08070027 CITY OF CUPERTINO .�. - ��« Ax �- 1 k ' �.- -
•
BUILDInGDIVISION PERMIT C01VTR4GT(1RI •
NFQ„ MACIf3 ,,`
BUILDING ADDRESS: PERMIT NO.
1.0531. STOKES AVE TBD — TO BE DETERMINED 08070027
OWNER'S NAME: PERMIT L4UEDATE
WONG SIDNEY S AND DORIS S • 07/03/2008
*NE: SANITARY NO. CONTROL NO.
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
C O O C
U00LICENSED CONTRACTOR'S DECLARATION Job Description
0
iw C I hereby affirm that I am licensed under provisions of Chapter 9(commencing
w withSecdon7q10)ofDivision3oftheBusinessandProfessionsCode.andmylicenseis REPLC WNDWS, CUTTNG DWN 3 WNDWS TO MT EGRESS
n H in full forte an effect.
,i2 F. uaens.pa Cuctt�LConta 1� GORE HOME EXTERIORS PDY FOR BUS LIC 7/3/4
E p Dale Et 1, jny Contractor Artier Ludo•.Y/%
W ARCHITECT'S DECLARATION
I understand my plans shall he used as public retort .
5yEft
o Licensed Professional
LI 3 OWNER-BUILDER DECLARATION
1 hereby affirm that I am exempt from the Contractor's License Law far the
-O O following mason.(Section 7131.5,Business and Professions Code:Any city or county
2 which requires a permit to convect alter,improve.&mulish,or repair any struck=
-m prior to its issuance,also requires the applicant for such permit to fileeaa signed nommen
ss C that he is licensed Section
7 )of
of the Contractor's snd Professions Code)or
e F 19 that he is exempt therefrom and the basis for the alleged exemption Any violaaon of
Section 7031.5 by any applicant fora permit subjects the applicant to a civil penalty ofNumber Occupancy Type
more than five hundred dollars(55001 32648033 .E P Y
0 I,as owner of the property.or my employees with wages as their sole compensation.
will do the work and the structure is not Intended or offered for sale(Sec.7044,Business
and Professions Coda The Contractor's License Law does not apply to an owner of Required Inspections
property who builds or imprints thereon.and who does such work himself or through his
own employees,provided that such impmvements are not intended or offered for sale.If.
however.the building or improvement is sold within one year of completion.the owner-
builder will have the burden of proving that he did not build or improve for purpose of
sak.). •
❑I.as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044.Bucinas and Professions Code)rhe Contractor's Li-
cense Law does not apply to an owner of property who builds or improves thereon,and
who contracts for such projects with a conuaem(s)licensed pursuant to the Contractors
Licenm Law.
lam exempt under Ss .B&PC for this mann
Owner Dam
WORKERS COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a Certificate of Consent to self-insure for Worker's Compen-
ation,as provided for by Section 3700 of the Labor Code.for the performance of the
work for which this permit is issued.
❑I have and will maintain Worker's Compensation Insurance,as required by Section
3700 of the Labor Code,for the performance of the work for which this permit is issued. '
My Worker's/ Compensation Insurance carrier and Policy number axe:
Canier:J inrn l9 0-e n Policy No:6 f.✓CCOpc v a
CF IFICATE OF EK FIEON FROM WORKERS'
COMPENSATION INSURANCE .
(This section need not heconpleted if the permit Is for onehundmd dollen($l00)
or less)
1 certify that in the performance of the work for which this permit is issued.I shall not
employ any person in any manner so as to become subject to the Worker'Compensation
Laws of California.Date
Applicant
NOTICE TO APPLICANT:If,after making this Certificate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Cade,you must
.,Z forthwith comply with such provisions or this permit shall be deemed invoked.
'Z”" CONSTRUCTION LENDING AGENCY
Ei i. I hereby,(lino that there is a construction lending
Xpermit issued(Sec.3097,Civ.C.)
the work for which thisfor agency the performance of
bra 6 Lender's Name
=z Lender's Address
V 0 I certify that I have read this application end state that the above information is '
D. F coram I agree to comply with all city and county ordinances and state laws relating to
•0 it, shovebuildi-memo"" red property(or nspection puremby author= poses uuvea of Nu city to enter upon the
0. (We)agree to save,indemnify and keep harmless the City of Cupertino against i '
▪ fA liabilities,judgments,cos and expenses which may in any way accrue against said City
vz in consequence of the granting of this permit
F-, APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: w.� t i1�l1// Date 7-3- 09
SOURCE REGULATIONS.
Re-roofs 0 //
Sig tare of "(ilium/Co ' r am ✓ I.(
HAZARDOUS MATERIALS DISCLOSURE Type of Roof e
Will the applicant or future building occupant store or handle hazardous material •
as defined by the Cupertino Municipal Code.Chapter 9.12,and the Health and Safety
Code, es25s32(a)?
DTon JPJ'No All roofs shall be inspected prior to any roofing material being installed.
If a roof is installed without first obtainingan inspection,I agree to remove
Will the air coat or aurum building occupant use equipment or devices which P g
it Avardnes air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection.
District?
❑Yes t io
I have mad the hazardous materials requirements under Claimer 6.95 of dm Califor-
nia Health&Safety Code,Sections 25505.25533 and 25534.1 undersand that if the building
does not currently hate a tenant.that it is my responsibility to notify the scup nt of the
requirements which,. be 'tau - of a Catifcate of• yc•
Signature of Applicant Date
-.111'� t ' U
Ow ear authorized agent Date All roof coverings to be Class'73"or better
�
o e2 "4{ (ou,,,,,
0,07 00,7
L.— CITY OF CUPERTINO
I OF .
• CUPERJiNo GENERAL BUILDING
PERMIT APPLICATION FORM
APN# Date:
3a 6. qi c). 3. `7� v�
Building Address: / 5 J / s-(---o) CAA/42 )
A1/ 2 ) 6,1 peri'nor Cy
c 5—C3/ 4-/ "iz3i(
Mailing Address (if different from building address):
Owner's Name: / I Phone#:
Contractor: G,o-re_ t-KMQ- 1a.X--e rifyir.3 Phone: 9 i& ,G 52— !l3r-
Fax: •
Contractor License#: etc', -2�(
Cupertino Business License #:
Contact: Phone:
• Fax:
• Residential g Commercial Li ,
Job Description: • I � . .
RQ Gl1r 1un _�_ LJ,.�v 1� 1 6_,,,,i-c:,1 v� be, vn ..-S
J irJo-vS
1 l as lVt�-1
Building Permit Info: (� v
Bldg El Elect ❑ Plumb 0 Mech 0 _
Type of Construction(Usage Class): Occupancy Type:
1-A, 1-B ❑ II/III/V-A ❑ II/III B, IV-HT, V-B 2 S p .Q
Valuation: JSquare Footage:
7,7 '7/ •
Project Size: Express ❑ Standard 14 Large ❑ Major ❑
Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it
to the application or if applicable, include in plan set& the sheet index.
Points Achieved: /
• For help, contact Build it Green at www.builditgreen.org 7�'
�" Revised 6/16/08
•
•
CITY OF CUPERTINO
OF
CUPEIINO GENERAL BUILDING
PERMIT APPLICATION FORM
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
1GENCOM
1BTEMPPER Temporary Building Permit (good for B
30 days)
1BBOILER1 For the installation or relocation of ea M
boiler/compressor to & including 3
horsepower, or ea absorption sys to &
incl 100,000 Btu/h (29.31(w)
1BBOILER2 Installation/relocation of ea M
boiler/compressor over 3 horsepower
to & incl 15 horsepower, or ea
absorption sys over 100,000 Btu/h
1BBOILER3 Installation/relocation of ea M
boiler/compressor over 15 horsepower
to & incl 30 horsepower, or ea
absorption sys over 500,000 Btu/h to
& incl 1,000,000 Btu/h •
1BBOILER4 Installation/relocation of ea M
boiler/compressor over 30 hosepower
to & incl 50 horsepower, or for ea
absorption sys over 1,000,000 Btu/h to
& incl 1,750,000 Btu/h
1BBOILER5 Installation/relocation of ea boiler or M
refrigeration compressor over 50
horsepower, or ea absorption sys over
1,750,000 Btu/h
1BAPPLOTH For ea appliance or piece of equip M
regulated by this Code but not classed
in other appliance categories, or for
which no other fee is listed in this
code.
1ELECINSP Other Electrical Inspections (per hour) E
1MECHINSP Other Mechanical Inspections (per M
hour)
1 PLMBINSP Other Plumbing & Gas Inspections P •
(per hour)
1MEETING1HR Application Meeting B
• ,( CITY OF CUPERTINO
�'TMOF GENERAL BUILDING APPLICATION
• CUI ICIINO
• FEE SCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
• 1GENCOM
ACOUSTICAL •
REVIEW
1ACOUSFDW SFDWL/Duplex New B
1ACOUSRESAD SFDWL/Duplex-Addition/Alteration B
1ACOUSCOM Multi-Family/Commercial B
CHIMNEY'S
1 CHIMNEY Chimney B
1 CHIMNEYR Chimney Repair B
FENCES
•
• 1 FENCE>6FT Non-masonry, over 6 ft in height B
1 FENCEMAS>6 Masonry, over 6 ft in height B
FIREPLACES
1FIREPLMAS Fireplace Masonry B
1FIREPLFAB Fireplace Pre-Fabricated/Metal B
1 FLAGPOL>20 Flag pole (over 20 ft in height) B
I MODUSTRU Modular Structures B
FOUNDATIONS
1FOUNDREP Foundation Repair B
1PILECAST Pile Foundation Cast in place concrete B
I PILEDRIV Pile Foundation Driven (steel,pre- B
• stressed concrete)
3 of 5
CITY OF CUPERTINO
cuki TING
GENERAL BUILDING APPLICATION
FEE SCHEDULE •
Quantity/Sf Fee ID Fee Description Fee Permit Type
Group 1GENRES or
• IGENCOM
RETAINING
WALL(CONCRETE
OR MASONRY)
1RETSTN Standard (up to 50 ft) B
1RETSP310 Special Design, 3-10' high (up to 50 `) B
1RETSP10 Special Design, over 10' high (up to B
50')
1RETCRB< Gravity/Crib Wall, 0-10'high (up to B
50 ft)
1RETCRB> Gravity/Crib Wall over 10' high(up to B
50 ft)
SIDING
1SIDEST/BK Siding, Stone &Brick Veneer B
(interior/exterior) •
1SIDEOTHER Siding all other B
SKYLIGHTS
ISKYL<10 SF Skylight less than 10 sf B
1 SKYL>10SF Skylight greater than 10 sf or B
structural
1STAIRS Stairs-first flight/ea addt'l B
STORAGE RACKS
1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B
1SRACKS>8 Storage Racks over 8' high (up to 100 B
st)
ISTUCOAP Stucco Applications (up to 400 sf) B
additional stucco application
•
4 of 5
CITY OF CUPERTINO
°F GENERAL BUILDING APPLICATION
cu4i(fiNO
• FEE SCHEDULE
Quantity/Sf Fee ID Fee Description Fee Permit Type
• Group 1GENRES or
1 GENCOM
1 WINREP Replacement windows/sliding glass B
door (ea 8 windows)
1 WINMEWSTR New Window-structural shear B
wall/masonry(includes plan ck fee)
1EPERMITFEE Electrical Permit Fee E
1 MPERMITFEE Mechanical Permit Fee M
1PPERMITFEE Plumbing Permit Fee P
1ELCPLNCK Stand Alone Electric Pln Ck (hourly) E
• 1MECPLNCK Stand Alone Mechanical Pln Ck(hrly) M
1PLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P
1 STPLNCK-(3 Hr Min Standard Plan Check (when no E/M/P) B
when not over counter) hourly-stand alone
1BSEISMICR Seismic Residential B
1BSEISMICO Seismic Commercial B
/ 1TRAVDOC Travel &Documentation B
1BUSLIC Business License B
5of5
•
Green Building Plan Check
•
Index of Green Building Points/Categories
• A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
fri 'F.a C§?; r _ m..a :; r'4 ? ' Vi) 4 .. 1 , 4`Ml;n. :i' i. ,-..-.7::::,:r..
B. Site 9. Install H.E. Irrigation, (details/spec)" L-1 2 points
11. Permeable Paving, (Note) L-1 2 points _
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) 5-2 2 points
6. B. OSS Sheathing, (detail) S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec.) A-4 2 points _
F. Plumbing i. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal.Tank, (Note/Spec) L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec.) _ A-3 1 point
P. Other 1. List Green Features on Plans 4.4/- point
.-"s,..'�„ tae ,.2s TOTAL POINTS n40 points
•
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points°value to a project to be considered environmentally friendly is
• not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen baked upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening°your project. .
INPUT Resources Energy IAQIHealrh
A.Site
11.Recycle Job Site Construction&Demolition Waste 1
65%=1 point;75%= 2 points;B0%=4 points up to 4 Resource pts
0
I2.Salvage Reusable Building Materials _ i 4 Resource pts y=yes 0
• 3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0 •
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes . 0
CDesign Resource-Efficient Landscapes and Gardens 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials •
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 1 0
0 0 0
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes— 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
0 0 0
C.Structural Frame
It.Substitute Solid Sawn Lumber with Engineered Lumber 117 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
. 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes _ 0
B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPs)
• a.Floors . 3 Energy pts y=yes 0
b.Wall • 3 Energy pts y=yes
0
c.Roof 3 Energy pts y=yes • 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
12.UseOSB — -- — — .
a.Subfloors 1 Resource pt y=yes 0
• I b.Sheathing t
L . .. . _ -._ _ ___ 1 Resource pt y=yes 0
Q - -- 0, 0
' INPUT Resources Energy IAQiHealth
I.Exterior Finish
.Use Sustainable
1Decking Materials
a.Recycled content 3 Resource pts y=yes— 0 •
b.FSC Certified Wood ' 3 Resource pts y=yes— 0
'2.Use Treated Wood That Does Not Contain Chromium/Arsenic ' 1 IAD/Health pt y=yes 0
13.Install House Wrap under Siding 1 IAD/Health pt y=yes_ 0
4.Use Fiber-Cement Siding Materials I 1 Resource pt y=yes 0 .
0 0 0
E.Plumbing •
•
1.Install Water Heater Jacket
____.__—_..J
CEnergy Pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) 1 Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. .0
4.Replace Toilest with Ultra-Low Flush Toilets I
(1 point each,up to 3 points) _ _ ( Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
•
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAD/Health pts. 0
8.Install On-Demand Hot Water Circulation Pump 4 Resource pts yryes 0
0 0 0
r.tiectncal
I1.Install Compact Fluorescent Light Bulbs(CFLs) • •
(6 bulbs=2 paints,10 bulbs=3 points,12 bulbs=4 points) i Up to 4 Energy pts. 0 •
- 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to •
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
0 0 0
G.Appliances •
1.Install Energy Star Dishwasher f 1 Energy pt y=yes I— 0
2.Install Washing Machine with Water and Energy • i
Conservation Features , 1 Energy pt y=yes 0
3.Install Energy Star Refrigerator 1 1 Energy pt y=yes— 0
`4_Install Built-In Recycling Center 3 Resource pts y=yes_ 0
0 0 0
H.Insulation .
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings . 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 •
'Kin-kill Recyoled-0oriterit,Fiberglass Insulation witI — ,
INo Added Formaldehyde _ i 3 IAD/Health pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes • 0
b.Ceilings 4 Resource pts y=yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes • 0
D.i elings 4 Resource pts y=yes 0
• o . 0 . . 0
IIII INPUT Resources Energy IADiHealth
' I.Windows
1.Install Energy-Efficient Wiridsws . -
• II a.Double-Paned • 1 Energy pt y=yes 0
b.Low-Emissivity(Low-E) 2 Energy pts yryes 0
c.Low.Conductivity Frames _ 2 Energy P is Y yes 0
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes D
0 0 0
J.Heating Ventilation and Air Conditioning
ft-Use Duct Mastic on All Duct Joints - _ _ _1 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes D
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
8.Install Sealed Combustion Units -
a.Furnaces 3 IAQ/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/1I EER or higher AC with a DCV 3 Energy pts y=yes 0
11,Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
•
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0
b. Insta VReplace Dampers 1 Energy pt y=yes 0
c. Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 IAQMealth pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAD/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 .
0 0 0
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
I .Seellect Safe and Durable Roofing Materiels 1 Resourcept 0
- — — — - — -- --- - —_. _ _ Y=Yes
7.Install Radiant Barrier 3 Energy pts y=yes 0
0 0 0
L.Natural Heating and Cooling -
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pis . y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
0 0 0
0
•
INPUT Resources Energy IAQ/Health
�.Indoor Air Quality and Finishes
r1.Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 •
3.llse Lowi o Vb 'Adhesives _ 3 IAC/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IAQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQMealth pts y=yes 0
17.Seal all Exposed Particleboard or MDF 4 IAQMealth pts y=yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes • 0
10.Install Whole House Vacuum System 3 IAQMealth pts y=yes 0
0 0 0
N.Flooring •
1.Select FSC Certified Wood Flooring B Resource pts y=yes 0
L.Use Rapidly Renewable Flooring Materials _ _ , 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
•
o o o
•
Total Points Available: 1401 1301 57
Total Points Project Received: 01 01 0 •
•
G:data/progs/greenbuildngguidelins/renodzlersigreenpointsnna12.12.04protectelds
•
•
CITY OF CUPERTINO
• 4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: patg
COPY # : 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN • 32648033 . 00
DATE ISSUED • 07/03/2008
RECEIPT # • BS000005336
REFERENCE ID # . . . : 08070027
SITE ADDRESS • 10531 STOKES AVE
SUBDIVISION
CITY • CUPERTINO
IMPACT AREA
OWNER • WONG SIDNEY S AND DORIS S
ADDRESS • 10531 STOKES AVE
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-1234
RECEIVED FROM • GORE WINDOWS & DOOR
CONTRACTOR • TBD - TO BE DETERMINED LIC # 00096
COMPANY • TBD - TO BE DETERMINED
ADDRESS
CITY/STATE/ZIP ,
TELEPHONE
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
1BSEISMICR VALUATION 7, 476 . 00 0 . 80 0 . 00 0 . 80 0 . 00
1BUSLIC FLAT RATE 1 . 00 110. 00 0 . 00 110 . 00 0 . 00
1TRAVDOC FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
1WINREP EACH 8 1 . 00 367 . 00 0 . 00 367 . 00 0 . 00
TOTAL PERMIT : 518 . 59 0 . 00 518 . 59 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
CHECK 518 . 59 #7909
TOTAL RECEIPT : 518. 59
•
RECTheitk
la
J(/1 3 /Jla
mGS =.-i
6711.
I. Nti�. ` I
Y \plc La— I. �rcx�✓�l K
�e SSS (, (aeckrr,rn tel- , Ad, VED. off
F U Il 3�' N ACCORDANCE WITH THE
CRY U;,eNuh GUPERTINO CODES AND ORDINANCES
!� p yU(7YM .Z-P 0----------
. UUse
'3ea�`� c ,IGNEU lans andnotio1n un
o G t. (his o the lob at (o, alteration
Ix 3 i'. �n } _ �e kepto make ut t changes of
Iron
I I' without written permission
it "` 7 n same , Dept., City of Cupertino.
ne buildmp of this p'-n end specification
. J the stamping 1c nc mit o t., be e'
t HALL NOT be hed en V1.0 uts
oproval of me violation
31�U(7Y'�\ F n^^ ha'
ISS 3l S Ips �..�� GUr�� C4 .,
1SUl-/- 123�i
ct
\' ocir
s
• • • ..
Driving Directions from 10300 Torre Ave, Cupertino, CA to 10531 Stokes Ave, Cupertin... Page 1 of 2
•
•
MA I \p a u .rte irm Sorry!When printing directly from the browser your directions
or map may not print correctly.For best results,try clicking
the Printer-Friendly button. t"
10300 Torre Ave sn 10531 Stokes Ave
Cupertino, CA 95014-3202 Cupertino, CA 95014-1234
Total Estimated Time: 5 minutes Total Estimated Distance: 2.15 miles .)
• Directions from A to B:
1: Start out going WEST on RODRIGUES AVE toward S DE ANZA.BLVD. 0.2 mi
4 2: Turn RIGHT onto S DE ANZA BLVD. 0.3 mi
4 3: Turn LEFT onto STEVENS CREEK BLVD. 1.1 mi
4 4: Turn RIGHT onto PENINSULA AVE. 0.3 mi
4 5: Turn LEFT onto DEMPSTER AVE. • 0.3 mi
O6: DEMPSTER AVE becomes STOKES AVE. • 0.0 mi
ird 7: End at 10531 Stokes Ave Cupertino, CA 95014-1234 r
• Estimated Time: 5 minutes Estimated Distance'2.15 miles
Total Estimated Time: 5 minutes Total Estimated Distance: 2.15 miles
•
•
••
•
-
hftp://www.mapquest.com/maps?lc—Cuperti no+&1 s=CA&1 a=10300+Torre+Ave&1 z=950... 7/2/2008
Community Development
10300 Torre Avenue
E 5' Cupertino CA 95014
Telephone(408)777-3228
CITY F INO Fax(408)777-3333
•U
Building Department
All Cupertino building permits must meet certain conditions related to maintaining
environmental quality and public peace and safety. The two most common
conditions are described below.
Rigerwen
STORMWATER POLLUTION CONTROL JUL 03108
State law requires that Cupertino, 12 other Silicon Valley cities, Santa Clara County and
the Santa Clara Valley Water District contM;litorr wale .pytlutien. Educating local
residents and businesses and enforcing stormwater pollution control laws are key parts
of the City's compliance efforts.
Stormwater pollution prevention: It's up to us
In northern Santa Clara Valley, storm drains flow directly to local creeks and San
Francisco Bay, with no treatment. Stormwater pollution is a serious problem for wildlife
dependent on our waterways, for people living near streams and baylands, and for the
local water supply. Common sources of stormwater pollution include:
• Dripped oil, fuel, and antifreeze from vehicles and heavy equipment;
• Construction debris, including dirt, concrete and paint;
• • Landscaping runoff containing pesticides or weed killers; and
• Any material dumped or spilled into streets or storm drains . •
The property owner and the contractor share ultimate responsibility for activities
occurring at a construction site and will be held responsible for any environmental
damage caused byrsubcontractors or employees.
For more informatio o .con tFu ttonrel to Stormwater requirements, see the�� n � to Alf it �, ,
Stormwater Qualityrkeguht�origsectionthe City-ofiCupertino web site at:
http://www.cluieVtirtb.cli-criciWzboterrimentidebartments and offices/
environmental services
COMMUNITY NOISE CONTROL
The basic noise control requirements for construction sites are as follows:
• Typical construction work hours are: .
- Weekdays - 7 a.m. to 8 p.m.
- Weekends - 9 a.m. to 6 p.m.
• Construction other than street construction is prohibited on holidays.
• Residential daytime noise levels from complaint site - 60 dBA
• Nonresidential daytime noise levels from complaint site - 65 dBA
For, more information on noise control, please see Chapter 10.48 of the Cupertino
Municipal Code, which can be accessed at http://www.amleeal.com/cupertino ca/
•
Greg Casteel
Building Official
• t • •
tonf .\ 1
_A-S
hiLi - h1QS,4 h7 nit-Jac -9 -am° ca'I"i-S iLs01
�Q� r . 1
4 L
\ /--_ _.Q.,s n -1
.,, 0
-�rr�✓hh
J •
0 u4• (I C • ,yid l d t''nm,1 a , cz.,
E lk-d ssa&T) ,
—k-51. .lad\
i I I_Aacnira`V --inhldal
perk5lOW