Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
R-5608 1
r
PERMIT
APPLICATION FOR CITYEC
CUPERTINO
NUMB RR- 5608
INSPECTION DIVISION PERMIT EXPIRATION
REROOF PERMIT (408)777-3228 PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 100 DAYS OF PERMIT ISSUANCE OR
' 180 DAYS FROM LAST CALLED INSPECTION,
BUILDING ADDRESS
RESIDENTIAL COMMERCIAL OTHER
OWNER'S „ HAZARDOUS FIRE AREA
YES ❑ If yes—I understand that a Class A
NAME roof assembly is required.
NO Initial I.C.B.O.#
EXISTING ROOF COVERING
ADDRESS
PHONE NUMBER OF EXISTING COVERINGS
CONTRACTOR'S
TO BE REMOVED TO BE RETAINED
NAME /V
ADDRESS E OF ROOF COVERING
cITY a zIP .
(3120 Q?X 1510 EXISTING
PHONE 'll BUILT-UP ROOFLICENSE ❑
NUMBER / ASPHALTSHINGLES ❑
LICENSED CONTRACTORS DECLARATION _ w
hereby iaffirmnion that em Business
under Professions
lone of e,and g(commencing with Section WOOD SHAKES
]000)of Division 3 of the Business entl PrOlesslona Cotle,entl my license Is In lull force and
effect. WOOD SHINGLES ❑
License Of LIc.Number
OTHER(SPECIFY)
Dat Contractor
OW from th ContrDERactors
DECLARATION PROPOSED j
hereby affirm Bu rhes am exempt from the e: Any
License Law for the lines a reason.
(Sec.]ct,alt Business and Professions Code: Any city or county which requires requires permit to
construct,alter,Improve,demoto file signedrepair statem ntrthat a prior co sta Issuance,also pture the BUILT-UP ROOF }
or its Co for such permit a Ills a signed statement that he Is licensed pursuant to the provisions /
' of she ss and)Prof License Lew(Chapter h(commencing with Section]000)01 Dlvlslon 3 Of the Q
Business entl violation of Code)of that he Is exempt therefrom and she jbasisis for the alleged ASPHALT SHINGLES
exemption.Any violationofhSection five hundred
by any applicant for a permit subjects the applicant to
e civil penalty of not more then five by employees
yeesdollars(h wag):
0I,k,and
sthctureI not ty,or
tended oyerswhhwages(Sec.their 44,compessatbn,will do WOOD SHAKES ❑
she work,entl the ant hecto Is nos Inse Law or offered for sale(Sac.]044,Business and Profbuilds
or
improves The Cant hectors time Law does not apply to an owner of property who bondsor WOOD SHINGLES ❑
Improvesothereon,and not doessuch work redhimself orthroughhis Own employees,or provided ant
such improvements are not completion,
leb n,or offered tar seer. ill however,for burden
or Improvement
is not
or
prove for purpose
sale.).Ownerbulltlerwlll have the burtlen of proving that he did OTHER(SPECIFY) ❑
not bulb or Improve icor purpose of sele.).
❑I,as owner of the property,am exclusively contracting with licensed contractors to construct
the project(Sec.7044,Business and ProfesslDna Code:The Contractor's License Law does not PROVIDE I.C.B.O.REPORT NO.
apply to an owner of property who builds or Improves thereon,and who contracts for such projects -
with a contractor(s)licensed pursuant to the Contractor's License Law. PROVIDE MFGR.INSTALLATION SPECS.
❑I am exempt under Sec. ,B 8 P.C.for this reason
Owner Date APPLICATI E VALUATION PERMIT FEE
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of penury one of the following declaration: ^�,�
C]I have and will maintain a Certificate Of Consent to salt-Insure for Workers Compensation, Building��L�
as provided for by Section 3700 of the Labor Code,for the performance of the work for which this
permit h v and ��j �,NC��©� Seismic ___�-�(_.
I have and will maintain Worker's Compensation Insurance,as required by Section 3700 of
the Labor Code,for the performance of the work for which this permit Is Issued.My Worker's Ut'C Total
Compensatl nIn rence ceryl andel Policy number are: 9/ UY �!
Coul K),V� PolicyNo.1-/b PERMITAUTHORI TION DATE
CERTIFCO F EXEMPTION FROM W RS'
COMPENSATION INSURANCE N.C.Q
(This section need not be completed It the permit Is lot one hundred dollars(510Old,
less.)
I certify that In the performance of the work for which this permit Is issued,I shall not employ
any person In any manner so as to become subject to the workers'Compensation laws of Calf- All roots shall be inspected prior to any roofing material being
fornia' installed. If a roof is installed without first o ammg an
Dale Applicant inspection,l agree to remove all new materials inspection.
NOT subject IoEtheWorrkers'Compensation f,after prolvisionis of thecate of Labor Code,you mustforthwith become
comply Applicant nderstands and will c mply w' all non point
with such provisions Or this permit shell be deemed revoked. sour ulatl -
I certify that I have read this application and state that the above Information Is correct.I agree
to comply with all city and county Ordinances and state laws relating to building construction,and At O f Over classa r.
hereby authorize representatives of this city to enter upon the above-mentioned property for In-
spection purposes.
(We)agree to save,Indemnity and keep harmless the City of Cupertino against liabilities,
judgments,costs and expenses which may In any way accrue against said City In consequence PPLICAN DAT
• of the 9 0l this Permit.
PRE-INSPECTION:
ION: PLYWOOD: N-PROGRESS:
INSP. DATE INSP. DATE INSP. DATE
TEAR OFF INSPECTION: BATTENS: FINAL:
INSP. DATE INSP. DATE INSP. DATE
NOTE: OSHA APPROVED ACCESS TO ROOF SHALL BE PROVIDED FOR INSPECTION
OFFICE COPY
SUBJECT: .RE_400FR4G POLICY FOR THE CITY OF CUPERTNO BUILDD+G DEPART`IENT
PRIOR TO ISSUANNICE OF PERMIT AND INSPECTION PHASE.
1. Prior to permit issuance, you must agree to comply with U.B.C. standards and rnnnufacrurets spec's
on rercofing.
2. New roof coverings shall not be applied without first obtaining all inspection and «Tinea approval
from the building inspector. A final inspection and approval shall be obtained from the building
inspector when the reroofing is completed.
3. All types of roof shall be inspected prior to any roof being installed.
4. In order to receive a final,you must complete steps 1, 2, and 3.
1,) Preinspection or tear off approval.
2.) In progress inspection approval.
3.) Final inspection approval.
a.) Operable smoke de,.e^_:or verinaticn
• b.) Spark arrestor installation
5. If plywood is installed,a plywood nail inspection is required
6. If any roof is applied without first obtaining an inspection, you will be required to remove all new
material down to the sheathing and a building inspector will inspect all sheathing at that time.
WE UNDERSTAND TI.M ABOVE POLICY ON REROOFING P_NID WILL COMPLY WITH TIHE
POLICY
HOiv1EOWNERS NA.VfE:
ADDRESS" `
REROOFING COjvTANY NAME:
APPLICANTS SIGNATURE: zn
CITY OF CUPERTINO
BUILDING DEPARTMENT
ReroofAvinword