. E. Rvder /s/ Reed ~arks
Ci,ty~Clerk Mayor, City of Cupertino