.03 U-2007-06 Cupertino Village
CITY OF CUPERTINO
10300 Torre Avenue, Cupertino, California 95014
DEPARTMENT OF COMMUNITY DEVELOPMENT REPORT FORM
Application: U-2007-06, ASA-2007-10 (EA-2007-08) Agenda Date: November 13,2007
Applicant: Brian Replinger (Cupertino Village)
Location: Homestead Road and Wolf Road
APPLICATION SUMMARIES:
USE PERMIT and ARCHITECTURAL & SITE APPROVAL to construct two one-story
retail buildings totaling 24,455 square feet and a two level parking structure.
RECOMMENDATION:
The Planning Commission should take the following actions:
1. Take public input and evaluate the issues of the project; and
2. Provide feedback to the applicant and staff; and
3. Continue the item to a date certain to allow sufficient time for the applicant to
respond to the Planning Commission input and provide a recommendation to
the City Council.
The project will be reviewed by the Environmental Review Committee (ERC) on
November 14,2007. The Planning Commission can not take action until ERC provides
findings for the environmental considerations.
BACKGROUND:
Kimco Realty was founded in 1960 and is the nation's largest publicly traded owner and
operator of neighborhood and community shopping centers with more than 1,500
properties through out 45 states and several countries. Kimco recently acquired the
Cupertino Village Shopping Center from the former owner, Sand Hill Properties
Company. The Cupertino Village Shopping Center is located at the southeast corner of
Homestead and Wolfe Road. The applicant, Brian Replinger of Kimco, is requesting
approval to construct two one-story retail buildings and a two level parking structure at
the existing shopping center.
GENERAL PLAN:
The project site is located in the Valko Park North area. According to the General Plan,
there are only 5,341 square feet of commercial development allocation left for this area.
This means that the project still needs 19,114 square feet in order to facilitate the
proposed expansion. According to the General Plan Policy 2-20 (strategy 4), allocations
may be redistributed from one geographical area to another if necessary and if no
significant environmental impacts, particularly traffic, are identified. The applicant is
requesting that the remaining 19,114 square feet of commercial square feet be
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village S110pping Center
Page 2
redistributed from the Vallco Park South area, which currently has 791,846 square feet
of commercial development allocation available.
DISCUSSION:
Site Design
The shopping center comprises three parcels wit11 seven existing retail/ commercial
office buildings. Four of the main buildings are connected by an i11terior court yard
system and the remaining satellite buildings are at the perimeter of the center along
Wolfe Road. T11e project proposes two new retail buildings (buildiI1gs. A al1d B), 14,000
sq. ft. and 10,500 sq. ft. in size, respectively. The project also proposes to delete one of
the existing driveways along Wolfe Road to accommodate Building A. Building B will
be located at the southwest corner of the shopping center, approxiInately 50 feet from
t11e existing apartment development (Avalon). The proposed two-level new parking
garage will be located along the westerly property line acting as a buffer betweel1 the
Linnet Lane residential neighborhood and the shopping center (see diagram below).
~~:~.=.:=.._==:=:'=':C~,~_._-::~'l
2-Level Parking
Garage ~ ~-:-_~~" .,
:~~;;..".,!;i1$~' .,
.~ ";~~' ,~,,~,:f~
...__~. n. .
. !
~Cl) EXlS1lNG
18:'P~:SfJ.U.5 lli' "~:iTo\ll..."
3li,5ll4 ar ,...l\tQN.. Ol:!CI\
I . '\
I
!
.~!t7 .1 ,-~.
CUPERTINO VILLAGE
Neighbo1/1hood Connection
Enhal1ciI1g neighborhood connectivity and creating a walkable city are guiding
priI1ciples in the City of Cupertino General Plan (Guidil1g PriI1ciples 3 and 4). In
additiol1, providing pedestrian access via paths and trails also enhances the community
iI1terface between uses and encourages alternatives means of transportation resulting in
reduced number of automobile trips (General Plan Policy 4-2, Strategy 1; Policy 5-1).
Currently there are two pedestrian access points along the westerly property boundary
from the adjacent residential neighbor11ood to the west (see diagram below).
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 3
- - - -
-<~~-~ ~ - ~.-~ ~ ~'.- '~~'~'~~-':-~"-T- ~~ II r~ ~I
II':J ''''-''.. /0' >", ,~,~ L,'~\j []~bll'
./,,- "'~ ~ /") I ~.,,,,^ ,,~~ ~ ] I
I' - _,'ii':;J... ) ~ ' '. ,~I ~ .t:""
'.0",:\
/ ~ ~~~
i """ '-', " . . ":1 .-~' ". '
---t, f~~:;.".~~ r' ~
:::::--=---".' 'l,t: / .,; .. -'".-l
_ ',:;"if/::r.:'# 'v"" .
1 :~-'~!r' . \;<I;~~,::~' ~-~ / ./ /. .. A" "'~t/-
I ~--ro' I' ~ " .II, ..;;. a:: ~ t '
;, · -"~L-'-~~.~~ ..,,';:-.....~-::~. :~<~~~~~,~~:,~,_, ,h~..~~..'.~~;
. I
I
The project proposes to delete the access closest to the church (north.) and provide an.
enhanced pedestrian. entran.ce at the center of the garage (t11rough a tun11el passage
way) near mid-block of Linnet La11e where Lark Lane intersects with Lin11et Lane. A
second pedestrian entry is proposed near the southwestcor11er of t11e center desig11ed to
serve as a11 emergency fire truck access with break away bollards at the request of the
Fire Departme11t. Tl1e proposed pedestrian access points along the westerly property
boundary are desirable and consistent with the City's Ge11eral Plan goal of promoting
neighborhood connectivity.
fIJ2"~ a!AU.S tl)1 ~~Nt>:ST"'J.1\
Ped. Access .
. -1
..:....1 I'
I
.l6.S(M SF ,.HllU>I:o. (l(CI',
I
,: ,I:;
A1"chitt-l.-l-ul ~ "
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 4
The design and the general architectural detailing of the new buildings will compliment
and enhance the existing center. The City's architectural consultant has reviewed the
project and provides the following minor suggestions:
1. Consider a second stair from the upper level of the garage to the ground level to
discourage pedestrians from using auto ramps at the north end of the garage.
2. Consider widening the ground level garage entry at the north end (unless it will
serve only as exiting).
3. Plant additional shading trees and enhance the existing landscaping wherever
possible throughout the entire center.
4. Repeat the arch element through out all of the pedestrian entrances.
5. Add pedestrian walk (special paving material) between building A and existing
buildings.
6. Details should be provided on how stucco wall top is finished off (avoid sheet
metal cap flashing).
If the Planning Commission finds merits in these suggestions, staff recommends that
they be incorporated as conditions of the project and that revised plans be reviewed and
approved by Design Review Committee prior to issuance of building permits.
Other Enhancements
Other site enhancements that should be incorporated into the project are as follows:
Bus Shelters: There are currently two bus stops along Wolfe Road. One of the bus stops
is located near the intersection of Homestead and Wolfe. This bus stop will be relocated
to the south of the entrance drive in front of Starbucks Coffee in order to promote safer
vehicular movement. The site plan already reflects this change. In addition, staff
suggests that the project be required to design and build appropriate bus stop shelters
at the two bus stops. The final bus shelter design and location shall be reviewed and
approved by the Public Works Department to the Valley Transportation Authority's
(VTA) specification.
Reconstruction of Sidewalk: In order to prolong the life of the double row of Ash Trees
along Wolfe Road and the street trees along Homestead Road, the existing perimeter
sidewalk should be replaced with a new at-grade sidewalk to facilitate proper root
growth and reduce future uplifting of the sidewalk. All monolithic sidewalks shall be
replaced with detached sidewalk (except in situations where trees are in the way or
special physical! functional constraints warrants special consideration by the Director of
Community Development). Unused driveway curb cuts, unnecessary and unsafe curb
features or tree wells shall be eliminated.
Corner Plaza Enhancements: The project shall enhance the corner areas at the
intersections of Pruneridge/Wolfe and Wolfe/Homestead. Said areas shall be
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 5
enhanced with special paving material, appropriate landscaping and sidewalk features
and potentially benches or art features as determined by the City in order to improve
the pedestrian experience and overall aesthetic of the site. A detailed corner plaza
enhancement plan shall be submitted for review and approval by the Design Review
Committee prior to issuance of building permits. The proposed site plan already
acknowledges the plaza.
Enhancements to the Interior Crosswalks: The applicant shall work with staff to
determine areas within the existing shopping center that should be better delineated as
special pedestrian walks or crossing areas. Such areas shall be enhanced with special
paving materials and striping. Detailed plans shall be reviewed and approved by the
Design Review Committee prior to issuance of building permits.
Parking Lot Shading Trees: The applicant shall work with staff to provide new parking
lot shading trees to the maximum extent possible through out the entire shopping
center. Detailed parking lot landscaping plan shall be approved by Design Review
Committee prior to issuance of building permits.
Trash Enclosure Size and Location: A detailed trash enclosure plans shall be submitted
to the City for review prior to issuance of building permits. New trash enclosures shall
be located away from the residential neighborhood as far as possible. The final trash
enclosure plan shall be reviewed by the City prior to issuance of building permits.
Parking
Cupertino Village Shopping Center is an extremely successful shopping center. As with
any successful center, determining the appropriate amount of parking to meet the
demand is always a challenging task since parking ratios in general do not account for
success. From an environmental/ smart growth perspective, shopping centers should
not be over-parked in order to minimize excessive paving area, reduce urban run-off,
and promote alternative means of transportation to benefit air quality. Also, the
parking demand of a shopping center may fluctuate depending on the time of day,
season of the year, weather and even by the economy (since retail/restaurant demand
has a strong correlation with the health of the economy). The City's parking ordinance
provides general guidelines to address parking demands for individual uses such as
office, general retail and different types of food services. Generally, these ratios are
acceptable on individual applications but tend to be inaccurate when applied to larger
projects with complicated mixture of uses. As a result, when large shopping centers
propose site changes, the City retains a third parking professional parking engineer to
evaluate parking demand on a case-by-case basis.
Hexagon Transportation Consultants were retained by the City to evaluate the traffic
and parking impacts of the project. Hexagon performed a parking occupancy survey
on Saturday, July 21, between 1:00 and 3:00 PM and on Thursday, August 23, between
12:00 to 2:00 PM. The parking occupancy surveys focuses on the times of peak
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 6
demand. The logic is that if enough parking is provided based on peak hour demand,
demand at other times would not exceed supply. The following is a summary of the
survey results:
July 21, 2007 - Saturday (1 to
3 PM)
Stalls Occu
691 (100%)
Consultant Comments
There were vehicles
continually entering and
existing parking stalls, and
there were vehicles waiting
for each space that was
be in vacated.
NIA
August 23, 2007 - Thursday
(12 to 2 PM)
589 (85%)
*No spill-over parking was observed on surrounding streets or properties in both
instances.
Based on the survey, the supply (691 stalls) exactly meets the demand (691 stalls) at the
peak usage of the shopping center. To determine the parking demand for the
expansion, Hexagon used both the City parking code and the parking industry
standard. The City's code shows that the existing center needs 307 spaces for the
retail! office use and 296 stalls for restaurants for a total of 603 stalls (see table below).
Retail
Office
Restaurant
TOTAL
lper 1,000 square feet
Existing s.f. City Code'
76,176 4.00
5,500 0.36
29,605 10.00
Spaces
305
2
296
603
Please note that for the restaurant use, Hexagon took a more conservative approach and
used the industry standard ratio (10 stalls per 1,000 sq. ft.), which is more restrictive
than the City's ratio (114 seats plus 1 per each employee). This exercise indicates that
the City's parking code is insufficient (691 > 603) for determining the number of spaces
needed for the expansion. Hexagon then used the survey results and calculated that the
actual restaurant rate at the center is approximately 13 stalls per 1,000 square feet. By
using this rate it resulted in a total demand of 691 spaces for the existing center, which
matches the actual count data. Therefore based on the rates determined during the
survey, the total parking demand for the shopping center after the expansion is
projected to be at 800 stalls. There may be various other type studies that may show
ratios that may produce more or less projected stalls. However, Hexagon believes that
Applications: U-2007-06, ASA-2007-1O (EA-2007-08)
Cupertino Village Shopping Center
Page 7
using the parking ratios that were derived from the actual survey data is an appropriate
way of projecting accurate parking demands for the expansion project.
The following table summarizes what the project is proposing:
# of stalls
dis laced
89
# of stalls
added
180
Net gain
Total
Existin
*Re uired
Net
*Based on Hexagon's Parking Survey Projection.
The currently site plan shows 782 stalls, which is 18 spaces short of the estimated
demand (800 stalls). The Planning Commission has the following mitigation options to
avoid parking shortage at the center:
1. Provide 18 more stalls in order to meet the parking demand.
2. Reduce the proposed expansion, which in turn reduces the parking demand.
3. Limit the proposed new restaurant square footage to 2,165 sq. ft. (a 50%
reduction from what is being proposed) or the total restaurant square footage of
the center to 31,770 sq. ft. in order to balance parking supply (782 stalls) with
parking demand (781 stalls) until such time when 18 more stalls could be
provided.
4. Consider implementing parking demand mitigation measures such as:
Offsite employee parking arrangements with adjacent property owners
(i.e., HP, Hilton Garden Inn and the Church).
Carpool or vanpool incentives for employees, including preferential
parking.
Transit subsidization for employees.
Valet Parking.
If the Planning Commission finds merit in any of the above options (it may be a
combination of several options), it should direct the applicant to revise the plans or
provide a detailed parking plan to confirm that sufficient parking stalls have been
provided based on Hexagon's recommendation.
Staff received a letter from the abutting church property (located near the northwest
corner of the project) stating that there is a private agreement allowing them to use
some of the shopping center's parking lot. In general the City does not get involved in
interpreting private agreements between two private property owners. In this case,
there are no references of any reciprocal access or parking easement for the church on
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 8
the shopping center's property title. In spite of that, normal church activities are
usually at off-peak times (Sunday morning) of the shopping center; therefore the impact
of any parking share should be insignificant.
Visual
Over the past several years, 011e t11e main suggestions expressed by the adjacent
residents is the desire to enha11ce how the shopping center interfaces with t11e adjacent
residential homes 011 Lilu1et La11e. Currently, there is a relatively new 5-foot wood
fence located 011 a berm along the westerly boundary of the shopping ce11ter (al011g
Linnet Lane) wit11 minimal landscaping or screen trees along the fe11ce.
The proposed parking garage is approximately 48 feet away from the residential
properties. In consideration for t11e neighbors, the applicant is proposing a linear park
alol1g the entire westerly boundary with a new detached sidewalk al1d double rows of
screenil1g trees along Lilmet Lane (see diagram below).
=~~~ -...., ..
~
1:$&1.~'~
g)<llt1Nv
~/..~~.,
~*--.
~~~~
~Jj;~l'
'~~~:
~ ~ ~~t, t~
~ I I J I L..~t1bT:..M6
~. ..~- ~'Q,.l.,...""
-~ - 'Y" . "---;-_ . ....,
"IW"'~ I
~r ~,..J
I 'MY~
~t '.' I
::;~-~--;
\; .
r
A SECTION LODI<ING NORTH I,LONG UNN[T Lf.o.l..,C
~I~U~- ..
'0"_"" ~
_W'J.~~ ~
"'..t"~..
~I.~
~~ J/~ln:.'::l:!>
, ~~\,f,
-~.b"'~
~~,~~.......'"
;~)
Lr~-~.; ~ ~~,. ~g
",.111
.,_...~-
I I I 1 I ll......T L.~""
I-~ .." -~- -r;;Tti
...,""""...~ I
1'\.AWr ~t'_/
B SECTION LOOKING NORTH ALONG LINNET L~NE
~' - -} ,-,..'
:.} IlL'
\
r
Similar to the treatments that were required on the Macy's parkil1g garage, the west
perimeter wall of the garage will act both as the visual screen wall a11d a sound wall
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 9
(see illustratio11 below). The wall will also be sided by a green screen system similar to
the 011e on the Macy's garage. 111 additiol1 a short decorative parapet /roof wall is
placed around the perimeter of t11e garage to prevent any views of the cars and their
I1ead lights from the residential neighbors.
~
Noise
The City has retained Illingworth & Rodkin, Inc. to prepare a noise assessment 011 the
project al1d provide recommendations on any required noise mitigation Ineasures. The
report is being fi11alized at t11e time of preparatiol1 for t11is staff report. A detailed
summary of the noise consultant's fi11di11gs and recommendations will be made
available at the PIanni11g Commission I1eari11g.
Lighting
The applical1t has been requested to prepare a lig11ting plal1 a11d provide details on the
location and iI1tel1sity of the parking lot lights (especially 011 top of the garage). Proper
screening of lig11t sources and light pole heights may l1eed to be evaluated at the next
PI aIming Commission hearing.
Trees
A prelimi11ary arborist report has been prepared by Mayne Tree Expert Compal1Y, Inc
(see exhibit B) indicating there are 203 trees currently located withi11 or arou11d the
perimeter of the s110pping center site. N011e of the trees 011 t11e site are defi11ed as
protected trees i11 the City's Tree Ordinance. Accordi11g to the arborist report, 26 trees
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 10
(#60-62,74,77,78,130-132,151,152,180,182,188-198, 200 and 201) are identified for
removal. After reviewing the conceptual landscaping plan, the City's Arborist
Consultant is anticipating an additional seven trees that may be affected by the project
(#38,76,79, 183-186). In addition, the City Consulting Arborist is recommending that
trees #183 to 186 be considered for removal due to their poor health and declining
condition. A summary of the City Arborist's suggestions are summarized below:
1. A detailed tree survey with a corresponding accurate landscaping plan (existing
and proposed) should be provided.
2. The tree survey should all of the street trees in the vicinity of the project.
3. Prior to final approval, a topographic map, detailed site map with accurate tree
locations, grading and drainage plan and utility plan should be reviewed in
order to determine if any additional trees will be affected by the project.
4. A detailed tree replacement should be provided indicating replacement
strategies consistent with the City's tree replacement guidelines (Section
14.18.180, Table A)
If the Planning Commission agrees, the applicant shall address the above City
Arborist's recommendations and the revised landscaping plan/report shall be reviewed
and approved by the Design Review Committee prior to issuance of building permits.
Alternatively, the Planning Commission may require that the applicant address all of
the landscaping concerns prior to an action is taken at the next public hearing.
Green Building Measures
The two new buildings will be required as a condition to be Leadership in
Environmental and Engineering Design (LEED) certifiable (meeting at least 26 points
out of 69 points). Prior to issuance of building permits, the applicant shall demonstrate
to the City how the project will meet the LEED certification requirements. The LEED
certification check list is attached for reference (Exhibit C).
NEIGHBORHOOD COMMENTS
A neighborhood meeting was held at City Hall on October 18,2007. Over 1,000 notices
were sent out by the applicant and a total of 18 neighbors attended the meeting. The
meeting was a voluntarily attempt on the applicant's part to reach out to the
surrounding neighbors regarding the proposed project. Kelly Kline, Economic
Development Manager of the City along with applicant (Brian Replinger) and the
project architect (Young Wong and David Blair) were present at the meeting. Some of
the key issues and comments expressed are summarized as follows:
.:. Landscaping along Linnet Lane in the past has not been maintained.
.:. Parking garage roof treatment and lighting design.
.:. Parking in the residential neighborhood. Perhaps pedestrian access should be
eliminated.
Applications: U-2007-06, ASA-2007-1O (EA-2007-0S)
Cupertino Village Shopping Center
Page 11
.:. Pedestrian access is convenient for residents, and addresses a safety issue for
everyone.
.:. Parking permits might need to be considered in the future.
.:. The proposal is a definite enhancement of Linnet Lane.
.:. Consider posting signs discouraging patrons from parking in the residential
neighborhood.
.:. People like staying at the center. Hope it says that way.
.:. Thank you for including the neighborhood early in the process.
Please refer to Exhibit D for a detaied account of the neighborhood meeting. The
applicant is planning on hosting a second neighborhood meeting on November S, 2007
at City Hall (room 100 starting at 6:30 p.m.) in order to give the residential neighbors
that live immediately adjacent to the shopping center another opportunity to better
understand the project and express input. Since the meeting will occur after the
preparation of this staff report, a detailed summary of the meeting will be reported to
the Planning Commission at the hearing.
Staff also has received one email correspondence from a residential neighbor who lives
on Parnell Place (see exhibit E) regarding concerns on parking. In addition, staff has
met with a neighbor living on Linnet Lane. The following is a brief summary of the
comments that were expressed:
.:. Landscaping along Linnet Land should be enhanced and maintained.
.:. The pedestrian access along Linnet Land should be eliminated in order to
discourage shopping center patrons from parking in the residential
neighborhood.
.:. If the pedestrian access can not be eliminated, then it should be de-emphasized.
.:. Spill over parking into the residential neighborhood is a concern.
.:. A fence should be erected between the church and the shopping center in order
to prevent patrons of the shopping center using Linnet Lane to get to the church
property and park in its parking lot.
.:. Prohibit the openings of nightclubs or bars in the shopping center to avoid
additional late night nuisance and noise impacts to the adjacent residential
neighborhood.
.:. The noise abatement and enforcement measures should be improved.
.:. The construction activities and noise impacts are concerns.
.:. The new trash bin location should be identified.
.:. Undesirable late night activities (delivery, stream blast and pumping truck
activities) occur occasionally at the center late at night or early in the morning.
Staff response:
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 12
The Planning Commission may consider incorporating the following conditions or
mitigation measures in response to some of the neighbors concerns:
1. Require that a detailed landscaping maintenance plan be submitted to the City
for review and approval prior to issuance of building permits. Said plan shall
include details on the irrigation system and the routing schedule of maintenance
and the upkeep of the landscaping area along east side of Linnet Lane.
2. Require clear multi-language signs at each of the pedestrian entrances along
Linnet Lane, informing them not to park in the residential streets.
3. Require that the conditions of approval (including the City's noise ordinance) be
made part of the lease agreements of all new tenants so they will be informed of
the conditions and rules that will be enforced.
4. Require that the trash enclosure plan be submitted for review and approval by
the Design Review Committee prior to issuance of building permits. All new
trash enclosures shall be located as far away from the residential neighborhood
as possible and shall be appropriately screened from public views.
5. Require that a detailed construction management plan be submitted to the City
for review prior to issuance of building permit. Said plan shall include but not
be limited to construction hours, truck routes, staging area, contractor parking
area, tree protection measures, dust control and best management practices. No
construction related vehicles shall use Linnet Lane to park or access the
construction site.
6. Require that a detailed truck delivery schedule and truck routing plan be
submitted for review and approval prior to issuance of building permits. The
applicant should also communicate with existing tenants of the City's regulations
on delivery hours and noise limitations.
7. Require security cameras to be installed at key delivery areas to assist in
monitoring and enforcing delivery hours and noise violators.
8. Require the installation of multi-language sign to inform truckers of the delivery
hours and rules.
9. Require the center to enhance patrol service so that they can monitor and prevent
spill over parking into the neighborhood and the delivery activities. The center
should also provide a hotline to the adjacent residents to report any code
violation and unsafe activities.
10. Require a I-year review of the use permit from the time the two new buildings
receive final occupancy.
ENVIRONMENT At REVIEW COMMITTEE (ERC)
The project will be considered by the Environmental Review Committee (ERe) on
November 14,2007. The final ERC recommendations and findings will be made
available to the Planning Commission at the next public hearing.
Applications: U-2007-06, ASA-2007-10 (EA-2007-08)
Cupertino Village Shopping Center
Page 13
Enclosures:
Exhibit A: Parking and Traffic Report
Exhibit B: Tree Report
Exhibit C: LEED Certification Checklist
Exhibit D: October 18, 2007 Neighborhood Meeting Minutes
Exhibit E: Email Correspondence from Neighbors
Plan Set
Submitted by: Gary Chao, Senior Planner ~ I
Approved by: Steve Piasecki, Director of Community Developme~
Cupertino Village
Final Traffic and Parking Study
Prepared for
City of Cupertino
Prepared by.
Hexagon Transportation Consultants, Inc.
Sandi Domingue, Project Manager
Updated
October 22,2007
Exhibit A
Table of Contents
Executi ve Summary........................................................................................................................ ............ iii
1. Introduction............................................................................................................................................l
2. Existing Conditions.................................................................................................................... ............6
3. Background Conditions...................................................................................................................... ..12
4. Project Impacts and Mitigation Measures............................................................................................ 15
5. Future Growth Conditions. ............. ........ ........ ... ..... ... ..... ........ ..... ..... ... ..... ....... ............ ...................... ...26
6. Conclusions................................................................................................................... ...................... .29
Appendices
Appendix A:
Appendix B:
Appendix C:
Traffic Counts
Level of Service Calculations
Approved Trips
List of Tables
Table ES 1
Table 1
Table 2
Table 3
Table 4
Table 5
Table 6
Table 7
Table 8
Table 9
Intersection Level of Service Summary.............................................................................. v
Intersection Level of Service Definitions...........................................................................5
Study Area Bus Routes....................................................................................................... 7
Existing Intersection Levels of Service ............................................................................11
Background Intersection Levels of Service ......................................................................14
Project Trip Estimates...................................................................................................... .17
Project Intersection Levels of Service............................................................................ ..21
City Code Parking Rates................................................................................................. ..24
ULI Study Parking Rates.................................................................................................. .25
CMP Intersection Levels of Service Under Future Growth Conditions ...........................28
List of Figures
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Site Location...................................................................................................................... .2
Existing Transit Facilities ... ..... ..... ... ..... ..... ..... ... ..... ..... ... ....... ....... ..... ....... ..... ....... ..... ....... ..8
Existing Lane Configurations............................................................................................. 9
Existing Traffic Volumes..................................................................................................l 0
Background Traffic Volumes............................................................................................ 13
Distribution of Project Trips........................................................................................... ..18
Assignment of Primary Project Trips..... ........ ..... ..... ..... ..... ......... ................... ..... ....... .......19
Pass-By Trip Assignment.................................................................................................. 20
Project Conditions Traffic Volumes ...... ..... ..... .......... .......... ....... ....... ............ ....... ....... .....22
Site Plan.......................................................................................................................... ..23
Future Growth Conditions Traffic Volumes ...................................................... ...............27
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
II
Executive Summary
This report presents the results of the traffic impact analysis conducted for the proposed Cupertino
Village Expansion. The project is located in the southwest quadrant of the Wolfe Road/Homestead Road
intersection in Cupertino, California. The project site currently contains 76,176 sJ. of retail space, 5,500
s.f. of office space and 29,605 s.f. of restaurant space. The project as proposed would add three new
commercial buildings (24,455 sJ.) and a two-story open parking structure. The site currently has three
driveways on Wolfe Road, an entrance via Pruneridge Avenue and one driveway on Homestead Road.
The proposed site plan includes the removal of the southernmost Wolfe Road driveway.
The potential impacts of the project were evaluated in accordance with the standards set forth by the City
of Cupertino and the Congestion Management Program (CMP) of Santa Clara County. The study
included an analysis of AM and PM peak-hour traffic conditions for seven signalized intersections. An
analysis of freeway levels of service was not performed because project trips on freeway segments would
not be greater than one percent of the capacity of the segments.
Project Trip Estimates
The traffic generated by the existing shopping center was determined from a field survey. The number of
trips generated by the proposed expansion was estimated using the trip generation rates calculated from
the survey of the existing center. Daily project trips and AM peak hour trips were extrapolated from the
peak-hour project trip estimates.
Using the observed trip rate, the proposed 24,455 s.f. expansion would generate 55 AM peak-hour trips
and 205 PM peak-hour trips. The existing shopping center generates 334 vehicle trips during the AM
peak hour, 929 vehicle trips during the PM peak hour and 10,637 daily vehicle trips.
The proposed retail trip estimates also reflect a 25 percent reduction for PM pass-by trips. Pass-by trips
already pass directly by the project site and would stop at the project site while en route to their ultimate
destination. Excluding pass-by trips, the project would add 55 trips during the AM peak hour and 154
trips during the PM peak hour. The project trip distribution pattern was estimated based on existing
travel patterns in the area and the locations of complementary land uses.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
III
Project Findings
Table ES-l presents a summary of the intersection level of service analysis. The findings of this analysis
are summarized below:
· The results of the intersection level of service analysis show that none of the signalized study
intersections would be significantly impacted by the project according to City of Cupertino and CMP
level of service standards.
. The proposed project would not have any significant adverse impacts on existing pedestrian, bicycle
or transit facilities in the project area.
Hexagon Transportation Consultants, Inc.
Cupertino Vii/age Expansion
IV
Table ES 1
Intersection Level of Service Summary
Existing Background Project Conditions
Peak Count Ave. Ave. Ave. Incr. In Incr. In
Intersection Hour Date Delay LOS Delay LOS Delay LOS Crit Delay Crit V/C
De Anza Blvd & Homestead Rd' AM 1 0/3/2006 34.7 C 35.6 D 35.7 D +0.0 +0.000
PM 10/3/2006 45.8 D 47.9 D 48.2 D +0.3 +0.001
Homestead Rd & Blaney Av AM 7/17/2007 15.8 B 15.9 B 15.8 B -0.1 +0.001
PM 7/17/2007 13.5 B 13.6 B 13.5 B -0.1 +0.003
Homestead Rd & Wolfe Rd AM 7/17/2007 32.1 C 32.2 C 32.4 C +0.2 +0.004
PM 7/17/2007 33.5 C 34.3 C 34.7 C +0.4 +0.010
Wolfe Rd & Prune ridge AM 7/17/2007 16.4 B 17.6 B 18.4 B +0.6 +0.007
PM 7/17/2007 24.7 C 29.8 C 31.6 C +2.0 +0.035
Wolfe Rd & 1-280 NB Ramp' AM 10/3/2006 10.1 B 10.2 B 10.2 B +0.0 +0.004
PM 10/3/2006 7.2 A 8.7 A 8.7 A +0.1 +0.007
Wolfe Rd & 1-280 SB Ramp' AM 1 0/3/2006 7.9 A 7.6 A 7.6 A +0.0 +0.003
PM 1 0/3/2006 7.1 A 8.6 A 8.6 A -0.6 +0.001
Wolfe Rd & Stevens Creek Blvd' AM 1 0/3/2006 35.4 D 37.6 D 37.7 D +0.1 +0.003
PM 10/3/2006 32.8 C 50.5 D 51.8 D +3.4 +0.011
. Denotes CMP Intersections
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
v
1.
Introduction
This report presents the results of the traffic and parking study conducted for the proposed Cupertino
Village expansion located in the southeast quadrant of the Wolfe Road/Homestead Road intersection in
Cupertino, California. The project site currently contains 76, I 76 s.f. of retail space, 5,500 s.f. of office
space and 29,605 s.f. of restaurant space. The project as proposed would add three new commercial
buildings (24,455 s.f.) and a two-story open parking structure. The site currently has three driveways on
Wolfe Road, an entrance via Pruneridge Avenue and one driveway on Homestead Road. The proposed
site plan includes the removal of the southernmost Wolfe Road driveway. The site location is shown on
Figure 1.
This study was conducted for the purpose of identifying the potential traffic impacts related to the
proposed development. The impacts of the project were evaluated following the standards and
methodologies set forth by the City of Cupertino and the Congestion Management Program (CMP) of
Santa Clara County. The study includes an analysis of traffic conditions at seven signalized intersections.
An analysis of freeway levels of service was not performed because project trips on freeway segments
would not be greater than one percent of the capacity of the segments.
Scope of Study
This study was conducted for the purpose of identifying the potential traffic impacts related to the
proposed development. The impacts of the project were evaluated following the standards and
methodologies set forth by the City of Cupertino and the Congestion Management Program (CMP) of
Santa Clara County. The traffic analysis is based on peak-hour levels of service for seven signalized
intersections. The traffic analysis also includes an evaluation of vehicle queuing at high-demand turning
movements at study intersections. The study intersections identified by City staff are listed below.
Wolfe Road and Homestead Road
Wolfe Road and Pruneridge A venue
Wolfe Road and 1-280 NB Ramp*
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
Figure 1
Site Location
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
2
Wolfe Road and 1-280 SB Ramp*
Wolfe Road and Stevens Creek Boulevard*
Homestead Road and Blaney A venue
Homestead Road and De Anza Boulevard*
Asterisk (*) denotes CMP intersections.
Traffic conditions at the study intersections were analyzed for the typical weekday AM and PM peak
commute hours of traffic. The AM peak hour of traffic is generally between 7:00 and 9:00 AM, and the
PM peak hour is typically between 4:00 and 6:00 PM. It is during these periods that the most congested
traffic conditions occur on an average day. Traffic conditions were evaluated for the following
scenanos:
· Existing Conditions: Existing traffic volumes were obtained from recent traffic counts.
· Background Conditions: Background traffic volumes were estimated by adding to existing volumes
the projected volumes from approved but not yet completed developments.
· Project Conditions: Future traffic volumes with the project (hereafter called project traffic volumes)
were estimated by adding to background traffic volumes the net additional traffic generated by the
project. Project conditions were evaluated relative to background conditions in order to determine
potential project impacts.
· Future Growth Conditions: Traffic volumes under future growth conditions were estimated by
applying a growth factor to existing volumes, adding trips from approved developments, and adding
project trips. This scenario is evaluated in fulfillment of CMP requirements.
Methodology
This section presents the methods used to determine the traffic conditions for each scenario described
above. It includes descriptions of the data requirements, the analysis methodologies, and the applicable
level of service standards.
Data Requirements
The data required for the analysis were obtained from new traffic counts, field reconnaissance and the
City of Cupertino. The following data were collected from these sources:
· existing traffic volumes
. lane configurations
. signal timing and phasing
. approved project trips
Analysis Methodologies and Level of Service Standards
Traffic conditions at the study intersections were evaluated using level of service (LOS). Level of Service
is a qualitative description of operating conditions ranging from LOS A, or free-flow conditions with
little or no delay, to LOS F, or jammed conditions with excessive delays. The analysis method is
described below.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
3
All the study intersections are subject to the City of Cupertino level of service standards. The City of
Cupertino level of service methodology is based on the 2000 Highway Capacity Manual (HCM) method
for signalized intersections using the TRAFFIX software. This method evaluates signalized intersection
operations on the basis of average delay time for all vehicles at the intersection. The City of Cupertino
methodology employs the CMP default values for the analysis parameters. The City of Cupertino level of
service standard for signalized intersections is LOS D or better. The correlation between average stopped
delay and level of service is shown in Table 1.
Report Organization
The remainder of this report is divided into five chapters. Chapter 2 describes existing conditions in
terms of the existing roadway network, transit service, and existing bicycle and pedestrian facilities.
Chapter 3 presents the intersection operations under background conditions. Chapter 4 describes the
method used to estimate project traffic and its impacts on the transportation system. Chapter 5 discusses
the traffic conditions resulting from additional future growth. Chapter 6 presents the conclusions of the
traffic and parking study.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
4
Table 1
Intersection Level of Service Definitions
Level of
Service
Description
Average
Stopped Delay
Per Vehicle
(Sec.)
A
Operations with very low delay occurring with favorable progression
and/or short cycle lengths.
Less than 10.0
B
Operations with low delay occurring with good progression and/or
short cycle lengths.
10.1 to 20.0
C
Operations with average delays resulting from fair progression
and/or longer cycle lengths. Individual cycle failures begin to
appear.
20.1 to 35.0
D
Operations with longer delays due to a combination of unfavorable
progression, long cycle lengths, or high V/C ratios. Many vehicles
stop and individual cycle failures are noticeable.
35.1 to 55.0
E
Operations with high delay values indicating poor progression, long
cycle lengths, and high V/C ratios. Individual cycle failures are
frequent occurrences. This is considered to be the limit of
acceptable delay.
55.1 to 80.0
F
Operation with delays unacceptable to most drivers occurring due
to oversaturation, poor progression, or very long cycle lengths.
Greater than 80.0
Source: Transportation Research Board, Highway Capacity Manual (2000).
5
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
2.
Existing Conditions
This chapter describes the existing conditions for all of the major transportation facilities in the vicinity
of the site, including the roadway network, transit service, and bicycle and pedestrian facilities.
Existing Roadway Network
Local and regional access to the site is provided by the following roadways:
1-280 is an eight-lane, north-south highway that extends from the U.S. 101/1-680 interchange in San Jose
north to the South of Market area in San Francisco. The peak direction on 1-280 is northbound in the
morning and southbound in the evening. In the project vicinity, 1-280 operates in an east-west direction.
Wolfe Road is a six-lane arterial that runs in a north-south direction through Cupertino. It extends from
Stevens Creek Boulevard in the south to the north where it operates as Fair Oaks Avenue. Left-turn
pockets are provided at major intersections. Wolfe Road is lined with a mix of commercial, residential
and public uses. In the vicinity of the site, there are bike lanes and on-street parking is not permitted.
Two project driveways would connect to Wolfe Road. There is a landscaped median on Wolfe Road that
prohibits left turns into and out of the site.
Homestead Road is a four-lane, east-west arterial that runs adjacent to the northern border of the
proposed project site. Homestead Road is lined with a mix of commercial and residential uses. There is
intermittent on-street parking permitted in the project vicinity. There are bike lanes and one project
driveway on Homestead Road.
Existing Bicycle and Pedestrian Facilities
Wolfe Road, Homestead Road and Pruneridge A venue are designated as bike routes in the vicinity of the
site. On these streets, bicyclists share the roadway with motor vehicles. Although not specifically
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
6
designated as bike routes, most neighborhood streets are suitable for bicycle travel due to the low traffic
volumes and low vehicle speeds.
Pedestrian facilities in the study area consist primarily of sidewalks, pedestrian push buttons and signal
heads at intersections. Sidewalks are found along Wolfe Road and Homestead Road.
Existing Transit Service
Existing transit service within the study area is provided by the Santa Clara Valley Transportation
Authority (VTA). The project site is served directly by bus routes 26,36,51 and 81, which run along
Wolfe Road adjacent to the project site. These bus routes are shown in Figure 2. Table 2 describes the
route terminus points and commute hour headways.
Table 2
Study Area Bus Routes
Bus Lines Route Description
Peak Hour
Headways (min.)
26
36
51
81
Eastridge Transit Center to Sunnyvale/Lockheed Martin
Penitencia Creek Transit Center to Valley FairNallco Park
Vallco Park to Moffett Field/Ames Center
McKee & Capitol to Vallco Park
20 to 30
30
20 to 60
1 0 to 60
Lane Configurations & Traffic Volumes
The existing lane configurations at the study intersections were provided by City staff and confirmed by
observations in the field (See Figure 3). Existing AM and PM peak commute-hour traffic volumes were
obtained from the City of Cupertino and supplemented with manual turning-movement counts at
intersections where counts were unavailable. The existing AM and PM peak commute-hour intersection
volumes are shown on Figure 4. The traffic count data are included in Appendix A.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
7
Figure 2
Existing Transit Facilities
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
8
Figure 3
Existing Lane Configurations
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
9
Figure 4
Existing Traffic Volumes
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
10
Existing Intersection Levels of Service
The results of the level of service analysis under existing AM and PM peak commute-hour volumes are
summarized in Table 3. All of the signalized study intersections currently operate at an acceptable level
of service (LOS D or better) during both peak hours, according to City of Cupertino standards and CMP
standards. The calculation sheets are included in Appendix B.
Table 3
Existing Intersection Levels of Service
Existing
Peak Count Ave.
Intersection Hour Date Delay LOS
De Anza Blvd & Homestead Rd* AM 1 0/3/2006 34.7 C
PM 1 0/3/2006 45.8 D
Homestead Rd & Blaney Av AM 7/17/2007 15.8 B
PM 7/17/2007 13.5 B
Homestead Rd & Wolfe Rd AM 7/17/2007 32.1 C
PM 7/17/2007 33.5 C
Wolfe Rd & Pruneridge AM 7/17/2007 16.4 B
PM 7/17/2007 24.7 C
Wolfe Rd & 1-280 NB Ramp* AM 1 0/3/2006 10.1 B
PM 1 0/3/2006 7.2 A
Wolfe Rd & 1-280 SB Ramp* AM 1 0/3/2006 7.9 A
PM 1 0/3/2006 7.1 A
Wolfe Rd & Stevens Creek Blvd* AM 1 0/3/2006 35.4 D
PM 1 0/3/2006 32.8 C
* Denotes CMP Intersections
Observed Existing Traffic Conditions
Traffic conditions in the field were observed in order to identify existing operational deficiencies and to
confirm the accuracy of calculated levels of service. The purpose of this effort was (1) to identify any
existing traffic problems that may not be directly related to intersection level of service, and (2) to
identify any locations where the level of service calculation does not accurately reflect level of service in
the field. The field observations revealed that for the most part, level of service calculations accurately
reflect existing conditions.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
11
3.
Background Conditions
This chapter describes background traffic conditions. Background conditions are defined as conditions
just prior to completion of the proposed development. Traffic volumes for background conditions
comprise volumes from the existing traffic counts, plus traffic generated by other approved developments
in the vicinity of the site. This chapter describes the procedure used to determine background traffic
volumes and the resulting traffic conditions.
Roadway Network & Traffic Volumes
It is assumed in this analysis that the transportation network under background conditions, including
bicycle and pedestrian facilities, transit service, roadways and intersection lane configurations, would be
unchanged from existing conditions.
Background peak-hour traffic volumes were calculated by adding to the existing volumes the estimated
traffic from approved but not yet constructed developments in the vicinity of the site. Information to
determine the added traffic from approved but not yet constructed developments was provided by the
City in the form of project size, location, land use and distribution (see Appendix C for approved trip
list). This information was used to determine the amount of traffic that each project added to the
Cupertino study intersections. Background traffic volumes are shown on Figure 5.
Background Intersection Levels of Service
The results of the level of service analysis under background conditions are summarized in Table 4. All
of the signalized study intersections would operate at an acceptable level of service (LOS D or better)
according to City of Cupertino standards. The calculation sheets are included in Appendix B.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
12
Figure 5
Background Traffic Volumes
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
13
Table 4
Background Intersection Levels of Service
Background
Peak Count Ave.
Intersection Hour Date Delay LOS
De Anza Blvd & Homestead Rd. AM 1 0/3/2006 35.6 D
PM 1 0/3/2006 47.9 D
Homestead Rd & Blaney Av AM 7/17/2007 15.9 B
PM 7/17/2007 13.6 B
Homestead Rd & Wolfe Rd AM 7/17/2007 32.2 C
PM 7/17/2007 34.3 C
Wolfe Rd & Pruneridge AM 7/17/2007 17.6 B
PM 7/17/2007 29.8 C
Wolfe Rd & 1-280 NB Ramp. AM 1 0/3/2006 10.2 B
PM 1 0/3/2006 8.7 A
Wolfe Rd & 1-280 SB Ramp. AM 1 0/3/2006 7.6 A
PM 1 0/3/2006 8.6 A
Wolfe Rd & Stevens Creek Blvd. AM 1 0/3/2006 37.6 D
PM 1 0/3/2006 50.5 D
. Denotes CMP Intersections
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
14
4.
Project Impacts and Mitigation Measures
This chapter describes traffic conditions under project conditions, any significant project impacts, and
measures that are recommended to mitigate any project impacts. Included are descriptions of the
significance criteria that define an impact and estimates of project-generated traffic. Project conditions
are represented by background traffic conditions with the addition of traffic generated by the project. It is
assumed in this analysis that the future transportation network under project conditions would be the
same as the existing transportation network.
Significant Impact Criteria
Significance criteria are used to establish what constitutes an impact. For this analysis the criteria for
impacts at intersections are based on the City of Cupertino and the Congestion Management Program
(CMP) of Santa Clara County level of service standards. Project impacts on other transportation
facilities, such as bicycle facilities and transit, were determined on the basis of engineering judgment.
City of Cupertino
The project is said to create a significant adverse impact on traffic conditions at a signalized intersection
in the City of Cupertino if for either peak hour:
I. The level of service at the intersection degrades from an acceptable LOS D or better under
background conditions to an unacceptable LOS E or F under project conditions, or
2. The level of service at the intersection is an unacceptable LOS E or F under background conditions
and the addition of project trips causes both the critical-movement delay to increase by four or more
seconds and the demand-to-capacity ratio (V IC) to increase by .01 or more.
An exception to this rule applies when the addition of project traffic reduces the amount of average
stopped delay for critical movements (i.e., the change in average stopped delay for critical movements is
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
15
negative). In this case, the threshold of significance is an increase in the critical VIC value by .01 or
more.
CMP
The definition of a significant impact at a CMP intersection is the same as for the City of Cupertino,
except that the CMP standard for acceptable level of service at a CMP intersection is LOS E or better. A
significant impact by CMP standards is said to be satisfactorily mitigated when measures are
implemented that would restore intersection conditions to LOS E or better.
Project Trip Estimates
The magnitude of traffic produced by a new development and the locations where that traffic would
appear are estimated using a three-step process: (1) trip generation, (2) trip distribution, and (3) trip
assignment. In determining project trip generation, the magnitude of traffic entering and exiting the site is
estimated for the weekday AM and PM peak hours. As part of the project trip distribution, an estimate is
made of the directions to and from which the project trips would travel. In the project trip assignment, the
project trips are assigned to specific streets and intersections. These procedures are further described in
the following sections.
Trip Generation
The trips generated by the existing shopping center were surveyed on Wednesday, July 18,2007 from
4:00 to 6:00 PM. The trip generation survey consisted of a count of the number of vehicles entering and
exiting the six existing site driveways. The peak hour within this period was identified and the hourly trip
generation rate was derived. The inbound and outbound volume splits for the proposed project were
based upon the existing inbound/outbound trips from the trip generation survey. The ITE Trip
Generation manual Shopping Center land use includes various types of uses that might be found in a
typical shopping center (e.g. restaurant, office, retail, etc.). After reviewing Trip Generation, Hexagon
found that the rates are lower than those collected from the trip generation study performed at the project
site. As a result, Hexagon used the rates from the trip generation study to provide a more conservative
analysis and to better reflect the conditions at Cupertino Village.
Existing Shopping Center
The Cupertino Village Shopping Center generated approximately 929 vehicle trips during the PM peak
hour. This equates to a rate of 8.37 PM peak-hour vehicle trips per 1,000 square feet (s.f.). The AM and
daily traffic generated by the existing shopping center was extrapolated from the observed peak-hour
trips. A comparison of shopping center trip rates published in the ITE Trip Generation manual shows
that daily trips typically equal approximately 11 times the number of PM peak-hour trips on a weekday.
In addition, Trip Generation rates show that AM peak hour trips equate to approximately 27 percent of
PM peak hour trips. It is assumed that the same relationship between daily and peak-hour trips holds for
the Cupertino Village Shopping Center. Hexagon utilized the Trip Generation factors to determine trip
generation rates for the AM peak and for daily trips. Thus, the existing shopping center is estimated to
generate 10,219 vehicle trips on an average weekday.
These net project trip estimates include pass-by trips. Pass-by trips already pass directly by the project
site and would stop at the project site while en route to their ultimate destination. For retail uses the
proportion of pass-by trips comprise an average of 25% of the site-generated PM peak hour traffic. The
remaining 75% of the net project trips are primary trips that are new to the roadway network. Excluding
Hexagon Transportation Consultants, Inc.
Cupertino Vii/age Expansion
16
pass-by trips, the project would add 55 trips during the AM peak hour and 154 trips during the PM peak
hour.
Trip Distribution and Assignment
The project trip distribution pattern was estimated based on existing travel patterns in the area and the
locations of complementary land uses. Figure 6 illustrates the distribution of primary and pass-by project
trips. Figure 7 shows the assignment of pass-by trips at the project driveways. Figure 8 shows the net
assignment of project trips at the study intersections.
Table 5
Project Trip Estimates
AM Peak Hour PM Peak Hour
Peak-Hr Peak-Hr
Rate In Out Total Rate In Out Total
2.26 34 22 55 8.37 98 106 205
(25) (26) (51)
34 22 55 74 80 154
Use
Retail'
Daily
Daily
Size Rate Trips
24,455 s.f. 95.84 2,344
Pass-by Reduction2 (25%)
Primary Trips
Notes:
1 Per 1,000 square feet. Source: Cupertino Village Survey, Wednesday, 7/18/2007 4-6 PM.
2A reduction of 25% was applied to the proposed Retail Stores during the PM peak hour.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
17
Figure 6
Distribution of Project Trips
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
18
Figure 7
Assignment of Primary Project Trips
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
19
Figure 8
Pass-By Project Trips
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
20
Project Intersection Analysis
Project trips, as represented in the above project trip assignment, were added to background traffic
volumes to obtain background plus project traffic volumes. Background traffic volumes plus project trips
are typically referred simply as project traffic volumes. The project traffic volumes are shown graphically
on Figure 9.
The intersection level of service results under project conditions are summarized in Table 6. The level of
service calculation sheets are included in Appendix B. The results show that none of the study
intersections would be impacted by the proposed project according to the City of Cupertino and CMP
level of service standards for signalized intersections. All of the study intersections are expected to
operate at level of service D or better.
Table 6
Project Intersection Levels of Service
Background Project Conditions
Peak Count Ave. Ave. Incr. In Incr. In
Intersection Hour Date Delay LOS Delay LOS Crit Delay Crit V/C
De Anza Blvd & Homestead Rd' AM 1 0/3/2006 35.6 D 35.7 D +0.0 +0.000
PM 1 0/3/2006 47.9 D 48.2 D +0.3 +0.001
Homestead Rd & Blaney Av AM 7/17/2007 15.9 B 15.8 B -0.1 +0.001
PM 7/17/2007 13.6 B 13.5 B -0.1 +0.003
Homestead Rd & Wolfe Rd AM 7/17/2007 32.2 C 32.4 C +0.2 +0.004
PM 7/17/2007 34.3 C 34.7 C +0.4 +0.010
Wolfe Rd & Pruneridge AM 7/17/2007 17.6 B 18.4 B +0.6 +0.007
PM 7/17/2007 29.8 C 31.6 C +2.0 +0.035
Wolfe Rd & 1-280 NB Ramp' AM 1 0/3/2006 10.2 B 10.2 B +0.0 +0.004
PM 1 0/3/2006 8.7 A 8.7 A +0.1 +0.007
Wolfe Rd & 1-280 SB Ramp' AM 1 0/3/2006 7.6 A 7.6 A +0.0 +0.003
PM 1 0/3/2006 8.6 A 8.6 A -0.6 +0.001
Wolfe Rd & Stevens Creek Blvd' AM 10/3/2006 37.6 D 37.7 D +0.1 +0.003
PM 10/3/2006 50.5 D 51.8 D +3.4 +0.011
, Denotes CMP Intersections
Other Transportation Issues
Site Access & Circulation
Figure 10 presents the project site plan. Circulation within the parking lot is generally adequate. The
majority of the parking stalls would be at 90 degrees to the main drive aisles, including the stalls in the
parking deck. The parking stalls located between the existing Ranch 99 market and the building
containing Starbucks will remain at 45 degrees. The drive aisles are sufficiently wide to allow vehicles
to back up or turn.
There are currently five driveways into the project site, including three on Wolfe Road. As part of the
proposed project, the southernmost driveway on Wolfe Road will be removed. The current middle
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
21
Figure 9
Project Conditions Traffic Volumes
Hexagon Transportation Consultants, Inc.
Cupertino Vii/age Expansion
22
Figure 10
Site Plan
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
23
driveway on Wolfe Road will be relocated approximately 30 feet to the north. The location of the three
remaining project driveways will stay the same. The proposed project would have vehicular access via
one driveway on Homestead Road, two right-turn only driveways on Wolfe Road, and one entrance via
Pruneridge Avenue just west of the Homestead/De Anza intersection. The driveway on Homestead
would be reconfigured as a right-turn only entrance as required by the City of Cupertino. All of the
project driveways would be sufficiently designed to accommodate the shopping center traffic.
Parking
The proposed project includes the construction of a two-story open parking structure. There are currently
691 parking stalls on the project site. After proposed project completion, there would be a total of 787
parking spaces.
To determine the adequacy of the existing and proposed parking supply, Hexagon conducted parking
occupancy surveys on Saturday, July 21 between 1:00 and 3:00 PM and on Thursday, August 23 between
12:00 noon and 2:00 PM. The parking occupancy surveys focused on the times of peak demand. Thus, if
enough parking is provided based on peak hour demand, demand at other times would not exceed supply.
The counts were conducted for the entire parking lot for all areas of the shopping center. On Saturday
July 21, one hundred percent of the parking stalls were occupied (691 stalls). There were vehicles
continually entering and exiting parking stalls, and there were vehicles waiting for each space that was
being vacated. However, no spill-over parking was observed on surrounding streets or properties. On
Thursday August 23, the peak parking occupancy count was at 85 percent of capacity (589 stalls
occupied). It can be concluded that the existing parking supply of 691 spaces exactly matches the size of
the center.
To determine the parking demand for the expansion, Hexagon checked both the City parking code and
parking industry research. The city parking code shows that the existing center needs 603 parking spaces
(see Table 7). The actual demand, however, is 691 spaces, as noted above. Therefore, the city code is
insufficient for determining the number of spaces needed for the expansion.
Table 7
City Code Parking Rates
Retail
Office
Restaurant
TOTAL
'per 1,000 square feet
Existing s.f. City Code 1
76,176 4.00
5,500 0.36
29,605 10.00
Spaces
305
2
296
603
One widely used and industry accepted source of parking data is the Urban Land Institute (UU)
publication Shared Parking. This publication is a compilation of parking surveys at numerous locations
throughout the United States. Based upon their research, ULI has published recommended parking ratios
for different types of land uses. Table 8 shows the existing shopping center's land use square footage
along with the expected parking demand based on Shared Parking suggested parking ratios.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
24
Table 8
ULI Study Parking Rates
Retail
Office
Restaurant
TOTAL
Existin s.f.
76,176
5,500
29,605
111,281
Rate'
4.00
0.55
15.00
Reauired Parkina
Proposed
Low' Rate2 Hi h2 Rate3 Ad'usted3 s.t.
305 4.00 305 4.00 305 88,228
3 0.55 3 0.55 3 13,574
444 20.00 592 12.94 383 33,934
752 900 691 135,736
Rate
4.00
0.52
12.97
Required
Parkin
353
7
440
800
11ncludes ULI's Family Restaurant Use
21ncludes ULI's Fine/Casual Dining Use
3Sased on parking survey
The number of spaces would range from 444 to 592 depending on the assumed type of restaurants. The
ULI data show a range of parking rates for restaurants. ULI's recommended ratio is 15.0 spaces per
1,000 s.f. for family restaurants and 20.0 spaces per 1,000 s.f. for fine/casual dining. Based on the
existing demand found in the parking surveys described above, the actual parking demand for the
restaurant portion of the shopping center is lower than the lowest ULI rate. The measured restaurant rate
at the center is estimated to be 13.0 spaces per 1,000 s.f. This would result in a calculated demand of 691
spaces, which matches the actual count data.
Based on the parking rates determined during the surveys, the expanded Cupertino Village would require
800 parking spaces (see Table 8). The current site plan shows 787 spaces, which is 13 spaces short of the
estimated demand. Possible mitigation measures to avoid parking shortages at Cupertino Village with
the expansion include the following:
. revised site plan to pick up 13 spaces
. agreement with nearby entity to share parking (adjacent church, etc.)
. valet parking
. off site parking with a shuttle for employees
. carpool or vanpool incentives for employees, including preferential parking
. transit subsidization for employees
Bicycle, Pedestrian and Transit Facilities
The project would not change or alter pedestrian, bike or transit facilities in the area. In addition, the
project would not create a demand for these facilities greater than what is currently provided. For these
reasons, the project would not result in a significant impact on bicycle, pedestrian, and transit facilities.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
25
5.
Future Growth Conditions
This chapter presents a summary of the traffic conditions that would occur under future growth
conditions. The purpose of analyzing future growth conditions is to assess the traffic conditions that
would occur at the time that the proposed development becomes occupied. For this analysis, the assumed
occupancy is 2010. The analysis of future growth conditions is required by the CMP and includes an
analysis of level of service for CMP intersections only.
Roadway Network & Traffic Volumes
The intersection lane configurations under future growth conditions were assumed to be the same as
described under project conditions. Traffic volumes under future growth conditions were estimated by
applying to the existing volumes an annual growth rate of 1.2 percent, then adding the trips from
approved developments and the project trips. The traffic volumes under future growth conditions are
shown in Figure 10.
Levels of Service
The level of service results for the CMP intersections under future growth conditions are summarized in
Table 9. The results show that all of the CMP study intersections would operate at LOS D or better under
future growth conditions. The intersection level of service calculations are included in Appendix B.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
26
Figure 11
Future Growth Traffic Volumes
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
27
Table 9
CMP Intersection levels of Service Under Future Growth Conditions
Peak Ave.
Intersection Hour Delay LOS
De Anza Blvd & Homestead Rd' AM 36.6 D
PM 52.0 D
Wolfe Rd & 1-280 NB Ramp' AM 10.5 B
PM 8.9 A
Wolfe Rd & 1-280 SB Ramp' AM 7.7 A
PM 8.7 A
Wolfe Rd & Stevens Creek Blvd' AM 38.3 D
PM 54.8 D
. Denotes CMP Intersection
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
28
6.
Conclusion
The findings of this analysis are summarized below:
. Excluding pass-by trips, the proposed project is estimated to generate a net increase of 55 trips
during the AM peak hour and 154 trips during the PM peak hour.
. The results of the intersection level of service analysis show that none of the signalized study
intersections would be significantly impacted by the project according to City of Cupertino and CMP
level of service standards.
. The proposed project would not have any significant adverse impacts on existing pedestrian, bicycle
or transit facilities in the project area.
. The project would not provide sufficient parking on site to meet the demand during the Saturday
peak. Possible mitigation measures include provision of off-site parking, implementation of valet
parking or employee rideshare programs.
Hexagon Transportation Consultants, Inc.
Cupertino Village Expansion
29
AQpendix A
Traffic Counts
AQpendix B
level of Service Calculations
AQpendix C
Approved Trips
8Qpendix A
Traffic Counts
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
I(lsbay@!:s.com
File Name
Site Code
Start Date
Page No
: 1AMFINAL
: 00000001
: 10/3/2006
: 1
Grou sPrinted- Veh.icles
Start Time
Factor
07:00 AM
07;15 AM
07:30 AM
07:45 AM
Total
08:00 AM 136 134 0 0 270 206 0 136 2 344 94 314 0 0 408 0 0 0 1 1 1023
08;15 AM 185 153 0 0 338 156 0 79 2 237 78 317 0 0 395 0 0 0 0 0 970
08:30 AM 136 168 0 0 304 180 0 86 2 258 42 305 0 0 347 0 0 0 2 2 921
08:45 AM 116 174 0 0 290 178 0 82 0 260 42 384 0 0 426 0 0 0 0 0 976
Total 573 629 0 0 1202 720 0 383 6 1109 256 1320 0 0 1576 0 0 0 3 3 3890 .
Grand Total I 1128 1177 0 2 230711279 0 698 101987 1569 2058 0 0 2627\ 0 0 0 7 716928
Apprch % 48.9 51 0 0.1 64.4 0 35.1 0.5 21.7 78.3 0 0 0 0 0 100
Total % 16.3 17 0 0 33.3 18.5 0 10.1 0.1 28.7 8.2 29.7 0 0 37.9 0 0 0 0.1 0.1
08;00 AM 136 134 0 0 270 206 0 136 2 344 94 314 0 0 408 0 0 0 1 1 1023
08:15AM 185 153 0 0 338 156 0 79 2 237 78 317 0 0 395 0 0 0 0 0 970
08:30 AM 136 168 0 0 304 180 0 86 .2 268 42 305 0 0 347 0 0 0 2 2 921
08:45 AM 116 174 0 0 290 178 0 82 0 260 42 384 0 0 426 0 0 0 0 0 976
Total Volume 573 629 0 0 1202 720 0 383 6 1109 256 1320 0 0 1576 0 0 0 3 3 3890
% Aoo. ToIal 47.7 52.3 0 0 64.9 0 34.5 0.5 16.2 83.8 0 0 0 0 0 100
PHF .774 .904 .000 .000 .889 .874 .000 .704 .750 .806 .681 .859 .000 .000 .925 .000 .000 .000 .375 .375 .951
f4i?~S,02.
2.02/ 1~44-
11/30/2006 13:37 FAX 408377~998
TRAFFIC DATA SERVICE
~ 002
Traffic Data Service
Campbell, CA
(408) 377-1988
tdsba~s.com
File Name : 1 PMFINAL
Site Code : 00000001
Start Date : 11/29/2006
Page No ; 1
Grou ~ Printed- Vehicle~
:-:".-'.'----l .~~~~~~d. 1'2~~;ft~1F~~SI" :... ..,.....~l~~~;;~.J.... ....hi.JTi;.r~~oJl!nd~BOI
:~~gi;~ R~B~ :~g ..~~g. tg.... 3:" ~\l ~;~g.q~~': ='~~:n~~lT !1'1~g{i~ ~: .R~~~~~~1~g ~t~_~~~~...:=;:~j
05: 15 PM 72 236 0 0 308 126 0 101 0 227 49 153 0 0 202 0 0 0 0 0 737
g~;;~ ~~ . ~{jit .J .. . g.. . ~~~. . U~ .....t_...~t...._E___.~~~ ~~Jit_.J_.__._~_. "".3~g . .."g g.. t g ~ ~;;
Total 317 loa1 0 0 1346 484 0 306 :2 792 126 597 0 0 723 0 0 0 :3 3 2666
06:00 PM 148 340 0 0 486 102 a 69. 3 174 aB' 167. a 0 ~05 0 0 0 0 0 865
06:15 PM 152 340 0 0 492 145 0 72 0 217 19 166 0 0 207 0 0 0 0 0 916
OS:~O PM 145 253 0 0 399 63 0 90 0 153 26 174 0 0 200 0 0 0 0 0 752
06:45 PM 156 362 .0 0 520 13<> 0 94 0 224 16 160 0 0 196 0 0 0 0 o 940
.. 'Total 6'02 1211$ 0 "0 1897 440 .....".0' "325----"-a-- 768 99 709 0- 0 80B 0 0 0 0 --. -tj" " 3473""
Grlilnd TOt$11919. ZJZ6 0 0 3245 1924 0 631 5 15601225 1305 0 0 15311 0 0 0 3 : I 6339
Apprch % 26.3 71.7 0 a SU 0 40.4 0.3 14.7 65.3 0 a 0 0 0 100
Total % 14.5 36.7 0 a 51.2. 14.6 0 10 0.1 24.6 3.5 20.6 0 0 24.2 0 0 0 0
WOLFE RO-----.-----f..--.-... 1:2'80 Nfl RAMPS. ,. - 'WOLFE RO . "1' .,/
Soutllbound Westbound Northbound ' Eastbound
'~~~~!!~~'. ~.~~~J::tti~J.:~~.f!I~#!.[~;':;~~: )1~~i.l.T~~~l4~0 p'elli.1. -,.... RI"~11 Thl'l,l I Left.! POtl& I ....r.... Righi i Thiv i l-eft I ?~& I A!f'~..' !nl. Tgl.' I
Peak Hour AnalY5is From 05:00 PM to 06:45 PM - Peak 1 of 1 .
Peak Hour for Entillt Intarsecticn Begins at 06:00 PM
06:00 PM 146 340 0 a 485 102 0 59 3 174 38 167 0 Q 205 0
06:15 PM 152 340 0 a 492 145 0 72 0 217 19 188 0 0 207 0
0$;30 PM 146 253 0 0 399 63 0 90 0 153 26 174 0 0 200 0
06:45 PM 158 362 0 0 620 130 0 94 0 224 16 180 0 0 196 0
TolelVolUme 602 1295 0 0 1897 440'...-...'0.-325..."......3. '''768' '''5i9' 709".....0 . . t;' ....acs..... bOO'
% App. Total 31.7 68.3 0 0 57.3 0 42.3 0.4 . 12.3 67.7. 0 0 0
..:.....:::.~::f.>8.17' ~~s~.. :~9.4. :';06.0 .':"0.00'.::' ~91'2. .!59 .'O~~. '.864" .~SO . "~$.? .6~'f...:~3.' .'~o~.. .,.o.bo . .g:r~ ..~00
0000665
o 0 0 0 916
o 0 0 0 752
0000940
. .0..... '(f'''. "0"- "'.""',5" --3473-
000
.000 .000" :oocf . .000 . .~24
\
\
t,
"'. '.
), '
" .. \\
\\.,' ...;
.~.
.; \' 'V
\\:- y
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
tdSbuy@~s. com
. File Name
Site Code
Start Date
Page No
: 2AMFINAL
: 00000002
: 10/3/2006
: 1
StaFI Time Ri hi
Factor .1.0
07:00AM' 55
07:15AM 78
07:30 AM 97
07:45 AM 92
Total 322
08:00 AM 76 152 0 0 228 0 0 0 0 0 83 212 0 1 296 30 0 126 0 156 680
08:15AM 77 191 0 0 268 0 0 0 0 0 82 226 0 1 309 42 0 145 0 187 764
08:30 AM 24 174 0 0 198 0 0 0 0 0 76 240 0 0 316 . 38 0 105 0 143 657
08:45 AM 71 214 0 0 285 0 0 0 0 0 80 287 0 0 367 44 0 185 0 229 881
Tolal 248 731 0 0 979 0 0 0 0 0 321 965 0 2 1288 154 0 561 0 715 2982
Gram! Total 1570 1236 0 0 18061 0 0 0 0 o I 587 1589 0 2 21781307 0 943 0 125015234
Apprch % 31.6 68.4 0 0 0 0 0 0 27 73 0 0.1 24.6 0 75.4 0
Tolal % 10.9 23.6 0 0 34.5 0 0 0 0 o 11.2 30.4 0 0 41.6 5.9 0 18 0 23.9
08:00 AM 76 152 0 0 228 0 0 0 0 0 83 212 0 1 296 30 0 126 0 156 680
08:15 AM 77191 0 0 268 0 0 0 0 0 82 226 0 1 309 42 0 145 0 187 764
08:30 AM 24 174 0 0 198 0 0 0 0 0 76 240 0 0 316 38 0 105 0 143 657
08:45 AM 71 214 0 0 285 0 0 0 0 0 80 287 0 0 367 44 0 185 0 229 881
Tolal Volume.. 248 731 0 0 979 0 0 0 0 0 321 965 0 2 1288 154 0 561 0 715 2982
% ADD. Tolal 25.3 74.7 0 0 0 0 0 0 24.9 74.9 0 0.2 21.5 0 78.5 0
PHF .805 .854 .000 .000 .859 .000 .000 .000 .000 .000 .967 .841 .000 .500 .877 .875 .000 .758 .000 . .781 .646
12~ J? 06, 62-
203. / )." 4-'3
1".___.______ - .
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
tdsbuy@:s.COffl
File Name
Site Code
Start Date
Page No
: 2PMFINAL
: 00000002
: 10/3/2006
: 1
Start Time Ri hi
Factor 1.0
05:00 PM 64
. 05:15 PM 72
05:30 PM 65
05:45 PM 94
Total 295
06:00 PM 73 261 0 0 334 0 0 0 0 0 80 191 0 0 271 116 0 90 '0 206 811
06:15 PM 83 331 0 2 416 0 0 0 0 0 103 193 0 0 296 95 0 95 0 190 902
06:30 PM 43 312 O' 0 355 0 0 0 0 0 99 184 0 0 283 77 0 105 0 182 820
06:45 PM 103 384 0 0 487 0 0 0 0 0 103 171 0 0 274 82 0 170 0 252 1013
Total 302 1288 0 2 1592 0 0 0 0 0 385 739 0 0 1124 370 0 460 0 830 3546
Grand Total 1597 2255 '0 3 2855\ .0 0 0 0 01857 1504 0 0 2361\728 0 917 0 164516861
Apprch % 20.9 79 0 0.1 0 0 0 0 36.3 63.7 0 0 44,3 0 55.7 0
Total % 8.7 32.9 0 0 41.6 0 0 0 0 o 12.5 21.9 0 0 34.4 10.6 0 13.4 0 24
06:00 PM 73 261 0 0 334 0 0 0 0 0 80 191 0 0 271 116 0 90 o . 206 811
06:15 PM 83 331 0 2 416 0 0 0 0 0 103 193 0 0 296 95 0 95 0 190 ~02
06:30 PM 43 312 0 0 355 0 0 0 0 0 99 184 0 0 283 77 0 105 0 182 820
06:45 PM 103 384 0 0 487 0 0 0 0 0 103 171 0 0 274 82 0 170 0 252 1013
Tolal Volume 302 1288 0 2 1592 0 . 0 0 0 0 385 739. 0 0 1124 370 0 460 . 0 830 3546
% AM. Tolal 19 80.9 0 0.1 0 0 0 0 34.3 65.7 0 0 44.6 0 55.4 0
PHF .733 .839 .000 .250 .817 ,000 .000 ,000 .000 .000 .934 .957 .000 .000 .949 .797 .000 .676 ,000 .823 .875
",;)
,.I".
. .
I" :
(\ ,
/'
I t4/;~S(02
209// ~4:;
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
fdsbaJ'~s.com
File Name : 3AMFINAL
Site Code : 00000003
Start Date : 1013/2006
Page No : 1
Start Time Ri hi Thru
Factor 1.0 1,0 ~
07:00 AM 22 4~)
07:15 AM 39 .84 IS,
07:30 AM 53 32 /140 772 ~
07:45 AM 83 17 ! 160 901 :3<>0
Total 197 75/ 431 2656
08:00 AM '66 68 49 0 14 0 283 25( 187 56 0 268 12 126 3 208 942 ~
08:15 AM 110 56 31 2 23 . 0 276 21 \ 152 27 .1 201 32 150 1 239 915 U 3
08:30 AM 90 50 55 0 8 1 239 33 \ 195) li1 0 279 32 122 0 270 983 >1- 3
08:45 AM 114 90 61 0 17 0 309 46' '168 80 6 300 37 79 5 185 1059 '2.(1
Total 380 264 196 2 62 1 1107 125 7.02 214 7 1048 113 477 9 902 3899
Grand Total 1577 548 327 15 14671393 1368 161 6 19281200 1133 343 11 16871195 776 484 18 .14731 6555
Apprch % 39.3 37.4 22.3 1 20.4 71 8.4 0.3 . 11.9 67.2 20.3 0.7 13.2 52.7 32.9 1.2
Total % 8.8 8.4 5 0.2 22.4 6 20.9 2.5 0.1 29.4 3.1 17.3 5.2 0.2 25.7 3 11.8 7.4 0.3 22.5
Grou s Printed- Vehicles
08:00 AM 66. 68 49 0 183 38 231 14 0 283 25 187 56 0 268 12 126 67 3 208 942
08:15AM 110 56 31 2 199 55 19B 23 0 276 21 152 27 1 201 32 150 56 1 239 915
08:30 AM 90 50 55 0 195 62 168 8 1 239 33 195 51 0 279 32 122 116 0 270 983
08:45 AM 114 90 61 0 255 49 243 17 0 309 46 168 80 6 300 37 79 '64 5 185 1059
TOlal Volume 3BO 264 196 2 842 204 840 62 1 1107 125 702 214 7 1048 113 477 303 9 902 3899
% ADO. Tolal 45.1 31.4 23.3 0.2 18.4 75.9 5.6 . 0.1 11.9 67 20.4 0.7 12.5 52.9 33.6 1
PHF .833 .733 .803 .250 .794 .823 .864 .674 .250 .896 .679 .900 .669 .292 .873 .764 .795 .653 .450 .635 .920
14) ~<14-, 01
204-/ J~/S
t;,-.:=;
I
. -01
..
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
ldsbay@,es.com
File Name
Site Code
Start Date
Page No
: 3PMFINAL
: 00000003
10/3/2006
1
Grou s Printed- Vehicles
Start Time Ri hi
Factor 1.0
05:00 PM 64 Z'3-+
05:15 PM 118 CG I
05:30 PM 75 [. l' L.
05:45 PM 94 'l"l.q
Total 351
; ~-f
06:00 PM 102 215 54 10 381 i 67 172 42 4 285 6 175 45 113 2 457 1298
06:15 PM 115 226 78 0 419 74 198 26 1 299 1 155 43 97 1 404 1277 Lei
06:30 PM 104 239 63 0 406 , 66 177 35 0 278 0 134 19 80/ 2 232 1050 (3"'6
06:45 PM 121 205 49 0 375' 63 184 42 0 289 2 180 35 0 302 1146 7,V~
Total 442 885 244 10 1581 4~0 731 145 5 1151 9 644 142 5 1395 4771
Grand Tolal 1793 1646 558 11 30081584 1550 301 5 24401120 730 318 11 11791319 1904 9 3054)9681
Apprch % 26.4 54.7 18.6 0.4 23.9 63.5 12.3 0.2 10.2 61.9 27 0,9 10.4 62.3 0.3
Total % 8.2 17 5:8 0.1 31.1' 6 16 3.1 0.1 25.2 1.2 .7.5 3.3 0.1 12.2 3.3 19.7 0.1 31.~
05:15 PM 118 182 100 1 401 82 198 40 0 320 12 73 26 0 111 67 285 106 1 459 1291
05:30 PM . 75 216 60 0 351 71 220 39 0 330 11 93 26 '1 131 32 249 108 1 390 1202
05:45 PM 94 21883 0 395 71 225 51 0 347 15 1094 9 1 174 25 264 118 0 407 1323
06:00 PM 102 215 54 10 381 67 172 42 4 285 19 107 43 6 175 45 297 113 2 457 1298
Tolal Volume 389 831 297 11 1528 291 815' 172 4 1282 57 382 144 8 591 169 1095 445 4 1713 5114
% Aoo. Tolal 25.5' 54.4' 19.4 0.7 22.7 63.6 13.4 0,3 9.6 64.6 24.4 1.4 9.9 63.9 26 0.2.
PHF .824 .953 . .743 .275 .953 .887 .906 .843 .250 .924 .750 .876 .735 .333 .844 .631 .922 .943 .500 .933 .966
1-L.t)BQ4- .01
204- / 10P5
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
tdsbay@}J:S.com
File Name
Site Code
Start Date
Page No
11AMFINAL
: 00000011
: 10/3/2006
: 1
Grou s Printed- Vehicles
Start Time Ri hi
Factor 1.0
07:00 AM 56
07:15 AM 74
07:30 AM 88
07:45 AM 111
Total 329
08:00 AM 94 251 48 3 396 75 118 104 0 297 103 316 72 2 493 77 96 50 0 223 1409
08:15 AM 112 287 47 2 448 65 111 121 0 297 34 440 114 2 590 109 69 60 1 239 1574
08:30 AM I .81 276 46 0 403 55 78 91 0 224 32 487 87 2 608 77 108 50 2 237 1472
08:45 AM 86 189 52 0 327 69 131 124 0 324 52 385 98 3 538 79 92 61 0 232 1421
Total 373 1003. 193 5 1574 264 438 440 0 1142 221 1626 371 9 2229 342 365 221 3 931 5876
Grand Tot~1 1702 1906 313 8 2929\444 782 719 1 19461309 2750 678 26 37631636 566 368 11 1581110219 .
Apprch % 24 65.1 10.7. 0.3 22.8 40.2 36.9 0.1 8.2 73.1 18 0.7 40.2 35.8 23.3 0.7
Total % 6.9 18.7 3.1 0.1 28.7 4.3 7.7 7 0 19 3 26.9 6.6 0.3 36.8 6.2 5.5 3..6 0.1 15.5
07:45 AM 111 32135 0 467 65 134 92 0 291 29 378 96 0 503 106 72 66 3 247 1508
08:00 AM 94 251 48 3 396 75 118 104 0 297 103 316 72 2 493 77 96 50 0 223 1409
08:15AM 112 287 47 2 448 65 111 121 0 297 34 440 114 2 590 109 69 60 1 239 1574
08:30 AM . 81 276 46 O' 403 55 78 91 0 224 32 487 87 2 60S 77 108 50 2 237 1472
Tolal Volume 398 1135 176 5 1714 260 441 408 0 1109 198 1621 369 6 2194 369 345 226 6 946 5963
% Aoo. Tala' 23.2 66.2 10.3 0.3 23.4 39.8 36.8 0 9 73.9 16.8 0.3 39 36.5 23.9 0.6
PHF .888 .884 .917 .417 .918 .867 .823 .843 .000 .934 .481 .832 .809 .750 .902 .846 .799 .856 .500 . .957 .947
it)3(P0,04-
2.11I\"=t
L_
-
Traffic Data Service
1386 White Oaks Road, Suite 1
Campbell, CA 95008
tdsbay@Cs.com
File Name
Site Code
Start Date
Page No
: 11 PMFINAL
: 00000011
: 1 0/3/2006
: 1
Start Time RI hi
Factor 1.0
05:00 PM 63
05:15 PM 67
05:30 PM 52
05:45 PM 74
Total 256
06:00 PM 81 471 84 0 636 37 120 85 0 242 H2 323 171 2 668 93 146 46 1 286 1832
06:15 PM 95 487 101 0 6B3 31 113 85 0 229 201 30B' 139 19 667 B1 166 47 5 299 1878
06:30 PM 96 526 96 0 718 40 102 86 0 228 131 319 140 0 590 76 107 49 1 233 1769
06:45 PM 97 457 112 0 666 42 118 72 0 232 103 293 108 7 511 75 99 43 0 217 1626
Total 369 1941 393 0 2703 150 453 328 0 931 607 1243 55B 28 2436 325 518 185 7 1035 7105
Grand Tolal 1625 3720 705 0 50501295 88B 624 0 180711196 2411 1015 34 46561653 1021 342 25 2041 /13554
Apprch % 12.4 73.7 14 0 16.3 49.1 34.5 0 25.7 51.8 21.8 0.7 32 50 16.8 1.2
Total % . 4.6 27.4 5.2 0 37.3 2.2 6.6 4.6 0 13.3 8.8 17.8 7.5 0.3 34.4 4.8 7.5 2.5 0.2 15.1
05:45 PM 74 487 91 0 652 42 113 67 0 222 168 327 131 4 630 B3 142 41 6 272 1776
06:00 PM B1 471 84 0 636 37 120 85 0 242 172 323 171 2 668 93 146 46 1 286 1832
06:15 PM 95 4B7 101 0 683 31 113 85 0 229 201 308 139 19 667 81 166 47 5 299 1878
06:30 PM 96 526 96 0 718 40 102 86 0 228 131 319 140 0 590 76 107 49 1 233 1769
Total Volurn. 346 1971 372 0 2689 150 448 323 0 921 672 1277 581 25 2555 333 561 183 13 1090 7255
% ADD. Tolal 12.9 73.3 13.8, 0 16.3 48.6 35.1 0 26.3 50 22.7 1 30.6 51.5 16.8 1.2
PHF .901 .937 .921 .000 .936 .893 .933 .939 .000 .951 .836 .976 .849 .329 .956 .895 .845 .934 .542 .911 .966
7~3G>0.0t
2/4;)(olr
AM Peak-Hour Volume Count Worksheet
AUTO-CENSUS
Traffic Monitoling and Analysis
870 Castlewood Dr. #1
Los Gatas, CA 95032
Phone 408-826-9673 Fax 408-877-162~
Dale: 7/17/07
Counter: Patti and Byron
Intersection Name: Homestead Rd. and N. Blaney Ave.
Weather: Clear
.......- ........--..--... .._ _._..W' ....... . ........--..-....-
N.orth A ,proach . Ea$t,AD~ roach S.o,uth'AI: Droach, . We$tA 'oro,ach' " ,.,'
Start Time Right Thru Left Total Riaht Thru Left Total Riaht Thru Left Total Riaht Thru Left Total
7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 0 0 0 0 0 66 9 75 20 0 18 38 8 48 0 56
7:30 0 0 0 0 0 173 19 192 36 0 39 75 23 100 0 123
7:45 0 0 0 0 0 297 31 328 67 0 73 140 33 175 0 208
8:00 0 0 0 0 0 434 53 487 105 0 122 227 41 282 0 323
8:15 0 0 0 0 0 592 78 670 143 0 200 343 56 385 0 441
8:30 0 0 0 0 0 742 99 841 183 0 238 421 81 496 0 577
8:45 0 0 0 0 0 914 125 1,039 243 0 310 553 100 663 0 763
9:00 0 0 0 0 0 1,159 151 1,310 287 0 353 640 124 813 0 937
N
H
d
N.BI
Rd
H
d
Peakliour Right Ihru Left Total Right Thru Left Total Right Thru Le.ft: Total Right Thru Left Total PK Hour
7:00 - 8:00 0 0 0 Ci 0 434 53 487 105 0 122 227 41 282 0 323 1,037
7:15 - 8:15 0 0 0 0 0 526 69 595 123 0 182 305 48 337 0 385 1,285
7:30 - 8:30 0 0 0 0 0 569 80 649 147 0 199 346 58 396 0 454 1 ,449
7:45 - 8:45 0 0 0 0 0 617 94 711 176 0 237 413 67 488 0 555 1,679
8:00 - 9:00 0 0 0 0 0 725 98 823 182 0 231 413 83 531 0 614 1,850
Peak Volumes: 0 0 0 0 0 725 98 823 182 0 231 413 83 531 0 614 1,850
Cut and Paste
None'
"tJ
..
$
VI
<1l
E
o
:c
Out ill Total
0 0 0
Riaht Thru Left
0 0 0
~I 0 31 ~ .... I~
,... 0 . 0 01
on '"
.... 0>
.EI "<t ~I ;;; .... I~ co IS"
.... '" '"
co It) 01 '"
81 <D ~ '" I~ ::1 I~
on <D
0> 00 co '"
231 0 182
Left Thru Riaht
181 413 594
Out ill Total
:c
o
3
III
II>
..
III
C.
N. Blaney Rd.
PM Peak-Hour Volume Count Worksheet
AUTO-CENSUS
Traffic Monitoring and Analysis
870 Castlewood Dr. #1
Los Gatos, CA 95032
Phone 408-826-9673 Fax 408-877-162~
Date: 7/17/07
Counter: Matt and Jayme
Intersection Name: Homestead Rd. and N. Blaney AYe.
Weather: Clear
- ----- .n____ ---" ..-..... -.-..- ...-. . .-...--.--- - ---
. . North,A mroach EastA61i roach 'S.outh A[ rQach . ',' We,slA )p~o,ach,
Start Time Right Thru Left Total Rioht Thru Left Total Rioht Thru Left Total Right Thru Left Total
4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 0 0 0 0 0 125 26 151 20 0 35 55 36 142 0 178
4:30 0 0 0 0 0 264 49 313 41 0 60 101 68 275 0 343
4:45 0 0 0 0 0 387 76 463 78 0 93 171 114 429 0 543
5:00 0 0 0 0 0 521 112 633 119 0 125 244 155 603 0 758
5:15 0 0 0 0 0 683 151 834 169 0 145 314 207 860 0 1,067
5:30 0 0 0 0 0 845 182 1,027 203 0 175 378 250 1,052 0 1,302
5:45 0 0 0 0 0 1,039 236 1,275 246 0 203 449 294 1,303 0 1,597
6:00 0 0 0 0 0 1,202 290 1,492 277 0 233 510 348 1,517 0 1,865
N
H
tead Rd
North BI
A
H
d Rd
l'eakHour ~I9ht . Thru 'I,.eft Total' .Rjght Thru left 'Total 'Right Thru "'le6 'rotlil' . Right Thru 'Left Total PK Hour
4:00 - 5:00 0 0 0 0 0 521 112 633 119 0 125 244 155 603 0 758 1,635
4:15 - 5:15 0 0 0 0 0 558 125 683 149 0 110 259 171 718 0 889 1,831
4:30 - 5:30 0 0 0 0 0 581 133 714 162 0 115 277 182 777 0 959 1,950
4:45 - 5:45 0 0 0 0 0 652 160 812 168 0 110 278 180 874 0 1,054 2,144
5:00 - 6:00 0 0 0 0 0 681 178 859 158 0 108 266 193 914 0 1,107 2,232
Peak Volumes: 0 0 0 0 0 681 178 859 158 0 108 266 193 914 0 1107 2.232
Cut and Paste
None
.,;
~
'0
<0
$
"'
QJ
E
o
J:
Out ill Total
0 0 0
Rioht Thru Left
0 0 0
~I U> 31 ~ -" I~
0> co . co U> ~
co ~
T'" !!!.
... ~I ~ 0> I~ 00
EI co 15"
": 0; 00 01
.... -" 10
81 0> i M -" I~ -" I~
co
00 0> ~ ~
... .... 00 '"
10B 0 158
Left Thru Rioht
371 266 637
Out ill Total
J:
o
3
<0
III
Iii
III
a.
;V
po
North Blaney Ave.
AM Peak-Hour Volume Count Worksheet
AUTO-CENSUS
Traffic Monitoring and Analysis
870 Castlewood Dr. # 1
Los Gatos, CA 95032
Phone 408-826-9673 Fax 408-877-162!
Date: 7/17/07
Counter: Jane and Logan
Intersection Name: Homestead and Wolfe
Weather: Clear
NorthA ooroach, EastADDroaCh South'Ar roach West A IDroach .
Start Time RiQht Thru Left Total Right Thru Left Total Right Thru Left Total Riaht Thru Left Total
7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 7 102 6 115 6 48 30 84 25 115 35 175 24 39 16 79
7:30 16 232 16 264 21 109 72 202 67 254 69 390 46 85 27 158
7:45 26 422 36 484 42 202 123 367 118 406 128 652 78 158 49 285
8:00 45 574 51 670 57 282 164 503 180 557 167 904 122 255 65 442
8:15 62 777 80 919 73 384 216 673 237 779 215 1,231 180 340 90 610
8:30 74 921 106 1,101 92 477 252 821 288 972 280 1,540 213 436 113 762
8:45 97 1,122 140 1,359 119 589 314 1,022 360 1,219 352 1,931 271 565 149 985
9:00 113 1,289 164 1,566 132 733 357 1,222 432 1,411 406 2,249 310 688 188 1,186
Wolfe Rd.
Homestead Rd
Wolfe Rd
Homestead Rd
Pe.ak Hour ~jght Thtu Left Total Right Thru . 'Left Total Right Thru. c Left. Total.... Right Thtu Left Total PK Hour
7:00 - 8:00 45 574 51 670 57 282 164 503 180 557 167 904 122 255 65 442 2,519
7:15-8:15 55 675 74 804 67 336 186 589 212 664 180 1,056 156 301 74 531 2,980
7:30 - 8:30 58 689 90 837 71 368 180 619 221 718 211 1,150 167 351 86 604 3,210
7:45 - 8:45 71 700 104 875 77 387 191 655 242 813 224 1,279 193 407 100 700 3,509
8:00 - 9:00 68 715 113 896 75 451 193 719 252 854 239 1,345 188 433 123 744 3,704
Peak Volumes: 68 715 113 896 75 451 193 719 252 854 239 1,345 188 433 123 744 3,704
Cut and Paste
,j
0::
1:1
'"
2
'"
CII
E
o
:I:
Out In Total
1,052 896 1,948
Ri.9h1 Thru Left
68 715 113
21 '" ~I M ~ -" lot
0 N . ..... Ul
(!. l/') Ul -" [
.... .... .....
.sl "" ~I M ~ I[ ..... 15'
"" M Ul -"
..... "" -" CD
81 00 ~ 00 -" I~ ..... I~
l/') 00 CD CD
..... .... '" co
239 854 252
Left Thru Riaht
1,096 1,345 2,441
Out In Total
Wolfe Rd.
:I:
o
3
<II
It
QI
Co
;ll
?-
Wolfe Rd.
PM Peak-Hour Volume Count Worksheet
AUTO-CENSUS
Traffic Monitoring and Analysis
870 Castlewood Dr. #1
Los Gatos, CA 95032
Phone 408-826-9673 Fax 408-877-162~
Date: 7/17/07
Counter: Kevin So and Huy
Intersection Name: Wolfe Rd. and Homestead. Rd.
Weather: Clear
,NortbAllllr()ach " E.a.s,t AD~ rl>ach S,l>uthA[ Ilroach ,WestA )D(l>8Ch,
Start Time Rlaht Thru Left Total Richt Thru Left Total Richt Thru Left Total Riaht Thru Left Tl>tal
4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 26 188 23 237 17 114 42 173 37 120 39 196 38 109 31 178
4:30 45 405 57 507 41 227 98 366 55 221 106 382 72 206 50 328
4:45 63 638 99 800 66 317 151 534 84 367 159 610 122 316 76 514
5:00 83 845 132 1,060 85 407 194 686 114 509 206 829 166 414 110 690
5:15 98 1,087 171 1,356 109 530 278 917 140 657 267 1,064 218 553 156 927
5:30 136 1,389 203 1,728 131 677 357 1,165 179 844 345 1,368 279 700 192 1,171
5:45 193 1,663 247 2,103 146 816 436 1,398 210 1,002 414 1,626 328 844 225 1,397
6:00 229 1,972 290 2,491 174 981 525 1,680 232 1,162 466 1,860 378 970 268 1,616
Wolfe Rd.
Homestead. Rd
Wolfe Rd.
Homestead. Rd
Peak Ho.ut 'Right Thru Left TO.tal Right Thtu Left Total Right Thru Left Total Right Thru Left Total PK Hour
4:00 - 5:00 83 845 132 1,060 85 407 194 686 114 509 206 829 166 414 110 690 3,265
4:15 - 5:15 72 899 148 1,119 92 416 236 744 103 537 228 868 180 444 125 749 3,480
4:30 - 5:30 91 984 146 1,221 90 450 259 799 124 623 239 986 207 494 142 843 3,849
4:45 - 5:45 130 1,025 148 1,303 80 499 285 864 126 635 255 1,016 206 528 149 883 4,066
5:00 - 6:00 146 1,127 158 1,431 89 574 331 994 118 653 260 1,031 212 556 158 926 4,382
Peak Volumes: 146 1,127 158 1,431 89 574 331 994 118 653 260 1,031 212 556 158 926 4382
Cut and Paste
'0
0:::
-0
III
S
I/)
QI
E
o
:r
Out ill Total
900 1431 2,331
Richt Thru Left
146 1127 158
JgI to ~I "" i ..... I~
co 00 0>
{!. OJ LO . to N
..... ~ 01
.51 to ~I (() 01 I~ to 15'
N LO .... to
01 LO ~ ~
81 co ~ N t.ol I~ 0> I~
00 ..- t.ol t.ol
OJ N ..... N
260 653 118
Left Thru Riaht
1,670 1,031 2,701
Out ill Total
Wolfe Rd.
:r
o
3
<I>
!!l.
<I>
Ql
P.
;0
Co
Wolfe Rd.
AM Peak-Hour Volume Count Worksheet
AUTO-CENSUS
Traffic Monitoring and Analysis
870 Castlewood Dr. # 1
Los Gatos, CA 95032
Phone 408-826-9673 Fax 408-877-162~
Date: 7/17/07
Counter: Alvan and NQOC
Intersection Name: Wolfe and Pruneridge
Weather: Clear
........- - .-.......-- .... _'_H"" . . -..-..- -
, North A lproach 'East Apllro,a,<:h S.outh A~ prQa<:h '. , W~st A lp~oa<:h
..
Start Time Right Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total
7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 1 170 7 178 6 3 21 30 40 181 10 231 12 4 4 20
7:30 6 351 14 371 23 7 37 67 '79 414 19 512 20 9 11 40
7:45 11 607 21 639 37 9 70 116 135 651 31 817 35 15 14 64
8:00 18 867 39 924 57 11 116 184 205 940 55 1,200 62 24 21 107
8:15 19 1,111 58 1,188 80 13 158 251 285 1,229 67 1,581 79 41 29 149
8:30 22 1,393 71 1,486 103 17 198 318 386 1,536 90 2,012 102 51 40 193
8:45 27 1,695 90 1,812 124 23 238 385 476 1,903 118 2,497 134 54 51 239
9:00 30 1,961 103 2,094 138 32 280 450 590 2,289 145 3,024 152 55 65 272
PeakHQur ~ight Thru I.eft Total Right Thru 'Left Total Right Thru Left Total Right Thru Left Total PK Hour
7:00 - 8:00 18 867 39 924 57 11 116 184 205 940 55 1,200 62 24 21 107 2,415
7:15 - 8:15 18 941 51 1,010 74 10 137 221 245 1,048 57 1,350 67 37 25 129 2,710
7:30 - 8:30 16 1,042 57 1,115 80 10 161 251 307 1,122 71 1,500 82 42 29 153 3,019
7:45 - 8:45 16 1,088 69 1,173 87 14 168 269 341 1,252 87 1,680 99 39 37 175 3,297
8:00 - 9:00 12 1,094 64 1,170 81 21 164 266 385 1,349 90 1,824 90 31 44 165 3,425
Peak Volumes: 12 1,094 64 1,170 81 21 164 266 385 1349 90 1,824 90 31 44 165 3,425
Cut and Paste
Wolfe
QI
01
:E
Cii
c:
:l
a:
Out In Total
1,474 1170 2,644
Right Thru Left
12 1094 64
~I <0 ~I "<t 00 ~ .... Ii
<0 "<t . ... -I>>
N 0>
051 It) ~I .- '" I~ '" l:r
to M ... 0>
.- 0>
81 M ~ <:> ... Ii -I>> I~
N 0> 0> co
.- -I>> <:>
90 1349 385
Left Thru Riuht
1,348 1,824 3,172
Out In Total
--- .-
"
.,
C
:l
II>
.,
0:
10
II>
Wolfe
PM Peak.Hour Volume Count Worksheet
AUTO-CENSUS
Traffic Monitoring and Analysis
870 Castlewood Dr. #1
Los Gatos, CA 95032
Phone 408-826-9673 Fax 408-877-162~
Date: 7/17/07
Counler: ShaUiland Kristen
Intersection Name: Wolfe Rd. and Pruneridae Ave.
Weather: Clear
.......n_ 0'_"_"_ '"' .-_..11; . .-..-..- ....
North A loroach East Ao~ roach South. AI oroach West A ooroach
Start Time Riaht Thru Left Total Riaht Thru Left Total Riaht Thru Left Total Rioht Thru Left Total
4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 6 237 22 265 14 4 72 90 29 207 41 277 27 3 7 37
4:30 11 484 35 530 25 11 131 167 53 392 94 539 60 5 15 80
4:45 19 723 49 791 34 18 183 235 85 601 132 818 84 8 22 114
5:00 22 968 82 1,072 46 31 274 351 119 808 181 1,108 118 9 28 155
5:15 27 1,293 102 1,422 54 38 380 472 157 1,008 225 1,390 144 10 34 188
5:30 32 1,664 117 1,813 70 50 487 607 208 1,247 262 1,717 171 13 41 225
5:45 39 1,931 151 2,121 76 59 596 731 257 1,497 307 2,061 207 18 47 272
6:00 46 2,283 200 2,529 83 72 689 844 296 1,750 352 2,398 234 23 52 309
Wolf,
P
'd
Wolf,
P
'd
Peak H.our Right . -Thru Left Total Right Thru Left Total Right Thru Left Total Right Thru Left Total PK Hour
4:00 - 5:00 22 968 82 1,072 46 31 274 351 119 808 181 1,108 118 9 28 155 2,686
4:15 - 5:15 21 1,056 80 1,157 40 34 308 382 128 801 184 1,113 117 7 27 151 2,803
4:30 - 5:30 21 1,180 82 1,283 45 39 356 440 155 855 168 1,178 111 8 26 145 3,046
4:45 - 5:45 20 1,208 102 1,330 42 41 413 496 172 896 175 1,243 123 10 25 158 3,227
5:00 - 6:00 24 1,315 118 1,457 37 41 415 493 177 942 171 1,290 116 14 24 154 3,394
Peak Volumes: 24 1,315 118 1457 37 41 415 493 177 942 171 1,290 116 14 24 154 3,394
Cut and Paste
OJ
01
:g
OJ
c::
::I
Ii:
. ~ -..-
Out ill Total
1,003 1457 2,460
Riaht Thru Left
24 1315 118
191 0 ~I -.t w ~ 00 I~
(3. (1) N . ... 0
M '"
EI -.t ~I -.t ~ I~ .1>0 15'
lO ID
... ... w
81 to ~ to .1>0 " w I~
M ... .... ~ 0
N ... U1 ID
171 942 177
Left Thru Riaht
1,846 1,290 3,136
Out ill Total
... - ."'~
Wolfe
~
t:
:J
II>
.,
c:
10
II>
Wolfe
wendix B
level of Service Calculations
COMPARE
F ri Ocl 05 12:02:50 2007
Page 3. 1
level Of Service Compulation Report
2000 HCM Operations (Future Volume Alternative)
Existing AM
Intersection #1: De Anza/Homestead
Signal=ProtecVRights=lnclude
Final Vol: 398 1135m 176
lanes: 0 1 2 0 2
..-J4.~~
Signal=Protecl Signal =Protect
Final Vol: lanes: Rights=lncluCle Vol Cnt Date: 1 013/2006 Rights=lnclude Lanes: Final Vol:
j- Cycle Time (see): 118 ~
226 2 260
~ loss Time (see): 0 J-
0 0
345 2 -... Critical VlC: 0.758 ....- 2 441
r Avg Crit Del (sec/veh): 40.1 1= 0
369'" Avg Delay (sec/veh): 34.7 2 408."
LOS: C
~ ~ t .,. r+
lanes: 2 0 3 0
Final Vol: 369'.' 1621 198
Signal=ProtecVRights=lnctude
De Anza Boulevard Homestead Road
North Bound South Bound East Bound West Bound
L T R L T R L T R L T R
------------1---------------11---------------11--------------,...11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1_______________11_______________11_______________11_______________1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 369 1621 198 176 1135 398 226 345 369 408 441 260
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 369 1621 198 176 1135 398 226 345 369 408 441 260
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 369 1621 198 176 1135 398 226 345 369 408 441 260
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 369 1621 198 176 1135 398 226 345 369 408 441 260
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 369 1621 198 176 1135 398 226 345 369 408 441 260
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 369 1621 198 176 1135 398 226 345 369 408 441 260
____________1_______________11_______________11_______________11_______________1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.87 0.87 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.22 0.78 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 3691 1294 3502 3610 1615 3502 3610 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.11 0.31 0.12 0.05 0.31 0.31 0.06 0.10 0.23 0.12 0.12 0.16
Crit Moves: ****
Green/Cycle: 0.14
Volume/Cap: 0.76
Uniform Del: 48.9
IncremntDel: 6.8
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 55.7
User DelAdj: 1.00
AdjDel/Veh: 55.7
LOS by Move: E
HCM2kAvgQ: 8
Street Name:
Approach:
Movement:
0.47
0.67
24.2
0.7
0.0
1. 00
24.9
1. 00
24.9
C
17
0.47
0.26
18.9
0.2
0.0
1. 00
19.1
1. 00
19.1
B
4
****
0.08
0.67
53.1
6.3
0.0
1. 00
59.4
1. 00
59.4
E
4
0.41
0.76
30.1
1.7
0.0
1. 00
31.8
1. 00
31. 8
C
19
0.41
0.76
30.1
1.7
0.0
1. 00
31.8
1. 00
31.8
C
19
0.13
0.50
47.7
0.8
0.0
1. 00
48.6
1. 00
48.6
D
4
0.30
0.32
31. 8
0.2
0.0
1. 00
32.0
1. 00
32.0
C
5
****
0.30
0.76
37.3
6.8
0.0
1. 00
44.1
1. 00
44.1
D
14
**"**
0.15
0.76
47.8
6.2
0.0
1. 00
54.0
1. 00
54.0
D
9
0.32
0.38
30.6
0.2
0.0
1. 00
30.8
1. 00
30.8
C
6
0.32
0.50
32.0
0.7
0.0
1. 00
32.8
1. 00
32.8
C
8
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3- 2
Level Of Service Computation Report
2000 HCM Operalions {Future Volume Alternative}
Background AM
Intersection #1: De Anza/Homestead
Signal=ProlecVRights=lnclude
Final Vol: 400 1168'" 178
Lanes: 01202
~4~}''+
Signal=Protect Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: , 0/3/2006 Rights=tnclude Lanes: Final Vol:
j Cycle Time (sec): 118 ~
232 2 261
~ Loss Time (sec): 0 J-
0 0
348 2 ----.... Critical VlC: 0.787 ...- 2 442
0 r Avg Crit Del (seclveh): 41.7 r
399'" Avg Delay (seclveh): 35.6 2 416'"
LOS: 0
~ +t t ~ ~
Lanes: 2 0 3 0
Final Vol: 375'" 1634 200
Signal=ProtecVRighls=lncl ude
Street Name: De Anza Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11----.:.----------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 369 1621 198 176 1135 398 226 345 369 408 441 260
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 369 1621 198 176 1135 398 226 345 369 408 441 260
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 6 13 2 2 33 2 6 3 30 8 1 1
Initial Fut: 375 1634 200 178 1168 400 232 348 399 416 442 261
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 375 1634 200 178 1168 400 232 348 399 416 442 261
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 375 1634 200 178 1168 400 232 348 399 416 442 261
peE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 375 1634 200 178 1168 400 232 348 399 416 442 261
_nn_n_n_I__nnnn_nn 1 I-nn-nnn---I 1 nnnn__n_n Ilnnn-n-n---1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.88 0.88 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.23 0.77 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 3717 1273 3502 3610 1615 3502 3610 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.11 0.32 0.12 0.05 0.31 0.31 0.07 0.10 0.25 0.12 0.12 0.16
Crit Moves: ****
Green/Cycle: 0.14
Volume/Cap: 0.79
Uniform Del: 49.3
IncremntDel: 8.5
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 57.8
User DelAdj: 1.00
AdjDel/Veh: 57.8
LOS by Move: E
HCM2kAvgQ: 9
0.46
0.68
25.0
0.8
0.0
1. 00
25.9
1. 00
25.9
C
17
0.46
0.27
19.6
0.2
0.0
1. 00
19.8
1. 00
19.8
B
4
0.07
0.68
53.3
7.3
0.0
1. 00
60.6
1. 00
60.6
E
5
0.40
0.79
31.1
2.2
0.0
1. 00
33.2
1. 00
33.2
C
20
****
0.40
0.79
31.1
2.2
0.0
1. 00
33.2
1. 00
33.2
C
20
0.14
0.49
47.3
0.8
0.0
1. 00
48.1
1. 00
48.1
D
5
0.31
0.31
30.7
0.2
0.0
1. 00
30.9
1. 00
30.9
c
5
0.31
0.79
36.9
8.0
0.0
1. 00
44.9
1. 00
44.9
D
15
****
****
0.33
0.49
31.6
0.7
0.0
1. 00
32.3
1. 00
32.3
C
8
Traffrx 7.8.0915
Copyright {cl 2005 Dowling Associales, Inc.
0.15
0.79
48.3
7.7
0.0
1. 00
56.0
1. 00
56.0
E
9
0.33
0.37
30.2
0.2
0.0
1. 00
30.4
1. 00
30.4
C
6
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3. 3
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Projecl AM
Intersection #1: De Anza/Homestead
Signal=ProtecVRights=lnclude
Final Vol: 400 1168'" 180
Lanes: 01202
.-J4.~'+
Signal=Prolecl Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 10/3/2006 Rights=lnclude Lanes: Final Vol:
j- Cycle Time (see): 118 ~
232 2 262
-t Loss Time (see): 0 ~
0 0
350 2 ----... Critical V/C: 0.787 -<Ilf- 2 443
0 r Avg Crit Del (seclveh): 41.7 1=
399'" Avg Delay (seclveh): 35.7 2 417'"
LOS: 0
~ ~ t ~ r+
Lanes: 2 0 3 0
Final Vol: 375'" 1634 202
Signal=ProtecVRights=lnclude
Street Name: De Anza Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------I---------------II---------n----II n_______nn__ II n_____________1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 375 1634 200 178 1168 400 232 348 399 416 442 261
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 375 1634 200 178 1168 400 232 348 399 416 442 261
Added Vol: 0 D 2 2 0 0 0 2 0 1 1 1
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 375 1634 202 180 1168 400 232 350 399 417 443 262
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 375 1634 202 180 1168 400 232 350 399 417 443 262
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 375 1634 202 180 1168 400 232 350 399 417 443 262
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 375 1634 202 180 1168 400 232 350 399 417 443 262
------------I---------------II--------nn--- II ___________n__ II n___________n 1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.88 0.88 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.23 0.77 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 3717 1273 3502 3610 1615 3502 3610 1615
------------1---------------1 I----n---nn--I I------n-------I 1---- ___n______1
Capacity Analysis Module:
Vol/Sat: 0.11 0.32 0.13 0.05 0.31 0.31 0.07 0.10 0.25 0.12 0.12 0.16
Crit Moves: ****
Green/Cycle: 0.14
Volume/Cap: 0.79
Uniform Del: 49.3
IncremntDe1: 8.5
InitQueuDe1: 0.0
Delay Adj: 1.00
Delay/Veh: 57.8
User DelAdj: 1.00
AdjDe1/Veh: 57.8
LOS by Move: E
HCM2kAvgQ: 9
0.46
0.68
25.1
0.8
0.0
1. 00
26.0
1. 00
26.0
C
18
0.46
0.27
19.7
0.2
0.0
1. 00
19.9
1. 00
19.9
B
4
****
0.08
0.68
53.2
7.3
0.0
1. 00
60.5
1. 00
60.5
E
5
0.40
0.79
31.1
2.2
0.0
1. 00
33.2
1. 00
33.2
C
20
0.40
0.79
31.1
2.2
0.0
1. 00
33.2
1. 00
33.2
C
20
0.13
0;49
47.3
0.8
0.0
1. 00
48.1
1. 00
48.1
D
5
0.31
0.31
30.8
0.2
0.0
1. 00
30.9
1. 00
30.9
C
5
****
0.31
0.79
36.9
8.0
. 0.0
1. 00
44.9
1. 00
44.9
D
15
****
0.15
0.79
48.3
7.7
0.0
1. 00
56.0
1. DO
56.0
E
9
0.33
0.37
30.2
0.2
0.0
1. 00
30.4
1. 00
30.4
C
6
0.33
0.49
31.6
0.7
0.0
1. 00
32.3
1. 00
32.3
C
8
Traffix 7.8.0915
Copyright (c) 2005 Oowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:502007
Page 3. 4
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth AM
Intersection #1: De Anza/Homestead
Signal=ProtecVRights=lncl ude
Final Vol: 414 1209". 186
Lanes: 0 1 2 0 2
~4t~~
Signal=Prolect Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: nla Rights=lnctude Lanes: Final Vol:
J. Cycle Time (sec): 118 ~
240 2 271
~ Loss Time (see): 0 ~
0 0
362 2 -... Critical VlC: 0.815 +- 2 459
0 =r Avg Crit Del (seelveh): 43.2 1= 0
412". Avg Delay (seelveh): 36.6 2 432...
LOS: D
~ ~ t ~ ~
Lanes: 2 0 3 0
Final Vol: 38B". 1692 209
Signal=ProtecVRights=lnclude
Street Name: De Anza Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1 _______________11 --------------- 11_______________11 --------------- I
Volume Module:
Base Vol: 388 1692 209 186 1209 414 240 362 412 432 459 271
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 388 1692 209 186 1209 414 240 362 412 432 459 271
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 388 1692 209 186 1209 414 240 362 412 432 459 271
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 388 1692 209 186 1209 414 240 362 412 432 459 271
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 388 1692 209 186 1209 414 240 362 412 432 459 271
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 388 1692 209 186 1209 414 240 362 412 432 459 271
----~-------I --------------- II _______________11_______________11 --------------- I
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.88 0.88 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.23 0.77 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 3717 1273 3502 3610 1615 3502 3610 1615
------------ 1_______________11 --------------- II --------------- II _______________1
Capacity Analysis Module:
Vol/Sat: 0.11 0.33 0.13 0.05 0.33 0.33 0.07 0.10 0.26 0.12 0.13 0.17
Crit Moves: ****
Green/Cycle: 0.14
Volume/Cap: 0.81
Uniform Del: 49.5
IncrernntDel: 10.4
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 59.9
User DelAdj: 1.00
AdjDel/Veh: 59.9
LOS by Move: E
HCM2kAvgQ: 9
0.46
0.71
25.5
1.0
0.0
1. 00
26.5
1. 00
26.5
C
19
0.46
0.28
19.7
0.2
0.0
1. 00
19.9
1. 00
19.9
B
5
****
0.07
0.71
53.3
8.6
0.0
1. 00
62.0
1. 00
62.0
E
5
0.40
0.81
31.6
2.7
0.0
1. 00
34.3
1. 00
34.3
C
21
0.40
0.81
31.6
2.7
0.0
1. 00
34.3
1. 00
34.3
C
21
0.13
0.51
47.4
0.9
0.0
1. 00
48.3
1. 00
48.3
D
5
0.31
0.32
30.9
0.2
0.0
1. 00
31.1
1. 00
31.1
C
5
****
0.31
0.81
37.4
9.8
0.0
1. 00
47.2
1. 00
47.2
D
16
****
0.15
0.81
48.5
9.4
0.0
1. 00
57.9
1. 00
57.9
E
10
0.33
0.39
30.4
0.2
0.0
1. 00
30.6
1. 00
30.6
C
7
0.33
0.51
31.8
0.8
0.0
1. 00
32.6
1. 00
32.6
C
8
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3- 5
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Existing AM
Intersection #2: Homestead/Blaney
Signal=ProlecVRights=lndude
Final Vol: 0 0 0
Lanes: 0 0 0 0 0
~4+~~
Signal=ProteCl Slgnal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 7/1712007 Rights=lnclude Lanes: FlOal Vol:
-.f Cycle Time (see): 100 ~
0 0 0 0
~ Loss Time (see): 0 ~
0 0
531'" -. Critical V/C: 0.356 ..- 2 725
r Avg Crit Del (seclveh): 20.3 1= 0
83 0 Avg Delay (seclveh): 15.8 98'-
LOS: B
~ ~ t ~ r+
Lanes: 1 0 0 0
Final Vol: 231-- 0 182
Signal=ProtecVRights= Include
Blaney Avenue Homestead Road
North Bound South Bound East Bound West Bound
L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 231 0 182 0 0 0 0 531 83 98 725 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 231 0 182 0 0 0 0 531 83 98 725 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 231 0 182 0 0 0 0 531 83 98 725 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 231 0 182 0 0 0 0 531 83 98 725 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 231 0 182 0 0 0 0 531 83 98 725 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 231 0 182 0 0 0 0 531 83 98 725 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1.00 0.85 1.00 1.00 1.00 1.00 0.93 0.93 0.95 0.95 1.00
Lanes: 1.00 0.00 1.00 0.00 0.00 0.00 0.00 1.73 0.27 1.00 2.00 0.00
Final Sat.: 1805 0 1615 0 0 0 0 3060 478 1805 3610 0
____________1 n_____________11 n_____________II_____________n II n_________n__1
Capacity Analysis Module:
Vol/Sat: 0.13 0.00 0.11 0.00 0.00 0.00 0.00 0.17 0.17 0.05 0.20 0.00
Crit Moves: ****
Green/Cycle: 0.36 0.00
Volume/Cap: 0.36 0.00
Uniform Del: 23.5 0.0
IncremntDe1: 0.3 0.0
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 0.00
Delay/Veh: 23.8 0.0
User DelAdj: 1.00 1.00
AdjDel/Veh: 23.8 0.0
LOS by Move: C A
HCM2kAvgQ: 5 0
Street Name:
Approach:
Movement:
0.36
0.31
23.1
0.3
0.0
1. 00
23.4
1. 00
23.4
C
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.49
0.36
15.9
0.1
0.0
1. 00
16.0
1. 00
16.0
B
6
****
0.49
0.36
15.9
0.1
0.0
1. 00
16.0
1. 00
16.0
B
6
****
0.15
0.36
38.0
0.8
0.0
1. DO
38.8
1. 00
38.8
D
3
0.64
0.31
8.1
0.1
0.0
1. 00
8.2
1. 00
8.2
A
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3. 6
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Background AM
Intersection #2: Homestead/Blaney
Signal=ProtecVRights=lnclude
Final Vol: 0 0 0
Lanes: 0 0 0 0 0
~4.~~
Signal=Protecl Signal=Prolect
Final Vol: Lanes: Righls=lnclude Vol ent Dale: 7/1712007 Rights=lnclude Lanes: Fmai Vol:
..f Cycle Time (sec): 100 ~
0 0 0 0
~ Loss Time (see): 0 ~
0 0
533'" -... Critical V/C: 0.358 -<Ill- 2 726
=r Avg Crit Del [sec/veh): 20.3 r 0
84 0 Avg Delay (sec/veh): 15.9 98'"
LOS: B
~ ~ t t-- ~
Lanes: 0 0 0
Final Vol: 233'" 0 182
Signal=ProtecVRights=lnclude
Street Name: Blaney Avenue Homes tead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1_______________11 _______________11 _______________11 --------------- 1
Volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 231 0 182 0 0 0 0 531 83 98 725 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Ese: 231 0 182 0 0 0 0 531 83 98 725 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 2 0 0 0 0 0 0 2 1 0 1 0
Initial Fut: 233 0 182 0 0 0 0 533 84 98 726 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 233 0 182 0 0 0 0 533 84 98 726 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 233 0 182 0 0 0 0 533 84 98 726 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 233 0 182 0 0 0 0 533 84 98 726 0
____________1_______________11_______________11 _______________11_______________1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1.00 0.85 1.00 1.00 1.00 1.00 0.93 0.93 0.95 0.95 1.00
Lanes: 1.00 0.00 1.00 0.00 0.00 0.00 0.00 1.73 0.27 1.00 2.00 0.00
Final Sat.: 1805 0 1615 0 0 0 0 3056 482 1805 3610 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.13 0.00 0.11 0.00 0.00 0.00 0.00 0.17 0.17 0.05 0.20 0.00
Crit Moves: ****
Green/Cycle: 0.36
Volume/Cap: 0.36
Uniform Del: 23.5
IncremntDel: 0.3
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 23.8
User DelAdj: 1.00
AdjDel/Veh: 23.8
LOS by Move: C
HCM2kAvgQ: 5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.36
0.31
23.0
0.3
0.0
1. 00
23.3
1. 00
23.3
C
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.49
0.36
15.9
0.1
0.0
1. 00
16.0
1. 00
16.0
B
6
****
0.49
0.36
15.9
0.1
0.0
1. 00
16.0
1. 00
16.0
B
6
****
0.15
0.36
38.0
0.8
0.0
1. 00
38.8
1. 00
38.8
D
3
0.64
0.31
8.1
0.1
0.0
1. 00
8.2
1. 00
8.2
A
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Trafflx 7.B.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 05 12:02:50 2007
Page 3- 7
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
. Project AM
Intersection #2: Homestead/Blaney
Signal =ProlecURighls=lnclude
Final Vol: 0 0 0
Lanes: 00 0 00
~4~~~
Signal=Protecl Signal =Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnl Dale: 7/1712007 Rights=lnclude Lanes: Final Vol:
j Cycle Time (see): 100 ~
0 0 0 0
--t Loss Time (see): J.-
0 0
538." -.. Cntical VlC: 0.359 ...- 2 729
r Avg Crit Del (sec/veh): 20.2 1= 0
84 0 Avg Delay (sec/veh): 15.8 98.'.
LOS: B
~ ~ t ~ ~
Lanes: 0 0 0 1
Final Vol: 233... 0 182
Signal=ProlecURights=lnclude
Street Name: Blaney Avenue Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 233 0 182 0 0 0 0 533 84 98 726 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 233 0 182 0 0 0 0 533 84 98 726 0
Added Vol: 0 0 0 0 0 0 0 5 0 0 3 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 233 0 182 0 0 0 0 538 84 98 729 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.001.00
PHF Volume: 233 0 182 0 0 0 0 538 84 98 729 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 233 0 182 0 0 0 0 538 84 98 729 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 233 0 182 0 0 0 0 538 84 98 729 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1.00 0.85 1.00 1.00 1.00 1.00 0.93 0.93 0.95 0.95 1.00
Lanes: 1.00 0.00 1.00 0.00 0.00 0.00 0.00 1.73 0.27 1.00 2.00 0.00
Final Sat.: 1805 0 1615 0 0 0 0 3060 478 1805 3610 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.13 0.00 0.11 0.00 0.00 0.00 0.00 0.18 0.18 0.05 0.20 0.00
Crit Moves: ****
Green/Cycle: 0.36 0.00
Volume/Cap: 0.36 0.00
Uniform Del: 23.6 0.0
IncremntDel: 0.3 0.0
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 0.00
Delay/Veh: 23.9 0.0
User DelAdj: 1.00 1.00
AdjDel/Veh: 23.9 0.0
LOS by Move: C A
HCM2kAvgQ: 5 0
0.36
0.31
23.1
0.3
0.0
1. 00
23.4
1. 00
23.4
C
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.49
0.36
15.8
0.1
0.0
1. 00
15.9
1. 00
15.9
B
6
****
0.49
0.36
15.8
0.1
0.0
1. 00
15.9
1. 00
15.9
B
6
****
0.15
0.36
38.1
0.8
0.0
1. 00
38.9
1. 00
38.9
D
3
0.64
0.32
8.1
0.1
0.0
1. 00
8.2
1. 00
8.2
A
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 0512:02:50 2007
Page 3. 8
Level Of Service Computation Report
2000 HeM Operations (Future Volume Alternative)
Future Growth AM
Intersection #2: Homestead/Blaney
Signal =ProtecVRights=lnclude
Final Vol: 0 0 0
Lanes: 0 0 0 0 0
~4+~~
Signal=Prolect Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: nla Rights=lnclude Lanes: Final Vol:
J. Cycle TIme (see): 100 ~
0 0 0 0
~ Loss Time (see): ~
0 0
557"" 1 ----JIto- Crllical VlC: 0.372 -0lil- 2 755
r Avg Crit Del (seclveh): 20.4 T 0
87 0 Avg Delay (seclveh): 16.0 102'"
LOS: B
~ ~ t ~ ~
Lanes: 0 0 0
Final Vol: 241'" 0 189
Signal =ProtecVRights=lnclude
Street Name: Blaney Avenue Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------1 ] ---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 241 0 189 0 0 0 0 557 87 102 755 0
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 241 0 189 0 0 0 0 557 87 102 755 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 241 0 189 0 0 0 0 557 87 102 755 0
User Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 241 0 189 0 0 0 0 557 87 102 755 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 241 0 189 0 0 0 0 557 87 102 755 0
PCE Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 241 0 189 0 0 0 0 557 87 102 755 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1. 00 0.85 1. 00 1. 00 1. 00 1. 00 0.93 0.93 0.95 0.95 1. 00
Lanes: 1. 00 0.00 1. 00 0.00 0.00 0.00 0.00 1. 73 0.27 1. 00 2.00 0.00
Final Sat. : 1805 0 1615 0 0 0 0 3060 478 1805 3610 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.13 0.00 0.12 0.00 0.00 0.00 0.00 0.18 0.18 0.06 0.21 0.00
Crit Moves: **** **** ****
Green/Cycle: 0.36 0.00 0.36 0.00 0.00 0.00 0.00 0.49 0.49 0.15 0.64 0.00
Volume/Cap: 0.37 0.00 0.33 0.00 0.00 0.00 0.00 0.37 0.37 0.37 0.33 0.00
Uniform Del: 23.7 0.0 23.3 0.0 0.0 0.0 0.0 15.9 15.9 38.1 8.1 0.0
IncremntDel: 0.4 0.0 0.3 0.0 0.0 0.0 0.0 0.1 0.1 0.9 0.1 0.0
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 1. 00 0.00 1. 00 0.00 0.00 0.00 0.00 1. 00 1. 00 1. 00 1. 00 0.00
Delay/Veh: 24.1 0.0 23.6 0.0 0.0 0.0 0.0 16.1 16.1 39.0 8.2 0.0
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh: 24.1 0.0 23.6 0.0 0.0 0.0 0.0 16.1 16.1 39.0 8.2 0.0
LOS by Move: C A C A A A A B B D A A
HCM2kAvgQ: 6 0 4 0 0 0 0 6 6 3 5 0
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3- 9
Level Of Service Computation Report
2000 HeM Operations (Future Volume Alternative)
Existing AM
Intersection #3: HomesteadlWolfe
Signal =ProtecVRights=lnclude
Final Val: 68 715 113'"
Lanes: 01202
..v4t~~
Signal=Protect Signal=ProlecL
Final Val: Lanes: Rights=lnclude Val Cnt Dale: 7/1712007 Rights=lnclude Lanes: Final Val:
J- Cycle TIme (see): 120 +-
123 0 75
~ Loss Time (see): 0 J-
0
433'" 2 ~ Critical V/C: 0.496 +- 451
0 r Avg Crit DeL (seclveh): 31.5 1= 0
188 Avg Delay (seclveh): 32.1 193'"
LOS: C
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Val: 239 854'" 252
Signal=ProtecVRighls=lnclude
Street Name: Wolfe Road Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------ t ---------------11--------------- t t ---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 239 854 252 113 715 68 123 433 188 193 451 75
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 239 854 252 113 715 68 123 433 188 193 451 75
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 239 854 252 113 715 68 123 433 188 193 451 75
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 239 854 252 113 715 68 123 433 188 193 451 75
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 239 854 252 113 715 68 123 433 188 193 451 75
PCE Adj: 1. 00 1. 00 1. 00 1.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 239 854 252 113 715 68 123 433 188 193 451 75
------------1--------------- t 1---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.90 0.90 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.74 0.26 1.00 2.00 1.00 1.00 1.71 0.29
Final Sat.: 3502 3610 1615 3502 4675 445 1805 3610 1615 1805 3030 504
------------1---------------1 t ---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.07 0.24 0.16 0.03 0.15 0.15 0.07 0.12 0.12 0.11 0.15 0.15
Crit Moves: ****
Green/Cycle: 0.17 0.48
Volume/Cap: 0.41 0.50
Uniform Del: 44.6 21.5
IncrernntDel: 0.5 0.2
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 45.1 21.7
User DelAdj: 1.00 1.00
AdjDel/Veh: 45.1 21.7
LOS by Move: D C
HCM2kAvgQ: 4 11
0.48
0.33
19.4
0.2
0.0
1. 00
19.7
1. 00
19.7
B
6
0.07
0.50
54.2
1.7
0.0
1. 00
55.9
1. 00
55.9
E
3
****
0.37
0.41
27.7
0.1
0.0
1. 00
27.8
1. 00
27.8
C
8
0.37
0.41
27.7
0.1
0.0
1. 00
27.8
1. 00
27.8
C
8
0.14
0.47
47.2
1.4
0.0
1. 00
48.6
1. 00
48.6
D
5
0.24
0.50
39.2
0.4
0.0
1. 00
39.6
1. 00
39.6
D
7
****
0.24
0.48
39.0
0.9
0.0
1. 00
40.0
1. 00
40.0
D
6
****
0.22
0.50
41.3
1.0
0.0
1. 00
42.3
1. 00
42.3
D
7
0.31
0.47
33.2
0.3
0.0
1. 00
33.5
1. 00
33.5
C
8
0.31
0.47
33.2
0.3
0.0
1. 00
33.5
1. 00
33.5
C
8
Trallix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:502007
Page 3.10
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alterna\lve)
Background AM
Intersection #3: HomesteadlWolfe
Signal=ProlecVRights=lncl ude
Final Vol: 68 721 113--
Lanes: 01202
~4t~~
Signal=Protect Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 7/17/2007 Rights=lnclude Lanes: Final Vol:
~ Cycle Time (see): 120 ~
123 0 75
-4 Loss Time (see): 0 J-
0
433--- 2 ----... Critical V/C: 0.500 ....- 451
0 r Avg Cril Del (seclveh): 31.6 1= 0
194 Avg Delay (seelveh): 32.2 199'"
LOS: C
..) ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 242 858'" 256
Signal=ProlecVRights=lnclude
. Street Name: Wolfe Road Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------I
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 239 854 252 113 715 68 123 433 188 193 451 75
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 239 854 252 113 715 68 123 433 188 193 451 75
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 3 4 4 0 6 0 0 0 6 6 0 0
Initial Fut: 242 858 256 113 721 68 123 433 194 199 451 75
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 242 858 256 113 721 68 123 433 194 199 451 75
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 242 858 256 113 721 68 123 433 194 199 451 75
PCE Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 242 858 256 113 721 68 123 433 194 199 451 75
------------1---------------11---------------11--------------,-11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.90 0.90 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.74 0.26 1.00 2.00 1.00 1.00 1.71 0.29
Final Sat.: 3502 3610 1615 3502 4678 441 1805 3610 1615 1805 3030 504
------------1---------------11---------------11---------------11---------------I
Capacity Analysis Module:
Vol/Sat: 0.07 0.24 0.16 0.03 0.15 0.15 0.07 0.12 0.12 0.11 0.15 0.15
Crit Moves: ****
Green/Cycle: 0.17 0.48
Volume/Cap: 0.41 0.50
Uniform Del: 44.7 21.7
IncremntDe1: 0.5 0.2
InitQueuDe1: 0.0 0.0
Delay Adj: 1.00 1.00
De1ay/Veh: 45.2 21.9
User De1Adj: 1.00 1.00
AdjDe1/Veh: 45.2 21.9
LOS by Move: D C
HCM2kAvgQ: 4 11
0.48
0.33
19.6
0.3
0.0
1. 00
19.9
1. 00
19.9
B
6
0.06
0.50
54.3
1.7
0.0
1. 00
56.0
1. 00
56.0
E
3
****
0.37
0.41
27.9
0.1
0.0
1. 00
28.1
1. 00
28.1
C
8
0.37
0.41
27.9
0.1
0.0
1. 00
28.1
1. 00
28.1
C
8
0.14
0.47
47.1
1.3
0.0
1. 00
48.5
1. 00
48.5
D
5
0.24
0.50
39.4
0.5
0.0
1. 00
39.9
1. 00
39.9
D
8
****
0.24
0.50
39.4
1.0
0.0
1. 00
40.4
1. 00
40.4
D
7
****
0.22
0.50
41.0
1.0
0.0
1. 00
42.0
1. 00
42.0
D
7
0.32
0.47
33.0
0.3
0.0
1. 00
33.3
1. 00
33.3
C
8
0.32
0.47
33.0
0.3
0.0
1. 00
33.3
1. 00
33.3
C
8
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 0512:02:50 2007
Page 3-11
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project AM
Intersection #3: HomesteadlWolfe
Signal =ProtecVRighls=lnclude
Final Vol: 66 726 113m
Lanes: 01202
..-J4.~~
Signal=Protecl Signal=Prolect
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 7/1712007 Rights=lnclude Lanes: Final Vol:
J. Cycle Time (sec): 120 ~
126 0 75
-t Loss Time (see): 0 ~
0
435." 2 -. Critical VlC: 0.504 ..- 451
0 r Avg Crit Del (seclveh): 31.8 r 0
194 Avg Delay (seclveh): 32.4 204."
LOS: C
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 242 860." 256
Signal=ProlecVRights=lnclude
Street Name: Wolfe Road Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11------------------------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1 _______________11_______________11_______________11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 242 858 256 113 721 68 123 433 194 199 451 75
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 242 858 256 113 721 68 123 433 194 199 451 75
Added Vol: 0 2 2 0 5 0 5 2 0 5 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 242 860 258 113 726 68 128 435 194 204 451 75
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 242 860 258 113 726 68 128 435 194 204 451 75
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 242 860 258 113 726 68 128 435 194 204 451 75
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj.: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 242 860 258 113 726 68 128 435 194 204 451 75
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.90 0.90 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.74 0.26 1.00 2.00 1.00 1.00 1.71 0.29
Final Sat.: 3502 3610 .1615 3502 4681 438 1805 3610 1615 1805 3030 504
------------I---------------II--~------------II---------------II--_____________1
Capacity Analysis Module:
Vol/Sat: 0.07 0.24 0.16 0.03 0.16 0.16 0.07 0.12 0.12 0.11 0.15 0.15
Crit Moves: ****
Green/Cycle: 0.17 0.47
Volume/Cap: 0.42 0.50
Uniform Del: 44.9 21.9
IncremntDel: 0.5 0.2
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 45.4 22.1
User DelAdj: 1.00 1.00
AdjDel/Veh: 45.4 22.1
LOS by Move: D C
HCM2kAvgQ: 4 11
0.47
0.34
19.9
0.3
0.0
1. 00
20.1
1. 00
20.1
C
6
0.06
0.50
54.3
1.8
0.0
1. 00
56.1
1. 00
56.1
E
3
****
0.37
0.42
28.1
0.1
0.0
1. 00
28.2
1. 00
28.2
C
8
0.37
0.42
28.1
0.1
0.0
1. 00
28.2
1. 00
28.2
C
8
0.15
0.47
46.7
1.3
0.0
1. 00
48.0
1. 00
48.0
D
5
0.24
0.50
39.5
0.5
0.0
1. 00
40.0
1. 00
40.0
D
8
****
0.24
0.50
39.5
1.0
0.0
1. 00
40.5
1. 00
40.5
D
7
****
0.22
0.50
40.7
1.0
0.0
1. 00
41. 7
1. 00
41.7
D
7
0.31
0.47
33.2
0.3
0.0
1. 00
33.5
1. 00
33.5
C
8
0.31
0.47
33.2
0.3
0.0
1. 00
33.5
1. 00
33.5
C
8
Traff<x7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Frr Del 05 12:02:50 2007
Page 3-12
Level Of Service Computation Report
2000 HCM Operations (Fulure Volume Alternative)
Fulure Growth AM
Intersection #3: HomesteadlWolfe
Signal =ProtecVRights=lnclude
Final Voi: 70 752 11 r"
Lanes: 01202
~4~~~
Srgnal=Protect Signal=Protect
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: nla Righls=lnclude Lanes: Final Vol:
J- Cycle Time (see): 120 ~
132 0 78
~ Loss Time (see): 0 .t-
O
451'" 2 -. Critical V/C: 0.522 +- 467
0 r Avg Cril Del (seclveh): 32.1 r 0
201 Avg Delay (sec/veh): 32.6 211'"
LOS: C
~ ~ t ~ r+
Lanes: 2 0.2 0
Final Vol: 251 891'" 267
Slgnal=ProtecVRighls=lnclude
Street Name: Wolfe Road Homestead Road
Approach: North Bound South Bound East Bound West Bound
Hovemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Hin. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------I
Volume Hodule:
Base Vol: 251 891 267 117 752 70 132 451 201 211 467 78
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 251 891 267 117 752 70 132 451 201 211 467 78
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol : 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 251 891 267 117 752 70 132 451 201 211 467 78
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 251 891 267 117 752 70 132 451 201 211 467 78
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 251 891 267 117 752 70 132 451 201 211 467 78
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
HLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 251 891 267 117 752 70 132 451 201 211 467 78
------------1---------------11---------------11---------------11---------------1
Saturation Flow Hodule:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.90 0.90 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.74 0.26 1.00 2.00 1.00 1.00 1.71 0.29
Final Sat.: 3502 3610 1615 3502 4684 436 1805 3610 1615 1805 3028 506
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Hodule:
Vol/Sat: 0.07 0.25 0.17 0.03 0.16 0.16 0.07 0.12 0.12 0.12 0.15 0.15
Crit Haves: ****
Green/Cycle: 0.17 0.47
Volume/Cap: 0.43 0.52
Uniform Del: 45.0 22.1
IncremntDe1: 0.5 0.3
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 45.5 22.4
User DelAdj: 1.00 1.00
AdjDel/Veh: 45.5 22.4
LOS by Move: D C
HCM2kAvgQ: 5 12
0.47
0.35
20.0
0.3
0.0
1. 00
20.3
1. 00
20.3
C
6
****
0.06
0.52
54.4
2.2
0.0
1. 00
56.6
1. 00
56.6
E
3
0.37
0.43
28.3
0.2
0.0
1. 00
28.4
1. 00
28.4
C
8
0.37
0.43
28.3
0.2
0.0
1. 00
28.4
1. 00
28.4
C
8
0.15
0.49
46.9
1.4
0.0
1. 00
48.3
1. 00
48.3
D
5
0.24
0.52
39.7
0.6
0.0
1. 00
40.3
1. 00
40.3
D
8
****
0.24
0.52
39.7
1.3
0.0
1. 00
40.9
1. 00
40.9
D
7
****
0.22
0.52
40.9
1.2
0.0
1. 00
42.2
1. 00
42.2
D
7
0.31
0.49
33.4
0.3
0.0
1. 00
33.7
1. 00
33.7
C
9
0.31
0.49
33.4
0.3
0.0
1. 00
33.7
1. 00
33.7
C
9
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:502007
Page 3-13
Intersection #4: Wolfe/Pruneridge
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Existing AM
Signal=ProtecVRights=lnclude
Final Vol: 12 1094 64--
Lanes: 01201
~4.~~
Signal=Protect Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 7/17/2007 Rights=lnclude Lanes: Final Vol:
J- Cycle Time (sec): 120 ~
44 81
-.\. Loss Time (sec): J-
0 0
31'" 0 -.. Critical VlC: 0.528 +- 21
T Avg Crit Del (sec/veh): 17.7 1= 0
90 0 -. Avg Delay (sec/veh): 16.4 2 164'"
LOS: B
~ +t t ~ r+
Street Name: Wol fe Road Pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------I-uu---------- j 1_________u____II______uuu___II__u___________1
volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 90 1349 385 64 1094 12 44 31 90 164 21 81
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 90 1349 385 64 1094 12 44 31 90 164 21 81
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 90 1349 385 64 1094 12 44 31 90 164 21 81
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 90 1349 0 64 1094 12 44 31 90 164 21 81
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 90 1349 0 64 1094 12 44 31 90 164 21 81
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 90 1349 0 64 1094 12 44 31 90 164 21 81
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.89 0.89 0.92 1.00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.97 0.03 1.00 0.26 0.74 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5120 56 1805 432 1255 3502 1900 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.03 0.37 0.00 0.04 0.21 0.21 0.02 0.07 0.07 0.05 0.01 0.05
Crit Moves: ****
Green/Cycle: 0.08 0.71
Volume/Cap: 0.31 0.53
Uniform Del: 51.8 8.2
IncrernntDel: 0.6 0.2
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 52.4 8.4
User DelAdj: 1.00 1.00
AdjDe1/Veh: 52.4 8.4
LOS by Move: D A
HCM2kAvgQ: 2 12
Lanes: 2 0 2 0
Final Vol: 90 1349'" 0
Signal=ProtecllRlghts=lgnore
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.07
0.53
54.1
4.3
0.0
1. 00
58.4
1. 00
58.4
E
3
0.69
0.31
7.2
0.0
0.0
1. 00
7.3
1. 00
7.3
A
6
0.69
0.31
7.2
0.0
0.0
1. 00
7.3
1. 00
7.3
A
6
0.07
0.33
52.8
1.5
0.0
1. 00
54.3
1. 00
54.3
D
2
0.14
0.53
48.3
2.3
0.0
1. 00
50.6
1. 00
50.6
D
5
****
0.14
0.53
48.3
2.3
0.0
1. 00
50.6
1. 00
50.6
D
5
****
0.09
0.53
52.3
1.7
0.0
1. 00
54.0
1. 00
54.0
D
4
0.15
0.07
43.7
0.1
0.0
1. 00
43.8
1. 00
43.8
D
1
0.15
0.33
45.5
0.8
0.0
1. 00
46.3
1. 00
46.3
D
3
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3-14
Level Of SE!lVice Computalion Report
2000 HeM Operations (Future Volume Alternative)
Background AM
Intersection #4: WolfefPruneridge
Signal=ProtecVRighls=Jnelude
Final Vol: 12 1112 64'"
Lanes: 01201
.-J4t~'+
Signal =Proteel Signal=Prolect
Final Vol: Lanes: Rights=lnelude Vol Cnt Date: 7/17/2007 Rights=lnclude Lanes: Final Vol:
J- Cycle Time (see): 120 -+-
44 81
~ Loss Time (see): 0 ~
0 0
31'- 0 -.... Critical VlC: 0.545 ..- 21
r AV9 Crit Del (seclveh): 19.0 r 0
105 0 AV9 Delay (seclveh): 17.6 2 180'"
LOS: B
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 100 1361'" 0
Signal =ProlecVRights=lgnore
Street Name: Wolfe Road pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1--------------- [ 1---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------1 [---------------1
volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 90 1349 385 64 1094 12 44 31 90 164 21 81
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 90 1349 385 64 1094 12 44 31 90 164 21 81
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 10 12 73 0 18 0 0 0 15 16 0 0
Initial Fut: 100 1361 458 64 1112 12 44 31 105 180 21 81
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 100 1361 0 64 1112 12 44 31 105 180 21 81
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 100 1361 0 64 1112 12 44 31 105 180 21 81
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 100 1361 0 64 1112 12 44 31 105 180 21 81
------------1---------------11---------------11---------------11---------------I
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.88 0.88 0.92 1.00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.97 0.03 1.00 0.23 0.77 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5121 55 1805 383 1297 3502 1900 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.03 0.38 0.00 0.04 0.22 0.22 0.02 0.08 0.08 0.05 0.01 0.05
Crit Moves: ****
Green/Cycle: 0.09 0.69
Volume/Cap: 0.32 0.54
Uniform Del: 51.4 9.1
IncremntDel: 0.6 0.3
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 52.0 9.4
User DelAdj: 1.00 1.00
AdjDel/Veh: 52.0 9.4
LOS by Move: D A
HCM2kAvgQ: 2 13
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.07
0.54
54.4
5.2
0.0
1. 00
59.6
1. 00
59.6
E
3
0.67
0.32
8.4
0.1
0.0
1. 00
8.4
1. 00
8.4
A
6
0.67
0.32
8.4
0.1
0.0
1. 00
8.4
1. 00
8.4
A
6
0.08
0.31
52.1
1.2
0.0
1. 00
53.3
1. 00
53.3
D
2
0.15
0.54
47.3
2.5
0.0
1. 00
49.8
1. 00
49.8
D
5
****
0.15
0.54
47.3
2.5
0.0
1. 00
49.8
1. 00
49.8
D
5
****
0.09
0.54
51.9
1.9
0.0
1. 00
53.8
1. 00
53.8,
D
4
0.16
0.07
42.5
0.1
0.0
1. 00
42.5
1. 00
42.5
D
1
0.16
0.31
44.2
0.7
0.0
1. 00
44.9
1. 00
44.9
D
3
TrafflX 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oel 05 12:02:50 2007
Page 3.15
Level or Service Computation Report
2000 HCM Operations (Future Volume Allernalive)
Project AM
Intersection #4: Wolfe/Pruneridge
Signal=ProlecVRighls=lnclude
Final Vol: 12 1112 64'"
Lanes: 0 1 2 0 1
..,J4.~~
Signal=Protect Signal=Proleel
Final Vol: Lanes: Righls=lnclude Vol Cnt Dale: 7/17/2007 Rights=lnclude Lanes: Final Vol:
~ Cycle Time (sec): 120 ~
47 81
~ Loss Time (sec): 0 .t-
O 0
34-' 0 ---... Critical vie: 0.552 +- 26
r Avg Crit Del (seclveh): 19.6 1= 0
114 0 Avg Delay (seclveh): 18.4 2 180'"
LOS: B
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 114 1361'" 0
Signal=ProtecVRighls=lgnore
Street Name: Wolfe Road Pruneridge
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
volume Module: >> Count Date: 17 Jul 2007 << AM Peak
Base Vol: 100 1361 458 64 1112 12 44 31 105 180 21 81
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 100 1361 458 64 1112 12 44 31 105 180 21 81
Added Vol: 14 0 0 0 0 0 3 3 9 0 5 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 114 1361 458 64 1112 12 47 34 114 180 26 81
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 114 1361 0 64 1112 12 47 34 114 180 26 81
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 114 1361 0 64 1112 12 47 34 114 180 26 81
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 114 1361 0 64 1112 12 47 34 114 180 26 81
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.89 0.89 0.92 1.00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.97 0.03 1.00 0.23 0.77 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5121 55 1805 386 1295 3502 1900 1615
------------1---------------] 1---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.03 0.38 0.00 0.04 0.22 0.22 0.03 0.09 0.09 0.05 0.01 0.05
Crit Moves: ****
Green/Cycle: 0.10 0.68
Volume/Cap: 0.33 0.55
Uniform Del: 50.5 9.7
IncrernntDel: 0.6 0.3
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 51.1 9.9
User DelAdj: 1.00 1.00
AdjDe1/Veh: 51.1 9.9
LOS by Move: D A
HCM2kAvgQ: 2 13
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.06
0.55
54.5
5.6
0.0
1. 00
60.1
1. 00
60.1
E
3
****
0.65
0.33
9.4
0.1
0.0
1. 00
9.5
1. 00
9.5
A
7
0.65
0.33
9.4
0.1
0.0
1. 00
9.5
1. 00
9.5
A
7
0.09
0.30
51.4
1.1
0.0
1. 00
52.5
1. 00
52.5
D
2
0.16
0.55
46.5
2.5
0.0
1. 00
49.0
1. 00
49.0
D
6
****
0.16
0.55
46.5
2.5
0.0
1. 00
49.0
1. 00
49.0
D
6
****
0.09
0.55
52.0
2.0
0.0
1. 00
54.1
1. 00
54.1
D
4
0.17
0.08
42.3
0.1
0.0
1. 00
42.4
1. 00
42.4
D
1
0.17
0.30
43.9
0.6
0.0
1. 00
44.5
1. 00
44.5
D
3
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
F ri Ocl 05 12:02:50 2007
Page 3-16
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth AM
Intersection #4: Wolfe/Pruneridge
Signal=ProtecVRights=lnclude
Final Vol: 12 1151 66'"
Lanes: 0 1 2 0 1
~4.~'+
Signal=Protect Signal =Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: nla Rights=lnclude Lanes: Final Vol:
.J- Cycie Time {sec}: 120 ~
49 B4
~ Loss Time (sec): 0 J-
0 0
35'" 0 -... Critical V/C: 0.571 +- 27
r Avg Crit Del (sec/veh): 19.9 ~ 0
117 0 Avg Delay (seclveh): 16.6 2 166'"
LOS: B
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 117 1410'" 0
Signal =ProlecVRighls=lgnore
Street Name: Wolfe Road pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------1 [---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
volume Module:
Base Vol: 117 1410 472 66 1151 12 49 35 117 186 27 84
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 117 1410 472 66 1151 12 49 35 117 186 27 84
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Ini tial Fut: 117 1410 472 66 1151 12 49 35 117 186 27 84
User Adj: 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 117 1410 0 66 1151 12 49 35 117 186 27 84
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 117 1410 0 66 1151 12 49 35 117 186 27 84
PCE Adj : 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 117 1410 0 66 1151 12 49 35 117 186 27 84
------------1---------------11---------------1 [---------------1 [---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1. 00 0.95 0.91 0.91 0.95 0.89 0.89 0.92 1. 00 0.85
Lanes: 2.00 2.00 1. 00 1. 00 2.97 0.03 1. 00 0.23 0.77 2.00 1. 00 1. 00
Final Sat. : 3502 3610 1900 1805 5128 53 1805 387 1294 3502 1900 1615
------------1---------------1 [---------------11--------------- [ 1---------------]
Capacity Analysis Module:
Vol/Sat: 0.03 0.39 0.00 0.04 0.22 0.22 0.03 0.09 0.09 0.05 0.01 0.05
Crit Moves: **** **** **** ****
Green/Cycle: 0.10 0.68 0.00 0.06 0.65 0.65 0.09 0.16 0.16 0.09 0.17 0.17
Volume/Cap: 0.34 0.57 0.00 0.57 0.34 0.34 0.31 0.57 0.57 0.57 0.09 0.31
Uniform Del: 50.6 9.8 0.0 54.6 9.4 9.4 51. 5 46.7 46.7 52.1 42.4 44.1
IncremntDel: 0.6 0.3 0.0 6.7 0.1 0.1 1.2 2.9 2.9 2.4 0.1 0.7
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Delay/Veh: 51.2 10.1 0.0 61. 2 9.5 9.5 52.7 49.7 49.7 54.5 42.5 44.8
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh: 51.2 10.1 0.0 61. 2 9.5 9.5 52.7 49.7 49.7 54.5 42.5 44.8
LOS by Move: D B A E A A D D D D D D
HCM2kAvgQ: 2 14 0 3 7 7 2 6 6 4 1 3
Traffix 7.6.0915
Copyright (cl 2005 Dowling Associates, Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Del 05 12:02:50 2007
Page 3-17
Level Of Service Computation Report
2000 HCM Operations (Future Volume A1temalive)
Existing AM
Intersection #5: Wolfe/l-280 NB Ramp
Signal =ProlecURlghts=lgnore
Final Vol: 0 629 0'"
Lanes: 0 0 2 0 0
~4.~~
Signal=Proleel Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 10/312006 Rights=lnclude Lanes: Final Vol:
J- Cycle Time (see): 60 ~
0 0 720'"
~ Loss Time (sec): 0 J-
0 0
0 0 -. Critical VlC: 0.624 .- 1! 0
0 r AV9 Crit Del (seclveh): 11.4 1= 0
0 Avg Delay (seclveh): 10.1 383
LOS: B
~ ~ t ~ ~
Lanes: 00200
Final Vol: 0 1320'" 0
Signal=ProtecURights=lgnore
Street Name: Wolfe Road I-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 0 1320 0 0 629 0 0 0 0 383 0 720
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 1320 0 0 629 0 0 0 0 383 0 720
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1320 0 0 629 0 0 0 0 383 0 720
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 1320 0 0 629 0 0 0 0 383 0 720
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1320 0 0 629 0 0 0 0 383 0 720
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 1320 0 0 629 0 0 0 0 383 0 720
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 0.89 1.00 0.89
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1.35 0.00 1.65
Final Sat.: 0 3610 0 0 3610 0 0 0 0 2270 0 2784
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.37 0.00 0.00 0.17 0.00 0.00 0.00 0.00 0.17 0.00 0.26
Crit Moves: ****
Green/Cycle: 0.00 0.59
Volume/Cap: 0.00 0.62
Uniform Del: 0.0 8.1
IncremntDel: 0.0 0.6
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
Delay/Veh: 0.0 8.7
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 8.7
LOS by Move: A A
HCM2kAvgQ: 0 9
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.59
0.30
6.2
0.1
0.0
1. 00
6.3
1. 00
6.3
A
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.41
0.41
12.4
0.1
0.0
1. 00
12.5
1. 00
12.5
B
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.41
0.62
13.9
0.7
0.0
1. 00
14.6
1. 00
14.6
B
7
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Del 05 12:02:50 2007
Page 3.18
Levei Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Background AM
Intersection #5: Wolfell.280 NB Ramp
Slgnal=ProtecVRights=lgnore
Final Vol: 0 678 0'"
Lanes: 0 0 2 0 0
...-J4.~~
Slgnal=Protect Signal=Prolect
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: 10/312006 Rights=lnclude Lanes: Final Vol:
~ Cycle Time (see): 60 ~
0 0 720'"
~ Loss Time (see): 0 ~
0 0
0 0 --+- Critical V/C: 0.638 ...- 11 0
0 r Avg Grit Del (seclveh): 11.6 r 0
0 0 Avg Delay (seclveh): 10.2 444
LOS: B
~ ~ t ~ ~
Lanes: 00 2 00
Final Vol: 0 1352'" 0
Signal =ProtecVRights=lgnore
Street Name: Wolfe Road 1-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------1 ) ---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------.------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 0 1320 0 0 629 0 0 0 0 383 0 720
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 1320 0 0 629 0 0 0 0 383 0 720
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 32 0 0 49 0 0 0 0 61 0 0
Initial Fut: 0 1352 0 0 678 0 0 0 0 444 0 720
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 1352 0 0 678 0 0 0 0 444 0 720
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1352 0 0 678 0 0 0 0 444 0 720
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol. : 0 1352 0 0 678 0 0 0 0 444 0 720
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 0.89 1.00 0.89
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1.38 0.00 1.62
Final Sat.: 0 3610 0 0 3610 0 0 0 0 2335 0 2736
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.37 0.00 0.00 0.19 0.00 0.00 0.00 0.00 0.19 0.00 0.26
Crit Moves: ****
Green/Cycle: 0.00 0.59
Volume/Cap: 0.00 0.64
Uniform Del: 0.0 8.2
IncremntDel: 0.0 0.7
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
Delay/Veh: 0.0 8.8
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 8.8
LOS by Move: A A
HCM2kAvgQ: 0 10
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.59
0.32
6.3
0.1
0.0
1. 00
6.4
1. 00
6.4
A
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.41
0.46
12.8
0.1
0.0
1. DO
12.9
1. DO
12.9
B
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.41
0.64
14.0
0.8
0.0
1. 00
14.8
1. 00
14.8
B
8
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Ino.
Licensed to Hexagon Trans. San Jose
COMPARE
F ri Oct 05 12:02:50 2007
Page 3-19
Level Of ServIce Computation Report
2000 HCM Operations (Future Volume Alternative)
Project AM
Intersection #5: Wolfell-280 NB Ramp
Signal=ProtecVRights=lgnore
Final Vol: 0 685 0'"
Lanes: 0 0 2 0 0
~4.~~
Signal=Protect Signal =Prolecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 10/312006 Rights=lnclude Lanes: Final Vol:
j- Cycle Time (see): 60 ~
0 0 723'"
~ Loss Time (see): 0 J-
0 0
0 0 --. Critical V/C: 0.641 ...- 1! 0
0 r Avg Crit Del (seclvehl: 11.6 1= 0
0 0 Avg Delay (seclveh): 10.2 444
LOS: B
~ ~ t ~ ~
Lanes: 00200
Final Vol: 0 1362'" 0
Signal =ProlecVRighls=lgnore
Street Name: Wolfe Road 1-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 0 1352 0 0 678 0 0 0 0 444 0 720
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 1352 0 0 678 0 0 0 0 444 0 720
Added Vol: 0 10 0 0 7 2 0 0 0 0 0 3
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1362 0 0 685 2 0 0 0 444 0 723
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 1362 0 0 685 0 0 0 0 444 0 723
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1362 0 0 685 0 0 0 0 444 0 723
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 1362 0 0 685 0 0 0 0 444 0 723
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 0.89 1.00 0.89
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1.38 0.00 1.62
Final Sat.: 0 3610 0 0 3610 0 0 0 0 2334 0 2738
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.38 0.00 0.00 0.19 0.00 0.00 0.00 0.00 0.19 0.00 0.26
Crit Moves: ****
Green/Cycle: 0.00 0.59
Volume/Cap: 0.00 0.64
Uniform Del: 0.0 8.2
IncremntDel: 0.0 0.7
InitQueuDe1: 0.0 0.0
Delay Adj: 0.00 1.00
De1ay/Veh: 0.0 8.8
User De1Adj: 1.00 1.00
AdjDel/Veh: 0.0 8.8
LOS by Move: A A
HCM2kAvgQ: 0 10
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.59
0.32
6.3
0.1
0.0
1. 00
6.4
1. 00
6.4
A
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.41
0.46
12.8
0.1
0.0
1. 00
13.0
1. 00
13.0
B
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.41
0.64
14.1
0.8
0.0
1. 00
14.9
1. 00
14.9
B
8
Traffix 7.8.0915
Copyright (cl 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 0512:02:50 2007
Page 3.20
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth AM
Intersection #5: Wolfe/l-280 NB Ramp
Signal=ProleeVRights=lgnore
Final Vol: 0 70B 0-'
Lanes: 0 0 2 0 0
~4~~~
Signal=Protect Signal =Protect
Final Vol: Lanes: Righls=lnclude Vol Cnl Date: nfa Righls=lnclude Lanes: Final Vol:
~ Cycle Time (see): 60 ~
0 0 749'"
~ Loss Time (see): 0 ~
0 0
0 0 -... Critical VIC: 0.664 ...- 1! 0
0 r Avg Crit Del (seelveh): 12.0 T 0
0 0 Avg Delay (seelveh): 10.5 45B
LOS: B
~ ~ t ~ ~
Lanes: 0 0 2 0 0
Final Vol: 0 1410'" 0
Slgnal=ProtecVRights=lgnore
Street Name: Wolfe Road 1-280 NB Ramp
Approach: North Bound Sout.h Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------I
Volume Module:
Base Vol: 0 1410 265 0 708 594 0 0 0 458 0 749
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 0 1410 265 0 708 594 0 0 0 458 0 749
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Init.ial Fut: 0 1410 265 0 708 594 0 0 0 458 0 749
User Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 0 1410 0 0 708 0 0 0 0 458 0 749
Reduct. Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1410 0 0 708 0 0 0 0 458 0 749
PCE Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 0 1410 0 0 708 0 0 0 0 458 0 749
------------1---------------11---------------11---------------11---------------1
Saturat.ion Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1. 00 0.95 0.95 1. 00 0.95 0.95 1. 00 1. 00 1. 00 0.89 1. 00 0.89
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1. 38 0.00 1. 62
Final Sat.. : 0 3610 0 0 3610 0 0 0 0 2332 0 2740
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.39 0.00 0.00 0.20 0.00 0.00 0.00 0.00 0.20 0.00 0.27
Crit Moves: **** **** ****
Green/Cycle: 0.00 0.59 0.00 0.00 0.59 0.00 0.00 0.00 0.00 0.41 0.00 0.41
Volume/Cap: 0.00 0.66 0.00 0.00 0.33 0.00 0.00 0.00 0.00 0.48 0.00 0.66
Uniform Del: 0.0 8.3 0.0 0.0 6.3 0.0 0.0 0.0 0.0 12.9 0.0 14.3
Incrernnt.De1: 0.0 0.8 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1 0.0 0.9
Init.QueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 0.00 1. 00 0.00 0.00 1. 00 0.00 0.00 0.00 0.00 1. 00 0.00 1. 00
Delay/Veh: 0.0 9.1 0.0 0.0 6.4 0.0 0.0 0.0 0.0 13 .1 0.0 15.2
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh: 0.0 9.1 0.0 0.0 6.4 0.0 0.0 0.0 0.0 13 .1 0.0 15.2
LOS by Move: A A A A A A A A A B A B
HCM2kAvgQ: 0 10 0 0 4 0 0 0 0 5 0 8
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 05 12:02:502007
Page 3-21
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Existing AM
Intersection #6: Wolfell-280 SB Ramp
Signal =ProtecVRights=lgnore
Final Vol: 0 731 0-
Lanes: 0 0 3 0 0
..v4ti+~
Signal=Prolect Signal=Prolect
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 10/3/2006 Rights=lnclude Lanes: Final Vol:
.-f Cycle Time (see): 60 ~
561." 2 0 0
-.t Loss Time (see): 0 J-
0 0
0 0 --+ Critical VlC: 0.428 -+- 0 0
0 T Avg Crit Del (seclveh): 8.9 1= 0
154 2 . Avg Delay (seclveh): 7.9 0 0
LOS: A
~ ~ t ~ r+
Lanes: 0 0 2 0 0
Final Vol: 0 965... 0
Signal=ProtecVRighls=lgnore
Wolfe Road 1-280 SB Ramp
North Bound South Bound East Bound West Bound
L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 0 965 0 0 731 0 561 0 154 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 965 0 0 731 0 561 0 154 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 965 0 0 731 0 561 0 154 0 0 0
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 965 0 0 731 0 561 0 154 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 965 0 0 731 0 561 0 154 0 0 0
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 965 0 0 731 0 561 0 154 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.91 1.00 0.92 1.00 0.75 1.00 1.00 1.00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat.: 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.27 0.00 0.00 0.14 0.00 0.16 0.00 0.05 0.00 0.00 0.00
Crit Moves: ****
Green/Cycle: 0.00 0.63
Volume/Cap: 0.00 0.43
Uniform Del: 0.0 5.7
IncremntDel: 0.0 0.1
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
De1ay/Veh: 0.0 5.9
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 5.9
LOS by Move: A A
HCM2kAvgQ: 0 5
Street Name:
Approach:
Movement:
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.63
0.23
4.9
0.0
0.0
1. 00
4.9
1. 00
4.9
A
2
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.37
0.43
14.0
0.2
0.0
1. 00
14.2
1. 00
14.2
B
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.37
0.14
12.4
0.1
0.0
1. 00
12.5
1. 00
12.5
B
1
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (cl 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3-22
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Background AM
Intersection #6: Wolfe/l-280 SB Ramp
Signal=ProtecURighls=lgnore
Final Vol: 0 1121 0'"
Lanes: 00 3 00
~4+'}'~
Signal =Prolect Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 10/312006 Rights=lnclude Lanes: Final Vol:
J. Cycle Time (sec): 60 ~
561--- 2 0 0
~ Loss Time (sec): ~
0 0
0 0 --.... Critical VIC: 0.462 -+- 0 0
0 r Avg Crit Del (seclveh); 8.8 1= 0
210 2 Avg Delay (seclveh): 7.6 0
LOS: A
~ ~ t ~ r+
Lanes: 00 2 00
Final Vol: 0 108So.. 0
Signal=ProlecURights=lgnore
Street Name: Wolfe Road 1-280 SB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 0 965 0 0 731 0 561 0 154 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 965 0 0 731 0 561 0 154 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 124 0 0 390 0 0 0 56 0 0 0
Initial Fut: 0 1089 0 0 1121 0 561 0 210 0 0 0
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj; 1.001.00 0.00 1.00 1.00 0.00 1.001.00 1.00 1.001.00 1.00
PHF Volume: 0 1089 0 0 1121 0 561 0 210 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1089 0 0 1121 0 561 0 210 0 0 0
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 1089 0 0 1121 0 561 0 210 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.91 1.00 0.92 1.00 0.75 1.00 1.00 1.00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat.: 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module;
Vol/Sat: 0.00 0.30 0.00 0.00 0.22 0.00 0.16 0.00 0.07 0.00 0.00 0.00
Crit Moves: ****
Green/Cycle: 0.00 0.65
Volume/Cap; 0.00 0.46
Uniform Del: 0.0 5.2
IncrernntDel: 0.0 0.1
InitQueuDel: 0.0 0.0
Delay Adj; 0.00 1.00
Delay/Veh: 0.0 5.3
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 5.3
LOS by Move: A A
HCM2kAvgQ; 0 6
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.65
0.33
4.6
0.1
0.0
1. 00
4.7
1. 00
4.7
A
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.35
0.46
15.2
0.3
0.0
1. 00
15.5
1. 00
15.5
B
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.35
0.21
13.8
0.1
0.0
1. 00
13 .9
1. 00
13 .9
B
2
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3-23
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project AM
Intersection #6: Wolfe/l-280 5B Ramp
Signal=ProtecVRights=lgnore
Final Vol: 0 1125 0'"
Lanes: 00 3 00
~4~~~
Signal=Prolect Signal=Prolect
Final Vol: Lanes: Righls=lnctude Vol Cnt Date: 1013/2006 Righls=Jnclude Lanes: Final Vol:
J- Cycie Time (sec): 60 ~
564'" 2 0
~ Loss Time (see): 0 ~
0 0
0 0 ---III-- Critical V/C: 0.465 ..- 0 0
0 r Avg Crit Del (seelveh): 8.8 T 0
210 2 Avg Delay (seclveh): 7.6 0 0
LOS: A
~ ~ t ~ r+-
Lanes: 00 2 00
Final Vol: 0 1096m 0
Signal=ProlectlRlghts=lgnore
Wolfe Road 1-280 SB Ramp
North Bound South Bound East Bound West Bound
L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------I---------------! 1---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 0 1089 0 0 1121 0 561 0 210 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 1089 0 0 1121 0 561 0 210 0 0 0
Added Vol: 0 7 0 0 4 2 3 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1096 0 0 1125 2 564 0 210 0 0 0
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 1096 0 0 1125 0 564 0 210 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1096 0 0 1125 0 564 0 210 0 0 0
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 1096 0 0 1125 0 564 0 210 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.91 0.91 0.92 1.00 0.75 1.00 1.00 1.00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat.: 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.30 0.00 0.00 0.22 0.00 0.16 0.00 0.07 0.00 0.00 0.00
Crit Moves: ****
Green/Cycle: 0.00 0.65
Volume/Cap: 0.00 0.46
Uniform Del: 0.0 5.2
IncremntDel: 0.0 0.1
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
Delay/Veh: 0.0 5.3
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 5.3
LOS by Move: A A
HCM2kAvgQ: 0 6
Street Name:
Approach:
Movement:
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.65
0.33
4.6
0.1
0.0
1. 00
4.7
1. 00
4.7
A
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.35
0.46
15.3
0.3
0.0
1. 00
15.5
1. 00
15.5
B
5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.35
0.21
13.8
0.1
0.0
1. 00
13.9
1. 00
13.9
B
2
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:502007
Page 3-24
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth AM
Intersection #6: Wolfell-280 SB Ramp
Signal=ProteCVRights=lgnore
Final Vol: 0 1151 0'"
Lanes: 0 0 3 0 0
..,J4~~'+
Signal=Prolecl Signal=Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnt Dale: nfa Righls=lnctude Lanes: Final Vol:
J- Cycle Time (see): 60 ~
584'" 2 0 0
-t Loss Time (see): 0 ~
0 0
0 0 --JIIo- Critical VlC: 0.480 .- 0 0
0 =r Avg Crjt Del (seciveh): 8.9 r 0
216 2 Avg Delay (seciveh): 7.7 0 0
LOS: A
~ +t t ~ ~
Lanes: 0 0 2 0 0
Final Vol: 0 , 131'" 0
Signal=ProlecVRights=tgnore
Street Name: Wolfe Road I-280 SB Ramp
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11 --------------- 1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1_______________11_______________11_______________11 _______________1
Volume Module:
Base Vol: 0 1131 333 0 1151 257 584 0 216 0 0 0
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 0 1131 333 0 1151 257 584 0 216 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1131 333 0 1151 257 584 0 216 0 0 0
User Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 0 1131 0 0 1151 0 584 0 216 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1131 0 0 1151 0 584 0 216 0 0 0
PCE Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 0 1131 0 0 1151 0 584 0 216 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1. 00 0.95 0.95 1. 00 0.91 0.91 0.92 1. 00 0.75 1. 00 1. 00 1. 00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat. : 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.31 0.00 0.00 0.22 0.00 0.17 0.00 0.08 0.00 0.00 0.00
Crit Moves: **** **** ****
Green/Cycle: 0.00 0.65 0.00 0.00 0.65 0.00 0.35 0.00 0.35 0.00 0.00 0.00
Volume/Cap: 0.00 0.48 0.00 0.00 0.34 0.00 0.48 0.00 0.22 0.00 0.00 0.00
Uniform Del: 0.0 5.3 0.0 0.0 4.7 0.0 15.3 0.0 13 .8 0.0 0.0 0.0
IncremntDel: 0.0 0.2 0.0 0.0 0.1 0.0 0.3 0.0 0.1 0.0 0.0 0.0
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 0.00 1. 00 O~OO 0.00 1. 00 0.00 1. 00 0.00 1. 00 0.00 0.00 0.00
Delay/Veh: 0.0 5.4 0.0 0.0 4.7 0.0 15.6 0.0 13 .9 0.0 0.0 0.0
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh: 0.0 5.4 0.0 0.0 4.7 0.0 15.6 0.0 13 .9 0.0 0.0 0.0
LOS by Move: A A A A A A B A B A A A
HCM2kAvgQ: 0 6 0 0 4 0 5 0 2 0 0 0
Tralfix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:02:50 2007
Page 3-25
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Existing AM
Intersection #7: Wolfe/Stevens Creek
Signal=ProtecVRights=lnclude
Final Vol: 3BO'" 264 196
Lanes: 10 2 01
~4.~~
Signal=Protect Signal =Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 10/3/2006 Righls=lnclude Lanes: Final Vol:
J- Cycle Time (sec): 120 ~
303'" 2 0 204
~ Loss Time (sec): 0 J-
0
477 3 --... Critical VlC: 0.64B ...- 2 840'"
0 =r Avg Crit Del (seclveh): 39.7 1= 0
113 Avg Delay (seclveh): 35.4 2 62
LOS: D
~ ~ t t-- r+
Lanes: 0 2 0
Final Vol: 214'" 702 125
Signal=ProtecVRighls=lnclude
Street Name: Wolfe Road Stevens creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 214 702 125 196 264 380 303 477 113 62 840 204
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 214 702 125 196 264 380 303 477 113 62 840 204
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol : 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 214 702 125 196 264 380 303 477 113 62 840 204
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 214 702 125 196 264 380 303 477 113 62 840 204
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 214 702 125 196 264 380 303 477 113 62 840 204
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 214 702 125 196 264 380 303 477 113 62 840 204
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.88 0.88
Lanes: 1.00 2.55 0.45 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.41 0.59
Final Sat.: 1805 4302 766 1805 3610 1615 3502 5187 1615 3502 4052 984
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.12 0.16 0.16 0.11 0.07 0.24 0.09 0.09 0.07 0.02 0.21 0.21
Crit Moves: ****
Green/Cycle: 0.18
Volume/Cap: 0.65
Uniform Del: 45.4
IncremntDel: 4.4
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 49.9
User DelAdj: 1.00
AdjDel/Veh: 49.9
LOS by Move: D
HCM2kAvgQ: 8
0.33
0.50
32.4
0.2
0.0
1. 00
32.6
1. 00
32.6
C
9
0.33
0.50
32.4
0.2
0.0
1. 00
32.6
1. 00
32.6
C
9
0.22
0.50
41.1
1.0
0.0
1. 00
42.1
1. 00
42.1
D
7
0.36
0.20
26.2
0.1
0.0
1. 00
26.3
1. 00
26.3
C
3
0.36
0.65
31. 8
2.5
0.0
1. 00
34.3
1. 00
34.3
C
12
****
****
0.13
0.65
49.3
3.2
0.0
1. 00
52.5
1. 00
52.5
D
7
0.38
0.24
25.4
0.1
0.0
1.00
25.4
1. 00
25.4
C
4
0.38
0.18
24.8
0.1
0.0
1. 00
24.9
1. 00
24.9
C
3
0.07
0.24
52.5
0.5
0.0
1. 00
53.0
1. 00
53.0
D
1
0.32
0.65
35.0
0.9
0.0
1. 00
35.9
1. 00
35.9
D
13
****
0.32
0.65
35.0
0.9
0.0
1. 00
35.9
1. 00
35.9
D
13
Traffix7.8.0915
Copyright (e) 2005 Dowling Associales. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 0512:02:502007
Page 3.26
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Background AM
Intersection #7: Wolfe/Stevens Creek
Signal=ProtecVRights=lnclude
Final Vol: 432m 272 250
Lanes: 10201
~4.~~.
Signal=Protect Slgnal=Protect
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: 1 0/312006 Rights=lnclude Lanes: Final Vol:
.-f Cycle Time (see): 120 ~
368". 2 0 251
~ Loss Time (see): 0 .t-
O ,
504 3 ---JIIo- Critical V/C: 0.716 -+- 2 877".
0 r Avg Crit Del (seclveh): 42.1 1= 0
113 Avg Delay {seclveh): 37.6 2 77
LOS: 0
~ ~ t t-- r+
Lanes: 1 0 2 0
Final Vol: 214". 714 125
Signal =ProlecVRighls=lnciude
Street Name: Wolfe Road Stevens Creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------]
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------I
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 214 702 125 196 264 380 303 477 113 62 840 204
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 214 702 125 196 264 380 303 477 113 62 840 204
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 12 0 54 8 52 65 27 0 15 37 47
Initial Fut: 214 714 125 250 272 432 368 504 113 77 877 251
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 214 714 125 250 272 432 368 504 113 77 877 251
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 214 714 125 250 272 432 368 504 113 77 877 251
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 214 714 125 250 272 432 368 504 113 77 877 251
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.88 0.88
Lanes: 1.00 2.55 0.45 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.33 0.67
Final Sat.: 1805 4317 756 1805 3610 1615 3502 5187 1615 3502 3900 1116
------------[---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.12 0.17 0.17 0.14 0.08 0.27 0.11 0.10 0.07 0.02 0.22 0.22
Crit Moves: ****
Green/Cycle: 0.17
Volume/Cap: 0.72
Uniform Del: 47.4
IncrernntDel: 8.0
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 55.4
User DelAdj: 1.00
AdjDel/Veh: 55.4
LOS by Move: E
HCM2kAvgQ: 9
0.29
0.56
35.9
0.5
0.0
1. 00
36.4
1. 00
36.4
D
10
0.29
0.56
35.9
0.5
0.0
1. 00
36.4
1. 00
36.4
D
10
0.25
0.56
39.6
1.7
0.0
1. 00
41. 3
1. 00
41.3
D
9
0.37
0.72
32.1
4.1
0.0
1. 00
36.2
1. 00
36.2
D
15
****
****
0.15
0.72
48.8
4.8
0.0
1. 00
53.6
1. 00
53.6
D
8
0.38
0.26
25.9
0.1
0.0
1. 00
26.0
1. 00
26.0
C
5
0.38
0.19
25.1
0.1
0.0
1. 00
25.3
1. 00
25.3
C
3
0.09
0.26
51. 4
0.5
0.0
1. 00
51. 8
1. 00
51. 8
D
2
0.31
0.72
36.4
1.6
0.0
1. 00
38.0
1. 00
38.0
D
14
****
0.31
0.72
36.4
1.6
0.0
1. 00
38.0
1. 00
38.0
D
14
Traff!x 7.8.0915
0.37
0.20
25.5
0.1
0.0
1. 00
25.5
1. 00
25.5
C
3
Copyrighl (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 0512:02:50 2007
Page 3.27
Level Of Service Computation Report
2000 HeM Operations (Future Volume Allernalive)
Project AM
Intersection #7: Wolfe/Stevens Creek
Signal=ProtecVRights=lnclude
Final Vol: 434'" 272 252
Lanes: 1 0 2 0 1
~4.'}'~
Signal=Protect Signal=Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: 101312006 Rights=lnclude Lanes: Final Vol:
j- Cycle Time (see): 120 ~
371'" 2 0 254
~ Loss Time (see): 0 .t-
O
504 3 -.. Critical vIe: 0.719 ..- 2 877'"
0 -:( Avg Crit Oel (seclveh): 42.2 T 0
113 Avg Delay (seclveh): 37.7 2 77
LOS: D
~~t~~
Lanes: 2 0
Final Vol: 214'" 714 125
Signal=ProtecVRighls=lnclude
Wolfe Road Stevens Creek Boulevard
North Bound South Bound East Bound West Bound
L T R L T R L T R L T R
------------1---------------11--------------- 11_______________11_______________1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << AM Peak
Base Vol: 214 714 125 250 272 432 368 504 113 77 877 251
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 214 714 125 250 272 432 368 504 113 77 877 251
Added Vol: 0 0 0 2 0 2 3 0 0 0 0 3
PasserByVo1: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 214 714 125 252 272 434 371 504 113 77 877 254
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 214 714 125 252 272 434 371 504 113 77 877 254
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 214 714 125 252 272 434 371 504 113 77 877 254
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 214 714 125 252 272 434 371 504 113 77 877 254
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.88 0.88
Lanes: 1.00 2.55 0.45 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.33 0.67
Final Sat.: 1805 4317 756 1805 3610 1615 3502 5187 1615 3502 3885 1125
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.12 0.17 0.17 0.14 0.08 0.27 0.11 0.10 0.07 0.02 0.23 0.23
Crit Moves: ****
Green/Cycle: 0.16
Volume/Cap: 0.72
Uniform Del: 47.5
IncremntDel: 8.2
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 55.7
User DelAdj: 1.00
AdjDel/Veh: 55.7
LOS by Move: E
HCM2kAvgQ: 9
Street Name:
Approach:
Movement:
0.29
0.57
36.0
0.5
0.0
1. 00
36.5
1. 00
36.5
D
10
0.29
0.57
36.0
0.5
0.0
1. 00
36.5
1. 00
36.5
D
10
0.25
0.57
39.6
1.7
0.0
1. 00
41.3
1. 00
41.3
D
9
0.37
0.72
32.2
4.2
0.0
1. 00
36.4
1. 00
36.4
D
15
****
****
0.15
0.72
48.8
4.9
0.0
1. 00
53.7
1. 00
53.7
D
8
0.38
0.26
25.9
0.1
0.0
1. 00
25.9
1. 00
25.9
C
5
0.38
0.19
25.1
0.1
0.0
1. 00
25.3
1. 00
25.3
C
3
0.09
0.26
51.3
0.5
0.0
1. 00
51. 8
1. 00
51. 8
D
2
0.31
0.72
36.5
1.6
0.0
1. 00
38.1
1. 00
38.1
D
15
****
0.31
0,72
36.5
1.6
0.0
1. 00
38.1
1. 00
38.1
D
15
Traffix 7.8.0915
0.37
0.20
25.4
0.1
0.0
1. 00
25.5
1. 00
25.5
C
3
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fr; Oct 05 12:02:50 2007
Page 3-28
Level or Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth AM
Intersection #7: Wolfe/Stevens Creek
Sjgnal~ProtecVRights~lnclude
Final Vol: 448'" 282 259
Lanes: 1 0 2 0 1
~4.~~
Signal~Protecl Signal ~Protecl
Final Vol: Lanes: Rights~lncl ude Vol Cnt Date: n/a Righls~lnclude lanes: Final Vol:
J- Cycle Time (see): 120 ~
382'" 2 0 261
~ Loss Time (see): 0 ~
0 1
521 3 -----.. Critical vie: 0.742 +- 2 907'"
0 =r Avg Crit Del (seclveh): 43.1 1= 0
117 Avg Delay (sec/veh): 38.3 2 79
LOS: D
~ ~ t ~ r+
Lanes: 1 0 2 0
Final Vol: 222'" 739 130
Signal ~ProlecVRights~lnclude
Street Name: Wolfe Road Stevens Creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 222 739 130 259 282 448 382 521 117 79 907 261
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 222 739 130 259 282 448 382 521 117 79 907 261
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 222 739 130 259 282 448 382 521 117 79 907 261
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 222 739 130 259 282 448 382 521 117 79 907 261
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 222 739 130 259 282 448 382 521 117 79 907 261
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 222 739 130 259 282 448 382 521 117 79 907 261
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.88 0.88
Lanes: 1.00 2.55 0.45 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.33 0.67
Final Sat.: 1805 4314 759 1805 3610 1615 3502 5187 1615 3502 3895 1121
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.12 0.17 0.17 0.14 0.08 0.28 0.11 0.10 0.07 0.02 0.23 0.23
Crit Moves: ****
Green/Cycle: 0.17
Volume/Cap: 0.74
Uniform Del: 47.6
IncremntDel: 9.6
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 57.2
User DelAdj: 1.00
AdjDel/Veh: 57.2
LOS by Move: E
HCM2kAvgQ: 9
0.29
0.58
36.1
0.6
0.0
1. 00
36.7
1. 00
36.7
D
10
0.29
0.58
36.1
0.6
0.0
1. 00
36.7
1. 00
36.7
D
10
0.25
0.58
39.8
2.0
0.0
1. 00
41.8
1. 00
41. 8
D
9
0.37
0.21
25.5
0.1
0.0
1. 00
25.6
1. 00
25.6
c
4
0.37
0.74
32.6
4.9
0.0
1. 00
37.5
1. 00
37.5
D
15
****
****
0.15
0.74
49.0
5.8
0.0
1. 00
54.8
1. 00
54.8
D
9
0.38
0.27
26.0
0.1
0.0
1. 00
26.0
1. 00
26.0
c
5
0.38
0.19
25.2
0.2
0.0
1. 00
25.3
1. 00
25.3
C
3
0.08
0.27
51. 5
0.5
0.0
1. 00
51. 9
1. 00
51.9
D
2
0.31
0.74
36.8
1.9
0.0
1. 00
38.8
1. 00
38.8
D
15
****
0.31
0.74
36.8
1.9
0.0
1. 00
38.8
1. 00
38.8
D
15
Traffix 7.8.0915
Copyrighl (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans". San Jose
COMPARE
Fr; Oel 05 12:01 :43 2007
Page 3. 1
Level Of Serviee Computation Report
2000 HCM Operations (Future Volume Alternative)
Existing PM
Intersection #1: De Anza/Homestead
Signal =ProteeVRights=lnelude
Final Vol: 346 1971'" 372
Lanes: 0 1 2 0 2
~4t~~
Signal=Prolecl Signal=Protecl
Final Vol: Lanes: Rights=lnelude Vol Cnt Date: 1 0/3/2006 Righls=lnelude Lanes: Final Vol:
J- Cyele Time (see): 140 ~
163 2 150
~ Loss Time (see): 0 J-
0 0
561 2 -+ Critical V/C: 0.921 -<lit-- 2 448
0 r Avg Crit Del (seclveh): 53.6 r
333". Avg Delay (see/veh): 45.8 323'..
LOS: D
~ ~ t ~ ~
Lanes: 2 0 3 0
Final Vol: 581". 1277 672
Signal=ProleeVRights=lnelude
Street Name: De P~za Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 581 1277 672 372 1971 346 183 561 333 323 448 150
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 581 1277 672 372 1971 346 183 561 333 323 448 150
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 581 1277 672 372 1971 346 183 561 333 323 448 150
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 581 1277 672 372 1971 346 183 561 333 323 448 150
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 581 1277 672 372 1971 346 183 561 333 323 448 150
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 581 1277 672 372 1971 346 183 561 333 323 448 150
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.89 0.89 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.55 0.45 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 4315 758 3502 3610 1615 3502 3610 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.17 0.25 0.42 0.11 0.46 0.46 0.05 0.16 0.21 0.09 0.12 0.09
Crit Moves: ****
Green/Cycle: 0.18
Volume/Cap: 0.92
Uniform Del: 56.4
IncremntDel: 19.0
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 75.4
User DelAdj: 1.00
AdjDel/Veh: 75.4
LOS by Move: E
HCM2kAvgQ: 16
0.54
0.46
19.8
0.1
0.0
1. 00
19.9
1. 00
19.9
B
12
0.54
0.77
25.5
4.3
0.0
1. 00
29.9
1. 00
29.9
C
24
****
0.14
0.77
58.3
7.6
0.0
1. 00
65.9
1. 00
65.9
E
10
0.50
0.92
32.7
6.2
0.0
1. 00
39.0
1. 00
39.0
D
37
0.10
0.54
60.4
1.8
0.0
1. 00
62.2
1. 00
62.2
E
5
0.22
0.69
49.9
2.6
0.0
1. 00
52.6
1. 00
52.6
D
13
0.22
0.92
53.1
28.3
0.0
1. 00
81. 4
1. 00
81.4
F
18
****
****
0.10
0.92
62.4
28.9
0.0
1. 00
91.3
1. 00
91.3
F
10
0.23
0.54
47.6
0.8
0.0
1. 00
48.4
1. 00
48.4
D
9
0.23
0.41
46.0
0.7
0.0
1. 00
46.7
1. 00
46.7
D
6
Traffixl .8.0915
0.50
0.92
32.7
6.2
0.0
1. 00
39.0
1. 00
39.0
D
37
Copyright (e) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3. 2
Level Of Service Computation Report
2000 HCM Operations (Future Volume Allernatlve)
Background PM
Intersection #1: De Anza/Homestead
Signal=ProlecVRlghts=lnclude
Final Vol: 352 1993'" 373
Lanes: 0 1 2 0 2
~4.~~
Signal =Protect Signal=Protect
Final Vol: Lanes: Righls=lnclude Vol Cn! Dale: 10/3/2006 Righ!s=lnclude Lanes: Final Vol:
~ Cycle Time (see): 140 ~
188 2 152
~ Loss Time (see): 0 ~
0 0
562 2 ----.. Crilical V/C: 0.946 +- 2 454
0 r Avg Crit Del (seclveh): 57.9 r 0
349'" Avg Delay (sec/veh): 47.9 2 325m
LOS: D
~ ~ t ~ ~
Lanes: 2 0 3 0
Final Vol: 613'" 1312 680
Signal =ProtecVRights=lnclude
Street Name: De Anza Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1_______________ 11_______________11_______________11_______________1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 581 1277 672 372 1971 346 183 561 333 323 448 150
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Ese: 581 1277 672 372 1971 346 183 561 333 323 448 150
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 32 35 8 1 22 6 5 1 16 2 6 2
Initial Fut: 613 1312 680 373 1993 352 188 562 349 325 454 152
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 613 1312 680 373 1993 352 188 562 349 325 454 152
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 613 1312 680 373 1993 352 188 562 349 325 454 152
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 613 1312 680 373 1993 352 188 562 349 325 454 152
------------1---------------11---------------1 ] ---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.89 0.89 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.55 0.45 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 4311 761 3502 3610 1615 3502 3610 1615
------------ 1_______________11_______________11_______________ 11_______________1
Capacity Analysis Module:
Vol/Sat: 0.18 0.25 0.42 0.11 0.46 0.46 0.05 0.16 0.22 0.09 0.13 0.09
Crit Moves: ****
Green/Cycle: 0.19
Volume/Cap: 0.95
Uniform Del: 56.4
IncremntDe1: 22.9
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 79.3
User DelAdj: 1.00
AdjDel/Veh: 79.3
LOS by Move: E
HCM2kAvgQ: 17
0.54
0.47
20.0
0.1
0.0
1. 00
20.2
1. 00
20.2
C
12
0.54
0.78
25.9
4.7
0.0
1. 00
30.6
1. 00
30.6
C
24
****
0.14
0.78
58.5
8.3
0.0
1. 00
66.8
1. 00
66.8
E
10
0.49
0.95
34.1
8.6
0.0
1. 00
42.7
1. 00
42.7
D
40
0.49
0.95
34.1
8.6
0.0
1. 00
42.7
1. 00
42.7
D
40
0.10
0.55
60.2
1.9
0.0
1. 00
62.1
1. 00
62.1
E
5
0.23
0.68
49.4
2.3
0.0
1. 00
51.7
1. 00
51.7
D
12
0.23
0.95
53.2
33.1
0.0
1. 00
86.3
1. 00
86.3
F
19
****
****
0.10
0.95
62.8
34.7
0.0
1. 00
97.4
1. 00
97.4
F
10
0.23
0.55
47.6
0.8
0.0
1. DO
48.4
1. DO
48.4
D
9
0.23
0.41
46.0
0.7
0.0
1. 00
46.7
1. 00
46.7
D
6
Trafflx 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 05 12:01 :432007
Page 3. 3
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project PM
Intersection #1: De Anza/Homestead
Signal=ProtecVRights=lnclude
Final Vol: 352 1993-' 377
Lanes: 01202
~4.~~
Signal=Prolact Signal=Protact
Final Vol: Lanas: Rights=lnclude Vol Cnt Data: 10/312006 Rights=lnclude Lanes: Final Vol:
..J. Cycle Tlma (see): 140 ~
188 2 156
--\. Loss Time (sac): 0 J.-
0 0
566 2 --+- Critical VIC: 0.947 -<IIf- 2 458
0 r Avg Cril Dal (saclvah): 58.2 T 0
349'" Avg Delay (saclvah): 48.2 .- 2 329'"
LOS: D
~ ~ t 1+ ~
Lanas: 2 0 3 0
Final Vol: 613'" 1312 684
Signal=ProtectlRights=lncluda
Street Name: De Anza Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 613 1312 680 373 1993 352 188 562 349 325 454 152
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 613 1312 680 373 1993 352 188 562 349 325 454 152
Added Vol: 0 0 4 4 0 0 0 4 0 4 4 4
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 613 1312 684 377 1993 352 188 566 349 329 458 156
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 613 1312 684 377 1993 352 188 566 349 329 458 156
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 613 1312 684 377 1993 352 188 566 349 329 458 156
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 613 1312 684 377 1993 352 188 566 349 329 458 156
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.89 0.89 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1.00 2.00 2.55 0.45 2.00 2.00 1.00 2.00 2.00 1.00
Final Sat.: 3502 5187 1615 3502 4311 761 3502 3610 1615 3502 3610 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.18 0.25 0.42 0.11 0.46 0.46 0.05 0.16 0.22 0.09 0.13 0.10
Crit Moves: ****
Green/Cycle: 0.18
Volume/Cap: 0.95
Uniform Del: 56.4
IncremntDel: 23.2
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 79.6
User DelAdj: 1.00
AdjDel/Veh: 79.6
LOS by Move: E
HCM2kAvgQ: 17
0.54
0.47
20.1
0.1
0.0
1. 00
20.3
1. 00
20.3
C
12
0.54
0.79
26.1
4.9
0.0
1. 00
31.0
1. 00
31.0
C
25
****
0.14
0.79
58.5
8.6
0.0
1. 00
67.1
1. 00
67.1
E
10
0.49
0.95
34.1
8.8
0.0
1. 00
42.9
1. 00
42.9
D
40
0.49
0.95
34.1
8.8
0.0
1. 00
42.9
1. 00
42.9
D
40
0.10
0.55
60.3
1.9
0.0
1. 00
62.2
1. 00
62.2
E
5
0.23
0.69
49.5
2.5
0.0
1. 00
51. 9
1. 00
51. 9
D
13
****
0.23
0.95
53.2
33.4
0.0
1. 00
86.6
1. 00
86.6
F
19
****
0.10
0.95
62.7
34.7
0.0
1. 00
97.4
1. 00
97 .4
F
11
0.23
0.55
47.5
0.8
0.0
1. 00
48.3
1. 00
48.3
D
9
0.23
0.42
45.9
0.8
0.0
1. 00
46.7
1. 00
46.7
D
6
Trafflx 7.8.0915
Copyright (c) 2005 Dowling Associatas, Inc.
Licensed lo Hexagon Trans. San Jose
COMPARE
Fri Ocl 05 12:01 :43 2007
Page 3- 4
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternalive)
Future Growth PM
Intersection #1: De Anza/Homestead
Signal=ProtecVRighls=include
Final Vol: 364 2064'" 390
Lanes: 01 202
~4+~~
Signal=Protect Signal=Prolect
Final Vol: Lanes: Rights=lnclude Vol Cn! Date: nla Rights=include Lanes: Final Vol:
J- Cycle Time (sec): 140 -+--
195 2 161
~ Loss Time (see): 0 J--
0 0
566 2 ----. Critical VIC: 0.961 +- 2 474
0 r Avg Crit Del (seclveh): 65.0 1= 0
361'" Avg Delay (seclveh): 52.0 2 341'"
LOS: D
~ ~ t ~ r+
Lanes: 2 0 3 0
Final Vol: 634'" 1 356 706
Signal=ProtecVRights=lnclude
Street Name: De Anza Boulevard Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 634 1358 708 390 2064 364 195 586 361 341 474 161
Growth Adj: LOO LOO LOO LOO LOO LOO LOO LOO 1. 00 1. 00 LOO 1.00
Initial Bse: 634 1358 708 390 2064 364 195 586 361 341 474 161
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 634 1358 708 390 2064 364 195 586 361 341 474 161
User Adj: LOO 1. 00 LOO 1. 00 1. 00 1. 00 1. 00 LaO 1. 00 1. 00 LOO 1. 00
PHF Adj: LOa 1. 00 LaO 1. 00 LaO 1. 00 LOO LOO 1. 00 LaO LOO 1. 00
PHF Volume: 634 1358 708 390 2064 364 195 586 361 341 474 161
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 634 1358 708 390 2064 364 195 586 361 341 474 161
PCE Adj: LOa LaO LOO LOO 1. 00 LOO 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj; 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 LOO LaO LOO 1. 00
Final Vol.: 634 1358 708 390 2064 364 195 586 361 341 474 161
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.91 0.85 0.92 0.89 0.89 0.92 0.95 0.85 0.92 0.95 0.85
Lanes: 2.00 3.00 1. 00 2.00 2.55 0.45 2.00 2.00 1. 00 2.00 2.00 1. 00
Final Sat. : 3502 5187 1615 3502 4312 761 3502 3610 1615 3502 3610 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat; 0.18 0.26 0.44 0.11 0.48 0.48 0.06 0.16 0.22 0.10 0.13 0.10
Crit Moves: **** **** **** ****
Green/Cycle: 0.18 0.54 0.54 0.14 0.49 0.49 0.10 0.23 0.23 0.10 0.23 0.23
Volume/Cap: 0.98 0.49 0.82 0.82 0.98 0.98 0.57 0.71 0.98 0.98 0.57 0.43
Uniform Del: 56.8 20.4 26.8 58.8 35.2 35.2 60.4 49.8 53.7 62.9 47.8 46.1
IncrerrmtDel: 30.4 0.1 6.1 10.6 13.8 13.8 2.3 2.9 41.6 42.9 1.0 0.8
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 1. 00 1. 00 LaO 1.00 1. 00 LOa LOO LOO 1. 00 LOO LOa 1. 00
Delay/Veh: 87.2 20.5 32.9 69.3 49.0 49.0 62.7 52.8 95.3 105.8 48.8 46.9
User DelAdj: LOO 1. 00 LOa 1. 00 LaO 1. 00 1. 00 LOa 1. 00 LOa LOa 1. 00
AdjDel/Veh: 87.2 20.5 32.9 69.3 49.0 49.0 62.7 52.8 95.3 105.8 48.8 46.9
LOS by Move: F C C E D D E D F F D D
HCM2kAvgQ; 19 13 26 11 43 43 5 13 20 11 10 6
Traffix 7.8.0915
Copyrighl (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :432007
Page 3. 5
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Existing PM
Intersection #2: Homestead/Blaney
Signal=ProtecVRights=lnclude
Final Voi: 0 0 0
Lanes: 0 0 0 0 0
~.4+~~
Signal=Protect Signal=Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnt Dale: 7/17/2007 Rights=lnctude Lanes: Final Voi:
j. Cycle Time (see): 100 ~
0 0 0 0
~ Loss Time (see): 0 ~
0 0
914'" -... Critical V/C: 0.511 ....-- 2 681
r Avg Crit Del (seclveh): 17.2 1= 0
193 0 Avg Delay (seclveh): 13.5 178'"
LOS: 8
~ ----t t ~ ~
Lanes: 0 0 0 1
Final Vol: 108 0 158'"
Signal=ProtecVRights=lnclude
Street Name: Blaney Avenue Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 108 0 158 0 0 0 0 914 193 178 681 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 108 0 158 0 0 0 0 914 193 178 681 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 108 0 158 0 0 0 0 914 193 178 681 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 108 0 158 0 0 0 0 914 193 178 681 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 108 0 158 0 0 0 0 914 193 178 681 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 108 0 158 0 0 0 0 914 193 178 681 0
____________1_______________11_______________11_______________11 ---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1.00 0.85 1.00 1.00 1.00 1.00 0.93 0.93 0.95 0.95 1.00
Lanes: 1.00 0.00 1.00 0.00 0.00 0.00 0.00 1.65 0.35 1.00 2.00 0.00
Final Sat.: 1805 0 1615 0 0 0 0 2903 613 1805 3610 0
____________1_______________11_______________11_______________11_______________I
Capacity Analysis Module:
Vol/Sat: 0.06 0.00 0.10 0.00 0.00 0.00 0.00 0.31 0.31 0.10 0.19 0.00
Crit Moves: ****
Green/Cycle: 0.19 0.00 0.19
Volume/Cap: 0.31 0.00 0.51
Uniform Del: 34.8 0.0 36.2
IncrernntDel: 0.5 0.0 1.4
InitQueuDel: 0.0 0.0 0.0
Delay Adj: 1.00 0.00 1.00
Delay/Veh: 35.3 0.0 37.7
User DelAdj: 1.00 1.00 1.00
AdjDel/Veh: 35.3 0.0 37.7
LOS by Move: DAD
HCM2kAvgQ: 3 0 5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.62
0.51
10.8
0.2
0.0
1. 00
11.0
1. 00
11.0
B
10
****
0.62
0.51
10.8
0.2
0.0
1. 00
11. 0
1. 00
11.0
B
10
****
0.19
0.51
36.1
1.3
0.0
1. 00
37.4
1. 00
37.4
D
5
0.81
0.23
2.3
0.0
0.0
1. 00
2.3
1. 00
2.3
A
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyrighl (e) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Frj Oct 05 12:01 :43 2007
Page 3. 6
Level Of Service Compulation Report
2000 HCM Opera lions (Future Volume Alternelive)
Background PM
Intersection #2: Homestead/Blaney
Signal=ProlecVRights=include
Final Vol: 0 0 0
Lanes: 0 0 0 0 0
..-J4...~~
Signal=Prolecl Signal=Prolecl
Final Vol: Lanes: Righls=lnclude Vol Cnl Dale: 7/17/2007 Righls=lnclude Lanes: Final Vol:
Ja Cycle Time (sec): 100 -+-..
0 0 0
~ Loss Time (sec): 0 ~
0 0
924'" ---11Io- Crilical VIC: 0.518 -Ill(- 2 692
r AV9 Cril Del (sec/veh): 17.3 T 0
195 0 Avg Delay (sec/veh): 13.6 161'"
LOS: B
~ ~ t t+ r+
Lanes: 1 0 0 0
Final Vol: 108 0 161'"
Signal=ProlecVRights=lnclude
Street Name: Blaney Avenue Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---;...-----------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 108 0 158 0 0 0 0 914 193 178 681 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 108 0 158 0 0 0 0 914 193 178 681 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 0 3 0 0 0 0 10 2 3 11 0
Initial Fut: 108 0 161 0 0 0 0 924 195 181 692 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 108 0 161 0 0 0 0 924 195 181 692 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 108 0 161 0 0 0 0 924 195 181 692 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 108 0 161 0 0 0 0 924 195 181 692 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1.00 0.85 1.00 1.00 1.00 1.00 0.93 0.93 0.95 0.95 1.00
Lanes: 1.00 0.00 1.00 0.00 0.00 0.00 0.00 1.65 0.35 1.00 2.00 0.00
Final Sat.: 1805 0 1615 0 0 0 0 2903 613 1805 3610 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.06 0.00 0.10 0.00 0.00 0.00 0.00 0.32 0.32 0.10 0.19 0.00
Crit Moves: ****
Green/Cycle: 0.19 0.00 0.19
Volume/Cap: 0.31 0.00 0.52
Uniform Del: 34.7 0.0 36.2
IncrernntDel: 0.5 0.0 1.5
InitQueuDel: 0.0 0.0 0.0
Delay Adj: 1.00 0.00 1.00
Delay/Veh: 35.2 0.0 37.8
User DelAdj: 1.00 1.00 1.00
AdjDel/Veh: 35.2 0.0 37.8
LOS by Move: DAD
HCM2kAvgQ: 3 0 5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.61
0.52
10.9
0.2
0.0
1. 00
11.1
1. 00
11.1
B
10
****
0.61
0.52
10.9
0.2
0.0
1. 00
11.1
1. 00
11.1
B
10
****
0.19
0.52
36.1
1.4
0.0
1. 00
37.5
1. 00
37.5
D
6
0.81
0.24
2.3
0.0
0.0
1. 00
2.3
1. 00
2.3
A
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyrighl (c) 2005 Dowling Associales, Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :432007
Page 3. 7
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project PM
Intersection #2: Homestead/Blaney
Slgnal=ProlecVRighls=lncl ude
Final Vol: 0 0 0
Lanes: 0 0 0 0 0
~4t~~
Signal=Prolect Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 7/17/2007 Rights=lnclude Lanes: Final Vol:
J- Cycle Time (see): 100 ~
0 0 0 0
~ Loss Time (see): 0 .t-
O 0
935""" -.. Critical vie: 0.521 -t- 2 704
r Avg Crit Del (sec/veh): 17.3 1= 0
195 0 Avg Delay (seclveh): 13.5 181'-
LOS: B
~ ~ t 1+ r+
Lanes: 0 0 1
Final Vol: 108 0 161'"
Signal=ProlecVRighls=lnclude
Street Name: Blaney Avenue Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movernen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1_______________11_______________11 _______________11_______________1
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 108 0 161 0 0 0 0 924 195 181 692 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 108 0 161 0 0 0 0 924 195 181 692 0
Added Vol: 0 0 0 0 0 0 0 11 0 0 12 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 108 0 161 0 0 0 0 935 195 181 704 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 108 0 161 0 0 0 0 935 195 181 704 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 108 0 161 0 0 0 0 935 195 181 704 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 108 0 161 0 0 0 0 935 195 181 704 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1.00 0.85 1.00 1.00 1.00 1.00 0.93 0.93 0.95 0.95 1.00
Lanes: 1.00 0.00 1.00 0.00 ~.OO 0.00 0.00 1.65 0.35 1.00 2.00 0.00
Final Sat.: 1805 0 1615 0 0 0 0 2909 607 1805 3610 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.06 0.00 0.10 0.00 0.00 0.00 0.00 0.32 0.32 0.10 0.20 0.00
Crit Moves: ****
Green/Cycle: 0.19 0.00 0.19
Volume/Cap: 0.31 0.00 0.52
Uniform Del: 34.8 0.0 36.3
IncrernntDel: 0.5 0.0 1.6
InitQueuDel: 0.0 0.0 0.0
Delay Adj: 1.00 0.00 1.00
Delay/Veh: 35.3 0.0 37.9
User DelAdj: 1.00 1.00 1.00
AdjDel/Veh: 35.3 0.0 37.9
LOS by Move: DAD
HCM2kAvgQ: 3 0 5
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.62
0.52
10.8
0.2
0.0
1. 00
11.1
1. 00
11.1
B
10
****
0.62
0.52
10.8
0.2
0.0
1. 00
11.1
1. 00
11.1
B
10
****
0.19
0.52
36.3
1.4
0.0
1. 00
37.7
1. 00
37.7
D
6
0.81
0.24
2.3
0.0
0.0
1. 00
2.3
1. 00
2.3
A
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associales, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3. 8
Level Of Service Computation Report
2000 HCM Operations (Future Volume Allernative)
Future Growth PM
Intersection #2: Homestead/Blaney
Signal=ProtecVRights=lnclude
Final Vol: 0 0 0
Lanes: 00000
~4~~~
Signal=Prolecl Signal=Protect
Final Vol: Lanes: Rlghls=lnclude Vol Cnt Date: n/a Rights=lnclude Lanes: Final Vol:
.J. Cycle Time (see): 100 ~
0 0 0 0
~ Loss Time (see): 0 ~
0 0
96B""" --.... Critical VIC: 0.540 +- 2 729
r Avg Crit Del (seclveh): 17.6 r 0
202 0 Avg Delay (seclveh): 13.7 18r"
LOS: B
~ ~ t ~ ~
Lanes: 1 0 0 0
Final Vol: 112 0 167'"
Signal=ProlecVRighls=lnclude
Street Name: Blaney Avenue Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 112 0 167 0 0 0 0 968 202 187 729 0
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 112 0 167 0 0 0 0 968 202 187 729 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 112 0 167 0 0 0 0 968 202 187 729 0
User Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 112 0 167 0 0 0 0 968 202 187 729 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 112 0 167 0 0 0 0 968 202 187 729 0
PCE Adj : 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 112 0 167 0 0 0 0 968 202 187 729 0
____________1_______________11_______________ 11---------------11 _______________1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 1. 00 0.85 1. 00 1. 00 1. 00 1. 00 0.93 0.93 0.95 0.95 1. 00
Lanes: 1. 00 0.00 1. 00 0.00 0.00 0.00 0.00 1. 65 0.35 1. 00 2.00 0.00
Final Sat. : 1805 0 1615 0 0 0 0 2909 607 1805 3610 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.06 0.00 0.10 0.00 0.00 0.00 0.00 0.33 0.33 0.10 0.20 0.00
Crit Moves: **** **** ****
Green/Cycle: 0.19 0.00 0.19 0.00 0.00 0.00 0.00 0.62 0.62 0.19 0.81 0.00
Volume/Cap: 0.32 0.00 0.54 0.00 0.00 0.00 0.00 0.54 0.54 0.54 0.25 0.00
Uniform Del: 34.8 0.0 36.4 0.0 0.0 0.0 0.0 11. 0 11. 0 36.4 2.3 0.0
IncrernntDel: 0.5 0.0 1.9 0.0 0.0 0.0 0.0 0.3 0.3 1.7 0.0 0.0
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 1. 00 0.00 1. 00 0.00 0.00 0.00 0.00 1. 00 1. 00 1. 00 1. 00 0.00
Delay/Veh: 35.4 0.0 38.4 0.0 0.0 0.0 0.0 11.3 11. 3 38.1 2.3 0.0
User DelAdj: 1. 00 1.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh: 35.4 0.0 38.4 0.0 0.0 0.0 0.0 11.3 11. 3 38.1 2.3 0.0
LOS by Move: D A D A A A A B B D A A
HCM2kAvgQ: 3 0 5 0 0 0 0 11 11 6 3 0
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associales, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :432007
Page 3- 9
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
EXisting PM
Intersection #3: HomesteadlWolfe
Signal=PnotecVRights=lnclude
Final Voi: 146 1127-' 158
Lanes: 0 1 2 0 2
~4.~~
Signai=Protect Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 7/17/2007 Rights=lnclude Lanes: Final Vol:
J- Cycle Time (see): 110 ~
158 0 89
~ Loss Time (see): 0 J-
0
556'" 2 -+- Critical V/C: 0.661 ....- 574
0 r Avg Crit Del (sec/veh): 35.4 1= 0
212 Avg Delay (sec/veh): 33.5 331'"
LOS: C
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 260'" 653 118
Signal=ProtecVRights=lnclude
Street Name: Wolfe Road Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------I
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
____________1_______________11_______________11_______________11___________----I
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 260 653 118 158 1127 146 158 556 212 331 574 89
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 260 653 118 158 1127 146 158 556 212 331 574 89
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 260 653 118 158 1127 146 158 556 212 331 574 89
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 260 653 118 158 1127 146 158 556 212 331 574 89
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 260 653 118 158 1127 146 158 556 212 331 574 89
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 260 653 118 158 1127 146 158 556 212 331 574 89
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.89 0.89 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.66 0.34 1.00 2.00 1.00 1.00 1.73 0.27
Final Sat.: 3502 3610 1615 3502 4514 585 1805 3610 1615 1805 3063 475
------------1---------------11---------------'11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.07 0.18 0.07 0.05 0.25 0.25 0.09 0.15 0.13 0.18 0.19 0.19
Crit Moves: ****
Green/Cycle: 0.11
Volume/Cap: 0.66
Uniform Del: 46.8
IncremntDel: 4.2
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 51.0
User DelAdj: 1.00
AdjDel/Veh: 51.0
LOS by Move: D
HCM2kAvgQ: 6
0.39
0.46
24.8
0.2
0.0
1. 00
25.1
1. 00
25.1
C
9
0.39
0.19
21.9
0.1
0.0
1. 00
22.1
1. 00
22.1
C
3
****
0.10
0.46
46.9
1.0
0.0
1. 00
47.9
1. 00
47.9
D
3
0.38
0.66
28.4
0.9
0.0
1. 00
29.3
1. 00
29.3
C
14
0.38
0.66
28.4
0.9
0.0
1. 00
29.3
1. 00
29.3
C
14
0.16
0.54
42.3
2.0
0.0
1. 00
44.3
1. 00
44.3
D
6
0.23
0.66
38.3
2.0
0.0
1. 00
40.2
1. 00
40.2
D
10
****
0.23
0.56
37.3
2.0
0.0
1. 00
39.2
1. 00
39.2
D
7
****
0.28
0.66
35.2
3.3
0.0
1. 00
38.5
1. 00
38.5
D
11
0.35
0.54
28.8
0.5
0.0
1. 00
29.3
1. 00
29.3
C
10
0.35
0.54
28.8
0.5
0.0
1. 00
29.3
1. 00
29.3
C
10
Tralfix 7.8.0915
Copyright (c) 2005 Dowling Associates, inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3.10
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Background PM
Intersection #3: HoinesteadlWolfe
Signal=ProlecVRights=lnclude
Final Vol: 146 1159". 158
Lanes: 0 1 2 0 2
-.J4~~'+
Signal=Protect Signal =Protect
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: 7/17/2007 Rights=lnclude Lanes: Final Vol:
j- Cycle Time (sec): 110 ~
158 0 89
-t Loss Time (sec): 0 J-
0
556." 2 ----.... Critical V/C: 0.6B9 +- 574
0 r Avg Crit Del (sec/veh): 36.5 1= 0
239 Avg Delay (see/veh): 34.3 356".
LOS: C
~ ~ t t--- ~
Lanes: 2 0 2 0
Final Vol: 287". 681 146
Signal=ProlecVRights=lnclude
Street Name; Wolfe Road Homestead Road
Approach; North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date; 17 Jul 2007 << PM Peak
Base Vol: 260 653 118 158 1127 146 158 556 212 331 574 89
Growth Adj; 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 260 653 118 158 1127 146 158 556 212 331 574 89
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 27 28 28 0 32 0 0 0 27 25 0 0
Initial Fut; 287 681 146 158 1159 146 158 556 239 356 574 89
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume; 287 681 146 158 1159 146 158 556 239 356 574 89
Reduct vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 287 681 146 158 1159 146 158 556 239 356 574 89
PCE Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj; 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.; 287 681 146 158 1159 146 158 556 239 356 574 89
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane; 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment; 0.92 0.95 0.85 0.92 0.89 0.89 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.66 0.34 1.00 2.00 1.00 1.00 1.73 0.27
Final Sat.: 3502 3610 1615 3502 4528 570 1805 3610. 1615 1805 3063 475
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.19 0.09 0.05 0.26 0.26 0.09 0.15 0.15 0.20 0.19 0.19
Crit Moves: ****
Green/Cycle: 0.12 0.40
Volume/Cap; 0.69 0.48
Uniform Del; 46.5 24.8
IncremntDel; 4.8 0.3
InitQueuDel: 0.0 0.0
Delay Adj; 1.00 1.00
Delay/Veh; 51.3 25.0
User DelAdj; 1.00 1.00
AdjDel/Veh: 51.3 25.0
LOS by Move: D C
HCM2kAvgQ; 6 9
0.40
0.23
22.1
0.2
0.0
1. 00
22.3
1. 00
22.3
C
3
****
0.09
0.48
47.2
1.1
0.0
1. 00
48.3
1. 00
48.3
D
3
0.37
0.69
29.2
1.1
0.0
1. DO
30.3
1. 00
30.3
C
14
0.16
0.54
42.3
2.0
0.0
1. 00
44.3
1. 00
44.3
D
6
0.22
0.69
39.2
2.5
0.0
1. 00
41. 7
1. 00
41.7
D
10
****
0.22
0.66
38.9
4.6
0.0
1. 00
43.5
1. 00
43.5
D
8
****
0.29
0.69
34.9
3.9
0.0
1. 00
38.8
1. DO
38.8
D
12
0.35
0.54
28.8
0.5
0.0
1. 00
29.3
1. 00
29.3
C
10
0.35
0.54
28.8
0.5
0.0
1. 00
29.3
1. 00
29.3
C
10
Traffix 7.8.0915
0.37
0.69
29.2
1.1
0.0
1. 00
30.3
1. DO
30.3
C
14
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3-11
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project PM
Intersection #3: HomesteadlWolfe
Signal =ProlecVRights=lnclude
Final Vol: 146 1170'" 156
Lanes: 01202
~4.~~
Signal=Prolect Signal =Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 711712007 Rights=lnclude Lanes: Final Vol:
j- Cycle Time (see): 110 ~
176 0 69
~ Loss Time (see): 0 .t-
O
562'" 2 -.. Critical VIC: 0.699 -otC-- 574
0 =r Avg Cnt Del (secJveh): 36.6 T 0
239 Avg Delay (secJveh): 34.7 367'"'
LOS: C
~ ~ t ~ r--
Lanes: 2 0 2 0
Final Vol: 267"" 667 152
Signal =ProlecVRighls=lnclude
Street Name: Wolfe Road Homestead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11----------'-----11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 287 681 146 158 1159 146 158 556 239 356 574 89
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 287 681 146 158 1159 146 158 556 239 356 574 89
Added Vol: 0 6 6 0 11 0 18 6 0 11 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 287 687 152 158 1170 146 176 562 239 367 574 89
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 287 687 152 158 1170 146 176 562 239 367 574 89
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 287 687 152 158 1170 146 176 562 239 367 574 89
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 287 687 152 158 1170 146 176 562 239 367 574 89
------------1---------------11---------------11---------------11---------------I
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.89 0.89 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.67 0.33 1.00 2.00 1.00 1.00 1.73 0.27
Final Sat.: 3502 3610 1615 3502 4533 566 1805 3610 1615 1805 3063 475
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.19 0.09 0.05 0.26 0.26 0.10 0.16 0.15 0.20 0.19 0.19
Crit Moves: ****
Green/Cycle: 0.12
Volume/Cap: 0.70
Uniform Del: 46.7
IncremntDel: 5.3
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 52.0
User DelAdj: 1.00
AdjDe1/Veh: 52.0
LOS by Move: D
HCM2kAvgQ: 6
0.39
0.48
25.0
0.3
0.0
1. 00
25.3
1. 00
25.3
C
9
0.39
0.24
22.4
0.2
0.0
1. 00
22.6
1. 00
22.6
C
3
****
0.09
0.48
47.4
1.1
0.0
1. 00
48.5
1. 00
48.5
D
3
0.37
0.70
29.5
1.2
0.0
1. 00
30.7
1. 00
30.7
C
15
0.37
0.70
29.5
1.2
0.0
1. 00
30.7
1. 00
30.7
C
15
0.18
0.55
41.4
2.2
0.0
1. 00
43.6
1. 00
43.6
D
6
0.22
0.70
39.4
2.7
0.0
1. 00
42.1
1. 00
42.1
D
10
****
0.22
0.66
39.0
4.6
0.0
1. 00
43.7
1. 00
43.7
D
8
****
0.29
0.70
34.7
4.2
0.0
1. 00
38.9
1. 00
38.9
D
12
0.34
0.55
29.7
0.6
0.0
1. 00
30.3
1. 00
30.3
C
10
0.34
0.55
29.7
0.6
0.0
1. 00
30.3
1. 00
30.3
C
10
T raffix 7.6.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed 10 Hexagon Trans. San Jose
COMPARE
Fri Ocl 05 12:01 :43 2007
Page 3.12
Level 01 Service Computation Report
2000 HCM Operations (Future Volume Allernative)
Future Growth PM
Intersection #3: HomesteadMlolfe
Signal=Prolec\lRighls=lnclude
Final Vol: 151 1211-' 164
Lanes: 0 1 2 0 2
~4.~~
Signal=Prolecl Signal=Prolecl
Flnal Vol: Lanes: Rights=Jnclude Vol Cn! Date: nla Righls=lnclude Lanes: Final Vol:
~ Cycle Time (see): 110 ~
182 0 92
~ Loss Time (see): 0 .t-
O
582'" 2 -.. Crillcal VIC: 0.723 ...- 595
0 r Avg Crit Del (seclveh): 37.5 ~ 0
247 Avg Delay (seclveh): 35.3 .- 379'"
LOS: D
~ ~ t .,. ~
Lanes: 2 0 2 0
Final Vol: 296'" 711 158
Si9nal=ProlecVRighls=lnclude
Street Name: Wol fe Road Homes tead Road
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------I
Volume Module:
Base Vol: 296 711 156 164 1211 151 182 582 247 379 595 92
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 296 711 156 164 1211 151 182 582 247 379 595 92
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByvol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 296 711 156 164 1211 151 182 582 247 379 595 92
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 296 711 156 164 1211 151 182 582 247 379 595 92
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 296 711 156 164 1211 151 182 582 247 379 595 92
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol. : 296 711 156 164 1211 151 182 582 247 379 595 92
------------1---------------11---------------11--------------- J 1---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 0.85 0.92 0.89 0.89 0.95 0.95 0.85 0.95 0.93 0.93
Lanes: 2.00 2.00 1.00 2.00 2.67 0.33 1.00 2.00 1.00 1.00 1.73 0.27
Final Sat.: 3502 3610 1615 3502 4534 565 1805 3610 1615 1805 3064 474
-----------~ 1---------------11---------------[1---------------11---------------[
Capacity Analysis Module:
Vol/Sat: 0.08 0.20 0.10 0.05 0.27 0.27 0.10 0.16 0.15 0.21 0.19 0.19
Crit Moves: ****
Green/Cycle: 0.12
Volume/Cap: 0.72
Uniform Del: 46.8
IncremntDel: 6.2
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/veh: 53.1
User DelAdj: 1.00
AdjDel/Veh: 53.1
LOS by Move: D
HCM2kAvgQ: 7
0.39
0.50
25.2
0.3
0.0
1. 00
25.5
1. 00
25.5
C
10
0.39
0.25
22.4
0.2
0.0
1. 00
22.6
1. 00
22.6
C
4
0.09
0.50
47.4
1.2
0.0
1. 00
48.6
1. 00
48.6
D
3
****
0.37
0.72
29.8
1.4
0.0
1. 00
31.2
1. 00
31.2
C
15
0.37
0.72
29.8
1.4
0.0
1. 00
31.2
1. 00
31.2
C
15
0.18
0.57
41.6
2.6
0.0
1. 00
44.1
1. 00
44.1
D
6
0.22
0.72
39.6
3.3
0.0
1. 00
42.8
1. 00
42.8
D
11
****
0.22
0.69
39.2
5.4
0.0
1. 00
44.6
1. 00
44.6
D
9
****
0.29
0.72
35.0
4.9
0.0
1. 00
40.0
1. 00
40.0
D
13
0.34
0.57
29.9
0.7
0.0
1. 00
30.6
1. 00
30.6
C
10
0.34
0.57
29.9
0.7
0.0
1. 00
30.6
1. 00
30.6
C
10
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
licensed to Hexagon Trans. San Jose
COMPARE
Fr; Oct 05 12:01 :432007
Page 3-13
Level Of Service Computation Report
2000 HeM Operations (Future Volume Allemative)
Existing PM
Intersection #4: Wolfe/Pruneridge
Signal=ProtecVRights=lnclude
Final Vol: 24 1315 116'"
Lanes: 01 201
-.J4.~~
Signal=Protect Signal=Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnt Date: 7/1712007 Righls=lnclude Lanes: Final Vol:
J- Cycle Time (sec): 110 ~
24 37
~ Loss Time (see): 0 J.-
0 0
14'" 0 ----... Critical VlC: 0.524 ...- 1 41
r Avg Crit Del (seclveh): 28.1 1= 0
116 0 Avg Delay (seclveh): 24.7 2 415."
LOS: C
~ ~ t t+- ~
Lanes: 2 0 2 0
Final Vol: 171 942". 0
Signal=ProlecVRights=lgnore
Street Name: Wolfe Road Pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------I
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 171 942 177 118 1315 24 24 14 116 415 41 37
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 171 942 177 118 1315 24 24 14 116 415 41 37
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 171 942 177 118 1315 24 24 14 116 415 41 37
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 171 942 0 118 1315 24 24 14 116 415 41 37
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 171 942 0 118 1315 24 24 14 116 415 41 37
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 171 942 0 118 1315 24 24 14 116 415 41 37
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.87 0.87 0.92 1.00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.95 0.05 1.00 0.11 0.89 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5079 93 1805 177 1468 3502 1900 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.05 0.26 0.00 0.07 0.26 0.26 0.01 0.08 0.08 0.12 0.02 0.02
Crit Moves: ****
Green/Cycle: 0.10 0.50
Volume/Cap: 0.49 0.52
Uniform Del: 47.0 18.7
IncremntDel: 1.1 0.3
InitQueuDe1: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 48.1 19.0
User DelAdj: 1.00 1.00
AdjDel/Veh:' 48.1 19.0
LOS by Move: D B
HCM2kAvgQ: 3 11
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.12
0.52
45.1
2.2
0.0
1. 00
47.3
1. 00
47.3
D
4
0.52
0.49
16.8
0.1
0.0
1. 00
17.0
1. 00
17.0
B
11
0.52
0.49
16.8
0.1
0.0
1. 00
17.0
1. 00
17.0
B
11
0.14
0.10
41.4
0.2
0.0
1. 00
41.5
1. DO
41.5
D
1
0.15
0.52
43.1
2.0
0.0
1. 00
45.1
1. 00
45.1
D
5
****
0.15
0.52
43.1
2.0
0.0
1. 00
45.1
1. 00
45.1
D
5
****
0.23
0.52
37.4
0.6
0.0
1. 00
38.0
1. 00
38.0
D
7
0.24
0.09
32.6
0.1
0.0
1. 00
32.7
1. 00
32.7
C
1
0.24
0.10
32.6
0.1
0.0
1. 00
32.7
1. 00
32.7
C
1
Traffix 7.6.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fr; Oct 05 12:01 :43 2007
Page 3-14
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Background PM
Intersection #4: Wolfe/Pruneridge
Signal=ProtecURighls=lnclude
Final Val: 24 1399'" 118
Lanes: 01201
~4t}...'+
Signal=Protecl Signal=Prolect
Final Val: Lanes: Rlghls=lnclude Vol Cnt Dale: 7/1712007 Rights=lnclude Lanes: Final Val:
..f Cycle Time (sec): 110 ~
24 37
~ Lass Time (sec): 0 .t-
O 0
14'" 0 ----jIIo- Critical VlC: 0.616 .- 41
r Avg Crit Del (seclveh): 31.4 r 0
195 0 Avg Delay (seclveh): 29.8 2 494'"
LOS: C
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 252". 1026 0
Signal=ProtecURights=lgnore
Street Name: Wol fe Road Pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Ju1 2007 << PM Peak
Base Vol: 171 942 177 118 1315 24 24 14 116 415 41 37
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 171 942 177 118 1315 24 24 14 116 415 41 37
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 81 84 84 0 84 0 0 0 79 79 0 0
Initial Fut: 252 1026 261 118 1399 24 24 14 195 494 41 37
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 252 1026 0 118 1399 24 24 14 195 494 41 37
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 252 1026 0 118 1399 24 24 14 195 494 41 37
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 252 1026 0 118 1399 24 24 14 195 494 41 37
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.86 0.86 0.92 1."00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.95 0.05 1.00 0.07 0.93 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5084 87 1805 109 1525 3502 1900 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.07 0.28 0.00 0.07 0.28 0.28 0.01 0.13 0.13 0.14 0.02 0.02
Crit Moves: ****
Green/Cycle: 0.12
Volume/Cap: 0.62
Uniform Del: 46.2
IncremntDel: 2.8
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 49.0
User De1Adj: 1.00
AdjDel/Veh: 49.0
LOS by Move: D
HCM2kAvgQ: 5
0.46
0.62
22.6
0.7
0.0
1. 00
23.3
1. 00
23.3
C
14
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.11
0.62
47.1
6.2
0.0
1. 00
53.3
1. 00
53.3
D
5
0.45
0.62
23.2
0.5
0.0
1. 00
23.7
1. 00
23.7
C
14
0.45
0.62
23.2
0.5
0.0
1. 00
23.7
1. 00
23.7
C
14
0.16
0.08
39.3
0.1
0.0
1. 00
39.4
1. 00
39.4
D
1
0.21
0.62
39.6
3.4
0.0
1. 00
43.0
1. 00
43.0
D
7
****
0.21
0.62
39.6
3.4
0.0
1. 00
43.0
1. 00
43.0
D
7
****
0.23
0.62
38.1
1.4
0.0
1. 00
39.5
1. 00
39.5
D
8
0.28
0.08
29.4
0.1
0.0
1. 00
29.5
1. 00
29.5
C
1
0.28
0.08
29.5
0.1
0.0
1. 00
29.6
1. 00
29.6
C
1
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
licensed to HeKagon Trans. San Jose
COMPARE
Fri Ocl 05 12:01 :432007
Page 3-15
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project PM
Intersection #4: WolfelPruneridge
Signal=ProtecVRights= Include
Final Vol: 24 1399'" 118
Lanes: 0 1 2 0 1
~4.}"~
Signal=Protect Signal=Prolecl
Final Vol: Lanes: Rights=lnclude Vol Cnl Dale: 7/17/2007 Rlghls=lnclude Lanes: Final Vol:
ja Cycle Time (sec): 110 ~
36 37
--t Loss Time (sec): 0 ~
0 0
26'" 0 -.. Crilical V/C: 0.651 ...- 52
r Avg Crit Del (seclveh): 33.4 1= 0
227 0 Avg Delay (sec/veh): 31.6 2 494'"
LOS: C
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 282'" 1026 0
Signal=ProlecVRighls=lgnore
Street Name: Wolfe Road Pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 17 Jul 2007 << PM Peak
Base Vol: 252 1026 261 118 1399 24 24 14 195 494 41 37
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 252 1026 261 118 1399 24 24 14 195 494 41 37
Added Vol: 30 0 0 0 0 0 12 12 32 0 11 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 282 1026 261 118 1399 24 36 26 227 494 52 37
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 282 1026 0 118 1399 24 36 26 227 494 52 37
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 282 1026 0 118 1399 24 36 26 227 494 52 37
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 282 1026 0 118 1399 24 36 26 227 494 52 37
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.87 0.87 0.92 1.00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.95 0.05 1.00 0.10 0.90 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5084 87 1805 169 1475 3502 1900 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.28 0.00 0.07 0.28 0.28 0.02 0.15 0.15 0.14 0.03 0.02
Crit Moves: ****
Green/Cycle: 0.12
Volume/Cap: 0.65
Uniform Del: 45.9
IncremntDel: 3.5
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 49.4
User DelAdj: 1.00
AdjDel/Veh: 49.4
LOS by Move: D
HCM2kAvgQ: 6
0.44
0.64
23.7
0.9
0.0
1. 00
24.6
1. 00
24.6
C
15
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.10
0.64
47.4
7.3
0.0
1. 00
54.8
1. 00
54.8
D
5
0.42
0.65
25.3
0.7
0.0
1. 00
26.0
1. 00
26.0
C
14
0.42
0.65
25.3
0.7
0.0
1. 00
26.0
1. 00
26.0
C
14
0.19
0.10
36.7
0.1
0.0
1. 00
36.9
1. 00
36.9
D
1
0.24
0.65
37.9
3.9
0.0
1. 00
41. 8
1. 00
41. 8
D
9
****
0.24
0.65
37.9
3.9
0.0
1. 00
41.8
1. 00
41.8
D
9
****
0.22
0.65
39.3
2.0
0.0
1. 00
41.3
1. 00
41.3
D
9
0.26
0.10
30.8
0.1
0.0
1. 00
30.9
1. 00
30.9
C
1
0.26
0.09
30.6
0.1
0.0
1. 00
30.7
1. 00
30.7
C
1
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associales. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :432007
Page 3.16
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth PM
Intersection #4: Wolfe/Pruneridge
Signal=ProtecVRights=lnclude
Final Vol: 25 1446'" 122
Lanes: 0 1 2 0 1
~4+}t..'-.
Signal =Protecl Signal=Prolect
Final Vol: Lanes: R.ghts=lnclude Vol Cnt Dale: nla Rights=include Lanes: Final Vol:
~ Cyde Time (see): 110 ~
37 38
~ Loss Time (see): 0 J-
0 0
27'" 0 -. Critical V/C: 0.55S ..- 53
=r Avg Cril Del (secfveh): 33.7 T 0
231 0 Avg Delay (seclveh): 32.0 2 50S'"
LOS: C
~ ~ t ~ ~
Lanes: 2 0 2 0
Final Vol: 288'" 1060 0
Signal=ProlectlRighls=lgnore
Street Name: Wol fe Road pruneridge
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 288 1060 267 122 1446 25 37 27 231 509 53 38
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 288 1060 267 122 1446 25 37 27 231 509 53 38
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 288 1060 267 122 1446 25 37 27 231 509 53 38
User Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 288 1060 0 122 1446 25 37 27 231 509 53 38
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 288 1060 0 122 1446 25 37 27 231 509 53 38
PCE Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 288 1060 0 122 1446 25 37 27 231 509 53 38
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.92 0.95 1.00 0.95 0.91 0.91 0.95 0.87 0.87 0.92 1.00 0.85
Lanes: 2.00 2.00 1.00 1.00 2.95 0.05 1.00 0.10 0.90 2.00 1.00 1.00
Final Sat.: 3502 3610 1900 1805 5084 88 1805 172 1473 3502 1900 1615
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.29 0.00 0.07 0.28 0.28 0.02 0.16 0.16 0.15 0.03 0.02
Crit Moves: ****
Green/Cycle: 0.12 0.45
Volume/Cap: 0.67 0.66
Uniform Del: 46.1 23.9
IncremntDel: 4.0 1.0
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 50.1 24.9
User DelAdj: 1.00 1.00
AdjDel/Veh: 50.1 24.9
LOS by Move: D C
HCM2kAvgQ: 6 15
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.10
0.66
47.5
8.4
0.0
1. 00
55.9
1. 00
55.9
E
5
0.43
0.67
25.4
0.8
0.0
1. 00
26.2
1. 00
26.2
C
15
0.43
0.67
25.4
0.8
0.0
1. 00
26.2
1. 00
26.2
C
15
0.19
0.11
36.7
0.1
0.0
1. 00
36.9
1. 00
36.9
D
1
0.23
0.67
38.2
4.5
0.0
1. 00
42.7
1. 00
42.7
D
9
****
0.23
0.67
38.2
4.5
0.0
1. 00
42.7
1. 00
42.7
D
9
****
0.22
0.67
39.4
2.3
0.0
1. 00
41.7
1. 00
41.7
D
9
0.26
0.11
30.9
0.1
0.0
1. 00
31. 0
1. 00
31.0
C
1
0.26
0.09
30.8
0.1
0.0
1. 00
30.9
1. 00
30.9
C
1
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3-17
level Of Service Computation Repor1
2000 HCM Operations (Future Volume Alternative)
Existing PM
Intersection #5: Wolfe/l-280 NB Ramp
Signal=ProtectlRights=lgnore
Final Vol: 0 1295'" 0
lanes: 0 0 2 0 0
~4+f.~
Signal=Protecl Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 10/3/2006 Rights=lnclude lanes: Final Vol:
..f Cycle Time (see): 55 ~
0 0 440'"
-.t loss TIme (see): 0 ~
0 0
0 0 -+ Critical V/C: 0.523 +- 11 0
0 r Avg Crit Del (seclveh): 8.7 T
0 0 Avg Delay (seclveh): 7.2 325
LOS: A
~ +t t ~ ~
Lanes: 00 2 00
Final Vol: 0'" 709 0
Signal=ProtecVRights=lgnore
Street Name: Wolfe Road 1-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movement: L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
__n________1 n____n_____n II n__nnn_n__II_n_nn___nn II nn_nnnnn 1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 0 709 0 0 1295 0 0 0 0 325 0 440
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 709 0 0 1295 0 0 0 0 325 0 440
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 709 0 0 1295 0 0 0 0 325 0 440
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 709 0 0 1295 0 0 0 0 325 0 440
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 709 0 0 1295 0 0 0 0 325 0 440
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 709 0 0 1295 0 0 0 0 325 0 440
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 0.89 1.00 0.89
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1.42 0.00 1.58
Final Sat.: 0 3610 0 0 3610 0 0 0 0 2422 0 2678
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.20 0.00 0.00 0.36 0.00 0.00 0.00 0.00 0.13 0.00 0.16
Crit Moves: ****
Green/Cycle: 0.00 0.69
Volume/Cap: 0.00 0.29
Uniform Del: 0.0 3.4
1ncrernntDel: 0.0 0.1
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
Delay/Veh: 0.0 3.4
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 3.4
LOS by Move: A A
HCM2kAvgQ: 0 3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.69
0.52
4.2
0.2
0.0
1. 00
4.4
1. 00
4.4
A
6
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.31
0.43
14.9
0.2
0.0
1. 00
15.1
1. 00
15.1
B
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.31
0.52
15.5
0.3
0.0
1. 00
15.8
1. 00
15.8
B
5
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fr; Oct 05 12:01 :432007
Page 3.18
Level Of Service Computation Report
2000 HCM Operations (FLJlure Volume Alternative)
Background PM
Intersection #5: Wolfefl-280 NB Ramp
Signal=ProlecVRights=lgnore
Final Vol: 0 1537*- 0
Lanes: 0 0 2 0 0
~4.~~
Signal =Protect Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 10/312006 Rights=lncl ude Lanes: Final Vol:
J. Cycle Time (see): 55 ~
0 0 440
~ Loss Time (see): .t-
O 0
0 0 -. Critical VIC: 0.654 1- 1! 0
0 r Avg Grit Del (seclveh): 10.4 r 0
0 0 Avg Delay (seclveh): 8.7 628'"
LOS: A
~ ~ t t--- r+
Lanes: 00 2 00
Final Vol: 0'" 958 0
Signal=ProtecURighls=lgnore
Street Name: Wolfe Road I-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 0 709 0 0 1295 0 0 0 0 325 0 440
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 709 0 0 1295 0 0 0 0 325 0 440
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 249 0 0 242 0 0 0 0 303 0 0
Initial Fut: 0 958 0 0 1537 0 0 0 0 628 0 440
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 958 0 0 1537 0 0 0 0 628 0 440
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 958 0 0 1537 0 0 0 0 628 0 440
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 958 0 0 1537 0 0 0 0 628 0 440
------------1---------------11---------------11---------------11---------------I
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 0.91 1.00 0.91
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1.59 0.00 1.41
Final Sat.: 0 3610 0 0 3610 0 0 0 0 2748 0 2443
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.27 0.00 0.00 0.43 0.00 0.00 0.00 0.00 0.23 0.00 0.18
Crit Moves: ****
Green/Cycle: 0.00 0.65
Volume/Cap: 0.00 0.41
Uniform Del: 0.0 4.6
IncremntDel: 0.0 0.1
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
Delay/Veh: 0.0 4.7
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 4.7
LOS by l~ove: A A
HCM2kAvgQ: 0 4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.65
0.65
5.8
0.7
0.0
1. 00
6.5
1. 00
6.5
A
9
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.35
0.65
15.1
1.0
0.0
1. 00
16.1
1. 00
16.1
B
7
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.35
0.52
14.2
0.2
0.0
1. 00
14.4
1. 00
14.4
B
5
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates, Inc.
Licensed \0 Hexagon Trans. San Jose
COMPARE
Fri Ocl 05 12:01 :43 2007
Page 3-19
Level or Service Compulation Report
2000 HCM Operations (Future Volume Alternative)
Project PM
Intersection #5: Wolfell-280 NB Ramp
Signal=ProlecVRights=lgnore
Final Vol: 0 1561'- 0
Lanes: 00 2 00
~4+~~
Signal=ProleCl Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Dale: 10/3/2006 Rights=lnclude Lanes: Final Vol:
~ Cycle Time (see): 55 ~
0 0 447
-t Loss Time (sec): 0 ~
0 0
0 0 ---III- Critical Vie: 0.661 ...- 1! 0
0 r Avg Crit Del (seclveh): 10.5 1= 0
0 0 Avg Delay (seclveh): B.7 62B'"
LOS: A
~ +t t ~ r+
Lanes: 00200
Final Vol: 0- 9BO 0
Signal =ProtecVRighls=lgnore
Street Name: Wolfe Road I-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------I
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 0 958 0 0 1537 0 0 0 0 628 0 440
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 958 0 0 1537 0 0 0 0 628 0 440
Added Vol: 0 22 0 0 24 8 0 0 0 0 0 7
PasserByVo1: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 980 0 0 1561 8 0 0 0 628 0 447
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 980 0 0 1561 0 0 0 0 628 0 447
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 980 0 0 1561 0 0 0 0 628 0 447
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 980 0 0 1561 0 0 0 0 628 0 447
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 0.91 1.00 0.91
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1.58 0.00 1.42
Final Sat.: 0 3610 0 0 3610 0 0 0 0 2744 0 2453
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.27 0.00 0.00 0.43 0.00 0.00 0.00 0.00 0.23 0.00 0.18
Crit Moves: ****
Green/Cycle: 0.00
Volume/Cap: 0.00
Uniform Del: 0.0
IncremntDel: 0.0
InitQueuDel: 0.0
Delay Adj: 0.00
Delay/Veh: 0.0
User DelAdj: 1.00
AdjDel/Veh: 0.0
LOS by Move: A
HCM2kAvgQ: 0
0.65
0.42
4.5
0.1
0.0
1. 00
4.6
1. 00
4.6
A
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.65
0.66
5.8
0.7
0.0
1. 00
6.5
1. 00
6.5
A
10
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.35
0.66
15.2
1.0
0.0
1. 00
16.3
1. 00
16.3
B
7
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.35
0.53
14.4
0.3
0.0
1. 00
14.6
1. 00
14.6
B
5
Tralfix 7.B.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Frl Ocl 05 12:01 :43 2007
Page 3.20
Level Of Service Compulation Report
2000 HCM Operalions (Future Volume Alternative)
Future Growth PM
Intersection #5: Wolfell-280 NB Ramp
Signal=ProtecVRights=lgnore
Final Vol: 0 1608". 0
Lanes: 0 0 2 0 0
~4+~'+
Signal=Protecl Signal=Protecl
Final Vol: Lanes: Righls=lnclude Vol Cnl Date: nla Righls=lnclude Lanes: Final Vol:
-+ Cycle Time (sec): 55 ~
0 0 463
~ Loss Time (sec): 0 J-
0 0
0 0 ~ Critical V/C: 0.679 ...- 1! 0
0 r Avg Crit Del (seclveh): 10.7 T 0
0 0 Avg Delay (seclveh): 8.9 640'"
LOS: A
~ ~ t t--- r+-
Lanes: 0 0 2 0 0
Final Vol: 0'" 1 006 0
Signal=ProtecVRights=lgnore
Street Name: Wolfe Road 1-280 NB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 0 1006 103 0 1608 624 0 0 0 640 0 463
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 0 1006 103 0 1608 624 0 0 0 640 0 463
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
passerByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1006 103 0 1608 624 0 0 0 640 0 463
User Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1.00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 0 1006 0 0 1608 0 0 0 0 640 0 463
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1006 0 0 1608 0 0 0 0 640 0 463
PCE Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 0 1006 0 0 1608 0 0 0 0 640 0 463
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1. 00 0.95 0.95 1. 00 0.95 0.95 1. 00 1. 00 1. 00 0.91 1. 00 0.91
Lanes: 0.00 2.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 1. 58 0.00 1. 42
Final Sat. : 0 3610 0 0 3610 0 0 0 0 2735 0 2457
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.28 0.00 0.00 0.45 0.00 0.00 0.00 0.00 0.23 0.00 0.19
Crit Moves: **** **** ****
Green/Cycle: 0.00 0.66 0.00 0.00 0.66 0.00 0.00 0.00 0.00 0.34 0.00 0.34
Volume/Cap: 0.00 0.43 0.00 0.00 0.68 0.00 0.00 0.00 0.00 0.68 0.00 0.55
Uniform Del: 0.0 4.5 0.0 0.0 5.9 0.0 0.0 0.0 0.0 15.4 0.0 14.6
1ncremntDel: 0.0 0.1 0.0 0.0 0.8 0.0 0.0 0.0 0.0 1.2 0.0 0.3
1nitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 0.00 1. 00 0.00, 0.00 1. 00 0.00 0.00 0.00 0.00 1. 00 0.00 1. 00
Delay/Veh: 0.0 4.6 0.0 0.0 6.7 0.0 0.0 0.0 0.0 16.6 0.0 14.9
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDel/Veh: 0.0 4.6 0.0 0.0 6.7 0.0 0.0 0.0 0.0 16.6 0.0 14.9
LOS by Move: A A A A A A A A A B A B
HCM2kAvgQ: 0 5 0 0 10 0 0 0 0 7 0 5
Traffix 7.8.0915
Copynght (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12;01 ;43 2007
Page 3-21
Level Of Service Computation Report
2000 HCM Operations (Future Volume Allernative)
Existing PM
Intersection #6: Wolfell-280 SB Ramp
Signal=ProlecVRights=lgnore
Final Vol; 0 1288... 0
Lanes: 00 300
..-J4.~'+
Signal=Prolecl Signal=Protecl
Final Vol: Lanes: Rights=lnclude Vol Cnl Date: 1 0/3/2006 Rights=lnclude Lanes: Fmal Vol:
J- Cyde Time (sec): 55 ~
460... 2 0 0
~ Loss Time (sec): 0 ~
0 0
0 0 -.. Critical V/C: 0.380 ....- 0 0
0 r Avg Cril Del (seclveh): 6.9 1= 0
370 2 Avg Delay (seclveh): 7.1 0
LOS: A
~ ~ t t-- ~
Lanes: 0 0 2 0 0
Final Vol: 0." 739 0
Signal=ProlecVRighls=lgnore
Street Name: Wolfe Road 1-280 SB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------ t ---------------11---------------1 ] ---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 0 739 0 0 1288 0 460 0 370 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 739 0 0 1288 0 460 0 370 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 739 0 0 1288 0 460 0 370 0 0 0
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 739 0 0 1288 0 460 0 370 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 739 0 0 1288 0 460 0 370 0 0 0
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 739 0 0 1288 0 460 0 370 0 0 0
------------ 1_______________ II --------------- II---------------II-------n------I
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.91 1.00 0.92 1.00 0.75 1.00 1.00 1.00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat.: 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.20 0.00 0.00 0.25 0.00 0.13 0.00 0.13 0.00 0.00 0.00
Crit Moves: ****
Green/Cycle: 0.00
Volume/Cap: 0.00
Uniform Del: 0.0
IncremntDel: 0.0
InitQueuDel: 0.0
Delay Adj: 0.00
Delay/Veh: 0.0
User DelAdj: 1.00
AdjDel/Veh: 0.0
LOS by Move: A
HCM2kAvgQ: 0
0.65
0.31
4.1
0.1
0.0
1. 00
4.2
1. 00
4.2
A
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.65
0.38
4.4
0.1
0.0
1. 00
4.5
1. 00
4.5
A
4
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.35
0.38
13.5
0.2
0.0
1. 00
13.7
1. 00
13.7
B
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.35
0.38
13 .5
0.2
0.0
1. 00
13 .8
1. 00
13.8
B
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3-22
Level Of Service Computation Report
2000 HeM Operations (Future Volume Allernative)
Background PM
Intersection #6: Wolfe/l-280 58 Ramp
Signal :ProlecVRights:lgnore
Final Vol: 0 1835 0-'
Lanes: 0 0 3 0 0
-.J4+~\:"
Signal:Protect Signal:Prolecl
Final Vol: Lanes: Rights:lnciude Vol Cnt Date: 1 0/3/2005 Righls:lnclude Lanes: Final Vol:
j-. Cycle Time (see): 55 ~
450 2 0 0
-!. Loss Time (see): J--
0 0
0 0 -. Critical V/C: 0.588 .- 0 0
0 r Avg Crit Oel {seclvehl: 9.4 1= 0
651-' 2 Avg Delay {seclveh): 8.5 0 0
LOS: A
~ ~ t 1+ ~
Lanes: 0 2 0 0
Final Vol: 0 1284-' 0
Signal:ProtecVRights:lgnore
Wolfe Road 1-280 SB Ramp
North Bound South Bound East Bound West Bound
L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min _ Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 0 739 0 0 1288 0 460 0 370 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 739 0 0 1288 0 460 0 370 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 545 0 0 547 0 0 0 291 0 0 0
Initial Fut: 0 1284 0 0 1835 0 460 0 661 0 0 0
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 1284 0 0 1835 0 460 0 661 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1284 0 0 1835 0 460 0 661 0 0 0
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 1284 0 0 1835 0 460 0 661 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.91 1.00 0.92 1.00 0.75 1.00 1.00 1.00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat.: 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.36 0.00 0.00 0.35 0.00 0.13 0.00 0.23 0.00 0.00 0.00
Crit Moves: ****
Green/Cycle: 0.00 0.60
Volume/Cap: 0.00 0.59
Uniform Del: 0.0 6.7
IncremntDel: 0.0 0.4
InitQueuDel: 0.0 0.0
Delay Adj: 0.00 1.00
Delay/Veh: 0.0 7.1
User DelAdj: 1.00 1.00
AdjDel/Veh: 0.0 7.1
LOS by Move: A A
HCM2kAvgQ: 0 8
Street Name:
Approach:
Movemen t :
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.60
0.59
6.7
0.3
0.0
1. 00
6.9
1. 00
6.9
A
8
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.40
0.33
11. 6
0.1
0.0
1. 00
11.7
1. 00
11.7
B
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.40
0.59
13 .1
0.8
0.0
1. 00
13.9
1. 00
13.9
B
6
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.8.0915
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Copyright (cl 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 0512:01:43 2007
Page 3-23
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Project PM
Intersection #6: Wolfe/l-28D SB Ramp
Signal=ProlecVRights=lgnore
Final Vol: 0 1851'" 0
Lanes: 00 3 00
.-J4+~~
Signal=Prolect Signal=Protect
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 1 0/3/2006 Righls=lnclude
j- Cycle Time (sec): 55 ~
467 2
~ Loss Time (sec): ~
0
0 0 ----.... Crilical VIC: 0.589 ..-
0 r Avg Crit Del (seclveh): 8.8 1=
661'" 2 Avg Delay (seclveh): 8.6
LOS: A
~ ~ t ~ ~
Lanes: 0 0 2 0
Final Vol: 0'" 1299 0
Signal=ProtecVRlghts=lgnore
Lanes: Final Vol:
o 0
o
o
o
o 0
Street Name: Wolfe Road I-280 SB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 0 1284 0 0 1835 0 460 0 661 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 1284 0 0 1835 0 460 0 661 0 0 0
Added Vol: 0 15 0 0 16 8 7 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1299 0 0 1851 8 467 0 661 0 0 0
User Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 1299 0 0 1851 0 467 0 661 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1299 0 0 1851 0 467 0 661 0 0 0
PCE Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 0 1299 0 0 1851 0 467 0 661 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1.00 0.95 1.00 1.00 0.91 0.91 0.92 1.00 0.75 1.00 1.00 1.00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat.: 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.36 0.00 0.00 0.36 0.00 0.13 0.00 0.23 0.00 0.00 0.00
Crit Moves: ****
Green/Cycle: 0.00
Volume/Cap: 0.00
Uniform Del: 0.0
IncremntDel: 0.0
InitQueuDel: 0.0
Delay Adj: 0.00
Delay/Veh: 0.0
User DelAdj: 1.00
AdjDel/Veh: 0.0
LOS by Move: A
HCM2kAvgQ: 0
0.61
0.59
6.7
0.4
0.0
1. 00
7.1
1. 00
7.1
A
8
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.61
0.59
6.7
0.3
0.0
1. 00
7.0
1. 00
7.0
A
8
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.39
0.34
11. 6
0.1
0.0
1. 00
11.8
1. 00
11.8
B
3
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.39
0.59
13 .1
0.8
0.0
1. 00
14.0
1. 00
14.0
B
6
****
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
0.00
0.00
0.0
0.0
0.0
0.00
0.0
1. 00
0.0
A
o
Traffix 7.6.0915
Copyright (e) 2005 Dowling Associates, Ine.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01:43 2007
Page 3.24
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
Future Growth PM
Intersection #6: Wolfe/l-280 S8 Ramp
Signal=ProtecVRights=lgnore
Final Vol: 0 1 B97'" 0
Lanes: DO 3 DO
~4+~~
Signal=Prolecl Signal=Prolect
Final Voi: Lanes: Rights=lnclude Vol Cnt Dale: nfa Rights=lnclude Lanes: Final Vol:
j Cycle Time (see): 55 ~
4B4 2 0 0
~ Loss Time (see): J-
0 0
0 0 ----... Crilical VlC: 0.603 <If- 0 0
0 r Avg Crit Del (seclveh): B.9 r 0
674'" 2 Avg Delay (sedveh): B.7 0 0
LOS: A
~ +t t ~ ~
Lanes: DO 2 DO
Final Vol: 0'" 1326 0
Signal=ProlecVRights=lgnore
Street Name: Wolfe Road 1-280 SB Ramp
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 0 1326 399 0 1897 313 484 0 674 0 0 0
Growth Adj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Initial Bse: 0 1326 399 0 1897 313 484 0 674 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 1326 399 0 1897 313 484 0 674 0 0 0
User Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
PHF Volume: 0 1326 0 0 1897 0 484 0 674 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 0 1326 0 0 1897 0 484 0 674 0 0 0
PCE Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
MLF Adj: 1. 00 1. 00 0.00 1. 00 1. 00 0.00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
Final Vol. : 0 1326 0 0 1897 0 484 0 674 0 0 0
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 1. 00 0.95 0.95 1. 00 0.91 0.91 0.92 1. 00 0.75 1. 00 1. 00 1. 00
Lanes: 0.00 2.00 0.00 0.00 3.00 0.00 2.00 0.00 2.00 0.00 0.00 0.00
Final Sat. : 0 3610 0 0 5187 0 3502 0 2842 0 0 0
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.00 0.37 0.00 0.00 0.37 0.00 0.14 0.00 0.24 0.00 0.00 0.00
Crit Moves: **** **** ****
Green/Cycle: 0.00 0.61 0.00 0.00 0.61 0.00 0.39 0.00 0.39 0.00 0.00 0.00
Volume/Cap: 0.00 0.61 0.00 0.00 0.60 0.00 0.35 0.00 0.60 0.00 0.00 0.00
Uniform Del: 0.0 6.7 0.0 0.0 6.7 0.0 11.7 0.0 13 .3 0.0 0.0 0.0
IncremntDel: 0.0 0.5 0.0 0.0 0.3 0.0 0.2 0.0 0.9 0.0 0.0 0.0
InitQueuDel: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Delay Adj: 0.00 1. 00 0.00 0.00 1. 00 0.00 1. 00 0.00 1. 00 0.00 0.00 0.00
Delay/Veh: 0.0 7.2 0.0 0.0 7.0 0.0 11. 9 0.0 14.2 0.0 0.0 0.0
User DelAdj: 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00
AdjDe1/Veh: 0.0 7.2 0.0 0.0 7.0 0.0 11. 9 0.0 14.2 0.0 0.0 0.0
LOS by Move: A A A A A A B A B A A A
HCM2kAvgQ: 0 8 0 0 8 0 3 0 6 0 0 0
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associales, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fr! Oct 05 12:01 :432007
Page 3.25
Level Of Service Computation Report
2000 HCM Operations (Future Volume Alternative)
E<isling PM
Intersection #7: Wolfe/Stevens Creek
S,gnal=ProlecVRighls=lnclude
Final Vol: 389'" 831 297
Lanes: 1 0 2 0 1
..-J4~'}'~
Signal=Prolecl Signal=PrOlecl
Final Vol: Lanes: Righls=tnclude Vol Cnt Dale: 1013/2006 Righls=lnclude Lanes: Final Vol:
~ Cycle Time (sec): 110 +--
445'" 2 0 291
~ Loss Time (sec): 0 .t-
O
1095 3 ---.... Critical V/C: 0.670 +- 2 815--
0 =r Avg Cril Del (seclveh): 36.6 1= 0
169 Avg Delay (seclveh): 32.8 2 172
LOS: C
~~t~~
Lanes: 2 0
Final Vol: 144'" 382 57
Signal=ProlectfRights= Include
Street Name: Wolfe Road Stevens Creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 144 382 57 297 831 389 445 1095 169 172 815 291
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 144 382 57 297 831 389 445 1095 169 172 815 291
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 144 382 57 297 831 389 445 1095 169 172 815 291
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 144 382 57 297 831 389 445 1095 169 172 815 291
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 144 382 57 297 831 389 445 1095 169 172 815 291
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 144 382 57 297 831 389 445 1095 169 172 815 291
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.87 0.87
Lanes: 1.00 2.61 0.39 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.21 0.79
Final Sat.: 1805 4428 661 1805 3610 1615 3502 5187 1615 3502 3673 1312
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.09 0.09 0.16 0.23 0.24 0.13 0.21 0.10 0.05 0.22 0.22
Crit Moves: ****
Green/Cycle: 0.12
Volume/Cap: 0.67
Uniform Del: 46.4
IncremntDel: 7.9
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 54.3
User DelAdj: 1.00
AdjDel/Veh: 54.3
LOS by Move: D
HCM2kAvgQ: 6
0.16
0.52
42.0
0.6
0.0
1. 00
42.6
1. 00
42.6
D
6
0.16
0.52
42.0
0.6
0.0
1. 00
42.6
1. DO
42.6
D
6
0.31
0.52
31.0
0.9
0.0
1. 00
31.9
1. 00
31.9
C
9
0.36
0.64
29.3
1.1
0.0
1. 00
30.4
1. 00
30.4
C
13
0.36
0.67
29.7
3.0
0.0
1. 00
32.7
1. 00
32.7
C
12
****
****
0.19
0.67
41.4
2.7
0.0
1. 00
44.0
1. DO
44.0
D
8
0.42
0.50
23.2
0.2
0.0
1. 00
23.4
1. 00
23.4
C
10
0.42
0.25
20.5
0.2
0.0
1. 00
20.7
1. DO
20.7
C
4
0.10
0.50
47.0
1.1
0.0
1. 00
48.2
1. DO
48.2
D
3
0.33
0.67
31.6
1.1
0.0
1. 00
32.7
1. DO
32.7
C
13
****
0.33
0.67
31. 6
1.1
0.0
1. DO
32.7
1. 00
32.7
C
13
Traffix 7.8.0915
Copyright (c) 2005 Dowling Associates. Inc.
Licensed 10 He<agon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :432007
Page 3-26
Level Of Service Computation Report
2000 HeM Operations (Future Volume Alternative)
Background PM
Intersection #7: Wolfe/Stevens Creek
Signal ;ProtecVRighls;lnclude
Final Vol: 691." 892 583
Lanes; 1 0 2 0 1
..v4t~~
Signal;Protect Si9nal;Protect
Final Vol: Lanes: Rights;lnclude Vol Cnt Dale; 1013/2006 Rights;lnclude Lanes: F,nal Vol;
J-- Cycle TIme (see): 110 ~
703." 2 0 528'"
~ Loss Time (see): 0 J--
0
1153 3 ----... Critical V/C: 1.032 ..- 2 896
0 --r Avg Crit Del (seclveh): 78.8 1= 0
169 Avg Delay (seclveh): 50.5 2 181
LOS: D
~ +t t ~ r+
Lanes; 1 0 2 0
Final Vol: 144'" 441 57
Signal;ProtecVRighls;lnclude
Street Name: Wolfe Road Stevens Creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 144 382 57 297 831 389 445 1095 169 172 815 291
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 144 382 57 297 831 389 445 1095 169 172 815 291
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Approved Tr: 0 59 0 286 61 302 258 58 0 9 81 237
Initial Fut: 144 441 57 583 892 691 703 1153 169 181 896 528
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 144 441 57 583 892 691 703 1153 ,169 181 896 528
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 144 441 57 583 892 691 703 1153 169 181 896 528
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 144 441 57 583 892 691 703 1153 169 181 896 528
------------\ _______________11_______________11_______________11_______________I
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.86 0.86
Lanes: 1.00 2.66 0.34 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.00 1.00
Final Sat.: 1805 4515 584 1805 3610 1615 3502 5187 1615 3502 3264 1632
____________1_______________11 _______________11_______________11_______________1
Capacity Analysis Module:
Vol/Sat:. 0.08 0.10 0.10 0.32 0.25 0.43 0.20 0.22 0.10 0.05 0.27 0.32
Crit Moves: ****
Green/Cycle: 0.08
Volume/Cap: 1.03
Uniform Del: 50.7
IncremntDel: 84.9
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 135.6
User De1Adj: 1.00
AdjDel/Veh: 135.6
LOS by Move: F
HCM2kAvgQ: 9
0.11
0.86
47.8
11.9
0.0
1. 00
59.7
1. 00
59.7
E
9
0.11
0.86
47.8
11. 9
0.0
1. 00
59.7
1. 00
59.7
E
9
0.38
0.86
31. 5
10.3
0.0
1. 00
41.8
1. 00
41. 8
D
21
0.41
1. 03
32.2
43.2
0.0
1. 00
75.4
1. 00
75.4
E
32
****
****
0.19
1. 03
44.3
42.9
0.0
1. 00
87.2
1. 00
87.2
F
19
0.41
0.54
24.4
0.3
0.0
1. 00
24.7
1. 00
24.7
C
11
0.41
0.25
21.2
0.2
0.0
1. 00
21.4
1. 00
21.4
C
4
0.10
0.54
47.4
1.8
0.0
1. 00
49.2
1. 00
49.2
D
4
0.31
0.88
35.7
5.7
0.0
1. 00
41.4
1. 00
41. 4
D
19
****
0.31
1. 03
37.8
32.8
0.0
1. 00
70.6
1. 00
70.6
E
27
Traffix 7.8.0915
0.41
0.60
25.0
0.7
0.0
1. 00
25.7
1. 00
25.7
C
13
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Oct 05 12:01 :43 2007
Page 3-27
Level Of Service Computation Report
2000 HCM Operations (Future Volume Allernative)
Project PM
Intersection #7: Wolfe/Stevens Creek
Signal=ProtecVRights=lnctude
Final Vol: 699- 892 591
Lanes: 10201
-.J4~~~
Signal=Prolect Signal =Prolecl
Final Vol: Lanes: Rights=lnclude Vol Cnt Date: 1 0/3/2006 Righls=lnc1ude Lanes: Final Vol:
j- Cycle Time (see): 110 ~
710'" 2 0 535'"
~ Loss Time (see): 0 .t-
O
1153 3 -.. Critical V/C: 1.043 +- 2 896
0 r Avg Crit Del (sec/veh): 82.2 T 0
169 Avg Delay (sec/veh): 51.8 2 181
LOS: D
~ ~ t .,. r+
Lanes: 1 0 2 0
Final Vol: 144'" 441 57
Signal=ProtecVRights=lnclude
Street Name: Wolfe Road Stevens Creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1---------------11--------------- 11_______________11_______________1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module: >> Count Date: 3 Oct 2006 << PM Peak
Base Vol: 144 441 57 583 892 691 703 1153 169 181 896 528
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 144 441 57 583 892 691 703 1153 169 181 896 528
Added Vol: 0 0 0 8 0 8 7 0 0 0 0 7
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 144 441 57 591 892 699 710 1153 169 181 896 535
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 144 441 57 591 892 699 710 1153 169 181 896 535
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 144 441 57 591 892 699 710 1153 169 181 896 535
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 144 441 57 591 892 699 710 1153 169 181 896 535
------------1---------------11---------------11---------------11---------------1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.86 0.86
Lanes: 1.00 2.66 0.34 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.00 1.00
Final Sat.: 1805 4515 584 1805 3610 1615 3502 5187 1615 3502 3264 1632
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.10 0.10 0.33 0.25 0.43 0.20 0.22 0.10 0.05 0.27 0.33
Crit Moves: ****
Green/Cycle: 0.08 0.11
Volume/Cap: 1.04 0.87
Uniform Del: 50.8 48.0
IncremntDel: 88.5 13.0
InitQueuDel: 0.0 0.0
Delay Adj: 1.00 1.00
Delay/Veh: 139.3 60.9
User DelAdj: 1.00 1.00
AdjDel/Veh: 139.3 60.9
LOS by Move: F E
HCM2kAvgQ: 9 9
0.11
0.87
48.0
13.0
0.0
1. 00
60.9
1. 00
60.9
E
9
0.38
0.87
31. 6
11.2
0.0
1. 00
42.8
1. 00
42.8
D
21
0.41
0.60
25.0
0.7
0.0
1. 00
25.7
1. 00
25.7
C
13
0.41
1. 04
32.2
46.5
0.0
1. 00
78.7
1. 00
78.7
E
33
****
****
0.19
1. 04
44.3
46.3
0.0
1. 00
90.6
1. 00
90.6
F
19
0.41
0.54
24.4
0.3
0.0
1. 00
24.7
1. 00
24.7
C
11
0.41
0.25
21.2
0.2
0.0
1. 00
21.4
1. 00
21.4
C
4
0.10
0.54
47.4
1.7
0.0
1. 00
49.2
1. 00
49.2
D
4
0.31
0.87
35.7
5.5
0.0
1. 00
41.2
1. 00
41.2
D
19
****
0.31
1. 04
37.7
36.4
0.0
1. 00
74.1
1. 00
74.1
E
28
Traffix 7.8.0915
Copyrighl (c) 2005 Dowling ASSOCiates. Inc.
Licensed to Hexagon Trans. San Jose
COMPARE
Fri Ocl 0512:01:43 2007
Page 3.28
Level Of Service Computation Report
2000 HCM Operafions (Future Volume Alternative)
Future Growth PM
Intersection #7: Wolfe/Stevens Creek
Signal=ProlecVRighls=include
Final Vol: 713- 922 S02
Lanes: 10 2 01
-.J4+~~
Signal=Protecl Signal=Protecl
Final Vol: Lanes: Righ!s=lnclude Vol Cn! Date: nfa Rights=lnclude Lanes: Final Vol:
J- Cycle Time (see): 110 ~
72S'" 2 0 545'"
~ Loss Time (see): 0 ~
0
1192 3 ----... Critical VlC: 1.0S5 ...- 2 925
0 =r Avg Crit Del (sec/veh): 89.4 1= 0
175 Avg Delay (sec/veh): 54.8 2 187
LOS: D
~ ~ t ~ ~
Lanes: 1 0 2 0
Final Vol: 149*" 455 59
Signal=Pro!eCVRights=lnclude
Street Name: Wolfe Road Stevens Creek Boulevard
Approach: North Bound South Bound East Bound West Bound
Movemen t : L T R L T R L T R L T R
------------1--------------- t 1---------------11---------------11---------------1
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
------------1---------------11---------------11---------------11---------------1
Volume Module:
Base Vol: 149 455 59 602 922 713 726 1192 175 187 925 545
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 149 455 59 602 922 713 726 1192 175 187 925 545
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 149 455 59 602 922 713 726 1192 175 187 925 545
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 149 455 59 602 922 713 726 1192 175 187 925 545
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 149 455 59 602 922 713 726 1192 175 187 925 545
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 149 455 59 602 922 713 726 1192 175 187 925 545
____________1_______________11_______________11 _______________11_______________ 1
Saturation Flow Module:
Sat/Lane: 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adjustment: 0.95 0.89 0.89 0.95 0.95 0.85 0.92 0.91 0.85 0.92 0.86 0.86
Lanes: 1.00 2.66 0.34 1.00 2.00 1.00 2.00 3.00 1.00 2.00 2.00 1.00
Final Sat.: 1805 4514 585 1805 3610 1615 3502 5187 1615 3502 3264 1632
------------1---------------11---------------11---------------11---------------1
Capacity Analysis Module:
Vol/Sat: 0.08 0.10 0.10 0.33 0.26 0.44 0.21 0.23 0.11 0.05 0.28 0.33
Crit Moves: ****
Green/Cycle: 0.08
Volume/Cap: 1.07
Uniform Del: 50.7
IncremntDel: 94.6
InitQueuDel: 0.0
Delay Adj: 1.00
Delay/Veh: 145.3
User DelAdj: 1.00
AdjDel/Veh: 145.3
LOS by Move: F
HCM2kAvgQ: 9
0.11
0.88
48.0
14.8
0.0
1. 00
62.8
1. 00
62.8
E
9
0.11
0.88
48.0
14.8
0.0
1. 00
62.8
1. 00
62.8
E
9
0.38
0.88
32.0
13 .0
0.0
1. 00
44.9
1. 00
44.9
D
22
0.41
1. 07
32.2
53.5
0.0
1. 00
85.7
1. 00
85.7
F
34
****
****
0.19
1. 07
44.3
53.2
0.0
1. 00
97.5
1. 00
97.5
F
20
0.41
0.56
24.7
0.3
0.0
1. 00
25.0
1. 00
25.0
C
11
0.41
0.26
21.3
0.2
0.0
1. 00
21.5
1. 00
21.5
C
4
0.10
0.56
47.5
2.1
0.0
1. 00
49.6
1. 00
49.6
D
4
0.31
0.90
36.2
7.5
0.0
1. 00
43.7
1. 00
43.7
D
20
****
0.31
1. 07
37.8
43.7
0.0
1. 00
81. 4
1. 00
81. 4
F
30
Traffix 7.8.0915
0.41
0.62
25.3
0.8
0.0
1. 00
26.1
1. 00
26.1
C
13
Copyright (c) 2005 Dowling Associates, Inc.
Licensed to Hexagon Trans. San Jose
Agpendix C
Approved Trips
Development
Land Use
TolDl
I. WIlIl\:,';1 V"llc,' 1'llrl..wn.\'I\'llk., Ro:siu,'nlilllllll
Condo
~
Condo
RCl<Iil
Condo
Rclail
Tolal
Retail
'!.j\'.II..^n:nlIl'I'I!.IlI1..1I.2IlUI(lt1kPllr\.:vn~'l-oo:l
J.:WI:RSln..uIII'l\:o:k 11!\'u (,'J.>l-.:TO:Ir..~o:l
~. 1.17S:;.I>..:.~n...IIlYu ("'IM('MII1!o:I1lItI)
-rJ'.;- J J.:/
~. 1'}77tlSI(\'VtI~('n.'\'k IlivLl (MnrkO:II'IIlC..lllJj.: (.J
TOlal
P.M. Poek Hour
~
Rale
204 d.lI.
46 duo 5.66 270 0.44 3 17
23 duo 6.72 155 051 2 10
2.400s.r. 41.94 103 1.0.\ 1 1
6d.u.
1.825 s.r.
100.000 s.r.
296.000 s.r.
n.ooos.r.
3500 !lcal.!:
7.000 studcnt~
68.000g.s.r
14.652..r.
60,000 5. r. gross
1.774 s.(
IOU60s.r. ncl
55 d.u.
8d.u.
10.582,.r.
I J7 unils
19 d.u. nct
14:1 roolT6
20.ooo5.r.
10.000s.r.
19.000 s.r.
65
20
12
2
'2
16 8 24
9 5 14
4 5 9
0..52
0.62
3.75
41.94
4
n
121
I.b' ...\,..}
r,. I Ie ,'";.'lllllnl.~ R"o.lri~u"li An:,ll'ivir:: I'nrJ;XII
J4.300(;.5.r.
( 19.000 s. r. lIet)
1~13S5.A. '({i.
107 d.u.
6.4005.(
7. HI"'''''lI~ .n....k So: Wl1l1t: II,:""" (:\fo;l1~' liljuilK."':L1
Mh:cd Usc
Condos
Relail
Tolal
Retail
Rctail
Rcslauranl
Theater
TOlal
JJ.Collcgc
Relail
Rl'Stauranl
Office
RClail
Wurchouse
S.F. housa
S,F. houses
~. W.,IIi.: s: V.llc" 1'.rkll'llY t~k:~ ,.(',.'...."'1 l'1"1....XII
'J, ""_11'0: & V"l1o;" 1'.rkwllY (VlItk,.I(.'\("IIIl!li..n)1 I)
1\1. SI~.V"'hLI'I'\...k IItHI. ...r. Sl..mn~ (Do: ,\nm f'"Ih:~o; J:.'\l'l11IISj"nl12)
I'. \l1..,,,-, 1\....J.~I.ll
I:!. Slo:\'o:,'~l'n....k& 1"'I1nll)r {('hUll" kl'hl"!le><~l
tJ. MlU;..ni^~..'\!KI~^"Wl (AnrMlnOn){MI
1~.;!2_I!>l'.~::!II"n"''1lI(.uJ{d.(llnrrin~ldnl-+Oh ._.}_~/
I~. ::!II~(.~ V.t....ych\'\'1l I Jriu: (l>llblk.l\I''\TIIIl''''
If.. (IIU ,\110.11:. '\I'..nw lI{i.IIWn.'l: l{o;lil.>f1 T~'IT1ICO:lI)
17. ;117 E 1t..."..lIlt'lIJ IhJ (rllln.'il FI'I,",:..lin TO;TllIO:'''~)
PE.NDING
lUIIIO"'. Tlll1lnuAI\.'UH:
Retail
ApanmcnlS
S.F. Houses
11011:1
Rclall
Mt'ctinS Rms
Total
Rclail
:!llKtlllllll.U.........IIJ. IW~1I7 /';. SI...UiulillVillll ~n'n}l(oj
111!'CS_~i'I.SldUUf:lhl. tl"I1'ylill}'jl7l
-\'\J1)-tt1A
l )~b Sh"Nliflll ( 'O:III''TI:'l",ll:nll f"n:.:kl:tllll~l
l~i\tl"IIII\J.iII,'llilli=-l."rl{u lillSullJ,'~.n'Jl
Notes:
Trip gener:.llion average ratcs rrom lTE's 1'rip (j('I/{'nl/irlll. 7''' Edilioll.
(I) Peak hour trip generation provided by CilY orCupcrlino
(2) Trip gcncration rrom DKS,Oe An1.a College E:.IR (May 2002)
()) Trip generation pro\.idcd by City ofCupcnino (Whole Foods TIA)
(4) Trip generation rates Crom I'm ~Iigh Tumcwcr Sil 00\\11 Restaurant (932).
(5) Trip generation rales rrom ITE Quality Rrsl:IUr<1l11 (93 I).
(6) Trip gl.'ll.cralion tales rram Fchr & Peers. TIA (May 2007)
(7) Trip generation rales rram Fchr & Peers. TIA (April 2007)
(S) Trip generation r:ues rrolll Piing Enginccrs. TIA (June 2006)
(9) Trip generation HUCS from Fellr & PeefS. TIA (Feu 2007)
(IOJ Trip generation rates from Republic ITS (still tlran).
U8.')
20
13
J.75
58
6J
1.093
1.~4 10.7'0 0.14 892 88 980 0.16 728 292 1.120
42.94 2.920 25 32 57 179 149 328
111.15 1.863 98 62 Ilia
11.01 661 1.55 '2 II 93 1.49 15 74 89
9.57
9:57
526
77
0.75
0.75
10
1
31
5'
41
6
1.01
1.01
35
.I
21
J
56
,
7.3
H--i
53
.,,~s
\1
~o
't.[)
29
..1<:.
82
854
O.~2
I 27
1::;\h'itl:r;'U;i~ ~4~;:;;iH :j~~t~~:
,,'1' !.'-' ':JI "\"., ,. -:_1. "PJ .,......~I,. .~.,.",. h..J
,\~1~;D: t':I~:~X ~t~:I\'~_: .if;f~i~
- 2.107 - 77
1437 49
61
~ '-'
~ .. /.:,
.~ ~ -~ -,'~~~v ..
#~
~
Exhibit B
Mayne Tree Expert Company, Inc.
ESTABLISHED 1931
GRADUATE FORESTER
CERTIFIED ARBORISTS
STATE CONTRACTOR"S LICENSE NO. 276793
PEST CONTROL ADVISORS AND OPERATORS
RICHARD L. HUNTINGTON
PRESIDENT
KEVIN R. KIELTY
OPERATIONS MANAGER
September 20,2006
535 BRAGATO ROAD, STE. A
SAN CARLOS, CA 94070-6228
TELEPHONE: (650) 593-4400
FACSIMILE (650) 593-4443
EMAIL: info@maynetree.com
Mr. William Brown
Kimco Realty Corp.
4055 Factoria Mall SE
Bellevue, WA 98066
Dear Mr. Brown,
RE: CUPERTINO VILLAGE
This report is essentially an addendum to the tree survey report of August 25,2006.
The original report did not include any proposed development/construction or tree
removal for development or construction. I have now received a scope of development
opportunity locations.
Each of the three areas will be addressed along with a synopsis of trees on the smaller
sites, in light of removal and potential development.
Area I is between Building D and the English Pub. The only trees within this area are
numbers 1, 58, 59, 60, 61, and 62. All of these trees have a 60 percent or less rating or
fair condition. All are, or will be, causing damage with roots uplifting nearby curbs or
paving. Also, there will always be risks to pedestrians and parked cars from limb drop.
Mitigating these will result in support loss or a program of pruning every 2 years.
The trees along Wolfe Road have roots under the parking lot. Therefore, any
excavation will impact tree health and/or support. These are trees numbered 38, 63,
65, 68, 70, and 72. These trees will require a minimum of 10 feet of open space free of
excavation to give them a reasonable level of acceptable risk.
Protective fencing can be installed along the curb if paving is kept. Fencing can be
placed further if paving is removed to reduce soil compaction and keep excavation away
from root zone
Cupertino Village
- 2 -
September 20, 2006
Area II is in the northwest corner and again is all parking area. There are 19 trees
numbered 165 and 181 - 198 within the site plus 20 perimeter trees numbered, 157-
164 and 166 - 177. All of the inside trees have a condition rating in the fair range, 50 -
69, or less. Trees numbered 196 and 198 have a higher fair percent of 65 percent.
Paving surrounds all trees so they have a very high chance of uplifting paving and curbs
as was stated for most trees. They also have a high risk of falling limbs onto cars and
tripping hazards for pedestrians.
The perimeter trees on the northerly side can stay except numbers 160 & 161. Both
trees are about 3 feet from the curb with many roots below the paving. It is prudent to
remove both trees due to sap on cars and limited life spans. Excavation along the curb
would impact roots and removal would be recommended. Install protective fencing
along the curb.
The trees along the westerly side, numbers 164 - 177 are mostly ginkgos. Number 168
is a hawthorn that has poor form. All of the other trees are small and about 3 feet from
the curb. Excavation would cause only minor impacts. I do recommend deep root
fertilizing. Install protective fencing along the curb.
Area III is very small with only 5 or 6 trees. The 2 locusts, numbers 149 and 150,
have ample room to grow, but are potentially in the footprint of any construction. Tree
number 151, a ginkgo, has a nuisance fruit issue and should be removed regardless of
any proposed work. Tree number 152 is a Monterey pine, which is heavily infected with
Sequoia pitch moth larval activity and also is in potential construction footprint.
Tree number 152 has roots uplifting the curb and below the paving. Excavation along
the curb would cause damage. If tree is retained it will need at least a 10 foot distance
from any construction. Deep root fertilizing will help offset potential impacts. It,
however, is prudent to remove the pines due to a variety of health issues, are short-
lived, insect prone, easily stressed.
Photographs are included to give a visual picture of each site. Individual trees were not
photographed but all are in the fair condition range or below. There are no high-value
trees in the three sites discussed in this report.
Sincerely, .
-pvJ./ f/)/ &~L;/
RLH:pmd
Richard L. Huntington
Certified Arborist WE #0119A
Certified Forester # 1925
Cupertino Village
- 3 -
September 20, 2006
t~!F
~~.~.r .
~/. .~.{-
I ~ 7~ ,.. ., fJ
~~~7"'" ~"fj
, ~. '",. '. ': ~. ,'O:~
.~
~
15 1:56PM
AREA I - Looking north
Tree on right is # 58.
Cupertino Village
- 4 -
September 20, 2006
T.
~--
- ",
, ' ~,,'.""O'"
:.I
15.
, I
. >.:< :~~'0~~~:~J; !
. ..1~~~tjf~J; ".,~ "
., '''~;'>~~;~';';?~f~{ ,
AREA II - Looking northwest
Tree in front is # 187.
Cupertino Village
- 5 -
September 20, 2006
-r
.,
.
~ : .' --=-..:..-...- . ~
~--- ---....,~-
.~7.' '=-
r - -~-
~";;:;,,
r --
15 2:01PM
I
-- - - --
AREA II - Looking west
Tree in front is #181.
Cupertino Village
- 6 -
September 20, 2006
~
1~ 2.03PM
AREA III - Looking east
Tree on right is #152. Tree centered in back is #149.
'k
" ~,.
J -
___~ ~_____~n--__b.....- ~
~ N u; gfR m [:.:,,~ t~
~. ~ _ __~ ~,_ ....1::.._....._'"-..-:.~~h. ~
~
-.
~~_.-..r.
co. I/) 'It c")
1/). to 1/). I/)
...~.~.,....
:r-~'
,,~,'~~~'" ---
~~
,. $r;,
/' -- ,
_'t...
'~~""-
'~<"~'-
/'
MAP KEY, TREE COUNTJ SPECIES
.- (92) ASH TREES
X- (12) REDWOOD TREES
~,. (8)'PJNE TREES
T - (3) TULIP TREES
L. (12) LOCUST TREES
p~ (1) PEAR TREE
G- (7) GlNKO TREES
A- (2) ALDER TREES
0- (2) LOOUATTREBS
~ , I ~' ' . .
",
"-
'.
t
;~~~.:;
-~"",
. -- _..............~
r,--' - ",:
,,~,- . ,.,-! " .!
- I .- ~ l
. . . . I
" ' . ._,; '. .i : 1
"" ._ ~_. ". I, ;.1
_ . ---.l- .... . r ..t" _..1
'.J "- f --.,' I.:' ~
.-:_ .... . h. ~- l~' "./ -
",.^~ . - ...1-' <>
n .". "" '
",~I>V: C . " ' ".1 l
'.'~-=-' . .' J ll\
, _ ',_ ,_ ; 1.1 "l
I, , ~ It) -=--t
!'!<
.... . .
, " ~
. ""':.E~ ~~
'1.:-.
.~
1i.. !''': r..'~J ,1"
.'-.-
" .. .. . ~: :. .', n -.' .
,," lil 1; i: , '., .. ......... .' '<"" =- '" ~-'."
. . ,,':<:,;<,;. J I i n ,cr"'I'--::"';!,.;'.c: 0 ..'';,;; ,lIfl06
, #~ ~., ,0> l'.w.... ,,= 1."- _T:"'.',;i'!!,J
-;. " . ,.. .___ _' .<< . ' '" ; . '" .J" .Lt' <"I.'" .>'';''
.. ...., "... .. .... ..... ........ ". ... .... --.,;;"'" > "'" '"
co co co _ ..., S1 .0>: O~A'~ .~..~... " ' .;. --+ (j:7/r....
... VJ _ .0;) o>,m(i)'" ." I/) co fo- 0>' .-:- ..."".
0> en GI 01 0> 0> <':'" c")
0'- 0
,.... '\"" ,.
-..---
... '~~f~Y"~1=;~":)-.
. .rr::.~~ ~ ::..~=_____
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
REPORT ON
203 trees at Cupertino Village
Wolfe Road and Homestead, Cupertino, California
Prepared For:
Kimco Realty Corporation
4055 Factoria Mall SE
Bellevue, Washington 98066
Contact: William Brown
Telephone: (425) 041-9716
Prepared By:
Mayne Tree Expert Company, Incorporated
535 Bragato Road, Suite A
Contact: Richard Huntington
Telephone: (650) 593-4400
Facsimile: (650) 593-4443
August 25, 2006
Report on Cupertino Village, Wolfe "oad and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TABLE OF CONTENTS
Pace No.
SITE:
1
ASSIGNMENT:
1
METHODOLOGY:
1
TREE SURVEY:
2 -13
FINDINGS:
14
Report on Cupertino village, Wolfe Koad and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
SITE:
The site is a shopping center, mostly covered with paving, walkways and structures.
There is a lot of vehicular and pedestrian traffic, so uneven surfaces are a problem.
There are 203 trees on the site, most of which are in planting strips, peninsulas or
islands. The majority do not have adequate room for root growth or canopy spread.
The trees are along the streets, Wolfe Road and Homestead (major thoroughfares),
parking stalls or sidewalks. The only exception is the area where there are redwoods
and alders.
Tree species and sizes vary from large ashes, redwoods and pines to small, recently
planted plums, Chinese pistaches and crape myrtles. The trees also vary in the amount
of care and inspections they have had and in their longevity. The redwoods are long
lived and require very little care. The pines are relatively short lived and require little
care, but do need to be inspected for insects and disease. The ash trees need lots of
care and inspections, due to their inherently weak structures.
ASSIGNMENT:
Each tree was to be identified as to species and then measured, as all trees on this site
are significant. The trees were to be given numbers, which coordinate on the Report
and the Site Plan. Each tree was to be inspected for general health and structure. This
is to include the presence of insects and diseases, longevity and hazardous conditions.
Mitigating Measures will be included, but not Tree Protection.
METHODOLOGY:
The trees were measured at 54 inches above grade; trees with multiple trunks were
measured separately. Smaller, multiple-trunked trees were measured at the base and
so noted.
Small trees under 4 feet tall are not included in this report, nor were the oleander trees.
Trees along the north fence are included, as are the trees along the west parking area
by the apartments.
Each tree was affixed with a one inch round metal, sequentially numbered tag which
was attached about 6 feet high on the northerly side, if possible. Trees on the northerly
side were tagged on the southerly side.
The inspection process included insect and disease presence or the trees' inherent
susceptibility to these pests. Trunk orientation is also included, as is branch structure,
past failures, past care, root pruning for sidewalk repair, foliar density and/or color,
seasonal shoot growth, trunk damage, growing space and potential problems with roots
and/or fruit.
Page 1
Report on Cupertino Village, Wolfe r<.oad and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
The Condition rating takes into account and notes them as a percentage as compared to
a perfect tree, using the following scale:
1 -
30 -
50 -
70 -
90 -
29 Very Poor
49 Poor
69 Fair
89 Good
100 Excellent
The final section (entitled "Comments'') gives information to help explain the condition
rating and recommendations to help offset health and/or structural conditions. This
includes irrigation, fertilization, pruning, spraying or removal.
Photographs were taken to depict the diverse growing area on this site. They show the
unique ambiance of the arching effect along Wolfe Road and the bareness in the parking
lots. They also show the areas of potential hazard to cars, both on the streets and in
the parking lots. In addition, they show the pedestrian hazards from root damage to
the sidewalks and curbs. Also, heavy limbs could fall on cars or pedestrians.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
1 Monterey pine 26.7 50 Tree has been topped and leans. Limbs are
heavy and it has very weak structure. Tree is
also uplifting curb.
2 Ash tree 29.2 35 Forks at 10', with included bark and no center
top. Significant decay at crotch. Weak structure
and is uplifting curb. Removal is recommended.
3 Ash tree 14.2 60 Minor dieback.
4 Ash tree 13.7 50 Slight lean and has included bark. Tree is
sunburned due summer or late spring pruning.
5 Ash tree 21.2 55 Weak structure and included bark. Tree is
uplifting curb.
6 Ash tree 22.7 55 Tree is uplifting curb and has included bark.
7 Ash tree 11.3 55 Uplifting curb. Lighten.
Page 2
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
Tree No. Soecies
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
TREE SURVEY
DBH Condition Comments
(Inches) (Percent)
Ash tree
13.3
Ash tree
11.1
Ash tree
19.4
Ash tree
15.1
Ash tree
14.7
Ash tree
20.4
Ash tree
23.1
Ash tree
20.1
Redwood
22.6
Redwood
24.9
Redwood
27.7
Ash tree
20.1
Redwood
25.5
Redwood
24.5
Redwood
19.9
Ash tree
19.6
Ash tree
18.9
Ash tree
26.4
Ash tree
17.5
60
65
60
50
50
45
50
55
80
80
80
50
80
80
70
55
40
55
40
Tree uplifting curb and has decayed crotch.
Lighten and clear light,
Clear light.
Minor weak structure and bark damage.
Included bark.
Tree is next to several utilities. Lighten.
Included bark and thin foliage. Prudent to remove.
Many tops, with included bark.
Tree has surface roots and lawnmower damage.
Thin by Y4.
Next to the flag pole. Thin by Y4.
Thin by Y4.
All growth on south side.
Next to flagpole. Thin by Y4.
Roots are uplifting driveway. Thin by Y4.
Twist in trunk. Thin by Y4.
Potential risk to street.
All growth on west side, recommend removal.
Broken limb resting on Tree No. 24. Tree has
included bark and is girdled by rope. Roots
cut to repair walk.
All growth to west. Recommend removal.
Page 3
Report on Cupertino Village, Wolfe Road and homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
27 Ash tree 24.3 45 Tree is risk to street, with most growth on south
side. Included bark. Removal is recommended.
28 Ash tree 24.3 45 All growth at top, clear No. 27, if tree is kept.
29 Ash tree 19.1 40 All growth on street side next to hydrant. Removal
recommended.
30 Ash tree 27.7 50 All growth at top, tree is uplifting concrete and
past sidewalk repair. Clear the redwood.
31 Ash tree 26.2 50 All growth on street side. Lighten.
32 Ash tree 8.9 35 Suppressed by other trees. Removal recommended.
33 Ash tree 36.9 50 Is uplifting sidewalk. Weak structure, lighten
street side.
34 Ash tree 29.2 55 All growth on west and north sides, has included
bark. Thin.
35 Ash tree 24.1 45 All growth on street side, uplifting sidewalk. Lighten.
36 Ash tree 25.6 60 Tree has included bark, thin.
37 Ash tree 24.7 50 Uplifting sidewalk, lighten over street.
38 Ash tree 31.3 60 Tree has had roots cut for sidewalk repair, lighten.
39 Redwood 31.3 80 Too close to building.
40 Alder 15.8 40 All growth on one side, lighten. Prudent to remove.
41 Alder 21.1 45 All growth on one side, lighten. Prudent to remove.
42 Redwood 30.2 80 Thin by 114.
43 Redwood 23.5 80 Thin by 114.
44 Redwood 23.1 70 Most growth on north side, thin by 114.
Page 4
Report on Cupertino Village, Wolfe Road and homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
Tree No. Species
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
TREE SURVEY
DBH Condition Comments
(Inches) (Percent)
Redwood
24.8
Redwood
31.2
Locust
7.7
Locust
6.7
Locust
7.9
Locust
7.0
Locust
6.9
Locust
8.0
Loquat
12.4
Redwood
33.5
Ginkgo
11.4
Ginkgo
7.3
Ginkgo
6.1
Monterey pine
14.8
Ash
19.0
Ash
20.6
Ash
26.7
Ash
22.1
Ash
21.6
Ash
29.0
80
80
60
40
55
60
35
45
60
70
65
50
70
40
60
55
50
50
50
55
Thin by V4.
Thin by V4.
TOp dieback, clear roof.
Top dieback, bark damage. Recommend removal.
TOp dieback, growing over bricks.
Top dieback.
Significant trunk decay and top dieback. Recom-
mend removal.
Bark damage, tree is stressed. Prudent to remove.
Lower trunk wound.
Pushing over retaining wall and uplifting sidewalk.
Tree has included bark. Remove secondary top.
Tree leans and is suppressed.
Cut back Tree No. 1 for clearance.
Significant trunk oozing. Removal recommended.
Tree is in peninsula.
Uplifting curb, lighten.
Damage to curb, crotch decay.
Slight lean and included bark.
Causing curb damage, most growth on west.
Included bark, uplifting sidewalk. Lighten.
Page 5
Report on Cupertino Village, Wolfe Road and homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Species DBH Condition Comments
(Inches) (Percent)
65 Ash 22.3 45 Basal cavity, decay on west side and included
bark. Install cable.
66 Ash 18.4 55 Keep thin.
67 Ash 31.2 35 Past root cutting for sidewalk repair. Intermittent
dieback in canopy and included bark. Prudent to
remove.
68 Ash 18.2 60 Keep light over parking.
69 Ash 20.1 50 All growth on west side, included bark.
70 Ash 27.1 50 All growth on north side. Has had past root
cutting for curb and sidewalk repair. Lighten.
71 Ash 27.8 50 Tree is next to utilities, with all growth on west
side. Lighten over street.
72 Ash 29.9 45 Sidewalk, curb and utility damage. Cavity at cuts.
Lighten over parking.
73 Ash 35.0 45 Tree next to utility, bark damage. Has had root
cutting to repair sidewalk. Install cable on south-
east limb.
74 Chinese pistache 4.0 70 Newly planted, keep thin.
75 Chinese pistache 3.5 70 Newly planted, keep thin.
76 Chinese pistache 3.4 60 Deformed.
77 Ash 26.4 55 Weak structure, lighten over street.
78 Ash 35.5 45 Significant included bark, keep thin.
79 Ash 25.1 50 Root damage, weak structure.
80 Ash 27.6 50 Included bark, broken limbs. Keep lightened over
parking.
Page 6
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
81 Chinese pistache 3.0 70 New tree
82 Ash 23.8 65 Root cutting for walkway repairs, recently
pruned.
83 Ash 18.9 60 All growth on south and west sides, broken
limb over street. Lighten.
84 Ash 21.2 55 Stressed, lighten over parking.
85 Ash 19.2 60 Has had root cutting for sidewalk repair.
86 Ash 19.2 60 Included bark and is uplifting sidewalk.
Lighten over parking.
87 Ash 17.4 60 Recently pruned.
88 Ash 18.6 55 Appears overly pruned.
89 Ash 18.2 60 Thin in 2 years.
90 Ash 15.9 60 Recent root cutting for sidewalk repair.
91 Ash 7.2 50 Leans over street.
92 Ash 20.0 50 Tree has included bark. Install a cable.
93 Ash 24.9 50 Most growth on west side, has included bark.
Lighten over parking.
94 Ash 18.5 50 Uplifting sidewalk.
95 Ash 25.7 55 Uplifting sidewalk and has included bark. Lighten
over parking.
96 Ash 34.6 60 Next to utility and has included bark. Lighten and
cable.
97 Ash 35.1 55 Uplifting sidewalk and has included bark. Lighten
and cable.
Page 7
Report on Cupertino Village, Wolfe Road and homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
98 Ash 4.1 55 Newly planted, has included bark.
99 Ash 21.1 50 Significant visible root plate. Lighten.
100 Ash 33.4 55 Significant visible root plate and significant curb
damage. Lighten.
101 Ash 4.5 45 Newly planted, deformed.
102 Crape myrtle 2.5 70 Newly planted.
103 Crape myrtle 2.4 70 Newly planted.
104 Crape myrtle 3.0 70 Newly planted.
105 Crape myrtle 2.0 70 Newly planted.
106 Ash 4.4 60 Newly planted. Too many tops.
107 Ash 36.4 65 In 4' wide island, pushing out curb, utility
at base. Has included bark. Lighten.
108 Ash 4.0 65 Newly planted, growing over parking.
109 Ash 20.7 50 In 4' wide planter, has bark loss, limb girdled by
cable and tip dieback.
110 Ash 2.9 45 New tree, has tip dieback.
111 Ash 27.5 55 In 4' wide planter, has weak upper structure.
Lighten over street and parking.
112 Chinese pistache 3.2 75 New tree.
113 Chinese pistache 2.6 75 New tree.
114 Ash 24.4 60 Recently pruned.
115 Ash 27.8 60 Recently pruned.
Page 8
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Species DBH Condition Comments
(Inches) (Percent)
116 Ash 34.7 50 Significant root cutting on east side for sidewalk
repair. Lighten west side.
117 Ginkgo 7.1 50 Leans west, has tip dieback.
118 Ginkgo 3.0 70 New tree.
119 Ginkgo 8.5 70 Wind swept.
120 Ginkgo 7.1 60 Slight lower basal wound.
121 Ginkgo 11.0 40 Slight lower basal wound.
122 Ginkgo 11.2 70 Fruit developing is a significant nuisance.
123 Ginkgo 6.1 60 Basal wound.
124 Monterey pine 17.6 65 Surface roots, weak upper structure. Possibly
has pine pitch canker.
125 Monterey pine 24.7, 15.6 60 Forks at 2 feet, most growth on west side. Trunk
is oozing, may be pine pitch canker. Lighten in
winter.
126 Crab apple 4.1 75 Has ample room to grow.
127 Crab apple 2.9 70 Has ample room to grow.
128 Nectari ne 1. 5 Est. 60 Newly planted, recently leafed out. Has peach
leaf curl.
129 Nectarine 1. 5 Est. 60 Newly planted, has peach leaf curl.
130 Plum 1.5 Est. 65 Newly planted.
131 Plum 3.3 60 Leans.
132 Plum 5.1 65 Leans, curb damage.
133 Chinese pistache 5.3 75 Ample room to grow.
Page 9
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
134 Chinese pistache 5.1 75 Ample room to grow.
135 Crape myrtle 5.1 75 Utility box near tree.
136 Crape myrtle 2.0 Est. 75 Utility box near tree.
137 Crape myrtle 1. 5 Est. 70 Broken limb.
138 Crape myrtle 1. 5 Est. 75 Ample room to grow.
139 Crape myrtle 3.0 Est. 75 Ample room to grow.
140 Fan palm 8.0 Est. 80 Thorns are risk to public.
141 Japanese maple Multi 70 Trimmed to a ball.
142 Japanese maple Multi 70 Trimmed to a ball.
143 Japanese maple 7.0,5.8,5.5 55 Has included bark, split-off limb and sunburn.
144 Japanese maple 3.4,4.2,3.5 65 Leaning, has included bark.
145 Plum 4.3 65 Slight lean.
146 Plum 4.0 65 Most growth on south side.
147 Tulip tree 17.0 70 Uplifting bricks on north and west side.
148 Plum 6.0 65 Slight lean, included bark.
149 Locust 5.3 65 Ample growing room. Thin.
150 Locust 5.2 65 Ample growing room. Thin.
151 Ginkgo 5.7 50 Nuisance fruit, trunk decay.
152 Monterey pine 15.1 50 Significant Sequoia pitch moth infestation. Tree
has slight lean.
153 Monterey pine 14.6 60 Pushing curb.
Page 10
Report on Cupertino Village, Wolfe Road and h\Jmestead
Prepared for l<imco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
154 Monterey pine 17.2, 19.2 55 Forks at 3 feet, pushing curb.
Sequoia pitch moth.
155 Locust 5.2 65 4 feet from curb.
156 Locust 4.6 65 4 feet from curb.
157 Locust 5.1 65 4 feet from curb.
158 Locust 4.2 65 4 feet from curb.
159 Locust 5.8 60 4 feet from curb, broken limb.
160 Monterey pine 17.6 65 Lighten over parking and driveway.
Dropping pitch on cars.
161 Monterey pine 24.5 55 Forks at 6 feet with most growth on
west side.
162 Locust 5.3 65 4 feet from curb.
163 Locust 5.2 60 Irrigate.
164 Redwood 8.1 80 Irrigate.
165 Hawthorn 6.0 50 Leans and is stressed.
166 Ginkgo 4.7 60 Poor form, leans.
167 Ginkgo 3.7 50 Significant trunk decay.
168 Ginkgo 7.0 65 Multiple tops.
169 Ginkgo 5.3 65 Two tops.
170 Ginkgo 6.5 60 Leans, has been topped.
171 Ginkgo 5.2 60 Leans, has been topped.
172 Ginkgo 7.0 60 Leans, has been topped.
Page 11
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
173 Ginkgo 5.8 55 Leans, poor form
174 Ginkgo 7.0 65 Has 3 tops.
175 Ginkgo 7.5 70 Leans.
176 Ginkgo 6.2 60 Leans, has weak form.
177 Ginkgo 6.0 70 Irrigate.
178 Tulip tree 25.1 70 Uplifting bricks, poSSible aphis problem. Ughten
for safety in winter.
179 Tulip tree 20.3 65 3 tops with included bark, lawnmower damage.
Thin and cable in winter. Possible aphis problem.
180 Evergreen pear 7.1 50 Cracking bricks, has significant leaf spot. Growing
around support pipes. Prudent to remove.
181 Ash 25.2 50 Recently pruned, uplifting curb. Has girdling root
and significant included bark. Install cable.
182 Ash 22.4 60 Recently pruned, uplifting curb. Has trunk wound
with decay.
183 Ash 25.1 60 Recently pruned, uplifting curb. Surrounded by
paving, has included bark.
184 Ash 22.6 55 Surrounded by paving, uplifting curb. Canopy all
sprouts.
185 Ash 16.6 60 Surrounded by paving, recently pruned.
186 Locust 4.4 50 Planted too deep, roots exposed. Has included bark.
187 Locust 4.7 50 Planted too deep, roots exposed. Has included bark.
Near sewer meter.
188 Ash 24.6 50 Surrounded by paving, uplifting curb. Recently
pruned, has included bark and girdling roots.
Page 12
Report on Cupertino Village, Wolfe Road and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
TREE SURVEY
Tree No. Soecies DBH Condition Comments
(Inches) (Percent)
189 Ash 19.2 50 Surrounded by paving, uplifting curb. Recently
pruned, has included bark and canopy is all
sprouts.
190 Ash 14.7 45 Surrounded by paving, significantly stressed, very
thin canopy. Prudent to remove.
191 Ash 23.8 30 Surrounded by paving. Tops stubbed off, with
many small sprouts. Significant dieback. Recently
pruned. Removal recommended.
192 Ash 23.6 50 Recently pruned, surrounded by paving. Girdling
roots and included bark.
193 Ash 23.9 60 Newly pruned, surrounded by paving, pushing
curb.
194 Ash 18.5 60 Recently pruned, surrounded by paving. Root
growing around sprinkler.
195 Ash 16.7 60 Recently pruned, 3 feet from curb.
196 Ash 19.1 65 Recently pruned, 3 feet from curb.
197 Ash 14.0 40 Leans, with all growth over road. 4 feet from
curb and has included bark. Prudent to remove.
198 Ash 24.3 65 Uplifting curb, 4 trunks at 10'. Thin.
199 Loquat 6.6 40 Leans, tip dieback. Recommend removal.
200 Loquat 4.7 @ 12' 60 Leans.
201 Loquat 6.5 @ 4' 60 Leans, has basal wound.
202 Magnolia 8.4 70 Uplifting curb, minor dieback, limited room.
203 Magnolia 7.2 40 Major limb cut, limited room.
Page 13
Report on Cupertino Village, Wolfe koad and Homestead
Prepared for Kimco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
FINDINGS:
The majority of larger trees are in areas that are too small for adequate root growth.
There is limited water, nutrients and space. Most of these trees have roots that have,
or are causing damage to surrounding hardscape, i.e. sidewalks, curbs and paving.
The sidewalk along Wolfe Road has been repaired in several places and this has
reqUired root cutting. In other areas the uplifted edges have been temporarily ground
down level to adjacent hardscape. Mitigating these areas is not possible or prudent
without signi-ficant changes in pedestrian traffic or parking spaces.
The only practical solution is to continue pruning to reduce risks of limb failure, root
pruning to keep hardscape uplift minimized and grinding down concrete where possible.
These processes require routine inspections, or it could be done as an annual inspection.
The smaller trees are species that do not grow large and therefore have smaller, less
invasive root systems. These are the crape myrtles, Chinese pistache, maples, locusts,
plums, crabapples and hawthorns.
The only area where trees have room to grow is the redwood grove in the southwest
corner. Parts of this area have new curbs, so uplift may occur again. As stated
previously, maintaining routine monitoring and pruning is the only way to reduce the
chance of this happening to the sidewalks.
The other area of concern is the pear tree, No. 180, with its annual leaf spot; I recom-
mend replacing it. I also noted the ginkgo that had developing fruit. These two trees
should be removed and replaced with non-fruiting types.
Any trees recommended for removal should be replaced. There should be a long range
planting plan, which would include expanding the growing areas at the same time.
Changing the sidewalk surfaces may help; rubber is one option.
I think this report is accurate and based on sound arboricultural principles and practices.
Sincerely, ..._
;,G/) () // f/Jl~L::;/,c
,c~ /'
Richard L. Huntington
Certified Arborist WE #0119A
Certified Forester # 1925
RLH:dcr
Page 14
Report on Cupertino Village, Wolfe Koad and Homestead
Prepared for Ki mco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
19 11:03RM
Parking lot example with overhanging limbs.
Report on Cupertino Village, Wolfe Koad and Homestead
Prepared for Ki mco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
Trees overhanging Wolfe Rd. and sidewalk.
Report on Cupertino Village, Wolfe Koad and Homestead
Prepared for Ki mco Realty Corporation
Prepared by Richard Huntington
Mayne Tree Expert Company, Inc.
Open space with redwood group.
'-'",ii,
MAY KEY, TREE COUNT, SPECIES
-~
e.. (92) ASH TREES '.
X.. (12) REDWOOD TREES
Jgi.. (8)'PlNB TREES
T - (3) tULIP TREES
L.. (12) LOCUST TREES
p.. (1) PEAR TREE
G- (7) GINKO TREES
A- (2) ALDER. TREBS
0- (2) LOQUAT TREES
, " -"~ - - .
: i,: 1
i.~ '; ~ ~!i!
-< ~ ~ :.~ ~
/.... .'::1: /" ....'co. r
~~ b....- ,~ :~...-:;t, _~...i:.. ~ ~-~-, -- .~~-.~ .......-'
--i- ('I . i-~-~ "m-t.~Mi."I.~ :&.:g ~, ~ ------ ..------ .----',..-
... ~ ~.... .. .~ . ""~i;' ..- - -'-..- .-........- --.;::::;-:::::::..,-:.....~.~.- .
r''-.'.".''. ..~.."~: .......,It.:,.:~.~\ ._.....:)...:..;,;i.....~ _..;'..:' , -. ':: .-....._..~'\...\
164" .;:.~. ..... . ..' '. ", ...... - ..Z. "..'''''''' '; . 'I" .s:J;'...... ." 'fii'1J11lo - --- - .....~ '.
';2:::~65" "I~" :'~...!'H.;.' ........:.; .' '. .. ..... 15 '/;,.!"!"'" ~ I ~-:,..-.' ........
166i ;' . . _-;':'1,' :,r ~ . . ;!
. '.I:- 195 194 192 ~~j.. . ~ -: l!I ~y.~ .,....-. ~ : . .
167r~i'J+- 1$6'1& IU ~".:193 1-4.A.,/ ....8Pi!Zr]/~, :.../" 52 "~f:;;.., 1 ~~. ...,-.FW I . t
: ,," \ r.5<';.~~ ..( ..~# ,r...),y- ." -1:rJ '''i./~ . ~~ i1 ..~),.., -::m J If
168'.. 197/.~," , ,J$.~'-,': ,S)~"'," ':;;''l-. Y..J' ".. r~/~' :<,Z:,j V'I :. \. . I
i I Ao,l'., ~i'-" ....:r:,'.' -.'v ~''''/ ,,~t~. V' '. !.! ,
~=lh198~)" rf~J~~:m . ?l....;~83. " .:. ~;f0?1~.' 17~/~t.,. "=-\.rs.~?i:l"51"~ -"-, ~.. "': ~, ~'il" ::t.
1711" ~"i" ,".~', s,^.; .... 'v/ ,,~.. '.',,// ,,:- "--. 1-' ", r>
..' ._'. . .)'1:;.;' ';L!'." '\..' -(;\,', 1r/' -....' I ~- - _..t., '<.~
172' ,12 ft I.... '. '" ~.~ /J '" t .;a-.
iP 18g.:~~,.;:l0 . .;;'-(~':' . ':"/51" '2;---. /l3.' / '" :':~;:,: j ~:: 1 (to,
173ifi: ,--Y.',' . >)~'184lY:''':I'i;r ~.!. ,I.."ft " li . i I'I;) 'J
174]tt I~~ '. ....~~:~:.. . ": n I D~ C. ' /A::! I..i ,.~...=-.- '.,. 1- -' .. --- j' I .~
~ ' ....l1E. . t!'i " '" . . ~ 10- r I. " . J, ~
17S! ~ ... -.:>~~85 .,:.y~. '. 144f.1)' " . I .....,; '-! t t Q.....
1761.:' 186~'"''''~''''''' .../7 ". -.... 14'l ~43 ;{'. 1d (y ":,,,.g... .... ... '..."1.
:c- ~.~..... . ify' -'" .... .!~ . .:'" 0. t .601" A n' r --...~. ~-:-
177;1--- ,'. ,~;~-/' ...~'- 01.;;' / g&..ltl\."1l .- . I~"" .... ;.. '
4---'; " .... ',>Y " ". ..k .' - ~'}"0 ".r. " I .
---"--'-""~T" . -:~~ ~87~~Y .-..~. ". 14Q?~..../,~ "":'-.EL~! _'- ..\)\"'( .~ "~"hl ~'J4 13
.. I. .".~ . .......139~~ (.;, " - ~t"Jl . =~ ....; I .12
1 9. :65" 4' 3, 2\_ ~~ K l':'"f\ . ..."j1~ ~ '~~"~'''' .--:.;t:- .j,; ,':1',' -A;4:'-'~ II' ~...~ . 1"1
. .r---, " jf'1I P,f1f V / ,103 . -'... ,."... .'1'" J:. ..'JiI~~" .......
" ..." _t_ ."".. 0'" .,,> ..." ,..~', ~ft )-~ . ~J;rL t~'\. ,N ~
f<"""." ..; .r,''- ~ I ...l-Ji" r/.~ ./ '135 ~ ~ 1". ~&'.. ..g- .f.... r110
1:1.'. ~. 1= ' ........ ".- ~'. /~ ',"f'<U'~ · .t".i' ~"'t'" .~,' .-.,. #. '
, ' , ,,,, '-':'0 . ..:/;;;.'" . .' -<t:> " '1 6.... .' E.' ...!,,:!J', r" ,1
". e::::::: ' " ~ .. , ~ . ," , 1r' ..: . ... U':.. -" ...... . ;:e.-6W-.....~~,. - ", ..
,2't. ~. -A-. ~~ _: . . ~ ...........{!z' .~.. .r. -.? , . 113.t '"1-- ,f." '..',' .c:~,. . '..~\~ .~ .-: .l';:;,,~/ =-:: "09
.~~ ~.~. P.....,.!Y'IU 53:r.r:')s, -';~i~-', ~~"~"}'" / .) ~~b~ & -. ~~~i'~~' ":"~""" ~~ ';'';rV..z;,r ';.< .-i~ '.
~_. . 'k' '.," 54 _ .h....):t... '. <# . '. \";.' ~ .",~.' '\,'.;.r.- .11 J. .;.1"08
....... '521 'y.~.-.I. . /'-{.>... . 132. r. , ,..,', o.:.-;~~ .......... -~w.' 'I "",.
t'(1i -. 0) : .1-_ 'f;'*'J:t'i "~" ~. 'Co".~TI .. ..", .~.~..r.,. ..--"~ '.:;:-. .~t ._-.....J, ,..~
1'3-::11 ~m~.i. 51~U II-+- ~.., ~i;:t~;';''':'', ".U<I' ..,' ~;.: 131. . - \'\~i.~\' ~>,;;1~' .~......:.:...::;;.~1='If.~:-r.".i! :-p~
~ ~ 'T t. ,hi:- '.. './'l!! .. ",. '. 'J""... --. . . --"...' I' +
'~ . ,', ~. " ltt : ~..~,. '~;//.. -7A..... 130- ~ - .;...~"lJ.1---:..."-.~-:.-. .,' 'I,T ';:-oJ,.'C' 'I -' l07
1.:1 -.... .. .. 41~ ~"\ .. 1- /-,.. " "....-.j.~~.. "'..... , , ~ .~,
. :i1'" ~ !! ~- 6.A,! ~2 =1' ..... ) '... 75 I. ~ ..;- ./.?;1-:f. - ~ '-,... ~;'~'-~;: 1 .... .'; IO-.~ I ,
.....oJ.. .. ,.-- lil~ - ~"~ _'I."'.J' ~ . '-' . - ,/ C"l-IL'
14- ._' .,.,. '.. <" .~ ~ ~ ~--- -.. - -...' . --....... .....--. .'~n6
, lO-~ .". 1{~ 0) 'I=;'" ---".... --;".... .... - .-- N , ......
~~!!l ," .:" <j 1,_ . (W) _' ...., ~ ..," ~J.:-?'" 0 ..~',!!l I r
'I""'!' .", I:.. -:: I .; I "./. I I . , ;t.... ~h I t I. '. i ~ \;1.:" ~..,'!' . I '.. . : : Ii' :,) . J If' fl'.. t ~: ::!..:::--:.: -.. -.. ...,.:t"tl
15& j:}( 1.; ~...' ',:, ,,'.,. A,;, Md . p". '-':: ,~'.~'" I;, " ,.: ; ! ..1 'c.<-,l"."c ,..,. "'H, "~.L> ;. , ".-c'-'" 1 " I I : lll: II ',;,. ,-!o Jtl ~#-y'7~
~~;J. ~".."~ :";1; Lr~I.' ~ . . .. . . ." , I.:; t.!~it., '..~~~!. .!.-4.-! ..-:.!... . ..., ~~_.." , . '. ~.l!...:.::~ .:::::....-.,;?=:li&/...
0) ;"#.... t: ". . .... .' .~.. . ---' ,.--==-~-=."..--- "'-'--"-' . -:---'_'___00 _.. ,~';" ~-=-::,,-((,-c;'
N\IJ....OI Z;; ~lt-~.'-_._~~"" lO 10 aoOi"'":O):: ~ 10 '''''lPD;O ,;:('1 ('I) 'it'''' lO...... CO' 'i:Ji.o'r'Nt? ';r"ii)mii" Si g g~ 0
N .... tII . lOU)' <0 lO ,<CO ,CQ ..........,... ,... Nro;;""CO - eX) eX) eX) CO all' as CD '<0 O)wO)OI 0> 0) 0> ... .... ...
t
'~
. .tIr':.~=e ~ !:.~~w:r: __
. ----
o-~~-=
.
ARBOR RESOURCES
Professional Arboricultural Consulting & Tree Care
July 26, 2007
Gary Chao
Community Development Department
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
RE: PRELIMINARY REVIEW
Cupertino Village, Cupertino
Dear Mr. Chao:
I have reviewed the following documents in connection with the proposed development at
the above-referenced site: [1] the set of plans (Sheets 1 and 3-11) by MCG, dated 6/29/07;
[2] the Land Title Survey by Kier & Wright, dated October 2005; and [3] the arborist
reports by Mr. Richard L. Huffington of Mayne Tree expert Company, Inc., dated 8/25/06
and 9/20/06. I visited the site on 7/23/07, and this letter presents my comments and is
intended to serve as a preliminary review until more detailed plans can be reviewed.
1. Mr. Huffington's report provides an inventory and evaluation of 203 trees located
within or in the immediate vicinity of the subject site. The trees are sequentially
numbered as 1 thru 203, and none within the site are defined as "protected trees."
There is a significant amount of trees, primarily all shamel ash (Fraxinus uhdei),
situated within the public right-of-way (i.e. "street trees"); the amount and specific
numbers can be provided upon review of more detailed plans (see further in letter).
2. The locations of trees shown on the Tree Plan (Sheet 4) or map within the arborist
report do not represent the locations of trees around the perimeter, nor are they
necessarily accurate for trees within the interior. Sheet 4 and the report map identify
trees along Wolfe Road as being in a row, when in actuality there are two rows (most
or all being shamel ash), one between the curb and sidewalk, and the other between the
sidewalk and parking lot.
P.O. Box 25295, San Mateo. California 94402 . Email: arborresources@comcast.net
Phone: 650.654.3351 . Fax: 650.240.0777 . Licensed Contractor #796763
.
ARBOR RESOURCES
Professional Arboricultural Consulting & Tree Care
July 26, 2007
Cupertino Village
page 2 of 4
3. More detailed plans showing existing and proposed conditions should also be created
and supplied for review, to include a topographic map, site plan, grading & drainage,
utility and landscaping. The limits of work should also be outlined on the site plan.
4. A professional survey of the site and trees is necessary and essential to accurately
assess the tree-related impacts that can be expected through implementation of the
proposed project. In doing so, I recommend the following information is obtained
during the survey (to be performed by a licensed surveyor) and presented on a
topographic map (or existing conditions plan):
a. The existing grades throughout the site.
b. The trunk locations (representing the horizontal elevation) of all trees on-site,
as well as those overhanging the site from neighboring properties (namely five
Monterey pines along Linnet Lane). The trunks locations should be
exemplified by a circle to scale based on its diameter.
c. The vertical trunk elevation of each tree.
d. The accurate canopy dimensions of trees (these can be represented by one
canopy where a group or cluster exist).
e. The tag/number of each tree (round, aluminum tags with engraved numbers
representing the tree numbers were found on nearly all of the trees' trunks).
5. All site-related plans (e.g. site plan, grading and drainage, utilities, and landscape)
should contain information specified in the previous recommendation, as well as plan
scale and bearing. Canopies of the trees, which will change for conformance to the
future topographic map, should not be shaded to allow for visibility of
existing/proposed elements or features beneath the trees. For trees to be removed, an
"X" should be shown through their trunks.
P.O. Box 25295. San Mateo. California 94402 . Email: arborresources@comcast.net
Phone: 650.654.3351 . Fax: 650.240.0777 . Licensed Contractor #796763
.
ARBOR RESOURCES
Professional Arboricultural Consulting & Tree Care
July 26, 2007
Cupertino Village
page 3 of 4
6. The proposed design should conform to setbacks specified within Mr. Huffington's
9120/06 report.
7. There are numerous large redwood trees that are situated at the corner of Pruneridge
Avenue and Wolfe Road (southeast corner of the property) but not shown on the Tree
Plan (Sheet 4). I recommend this area is redesigned to consider retention of the
redwoods by achieving a minimum setback from their trunks of five times their
diameter for any excavation, fill or trenching (e.g. a tree with trunk. diameter of 24
inches will have a 10-foot setback).
8. Sheet 4 identifies the removal of the following 26 trees: #60-62, 74, 77, 78, 130-132,
151, 152, 180, 182, 188-198, 200 and 201. Based on the proposed design, I
anticipated the following additional trees will require removal: #38, 76, 79, 183-186,
and numerous at the southeast corner of the property. Note that these numbers are
only estimates, and a more accurate assessment can be provided upon reviewing the
information requested previously in this letter.
9. Trees #183 thru 186 are indicated for retention on the plans. During my site visit, I
found trees #183 (ash), 184 (ash) and 186 (locust) to be in overall poor and declining
condition, and #185 (ash) to be in only fair overall condition. When considering this
information, their short remaining life-expectancy, propensity for limb failure, and
aggressive root system, I suggest their removal is considered rather than investing
resources towards protecting their compromised condition.
10. A tree protection plan is necessary and can be prepared upon the information
requested in this letter being supplied to the City for review.
P.O. Box 25295. San Mateo. California 94402 . Email: arborresources@comcast.net
Phone: 650.654.335 I . Fax: 650.240.0777 . Licensed Contractor #796763
4'
ARBOR RESOURCES
Professional Arboricultural Consulting & Tree Care
July 26, 2007
Cupertino Village
page 4 of 4
11. Trees #74-76, 81, 112, 113, 133 and 134 are identified as Chinese pistache within the
report. Trees #74-76,81, 112 and 113 are actually Raywood ash, and #133 and 134 are
crape myrtles.
12. Trees #49 and 50, both relatively small honey locusts, are dead and should be
removed.
13. Tree #48 is a flowering plum that has been recently installed to apparently replace the
removal of a dying honey locust at the same location. It requires restaking so it has a
greater opportunity for survival and stability (the current staking is not to professional
industry standards).
14. Regarding replacement trees, Table A of Section 14.18.185 of the City Code should
be used as the basis for determining the size and amounts of trees to mitigate those
approved for removal. The landscape plans should identify the type, size and amount
of trees that will be installed.
Should you have any questions or would like additional information, please do not hesitate
to contact me at your convenience.
Sincerely,
~
<is
David L. Babby, RCA
Consulting Arborist
P.O. Box 25295. San Mateo. California 94402 . Email: arborresources@comcast.net
Phone: 650.654.3351 . Fax: 650.240.0777 . Licensed Contractor #796763
~
~
Project Name:
Project Address:
Yes ? No
LEED for New Construction v2.2
Registered Project Checklist
Exhibit C
... Sustainable Sites 14 Points
In
Prereq 1
Credit 1
Credit 2
Credit 3
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5.1
Credit 5.2
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8
Yes ? No
Construction Activity Pollution Prevention
Site Selection
Development Density & Community Connectivity
Brownfield Redevelopment
Alternative Transportation, Public Transportation Access
Alternative Transportation, Bicycle Storage & Changing Rooms
Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
Alternative Transportation, Parking Capacity
Site Development, Protect or Restore Habitat
Site Development, Maximize Open Space
Stormwater Design, Quantity Control
Stormwater Design, Quality Control
Heat Island Effect, Non-Roof
Heat Island Effect, Roof
Light Pollution Reduction
Required
1
1
1
1
1
1
1
1
1
1
1
1
1
1
... Water Efficiency 5 Points
gcredit1.1
Credit 1 .2
Credit 2
Credit 3.1
Credit 3.2
Water Efficient Landscaping, Reduce by 50%
Water Efficient Landscaping, No Potable Use or No Irrigation
Innovative Wastewater Technologies
Water Use Reduction, 20% Reduction
Water Use Reduction, 30% Reduction
... Energy & Atmosphere 17 Points
'Note for EAc1: All LEED tor New Construction projects registered after June 26~. 2007 are required to achieve at least two (2) pOints under EAc1.
I I I ICredit 1 0 timize Energy Performance 1 to 10
10.5% New Buildings or 3.5% Existing Building Renovations 1
14% New Buildings or 7% Existing Building Renovations 2
17.5% New Buildings or 10.5% Existing Building Renovations 3
21% New Buildings or 14% Existing Building Renovations 4
24.5% New Buildings or 17.5% Existing Building Renovations 5
28% New Buildings or 21 % Existing Building Renovations 6
31.5% New Buildings or 24.5% Existing Building Renovations 7
35% New Buildings or 28% Existing Building Renovations 8
38.5% New Buildings or 31.5% Existing Building Renovations 9
42% New Buildings or 35% Existing Building Renovations 10
On-Site Renewable Energy 1 to 3
~2.5% Renewable Energy 1
7.5% Renewable Energy 2
12.5% Renewable Energy 3
Enhanced Commissioning
Enhanced Refrigerant Management
Measurement & Verification
Green Power
I
prereq 1
Prereq 2
Prereq 3
ICredit2
a Credit 3
Credit 4
Credit 5
Credit 6
Fundamental Commissioning of the Building Energy Systems
Minimum Energy Performance
Fundamental Refrigerant Management
Required
Required
Required
continued. ..
Yes ? No
... Materials & Resources 13 Points
11'II
prereq 1
Credit 1.1
Credit 1.2
Credit 1.3
Credit 2.1
Credit 2.2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 5.1
Credit 5.2
Credit 6
Credit 7
Yes ? No
Storage & Collection of Recyclables
Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
Building Reuse, Maintain 100% of Existing Walls, Floors & Roof
Building Reuse, Maintain 50% of Interior Non-Structural Elements
Construction Waste Management, Divert 50% from Disposal
Construction Waste Management, Divert 75% from Disposal
Materials Reuse, 5%
Materials Reuse,1 0%
Recycled Content, 10% (post-consumer + Y2 pre-consumer)
Recycled Content, 20% (post-consumer + Y2 pre-consumer)
Regional Materials, 10% Extracted, Processed & Manufactured Regie
Regional Materials, 20% Extracted, Processed & Manufactured Regie
Rapidly Renewable Materials
Certified Wood
Required
1
1
1
1
1
1
1
1
1
1
1
1
1
... Indoor Environmental Quality 15 Points
prereq 1
Prereq 2
Credit 1
Credit 2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
CreditS
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8.1
Credit 8.2
Yes ? No
Minimum IAQ Performance
Environmental Tobacco Smoke (ETS) Control
Outdoor Air Delivery Monitoring
Increased Ventilation
Construction IAQ Management Plan, During Construction
Construction IAQ Management Plan, Before Occupancy
Low-Emitting Materials, Adhesives & Sealants
Low-Emitting Materials, Paints & Coatings
Low-Emitting Materials, Carpet Systems
Low-Emitting Materials, Composite Wood & Agrifiber Products
Indoor Chemical & Pollutant Source Control
Controllability of Systems, Lighting
Controllability of Systems, Thermal Comfort
Thermal Comfort, Design
Thermal Comfort, Verification
Daylight & Views, Daylight 75% of Spaces
Daylight & Views, Views for 90% of Spaces
Required
Required
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
... Innovation & Design Process 5 Points
gcredit1.1
Credit 1.2
Credit 1.3
Credit 1.4
Credit 2
Yes ? No
Innovation in Design: Provide Specific Title
Innovation in Design: Provide Specific Title
Innovation in Design: Provide Specific Title
Innovation in Design: Provide Specific Title
LEED@ Accredited Professional
... Project Totals (pre-certification estimates) 69 POints
Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 p
Cupertino Villal!e Community Meetinl!: 10/18/07
Exhibit 0
Present:
Brian Replinger, Kimco Development
Young Wong and David Blair, MCG Architecture
Kelly Kline, City of Cupertino
(18)
Werner Gans, 1015 Lanark Ct., Sunnyvale
J eryuan Luo, 807 Kilbirnie Court, Sunnyvale
Barbara Ireland, 807 Selkirk Place, Sunnyvale
Charles & Charlene Cox, 1741 Killdeer Ct., Sunnyvale
Eugene & Birgit Boklund, 1770 Killdeer Ct., Sunnyvale
Paul Finnegan & Carolyn Bircher, 1663 Martin Ave., Sunnyvale
Helen & Ron Nowicki, 722 Kenley Way, Sunnyvale
Dan Iverson & Laima Baltusis, 19872 Merritt Dr., Cupertino
Bernadette Vergara, 912 Leighton Way, San Jose
Warren Mine, 10630 Bezker Lane, Cupertino
Roger Riffenburgh, 1630-F Roadrunner Ter., Sunnyvale
Stanley Lee, 1698 S. Wolfe Rod., #108, Sunnyvale
Good Samaritan UMC, 19624 Homestead Rd., Cupertino
Presentation Overview:
· 28,129 sf total new retail - 2 buildings along Wolfe, and 1 in the southwest comer
· 70-100 new parking spaces
· New retail on Wolfe will include plaza area to connect to the Duke of Edinburgh
as well as an outdoor space on the right. Plan attempts to improve internal
circulation, and to be more pedestrian friendly along Wolfe.
· Linnet Treatment will include:
o double row of trees (the second row being added),
o new sidewalk
o pedestrian access
o new architecturally detailed and green-screened wall (back of parking
structure)
· Parking Structure elements:
o sloped roof treatment to screen the lot from view
o green screen on back and side will be similar to what was done at the new
VaIlco garage behind Macy's
· New Amenities include a main plaza, enhanced paving elements at auto entries,
and enhanced outdoor space.
· New Design Elements enhanced archways with more color, new directory signs,
lantern style gateways at auto entries, and enhancements at the Pruneridge comer.
Ouestions:
Q: Can you get people to park in the new garage?
A: New and existing businesses will be incentivized to have employees use the
garage.
Q: What is the timeframe for the total project?
A: Ground breaking -- late first quarter, 2008; completion - end of2008.
Q: Will Ranch 99 stay in the project? How about the Duke of Edinburgh?
A: Yes. Many tenants have long-term leases and renewal options. There are plans to
dress up existing storefronts so they will match new buildings.
Q: Is the new plan fire truck accessible?
A: Yes. Developer has met with Fire Department to ensure that all requirements are
met for fire trucks to get through the center.
Q: How much bigger will the center be with after new retail added?
A: Approximately 20%.
Q: Does the developer have potential tenants for the new space?
A: Yes, wouldn't pursue project ifthere wasn't good interest already. Developer will
pursue a mix of new tenants, recognizing that restaurants should not comprise
more than the current 30% due to parking needs.
Q: Will the Linnet landscaping use existing trees, or new trees?
A: Will keep the existing trees and will add more.
Q: Where do you enter or exit with the new design?
A: Everything remains the same except that one Wolfe entry will be removed. All
construction staging and movement will occur on-site.
Q: What will the size of the trees be on Linnet?
A: They will be "substantial caliber trees" - 3" trunk or better. The size will be
influenced by the need to protect the existing trees from damage.
Q: Will there still be access to the playground at the church? (currently an opening
with a sidewalk)
A: Needs to be examined.
Q: What is the parking garage roof treatment?
A: Roofing materials will be a neutral color, and will effectively hade car lights from
neighborhood.
Q: What happens to the existing fence on Linnet?
A: It disappears, and will be replaced by the solid wall of the garage.
Q: What is the purpose of the new sidewalk on Linnet?
A: This was the City's idea to make the east side of Linnet more inviting.
(Some discussion about whether or not sidewalk should be added, most felt it would
alleviate a current hazard.)
Q: How will lighting be handled on the 2nd level of the garage?
A: Lighting will be pointed down.
Q: Will Linnet landscaping be irrigated?
A: Yes.
Q: Will parking be allowed on the east side of Linnet?
A: No, this won't change.
Q: Where will trash be located?
A: Haven't decided the exact location, but will probably be more interior because of
parking garage placement.
Q: Will exhaust levels increase because of extra parking? (may affect preschool)
A: This will be considered in EIR process.
Q: I like shopping at the center. Will it retain the same flavor?
A: Yes.
Q: What happened to Charles Schwab?
A: Doesn't know.
Q: How many compact spaces will be in the new parking plan?
A: None. (Compact spaces are not allowed by the City of Cupertino.)
Q: What are the next steps?
A: Schedule a pre-planning meeting with City Departments, followed by
environmental review and a design approval meeting. There will be several more
opportunities for public comment. The goal was to meet with neighborhood early
in the process, before the formal submittal took place.
Q: I'm excited! How long will the project take?
A: 10 months, but might hold off on the Wolfe building so as not to disturb '08
holiday season.
Community Comments:
· Landscaping along Linnet has not been maintained in the past.
· People park in residential area even if parking is available in the parking lot
(employees too.) Perhaps pedestrian access should be eliminated.
· The pedestrian access is convenient for residents, and addresses a safety issue for
everyone.
· Parking permits might need to be considered in the future even though they
haven't had support in the past.
· . The proposal is a definite enhancement of Linnet.
· A great improvement - much better than previous owners.
· Consider posting signs discouraging patrons from parking in the residential
neighborhood.
· People like staying at the center - it is active even later in the evening. Hope it
stays that way.
· Thank you for including the neighborhood early in the process.
· The view from the multi-family side will be exactly the same as Linnet.
Meeting adjourned at 7:45 p.m.
Gary Chao
From:
Sent:
To:
Cc:
Subject:
David Doudna [dave@doudna.com]
Tuesday, November 06,200710:14 PM
Gary Chao
Kelly Kline; Noemi Doudna
Re: Cupertino Village Shopping Center redevelopment questions
Exhibn E
Dear Mr. Chao,
I'm glad the City of Cupertino has conducted parking surveys, but also curious if the
parking consultant observed the related traffic on our neighborhood streets. And if he
conducted any of this survey on the weekend.
When the parking lot is "at capacity," where do you suppose arriving patrons search for
parking? I can tell you that many try to park on Linnet Lane. Then the street parking on
Linnet Lane becomes "at capacity," and they start parking up and down Parnell Place and
doubtless other nearby neighborhood streets. This is a regular situation on the weekends
here, occasionally compounded by church traffic on some Sundays. However at least the
church goers don't try to leave shopping carts...
You see, prior to the installation of a barrier post at the pedestrian portal on Linnet
Lane, patrons of the 99 Ranch Market used the shopping carts to carry groceries to their
car, and then often just left the cart at the curb, sidewalk, or lawn, and drove off.
By keeping the current ratio of parking stalls to retail area, our neighborhood streets
will continue to serve as an auxiliary parking lot for Cupertino Village's businesses.
Worse, the proposal I saw added a large portal to Linnet Lane which will bring back the
stream of abandoned shopping carts.
Other nearby shopping centers (e.g. Safeway at Homestead and Hollenbeck, Target on Stevens
Creek) are able to maintain a balance of parking to retail space such that we've never
seen evidence of anyone forced to park in nearby neighborhoods. With this redevelopment,
we have the opportunity to ensure that Cupertino Village Shopping Center handles all of
their parking needs without dumping their problem on the neighboring community.
With regards to the other mitigation measures (e.g. incentives for using alternative
transportation), that sounds great... but if they're really effective they'd have been
implemented and we wouldn't have the problem. The parking is inadequate _now_, before the
proposed redevelopment.
Regards,
-David Doudna
810 Parnell Place
Sunnyvale
On Nov 6, 2007, at 5:34 PM, Gary Chao wrote:
> Mr. Doudna,
>
> Thank you for your email. We are aware of the key issues that will
> need to be addressed as this project moves forward such as traffic,
> parking and noise impacts. The City has retained outside consultants
> to evaluate the traffic, parking and potential noise impacts from the
> project. The conclusions of these reports will be made available to
> the public and will be considered by the Planning Commission and City
> Council at their upcoming hearings (the first Planning Commission
> hearing is scheduled on November 13, 2007).
>
> The center currently has 691 stalls. As part of this project, the
> applicant proposes to add about 91 stalls to the site (through the new
> parking structure and through more efficient usage of their existing
> parking lot). Along with the extra parking stalls, new parking lot
> shading trees will be added through out the entire shopping center. A
1
> new linear park with double rows of trees, a detached sidewalk and a
> new masonry screen wall (with green screen system) will be provided
> along ,the Linnet Lane. Hopefully with some of the proposed
> improvements, most of the shopping center activities will be
> completely screened from the folks living along Linnet and the
> interface between the residential neighborhood and the shopping center
> will be significantly enhanced and beautified.
>
> Our parking consultant has been out at the site to perform parking
> demand surveys. Basically, the parking lot was found to be right at
> capacity and therefore we are requesting that the project maintain
> their current parking ratio (stall/square footage) with the new
> proposed project. Most likely, you will see some form of parking
> management plan implemented where mitigation measures such as offsite
> employee parking, incentive program for employees to use alternative
> means of transportation, parking agreement with adjacent land owners
> (HP, Hotel or Church), potentially limitations on the restaurant
> square footage or opening timing and even reduction of square footage
> if necessary. Of course the final conditions relating to parking
> mitigation will be made by the City Council with careful
> considerations of the facts of the projects and any input received
> from the neighbors.
>
> If you have additional questions, feel free to contact me. I'll be
> glad to discuss any other comments or inputs that you may have on this
> subject matter or the project in general. Thanks!
>
> Gary Chao
> Senior Planner
> City of Cupertino
> 408.777.3247 (Direct)
> 408.777.3333 (Fax)
>
>
>> -----Original Message-----
>> From: David Doudna [mailto:dave@doudna.com]
>> Sent: Friday, October 19, 2007 11:52 AM
>> To: Sarver, Shekinah
>> Cc: Noemi Doudna
>> Subject: Cupertino Village Shopping Center redevelopment questions
>>
>> Hi,
>>
>> Neither my wife nor I were able to attend your presentation at the
>> Cupertino City Hall yesterday, however I did find some information
>> online in
>>
>> http://www.kimcoredevelopmentgroup.com/projects_view.asp?proid=l
>>
>> Our main concern is whether the shopping center will have sufficient
>> parking for the customers. For years, the parking has been clearly
>> insufficient, forcing shoppers to park in our neighborhood. It is
>> better now since the shopping-cart blockers were installed. However
>> we would certainly prefer not to have the extra traffic in our
>> neighborhood, using our driveways as turnarounds, and consuming our
>> street parking.
>>
>> * Are you aware that the current parking is inadequate?
>>
>> * Will the new parking structure have enough room to accommodate all
>> of your customers on the busiest days?
>>
>> Regards,
>> -David Doudna
>> 810 Parnell Place
>> Sunnyvale
>
2
> -----Original Message-----
> From: David Doudna [mailto:dave@doudna.com]
> Sent: Friday, October 19, 2007 11:52 AM
> To: Sarver, Shekinah
> Cc: Noemi Doudna
> Subject: Cupertino Village Shopping Center redevelopment questions
>
> Hi,
>
> Neither my wife nor I were able to attend your presentation at the
> Cupertino City Hall yesterday, however I did find some information
> online in
>
> http://www.kimcoredevelopmentgroup.com/projects_view.asp?proid=l
>
> Our main concern is whether the shopping center will have sufficient
> parking for the customers. For years, the parking has been clearly
> insufficient, forcing shoppers to park in our neighborhood. It is
> better now since the shopping-cart blockers were installed. However
> we would certainly prefer not to have the extra traffic in our
> neighborhood, using our driveways as turnarounds, and consuming our
> street parking.
>
> * Are you aware that the current parking is inadequate?
>
> * Will the new parking structure have enough room to accommodate all
> of your customers on the busiest days?
>
> Regards,
> -David Doudna
> 810 Parnell Place
> Sunnyvale
Page 1 of2
Steve Piasecki
From: Greg Casteel
Sent: Thursday, November 08, 20077:37 AM
To: Steve Piasecki
Cc: Ciddy Wordell; Kelly Kline
Subject: FW: Concerns from residents of Linnet Ln, Sunnyvale, CA
It doesn't look like you received this, so here ya go.
Greg
-----Original Message-----
From: akashpai@gmail.com [mailto:akashpai@gmail.com]On Behalf Of Akash Pai
Sent: Wednesday, November 07,20079:17 PM
To: cityatty@ci.sunnyvale.ca.us; citymgr@ci.sunnyvale.ca.us; otto@ottolee.org; Building; Cupertino City
Manager's Office
Subject: Concerns from residents of Linnet Ln, Sunnyvale, CA
From the residents of Linnet Ln, Sunnyvale, CA 94087 and adjoining neighborhood. We apologize for
the wide distribution of this email but we were not sure which department it should be addressed to.
We want to bring to attention the proposed work on Cupertino Village shopping complex by Kimko
Realty Corp. As per our current understanding this involves construction of a multi story parking
complex (visible from Linnet Ln) and the opening of boundary separating Linnet Ln from Cupertino
Village. We would like to strongly object to these changes as it will:
. Significantly increase the traffic pattern on Linnet Ln. The proposed change will allow
automobiles to enter the Cupertino Village parking complex from Linnet Ln. This gravely impacts
our privacy and security.
. As you may be aware, there have been multiple thefts in the neighborhood. Adding additional
traffic flow will likely increase the probability of thefts.
. Residents of Linnet Ln purchased houses with the premise that this road is a "dead-end",
according us significant privacy. This is reflected in our home value and property taxes. Changes
in traffic pattern will reduce our home values and thus is a non-starter.
. Our children today play freely in front of the houses with the knowledge that this street has very
low traffic with neighborhood residents driving at low speeds. This will change with the proposed
development. We cannot accept these risks.
. The proposed multi-story parking lot will be visible from Linnet Ln, this is a significant "eye-
sore". The current shopping structure is a single story and the boundary separating us provides a
decent amount of privacy. Any changes to that is an issue and not acceptable to the residents.
. We currently suffer significantly from increased parking on weekends when Cupertino Village
patrons park their cars next to our houses. This increased traffic is not acceptable to us but we live
with it. Any additional traffic as a result of new development work will test our patience to the
tipping point, i.e. is not acceptable.
We strongly urge the mayors of Cupertino and Sunnyvale to take the view of their residents into account
and maintain the sanctity of Linnet Ln and adjoining neighborhoods.
Weare collecting signatures from the residents to register our protest.
11/8/2007
Sincerely.
The Concerned Residents of Linnet Ln, Sunnyvale, CA and adjoining neighborhood.
(sent by Akash Pai, 1761 Linnet Ln, Sunnyvale, CA. 408 255 7711)
11/8/2007
Page 2 of2
Date: Nov. 8, 2007
Notice to: Cupertino Planning Commission, Mayor, Vice Mayor, and Council Members
Subject: Objection to U-2007-06, ASA-2007-10 - Cupertino Village Proposed Re-
Development.
To: Steve Piasecki - Community Development Department, Mayor, Vice Mayor and City
Council Members
I am a resident living on 1725 Linnet Lane, right next to the proposed re-development of
Cupertino Village shopping center. I will be directly impacted. I cannot be at the Public
Hearing on Nov. 13,2007. I would like to summit my concerns officially. I OPPOSE the
further development of the shopping center.
The shopping center is already beyond its parking needs. I understand that a parking
study was done recently and has concluded that there is 100% usage of the parking at
peak times. Also I have found out that in this study, off street parking was not taken into
account. Let me assure you that during peak hours there is 100% plus usage of the
parking in the center. Many people park in front of my residence then walk across the
street to eat lunch, dinner and shop when the parking lot is full. The peak times are
normally Saturday and Sunday during lunch and dinner hours, on Friday at dinner time
a.T1d during the lunch hour during the week.
Kimco Realty Corporation (the owners) want to add more buildings totaling 24,455
square feet of new retail (restaurant) space on existing parking spaces. A new two story
parking structure is being proposed. The parking structure is replacing lost parking spaces
due to the new building plus 71 parking spaces. There is not enough parking now. Where
are the new workers and new customer going to park? In the 71 parking spaces? The
developer is proposing a 15 FEET pedestrian walkway through the bottom level of the
parking structure on to Linnet Lane, Sunnyvale streets for further parking needs. TillS IS
UNACCEPTABLE. More parking spaces must be made in the shopping center complex.
The local residences petitioned the City of Cupertino, before the city council on Sept. 2,
2003 to close the opening to the shopping center along with other concerns of the
neighborhood.
If this re-development goes ahead I would like to bring up these issues and have the
issues added into the building use permit and or construction permit requirements.
1) Close all entrances to the shopping center on Linnet Lane except for those
required by the fire department emergency requirements. This issue has be
discussed at the Sept. 2, 2003 Council Meeting.
2) Build a wall or fence around the Church property. Have a keypad entry doorway
in the wall so that the church members have access to the deeded parking access.
3) There should be a condition of use that there would be no bars, night clubs or any
activity that goes beyond 10 PM at the new retail structure and any new tenants at
the existing buildings. An open air parking structure is being built facing
residential streets and the noise from the parking structure will disturb the
neighborhood. .
4) A planned trellis fence is being planned for the rear of the parking structure along
Linnet Lane. The fence will be higher than the parking structure and the length
(600 feet or so) along Linnet Lane. Vines will be planted to grow on the trellis to
make a solid green foliage covering. Sounds really nice if properly done and
maintained. Over the last 20 years, through 2 previous owners of the shopping
complex the landscaping on the Linnet side of the fence has NEVER been
maintained properly. We will have DEAD vines on the trellis. If a trellis is to
proceed, a condition of use permit would be needed so that a 10 year bond issued
to make sure the landscaping is installed and maintained.
5) As a requirement of Construction - there should be no construction vehicles,
delivery vehicles or construction worker's vehicles on the streets of Sunnyvale
surrounding the construction site. A further requirement would be that the
developer make arrangements to have an off site parking and storage area for the
construction worker parking and equipment. The men and material can be bussed
to the construction site.
6) Delivery time laws of the City of Cupertino should be strictly enforced and ticket
given, not warnings for any violations, enforced by the Santa Clara Sheriff's
department. In short deliveries are from 8AM to 8PM on week days and from 9
AM to 6 PM on Weekends and holidays.
7) Noise laws of the City of Cupertino should be strictly enforced and any violation
ticked without warning given. No noise greater then 55 DBA during the night and
the commercial noise level of the day time of 65 DBA with brief daytime
incidents given in 92.25 of the Cupertino Municipal codes. Which allows the sum
of excess noise duration and the excess noise level does not exceed 20 in a 2 hour
period. Example an extra 5 DBA for 15 minutes or an extra 10 DBA for 10
minutes during a 2 hour period.
8) As a requirement of construction the developer is to install an automated
recording (computerized) noise monitoring system that the City of Cupertino
noise enforcement monitors to make sure that noise levels are not exceeded. This
device will be able to inform the construction company when it is about to exceed
the noise and so they can comply with the noise laws. The sheriff s department
will not have to come out due to noise complaints. Note sheriffs department may
not have sound measure devices and the officers will not want to stick around for
2 hours at a time to monitor the excess noise levels. The computerized system
would have a digital or hard copy report or graphs so enforce can be made and
tickets issued for violations. Also the reports should be public records.
9) All current Cupertino Municipal ordinances are enforced.
10) A sound wall should be constructed first so the surrounding neighborhood is not
disturbed during construction and this will also prevent accidents from children
getting to construction site.
11) Dust prevention should be implementing and required during construction.
12) Residence privacy should be respected. Meaning there should be no view from
the shopping center complex into the residence windows, garages, doors under
any circumstances.
13) . Requirement under condition of use permit that a person representing the
ownership of the shopping center be present at the shopping center at all business
times. Interface for the residences. city. tenants and customers.
14) All up to date codes and requirements be added to the condition of use. Update all
code statures.
15) Hide the roof air conditions for all view of the roof tops.
16) Hide view of the trash cans from surrounding neighborhood.
17) Add to the condition of use permit - Prevent any smell (odor) problem escaping
to the neighborhood or within the center.
18) Prevent car headlights from shining into the neighborhood for the parking areas.
19) Construction hours should be from 8 Am to 5 PM weekdays only.
20) Prevent car headlights from shining into the neighborhood for the parking areas.
21) Prevent noise from parking areas from getting into the neighborhood.
22) Prevent shopping carts from getting into the surrounding neighborhood
23) All toxic clean up be done.
24) Rear property building set back is 20.00 feet to adjacent residential street.
Plus any other issues that the neighborhood brings up.
~
Dean Fujiwara II /9 /(J 7
1725 Linnet Lane / C
Sunnyvale, California 94087
d.fuiiwara@comcast.net
Rev. Kristie Olah
Senior Pastor
Pastor Gail Chiew
Associate Pastor
Chinese Ministry
(408 )253-3620
Mark Teagle
Director of Music
and Family Ministries
Carolyn Robbins
Youth Director
Estacie Brooks
Helen Kung
Office Managers
Loretta Wong
Preschool Director
(408 )996-8290
The Good Samaritan
United Methodist Church
19624 HOMESTEAD ROAD
CUPERTINO, CALIFORNIA 95014-0607
TELEPHONE: 408/253-0751
www.goodsam.info
FAX: 408/996-2621
GSUMCAO@Prodigy.net
October 29, 2007
Gary Chao, senior planner
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
RECEIVED
NOV 0 6 20m
RECEIVED
I'WV 111tlll'.
BY:
BY:
Dear Mr. Chao:
Thank you for hosting the neighborhood meeting regarding the
redevelopment of Cupertino Village Shopping Center. We greatly
appreciate being informed about the proposed plans so early in the
process.
As neighbors to the shopping center, we are concerned about the
proposed parking structure. In order to protect the safety of the
children in our preschool and to preserve our parking agreement with
the shopping center, we are asking you to add the following conditions
for approving this redevelopment project.
First, we are concerned that the added parking in the back of the
center will substantially increase traffic on the driveway between the
former dry cleaner and our preschool playground. There is currently
only a lightweight fence between the playground and that driveway.
We feel that adding an 8-foot, solid wall would alleviate our fear of a
potential disaster if a car should lose control and would protect the
children from the auto exhaust fumes. This wall should extend all
along the diagonal side and south end of our property. (See enclosed
diagram)
Secondly, the enclosed parking agreement states that the church has
rights to use 200 parking spaces at the shopping center. We
appreciate that they are maintaining and even increasing the available
parking spaces close to the church. However, there must be
reasonable access for church attendees to get to the church entrances
from their cars in the back lots and parking deck. Currently, there is a
walkway on the south side of our property. It has raised paving to
keep cars from blocking it and posts to keep
Page 2
grocery carts from passing through it. Please be sure that the proposed wall
includes a pedestrian passageway.
Thank you in advance for your attention to these issues. We look forward to working
with you and being a part of the future of Cupertino Village. Please keep us
informed about future design reviews. If you have questions, please contact David
Chapman at (408) 739-9332 or chaponegret@yahoo.com.
Sincerely,
,{(J~l/( /)/_~
David Chapman,~~e President
~ If l/t feltt-J~c J "- (bfit
Bill Hutchinson, Trustee VP
,..-
..r","'.........r...""",.,,.
Ene.
/...----../J. ..,/-,~
//~_.. )
, ;'.) , ,W~
Cindy Pellew1l1o, Trustee Secretary
/itl!;i1id::t,rd Chair
&14 /1t, tJ<-1~
Carolyn Bircher, Church Treasurer
~x~
Rev. Kristie Olah, Senior Pastor
I'
. -.1 c
'.
.,
c.
r-.
L
(')
.fTj)....,:...
('1.1',,,,,, .....
. '.' . .1'
. <.: '.' ./.
"--
BBI8j-(Q
--me< K\C'06 .
Ael~e.f\AeJJT
~V~~1 ~r (tgpf!r~O~~V
"
103UO Tu,n: ^VCIIIJU
C:upc'lio',u: C.lilu,",. '.I.~1I1 ~
TcI"l'hulIC 14UU) 25:1-.15U5
UI:I'^1l1MCNl or I'L^I~NING ^NU UEVE'l:UI'h!L:NI
April 10, 1975
~
~
Mr. \'!urrell CillH:rt, A.LA.
, 1 GO J:lC.:k~oll 5 t.
Sun Jo~el CA 95112
..
Subject: ExdliJnge Agreement Datell JaTluury 24, 1966 - Vallco Purk nnd .
Guuu Salllur 1. l:..1I\ Church
Dear Mr. Gilbcrt:
--"
Thi9 lcttcr il:! .u brief follo.....-up to our recent tliscul:lsion concerning ,~h~.:sub-.
jeer exchu1\l.\c agrel::ment.
/VJ we dillCUUt;ed,. it .iJppeurs that in 1966, UPUII ellnsidcrntioll of n ut;;e permit
tu develup the Vallco Villal.\c Shuppinll Ccnter, this allr~l!mellt \Wl:! filed with...
the City i\ldicatill~ t:lwt upun construction of thl.! patkinl1 [uci1iticl:l within .
the Center, the Church ..wuu 10 huve rir,h ts Lo u tili:lc thul:l~ f ucili tiel:! in con-
junction \dth Church-ri:lnted activiticl:l.
I UEHlIlme yuur illlJuiry ill relul:I.!O tu thc ufficiul uta'tu!:! uf said agrccment in
view uf pOliti lblu devclupmclI t un the Church l:l i tl!.
. .;
It'9 my opinion thut ill 1966, official rccu811ition of.this ugreement was known
to the Ci ty . :Il1d to SUIII~ lh!I.\rce IWIIC t.iOllCd upon thc g run tins of the utle permi t
for the :;hul'plllU centcr. \lU\~cvcr, it wuuld uppl.!ur thut ill order to offid.u'lly
recognize thc r1l.lht to utili:lc the pnrldnl:: Hpuec:J os a pal-t of Church-related
cOllGtructloll, this will havc to be lIlUU~. u },urt of [l1l.y f\lture U!JI.! pertuits for
Church con::;truction. Thcrefore., iuos\IIuch [Ill you huvc imlicu ted thut the. Church
io 1I0\~ COlltclllplntillg ulhlitiullOl cup"tructiull Oll the sit.c, ie will bl!. ncc.ettuury
to file the siglleu uurCclllellt with tI,e u,,;e permit ul'p11c;Jtion. so thut tlHl
COlluII1uoion muy be as:Jureu thut \lurking i:; av~i.l.u~~c on Vullco Put:k propcrty~"
.1 hope thIs information \~ill be helpful. If yuu have Olny queations"concerninu
th11llllutter, do not hcsituLI.! tu CUlltUct me. . "'-':-', ,":.':
'" ...-
Sincerely,
CITY OF CUPERTINO
'"
.~a?1.<.n-~-I;A~
-:'lilies' 11. :->1 "It '.
l'lanllillL\ Ilh'cctor
.'
.111$: fr
CU~~
<t <J" ~ oJ..
o .....;i!l'a. " ..'Y
J, I i;..,~. f""'1':lto..'" .... ~
CITY OF CUPERTINO;~~%. ~ r~ CAI~IFORNIA
o ,~ . f ~ T~L~PI-jON~ ALPIN~ 2-4505
10321 S. Saratoga.. Sunnyvale Road C\"'l.( , .f"r
Cupertino, California 95014 :r... 0 ~.
February 7) 1966
Mr. Richard C. Morris
Attorney at Law
24131 Summerhill Avenue
Los Altos) California
Dear Sir:
Reference your letter of January 25) 1966~ per-
taining to a parking agreement between the Good
Samaritan Church and Vallco Park.
Tl).e City staff.has reviewed the proposed agree-:-
ment along with Mr. Walter Wafd of villco 2ark
and we are satisfied that the wording of the .
agreement is such that' it would enable .us to
grant permits to the church for.expansion as far
as parking requirements are concerned. .
Very. truly yours~
/.,
. ;:{ .- .
.-f. /.... 7/,. . . .
. ,of';' /'. _..'
.....~~~~~
. . ..' .-' >;,.W 1m ..-f\J] zwn .
" '/....
/<' h'// As-s.t";-""City Planner
'. '. C:~:////" '"
," ';;. .
. '.
. ....,
. .' . -.
,- ......
"
.:. . .
'".', . .....",
. '.
. ',-.
. .... : '.. "
.... '"
....
. .' .
. .
: :: '-'~
; ,
:. .; .'.
, .
, ,
. .
{'f'. "
. .
"
;. ..,
.. .
.'
';:.' .
.. .
,
... ;'
:. ,". .:
.;', ':. :,.,. ':..
. .. .
..... " .
~. '.:'.,1 :" ....
.' ,
. . .
',' ",-
,0, .
" .
,: ~ .
'j
,
i.
, .
.:;,~... >/....::.. .'. .
. ", ::': .R'~dRAR~'G~ .Mo.RRis'.,:",,>:>;,.:, ,
ATTOR'NC:Y AT LAW
.. '..I~I .UMM E..HILL AVENUE
" '. ";.: 1.0,8 ALTOS; CALlPOIllfU
. . 'WH"IiC:LI~' .:..:1.
"
.. .
.' ,
.... J'" "
, '
. ,'.'.: J~n~ar""2'5' 1'96'6 ..,:.. .:.',".':.:;'", .
.' ..".' .' I..". J I
., .
.:.."
".:.J
. .. . .
~:~... ...: . -:' .:. : :
" .
City of Cupertino .
10321 S. Se.ratoga-Sunnyvale Road
'Cupertino, California 95014
Re: Good Samar.1 ta.n Chuch,. 'Un1 ted.
Evangelical Br~thern - Vell~d Park.
l. t.
. ~ I ~.
......
A ttn: J. Nuzum,
Assistant Planner
Gentlemen:
I enclose herewith a copy of an exchange agreement
ne gotiated between The Good Sam.ari tan Church, Uni ted
Evangelical Brethe~n, arid yallco Park, invdlvlng the '
exchange of properties and provisions for church parking
in your'city.Mr. J. .Nuzum a.nd, I am sure, other me.mbers
of your planning' commis sion are familiar wi th the tena tive
arrangements fOI\ the exchange and parking accomodationa. ..
Mr. Walter P. Ward of Vallco Perk has been, or ,shortly will
be, in touch with you concerning these matters. . :.
......
As you are aware the Church intends as soon as
.it is able to make application to the City of Cupertino
for a permit or permits which will enabl~ it to make.ad-
ditional improvements on its property at Linnet Lane and
Homestead Road with the purposff in mind of accomodating a
larger membership. A t such time t he Church will rely on
off Church proper.ty parking, not to exceed 100 :st'a'lls,. as
made available to the Church by the agreement.~:xpres'sed
in the enclosed document.
',i
t'
If, in. 'your judgment, the e.nclosed document does
not sufficiently in'sure that the Church will have the available
parking to support the contemplated applications for permita,
ple&se advise a.t your early convenience. Ii', as we .feel,
the document 1a sufficient for that purpose, please so
indicate.r. As I'understand it neither the Church norVallco
Park will prooeed 'With their planning pending' ari expression
from you.. . '. ' ~
,'i
'\,.'
, .' Very truly yo~~, (, '
~~~dl Copy,' ,nExaw.:ngeAfY'..::!n~ 3,;' ',"
..,;.
>;,:1 ,:'. :::;;,:~.,<:/\.
. ~ .",:..:.~. ...:..~._ t ~~.,:
: . ......
"',; ',"."... ,
..... .f .', .
. .
.' I . . .
. ~. -' .' ". .."
.: ...... .
',. ." .". .
. .-...:.{...........: -':'.'
", . ......j:
r
.~':':':l
,,-....
---
~... ~:.1':,,\'..
EXCHANGE ^GREEMENT
AGREEMENT, as of February 7, 1966, between VALLCO PARK,
,
a California corporation (hereinafter called "VALLeO") and 'THE GOOD'
Si\MMtITAN CHURCH, EVANGELICAL UNITED BRETHREN, a corporation (hereinafter
referred to as "CIIURCH"):
WHEREAS, VALLGO is a general partner' of VALLCO PARK, LTD..
a limited partnership formed pursuant to the laws of the State of
California; und
\~llEREAS, VALLeO owns Parcel No.1 ilnd CHURCH Own6 Parcel
No.2. each of which is more particularly described in Exhibit A
nttachpd hereto; and
WHEREAS, VALLCO ~roposes to construct Vallco Village Square
Shopping Center on property adjacent to' the real property hereinabove
referred to (a preliminary plot plan of said Center is anne~ed hereto
as Exhibit B and by reference made a part hereof), which !ihopping
center will provide in excess of 20~ parking stalls within a distance
of 300 feet .of a church entrance; and
WHEREAS, the parties' hereto are desirous of exchanging said
parcels of real property upon ehe terms and conditions hereinafter set
forth,
IT IS THEREFORE AGREED:
1. VALLeO shall promptly open an escrow with Western Title
Guaranty Company, Santa Clara County Division, for the purpose of
consummating said exchange. All costs of escrow, including documentary
stamps and recording" shall be c'it the sole cost nnd expense of VALLeO
and be paid by it.
2. Each of the parties hereto shall therea[t[!r cause to
be deposited in C6CTOW Gront Deeds conveyinG the properties to be
exchanct'o hereunder free and clear of all ~ncwnbrances, save and except
covenants, conditions, restrictions and public utility easements of
record and current property taxes a lien not yet pDy~ble, to wit:
VAl.LCO l'AIU~, LTD. shall dded Parcel No. I to CHURCH and
CHURCII !;hal1 deed Parce! No.2 to VALLCO PARK, LTD.
-1-'
~,.
\
\
,,"'''- .-......~ ...\
-. --..... ".,. ,-
,.- "I..... .\....,..~..i7;.'( ,......r-I.- II'...........~.._ '-..."..J....; ., ~:.:: .J';-_ ';'.-.'~.. ~'_/ .',1. .,.'-r-:..~:.~:..~ - .-, ;.).', -.! "--~l_' r-'-'.~ t "'.'\.
"
~
.~-
t")
'.
,r-
i~".,;
3. As a further conGideration for the within exchange,
VALLeO hereby grants to CHURCH, or a successor CHURCH, the non-
exclusive right to permit persons attending the CHURCH or p.articipating
in CHURCH i1ffairs to use the parking facilities of thc center dC!lcribed
in Exhibit D so long as the CHURCH I S property remaining after the
conveyance of Parcels No. 1 and 2 is devoted to a church use, whic11
right shall not be construerl or deemed to be a covenant running with
the land. If any use other than a church use occurs on the existi.ng
. CHURCH property, such right shall terminate. CHURCH coven:lnts that
it will n~t pennit such inv(tecs to unduly interfere with th~ operation
of the shopping center by its tenants or otherwise violate the parking
rules thereof.
4. In consideration of the granti.ng by CHURCH of the
option referred to in Paragraph 5 hereof, VALLCO ,will provide a strip
of paving 8 feet in width or more as required by the appropriate
o
government bodies on Linnet Lane and landscaping in an 8-foot strip
to be installed at the time VALLCO contracts for paving and landscClping-'
th~ shopping center and of the same quality and kind as that provided
for the shopping center. The area to be paved is cross-hatched in
green on Exhibit D, and the area to be landscaped identified thereon
in red. VALLCO covenants further that it will proceed forthwith to
'develop and improve its properties in the manner described herein.
5. Contemporaneously upon depositing the Deed referred
to in Paragraph 2 hereof, CHURCH shall deposit an A~rcement whereunder
it g~~~'t~' 'to VALLCO an option of first refusal to purchase the r~al'
prop,crty owned by CHURCH situated in the County of Santa Clara,
, '
State of. California, described in Dook 4615, Page 749, Official
Records, County of Santa Clara, excepting therefrom Parcel No.2.
Said ri~ht of first refusal ~hall be in form approved by counsel
for VALLeO.
6. The interest, rights, and obligations herein incurred
shall accrue to and be bindinr, upon the assigns and transferees of
the parties hereto.
-2.- :
'''.::''':'op..,' ;,...f":~~"" .......'.:.....~ '':;~::'--,..).-k;'t \:-:-- .:....r.\:"'....I.:~~~:J...r:"""',\.. ..~;".,,:~.'\::~. 't, r-'-"';:....:~.......,~:_~.~ ,.~~..';.:.J ,. .~... 4..,.rl ~IL.~~.~~:a :~'''. ..~,;~:..;.; .",J." r'''''"';:~''~''':~':''
IN WITNESS WHEREOF, the parties hereto through their duly
authorized officers acting pursuant to their respective Dylows or
Resolutions duly adopted by their Boards of Directors, have.executed
,
the ~ithin Exchange Agreement 8S of the doy and year first above
written.
. . .
:~ur;;iL!: ii.or.':on
Authorized Offic€:r
lJy 7t;;LC I? .1/;....,.,(.: d.r......7J
Author1zed Off1cer
m
--
..
.' _-3.'
~
i.... .,
-3- ;
.........
1.
,. .' -,- . .
,.
.....:.. "':.....:;\. ..,rh....-.. ""':~_. w..-.r:-:.r'~~'~/:,:-;'..; llo..i\,....(l,,('_.........~r,~:'.~:1::..,.:tJ;.;........;,4;...;.;........c'";\r":::;:r.~:'....:...::""""~'~...J ~~,..,;,y..,...~:.......r::~:__.!;..:~~y:..;.,~:;.,~~.
..
-~,
'If'.
"
. ,
r#!UL ''4 ".
GRANT
DEE D
.....r. ..' --.......1.--."":'-:--.
"
, FOR A VALUABLE C01lSID~'R!\TION I receipt' of vlhich is horeby
n e knov/ledGed I CALU'ORNIA CONl" gRBNCE j EVA HGELICAL UNI'fEJ) BRE'r~mEN
CHUHC:l, a corporation, f,ran ts to THE ,900 D S!U\\ARI TJ\l'1 CH.UHCH I. ' "
EV~~GELICAL UNITED BR1~rlREN, a corporation, the'real property in
'tho "County of Santa. Clara, Stato of Californj.a, described 0.3
foll:o\'/S: : . . .'
ImGJ:Nl'rli~o o.t tho 'nt.f)l'lJOo't~on of tho SO\lthorly .: .
. . :.:.=-....._=-:::.- ,1.ine of Homestend Road (forr..erly YoUl)~ Hoo.d) ~.
. r~~I...!:~~;"~Yl VIi th the .c:ostel'ly line or Becker Lane o.s shown :.
~~'::: :'~(l ' "upon that certain Hap enti tled "Record. of Sur-. :
'r.".'".'~~~',\~":... .. ': vey of the Land of Burrell Leonard" wInch 'Map" .': ."~
:\; "?, >~,-r \\~.' . :..' . was .filed for recoI'J. 'in t~e off ico of tho ';' .i
..-A:?,Sf;.J.{!\,.;,...'.. .Hecorder. of the Count-y of 'Sant.a Clara, State : ..' ~'.
~)"..:-,:..;~~~::.::::~., of California on. July 8, 1955 in Bo01c 60 of . '"
r... :;/.~:::,:~:~"tfq,;~,: l\~atJ~, P::l.30 30; thenco along the Eo.ste:::-ly line . ~
h~;\;'-'i:f~;~:-t of Bec1cer Lane South 326. '"{O feet j thence H. . :
._~::.!~..!..-'-_' . 89? 411 E. and parallel with the. Souther ly
, .l'ine of' nome s tea.d. Road 216.00 fee t; thence . -- ..
. .' "::. . ":,parallel' wi th t,he ~a5terly line of Bec1-~er Lane ,. ',~
, .... North 326.70 feet '';0 the Southerly line of . ~~"
,_ ' liomestead Rond; thence alont?) 9a:l..d Southerly" ....:.
.,line S. 090 41'. W. 216.00 feet to the ?oint of ' >
bOGinning. COl~Tl~INnxG"a;?pro:xil;la'tely 1.620
acres of land and bein~ a portion of that cer-
tain 161:.52 acre par~el of land r,onveyed by S.
Q. de'Ar~ello, et a~" to Lo.nuder E. Gardner,
.by~eed.dated April 2, 1870 and recorded. in
Bpok 1.7 of Decds,a.t 'page 348, Santa. Clara, '.
. C.ounty Records ~ .
'. .
;,'
,..
'n
IN WITNESS \\'1IERJ~OP~ ,said corporation has 'cau~ed its cor':'
porate seal to be affixed hereto ~nd this instrument to bo
executed by' its ~resident 'and Secretary thereunto -duly aut-.
horized. . ~'
DATED :
i'l,' v ,~ ..,..:.. ~ e......-
~l.,- ., 1959..
CALIFORNIA CO~fERENCE, EVANGELICAL
mlITED. BrtETHREl.'\f Ch"URCH, a corpora-
tion '
/..
/
) v ,.
,By: c: ,LJ ?~~7,rY_.'r' -' pre3id.~nt
. .
'j!;:-<< (T 7r<",.L. .~
,BY: ~'JI" 'J c. - Secreta.ry
, ..:.... i?23832
aocr.'4G15 i't.cf74G
I f\
f//Jf!.UL r'A
G R I\. N T
DEE D
i'
;,
.....,..... --"I;'--.--:"'~
"
Fon I\. VALUABLE COllSIDc.'R!\TION, receipt' of which is hereby
acknowledGed, CI\.LIFORNII\. CONr'gRE1WE, EVAHGELICI\.L m~I'rr::J) BRl:."mnEN
CHUBC:l, a corporo. tion, r.rnn ts to THE j]00 D SAi\II\.RITJ\N CfmI1CH, '
EVI\.HGELICAL UNl'rED BRE'l'rlJillN, n corporation, tho'real property in
'{he County of Santa.Olo.ra, Stato of Californ:l.n, described o.s
fol1.0\'1s:' .
l:mQr.NN;I:i~o o.t 'tho .'nt,fH'uoot,-on of tho Elo\l.t.hor'l.'1
....__._. . line of Homes tend Rond (1'o1']':)o1'1y y oun~ H oad)
t;;:;~;:::'~'J!l V1it:;h the !:ostcl'ly line or Becker Lane us shoV/n
C--':l.~-. ~"~l .upon tha t cer tain i.,tap enti tloc1 "Record of Sur-
(.:"..',::~~'..'\);~,'.." .' vey of the Land of Burrell Leonardll which'l.\ap' ..
..~\: "~ .:...~.). I\~.' '... wa~ .filed for recorll 'in t~e off ico or tho
'-A:~.:\~;':lr.f./\:-'~""'" l~ecordcr.of the; County of 'Santa Clara, State
":)":":i.;~:,;:..::..cS:--., of Culifornia on. July 8, 1~J55 in Boole 60 of
. : ........,-... MatJ~, P:l.60 ::;OJ thencu alonr; the EUDte~ly line
of Beclcer Lane South 326.?O feet; thence 1~.
e9? 41' E. and parallel with the. Southerly
, Tine of' Homestead Road 216.00 feet j thence .
.' ':" ".. iJarallel' wi th t.he Ea~terly line of Becker Lane
.:.....North 326.70 feet to the ~outhcrly line of
..' Eomestead noadj thence alonG Daid Southerly
.line S. HgO 411. W. 216.00 feet to the -point of
bOGinning- C01\TAINDW"a;>proxi1no.tely l.620
acres of land and beinB a portion of that cer-
tain 164.52 acre parcel of land ~onveyed by S.
O. de'l\.r~cllo, at al., to Lo.uuder E. Gardner.
by~Dood.dated April 2, 1870 and recorded. in
'Bpok 17 of Deods. at page 348, Sunta Clara,
. C.ounty Records ~
r-.
.~
porate seal to be affixed
executed by' its ~resident
horized. .
DATED:
i'l,' V ,~ v:- \0 ~ y-
.t..- , 195Q.
,',
,.
.,
...
. :. .
. .'\...
. ;'
:~.
'. .
0,
CALIFORNIA CONFERENCE, EVANGELICAL
1.JNl'l'ED. BRETHREN CJ-HJRCll, 0. corp,ora-
tion
1/.......
) .
v . .
..' , P-' J7.0
. . .By ; . , (.~ . . L , .......~), '7 rr _.v-,
. (/-(J (f:'-/
By: ~J.I 1"". (/j <::. _/rc-l..:.~-:->
. Sacre tary
i~f28832
BOer. (1015 ,~ . n
N,C[ l Ll J
;;;./
r ,'\ r. j1 r. q ':1 :,'\"" C [' ~", ' I {\
.._!.J , .0'.. ." ..u \...!J
'" ,,- r . J' .,,,, , ,-
/l . " I ,,'': -i \ l~':' I u" h j
r'..' /' ,', ,......"..I~......, 0 l~,
.... .
..; ')/.~Yi';'~;,)::,:,:'::;'~:",
Prcsident
('
"~
~
~ ~I?7/D)J
6&0..0 G4/v'1A?/rA-AJ U'&7?-J::;O/S-r
C/:JV,!iZCH .
P. itA II
I -;1r2-GPL -;: C/'Z/&/tJAL fiWp#--ry ~F OItJRCIf.
?Atz.cs- I = .0/75 4C-12E 5r,L-/? ~PL.A1JD
,DJi3I3lJGP To CHv.H:H f7UJM /.J A- L LC. D
?AVL fl3:I2- A6~ tJ,c 7h73b'
?M C l::L '2. - . I Lf Lf ,A-ctL& 7,iU A-}J 6-LL- Pi a::.E tJ F
t 4.;.J D PCC-O 7Q tI ~Q) pA/LIt...
f? ETL- ,/J-&f2Ct3" tU E PI (J;: 7 FEB ~ 0.
~f2-CE2- J- c.. 'I _ PI)J/J1.- ?P-<J P&Z 7'1 () uJJJ eo 15Y
Ctfr.J..e.CI~ A-;=7c-n hL-L f~SFBL~.
:t EIJ1J &uc--v-tS R 10/ vJ J{}e2-&
/7).J/J.{.,/-u:.-o
j;:k:::I?-E ;:iJ/1-~ .' ~
j,.M-CE L "c ,. =' /JrLcEL A -t pf)(2.Ct{L 1
- P/JILCCL- 2- .
. c == 'A - I - '2..
=- : ;-,
oPEc' AY7AeHiY .tx;ED [;E:$crarmopS
f pt:Ar HM.
~
....,J
a
~
PARCEl: \ All thilt cl!l:tain real pl:(lr)(;~t-ty situ.1te in r.r,(! City of CUp(,rLL.~o,
County of Sunta Clara, State of Cnlifo~nio and b~ing more
particularly describod as follo~s:
Bcginnin~ at a granite mOllument at the intersection.of HUOll'stei'lrJ
Road as said Humestead Rood formerly existed, 40 feet \~ide, qS shO\m on
the m~p of thnt ccrtnin Tract No. 1906, Verde Canlens, Unit 2 .:1 nl.:Jp uf
\Jhich is fiil'd in fiord, SIn of Mups nt ['.:Jge 36, in t1'e O([ice of tl)(' County
Rt'corder at sllit! Santa Clnn} County; thence fl:um said point of bE:!g,inning
s~024'02" 'vi along the centerline of l-lolllestcnd Rand 416.12 feet; thence.
]t' 'in~ said centerline S 0017'12" E 20.00 feet to the TRUE POINT OF
Ih,--..~NING, also knQ\,'11 ns the Northeust corner of that cel-tain parcel of
land conveyed by. Califol-ni.'1 COf\f('rcnce, Evangelical United llrethr.en Church
a corporation to the Coati Scllnaritan Church, EVlln:,.;elical United Erethren,
a corpot'ation, by deed dated N,ovember 5,195') nnd reL'(lnil~d in Bl(.46l5 of
Deeds at Page 749, S.anta Clara COLlnt)' Rt!cords; thent.:l' continuing"S OU17'22" E
along the East line 6f said lands of Gootl Spmuritnn Churcll, et aI, 214.74
feet; thence leaving said E<!.st line N 440))'lY" E 5.67 (eet; thence
N 0017'22" \v 210.74 feet to a' point in the South murbin o( Homcst~ad Road;
thence S 89024'02" \.J along the southerly marr,in of Homestead Road 4.00
fee t to the TRUE POINT OF BEGINNING.
Containing 0.0195 acres more or less.
PARCEL 1. All that certain real pt'operty situute in the City of Cupcl.tLl'"
County of Santa Clara, State of California and being more
p.nicularly described as fa 110\,. 1') : i. .
Beginning at a granite monument at the intersection of ~ume5teaJ
R()"ad as said Homestead Rand formerly existed, 40 feet ,vide, as shown on
the map of that certain Tract No., 1906, Verde GHrclens, Unit 2 a map of
\,'hich is fil~d in Book 98 of M.-1pS at P<:rge 36, in the Office of the County
Recorder of said Santa Clara County; thence from said point of bcginnin~
S 89024'02" W along the centerline of Homesteau Road 416.12 feet; thence
leaving said centerline S 0017'22" E along the East. line of that certain
parcel of land conveyed by California Conference, Evangelical United BrcthH'n
Church, a corporat~on, to The Good Samaritan Church, Evangelical Unitl:d
Brethren, a corporation, by deed clnted November 5, 19S9 and recorclE:!d in
Hk.4515 of Deeds nt Page 749, Santa Clar-'a~C.Qunt)' Reconls,..214..74 feet to
the TRUE POINT OF nEGINNINC;; thence continuing S OU 17' 22" E along said
East line 112.00 feet to the south~ast co~ner of said lanJs o( Good
SLlJ1laritnn Church, ot al, thence S 89024'02" 'vi along the 50uth line of
said l:\nds of Goc.lcl Samaritnn Church.; et aI, 112.00 feet; thence.!
~ 440J3'l')" E 158.82 feet to the TRUE POINT OF BEGINNING.
80ntnininc 0.144 acres more or l~ss.
\.
"
"
- .----.
.' . II!" .. ~1.<o'. t
I .' . f ~~.o,
It)> 0 (Tl f ~
I [) :n t )< I
I ~.: I
,. n z :r::
r ,: In
J (l1:l}J
I (P
~\ i
I ..... (1 t -l
10.-1.( I I i
I '0 I Y r i
o Ul r p ltol
. ." r I~
!. 'f ("l I.
. l' 0
I~O III
!.: t 11 \J ~l.J "
I'~ n r. r-
\.~ (Tl )> ;.u 0 .~
. - r. 1'\ <.,-)>
.- :. t. . -1
'\:J J> ~.
.l ' .0 .
. ~, ). \J .i ~0
. \' S1 (' :'0 J-
I' m 0 )7 I(
<:: " ~,
"., )0 U' Z -\.~ ,.
L.~
.- 1. 0
~ (\ Y. '"f"l 4~
.: 11 ' /
;'". 14 0 ~'"'t ,
-~ ~ I lJ
c .l>
9-., . <-
. n
M'c )7
o - ,.
- ,,'11)
1- Tit (11 I
n
trlJ 0
In ..{
pQz: <...
'0 7J
. 0 r
I -~ ( ,
\L' 0 II )r
:::: ,,~ )I n
r I" 111
() )> ,"
, ." r ..."
\ L..... 0 lfl
C'lQ/l :c
V' 0
V z:
~~~ -0
I -\1
\ ..~ z:
\'r~, .}
I \. - 0 (il
Y-\JiQl
\ ,-
r (I
z .P ~ ITl
I D~~ T
I
-I D
IjJ 11' ~, m
ITI t{) I" ?J
r rJ \F
fT).J)O
I,,~
v~
)
t.:
\)J ~~". \..~
..
7L-~
:::;
~
o
IE:
~
!
....\
PARCEL "A"
ORIGINAL CHURCH PARCEL
GRANT DEED (4615 OR 749)
PARCEL 1
DEEDED TO CHURCH FROM'VALLC
... "';-...:
00 ~" :0:..
:
PARCEL 2
DEEDED FROM CHURCH TO VALLO
., .
. . .
. .
...... . '::. I .' I
.0' .....
.,: r.--: . .... .f.
LI NE 'j ABLE:
LINE BEARING DISTANCE
1...1 N 89'2-4'02" E -4-.00'
Ll N 00'17' 22" W 2. 00'
L3 N 89' -4-2' 38"' E 9.00'
L4 N 00' 17' 22. W 30.00'
CURVE TABLE:
CURVE RAD I US DELTA LENGTH
Cl 20.00' 89' -4-1' 2-4-. 31. 31'
C2 8.50' -4-3' 20' 29" 6.43'
,C3 8.00' 43' 20' 29" 6. 05'
Kimeo Realty
Corporation
PROPOSED RE-DEVELOPMENT
SUBMITTAL
NOVEMBER 2, 2007
VILLAGE
SHEET INDEX
1 COVER SHEET
2 SITE SURVEY
3 PROPOSED SITE PLAN
4 TREE PLAN
5 BUILDING ELEVATIONS
6 BUILDING ELEVATIONS
7 BUILDING ELEVATIONS
8 SITE SECTIONS
9 SITE SECTIONS
10 ENLARGED PLAZA PLANS
11 SITE ELEMENTS
12 SCREENING
AL TA/AC.SM. LAND TITLE SURVEY
FOR: CUPERTINO VILLAGE ASSOCIATES, LLC
1~~B~~"''''f;,
~:e~~~i~~~
~;i~~~~;;
:::~~o;~.,~
~n~~li~~d
~~~:Jllili;~~
."~~''''~
~~~~l~~~~
~mi;m
g8~~~~~~
~i"":l;Q;"" ..
j~ lO .01
~ c ~~
?'~~~8~ig~1l~::~C:~~~~2~nq>O~Mi'~':.i1'M~:ll ~ o~'
~;Sl~~~!~~~~~~2~~~j ~~~~~~~I;~~ ~ ~:
..~,,,"'~'~~"~2~. ~~'o.r N~~\I~ .J
'~o;;~"ll~o;:~~!~~i:~o~ ~..,1,s;e:i~!~~ : :..
f'~~.~~~.~~~f~~~""~i~~ ~~~~tilB~!l:t~~~:
~~-",~~~~~..~~~~~~~.?t 2R u~"'~~t~~~ F
C>p~Bb~~:irP~..i~iil~5:i", ~y~~~~:~~;lo'1 ~g
;!8~~~;'~Q,~l;li~~!~;{~~~t if~;q~~~~~i ;!.
~2..~l/jOi~t,.,~'i'''''-:i!''~"'\''''FIiI ...zl!l~~Y.':i""2~i ~t
1z~::l~~~~~~I~;~;..~~r3"~ 2~i"''''tlil~'~:t~ :l.~
~~'~~~~I:?~'"'~~~~~S,;~;. ~ J'lm~:~~.I::~~~~ ~"
!::~.~!::~~QliI~ii1'~~alOl~~i r~~~p ",~~p~x ~.:J
:.~:~:~~i~~~~~~~~~~~ ~~~~:~~~~"~,,
'~~ "i'o.~~~~~.!'i~' ;' ....,~~.
~ : ~J . ~ ~~ca~~ ~~ ~g~' ~~~~
~.. r m~ ~~ ~u 5~ m~ :~ m !'it ~:~ ~~ ~~I;i
g~~ ~ i~ .- . " <>",i=l ~:;: ,a:::iiJ:l ::<~ ;!i=l ~.~
.,;;lQ ~;~~ ~~ .....ljl'" ~~~~ ~~~ ~j~;:
"P ~~ ~:i
.h H~~ ~ ~~~ ~ .~
~~. (lZ"'" .~~ ~~:$\~ :i ~i .:<~~~:
~~ q .~t8.. ~~: SiR.. ~ ,no
~.. 0 ~6i ~::~ .:.~~G ." ~S~ ~~~ ~:t!:
!*~ .i~ :i:~ e~ ~~~ ~I ~~~~~
~i~ ~~ ~~" ,i~~
,,"I.., ~~~ ~~~ ~~~~ ~~~ 3ljiz
~~: ~)o: ~~ <?,...JX q2~!l1
" - ~ ~~~ k~a ;;: m~
~~. ~~~ ~p.;:l 'i~..,.. ~. ,
~~1 :~:~ 4< i'I~^ ~;:
9t~ d~2 ;J~2 ~~ -""~I; ". ll'!
~~~ ~..:J ""..~ 2;'.1 ~~ ~~
~ei e~ ~j~~ .~. ~. ~" ~
~~~ ~'?~ '?~ 'i:~ i5,~
'" , .
. .
~,~ ;~ :~~~~~
~~ if.l ~i:l~~nt.
~~ ~ -.
~: ~~ ~;~~;~
~~ ~i ~I~~~~
~~ .t :.~~~~
i~ ~~ ~~~M
~; !i;:~;
~ ~~B~~
~ ~~i~' ~
2;
~~~
~=~
..~
"0
;~~
'"8~
~-4i
m
~~:J:
H~
"~
'.
!.
=~~~
mi
;~.~
~~~i ~
~~~~
~~;
r;:ljl~
~~.
~ia
~rd
t~ 6;-1g._ ~ (!/!; 'O~
p~ ~;;~ : :~~~~
~~ ~~~~ ~ ~:~:~
... ~~5~' ~~.~
~i~i ;:~i
~~8 ~ ~~~
~!; B"i~
t:~~ ~~~,~
~.~ 'C'O
9, ~:~ ~~~~
~:~ ~. ~~
>Ii E
!~~;~
"'SJl",;r;:
~ ~~.~~~
~ ji:;;:"
;,;.:~~
~~~~:
a~'~t~
l:~",~~
~~~~
j;jpa2
.~:~
~~~.
"';:lIS
~~~;6 ~~ ~~~ ~~~ ~gF: ~S ~~ H l!l1:~~ ;~ ~~i9~6 ~ i~
',0 ! ~~ !~~ i[;;R '. R" h~.
~I~;~ P9,,,, ~.~ ~, ~ri I I
i~ ...~ ~~:i ~"~~~" q
~ i~-' ~~ ~~~ :~~ ..>1 ~~ i~ "" .~ii:~~~ l,!i'
..:~~ ~~m R~ 'I"'....'" .:I':: ".
~"'iX z t~~ ~~ ~i ;;;l!l9~ ;J"l ~;t~ei a~
~~,~~ ~~ ~j~ 6~ ~; 1'llil;;!'" ,'#: ,~~
m! ~<II~9.~;;l
:Ig~ ~ ~ ~~~ ~'-'; a!~ ~g . :g~.~ ~~
~~~!i ~~ ;B ill~ ~~~lil~ ~':':
~~~; ~" ,,~. !l~ "I:::. &d ~""
: ~~~ ,'0 8 ;!;i~ ~.'i; ~~
~!~I ~. " '. ;:~~i -.
g,!:... ~ i1~~
. ~i. g~ ~~~ " i~! ~~
: ~~~ " "l~ ~~... ::i~~ l~
~iq ~ ~ ~ ~~ " ~~~~~
~ 0
Y' ~
~g,;,!z;:'
~mn
:f:Zl'll:l"
lill!
,
lll~i!;i
~1';!
~ ;~~
.. ~
5~.
~ ~;,~
~~i
9, :
:z"z S"'o:
m "p
~Jl~ ~~
~~~ ~;
;~i ~ ~
c~ ~
~~~ ~
l!l~:::i
, ~~~
i;J,.:
Pi~
~~
~~ IUf 3~
~~~!;; ~~
, 1111 Ii
'" il~~'1 ;i
IilP~~ ~~
E: ~~ 9, ~
" Eii~ H
m
J:":ii:l
.'!il,!:
..~
m
'-jgr
~~:
~~~
'-
~i
~s~ ~~n:
i~::l
'"'l.e
..~
~~;
~g~
~::i!~
:~~
~" "';Ii
~;~
;:'~~
;~
~~ '"
~~
%~~ '!,S'
rf~~i
~?;i~
, :;l'r
,!'l'
~~~~ ~
~![~
~n~
!~i,i
" -,
~!l~
~.!!.r!
~la
It ~~! ;q ii
H II
~
, ~
!~ij
iln~
l~.t
I';
~H
301;:
!i~
;i: ~
" "Ill
U!~H{ :~al; ; rn
',"~h~ U!~ll l
~~h~n ~~~I~. :I
P.ii~'~i ~~:,~~ii f
!,!!; ~ 3.. ~ ..~" s?-i
P~j!h ![:-!h~ ~
,o~"lo. i,.!.l
'mm ~m~i
~$-Jf~: i! ~!!
~ '~J! n.~~:
! ~ '"Iii
~~~
\l;
[~ ~rr
~i ~i!
8- nh
~ Hi
;;:.i ~
!!. .....
I'm
j ~
':!;;
l
i
II
i
@ ~
e
~
~
e
Ii
"
lUH Iii!
'!~~H "t~l~
~-E~
O,~
~~;
IP;:~
;!~
~;:~
j!i
pO
l~l
on ~1l
fi~
'.
:;11
t
'3
..
.
I
~B'~ ~~1 ~ ~
!. .
rs
"'
~~
<
lllllil!1111 Ii
,,~,.~,.!?,~<
!lj!I!!i~!~
H~~ir3Qr3 ~~
i':;~i~~~~ ~
n~~~i~; g
l~J~~;~; ~
h~~~~~~ gJ
~~a ~~~~~ ~
~l, ~~~ Ii
m ~;~ ~
;'fl
~I'
~
I
I
I. pup
II!-~; ;,j
n a ~
. .. a CUPERTINO
~'~
"'~
..
..
U
en
;1:1
;;;~
III 11"14'07"(
.... UIl1'(lOOO)
P ~h (j :~~,,~~
"~~I< ~~,., ~."
i.:&~; ..~~;
~
"<.
(A::l'"
~~~
B..
,~.
~!:
Ii~
~i
..
~~
.<
.,
.~
'::'"
,0
l~
~
hiD
~
o
~ I
~
~D
"J
lJ I' .- " -. --I~I
Ir----~---PRUNERIDGE-AVE~~, ---"'-a-:
(A PUfJUC sma(1) ::. ~ ; I
. 0 I
HOU.ENottK
'0
,0
~nn:n
~i~Jj~!!
~" . ~ if
~! ~" ~
Hupnnnnp
;n~~p"~~~hd~
.~ " "~.'"r'.'"
H ~ -~. P'i
H . ~ ~.
ANZA.
~g I I
~ I I
I I
I I
I I
~ ~ I I I
~ ,,'}' / /
;;; I I
I/'........~". €I
~ II rc:s.....~
,,/ /: j'; ~~,
/ / --.. ..
/ ;' ~ .
;' !
PARCEL TWG ".,. ,
(OOCfI(J.<<lfiUf) o,;;~
@ ~ '
~ I
~RA1OOA-
Nl"VALC
/
--.-
01
<
Ii
.~ ~
" -<
"
1;
\
~~~~;fiililn~'!R~'~ ~i'~.;!J!l9g1"1;i
· I' · ! · . . " . . < ~ . i ~ . < ~ '
"_BI.,~'~'~sl ' ".'
i5; Ii j!l :i!" Fl" ~ e:t III ~ eo 'iI
la'" , '~.'.'
,q~ a -'. i
, . ,
, . ,
, .
.
~
0 "i:'
fll'Pllf' l ""
("(DOl/GO') _16 )>
Iii! '",~
~~fri
~'I1r
I~~~ ~~:i
"',,~
p:len
,em
nl
II
II
/I ...
II
UI
@
+ It f o.
o
II
i I
e@
o !
,
I
,
I
I 1,5I'~
I, ~~I~1!~"
,
I
,
f
,
I
,
I
,
I
,
I
,
!
I
,
I
,
I
,
I
,
I
,
I
.
J ..~"'--
I ("UOR GOII)
~J~
~I~
~li
n
, :E
I~
I m ;u'
~ ~- ~
o
.e
,Q'"'GM:(34lT
(OOC. NrJ. /flU".)
@
" I
"""I
".
'I
,
f f
i II
r I
J l
,
1-
';,ZI
8 ~~ I
~ ~~ 110
~ \ l\~~____
~IP
, ,I! r'~--- -
J l/
,01 i
II
,I
.J: I
-\1 I
,I. .1
I: I
Ii . :
Ii Ii!
i\'1
.,
, Ow ~-..;:____
1 PARNELL
" PLACE
,:<~r r~~----.
.~~ /'
~ i !
, I
I I
\ I
, I
I I
,
I
,
I
,
I
,
I
,
I
,
I \\
, \,
,\io .
, 1
o~
,-
~
~
~
1
o
"1
Aifr~;
LARK LANE
(5)
,0
I
,
',,'i
'I'!
....11i!
g::;
~;: I
,~Il
'~Il
'/1
"
:11
I"
;~:
:'';;1
:'
,I
II
II
I,
"
~
Vo
e
"
,
, ~
I j
,
I
,
I
,
0, I
.
,
I
,
1-
,
I
II \J
I !;~~
-.;"1 ~O
~ ,.;
"
~r
WU1J1J
f
01
..
,0
---~~---
----------
ROAD
..
o
___..Y________ - ----------------l-l~-- ----. -----.------~::::::::-~-
C"'FlJRN" ~
KIER & WRIGHT
CIVIL ENGINEERS & SURVEYORS, INC.
3350 Scott 80ulevord, 8ui Iding 22 (408)727-6665
Sonlo Cloro, Col i lornio 95054 FAX 408 727-5641
_,.....c.t.12-Z7-0!I
Ul'DAlm m PItll' 11M lIEl'I:ll 0l1U,'tlI
1IDAltDPPCltM<<JITSOllllIQI
~~;~~~ARE ~ SIDEWAll< :=\
ACCESS ~ - --=--~~ \..,.
'IL~
\ ---
~~J. 'l '~~. __~;. ~-=
L1~NET ~~~__:=- _ ,
--"~,...~ _.~
L
--/
-'"
.1-
782 PARKING STALLS
691 PARKING STALLS
--------1
..---=----- I
I
I
I
I
I
I
I
I
I
10
1<(
I~
1<(
I~
I~
I~
I
I
I
I
I
I
I
I
I
I
1
------------~
PROPOSED
I III [ I I I [ III I
1111111111111
1T
=:J
I
EXISTING
135,736 SF SLOG AREA
112,607 SF SLOG AREA
36,564 SF PARKING DECK
1
WOLFE ROAD
~ ClO
0[7 ~
~
,
DATE:
MCG JOB #:
CUPERTINO VILLAGE
CUPERTINO, CA
SH EET 2
NOVEMBER 1, 2007
06.102.01
SITE PLAN
DATE
REVISIONS
Scale: 1" = 50'
E8z
rv7 Kimco Realty
~ Corporatjon
~
25' 50' 100'
@ MCG ARCHITECTS 2007 All RIGHTS RESERVED
NOTE: This infonnation is conceptual in nature and is subject Ie
adjustments pending further verificatjon and Client, Tenant. and
Governmental Agency approvals. No wlllTlllllies or guaranties of
any kind are given Dr impllBd by the Architect
,-
[
~
~
DATE:
MCG JOB #:
JUNE 20, 2007
06.102.05
DATE
REVISIONS
@ MCG ARCHITECTS 2007 ALL RIGHTS RESERVED
NOTE: This Information Is conceptual In nature and Is subject to
adjustmants panding furthar verification and CDent, Tenant. and
Governmental Agency approvals. No warranties or guaranties of
any kind are given or imprmd by tha Arch~ect.
LEGEND
~ (E) TREE TO REMAIN
/-,
I . \ (E) TREE TO BE REMOVED
\ J
.... ,.,.
o (N)TREE
'0--0'-0- - -c(1D 0 0
O. --- - -- ~ C:'C:' 0
. ~ ~
O 0
..' 0
o
o
00 00
o
()
. Qv:Q\
'_J\,<
(. ,
,_I
G,l)
@
~
fTl\,k'
V
@'~'"
':-;~.".
'(~ "
~.
:;-: .-, - - ~ .~~~.
.' ,,'~,", ;,.....,... ,'. ',,'
~. c- .,-,~
~,
TREE PLAN
0', ~-/?}-~-~0'~~~0rI-;' 0'0mAE:)00000-~--0 0-.0----
~. ~ ~-J0 8~' · . 0--
o
r(:) (:)
r\:"
\:.,
-~-~
~.O.)
,-,-
(:)
I;' ........
"""'0.
@. . ~r':\O' 000.,,' '~,,"." .
. · vv " _',~%~~:g)
'.~
o
0-0
(:)
"l't;""~ " ,,,,,,J,,,, , , , " '
' .."'~.'
, <"
.~~,..
"'"
-~ /-,
( . )~ . )
,- ....".
(:)
(:,
,'/
-~
( . )
,-
o
C:' 0
""f:)
o
@...~
~~-.4', ,
",:.-,
o
o
~O. 0
\J 0
SHEET 3
~,..-",','<
~
-.....
( . )
,-
(:)
(:,
,,/
"'''
I . ,
)'-~
I . \
\....,.,. J
@)
o
~'...
o
o 0'
o
o
o
o
o
o.
00
o
o 0
o
o
o
o
o
o
,......
( . ,
,_I
o
o
o
o
(:)
(:)
-- (:)
(:)
/-<-....~ ~
a { \ a 0, 0 . " · . ., . jO" 0,' 0 0 . 0, . .' ,:"
\.....)(~- -'.~ ." " . ' ~ ' '.
CUPERTINO VILLAGE
CUPERTINO, CA
I'V7 Kimco R~alty
LM. CorporatIOn
~ -,~~, ---1 j j -, o~rn_' "TI~ ~ t
~ WITH VINES / /
/ 15' 130'
125'
EAST ELEVATION AT RETAIL A ALONG WOLFE ROAD
OPAOUE TRANSFORMER SCREEN
wrrn MOLDING DETAil
WOOD DETAILING
FABRIC AWNINGS
WOOD SIDING
22'
~~~~
21'
STUCCO OVERHANG
t t t l
WEST ELEVATION AT RETAIL A
DATE:
MeG JOB #:
JLNE 29, 2007
08.102,05
EXTERIOR ELEVATIONS
CUPERTINO VILLAGE
CUPERTINO, CA
SHEET 5
o
5'
10'
I"'V7 Kimeo Realty
~ Corporation
DATE
REVISIONS
Scale: 3/32"=1'-0"
~
@ MCG ARCHITECTS 2007 All RIGHTS RESERVED
NOTE: This Informatton Is concaptual In nature and II subject to
adjultm8nts pending furth..- veriflcatlan and CII8nt, Tenant, and
Governmental. Agency appmvats. No warrantles or guaranties of
any kind 1f8 given or Implied by lt1e ArdlIl8ct.
SOUTH ELEVATION AT RETAIL A
NORTH ELEVATION AT RETAIL A
J 200' L
NORTHEAST ELEVATION AT RETAIL B
DATE:
MeG JOB #:
EXTERIOR ELEVATIONS
CUPERTINO VILLAGE
CUPERTINO, CA
SHEET 6
JUNE 29, 2007
06.102.05
DATE
REVISIONS
Scale: 3/32" = 1'-0"
-':.~ r;t<~,~: ,-'..
rv7 Kimco R~alty
LM. CorporatIon
"'- ~:-, ;--i"' ':(,): r ;~Gi ~.;a ~'.:: ~'~'~!-~c-:
-:',f;,;
@ MOO ARCHITECTS 2007 ALL RIGHTS RESERVED
NOTE: ThIs Information II conceptualln n81Uf8 end Is subject Ie
adjustments pending further vertfIcatIon and Client. Tenant, and
Gov.-nmen181 Agency approvaJs. No wanmties or guaranties at
any kind are given or implied by the Ard1118::L
l' 65' 1-
SOUTH ELEVATION AT PARKING STRUCTURE/RETAIL B
Scale: 3/32" = 1 '-0"
"~-"'""'--""""""""
.._~"- . '-"",'
Of'I!;:N
t
PED
t
AUTO ENTRY
EAST ELEVATION
Scale: 3/32" = 1 '-0.
PARTIAL WEST ELEVATION AT LINNET LANE
Scale: 3/32" = 1 '-0"
"ii~
,.....~
WEST ELEVATION AT LINNET LANE
Scale: 1/32" = 1'-0"
DATE:
MeG JOB #:
EXTERIOR ELEVATIONS
CUPERTINO VILLAGE
CUPERTINO, CA
SHEET 7
JUNE 29, 2007
oe.' 02.05
DATE
REVISIONS
'./;,
rv7 Kimco R~alty
~ Corporation
---
'>'.1. ...;;~, "'i:: ::,J ~~ "_CiS
"
i ~;,-"
@ MCG ARCHITECTS 2007 AU RIGHTS RESERVED
NOTE: Thllllnformatkln Is conceptual In nature anc:lls subj8cl: to
adlustments pending further verification and Clent. Tenartt. and
Governmental Agency approvaJa. No w&n'8r'Ities or guaranties of
any kind il/'8 given or impIiMl bV the Ard1i1ecl
: J------
RAMP
/ ~\~"lN~
./. ~1~tJC\:l
.1 ~~ I ~~^t h-h--t
~l~Wt\
'fL..ANT ~~
A. SECTION LOOKING NORTH ALONG LINNET LANE
/ ~\-&ilN&
./. ~t~tJC\:l
~rGTl~ l-tCo~\ ~
~t;::~ ~ ~lN ~
~
..r---:>-"'~
~ l:-,j
, LI
L1t..1tJF-:T
I ~~~~ I ~~^Y j~
c:pl~~t\
l'L..AWT ~ ~
B. SECTION LOOKING NORTH ALONG LINNET LANE
DATE:
MCG JOB #:
JUNE 29, 2007
06.102.05
SITE SECTIONS
f>~~~
t...lt{NE:T l-JaLHe
~I } ~I'" ~ t
:+ I~'
\:
f.
J
~
(ARl<:I~ ~
t&rrhll-
.BtJU..t:nwcp
cp~N C;;C;r<:~~
L-t'tmCe:: o.llTH
Vl1Jss.
DATE
REVISIONS
SHEET 8
Scale: 1/8" = 1'-0.
~ I
4' 8' 16'
@ MCG ARCHITECTS 2007 All RIGHTS RESERVED
NOTE: This Information is conceptual In natUra and Is subject to
adjustments pending further verillcation and Client, Tenant, and
Governmental Agency approvals. No warranties or guaranties of
any kind are given or implied by the Archnect
J:~r~~w
r~
NEW
"Dl~SyJM.~
LAHE
CUPERTINO VILLAGE
CUPERTINO, CA
f'V7 Kimco R~alty
LM. CorporatIOn
DATE:
MCG JOB #:
JUNE 29, 2007
06.102.05
DATE
REVISIONS
@ MCG ARCHITECTS 2007 All RIGHTS RESERVED
NOTE: This Information is conceptual In nature and Is subject 10
adjustments pending further verification and CDent. Tenant, and
Governmental Agency approvals, No warranties or guarantJes of
any kind are given or implied by the Archrtect.
_~O!,,:, ^'>'HH_"'~
I
;illY> PL6dCl- ~
,r. ....",...."..
, .'. -.. ,'-' , .-.,,:" . -
I
,~~~~.~
j
J:F-F~
~I'~
~ 11 ~ I~J
p~~~
\'()
l~R~ ~~~ l..}r1TlCI;:;
W ltH Vl~~
~1--\s-n~ ~e:.
oF c"'~e
C. SECTION LOOKING WEST AT MULTI-STORY RESIDENTIAL
SITE SECTIONS
CUPERTINO VILLAGE
CUPERTINO, CA
SH EET 9
Scale: 1/8" = 1'-0.
~ I
o 4' 8' 16'
I"V7 Kimeo Realty
~ Corporation
DATE:
MCG JOB #:
/v
/
~
,,'
~~~'-111
r==-=J~... ~~ -~ 7:'~'
(~~. Q"'1:~~' ~:,""-"~~e~ ,;~~ 'I
~.'~i~"~'~" .......~~ ,..... I
~-.t~t'~iL1~ir" ~ J~ln. I
~v . -=,::: ~', .:l .-f-.:J,,'#.t
-=.....- - ___- ..~ ~~ I
KEY PLAN
o
S'<"~ ~0
<<,,~ ~<::>" 4-
<Q..:s '?~O;
WOLFE ROAD
~ ..L-v~"'~~---
ft ~.~~~&.. --.:::,-'. \ I
J (Y . . ~~~..;.:~. I
t. -;.~" ....;-. -;I ~'I
:=-J#.... . ~~..'-.. -. ,
a':-". e ...t.?'I....~ ~.:.. ~ ..~ II
~r~~'.:;.:'~. ~..~~- r, fl'
, ., -.;., . ,. ~ I~
~~~-~~. c:.:hl~ l
"" ...... j~~~';'iz4,
KEY PLAN
r---
I
.~
,,;F
;,.; ./
. 1 ----:;
I
; !
'-l'ti
.~
.;.
PROPOSED RETAIL
15.500 SF
WOLFE ROAD
I~ ~~--"'
t;~~ ) ,:'~7. ~.~ ~ I
.-:.~ "">"__ ';y-' I
......'It>...r~. . '"", _ . ,.'. ~~ -- ... II
~<_~ _,...., f!f ... Q .: I
f[:~~~4--~' ~l ,I
~,":J'-J~~h~' '~'l)~ I
1j~tlb:.~:. .~.. f r:~ ~
. _.._ ~~~--t;: 1
KEY PLAN
JUNE 29, 2007
06,102.05
ENLARGED PLAZA PLANS
CUPERTINO VILLAGE
CUPERTINO, CA
DATE
REVISIONS
SHEET 10
@ MCG ARCHITECTS 2007 ALL RIGHTS RESERVED
NOTE: This Information Is conceptual In nature and Is subject to
adjustments pending further verification and cnent, Tenant, and
Governmental Agency approvaJ9. No warranties or guaranties of
any kind are given or implied by the Ardlftect.
I"V7 Kimco R~alty
~ COrpOratIOn
EXISTING BUILDING
18,387 SF
WOLFE ROAD
~.;' .~~ '"-z::-~:: 1
1~>~"~~. ~.r~~ I
- -~... ~~~. ---~;.~ :
'~.'Q.:!...~~~.;I .~.. I
r~'~[i ~~.\' P:-' r- z-~ :~, 'i~
~.~~ ;.,~..tPi ~~.~ ~p--;; 1'i:J. ~
,;.:;;-~.. ~y~~.~~:'::;
KEY PLAN
}lE;W r~lk
" ~E;1JJ OJ~1Q ~tm<.1
. }:;U5~l;:ti \
OPAQUE RICE
PAPER LANTERN
ln
METAL COLUMN
WITH TRIM
PEDESTRIAN GATEWAY
PROPOSED ENTRY LANTERN
DATE:
MCG JOB #:
JUNE 29, 2007
06.102.05
SITE ELEMENTS
CUPERTINO VILLAGE
CUPERTINO, CA
SHEET 11
DATE
REVISIONS
rv7 Kimeo R~alty
~ CorporatIOn
@ MCG ARCHITECTS 2007 All. RIGHTS RESERVED
NOTE: This InformatIon is conceptual In natUra and Is subject to
adjumnents pending further verificatjon and CfllIl1l. Tenant. and
Governmental Agency approvals. No warranties or guaranties at
any kind are given or implied by the Archnect.
,
,
I
;'
'. .,,' It '~'J.l. 'Ii
. ...." /f"-;~ .1,
1/!i,f" ",,:, , ,. , '
"-!-.~...' .' r <
.~F l
~'
, l'
'. ( l'
p~ " .1lt
'-0
.....
"
"
,
'^
"
.....
"
"
,
@