CC Resolution No. 99-051RESOLUTION NO. 99-051
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
APPROVING CONTRACT CHANGE ORDER NO. 2 FOR STEVENS CANYON
ROAD STORM DRAiN & RETAINING WALLS, PROJECT 98-110
RESOLVED by the City Council of the City of Cupertino, California, that
Change Order No. 1 for changes to work which has been approved by the Director of
Public Works and this day presented to this Council, be, and it hereby approved in
conjunction with the project known as
STEVENS CANYON ROAD STORM DRAIN & RETAINING WALLS,
PROJECT 98-110
BE IT FURTHER RESOLVED that funds are available and no further
appropriation is necessary.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 16~' day of February, 1999, by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAiN:
BURNETT, CHANG, JAMES, STATTON, DEAN
NONE
NONE
NONE
ATTEST:
City Clerk~~
APPROVED:
Mayor, City of~upertino
City Hall
10300 Torre Avenue
Cupertino, CA 95014-3202
(408) 777-3354
FAX (408) 777-3333
PUBLIC WORKS DEPARTMENT
STEVENS CANYON ROAD STORM DRAIN & RETAINING WALLS,
PROJECT 98-110
CONTRACT CHANGE ORDER NO. 2
Contractor
Anderson Pacific Engineering Construction
1390 Norman Avenue
Santa Clara, California 95054
The following changes are hereby approved:
2A. Construct grade bean for bollards-dowel both ends to
connect to headwall; backfill front of grade bean with riprap
boulders; match exterior creek bed
2B. Reconstruct headwall footing per revised plan or engineer's
instruction
2C. Protect headwall from erosion by placing filter fabric & riprap
2D, Remove loose dirt & smooth cut slope on northerly side of
headwall
2E. Place additional rip rap and hydroseed
2F. Repair exterior 84" storm drain pipe to prevent collapse of Bubb
Road at Regnart Creek; shotcrete bottom of pipe, repair voids
Total Change Order No. 2
Total Project:
Original Contract $ 424,000.00
Change Order No. 1 CREDIT (94,308.36)
Change Order No. 2 64,516.38
Revised Contract $ 394,208.02
$ 3,762.64
2,764.80
11,649.60
4,099.09
14,949.60
27,290.65
$64,516.38
CONTRACTOR
CITY OFCUPERTINO
Title
Date
Bert J. Viskovich
Director of Public Works
City Council: February 16, 1999