0806002202
_Z C
F
4 C
UC
UC
CL
U
F4
Uz
CITY OF CUPERTINO�.arpw�
BUU.DINCIDIVISION- PERMIT
^%CONTRACTOWINk',-ORMATTIQN
..„.
BwLp/Igc�,D�NDHAL LN
SHADYGROVE CONSTRUCTION
PERMIT N0.
08060022
OWNER'S NAME:
PERMIT ISSUE DATE
I.mAVINE THEODORE L AND WINICK
P 0 BOX 700325
06/03/2008
NE:
SANITARY NO. CONTROL NO.
(408)252--3500...
ARCHITECT(ENGINEER:
BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
Q (�
LICENSED CONTRACTOR'S DECLARATION
Job
Description
i
Rmthul tdunProvdocnerofChaaptes9(mmmeme
with Section 70)of Division 3ofhe Business and PaoCode. and myseisRPR
EXSTNG EXTER SDNG&DR TO CRRCT WTHR DMG ON W
`nlInnlrlgroleeam err Lk a 20
SIDE HSE
Dale Comracmr
ARCHITECTS DECLA ON
I understand my plarss shall be used! u PUMA mn=1
Liceued Professional
OWNER -BUILDER DECLARATION
1 hereby alarm Nat 1 am exempt from the Contractor's License Law for the
following mason. (Scedon RD 1.5. Business and Profrssiuna Code: Any city or county
which counts a permit t0 construct. alter. improve. demolish, nr mfoir any someone
! prior no its issuance, also mquiles IM applicant for such permit to Bk aligned saamcnt
that be is llccved o the, of the Contrxsr's License, Law(Otspsr9
Sq. Ft. Floor Area
Valuation
Pursuant provisions
$4000
(commencing with section 7000) ofDivision 3 of the Business and Professions Code) or
that he is exempt therefrom and the hubs for the alleged eurept on. Any violation of
Section 7031.5 by may applicant fora permit wbjccu the applicant 10 a civil penally of
37540029.E Number
Occupancy (:
P yT'P
not more Nan Ew hundred dollars (SM
❑ I.uowner o(Ne property,mmY employcu wish wagerer Neksokcompewdon,
Required Inspections
will de the work, and the structure ta Out imemk d..ffcred for sate (Sm. 30th, Business
and Prefessions CO. The Contractor's License Law does m1 appy 0 an owner of
Property who builds m im prow thereon, and who doer such work himself or through his
own employees, provided that such impmwmmu are nu intended oraRaW forale. H.
limews, the building or improwmer, lasold within one year of completion, the owner -
Wilder will have the, hnrdm of proving that he did no, Ntild or improve for purpose of
ask I.
❑ 1, as owner of the propcny am exclusively contracting with licensed contractors in
mutmct use pmlen (Sec. 7W. Business and Protestations Cade:) The ConeacmYs U.
.
cousin Law tinea not eppty in an owner of progeny who builds or improv thereon. and
who contracts for such projects with a contractor(s) licensed pursuant m the Contractor's
'
License law.
C]i am aempl under Sot. , B At P C for this moon
Owner Das
WORKERS COMPENSATION DECLARATION
thereby aQine under penalty of Perjury ane of thefollowing doolaratiomu:
t0I
m m1
had will inuln a Cmfiamdm of Consent relf-iuum for Worker's Compen.
n. as provided for by Secdon 3700 or the labor Code, fm our performan. of the
were for which this permit is issued.
O 1 have and will maintain Workers CompemNo r Insurance, as re sifted by Section
3700 of the lather Cade, fear the performance of the work forwhich this Permit u Issued.
My Work .Com tion lours”. artier sed Poliry numberam:
Carrier. Policy No.:
C MCATE OF EXEMPTION FROM WORKERS
COMPENSATION INSURANCE
'
(Dau auction need motion completed if ere Peril Is Twos hundrnd dollars (SIM)
nr kis)
1 certify unit in Ne Pmformerce of the worts for which this Permit is issued. ) shall not
employ any,.n la NY trusser so M to been=Oft WO 'Comlemnine
Laws of Califomia. 4
Applicant n
NOTICE TO AP Laclks�iiakmZlhu as of Glialopffo . yo ould
become subject m the Workeri ComNosation provisions of Ne labor C dc. you most
fnrlhwith camplY with such Providau m Nu permit Nil he doomed mwkcd.
CONSTRUCTION LENDING AGENCY
1 hereby affirm that Here u • construction knding agency for IM Portfolio. of
the work for which this Permit b bound (Sec. 3091, Civ. C.)
Landers Namo
Lender's Address
1 certify that 1 haw read this application and sal that the chow information 0
toren. I agree to comply with all city and county ordinances and state laws Misting m
Wilding construction. arta hereby authorise Mpresenuum of this city to cow upon the
shove -mentioned property, for iupeetion purposes
(We) agree to saw, indemnify and keep hamrkss the City of Cupertino against
liabilities, judgments, costs and exp'"o-, which may in any way seems, againat said City
in consequence of the granting of this permit.
APPLICANT U DERSTANDS A b COMPLY WINON -POINT
/+
Issued b Date
SOUR U ATIONS. /.AtN�
y^
Re-roofs
/Sr&owUn
,7.
/
of AMIiaruContranor Das
HAZARDOUS MATERIA ISCLOSURE
�S
Type of Roof r
Win the applicant in future building eceupanldone or handle haondous material
W defmnd by the Cupertino Municipal Cade. Chapter 9.12. and the Health and Safcty
Code, Section 25332(a)?
❑Yu <�
�O
All roofs shall be inspected prior to any roofing material being installed.
Will due applicant or future building occupant use equipment at devices which
If a roof is installed without first obtaininginspection, I agree to remove
an ns P $
cF It ardnus air cnnuminanu u defined by the Bay Area Air Quality Management
all new materials for inspection.
C] Yes �Tu
I haw rod the huvdouamamriakmgnimmcnu under Chapter 6.95 ofNe Califor-
niaHalthh Safety Code, SecumnaMM5,25533 am12553. 1 undersand thatifthe Wilding
does cot curmnuY haw a wnamn all it u my fly In 0Oofy 000upant 0r' dr
Onpiremenawhi IPrimtn a e Ittaka
Signature of Applicant Date
All roof coverings to be Class '%I}." or better
Owner ormthmi.dagent cats
• 2 ITEMS OF 2
Ll
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:
APN ........: 37540029.00
DATE ISSUED.......: 06/03/2008
RECEIPT #.........: BS000004985
REFERENCE ID # ...: 08060022
SITE ADDRESS .....: 706 STENDHAL LN
SUBDIVISION .......
CITY .............: CUPERTINO
IMPACT.AREA .......
OPERATOR: patg
COPY # : 1
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
367.50
---------------
367.50
REFERENCE NUMBER
--------------------
VISA
OWNER ............:
LAVINE THEODORE L AND
WINICK L
ADDRESS ..........:
706 STENDHAL LN
CITY/STATE/ZIP ...:
CUPERTINO CA, 95014-4659
RECEIVED FROM ....:
THEODORE LAVINE
CONTRACTOR .......:
REED, STEVEN RYAN
LIC
# 12398
COMPANY ..........:
SHADYGROVE CONSTRUCTION
ADDRESS ..........:
P 0 BOX 700325
CITY/STATE/ZIP ...:
SAN JOSE, CA 95170
TELEPHONE ........:
(408)252-3500
FEE ID
----------
UNIT QUANTITY
-------------
AMOUNT PD -TO -DT
THIS REC
NEW BAL
1BSEISMICR
-----.-----
VALUATION 4,000.00
---------- ----------
.'0':50 0.00
----------
0.50
----------
0.00
1SIDEOTHER
SQ FEET 1.00
367:00 0.00
367.00
0.00
TOTAL PERMIT
---------- ----------
367.50 0.00
----------
367.50
----------
0.00
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
367.50
---------------
367.50
REFERENCE NUMBER
--------------------
VISA
•
•
•
CITY OF
CUPEkTINO
CITY OF CUPERTINO
GENERAL BUILDING
PERMIT APPLICATION FORM
Of°(.� 0002
APN # O 9
Date:
Building Address: —7C) (o S T C N 17 4AL. L A N
G,i p E T �Mo -c—A cj —o t y -
Mailing Address (if different from building address):
Owner's Name:
Ttte" tit L-A./ t ua=
Phone #:
G--08-?-0-1- h$8
Contractor:
Phone:
Fax:
Contractor License
Cupertino Business License #:
!2
Contact:C
Phone:
,Q� pp
'9 D L11AC Li2 A:6
l7
Fax:
Residential ZI Commercial
PLYWOOD
Job Description:
FLFP14rR of EXIST /NG ��cTc�Rlt .SFD 1NG p.ND DzoK
*TD c-o(tREcT LwJeftThtzA DA-MA&E ftra}—AFS ON WE -ST
5\'DE- �F tto�SE.
Building Permit Info:
Bldg Elect ❑ Plumb ❑ Mich ❑
Type of Construction (Usage Class):
Occupancy Type:
1-A, 1-B ❑ II/IIIN-A ❑ II/III B, IV -HT, V -B3
Valuation: Q ooa Square Footage: NQ r—H pr N G F
Project Size: Standard ❑ Large ❑ Major ❑
Revised 5/21/08
(C CITY OF CUPERTINO
CITYCUPEI,TINO GENERAL BUILDING
PERMIT APPLICATION FORM
Quantity/Sf
Fee ID
Fee Description
Fee
Permit Type
Group
1GENRES or
1GENCOM
1 BTEMPPER
Temporary Building Permit (good for '
B'
30 days)
1 BBOILERI
For the installation or relocation of ea
M
boiler/compressor to & including 3
horsepower, or ea absorption.sys to &
incl 100,000 Btu/h (29.3kw)
1 BBOILER2
Installation /relocation of ea
M
boiler/compressor over 3 horsepower
to & incl 15 horsepower, or ea
absorption sys over 100,000 Btu/h
1 BBOILER3
Installation/relocation of ea
M
boiler/compressor over 15 horsepower
to & incl 30 horsepower, or ea
absorption sys over 500,000 Btu/h to
& incl 1,000,000 Btu/h
1BBOILER4
Instal lation/relocation of ea
M
boiler/compressor over 30 hosepower
to & incl 50 horsepower, or for ea
absorption sys over 1,000,000 Btu/h to
& incl 1,750,000 Btu/h
IBBOILER5 •
Installation/relocation,of,ea boiler or;
M. ,
refrigeration compressor over, 50.
horsepower, or ea absorption sys over
1,750,000 Btu/h
1 BAPPLOTH
For ea appliance or piece of equip
M
regulated by this Code but not classed
in other appliance categories, or for
which no other fee is listed in this
code.
1 ELECINSP
Other Electrical Inspections (per hour)
E
1 MECHINSP
Other Mechanical Inspections (per
M
hour)
1PLMBINSP
Other Plumbing & Gas Inspections
P
(per hour)
1MEETINGIHR
Application Meeting
B
E
CITY OF
CUPEkTINO
CITY OF CUPERTINO
GENERAL BUILDING APPLICATION
FEE SCHEDULE
Quantity/Sf
Fee ID
Fee Description
Fee
Group
Permit Type
1GENRES or
1GENCOM
ACOUSTICAL
REVIEW
IACOUSFDW
SFDWL/Duplex New
B
IACOUSRESAD
SFDWL/Duplex-Addition/Alteration
B
IACOUSCOM
Multi-Family/Commercial
B
CHIMNEY'S
1CHIMNEY
Chimney
B
1 CHIMNEYR
Chimney Repair
B
FENCES
1FENCE>6FT
Non -masonry, over 6 ft in height
B
1 FENCEMAS>6
Masonry, over 6 ft in height
B
FIREPLACES
1 FIREPLMAS
Fireplace Masonry
B
1FIREPLFAB
Fireplace Pre-Fabricated/Metal
B
1FLAGPOL>20
Flag pole (over 20 ft in height)
B
1MODUSTRU
Modular Structures
B
FOUNDATIONS
1FOUNDREP
Foundation Repair
B
I PILECAST
Pile Foundation Cast in place concrete
B
'
1 PILEDRIV
Pile Foundation Driven (steel, pre-
stressed concrete)
B
3 of 5
SKI
CITY OF
CUPEkTINO
CITY OF CUPERTINO
GENERAL BUILDING APPLICATION
FEE SCHEDULE
I
Quantity/Sf
Fee ID
Fee Description
]Fee
Group
Permit Type
1GENRES or
1GENCOM
RETAINING
WALL(CONCRETE
OR MASONRY
1 RETSTN
Standard (up to 50 ft)
B
IRETSP310
Special Design, 3-10' high (up to 50 `)
B
1RETSP10
Special Design, over 10' high (up to
50')
B
1RETCRB<
Gravity/Crib Wall, 0-1O'high (up to
50 ft)
B
1RETCRB>
Gravity/Crib Wall over 10' high (up to
50 ft)
B
SIDING
1SIDEST/BK
Siding, Stone & Brick Veneer
(interior/exterior)
B
(
1 SIDEOTHER
Siding all other
. B
SKYLIGHTS
1 SKYL<10 SF
Skylight less than 10 sf
B
—
1 SKYL>10SF
Skylight greater than 10 sf or
structural
7T
1STAIRS
Stairs -first flight/ea addt'l
B
STORAGE RACKS
1 SRACKS<=8
Storage Racks 0-8' high (up to 100 sf)
B
I SRACKS>8
Storage Racks over 8' high (up to 100
st)
B
1STUCOAP
Stucco Applications (up to 400 sf)
additional stucco application
B
4of5
•
E
CCt J
CITY of
• CUPEkTINO
CITY OF CUPERTINO
GENERAL BUILDING APPLICATION
FEE SCHEDULE
Quantity/Sf
Fee ID
Fee Description
Fee
Group
Permit Type
1GENRES or
1GENCOM
1 WINREP
Replacement windows/sliding glass
door (ea 8 windows)
B
1 WINMEWSTR
New Window -structural shear
wall/masonry (includes plan ck fee)
B
1 EPERMITFEE
Electrical Permit Fee
E
1 MPERMITFEE
Mechanical Permit Fee
M
I PPERMITFEE
Plumbing Permit Fee
P
1 ELCPLNCK
Stand Alone Electric Pln Ck (hourly)
E
1 MECPLNCK
Stand Alone Mechanical Pln Ck (hrly)
M
1 PLMBLNCK
Stand Alone Plumbing Pln Ck (hrly)
P
1 STPLNCK-(3 Hr Min
when not over counter)
Standard Plan Check (when no E/M/P)
hourly -stand alone
B
I
1BSEISMICR
Seismic Residentia 1
B
1BSEISMICO
Seismic Commercial
g
1TRAVDOC
Travel & Documentation
B
1BUSLIC
Business License
g
•
5 of 5
•
Plan Review Process Work Book Page -12-Revised 3/25/08
,JUN 0 31009
4
Green Building Plan Check
Index of Green Building
Points/Categories
A.
Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B.
Site
9.
Install H.E. Irrigation, (details/spec)'
L-1
2 paints
11.
Permeable Paving, Note
L-1
2 points
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S-1
5 points
D.
Structural
3.
Uses Wood I -Joist, (See Spec.)
S-2
2 points
5.
Use Truss with heels, (detail)
S-2
2 points
6.
B. OSB Sheathing, detail
S-2
2 points
E.
Ext. Finish
1.
Composite Decking, (Note/Spec.)
A-3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all H.W. pipes, (Note/Spec.)
P-1
2 points
5.
Tankless W.H., (Note/Spec.)
A-2
2 points
11.
A 2500 Gal. Tank, (Note/Spec
L-1
10 points
G.
Electrical
4.
E. Ceiling Fans, (Note/Spec.)
A-3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note/Spec.)
A-3
1 point
3.
Energy Star Refrigerator, (Note/Spec.
A-3
1 oint
P.
Other
1.
List Green Features on Plans
A-1
1 point
TOTAL POINTS
40 points
•
Plan Review Process Work Book Page -12-Revised 3/25/08
,JUN 0 31009
4
Green Points Rating System for Remodeling Projects
• Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project.
1. Recycle Job Site Construction & Demolition Waste
65%=1 point; 75%= 2 points; BO%= 4 points
12. Salvage Reusable Building Materials _ {
3. Remodel for Mixed Use, Adaptive Reuse, and
Historic Preservation
4. Protect Native Soil
5. Minimize Disruption of Existing Plants & Trees
6. Implement Construction Site Stormwater Practices
7. Protect Water Quality with Landscape Design
. Design Resource-Efficfent Landscapes and Gardens
9, Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yec
10. Install High -Efficiency Irrigation Systems 2 Resource pts y=yet
11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yet
up to 4 Resource pt!
4 Resource pts y=yet
4 Resource pts
y=yet
2 Resource pts
y=yet
1 Resource pt
y=yet
2 Resource pts
y=yet
2 Resource pts
y=yet
4 Resource pts
y=yet
B.Foundation -
1. Incorporate Recycled Flyash in Concrete
• 25%, Recycled Flyash = 2 points; Add 1 point for every 10%
increase of flyash, up to 5 points
2. Use Recycled Content Aggregate
3. Insulate Foundation/Slab before backfill
C. Structural Frame
1. Substitute Solid Sawn Lumber with Engineered Lumber
2. Use FSC Certified Wood for framing
(For every 10% of FSC lumber used = 2 points, up to 10)
3. Use Wood I -Joists for Floors and Ceilings
4. Use Web Floor Trusses
5. Design Energy Heels on Trusses 6' or more
B. Use Finger -Jointed Studs for Vertical Applications
7. Use Engineered Studs for Vertical Applications
B. Use Recycled Content Steel Studs for Interior Framing
9. Use Structural Insulated Panels (SIPS)
a. Floors
b. Wall
c. Roof
10. Apply Advanced Framing Techniques
11. Use Reclaimed Lumber for Non Structural Applications
up to 5 Resource pts
2 Resource pts y=yes
3 Energy pts y=yes
3 Resource pts y=ye
UP to 10 Resource pt
2 Resource pts
y=ye
2 Resource pts
y=ye
2 Energy pts
y=ye
2 Resource pts
y=ye
2 Resource pts
y=ye
2 Resource pts
y=ye,
3 Energy pts
y=ye
3 Energy pts
y=ye:
3 Energy pts
y=ye:
4 Resource pts
y=yet
3 Resource pts
y=yet
12. Use OSB
a. Subfloors 1 1 Resource pt y=ye
• b. Sheathing —
_ C 1 Resource pt y=ye
r
r
r
r
r
r
01
0
0
r
Oils
r
oil
r
0'
0.
Mill
0 0 0
r
r
r
r
r
r
0
r
r
r
0,
r
oil
r
0'
0.
Mill
0. Use Sustainable Decking Materials ,
2 Energy pts y:
3. Retrofit all Faucets and Showerheads Wath Row Reducers
a. Recycled content
3. Resource pts
y=yes
b. FSC Certified Wood
3 Resource pts
y=yes
2. Use Treated Wood That Does Not Contain Chromium/Arsenic
1 IAO/Health pt
y=yes
3. Install House Wrap under Siding {
1 IAQ/Health pt
y=yes
4. Use Fiber -Cement Siding Materials
1 Resource pt
y --yes
E. Plumbing
1. Install Water Heater Jacket _�_ , _, 1 Energy pt y:
2. Insulate Hot and Cold Water Pipes
2 Energy pts y:
3. Retrofit all Faucets and Showerheads Wath Row Reducers
Ey Star Dishwasher
1. Install nerg
a. Faucets (i point each, up to 2 points)
} Up to 2 Resource
b. Showerheads (1 point each, up to 2 points)
) Up to 2 Resource
4. Replace Toilest with Ultra -Low Flush Toilets
!
(1 point each, up to 3 points) _ _ _
y Up to 3 Resource
5. Install Chlorine Filter on Showerhead
1 IAQ/Health pt y:
6. Convert Gas to Tankless (Nater Heater
4 Energy pts y:
7. Install Water Filtration Units at Faucets
Y --yes
(2 points each, up to 4 points)
Up to 41AQ/Hea1th
B. Install On -Demand Hot Water Circulation Pump
4 Resource pts y:
r. tiecirrcai
r
r
r
r
1. Install Compact Fluorescent Light Bulbs (CFLs)
Ey Star Dishwasher
1. Install nerg
(6 bulbs -2 points, 10 bulbs =3 points, 12 bulbs = 4 points)
Up to 4 Energy pts.
2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to
5 points)
Up to 5 Energy pts.
3. Install Lighting Controls (1 point per fixture, up to 4 points)
Up to 4 Energy pts.
4. Install High Efficiency Ceiling Fans with CFLs
$ 1 Energy pt
(1 point each, up to 4 points)
Up to 4 Energy pts,
G. Appliances
r
r
r
r
r
r
r
Q
Ey Star Dishwasher
1. Install nerg
1 Energy pt
y=yes
2. Install Washing Machine with Water and Energy
Conservation Features
` 1 Energy pt
y=yes
3.Install Energy Star Refrigerator
$ 1 Energy pt
y=yes
,4. Install Built -In Recycling Center
— T—
S1 3 Resource pts
Y --yes
H. Insulation
1. Upgrade Insulation to Exceed Title 24 Requirements
a. Walls
2 Energy pts
Y --Yes
b. Ceilings
2 Energy pts
Y_ -Yes
2. Install Floor Insulation over Crawl Space
4 Energy pts
y=ye:
19. Install Recycled -Content, Fiberglass lnsulatior with
No Added Formaldehyde
3 IAQ/Health pts
y=ye:
_
4. Use Advanced Infiltration Reduction Practices
2 Energy pts
y=ye,l
5. Use Cellulose Insulation
a. Walls
4 Resource pts
y=ye!
b. Ceilings
4 Resource pts
y=ye!
6. Alternative Insulation Products (Cotton, spray -foam)
a. Walls
4 Resource pts
y=ye
o. Ceamgs
4 Resource pts
y=ye
•
r
r
r
r
r
r
r
Q
r
•
1. windows
_ 2 Energy pts
y=yes
1. Install Energy -Efficient Windows
3 Energy pts
Y --yes
a. Double -Paned
•
1 Energy pt
y=yes
I b. Low -Emissivity (Low -E)
2 Energy pts
y=yes
c. Low. Conductivity Frames
2 Energy pts
Y --yes
2.Install Low Heat Transmission blazing
_
1 Energy pt
yryes
J. Heating Ventilation and Air Conditioning
,. Use Duct Mastic on All Dud Joints _
_ 2 Energy pts
y=yes
2. Install Ductwork within Conditioned Space
3 Energy pts
Y --yes
3. Vent Range Hood to the Outside
1 IAQ/Health pt
y --yes
4. Clean all Ducts Before Occupancy
2 IAQ/Health pts
y --yes
5. Install Solar Attic Fan
2 Energy pts
Y --),es
6. Install Attic Ventilation Systems
1 Energy pt
Y --yes
7. Install Whole House Fan
4 Energy pts
Y --yes
6. Install Sealed Combustion Units
5 IAQ/Health pts
y=yes
a. Furnaces
31AQ/Health pts
y --yes
b. Water Heaters
31AQ/Health pts
y --yes
9. Replace Wall -Mounted Electric and Gas Heaters with
Through -the -Wall Heat Pumps
3 Energy pts
y=yes
10. Install 13 SEER/11 EER or higher AC with a TXV
3 Energy pts
y=yes
11. Install AC with Non -HCFC Refrigerants
2 Resource pts
y=yes
12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
2 Energy pts
y=yes
• 13. Retrofit Wood Buming Fireplaces
a. Install EPA certified wood stovestinserts
4 Energy pts
y=yes
2. Install Solar Vater Heating System
1 IAQ/Health pt
y=yes
It. Install/Replace Dampers
1 Energy pt
y=yes
c. Install Airtight Doors
1 Energy pt
y=yes
14. Install Zoned, Hydronic Radiant Heating
3 Energy pts
y=yes
15. Install High Efficiency Filter
4 IAQ/Health pts
y=yes
16. Install Heat Recovery Ventilation Unit (HRV)
5 IAQ/Health pts
y=yes
17. Install Separate Garage Exhaust Fan
31AQ/Health ots
v=ves
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating
4 Energy pts
y=yes
2. Install Solar Vater Heating System
10 Energy pts
y=yes
3. Pre -Wire for Future Photovoltaic (PV) Installation
4 Energy pts
y=yes
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =16 points)Up
to 16 Energy
pts
Durable Raterials _ _
6. Selej Safe and oofng M
--- -
-1 1 Resource pt
y=yes
7, Install Radrant BartieF - --- —
- - 3 Energy pts
y=yes
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating 5 Energy pts y=yes
2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes
3. Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes
•
F1 . Use L&A-64OC Paint 1 IAQ/Health pts y=yes
2. Use Low VOC, Water -Based Wood Finishes 2 IAQ/Health pts y=yes
3. Use Low/No VOC Adhesives 3IAO/Health pts y=yes
4. Use Salvaged Materials for Interior Finishes 3 Resource pts y --yes
5. Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y --yes
S. Use Exterior Grade Plywood for Interior Uses7. _ 1 IAQMealth pts y --yes
Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes
B. Use FSC Certified Materials for In or Finish 4 Resource pts y=yes
9. Use Finger -Jointed or Recycled -Content Trim 1 Resource pts y --yes
10. Install Whole House Vacuum System 3 IAQ/Health pts y=yes
0
0
0
1. Select FSC Certified Wood Flooring
0•
0
0
0
0
y --yes;
2. Use Rapidly Renewable Flooring Materials
4 Resource pts
y --yes
3. Use Recycled Content Ceramic Tiles
4 Resource pts
y=yes
4. Install Natural Linoleum in Place of Vinyl
5 IAQ/Health pts
y --yes
5. Use Exposed Concrete as Finished Floor
4 Resource pts
0
N. Flooring
1. Select FSC Certified Wood Flooring
B Resource pts
y --yes;
2. Use Rapidly Renewable Flooring Materials
4 Resource pts
y --yes
3. Use Recycled Content Ceramic Tiles
4 Resource pts
y=yes
4. Install Natural Linoleum in Place of Vinyl
5 IAQ/Health pts
y --yes
5. Use Exposed Concrete as Finished Floor
4 Resource pts
y --yes
B. Install Recycled Content Carpet with Low VOCs
4 Resource pts
y=yes
Total Points Available:1 1401 1301 57 •
Total Points Project Received: 1 0 0 0
G:daWprooslgreenbuildnoguidelineshemodelem[greenpointsr,nel2.12.04prolected.xls
0
El
JOB ADDRESS:
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax(408)777-3333
Building Department
PERMIT #
OWNER'S NAME: PHONE # 2v
GENERAL CONTRACTOR: (�j 4 FAX #
I am not using any subcontractors: lam- Ae
Signatur ate
h k li bl subcontractors and co m Tete the followin information
Please
c
ec app ca e
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor ature
ra
Date