Loading...
CC Resolution No. 99-051RESOLUTION NO. 99-051 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO APPROVING CONTRACT CHANGE ORDER NO. 2 FOR STEVENS CANYON ROAD STORM DRAiN & RETAINING WALLS, PROJECT 98-110 RESOLVED by the City Council of the City of Cupertino, California, that Change Order No. 1 for changes to work which has been approved by the Director of Public Works and this day presented to this Council, be, and it hereby approved in conjunction with the project known as STEVENS CANYON ROAD STORM DRAIN & RETAINING WALLS, PROJECT 98-110 BE IT FURTHER RESOLVED that funds are available and no further appropriation is necessary. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 16~' day of February, 1999, by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAiN: BURNETT, CHANG, JAMES, STATTON, DEAN NONE NONE NONE ATTEST: City Clerk~~ APPROVED: Mayor, City of~upertino City Hall 10300 Torre Avenue Cupertino, CA 95014-3202 (408) 777-3354 FAX (408) 777-3333 PUBLIC WORKS DEPARTMENT STEVENS CANYON ROAD STORM DRAIN & RETAINING WALLS, PROJECT 98-110 CONTRACT CHANGE ORDER NO. 2 Contractor Anderson Pacific Engineering Construction 1390 Norman Avenue Santa Clara, California 95054 The following changes are hereby approved: 2A. Construct grade bean for bollards-dowel both ends to connect to headwall; backfill front of grade bean with riprap boulders; match exterior creek bed 2B. Reconstruct headwall footing per revised plan or engineer's instruction 2C. Protect headwall from erosion by placing filter fabric & riprap 2D, Remove loose dirt & smooth cut slope on northerly side of headwall 2E. Place additional rip rap and hydroseed 2F. Repair exterior 84" storm drain pipe to prevent collapse of Bubb Road at Regnart Creek; shotcrete bottom of pipe, repair voids Total Change Order No. 2 Total Project: Original Contract $ 424,000.00 Change Order No. 1 CREDIT (94,308.36) Change Order No. 2 64,516.38 Revised Contract $ 394,208.02 $ 3,762.64 2,764.80 11,649.60 4,099.09 14,949.60 27,290.65 $64,516.38 CONTRACTOR CITY OFCUPERTINO Title Date Bert J. Viskovich Director of Public Works City Council: February 16, 1999 Resolution No. 99-051