AGENDA ITEM
Summary
AGENDA DATE June 2~ 2003
SUBJECT AND ISSUE
Monthly Status Report - Cupertino Civic Center and Library Project
BACKGROUND
Phase I Proiect Status
The Phase I contract is now substantially complete. The final cost at project close, out is
now estimated to be approximately $475,000. The site is now ready for the building
contract phase.
Phase II Proiect Status - Extension of Bid Opening/Contract Award
The Phase II (Buildings and Plaza) bid package was advertised on April 15, 2003 and the
bid opening date has been extended (from the original bid opening date of May 22, 2003)
to a bid opening on June 10, 2003. The schedule requires that the contract be awarded in
June 2003 to maintain the enmplefion date of October of 2004. Presuming acceptable
bids, staff would expect to forward the contract award for Council consideration at the
regular Council meeting of June 16, 2003.
Because of the short turnaround time between bid opening and Council agenda
preparation, the Council agenda packet will contain a background memorandum as a
"place-holder" for the agenda item. Once the low bidder has been determined and
qualified, a supplemental memorandum will be forwarded to the Council with the
specifies of a recommendation for the award of the contract. Should the evaluation and
qualification of bidders take longer than the time required to submit the recommendations
for award at the June 16 meeting, staff will recommend that the Council adjourn the
meeting to a subsequent date for consideration of this one item prior to June 30, 2003.
printed on Recycled Paper
Add Alternates and Value Engfneering
As staff has previously advised the Council, if the construction bids are sufficiently low,
staff will first recommend that the add altemates, in priority order, ($350,000) be
included in the project.
Secondly, the priority value engineering reductions ($345,000) noted in last months
report may also be recommended for inclusion back into the project as the low bid may
allow. The listings of each of these "add-backs" provided to the Council in earlier status
reports are attached to this report.
Budget Summary
Program Budget (Library, Plaza & Commllrlity Hall)
(Less) Commun/ty Fund Raising Commitment (2~F&E)
$25,500,000
(1,200,000)
Balance Project Budget (Approved Aug 2001)
$ 24,300,000
Proiect Expenditure Estimates - No Change from the April Report
Budget estimates: Arckitectural Consultants - Design
Architectural Consultants - Construction
Consmacfion Management (CM) Consultants
Specialty Consultants (AV, GeoTech, etc.)
Temporary Library
Phase I Construction Contract
Phase 1I Project
2,450,000*
650,000*
900,000
300,000
500,000
475,000
19,025;000'*
Total Project Estimate
$24,300,000
*The cost of the Architectural services remains at $3,100,000 anticipating the final
amendment of $650,000 to the Architects contract for their continued design and
architectural review during construction.
**As noted previously the Phase II construction project estimate is $16,800,000.
. However, there a number of items that are being purchased and installed separately
during the course of the contract as well as a constructiOn contingency for unforeseen
conditions or unknown changes to the project that may be required during the 16-
month construction period to ensure its completion as the scope and design had
originally intended. These all add up to the Phase II Project estimate of $19,025,000.
Furniture, Fixtures and Equipment (FF&E)
At the request of Mayor Chang, the original report from the Library Department on FF&E
costs is attached to this report.
The Library staff had analyzed the library furniture requirements (using the Libris Design
sot~are program developed for that purpose) for the 54,000 square foot facility program
in the current approved library design.
Essentially these costs break down into three areas:
New Furniture needs that could be met with used
Furuiture from the old library
$ 104,311
New FF&E that must be purchased
$ 707,569
New Shelving that must be purchased
$. 394,750
Total FF&E
$ 1,206,630
This forms the basis of the original $1.2 Million FF&E fundraising target. Although the
report is now about 9 months old, there was an escalation contingency allocated to the
costs such that they are still considered valid estimates. As noted previously, tiffs
approach assumes that the Library Department would be responsible for the acquisition
and procurement of these materials. The City would provide minimal design consultation
services to ensure that selected FF&E is compatible and complementary to the library
architecture and design.
The City staff had noted previously that the funding availability for acquisition of the
FF&E should be determined in the fall of 2003 (October-November) to ensure sufficient
lead time for selection, acquisition, shipping and installation prior to the project
· completion date of October 2004.
Submitted by:
Approved for submission:
David W. Knapp
City Manager
SANTA CLARA COL.qTY LIBRARY
109:5 North Seventh Strut · San Joso, CA 95112 ~ ~.~.5 · (408) 293-2326 · (408} g$7-9826 FAX
DATE: September 6, 2002.
TO: . Ralph Qualls,.Publio Works Director
I und=~'tand that the Council is inmst~ in how tho fumitu~ mst os~r.~t, was
d~v¢loped and ~ isin¢lu&~ I am pl=ased to outtl~o tho process for th~k information.
Original LizI of 2~eed~d Furniture
The original h2mry design program was writtm by David Smith, a library deign
consultant, in 1998 and accvpted by th~ City Council in 1999. That document outlined'
all tho furn~hi-~ and fixtures tl~ would I~ ne~led in th~ n~w library. Copies of tho
original program were givem to the Council when it was crated .~d are ava/labl¢ from
the l. alx~ry on reclu~
o~i~-~,l program docum~ but otherwis~ all the f~tur~ ~ como f~om that
Cost Estimatez for the Furniture
In 2001, th~ California 8ta~ Library rele. ased a computrr program called ~Libris Design~
which was created to h~lp public h'brari=s in tho Stat, c~ate h'brary design programs_
Part ofth~ program w~ s cardully r~scerch~ price list of all known typ~ of library
furnitu~. ·
Libris Design Offvrs throe cost ¢~m~te options: low, mo&t-ac, and high. Richard Hall,
tl~ author of the Libri~ De.s/gn program; rocomrne~cls using the 'modesty' cost o~r~
male. ss ~he project is known to have insurmountable t~.~rl~.g problems or s~o~it%ant
sourc~ of fumitur~ funding.
At the i~l,_._~st of the City staff; the IJbm-y used the cost ~t~s of Libris Design to
devdop areasonablebudgot for th, approved fumitur*. Thhlistis attachocL Prices
~ are based on tho 'moa..era~' solection of price.
Saratoga Library Er~riena~
As you may know, the City of garatoga is building a new L/bray which ~ b~
complY;cd in the Spr~- The new ~aratoga La'brary has ordcrcd or r~¢fv~l bids on ail of
If the price or bid for any pi~e of i~rm~mrc diffcr~l from thc Libr~ Design estimates, wc
mot~fi~l the Cupcr~o fumitu~ cost ~ to m~h th~ known costs of th= Saratoga
ftnmitta~. Th{s.wa~ n~w. cssary only ~n a few cases, as thc Libri~ Deign costs hay=
As ILntcd on thc attached.ck't~ she~ th~ incremental cos'ts for fr~i~t, shipping and sal~s
mx hav= boca included for the C'upc'dao fumimrc.
Potential Co~t Sm, in, for FurnJna'e
Thc Ia'br~ has idcnf~ficd ~xi~.g f-a~tur~ which could b= r~-us~t in thc new Library.
All fumitm~ currently in r~aso-~hl¢ condition is ILstr. d separately on the dcudl sh~ct as
items that may not ~ to bc r~plac~L Should fundrak~g effor~ not mcct thcir cntir~
goal, this ~ould b~ a ~ to redu~ th~ mount ne~suary to opm th~ near h'brary.
~ar will have impaaed ltz appemrance of our existing fumiV, u~.
The Library staffwel~om~s th~ Coundl's suggestions or ideas on th~ f-umlh~ p~u._ We
b~li~ve tl~ -~-hed listiag is a r~asonable astima~ of ~osts for th~ idmtifi~ h3rar/
Tc~l
Stacldng thai'
Total'
stand
Total
Eb~ unio worksL
sit-down
Elco'aortic work~
stand-up
Total
Electronic workst.
instructor
Lounge chair
Total
Total
Sofa
Total
1-piam table
" Total
2-piam table
Total
. ,Children's chairs
'":' (Adult size)
Total
Story Room
Adult Ref.
Child. Area
Adult Ref.
Bus. Ret'.
CWA
Med',=
Mag~,zine
Young AduR
Adult Ref. -
Intsmational
Browsing
Adult General
Media
Ins'a'. Ama
Children's size
Intamalbnal
Browsing
Adult General
Young Adult
CWA
Parent comer .
2-pia=e Childr.
CWA
Adult General
Magazines
Chlldan's Ama
Adult
2..piace tables
Group study
Cupertino Ubrary
Furniture and Shelving
Items
4
2
$
4O
4O
1
28
14
4
1
4
81
6
2
4
10
2
25
185
185
1
1
6
2
6
2
2
38
2
2
4
25
2O
53
5
27
10
24
Ba~e Cost incl.
COSt Tmc, Freight
Each im~tallation
450 ~8
~0 ~
178 225
735
1080
1080
1080
1080
1080
1080
1080
34O
34O
340
34O
33O
1080
1000
100O
1000
100O
1000
1000
100O
1755
760
76O
760
760
950
960
~20
320
1354
1284
1354
1354
1364
1354
1364
429
429
429
429
429
417
1364
1262
1262
1262
1262
1262
1262
1262
2215
969
969
969
969
1212
1212
402
4O2
15%
Furniture
Contingency
I
Total Type
Cost Tot:id
I
653 2813
653 1
$3,919
259 10350
$10,3,50
9~
$9~2
15~9 21960
1~9 12,~9
1 ,~9 6274
1 ~$9 1
1569 12~9
$105,096
493 987
493 1973
496 4934
493 967
$11,840
4BO 88717
$88,717
156g l~g
$1,5~9
1451 5708
1451 2903
1451 23221
1451 8708
1451 8708
1451 2903
1451 2903
2548 5097
$5,097
1103 4411
.1103 27571
1103 4411
1103 22057
$58,451
1394 6969
1394 36239
$43,208
462 11095
$15,718
9/~/02 1 "
Item
Children's chaim
4-p~ac~ table
Book truck
Depre~slble return
bins
File cabhets
EiecL Workstations
Dishwasher .
Task ahair
Guest Chaim
Total
Ama of
Ilbml7
Mid-size ohJldr.
Pre,,~:~'~31
Mid--s~ ch~dr.
· A size ~hlldr.
Child. Group
Preschocd
Intamat~nal.
Adult General
· Magaz~es
Young Adult ·
Group Study
Total
Total
Total
To~al
Total
Cupe~no Ubrary
Furniture and Shelving
Total
Total
Total
Total
Total
# Ba~e Cost in=L
of cost Tax, Freight
Item~ Eaoh l~--{allati~n
24 230 290 334
16 198 250 288
6 1190 1502 1727
2 1290 1628 1872
$ 1290 . 1628 1872
4 1190 1502 1727
1 1290 .1625 1872
B 12~0 1628 1872
1 1290 1 628 1872
1 1290 1 628 1872
6 1290 1 ~ 1872
35
40 210 250 288
Ream Ama 5 6{~0 830
Circ. Dank 4 560 830
12
Chlld. Workrm 2 1610 1610
b-'taft Copier 3 475 475
Adult workrm 2 475 475
5
Staff Break Rm 4 1200 1200
4.
Circ~ Woda'm 11 2504 2504
Circ. Supv. 1 3967 3967
Child. Wrkrm 6 2873 2873
Child. Pgm. Ln 1 39~7 3967
Corn. Lib. b-'Dy. 1 7500 7500
A Pgm I.ibn 1 3967 3967
Adult Wrkrm 12 2873 2873
Dern~y Ama 1 2504 2504
955
955
1852
1380
2BBO
4562
3304
4562
8625
4562
33O4
2BB0
b-'taft Break 1 BO0 800 920
Staff Break P,m 1 350 350 403
.~ssigned 15. 583 583 670
General 28 456 456 524
Clt~ Supv. 2 203 208 239
Child. Pgm. I.~ 2 208 208 239
Com. Mb. b"pv. 2 208 208 239
Adult Pgm. Ln 2 208 208 239
B
Total
Co~t
3004
4630
10354
3744
11233
6909
1872
14978
· 1872
1872
11233
11500
5'727
3818
3703
1639
1093
5520
31676
4562
19824
4562
5625
4562
39647
2880
92O
4~3
10O57
146~3
478
47B
478
478
Type
Total
$12,S04
$92,400
$11,500
$9,545
~S,434
$5,520
$118,337
. $BO0
$350
$24,740
$1,914
9/~/02 2
Cupe~no Ubrary
FumRure and Shelving
Worktable/ Circ. Workn'n 3
2 cha~ Child. Wd~rm 1
4x4' Circ. Workrm 1
Child. Wrknn 1
· Adult Wda'm 1
Total 7
Sofa Staff Break Rm 1
Total
Lounga cha'a' Staff Break Rm 2
.'rot3d 2
Supply/storage Child. Wrkrm 1
cabinet Comm. lb. Spy. 1
Staff Copier 2
Adult Wrkrm 1
Total 5
Lockers Staff Braak Rm BO
Total
Outdoor ~ole ~:aff Patio 1
& chairs/umbrella
· Total 1
':~ .~ :~ubl~al Fumltum that Mu~ be Purchased
Ea=h
1500
1500
5OO
5OO
5OO
1500
750
BOO
8O0
800
800
50
20O0
Cost incL
Tm~, Freight
Installeti~n
· 1500
1500
SOO
500
500
1500
750
800
808
808
5O
Total Type
Cost Total
1725' 5175
1725 .1725
575 575
575 575
575 575
$8,825
1725 1725
$1,725
853 1725
$1,725
920 r~20
g20 g20
920 1840
920 920
$4,500
58 3450
$3,450
2300 2300
$2,300
$7OT,SSe
Could I~use
Folding Table
Pocfium wK~ght &
mia~Pho~e
Ao¥ cart
Chair dolly
Seff-.ch~:~; unit
Desktop data
Diclionary stand
Book trucks Ail
Map file cabin~ All
Vending Mac~' Staff Break Rm
Book case Corn. lb. ~pv.
Confamnce Table Staff Conf. P,m
Conference Chalm Staff Conf. Rm
Ta~k Chaim All
'~.~" :Afia~ Stand Adult Ref.
· ' Index Table Adult Ref.
Supphj cabinet All
Story Room 8
Story Room
35O
1 574
St~j Room 1 265
~ Room 3 215
Circ. Ama 2 23000
In,~'. Ama
1
1
55
7
23
2
2
1
1
15
7
1
1
3
5000
753
210
475
2000
2500
208
456
753
2380
800
350 403 3220
724 833 833
334 354 384
271 312 g35
· 23000 2&450 52900
5000 8750 8750
BM 982 982
B0 ~B 15813
4~ 546 3824
2000 2300 4800
2500 2875 2875
208 239 3827
458 524 3671
854 982 982
3004 3455 3455
BOO 920 2760
3
Subte~l
GRAND TOTAL
Item
Shelving Ul:~aty
C~uld Reu~e
90"h DF
90"h SF
66"h DF
66"h SF
45"h DF
45"h SF
A Fr-~'~e
Area of
162
22
54
17
38
13
24
Shelving which Must be Purchased
90"h DF
90"h SF
72"h SF
66"h DF
~6"h SF
45"h DF
45"h SF
Indust3'ial
Equipment Rack
A Frame
Total
All
A~
Circ Desk
NI
Ail
Ail
A~
NI
A~
Cupertino Library
Furniture and Shelving
# Base Cost Incl.
of cost Tax; Freight
Items Each Ir~tallation
Total
Cost
440
5
40
g0
1
48
12
21
1
575
350
350
620
325
500
250
275
3OO
800
253000
1750
14000
55800
325
24000
30OO
5775
3O0
3OB00
$106,810
$814.378
Type
$394,750
$¶,2OO,128
9/~02 4