DRC Summary 04-19-07 City of Cupertino 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Council Members Planning Commissioners From: Steve Piasecki, Director of Community Development Date: April 26, 2007 Subj: REPORT OF DESIGN REVIEW COMMITTEE FINAL DECISIONS MADE April 19, 2007. Chapter 19.136 of the Cupertino Municipal code provides for A eal of decisions made b the Desi Review Committee 1. Application ASA-2006-14; Wayne Okubo (Marketplace), 19770 Stevens Creek Blvd Description Architectural and Site approval for Building C at Marketplace Shopping Center Action The Design Review Committee approved the application on a 2-0 vote. This is effective April 19, 2007. The fourteen-calendar day appeal will expire on May 10, 2007. Enclosures: Design Review Committee Report of April 19, 2007 Resolution No. 255 Approved Plan Set G:planning/Drcj041907 summaryletter.doc To: From: Subject: Location: Design Review Committee Date: April 19, 2007 Aki Honda Snelling, Senior Planner Application: ASA-2006-14 19770 Stevens Creek Boulevard (Marketplace Shopping Center) Project Description: Architectural and site review for Building C at Marketplace shopping center. RECOMMENDATION: Staff recommends approval of the architectural and site approval permit for Building C, based on the model resolution, including staff's recommended modifications. BACKGROUND: In February of 2006, the City Council approved a Use Permit (U-2006-09) and Architectural and Site Approval (ASA-2006-09) on a 3-2 vote to allow for the remodeling. of the Marketplace shopping center on the south side of Stevens Creek Boulevard, east of S. Portal Avenue. The approval of these applications allows for the demolition of a portion of the shopping center's east side and construction of a new two-story commercial building (Building C) and the conceptual design approval for Building C. A condition of approval of the Architectural and Site Approval (ASA-2006-09) requires that the final design review and approval for Building C be granted by the Design Review Committee. The condition also states that the applicant address the concerns and comments of the City architectural consultant on building design changes. Another condition requires that the final landscape plan for the shopping center be reviewed and approved by the Design Review Committee. DISCUSSION: Building C The conceptual plans for Building C that were approved by the Council in 2006 (See Exhibit A) provided the conceptual site plan and the basic shape and style of the two- story commercial building to show the building's similarity to the other two recently constructed buildings in the shopping center, including. hipped roof elements, storefront windows and doors, and stucco exterior and column features. The plans, however, lacked the architectural details on the exterior of the building. The updated plan set specifies the architectural details for the exterior of the building, including the lighting fixtures, roof tile color and type, exterior column and trellis features, and proposed colors of th~ building.. The material sheet (page 10 of the Plan Set) clarifies that Building C will be architecturally consistent with the other buildings in the shopping center. In addition to these details, the applicant has provided moderate design changes to the building that include the addition of a rounded glass skylight roof canopy along the I-I April 19, 2007 ASA-2006-14 Page 2 front elevation of the building facing Stevens Creek Boulevard to enhance the frontage of the building and for use as possible outdoor seating area, a modification of the entry feature along the south elevation of the building, and a modification of the floor-to-floor interior height of the two-story building. The outdoor seating area below the skylight glass canopy has not been shown on the plans at this time; however, the applicant has indicated that there is a possibility that this area may be considered for such use. Staff has added a condition of approval that will require the applicant to provide the layout of any tables and seating for this area and details related to furniture design and type (including seating, tables and outdoor lighting, etc.) to be reviewed and approved by the Director of Community Development, provided that adequate parking is provided. The applicant will need to demonstrate that adequate parking is provided for outdoor seating use based upon the number of seats proposed. The applicant has redesigned the front entry feature along the south elevation and raised the interior floor-to-floor height of the second floor to accommodate a potential restaurant tenant on the second floor. The entry feature has been modified from a one- story to a two-story entry element to accommodate a rounded staircase leading to the potential restaurant space with second-story storefront windows overlooking the west side of the shopping center. The interior floor-to-floor height of the building has been modified from the Council-approved 16 foot first floor height and 12 foot second floor height to a 13.5 foot first floor height and 16 foot second floor height. The applicant indicates that additional floor-to-floor height is needed to accommodate the potential restaurant. As a result of these changes, the building height has been increased from 33.3 feet to 35 feet. The City's Architectural Advisor has reviewed the updated plans and is satisfied that the applicant has addressed his concerns and comments about the building design changes. Use Limitations of Building C The section drawings on page 9 of the plan set indicate the potential second floor use as restaurant use and the first floor use as office. However, the Council-approved section plans and conditions of approval (Exhibit A) state that the first floor use is to be occupied solely for retail uses. Therefore, staff has included the condition of approval for this application stating the use limitations for this building based upon the City Council's condition of approval. Additionally, restaurant use cannot be confirmed due to the parking situation at the shopping center. The City Council conditions of approval in February of 2006 require that a professional traffic/parking engineer review the parking when the center is 70% occupied and/ or when building A is occupied (whichever comes first) and that another report be prepared when Building C is 50% occupied. Although staff supports the /-) April 19, 2007 ASA-2006-14 Page 3 architectural and site plans submitted for review, the potential use of the buildings cannot be approved without verifying the parking information. Site Improvements The Council-approved conditions require that pedestrian connection and crosswalks be enhanced in the center and that the entrance driveway along the eastern property line be enhanced to promote better pedestrian crossing and vehicular movements. The site plan on page 2 of the revised plans shows that new pedestrian connections and crosswalks will be installed around the building and connected to the realigned driveway along the east side of the property on Stevens Creek Boulevard. Additionally, pedestrian connections will be installed connecting the Building C site to the rest of the shopping center. Landscape Plan The landscape plan indicates that the existing trees within the interior parking lot of the shopping center will be replaced with 15-gallon Brisbane Box trees. The existing New Zealand Christmas trees in the interior portion of the parking lot have been dying and have not been growing adequately to provide shading for the parking lot. The City Arborist supports replacing the existing Brisbane Box trees and has indicated that these trees are desirable as parking lot trees because they are fast growing, provide a nice canopy (25 foot spread) for parking lots and do not have invasive roots. However, the City Arborist recommends that minimum 24-inch box trees rather than 15-gallontrees be planted to provide a more immediate effect in the parking lot. The applicant is also slightly modifying the parking lot by requesting to remove the finger islands that provide a double row of trees next to the pedestrian connection leading to the Long drugstore entrance. This is the only portion of the parking lot where a double row of trees is provided in the shopping center. The applicant would like to add parking spaces in this area and is requesting approval to remove the finger islands and replace them with new trees and tree wells that will be installed to match the pedestrian connection grade. This will result in the loss of a total of five trees. The pedestrian connection will be maintained and the tree wells will be covered by grates that will match the grade of the pedestrian connection. Staff supports the landscape plan, including the replacement trees and the reconfiguration of tree wells around the pedestrian connection leading to Longs since the proposed single row of trees matches the planting elsewhere in the shopping center. Palm Trees The applicant indicates that replacement of the palm trees will occur during the second week of May, due to the planting requirements of the Mexican palm trees. The City Arborist confirms that this is the typical planting time for this tree because the survivability of palm trees is sensitive to the soil temperature and moisture at planting '7 1 ~::) April 19, 2007 ASA-2006-14 Page 4 time. The applicant has submitted a $10,000 bond to ensure the planting of the palm trees. Tree Removals The applicant is requesting to remove four Chinese Elm trees along the S. Portal Avenue driveway entrance of the shopping center that have died. The City Arborist has reviewed these trees and concurs that the trees have died (See Exhibit B). As a result, the City Arborist recommends that each of these trees be replaced with a 48-inch box Grey Bark Elm or Frontier Elm tree. These trees are identified as trees #5, 6, 7 & 8 in the City Arborist report. The City Council conditions of approval state that removal of trees be replaced at a 1-to- 1 ratio and that the final landscape plan be reviewed by the City Arborist. Staff supports the City Arborist's recommendation and has added a condition of approval allowing for these tree removals and for the replacement of these trees per the City Arborist report. Prepared by: Approved by: Aki Honda Snelling, Senior PI~er ' Ciddy Wordell, City Planner ~~/ ~)~::e-y- Enclosures: Model Resolution Exhibit A: City Council approval of ASA-2005-06, including plans Exhibit B: City Arborist report Plan Set G:\Planning\DRC\staff rep\2006\ASA-2006-14 SLdoc [-4- ASA-2006-14 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 MODEL RESOLUTION OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL FOR BUILDING C OF THE MARKETPLACE SHOPPING CENTER SECTION I: PROTECT DESCRIPTION Application No.: Applicant: Location: ASA-2006-14 Wayne Okubo (Evershine) 19770 Stevens Creek Boulevard SECTION II: FINDINGS WHEREAS, the City Council has directed the Design Review Committee to review and approve the final architectural and site design of Building C and landscape plans for the Marketplace shopping center in accordance with the conditions of approval for ASA-2005-06 approved by the City Council on February 7, 2006; and WHEREAS, the Design Review Committee has reviewed the architectural and site design for Building C and landscape plans. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the Design Review Committee approves the architectural and site approval and landscape plan, file no. ASA-2006-14, subject to the conditions which are enumerated in this Resolution; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application ASA-2006-14 set forth in the Minutes of the Design Review Committee meeting of, April 19, 2007, and are incorporated by reference as though fully set forth herein. SECTION III. CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set titled: "Marketplace Shopping Center," dated revised April 9, 2007 consisting of 14 pages, except as may be amended by conditions in this resolution. 2. COLOR SCHEME The color scheme for Building C shall match the color scheme presented on the material sheet labeled as page 10 of the plan set dated revised April 9, 2007. 1'-5 Model Resolution April 19, 2007 Page 2 ASA-2006-14 3. USE LIMITATION The ground floor of Building C shall be occupied solely by retail uses. The second floor may be occupied by office uses, but the total amount of office square footage on site shall be limited to twenty-five percent (25%) of the shopping center's gross square footage. 4. OUTDOOR SEATING Any outdoor seating areas proposed for Building C shall be reviewed and approved by the Director of Community Development, provided adequate parking is provided to accommodate outdoor seating use. Prior to approval of outdoor seating, the applicant shall demonstrate that adequate parking is provided for the outdoor seating use and provide a table and seating layout plan indicating the number and location of tables and seats to be accommodated in the outdoor seating area and furniture design and type (including seating, tables, outdoor lighting, etc.) to be reviewed and approved by the Director of Community Development. 5. TRASH ENCLOSURE The final trash enclosure design shall be reviewed and approved by the Public Works Department prior to issuance of building permits. 6. TRANSPORTATION DEMAND MANAGEMENT A professional traffic/ parking engineer shall review the parking when the center is 70% occupied and/ or when building A is occupied (whichever comes first). Another report must be prepared when Building C is 50% occupied. The remaining tenant spaces will not be occupied unless the project can demonstrate that there is sufficient parking supply for the tenants at these two monitoring periods. A covenant shall be recorded on the property to disclose this requirement to future tenants and/ or property owners prior to the issuance of building permits. If the parking demand survey indicates that there is a parking deficiency, the shopping center management must implement TDM programs to reduce the demand equivalent to the identified parking deficiency. The programs may include the following: Employee parking cash out · Carpoolj shuttle services Valet Offsite employee parking G: IPlanninglDRClres\2007\ASA -2006- J 4 res. doc I-~ Model Resolution April 19, 2007 Page 3 ASA~2006-14 7. TREE REMOVAL/REPLACEMENT Removal of four Chinese Elm trees along the S. Portal Avenue driveway entrance and identified as tree #s 5, 6, 7 and 8 in the arborist report prepared by Barrie D. Coate and Associates dated "Revised December 2006" shall be permitted. The applicant shall be required to replace each of these removed elm trees with a 48-inch box Grey Bark Elm tree or Frontier Elm tree. 8. CONSTRUCTION PHASING The applicant shall prepare a construction phasing schedule, demonstrating completion of the planned Building C within two (2) years of this approval. The construction phasing schedule shall detail critical milestones of the construction and shall provide monetary penalties. If the building construction phasing does not comply with the stated milestone dates, the applicant shall post a cash deposit in the amount of $200,000 naming the City as beneficiary. If the critical construction phasing is not completed in accordance with the construction schedule, the City at its own discretion will assess a penalty that shall be deducted from the deposit. The applicant shall agree to this condition in writing prior to issuance of building permits. 9. LANDSCAPE PLAN The final landscape plan is approved based upon the approved plan set with the additional requirement that the Brisbane Box trees be minimum 24-inch box trees at the time of planting. 10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90- day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 19th day of April 2007, at a Regular Meeting of the Design Review Committee of the City of Cupertino, State of California, by the following roll call vote: G: IPlanningIDRClres\2007\ASA -2006-14 res. doc 1-1 Model Resolution April 19, 2007 Page 4 AYES: NOES: ABST AIN: ABSENT: ATTEST: COMMISSIONERS: COMMISSIONERS: COMMISSIONERS: COMMISSIONERS: APPROVED: Ciddy Wordell, City Planner ASA-2006-14 Cary Chien, Chair Design Review Committee G: IPlanningIDRClres\2007\ASA-2006-14 res. doc . ") I-b Exhibit A City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: (408) 777-3223 FAX: (408) 777-3366 CrfYOF' CUPEIUINO OFFICE OF THE CITY CLERK February 9, 2006 Todd Lee KCR Development, Inc. 19770 Stevens Creek Blvd. Cupertino, CA 95014 Consider Application Nos. U-2005-09, ASA-2005-06 (EA-2005-06), KCR Development, Inc. (Evershine), 19620-19780 Stevens Creek Blvd. (Marketplace), APN Nos. 369-06- 008, 009 and 010: a) Mitigated Negative Declaration b) Use Permit to demolish approximately 15,300 square feet of existing commercial space and construct a new 34,300 square foot two story building at the Marketplace shopping center c) Architectural and Site approval for demolition of approximately 15,300 square feet of existing commercial space and construction of a new 34,300 square foot two story building at the Marketplace shopping center d) Amended gateway design for South Portal Avenue by the Marketplace Shopping Center Dear Mr. Lee: At its February 7, 2006, regular meeting, the Cupertino City Council approved the project with the following additional conditions: s The design review will resolve the palm species issue . Shade trees will be provided in the parking lot . The architecture will be reviewed to achieve consistency with the existing center . Construction phasing language was added . Transportation Demand Management: , A professional traffic/parking engineer shall review the parking when the center is 70% occupied and/or when building A is occupied (whichever comes first). Another report must be prepared when building C is 50% occupied. The remaining tenant spaces will not be occupied unless the project can demonstrate that there is sufficient parking supply Printed on Recycled Paper /-9 U-2005-06 Page 2 February 7, 2006 for the tenants at these two monitoring periods. A covenant shall be recorded on the property to disclose this requirement to future tenants and/or property owners prior to the issuance of the building permits. If the parking demand survey indicates that there is a parking deficiency, the shopping center management must implement TDM programs to reduce the demand equivalent to the identified parking deficiency. The programs may include the following: . Employee parking cash out . Carpool/shuttle services . Valet . Off site employee parking The Use Permit conditions are as follows: SECTION ill: CONDITIONS ADMINISTERED. BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS The recommendation of approval is based on Exhibits titled: "Marketplace Center Commercial Redevelopment, Stevens Creek Boulevard, Cupertino, California, Dated January 18, 2006" consisting of 8 sheets, except as may be amended by the Conditions contained in this Resolution. 2. PARKINGREVIEW After completion of the project (or earlier if complaints received from neighbors), the project shall return to Planning Commission for review of parking. 3. RESTAURANT ODOR ABATEMENT All new and existing restaurants shall install odor abatement system to address the neighborhood odor concerns as identified in the Initial Study presented to the Environmental Review Committee on December 14,2005. The odor abatement systems in new restaurants shall be installed prior to final occupancy of their associated tenant spaces. All existing restaurants shall install odor abatement systems prior to final occupancy of Building C. This condition does not apply specialty food uses as defined by the Ordinance. 4. REPLACEMENT PALM TREES As identified in the Initial Study presented to the Environmental Review Committee on December 14,2005, the 10 existing palm trees (lining up the existing entry drive) removed shall be replaced by 10 new field grown palms. The applicant shall work will staff and the City Arborist to locate the new palms along the shopping center entry drive. This may mean some ofthe existing roof eaves and/or concrete work along Building A will need to be modified to allow sufficient room for the new palms to grow. The replacement palm trees shall be recorded on the property as heritage trees prior to final occupancy approval. The existing dead canary island palm shall also be replaced by a field grown palm in kind. 1'-/0 U-2005-06 Page 3 February 7,2006 5. TREE REPLACEMENT Seven (7) non-specimen trees are removed as part of this project. In addition, the City Arborist has identified eight (8) additional non-specimen trees will suffer.from severe root lost from the construction activities. All trees removed shall be replaced at a 1 to 1 ratio. Final landscaping plan shall be reviewed by the City Arborist prior to issuance of building permits. 6. . NEW ABOVE-GRADE SIDEWALK The existing sidewalk along Stevens Creek Boulevards in front of the project shall be replaced with a new walk constructed above the existing grade. The final design of the walk shall be reviewed and approved by the Public Works Department and the City Arborist prior to issuance of building permits. 7. RECIPRICAL ACCESS AND PARKING EASEMENT A reciprocal access and parking easement covenant shall be recorded between the three parcels as part of the shopping center. In addition, the applicant shall record c:t deed restriction for necessary reciprocal ingress and egress easement between the subject property and the abutting shopping center to the east. The easement language shall be reviewed and approved by the City Attorney prior to issuance of final occupancy. 8. TRASH AND DELIVERY ACTIVITIES A detailed refuge and truck delivery plan must be prepared by the applicant. The plan shall specify"locations of trash facilities, refuge pick up schedules and truck delivery schedules and routes. All trash facilities must be screened and enclosed to the satisfaction of Public Works Department. The final plan shall be submitted to the City for review and approval prior to issuance of building permits. 9. USE LIMITATION - REAR CORRIDOR As per use permit 16-U-76, the existing restaurant and specialty food services involving on- site food preparation which are located adjacent to the gated portion of the rear corridor may remain; however, new food services involving on-site food preparation shall not be permitted in this area. The intent of this condition is not only to prevent an increase in the number of above described food establishments adjoining the rear corridor, but also, upon termination of occupancy, to preclude replacement of existing establishments with food services that require a new use permit. For example, an existing sit-down restaurant could be replaced by another sit-down restaurant) provided the new restaurant was no larger than the existing one and had similar operating characteristics), but an existing sit-down restaurant could not be replaced by a specialty food store. 10. USE LIMITATION - SITE Uses allowed on-site shall be any such use that is permitted in the CG (General Commercial) zoning district. The applicant shall provide documentation that shows sufficient parking is available for any change in use, subject to staff approval. I '/I U-2005-06 Page 4 February 7,2006 . 11. USE LIMITATION - TWO-STORY BUILDING The ground floor of the two-story building along Stevens.Creek Boulevard shall be occupied solely by retail uses. The second floor may be occupied by office uses, but the total amount of office square footage on site shall be limited to twenty-five percent of the shopping center's gross square footage. 12. BICYCLE PARKING The applicant shall install one secured bicycle device, such as a bicycle rack, for every 6,500 square feet of the commercial building floor area throughout the entire center. In addition, six enclosed bicycle lockers shall be provided for each of the two-story retail/office building (buildings A and B). 13. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 250 feet of any residential property. 14. RECYCLYING OF BUILDING MATERIALS The building materials from the demolished buildings shall be recycled to the maximum extent possible. Proof of recycling shall be submitted to the City for review prior to final occup~cy. 15. NOTICE OF FEES. DEDICATIONS. RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. - ~ 16. SIGNAGE Signage is not approved with this use permit application. Signage shall conform to the City Sign Code. Applicant may apply for a sign exception as needed. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 17. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. I-I). U-2005-06 . Page 5 February 7, 2006 18. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 19. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site.is located. 20. FIRE HYDRANT Fire hydrants shall be located as required by the City. 21. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 22. STREET TREES Street trees shall be planted within the Public Right of Way and shall be of a type approved by the City in accordance with Ordinance No. 125. The developer shall submit the proposed tree type to the Corporation Yard for approval. 23. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 24. DRAINAGE Drainage shall be provided to the satisfaction ofthe City Engineer. Pre and Post- development calculations must be provided to identify how much runoff will be directed to our storm drain facilities. 25. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for undergrounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking & Inspection Fees: b. Grading Permit: c. Development Maintenance Deposit: d. Storm Drainage Fee: e. Power Cost: N/ A f. Map Checking Fees: $ 6% of Off-Site Imp.Cost or $3,440.00 $ 6% of On-Site Imp.Cost or $2,000.00 $ 1,000.00 Paid N/A 1"/3 U-2005-06 Page 6 February 7, 2006 g. Park Fees: N/A Bonds: a. Faithful Performance Bond: 100% of Off-Site Improvements b. Labor & Material Bond: I 00% of Off-Site Improvements c. On-site Grading Bond: 100% of On-Site Improvements. -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 26. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 27. DEDICATION OF WATERLINES The developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water for water service to the subject development. 28. FIRE ACCESS LANES Emergency fire access lanes shall meet Central Fire District standards. 29. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (EMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan shall be provided. 30. TRASH ENCLOSURES The trash enclosure plan must be designed to the satisfaction of the Environmental Programs Department. Clearance by the Public Works Department is needed prior to obtaining a building permit. The trash enclosure for the Marketplace Shopping Center at Stevens Creek Blvd should be able to accommodate all garbage, cardboard and recycling associated with this site. 31. MAINTENANCE AGREEMENT A maintenance agreement between the developer and the City shall be required to have the applicant maintain the WILLISTON PARK. NEIGHBORHOOD GA TEW A Y FEA 1URE and any other non-standard items within the City's right of way. /,-/Lj U-2005-06 Page 7 February 7,2006 32. TRAFFIC After review of draft traffic analysis and parking demand study, we offer the following comments. 1. The traffic analysis determined independently that the mid-block pedestrian crossing on Portal Avenue is inappropriate and recommends its removal. Public Works concurs. The pre-existing bulb-outs may remain, but . The ramps shall be removed and the cub brought back to full height. . The crosswalk shall be obliterated by grinding and seal-coating. . The opening in the walls in the bulb-outs shall be closed by extending the walls over the openings, or the walls shall be removed. If the openings in the walls are closed, it shall be verified that the walls are less than three feet in height. . The bulb-'outs shall be replanted with appropriate plants and irrigation . Appropriate signing and striping shall be installed. 2. As an alternative to a crosswalk at the mid-block bulb-outs north of Bixby Drive, the project shall install pedestrian crosswalk improvements across South Portal Avenue at either Bixby Drive or Price Avenue. 3. Since the neighborhood has expressed an interest in a "gateway" to the neighborhood that includes a crossing of South Portal Avenue in the vicinity of the project, the City should conduct a neighborhood meeting to discuss the crosswalk requirements prior to proceeding with "1" and "2," above. 4. The project will be required to make operational improvements to the Stevens Creek Boulevard/Portal A venue intersection. . The improvements may include minor traffic signal indication modifications and retiming, as well as provision of pedestrian countdown signal heads and upgrade of emergency vehicle preempt (EVP) equipment. The project may also be required to alter the crown of the road at the intersection if Public Works determines that the current road topography presents an impediment to the efficient movement of traffic through the intersection. 5. The project shall determine whether there is a potential pedestrian conflict at the driveway at the eastern edge of the site. If it is determined the potential conflict exists, the project shall propose and implement measures to mitigate the conflict. 6. The available parking for the project appears to be slightly insufficient. Appropriate measures shall be taken to reduce the parking demand or provide additional parking. The Architectural and Site Approval conditions are as follows: SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHffiITS The recommendation of approval is based on Exhibits titled: "Use Permit & ASA submittal, Marketplace Shopping Center, Stevens Creek Boulevard, Cupertino, California, Dated /-/5 U-200S-06 Page 8 February 7, 2006 January 18,2006" consisting of7 sheets, except as may be amended by the Conditions contained in this Resolution. 2. LANDSCAPING PLAN A complete landscaping plan shall be submitted to the City for review. The final landscaping plan shall be approved by the Design Review Committee prior to issuance of building permits. All of the trees approved as part of the center's landscaping plan shall not be removed without obtaining approval from the Planning Commission. 3. BUILDING DESIGN CHANGES The applicant shall address the concerns and comments of the City Architect and the Design Review Committee shall approve the revised plans prior to issuance of building permits. 4. SITE IMPROVEMENTS Pedestrian connection and, crosswalks shall be enhanced in the Center. Special paving materials or markings shall be provided at pedestrian intersections in the center. In addition, the entrance of the driveway along the easterly property line must be enhanced to promote better pedestrian crossing and vehicular movements. This may include but not limited to landscaping buffer enhancements, curb alterations, driveway re-alignment and deletion of existing parking stalls. Revised site plan shall be submitted to the City for review. The Design Review Committee shall approve the final site plan prior to the issuance of any building permits. 5. TREE TRIMMING Mature trees along the frontage of Portal Avenue arid Stevens Creek Boulevard shall not be trimmed in the process of construction of this project without the approval of the Director of Community Development 6. REPLACEMENT PALM TREES As identified in the Initial Study presented to the Environmental Review Committee on December 14, 2005, the 10 existing palm trees (lining up the existing entry drive) removed shall be replaced by 10 new field grown palms. The applicant shall work will staff and the City Arborist to locate the new palms along the new shopping center entry drive. This may mean some of the existing roof eaves and/or concrete work along Building A will need to be modified to allow sufficient room for the new palms to grow. 7. TREE REPLACEMENT Seven (7) non-specimen trees are removed as part of this project. In addition, the City Arborist has identified eight (8) additional non-specimen trees will suffer from severe root lost from the construction activities. All trees removed shall be replaced at a 1 to 1 ratio. Final landscaping plan shall be reviewed by the City Arborist prior to issuance of building permits. i-lIP U-2005-06 Page 9 February 7, 2006 8. NOTICE OF FEES. DEDICATIONS. RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020( d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(~), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 9. SIGNAGE Signage is not approved with this use permit application. Signage shall conform to the City Sign Code. Applicant may apply for a sign exception as needed. Please review conditions carefully. If you have any questions regarding the conditions of approval, please contact the Department of Community Development at 408-777-3308 for clarification. Failure to incorporate conditions into your plan set will result in delays at the plan checking stage. If development conditions require tree preservations, do not clear the site until required tree protection devices are installed. The conditions of project approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d)(1), these conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to fIle a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Any interested person, including the applicant, prior to seeking judicial review of the city council's decision in this matter, must first file a petition for reconsideration with the city clerk within ten days after the council's decision. Any petition so filed must comply with municipal ordinance code 92.08.096. Sincerely: ~4'H- Grace Schmidt Deputy City Clerk cc: Community Development ( -/ '7 I . i . ! I I r ~ j i i i f j i J / TI-lE FOLLOWING NOTES AP?L Y TO THIS SH&, ONLY PROJECT SCOPE 1\ r..r-"-""-""'-""-~J~ , PUBLIC ART FEAT1iRE-'\ 2, NEW BUILDING C aT' 2 STORIES - 34.289 SFI~ \j~\ ."-""~-'~~~~ 3. (E) BANK BUILDING f\ TO BE DEMOLISHED - (5.174 SF) L0. (E) 19640 MARKETI>LACE CENTER TO BE DEMOLISHED - l1 0.093 SF) (E)CURB ^ TO BE.PEI>1QlJSI;IEO~_ G 6. ~ESTRIAN WAITING ~TA ~ ) ~ 7. MD91ReA'RaNs-:rG-{Ej-PAAKING LOT NOT WIllilN PROJECT SCOPE I KEY NOTES --_/ ~ STEVENS CREEK BLVD. f8\ ~ .~ , I' ' ..r----... y I ' x. \ ~ ,..-.... ;--.. .--.,./ \!.,. \ : J ",;1' I " i J i ) i J \.' r--, I ; rh ", ... \, )0 0 I !II ! III , i I! I & (E) RUILDlh!G f.\ (El BUILDING B (E) SHOPPING CENTER 00 I ,~ ~ N m =ibi ob q. 3:.!.:i I ~ N =n::s:::.' ," ~ . 3...!:L ~ ~ , I 0 =mE "Li C? O i --'--- -_.. " ~ I ~f\ - ZKJ::) -00 j ef-\ - ~'Y::> - olt' id'.I~pr,uq 'A# "::1......"'5- 04 $...il " ,,~\;. t c.... ,;;;;v.-; /:;.~t]~e:~h~;: :.;.-:,:;;;;~r- V. \' I ;:eta':";r'", r....',.,::;:,~,.d".r. 1014101 ..... ... -...a.~"~("'~"".;;;;. '_'- .l:'1.....'...::....)......I;;;,!o..." _ \t/ I :.'.:.:. , rhH r..,'.:""",;; Oi ... ~ -"~J- ":"".;0;-0,,:;_..,,_ '-f" I I I I L__. ;:~e:~;~:;:;:.{~::;;:>/ / " /, //. / ~?j/ f'j ~~ n(.')(, )(~) (:.l.L:.Ji.'J Ii,) '.) (..:.).l....:..lJ 01,) I,) (.)i ' )1 :...ll..:....H_.' \(:...ll..:...l(.; Ii .:..J.L:..}LlJ' j(., , ~ _ ___'. l..d_~ -...=. __ _. ;;-:~""-'" 'c._' -....;....' _. _' '-- ,_ _. ___ ..:=..--_ ....- ~ -- -- ~. , ~i ~~~ CD ~~~.;LAN N EB ~ ro ~ ~ ~ , 'I I . : ~-- (IN FEET ) \TH I,^, :;;::~ ;JlD,)O>9nd o...a..e.tk~12 ~fS\O)Uleell5 Fe l5'ID)l.!ea!IU ZTZTo.." RD 1"-=. $llloo 0 DM.C/..Il5e.e '"*- lSEl)~ ~ lm)rSB-oOaa I- Z w O:::E we.. 1-0 Z..J Ww 0> ww UC :5~ 'Q. ..J ti<( ~O 0::0:: <(W :E:E :E o () "C (ij ttI >- al c: - .... iSg IIlm .>J!.f.) CIl al - .... 0 f.)C: mi:: c: Q) ale. > ::I .sf.) C/) -""'" SITE PLAN -.... HUKWH """" OS""""'" SSWOCE USE PERMIT &.I>SA. ........ .... 08-Q3.2005 ....".- A1.0 I SCOPE OF PROJECT '='-, I ~ '1"",\ //,r , "Il'iicj i !! I ------.:~'"":'"'-"."~;-~' ~ - - ., -- - '~>\t,..:<,:'.' I :';,.;/:, ',-:.,,",: I' "''-';'~4 I , I n ^ /~I\ <:JI,,, ;:"I~' J.' <1 \ ./ U i ,f I i \ - I .LJ~' )< . . !' '. ' i i I ;d-L.;, , ft,.,' , '. '--~/.('~:~'~i I ,1 ' ., ./ I -I \ ~ I J \, J>( . " ) i 4 i \, Vi ------- 1.\ .~ ,.......~:~;~... H '1/' .......------:- ; . / '-...._-~' ~..J...'.. ,,/ ~.:~~ // II'" I.- ." ,,:y. Ii Ii I I I I I I I I I I / / I /'./[ I /' / ./// . 1.<:. i'. I . / /1...., I /,' :/:/ .//1',/ ',".' I / / I.' ,.:,..," I . ,,/ / ,./ A~ - ,,' ,.. I / /Y' H;! I I I I C ~/ /~::// ./// ",,///I/~ I : c.." /. /~. ~ I I G rp~I'~v /~>.~\~ i I ~1f> c c ,..,.. S I S I S I S I sl 5 , , ,B~'- i i. I '1 I I I ~ . 2O'-S."-1 31'-11 'IB . >:'~ o'\. Gis. ~ ~~. ~'g 26'-1 liB" 20'-0" 1.r~. o'\. eo , ::; eo., '", o ~ 51S S IS S S S 1.5 s S 5 5 ! ii i << ! f I . I~< II' t I I f Q// if ' h · ",- '."', ~ - N E9 2S-D" o w ~ ~ ~ ~ ~__..; I I I : (IN FEET) I L \'\"III~~ :=;:.:.. 3e3t>>01l1nB o.=:."::,oo..GG:,2 "_ISlOje:u.msllll F--..: rSlO)...... 2:2fOt..R...._.6oI.0 D.....t;I,.ll5018 p*,- (5aI)J 1S.QM Far. (53ID1J!iS-Q(!ll I-- Z W a:::E We.. 'I-- 0 Z..J Ww 0> wW , t) C :3~ - e.. ..J I-.c( w- ~(.) 0::0::: c:::cW :eZ :E o (.) "C ~ ~, al c: ~g COca ~O al Eo oC: 1/)1:: c: (I) ale. > :;, .sO C/) -...... GROUND FLOOR PLAN BUILDING C _lit HUKWII ~ 1>$ SHOWN -- USE PERMIT (. ASA .........-. D8-03-2OOS -- A1.1 1"...._l!'IIftIfI.hI...,....~.J".. ......_ ".".11:"'- (fl (fl , (fl ~z' (fl "'- " ---------.-- 1)"'-' (fl -~o''''-.:;;-''' ------.....-...---... /1. '" --- ~.~~ . en \" (fl Ul . 0'\ l/ I ,:1 _._~.::;- CI ' ". "'- ..' I \:- ~ ) >1'1 if ~ 1 . u Ii "" _" II ,~ \,> (fl " '," '~" ''.''''-." '.,~ """'- " ........,.... "'." ..,.... ''\ " "'" ..'.....,.. .,'........ -..'!!.-..--..--.-- 0 "~"" -'" ""'-",- ."'........ -', . ..,',."",.,........,..".,.....'.,..,"'.'.,.,."", . r---'''- (fl "'.,'",, """ "..., ",- "'_ . .,..... '"'' . <'\ --(fl'--- U "'.-., '''''-...,' ". .... "'",- ..../., .:.,< """ -'-'" "'" '" "'" ' \~ ., \ "-'., '" ", . ", '..: "" ., "\ ". "'. '., ", 'f', 't ", '\'4' ','\, ~-: {~'<, "'" "', ",' ...:) 7 : Ik; ':~,-~r(' ,_,__~~:"'~,_,.~.",J~~2,// "~~___,, I )) / // Y//' / .,/ '8> I " ,/ ~O (~JlTrmTL __, '~__IIJlI!rlliP . . "\i) ~ "'-- ---- -" '" / ~ 1f r;..~" ~~-.~-" 7 II ',~ ._.,,~-... '" / 0 j/ ~""=_ :71 ,''''<':..., .."<~~:. '" "'~. /0., '.' f:" (C~'~=O'Er:::::J> ""..... "" '" ( ~~,< , I """ -"" ".... '" '-', I' '''''..'''''-' ......'..... '''.''''" '.~.. '" '" --< '\,,', .... ' '.........,... -.,.,~.._,...,' """'" '" '" 'I -----.------ '. ....'>"''''' ~"..".,'.<:.~,,,-~-----== E" -=--I -.--------: '" ....,... ",- ".." "'" ""'" / "I: ~ ". "".."", "'-'-'.",,-".../'/, ------ - --: "" ..<.~/.~//(." L do!)cr====J I' -- : " '-", ~....../,//~<.., ~ . I l , ". '/ / / ~-:~, ~,.m +- '" / ",---..:::;;, I I ;;~>,:~.,)/::~/,~ '~~~~~..~~... /",,- lllL 7" , ~. '",,1}"': / ~. ~ ~=-~:;/ ~ =. ~ . / ~;, !;i.. .;:,,~ .-.-,,/ --........ '';'''''' ._ """.....-'C':::::."::..~ r: trr1 - ,==~,. -~.-5""" "'\ ----- ~:, ~Q- .... ~"_"R'_''''''_'''''~ r.-...--...-..M....k.. 0 -- ------ ,; - S' 1"\ \ :. ~! , )IJ:~ f,< - --l;r- ~ !.. (fl (fl (fl Ul ..... ~ w ~ c .~ F "i g z G) o en m o o z o -n r a o ;;u \J ~ Z ./ / ,. 'I \ I --hi I .1 1 I --!-.'- I ! I I I I, il ~~~ >- i~ !\11.l 91'-1 . ""'.. -0 .1 I' ./ ~ ---nrlmT 11~~-Ul~e""rT _~ __.._n_____ !I' b <~~;~:I/ z :: '. . L . i"V Fd~!" m.l_IJ~1 J_IU, I "LI,), I J~b1UJ} l~lJI._I/ ~~fl~kfi::.:(::;.=~..~IJ~J '\ 0" P~l Lp~~P~A . -1' . T~9f}~*\ I ~ .~~ -I. \ 10\ .' I. ."~!j' -lJ ,I II : I II i! w-oen I I'Uf I'll; Ill!i c~m )>1 - 0 ~ MARKETPLAOE CENTER n9,; ;;'91 == r 0 WlUI - !l:; g z COMMERCIAL REDEVELOPMENT ",. .....30. =l Z 0 :;J po G) 11 . ~ o r Slevens Creek Boulevard " i N a II, I" a Cupertino, California I I ;;u ~"_I!rn'I"....,.._~,..,....MIJ""" """"_,.... .....,.,. " ", f./I "" " " " / ,'''y' )~'.":."'.""""""<. >\'" , h! 0 )1 llltt ./ / .~,~l\'I'I"''- ClJ (p (~ ~ ;:0 ~ 0 .!l. 0 q "T1 \J ~ EB iZ """'C<:,. 'j """"!'"'''''''''''''''''' r'""'~""''''''''I''1",I:l'I'\'''''''"''''''''''''''''''' ~",,,,",,,,,,,,,,,",,,,ffillml1....,,,,,,,.........,,,,.; ~ -:=1 J: 'I F~::<,:~:~~.:~::.'t:l ,",,,,,,,,1,,,1l,,,",,,,,,~,,(. it ",,,"',.....,,,,,"',,,,,,,.."'."',.,,. -0 -iii -~ _~~ij@~JjiiP ..........::..:..:........:..:.........::.~~.....................~~._"-^._-~>...~~;/ "".."..",,"'"'''..''' ..."....".""/ IK I I J '''' ""'"'''''''' """''''''''1 li""''''''''''''I'''''''' II I II I I II j ~i., I I , I ! 'i : \- Ii "\J': ,[ 1';::'1" ! :1 i. ~l , q I ., I ., , Ii I " 'i:,'.,.'" 'I. i! .' [I , : , I I I i I i , ii 1" :i! 1/ ....:"..,''',::,:::,::::,:::"''''',:,''''~",:",:,,,:,,:.,,::\'i'!::":?'~'"i':r:!;,~,,:l:;''' ~td~:i~!~! _,,_:,f",,~:i!t! "'T'.;'I;':" i ': I I i',.', I I I I !i .... .. ii.... I! I j I !i ;i :! !< :[ .._~ ---/' ;; Ii ii I, ii; " """.".T'...... , " , ~ -~"'--ll, I' ~.Il""', 11,,,..,,.....,[ ! ,..1[..." l' .........JI., "II,....",] /...]1,_". 11"...."ll, l/,,,_~~/,.II,.,(..,.ll,,,,....I!...,,-,~.II.,,,,,,!.,.....,. ",i II".,.....\',"II""II".,J, .. / ~ . I? ~ I ... " , .. " .- ,. !~ L I', ' " r, ,""" .'. I . -lit "'n<."['",",'111!'1 " 1.'iIm[",m". "'III'lil"''''''''''''/;'''''.''''''''"'' ~"""'"'''!'''r'''''~'''~''''''' ."""'''',, ,~"lI..'''' '''m''~ ;Y~''''''''"''''~''''''r' """,,'"'' ""j'''''''' "'~"'. '" "'.," ','''''),.'''''' ",r."''')''''''''''(:''''\'''''''''''I,,,,,t'''''''''''''''''',l,.'''''''''';'.''''''''''''1;..,,''''''''.''[.;''''\''''.'''....,''''''\. .....""( 'k:~" . \.! I!I r,l.o; l~~ e A n ~ 11 tl \.~ ,}t " \ l . \ . " '. J. J IP V\~:t-I~ .'. j ft . J f, \ ! ,. -~ ; II j I iBil ,I ;:0 i OJ \II .r. lol~"" , rl~~ 'fi~ -< 0 I " )>1 ! r i MARKETPLACE CENTER 'i' l- := 0 ~ n~: ~~~i "T1 U!{ Ii! - 1:: \J I ; I COMMERCIAL REDEVELOPMENT ... ....},. =i ~ po > . ~ z I ; 1'1 tv J> Stevena Creek Boulevard ,Ii i y~ Cupertino, California 1 1 KEY NOTES .'2a". i~ I I I I /:'1 ' r-'-.J I i i _f::'\3 '-'-'5 'r~2C ~~2b' _f::\10' -~2b _c-.13 , I ~I ~: ~ i "~ I "J I \J i \J I I I ~~/-~---T-~--~~-lv-~r---'-rr'~~~.~ THo FOLLOWING NOTES /<.PPL Y TO THIS SHEET ONLY 1. TILE ROOF TO MATCH (E) BUILDING A- ClI<Y "S" TILE - MSA MISSION TILE BLEND ~! I ~ '~2 i'~ : I ___L i ~----- - -----+---->r---~~~ I . , i I ~1 ______L "I -I -I"....:~ Q' ~:t, I?\\i 6 2. 718" EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A - PAINTED "DARK BROWN" .. KMB50-N B .. PAlNlcD "MID BROWN" - KMSBB-D C - PI<.INTIOD "BEIGE" .. KM5BT-M 3. ClEAR GlI<SS IN ALUMINUM STOREFRONT WINDOW WI 3" RECESS ~ t~ 'Wi ~O'.a' .-{>- 4. FIRE RESISTANT FABRIC AWNII~G h:DY USED G) ~1~~:~ ELEVATION'~ STEVENS CREEK BLVD. .. BUILDING C ,.-----'...,--"".--""'--...-/._____"---"'---/~__"'_"".__^___"'~~~J 26 5. CEM"NT PLASTER EXPANSION CONTROL JOINT, TYP. r@ 6. METAL PIPE RAILING WI PAINT FINISH- PAINTIOD "LOAM" - KM413 NOT USED 7. LIGHT FIXTURE --~iCm;-~4 8. METAL TRELLIS-PAlNTED"DARKBROWN"- KMB50-N NOT USED ~ , ~ 9. EXPDSED GlUlAM BEAM. PAINTED "BEIGE" KJ../.5B7-M ...... 10. WOOD 'TRELLIS.. PAINTED "LOAM" - KM4 13 & 11. METAL FASCIA - PAINTED "DARK BROWN".. KMBSO-N NOT USED 12. GlASS CEILING! ENCLOSURE ~ BAYWINDOW~& 14. WOOD LATTICE WI FLOWERING ~ ~..........,.,,-~~ 1 ~~"2T" '7 -- :-~~--~- _ -Ie I ^ .. f3\ SOUTH ELEVATlO :1 LJ \::..) 1/10"=1'-0" N - BUILDING C & o w ~ w ~ ro I _.. I I I : ~ , (IN FEET) ~t\ ~~.ct.ol &1\-OO~-OlP A?PROV Ai. U - o:DS-Cfj e~~.:;~~t J4tio~' P!mwi;tg Commtssi:m I J.94 J t:XP al . i}r1. CUJf C(Jsmdl 1j DL? .~ o ---l ------- ,'---"",; SJ F, '. l ,I f '--I 1 . i I : , : - : . , " 'i: IJ' 0 I 1- />~ ,/ ~- I I ~ I i . I i f ~~!, I .--I L- KEY PLAN - not to scale ,Tn I..~ :;;::_ y_1t L............... :JCJ')It>BInC [Mt.no:l.CA....u P_15'D)~ f-a 'SUI} oe-eall urro.-R"JtP_.IlllwD D......C\RS!Itt. --......... F.: f5IO)T58-QllS & & ~ z w IX::E wo. 1"-0 Z..J Ww u> wW '00 ::i~ "a.. ..J ti~ ~o ~.a: c(W :E:E :E o u - - :zD:IUIU61asa:;UD! .........1llU! ENLARGED ELEVATIONS WI NOTES -.. HUKWH ~ AS SHOWN ........ USE PERMIT & ASA -.... 08-03-2005 .......- A1.4 "C to ttl > .- (I) c:: - ... ~ 0 otE: COm ~t) (I) - ... 0 t)~ lIJ1:: c:: (I) (l)Q. > ~ $t) CI) I. ~ ....--~'-~~~~~...............--- ..............-..- ~ ~ ) ) J f i ~ i i I I f i I i ~ ~'1: i ',-" I ! ~-""L~C--rr--- I iD.ROOF' -------' , : 1'-- e:-.:----y------- ~ i~ ! i i .~ i~ i I I (;;\ t::'. r.;;:, r!.J I\~ -2;; ! (~~~~L ~'3' f\:J I . ""'-0 ----...!T' -- e-:r.o.2~PI..Il '? '~ ~..._--~ "'~~ 'T )? L~'~ ~LEVATION - BUILDING C o 10 15 20 3D 50 I I I I' , ~ I I [IN FEET,} ~ 2 NORTH ELEVATION - BUILDING C WI BUILDING A SHOWN FOR CONTEXT 112O"=1'-!l" ~ ~ NORTH ELEVATION - BUILDING C (PREVIOUSLY LONGER VERSION)WI BUILDING A SHOWN FOR CONTEXT 1J20"=1'-!l" ~ ~~~~"'--^--"'"~'-""------/~^'--".--^-"--' ~--' ill '. n --;:----. --,---- - - -g:i3:'" --- hf>(~f\ - ~~-cx.o) 'Si\- L:YOl.O ~ ArJ.non'\,l'~ / J.::-~~':::" 4q:j 't'\~~~ ~../ . - =-- Ap~~E:!!.::f.i ftC'\~~ o ' 20 30 4D 60 100 . I I I I : --- I _ I PI!umcDGfJ Cemml:.'s.lcm '/94/0l/J :Q } -:r 1 Q{;i__ ( IN FEET ) City OnmcU KEY NOTES THE FOllOWING NDTES APPLY TO THIS SHEET ONLY 1. TilE ROOF TO IAATCH (E) BUILDING A- CLAY'S-T1LE-I~SA MISSION TilE BLEND 2. 718" E,."TERIOR CEMENT PLASTER S'(STEM ON WOOD FRAMING A - PAINTED "DARK BROWN" - KMBSO-N B . PAINTED "MID BROWN'" . KM5BB-D C - PAINTED "BEIGE" - KM5B7-M 3. CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3' RECESS FIRE RESISTANT FABRIC AWNING ;.,tDT USED 5. CEMENT PlASTER EXPAlNSION CONTROL JOINT, T'<'P. 6. METAL PIPE RAILING WI PAINT FINISH- PAINTED "LOAM'. KM41.3 NOT USED 7. LIGHT FIXTURE 8. METAL TRELLIS - PAINTED "DARK BROWN"- KM8~ NOT USED 9. EXPOSED GLULAM BEAM. PAINTED "BEIGE" KMS87-M 10. WOOD TRaLlS 0 PAINTED "LOAM" - K1M13 11. -METAL FASCIA- PAINTED "DARK BROWN'"- KM~. NOT USED 12. GLASS CEILING ENCLOSURE t .'--, BAYWINDOWSYsTEM ....-~ " WOOD u= ~"'"""'" ""'" ? & '2' 'Y' C----- - .:.- ~l I :~; . d L---, 1 I I.' -', l! '0 ' , . . j , 1 ~I__ '3 ---.! I , - ~ --" ~ '---' ;/~ ~ .-~ CD KEY PLAN - not to scale \J/ \TiI I..~ :;::.. 3a)1)-.BlrlIlI: ~1Ill.t:A.DCaa '""- 151DI~ ""::t(5111)~ 272TD.:Rop-..sw.D o..'....C'O"D58M1. 1'1oo..lSXJ)~ Fe. fSiO)1'!ii8-OU I- Z w D::::E Wo.. ~O Z..J Ww 0> 'W W'e Ow j~ 11...J I-~ w- ~O ~a::: ~w :e:E :E o o "E co co >- co c: ]g c::lm ~() co CIl - ... 0 ().5 Cl)t:: c: CIl . CIl Co > ~ CIl() Ci5 _nn.e ENLARGED ELEVATIONS WI NOTES -... HUKWH """" AS SHOWN ......... USE PERMiT & ASA ......,.""" oa.=os ........... A 1 .4a 1........~_'!'nmI........,....~~.I.... """"'_ I..II\;IRII.,:!'\IroII N ~ ~ " q 5 z rp W 11 II 1 ~ ~ :>' ~ ~ 'l':;:l ""'0 ~~. :s () Ir.l b f'J ~ U\ ~} ''', ~;! :- ;,~ 0 II r". ". c: c::'"" ><....> "" il' '-.) ~ ~~. .[ ~ -(\) 0. --=-~O~ \)~~ [d~ o -\) t) (;' '0 o ~ '<:<, '<;.~' ~<, '" ". """,,"', '. "~' "" '" ~<\~ ~'; "'" "'~'''>'\' , "'....., . :, ".\. ";-, <"'- ...,....~,~ :::\~~". '. '<:' '"",-> ~<'~~ .;..,~<,.,~, '.:.,>~'~' "'. . "'~" .,....,..~- ~:~~;~::;. '. ~.~..." '" ',..~' ~,~~,- "....,.. ""~;"""'-'" ""'~ ~~~~',., "~" .::.';~,,"" ~~~;~2~~~ .. ~.< \"'-""~~" ~,~, "'>~ '<.',>':-, , .....~.'\,' , ".~ ~.,. ""'~ '; ~ ".' "~-':~>-" '. '''~'". "::"" '....~>~,- ,\:'.:, ", '" '. >.:':'. ". .~~~ .'\~:: "... ", .,<.....................':;:., ..... .,....:-". ':-~ ...." , ::~~~~~ .>,", .,~ <~,'" ',; , "0- " ,,~< \> "'\0 '~"~'" ' \~:;:.~~~<;: ~ "\.'\~t .<~~.>: ~.!!. ...<:,:>. '" ,!! ',,",.:\:\: ,I ~~.... ."<>. ....,.'\:..' '- ,I' "'.,~., ~ " ""~' 'Ii \;"" ",0:; :::~:~~'"~ ;~ ~"":" "'?S ~","~." .....,,~,. "-"" .... .. ..,,~'.. .~~~~~:1 " ~,)- ~~\: """ ~. H. >. "~''::~I! ,>~>, \:~, .1: ',,"'. "",~,,'" >~~,<'~: . ,.~. ~~. <~,~~,~ ;;j~. '.~.;. ';' "'>~' ' ", '''''''~~' rr--\ ~ ,," '" "., '. \"" '<'.r', 'e ....~,., ',' .... "'" " ""'" '.,,"~ ""'.""~. "" """",-,,, ~" '. "..,,~,~:'-... '-,' :. "',-~,:,., ,', .,'," ...~,\ .....,:.. ..-..>,.;;;..... ", ~ 0:-111 ."'" -. ~ .~ ~, ." f) ""-':l)' """,;:1 -0 ~ -0 -. -'" -~ 2: ~ -l!l 18'---0' -~- .~- .~- -{1 -I+--i+ P OJ b b ~ r ' ~I~ r ; . LIJ I I I I I I I I I I I I I I '" !'I ~ o 11 i1 m -l I I I I __J ~ ,. --l I I I I __J --l I I I I __J I I I I I I I I I I --2!OL-~t-_I~t2o~t ~' ~~1' " ". ~~. ~~- b1 ~~. il. Iillj d~ .~. ij; -l!l ~ ! I ; I is il UlW I '" " - , 'm l'lg ~ )>1 me ! ! i . . ~ i il.... 0- ~ MARKETPLACE CENTER n~~ ~~~i = -I' _0 Ul! II! - g !I: 0- .... --\, =i zZ I m I COMMERCIAL REDEVELOPMENT ~ "" cnG> i ~ , ~ v 01 Stevens Creek Boulevard Iii i I i r' . Cupertino, California l l ~ C1 m ~:nn'j \II '" tft \II lit - ~~p-[~~ ~~~o~,~ nil. n 'R [ l It if '~hlD :~~~i . ~ ~ ~{ J1~Z~"'" ~ ii I f ,~ ~ ., \" ~!!. '~~.Rd .?,,[~h < _I if ~ f" i i ~~. ~n .~ .. -! of : ~ ,P l r < ~ : :, ~ 'i. r. :a ~ ~ ~ ~ i'i.. ~f:~:~~~-i ~ ~~/ll)!.~~ I{ ~ ~ PQ'HJ[ ~ 'x'Hwl~d~ , ~ ,. ,. ~ "J !!. " .. If 0 . ," l' J ' :i r (~L~d 8, ., [ ~ 3 3 ,[ ~ . !{ I. . ~ ~ 'if:.il: ~ r " 'I' ~.It~'l l~! '~J[Ur"'i ~ ~ ~ ~ " " . ~ ~ I fi! . . " tl ,~ ~,. !.' fi! .~ t ~ Q n I ''t to " dp ., .\ . N ~~.JJ 1 1 ~ ~ iii ~ !t m ijj l; " ~ ~ .~ ~ r \P ~. r ~ f ., ~ ~ .,. P' ~ ~ D' ~. ~ c 'I ~ ,~ .. i a: j ~ n Ii ~ ~ I ~ If if ,~ '~ f .. 6 " I' If . R ~ if ~ [ ~ ~ r ~ t ill ~ ~ g [ /, /, if ~ I{ . . ~ UI ~ UI . Jo l'l } <l (j!i! To - !l \II '\JI \.II 111 'It \/I ; [ ~ ~; fA ~ ~ j' n I! l~~iI!!. l'z~ ~ ~ ~ g \I ~ t1 D. Ii ~ ~ :, If ~\ ~ F li' . < ~ .l-r1i~ Ii . i ~- ~ ~~,~n ~ 6.:.J, ii' 'fi 'U :I f-',~R~ ~ 1~~~) z l 0 ~ ~ ~ ~ d!' ~ ~\11 if . . . . t:') ~. ~ f.:.) ~, "~i) ..~ .~ ;;:;. liil (") 'Q ~ ~. ~~ .~. ~ ~\J - J,l) :::J ~r-t- r- CD ~(Q ~ CD <:J ,~ C. ~ i1I ~ 8 ~ a ')> (/\ )> ~ , ~~ <: VI > ~" \ s:::.Q :iX , G ~~~ ~ .,tS~ - ~: IJ\:J:> o .. " l)~~ j~ ~~ - ~i ~~~J ~ ~ "" o <lI,., ..... .,. (l.'J: J.(:" ll''i (/ '-" \1.) (j ([tt (I' iF I (L~ ~~~t ~ \'.) ([} (L~ I I..., ( . ) c > n (. , (.~" (1.1 i:::. (F' q.:. (i:' .~::: ~l~) f i(.:-; ,I:" 'I:.::' ;';3 i!' !~ ~ ~ -- l~, " f r- l-~--~ ____1..__.__._______......_ "11" (') EB~ ~~- I i ~ $; to ,- )> 0 0--1 )> J> Z Z c: --I (j) ZCJ (') l'i ~ "U 0 ;u VI r'1 ~ ~ ~. (;lJ 0 :c (') " !il ~. ~ c m ^ )> c! ;Q 0 " ;! . lIJ r Z m "1 )> i x o iil g "U -l r z ~~ -l "U m z -0 R ! ~ ~ GJ 3 .. G) m 1-- ~ ;Q -' ~ z ~ @ 0 !" tII 0 ;u () ~ , c rn ~ G) = 'U 0 t ~ o .. I ~ Di m 51 I " a ~ I " BARRIE D. COATE and ASSOCIATES Horticutural Consultants 23535 Summit Road Los Gatos, CA 95033 4081353-1052 Exhibit B AN EXAMINA nON OF THE LANDSCAPE PLANS FOR THE MARKETPLACE SHOPPING CENTER Prepared at the request of: Gary Chao Planning Department City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 Prepared by: Barrie D. Coate, ASCA Consulting Arborist October 16th, 2006 (Revised: December 2006) Job# 10-05-236-06B 1 ,/B LANDSCAPE PLANS, MARKETPLACE S.C. CUPERTINO Assignment th . On October 16 . 2006, I used the landscape plan prepared by Greg Ing Landscape Architect sheets L2.1 and L2.2 to review the proposed landscaping at the Marketplace Shopping Center in Cupertino to comply with Item 2 of the new 2005/06 document from the City of Cupertino. In addition, in Item 2 I was asked to review the tree replacement items in Items 5 and the new above grade sidewalk in Item 6. Observations Landscape Plan: Typical of Mr. lng's landscape designs, the majority of the plants on the list should perform very well and are well suited to the site. I note that he is using a Hybrid Strawberry tree (Arbutus 'Marina') as a parking lot tree on the east side of the new retail buildings and the New Zealand Christmas Tree (Metrosideros excelsus) in most other areas as parking lot trees. The tree chosen for parking lot use should provide shade for cars especially in a warm climate with black pavement. . Comments Item 1 The New Zealand Christmas Tree (Metrosideros excelsus) is shown in many other locations and currently exists as a parking lot tree. It would take many years for these trees, even under the best of care, to achieve more than 15' or someday, 20' in height. Obviously they would never provide significant shade. I suggest a species which would provide shade in the parking lots be chosen for this function. Note that nine ofthe existing New Zealand Christmas Trees in the parking lot have died. Since the spaces in which these are planted in the parking lots are so small, (4 feet x 4 feet) the species of tree used here should certainly be one which is relatively unlikely to cause pavement damage. Species which would provide shade without causing pavement damage include: Columbia London Plane Tree (Platanus acerifolia 'Columbia') PREPARED BY BARRIE D. COATE, CONSULTING ARBORlST OCTOBER 161H, 2006 " I-/q LANDSCAPE PLANS, MARKETPLACE S.C. CUPERTINO 2 Queensland Box (Lophostomon confertus) (syn. Tristania conferta) Chinese Pistache (Pistacia chinensis) Maintenance requirements for any of these species will exceed those of the New Zealand Christmas tree because they are much larger trees but the Plane Tree and Pistacia will only drop leaves in fall and the Queensland Box will drop old foliage in spring. It has been demonstrated that a well shaded pavement can last 10 years longer than a lightly shaded or un-shaded pavement, so much of this cost will be returned. Item 2 As previously mentioned, nine of the New Zealand Christmas Trees installed asparking lot trees in the parking lot between the Elephant Bar and the Coffeehouse have died. In my opinion, these trees should not be replaced by more New Zealand Christmas trees since that species will not provide shade for the parking lot or for the parking lot cars for many years. Item 3 Removed trees: It appears that the following trees larger than 12" trunk diameter have been removed from the project property, from the area east of Building C. They are: Coast Redwoods, #78, 79 and #83. They had an average DBH of 19.3". They are valued at $25,000 which is equivalent to 1248" boxed, or 26 36" boxed trees, in addition to the removed Mexican Fan Palms. Item 4 In the area north of La Patisserie restaurant, adjacent to the Red Miso and adjacent to the west parking lot entry, three very large mature Chinese elm (Ulmus parvifolia) trees have been severely damaged apparently by grading and other construction activity. One was dead when the tree survey was done in 2005. Two of these trees are producing small amounts of new foliage but the majority of the canopy is dead and has resulted in a very poor remaining tree. On the other hand, another of the specimens (#6) by Red Miso is completely dead. It may be claimed that these trees were killed by Elm anthracnose, a fungal disease, which defoliates Chinese elm but does not kill them in a short space of time. PREPARED BY BARRIE D. COATE, CONSULTING ARBORIST OCTOBER 16m, 2006 '....20 LANDSCAPE PLANS, MARKETPLACE S.C. CUPERTINO 3 In contrast, tree #4 has the appearance of a normal Chinese elm at this time of the year and is healthy and normal. - These trees were no doubt damaged or killed by the construction activity near them at the time of construction. Each of these two trees was worth at least $4,580. I suggest that each of the four dead elm trees (#5,6, 7, & 8) be replaced with at least a 48" box sized Grey Bark Elm (Zelkova serrata) or Frontier Elm (Ulnus x 'Frontier') A guarantee of their survival for at least one year should be required. An additional two young replacement elms at the south west entrance of building 19772 are primarily dead as well and should be replaced. Both appeared to have died for want of adequate irrigation of the root balls. A decision on what replacement to use and when to install them could be made at a later date, if desired by planning. Item 5 The new sidewalks along Stevens Creek Blvd will trave.l between a double row of Evergreen Ash (Fraxinus uhdei). The three existing trees on the south or the parking lot side are all very large old specimens of at least 2' in diameter. On the other hand, of the nine trees on the street side (north side) two of them are very old similar trees while the rest are much younger specimens. If these trees are to be maintained in a healthy condition after a new sidewalk is installed, the sidewalk will have to be installed without cutting roots of more than 3" diameter. Since the existing sidewalk is being displaced in several sites by the largest of these trees, one would expect the existing sidewalk to be raised in other areas in the near future by other of the largest of these specimens. I recommend that one of the following procedures be used in the installation of the new sidewalk: Remove the existing pavement in all areas within 20' of an Evergreen Ash tree. a. If roots of 2.5" diameter or larger are encountered directly beneath the previous pavement employ City of Los Angeles detail "Sidewalk Ramping without root pruning; Parkway setting ] I City of Los Angeles detail "Sidewalk Ramping without Root Pruning; Parkway setting" PREPARED BY BARRIE D. COATE, CONSULTING ARBORlST OCTOBER 16TH, 2006 '....11 LANDSCAPE PLANS, MARKETPLACE S.c. CUPERTINO 4 b. Ifno roots of2.5" diameter or larger are encountered directly beneath the previous pavement, employ City of Los Angeles detail "Sidewalk Removal and Replacement with Root Pruning: Parkway setting. 2 This activity should all take place during the dormant season (December-January). Respectfully submitted, ~I)~ Barrie D. Coate BDC/phlg Enclosures: Assumptions & Limiting Conditions City of Los Angeles detail re: Sidewalk removal with root pruning City of Los Angeles detail re: Si~ewalk ramping 2 City of Los Angeles detail "Sidewalk Removal & Replacement with Root Pruning: Parkway setting" PREPARED BY BARRIE D. COA TE, CONSULTING ARBORIST OCTOBER 16TIi, 2006 /-1;) " BARRIE D. COATE and ASSOCIATES Horti cUlural Consultants 23535 Summit Road Los Gates. CA 95033 408135S-1052 ASSUMPTIONS AND LIMITING CONDITIONS 1. Any legal description provided to the appraiser/consultant is assumed to be correct. No responsibility is assumed for matters legal in character nor is any opinion rendered as to the quality of any title. 2. The appraiser/consultant can neither guarantee nor be responsible for accuracy of Information provided by others. . 3. The appraiser/consultant shall not be required to give testimony or to attend court by reason of this appraisal unless subsequent written arrangements are made, including payment of an additional fee for services. 4. Loss or removal of any part of this report invalidates the entire appraisal/evaluation. 5. Possession of this report or a copy thereof does not imply right of publication or use for any purpose by any other than the person(s) to whom it is addressed without written consent of thiS appraiser/consultant. 6. This report and the values expressed herein represent the opinion of the appraiser/consultant, and the appraiser's/consultant's fee is in no way contingent upon the reporting of a specified value nor upon any finding to be reported. 7. Sketches, diagrams, graphs, photos, etc., in this report, being intended as visual aids, are not necessarily to scale and should not be construed as engineering reports or surveys. 8. This report has been made in conformity with acceptable appraisal/evaluation/diagnostic reporting techniques and procedures, as recommended by the International Society of Arboriculture:- 9. When applying any pesticide, fungicide, or herbicide, always follow label instructions. 1 a.No tree described in this report was climbed, unless otherwise stated. We cannot take responsibility for any defects which could only have been discovered by climbing. A full root collar inspection, consisting of excavating the soil around the tree to uncover the root collar and major buttress roots, was not performed, unless otherwise stated. We cannot take responsibility for any root defects which could only have been discovered by such an Inspection. CONSULTING ARBORIST DISCLOSURE STATEMENT Arborists are tree specialists who use their education, knowledge, training, and experience to examine trees, recommend measures to enhance the beauty and health of trees, and attempt to reduce risk of living near trees. Clients may choose to accept or disregard the recommendations of the arborist, or to seek additional advice. Arborists cannot detect every condition that could possibly lead to the structural failure of a tree. Trees are living organisms that fail in ways we do not fully understand. Conditions are often hidden within trees and below ground. Arborists cannot guarantee that a tree will be healthy or safe under all circumstances, or for a specified period of time. Likewise, remedial treatments, like medicine, cannot be guaranteed. Trees can be managed, but they cannot be controlled. To live near trees is to accept some degree of risk. The only ~ay to eliminate all risk associated with trees is to eliminate all trees. dJaNUe~~ Barrie D. Coate I SA Certified Arborist Horticultural Consultant /-:23 APPENDIX 5E 87 b. L :'\ il 0 if" 0" rJl 1\ ""''{" ~_..".._. ~_L~ tCS- -;::,...- 0 City of Los Angeles, CA: Sidewalk Ramping Wit Pruning; Parkway Setting OPTION 2B - SIDEWALK RAMPING WITHOUT ROOT PRUNING - PAR 6' THICK PAD \o/ITH FOAM BACKER OR \o/\o/F 4X4-\o/6.5X\o/6.5 ~ SAND BACKER TYPICAL \o/IRE MESH (SEE NOTD f4'-O'l LANDING EX. \o/ALK\o/AY 3 1/2' EX. \o/ALK\o/AY ~33% HAX SLOPE .... _ HIN TV ~:.33% HAX SLOPE 7 ~~ ~~. u -7>..~~~ NNN~."'" ~ I \..- EXISTING TREE ROOT . / I r 5'-0' . ROOT ZONE~5'-O'~ SECTION A SCALE: 1/4"=1'-0" EXPANSION JOINT 20' -0' MAX. jLXNBiNG1 XPANSION JOINT I 1 I I CONC 'WALK\o/AY: <f. ('oj I , o I r I 1 1 /1 I' --- ( I " I { } 1./ l--5'-O'-!-ROOT' -"z~AREA-l--5'-O'~ EXISTING -- >./ ...... -1 G "./ '-. / TREE ROOT~~;J-- '("L --.. EXISTING / - r '- --- LA\o/N J EXISTING TREE ../ <., 6' CONC. CURB PLAN SCALE: 1/4"=1'-0" NOTES: 1. 6' THICK REINFORCED CONCRETE \o/ALK\o/AY EXTENDS 5'-0' BEYOND TREE ROOT ZONE AREA. 2. FOAM DR SAND BACKER SHALL BE PLACED UNDER THE DIRECTION OF A CERTIFIED ARBORIST FROM THE BUREAU OF STREET SERVICES. AT NO TIME SHALL ANY PART OF THE ROOT SYSTEM BE CUT DR INJURED. 3. SCORE LINES ON CONCRETE PAD DR \o/ALK\o/AY ARE OPTIONAL. 1-.25 APPENDIX 6E 87 /\!'.\ r~, -, ~ eIc~lca1L}( City of Los Angeles, CA: Sidewalk Ramping Without Root Pruning; Parkway Setting OPTION 28 - SIDEWALK RAMPING WITHOUT ROOT PRUNING - PAR'r'0NAY SETTING 6' THICK PAD ~ITH FOAM BACKER OR ~~F 4X4-~6.5X~6.5 ~ SAND BACKER TYPICAL ~IRE MESH (SEE NOTD F4'-O'l LANDING EX. ~ALK~AY 3 1/2' EX. 'WALK'WAY ~33Y. MAX SLOPE "c....MIN TV .~:.~3Y. MAX SLOPE ~ ~ 'h.~'::f>..~ 'h.~~~ N&N~ ? I'\..- EXISTING TREE ROOT . / I 5'-0' . ROOT ZoNE~5'-0' SECTION A SCALE: 1/4"=1'-0" EXPANSION JOINT N 20' -0' MAX. r-cA'NBiNGj 1 1 I I I I I I I /1 :'-- ( : '- I { J I ./ 1-5'-O'-!-RoOT' ~~AREA-I-5'-o,-1 EXISTING ~ >./ "./( G "./ "- / TREE ROOT--""'~r -('L ____ EXISTING / - r '--.. LA'WNJ EXISTING TREE ./ <'1 1 1 I I CoNC 'W ALK'W A Y : ~ o 6" CONC. CURB PLAN SCALE: 1/4"=1'-0" NOTES: 1. 6' THICK REINFORCED CONCRETE 'WALK'WAY EXTENDS 5'-0' BEYOND TREE ROOT ZONE AREA: 2. FOAM OR SAND BACKER SHALL BE PLACED UNDER THE DIRECTION OF A CERTIFIED ARBoRIST FROM THE BUREAU OF STREET SERVICES. AT NO TIME SHALL ANY PART OF THE ROOT SYSTEM BE CUT OR INJURED. 3. SCORE LINES ON CONCRETE PAD OR 'WALK'WAY ARE OPTIONAL. I <2lo r:- c-o \ 7rf-I/~NS ~r- B~Vj). ~. >i ~ i l ~i I ~i ~j &?i, 0\ ORe SUBMITTAL ARCHITECTS MARKETPLACE SHOPPING CENTER \~HI~~ Stevens Creek Boulevard Cup e r tin 0, C a I i for n i a Rev i sed A p r i I 9, 2 0 0 7 PROJECT DIRECTORY PROJECT INFORMATION PROJECT INFORMATION VICINITY MAP - not to scale OWNER/DEVELOPER KCR DEVELOPMENT 19770 STEVENS CREEK BLVD. C1J!,ERTINO, CA 95014 TEL: 408.343.1088 LANDSCAPE ARCHITECT GREG G. ING & ASSOCIATES 1585 THE ALAMEDA. STE. #201 SAN JOSE, CA 95126 TEL: 408.947.7090 BUILDING CODE SEISMIC ZONE: CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING HEIGHT: USE: ZONING DESIGNATION: CODE EDITION: 4 TYPE V-N BIM 36' MAX. I 45' MAX. EXCEPTED OFFICE I RETAIL 'P' - PLANNED DEVELOPMENT CALIFORNIA BUILDING CODE 2001 EDJT10N (2000 UBC WITH 2001 CALIFORNIA TITlE 24) CURRENTLY ADOPTED NEC, UMC, UPC, UFC PARKING SPACE PROVISION PER CITY OF CUPERTINO MUNICIPAL CODE TITlE 19 CHAPTER 19.100 MIXED USE OCCUPANCY CALCULATION MAXIMUM TOTAL FOR WEEKEND - DAYTIME NO. OF SPACES PROVIDED ON-SITE - 592 SPACES 0, z - lD f[ ;; -< ~ C Il 81!C!kliitin PI --- - 0- ~ ~ A1ltlll"IDr '" OlD - .. -< ~ a c C. p ...... C ""'- z ARCHITECT YHLA ARCHITECTS 1617 CLAY STREET OAKlAND, CA 94612 TEL: 510.836.6688 , !?... c: .... ... r.: ". ;",; EB CIVIL ENGINEER/CONSULTANT UNDERWOOD & ROSENBLUM 1630 OAKlAND ROAD, SUITE A 114 SAN JOSE, CA 95131 (408) 453-1222 BUILDING AREA GROSS SITE AREA : NET SITE AREA: NO. OF STORIES: 9.9 ACRES (431, 494 SF) 9.9 ACRES (431, 494 SF) 2 STORY STRUCTURE !? z (') 0 Z ~ ~ ~ ~ ~ > g ~~ ~ < )> ?; a c .. r.: .. N ~o,,& Ifd v*o ruhion P...- ~. "'0 ............ _..... e ..... mi'I ; ,.......... f c ... ~, g ~~ :ll S ~, E;- t.-q-t! .:: t'o.o.,.,., Z' 'Y i'D"t",r "/Jr1.- ~ < g J2 ID ... g. \Nhe~O" Ot 17 Brenda Cl ..- Pert Mel~ Pi-- ?ri~! Ave Stevens Crcek Blvd ~ :Jch"'?cd Dr ~ Crall Or Dr l SorMSon Avo.! r,) (J) --t c: ~ [ ~ ~ TOTAL BUILDING AREA SHEET INDEX GROSS LEASEABLE AREA o COVER SHEET 1 OVERALL PROJECT SITE PLAN lA SITE & SITE DEMOLITION PlAN 2 PEDESTRIAN CIRCULATION PlAN 3 GROUND FlOOR PLAN - BUILDING C & SITE DETAILS 4 SECOND FLOOR PlAN - BUILDING C & SITE DETAIL 5 ROOF PlAN 6 EXTERIOR ELEVATIONS 7 EXTERIOR ElEVATIONS 8 BUILDING SECTIONS 9 BUILDING SECTIONS & DETAILS (E) BUILDING AREA SHOPPING CENTER BUILDING A BUILDING B PROJECT SITE ARCHITECTURAL 73, 078 SF 24,461 SF 9, 947 SF PROJECT DESCRIPTION BUILDING C 33, 466 SF MARKETPLACE SHOPPING CENTER, THE SITE FOR THE PROJECT, IS LOCATED ON STEVENS CREEK BOULEVARD AT THE CORNER OF SOUTH PORTAL AVENUE. THE SCOPE OF THE PROJECT CALLS FOR THE CONSTRUCTION OF A 34,151 SF GLA TWO-STORY BUILDING, WHICH WILL REQUIRE THE DEMOLITION OF THE (E) BANK BUILDING IN THE NORTH-EAST CORNER OF THE PROPERTY. THE PROJECT WILL ALSO INCLUDE THE DEMOLITION OF UNITS 19640 OF THE EXISTING COMMERCIAL BUILDING, AND TO PROVIDE NEW OFF-STREET PARKING IN THE ADJACENT AREAS WITHIN THE LOT. PROPOSED BUILDING AREA lANDSCAPE Ll HARDSCAPE PLAN l2 TREE REPLACEMENT PLAN l2a TREE REPLACEMENT PLAN L3 IRRIGATION PlAN DEMOLITION SHOPPING CENTER (E) BANK BUILDING (10,093 SF) (5, 174 SF) TOTAL 125,685 SF RECEIVED APR 0 9 2007 BY: Ul I J ~ l ~ o ] o SJ J o [] ] , ~ ffi .- 41 ,--{ 7' STEVENS CREEK BLVD, .--rs 4~ OVERALL PROJECT SITE PLAN 6) 120' SCALE: 1'. 4~ 4~ 8~ ----- /---..... I '\ [J KEY NOTES ) I THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY PROJECT SCOPE 1. PUBLIC ART FEATURE TO BE PROVIDED BY OWNER. SEE LANDSCAPE DRAWINGS FOR LOCATION 2. NEW BUILDING C 2 STORIES. 34,151 SF GLA 3. PEDESTRIAN WAITING AREA 4. MODIFICATIONS TO (E) PARKING LOT NOT WITHIN PROJECT SCOPE 5. (E) BUILDING A 6. (E) BUILDING B 7. (E) SHOPPING CENTER NOTES 1. FOR (N) PLANTING LOCATION AND WALKWAY PAVING PATTERNS SEE LANDSCAPE DRAWINGS 2. FOR SCOPE OF DEMOLITION SEE SHEET 1A DESIGN REVIEW SUBMITTAL ~ [~_ r\1 NOT FOR CONSTRUCTION ' .. r; ... IT.: C T 'e t617C1iyStttt 1ff141\SYe<<.Sutr304 0Ikbnd,C\t4612 ~C\95615 A'U* (Sl~lIJ6.<<iU ~ (5JO)7!lB-I2ll8 Far (510) 816-OW Far lSlO) 7S&-OB! ~ W I- Z W (J C) Z - n. n. o :I: en W (J <2: --I n. I-~ W~ ~5 ~g <2:~ :lEa %~,;...!\ '.'~J~~:-~}~" "~?I ". ' ~~.~~~~.'~~ . -----=,....... I~////a j//~ j///)/ij///'i// ~Lj//~Y/~///(0'/Y)v'~~ \. 7/~7--" /-.... ""'lE~]t:;!3J.F:}i:.i";.illi~/iTA/I/1/1/1/J.', //VVVVY1?'Y --rAAA,//I/1/I/I/I/IVVVVW'P':'t x A /1/1 /1/.' 'I/VV\x:J;(:5;'..;:~'[~f:;" I if I ~~r>~~~V~~.'~.~.'~~;~\~ l, Iii ~\. r. , ., I .....' .,.' 'J! I ,/ ~ I' /L I~\", ==A~;r-- ~t I I~ _nli~" !,...." ;-- ~:I!jfUv I I , n .~. ~, 51 --1L 1-,1 ~?' ~ 51 ^ x -I ./' 1-.. \ ~ ~ ,J<.~ I !i g ill, I / I II "',," .... I ii -----ij 5 ---T-;; =;....,1 ~ lih 16'-o"!I! 16'.0-1", i ....^, ~. ~ Ii Ii!;" ....'1 '-=-'~ II Ii '-lJ" fzoO" \' .~J >- . , :1 i! . J r--r~"" \ f==;, o====J I ii . ~ \" I J' 1 ! ! Ilil '~; -..A..-,: ....-\ l l --r l ! Ii : v 'I i . .. .. )-. I ! ii .' .}~ ~_'''''\ , ii r : ; r 1 Ii Ii "--:. ~ ~L ' II ,. < .,; .... li ~\~ .11"-: I~~',,~, ,I: .' ~,I ; .. ',===,--~ :;:;=,J l ~ -~\ rJiI l~ --11'1 . l : ~ J-+,. ----:,./, .' , .......... .' ...I.'}'....:........... ........:.....,.... . '=~.P:=~- ~-I'J :(jJ::tIIl, . T ' 11 I -~ .:- ,-- f-- 8 -----.L ~ \ b1.) I 1 ~., '. ~ ---1-{'J, ! . . .. p ;; -,' 1 I.c- l I5l Qj' ,~ --+ "";,X, ~ A f""""" .-= ..: -t-'- .~ "" f-- \ 1;1, I .. , 4'.q 9 .... ~. ,1/ ",' " ~ ~8'oO" 22'00" ~ \, . =Z=: .(. c.....- _ r = ! ("'J @":~ {\', - : ~ . , . ,f" ..:::C: '-.,. '. f- - I P=! ~ 2'~/~ '~~', - , ~ .....~..~..~ \. -I b " I ~j ~ '/=: " ',= ----L !t" f-- (~"]J I ~ I m .l '.... ",. k" I'~ ;i' , .R-:.:.... ...",..... -. b .~"""'...'. ~ /. ./ "!- ''''. '\'_':' _/ .. ~ "..... . -" V ~ "'\", ~ /' ..... 7 ---f;;:. t /\ " "n'At = / B /.) '" ' ,,~ II 'I I " T, I 1;'- '~\', ,---t: 0 A II .' \ "j "'~ . / / II. H ''oJ I" I .1 ~I ~'. L. i'i'" '\ / 1A 1~1-1- ....' '{1\ . r......)',{/ · W '.i I t, I . I: IJ I "'.I: I · ,)1 -r'.... I..... 1\\'..'-.j t ..... ,r' .<1 ... .1'. , .. _ ________ J. .. ' . ... '<' " >. ",' # I . '1 ~, (.,:,.'.I.....I.;,l'.~.1::+~,:Jc;o;r:.iL."'/\..lY':. ~~fV ~ . D ~ I ~,.~ # I s I \l ,....,"Lo'-'-..:J:'..J.:.CJ:..="1l.."-E~ll. ~~. Ii ,,1'" ~;, "- I 'r;l" 'I I ......'\. , · .r.. t I, 'i ---' ?'f' , I I ;(... I .... I r= ~' .? / I r-r; -~ !lr' I 161, f / ' .' I I 'j [".,.,v I-~ :i5 I I , ~ / / ~ .j'~ / : ~~~ 11....'. .~" /~ I I :J ~ . ~ ~.' TTlf]) / ~ I L m.:H.i---:- 18= I .. I-I ~ t: H "~. ~"" ~ STEVENS CREEK BLVD. r-0 r-0r-@ r-0 r-0 r-0 ~ r-CD ,-0~ ~ o z :) ~ t/....------r"" I ' 4Z.3112" ----...... -- ... / , , '\ \ '.""! ;-- :1ij 1J 1rlT1'''''' JJJM . ra"~ ci a: a: w I- W :2 12 w !!:. '\ '\ ~ t' ~ ~ 0' <Q'v<J ~~ G ~~~ o~ ~(J / 2~ SITE & SITE DEMOLITION PLAN Q 6lT SCALE: I' =211 1!1 411 KEY NOTES THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY PROJECT SCOPE ~ 1. NEW BUILDING C 2 STORIES -34.151 SF GLA 2- (E) BANK BUILDING TO BE DEMOLISHED - (5,174 SF) 3. (E) 19640 MARKETPLACE CENTER TO BE DEMOLISHED.. (10,093 SF) 4, (E) CURB TO BE DEMOLISHED, TYP. 5. (N) BICYCLE RACK. SEE 11 SHEET 4 6. (N) PATIO RETAINING WALL SEE 2J SHEET 9 7. (N) STEEL BICYCLE PARKING LOCKER. SEE 31 SHEET 3 B. PUBLIC ART WORK TO BE APPROVED BY A SEPERA TE REVIEW 9. ABOVE GRADE SIDE WN..K. TO BE APPROVED BY PUBLIC WORKS .' ... r-------, I , I , I , :rRASH : rlN ! L_____J ~ :r ~ .@ o ~~~ ENCLOSURE PLAN UETAL DOOR ON HOLlON LlETAl DOOR FRAME NOTES 1. FOR (N) PLANTING LOCATIONS AND WALKWAY PAVING PATTERNS SEE LANDSCAPE DRAWINGS l~ I~ A. SIDE ELEVATION (REAR 8.fVATJJN SMLAR) B.FRONT8.fVATION C. 1RANS\<ERSE SECTION 8~~~~ ENCLOSURE ELEVATION DESIGN REVIEW SUBMITTAL \TN I ~~ NOT FOR CONSTRUCTION ARC: H , T IE c: T S 1617C11rs:-t 1074t1StMl.SuI.304 o.U,ad.C4lMr.12 ea.-t.CA.ts611i PlIone15lOl~ Pholtt[SJO)7SB-C2815 F. 151Dl~8 Fa l5XI)7S8oal8 0::: w I- Z W o C) z - a. a. o ::I: en W o <( ...J a. I-~ W~ ~5 O:::g <(~ :Ei3 1A~ ~~~ U l I J ~ === ------ ~ ' STEVENS CREEK BLVD. ~ ~t/ . !,.,. t! ~_,-l "I, q~<::,<" ',1" ,. 1 .. ' .~: .;~' '; . ~ 'Ii' .....,.,. ".'. . t1'A;;~ ,..~'~. ~ 'j1 .'''lr..1'. . . . . r ~ _ l '. ~ :'..~j ;i:_ ;1 /". o.lI ", 1 "-, ~. . 'tl , I .'~, t. ,:;,.~ " ..~ .....-- ,/ " " / KEY NOTES LEGEND o (E) PEDESTRIAN CIRCULATION _ (N) PEDESTRIAN CIRCULATION 40' PEDESTRIAN CIRCULATION PLAN @ DESIGN REVIEW SUBMITTAL \'fHIA~ NOT FOR CONSTRUCTION ARC HIT e C T S SCAlE:'"' 4g 40' SO' 120' 1617Cb:t"smt 7U14P:1SUM,SllteSG4 ~CASol612 0IYb.CA9S61' ~(S,lD)~ ~lSJJlJM.428B F. ($10}1J6.6U' Fa ~75&-C381 0::: w I- Z W o C) z - a.. a.. o :L en W o <( ..J a.. I-~ W~ ~~ O:::g <(ffi :!:~ 2 _"'2llO7 4'.0' MIN. r---- II ~ I II I II I ~:~ 1f:1f I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1ri~ I " / 0 , , 1 \~ . ~' 1\ / '--- OUTFALL PER O\'ILSEE 2J SHEET 3 8 VEGITATED SWALE AT LANDSCAPED AREA SCAlE: N.T.s. 2' SIZE OF GRAVEL Wf3" MIN. Cl.R AROUND CB FlCJ-GARD FILTER INSERT 0~~~ALL ~-3' , , , , , , , I I I , I I I I I , I , I , , , , i I~ a AXONOMETRlC NOTE: 2 DOOR 2 BIKE CAPACITY 2. LOCKERS W1THST me MINIMUM OF 200 lB'S PER SOUARE FOOT INTEGRAL LOCKING HAAllWARE, ENGAGES BOTICN mo SIllE LfVELlNG FEET IN ALL. OClRN81S .. PlAN o ~~~L BICYCLE PARKING LOCKER GROUND FLOOR PLAN 16' @ 16' 31 SCALE: 1/16' = l'.Q' o o J o ,~ r-."-.,....-.-.-. ~ r ! 19,105S.F.GLA , . 52'$ 34'$ 24'Q 20'-6" ;!; . /~'lnTnmnr: -- . III ..- -II . ~ ~ ~ ~ ~ ~ ...... -- -- / / I I ----- -- / / / I 1 ~"" 9 \ , , l.--- SCOPE OF PROJECT , , , , , , I I \ ~I '-1\1 LI \ ' , " I ' , ,- 1 ~I .~' ___-.....1 \' 1 , Tl7 ~lllfl I . I I1 I I I fir T1' II I , IIZJ.>f. - 1 I / / ,/ l' l' :~:':)~1 ~;:~ :".i<~!'~: ~I- C - If;::;:::'}''' "j gg:;{. I "jl~ ~ , \ , ":'C.t-':':'~., ~,.:,..,.,~... ....~...;< --:"." :":,.:. .~ .;.... ....:......" ...... .... 0," ~. / ." . ..- :::::-'.' -::-_ . ".0 ~ ,'.: ," ,.:' :..~' , '. ~ :...t :-..~ }k7~t::-:;. ~."...~..... ~ . . ..... ....... t-- . ~<..~. :,,:, .\.~ -~. !.:-:4' :=,<. .~~.~ ~ ~'f:':'~ : ".) .. ~',)':'. .~ tt =l;r=='==== = =="Et~~~~~~~~~~~~~~1-'IJ , , , , lIB ID ID ID f ;:j~Ji,'J ~ ~ :Ms,,".:.,: .1.... ' . . ..J~ .: . 'm' H..:.... , . ,. . ",', o. ;!; ~ ::-:: . . ~ ~ rffiJJ . ,- fQD I J q" .0" " <J ," -- QJ~' . ...:.' .::, ,~ . / ~ DESIGN REVIEW SUBMITTAL ," H IAr\1 NOT FOR CONSTRUCTION ARC HIT E C T S c- =l .: I I , I '--i ~ I , 1 \ ~, ; I ~< -............ \ ./ I' I I> ".u., ..... I /' .-...... I V I ) " / , ~.::: \ I ' , I > ............. I I ' 1 I > t<...... \ I ' / I> -......... \ , / 1...../ -r I 1 -" ./ I' , I' I . \ -I" , .,( I ';, r .J--' f ~ \ \/ ,-,/ r tl,/, -. I , -I" ) l( 1)( I -;1 I \ I / \ I / -r I I I I I I -I- ./ I' / ....I ' 1-' , .. '~ I / \ ~-,,/ I _........, I I 'I '1 .A -r...../I I I -J-:/ , ' I \ J \ I 1 I I I / -I-..... I ~-, I \ , , i ) I I ~./ --~< , :' '1 \ \ , \ I I ~TI--< / , , .: 1 'II ! /1 -r..... I , I \ , \ , " \ , , 1 I , I / .....-- \ ./ < ~ \ ./ < f1L \ ./ "*' I \ '\ , 'ci--1 ~. I --... I I I r-, I : : I L_'" I I Iff1 I I I~: 161JDlyS'" 107Cl11S,",,~S04 ~CA54612 OMI.,CAt5616 f'hoII(5101~ FtIcr,.(S)QI~2811 Fu (510)8J6.6689 Faz (5JCI)756.o8e D::: w I- Z W 0 C) Z - a.. a.. 0 :I: en W 0 <( ...J a.. I-~ Wgs ~~ D:::g <(~ :!:B 3 o.:IU.oI.2OO1 ~~L-...o A PLAN ~ '" U' II II II j I 5.2~8' 1 B.8..EVA1lON ;. C. AXONOMETRlC .. .:. !! FINISH GRADE (0 ~~N.~~UND MOUNT BICYCLE RACK SECOND FLOOR PLAN 16' 32' 16' SCAI..E:1/16"=1'oO' Q II rf d~ o II i .6 ;;- o o IQ ~ r. "'~ . ~ " . r..:l' _ <o'~l 9J.~_.. ._ .~ "'\ . ~ . . / '---"" ~ 7 1 "/I! .! I' I '. I' X 1 B I Lj I I \ I '- 4,423 S.F. G.L.A. ~ f- I ",' I I ," 1\ r v- I I \1 " I"' \ 49'-0' ~l~ . . , , '" - / I ----r I ~ ",- I I ~ I -->.. '- DESIGN REVIEW SUBMITTAL' .- -( :~'" NOT FOR CONSTRUCTION : Po = '"' , ., E': 'T S '" 1117QlrSJn:t 7074f1S1lM..SIiII3G4 ClaIaftt.CA.~12 0I1'\5.CA9S61' Pllcfl,{!q~ PlOrlt(SJJ)7S&-oC2!l8 Fu (51ll8J&.(fj!$ Fu (SXF58-CJlI c::: W I- Z W (J C) Z - a.. a.. o J: en w (J <C ..J a.. I-~ We::: e ~~ C:::g <Cffi ~a ~ 0; ::0 s ,,0 ~ ~ nH1 nr+ijU 0 ".! 0 ~ g ." 0 lJ ~ r 0 0; )> 0 ~ z Hn I '0 I<j 0 0 0 10 0 0 0 0 0 0 0 0 0 ~ z~ Oen -IG) (jZ ::0::0 C")m 0< z~ en<=: -I en ::Oc Ceo ~s:: o::j z)> r- 1 ~ ! ~ - o - , :rr'- II ;~ ii'n~ -i :g~~r n~ ii'n~ .~~ n~;: ;r~ o o -0 (E) BUILDING A o o 0 b ___,,-@ D~~ D o ~~ ~ ~ --- ~ D-@ ~ ------------------------------ ~ ~ ------------------------------ ~ ~rr- / l2 K~a t ~. \,,~~.. - ~~~~- -:7~~~T-~~~~~f-~~~~~--.:~tm~-.: ~q~qr_-~~i8,;\f: t : "1",/1.11,.1,( ,h ~.~ 1~1~'~1\!;;. '1:\:111'11; r:1!WI~!! ;,l.l.lh 'i,I r:~! ip. i., :~:1:11:':~~~I:J ;:~I:I!r.:.~ . i -.u:1,!;!;!;:t. (:::;!I);~:;: ,:.,;:rl.ij I :~P,i;::~'{ .~> l -1'~1~ L-___ . ''1':".1. " I:~~rl':, 'lljj,:!.., "II ,!I.I, , rflll'lll' i'~",' ::'iij:ii . 'I' ;1 ;I!.',::, ':;'.;;,'~.i;:ll"',i: :1' ;;' if'; I'.::':. ~l);;i: II ~1,,::,i:i!;;:!:L,ii,:!:;::ii\, VI"lii;I;:,'I:""!ii:liilliil,'II;;: "1''''i,i::''.'''''.::'I,','. :,::'::'," ,.:.":''','''''''':'''' "1 ::,,,:,:.. 'i:':::':I', III' I oI:'::i,. Il::':':'" :" , !. i'l!(t:~:: . ~:::;;!j 1- I) ! ::1: _. ;Ij\;:; 'i~ i::;iiiii:;:,:i, I.': """:"'111::::""'''1':'1 ~'I,I'III"".Io'lIIl1l"lili !:,[:~,~GC:'i::i!!:,::i' ,",j!:!!:!:: j~t I f'~\' :~li!:':::'~,'\;j;ii!i:;~JI 1/1" :'iji:;iij1~ ':,il~~~l!l., !W:~!!j t" lb]' /1 :1;{ ,;H;j~:~~;'}I~j; ." 1'''1.1,,, ". ",,,,,,,[,,,.., , "'1'" .' I~'" ,'" :,: I': i;'I~;lll, Jli;:p: ,'j, Ilill 1 g n " I :I!:::r", "::;::I;:h" I':' ii. .,'T:,'".,:.::",,:I'.:. ".1"1::,,1 It "i'ii:,:I:::;.!,;::I' t"::; r ":::::;:!ii':,, 'i.:;!::!!::. "'!:;;!:I: ~ !r - ~J - ~ <I' -! 'illl' I'" ,~!::;~L,I::' I L_!~;!_,"~:,;.:!:i:,l;.i.,,,:i:iWii: L_.J --' t I ',i1':;:I,' .,iW',':ij:W,!':",I;;' . '''\ I ,;;;,::!I"':,.'i:1 i ,: r"1 .,~ +:"~ '::::1:;1'1:', '::! ':: 1I'Ilr'i: :,::!'/.J \ ,j,I!!!" :',,:1::,,1. I:,:, q 'J.'I:::';: , ::I::~:~ \\ (J~C::1~ /1 'it:;;':,i;;;;:;:i;" Ii! 1';"U'rll" """II'll.j ~ 1I'''''I~ .1.1... :: i' ':!:,i:::1 ','!H:!:!! i- h{r~~~ .-i ;1:;:;,': "II:;: :""/''':1:'1' '" '11':11':' ~i,fJl, I.h.!!. ::' ::.,' ':;!:!'!:ii: .i':.!!::! 1/' rrmH;;" .~\I :~i:::;"'!:'l':: ! "",,, I :: Ii:. ... .,1.::::. i , ill,: I"" t ,,~ , :-: IJ. IV;". ';h:-~L- r :;i: "".1; ~'l'-:, ",.,,1 .. :,:'I'!;l~~~_~lii:' J 'J!lli;l11:;, . ' II W:.l,: . t' ..I,W i, --~~i';1';;';;--~'I,:.::;:;,~-~,ij'r---,'i;IG~.,':,.--~,;;I~,p.:r--'":"~f--:;r~V\,;;--;f.'Jj~; ---"r"I:' :'!:" ,." I Ib) illll"':!'!,::,!!!!! , Ii.',! m:l':lf if"~:l,!' ,"~'",,"~'i~' ,<:jl'l~ ~i:i~~':I~~r . '::',:. '~,ih.:.I" ;'ilt'I:!:I':~'i "~~"I"I~j.I ';~:!:~ ,. I',', 1 (I I ;ill!\;:I..PjU:i!;/'L~!j. ""I' ..... I"" ,.. ",., ',I ,.,' ',.. I "I~1- M~ .. J ~ - <c, ,I"..,. I'" :;. '~!r~ '-;' I". ' ',li:.L; :,~lltl" ;' 11.,;1 " , 111. ill.",' ;" 'I":'.' I l \ ':\. .-' ' :. :"1'1" I' '" I :. I' ~~i:i 'i:.iilli:'i!'I~,i'''' ki!I;,li.I' ","':!I!l.!, "::,I"I.IJI;. , ! 11:'lr j1!!,,(:'" I"': ,;:.1 ''''''. ""., , '1'+: 'J,II'!I: ~;",,'I, 'i.IIIC' '~ ~l I '!ill::.;.- ';;::::':,Il:'j';,::j i~i :;!~::. ; " .. .' . !I ~ 1::i;~" ";::::;:;;;.,'\::; ,d .:i'i' I!!l~H ~181' -~I~I- oc:::JilWIIINli'ttVll[tl)i -t':.:!) ~ VI ii!i'!:'" 1:;::II:!i;: 1';1: :;:1 'f:;::: i\_~ !: ,,1;' ':,. ,,, , <",,: - I'. I', "I' 'I ""I:! : d"'" -h,;",,, ::;~:i:iii!i:' : ',j! ,,~,: 11'11" ";"'1' I'!'II'I":I ,'!lllh' ;"'1'1'1, '",1,1"., "'I,ll"ll ",1'1"'111 '1/,11""1' "".', I" '1 '1'1"1" "'I'll" :"11"1 "1,.1,: '''11',1,' 'I"""" :,',"'H. 'II'!II ",i'll"" ", 'C" ", I!; tl:\1 ,JI'., Illt:1 ! :~l ~':la I l.b~' ,,;:::.1 '11l"!I' .j m. I 1I~!1 ':' I L,; I:' i ,,:-~~ _ i~,~J~~ _~~~;;_ _ -~8~:- - -.;~'~~ -~ ;~~::r__ iA~~~-~:~~;I~~- ,~~~~~_ ~~~:ii _ :,;~~.~ _ __~~~,L. -~t~~~ _: ~:~~~~_._ J~~~:L_. ~~~~~ _ _ I ':. ,. " " , --... " " , I I I J ",---:-..- ... '<. "" \ / - - .... x. - - ~..~ - -y'; -......, . { i....1 lfl~ I. " I' , ~-, ~ x, ?<Jd-; J 01. 1 '/0 J ( I I _ II , I I ~, MARKETPLACE SHOPPING CENTER CUPERTINO, CALIFORNIA o ~-... " , I' \ ( \ I I \ I " ,- .....-;;-- I' " ( I \ ) ~.I ~ ---' --::!~ o I I \ \ I .....--,/ ~- .. ,,- I I I I I \ \ \ \ , " ... " I' I -- -1' I -' - --...-: I --l ( I \ ~ D~~~~- ,''' " I ~ ~ " \ 100 "'" e -.... "- , , , \ \ 1 I I / I / / ..." --I i "- " " \ \ / / I " ,,/ CD ~8~~.:H ELEVATION CD :":~.{):. ELEVATION KEY NOTES THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY 1, TILE ROOF TO MATCH (E) BUILDING A - CLAY "S" TILE. MSA MISSION TILE BLEND 2. 7/8" EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A - PAINTED "DARK BROWN" - KM85()"N B. PAINTED "MID BROWN" - KM588-D C - PAINTED "BEIGE" - KM587-M 3. CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3" RECESS 4. CEMENT PlASTER EXPANSION CONTROL JOINT, TYP. 5. LIGHT FIXTURE 6. EXPOSED GLULAM BEAM, PAINTED "BEIGE". KM587.M 7. WOOD TRELLIS - PAINTED "LOAM". KM413 0=-~~-------~~CU----::FlJ-'~' .--l i [] : ... : ~ :.. ..: I I : .G\. : : j- ',7 ~: 9 : r--..J L______u__________/ N KEY PLAN - not to scale E9 BUILDING ELEVATIONS DESIGN REVIEW SUBMITTAL \'fHI~r\1 NOT FOR CONSTRUCTION ARC H' Tee T S lU7~Sl.reIl 7f1'1UISlrMl.W.3l>4 OiI3ld.CAMU O.I'ts.CAt5616 Pben. (510)aJ6.6W PMnI (53Cl)7S&-I288 Fu (510)BJ6.668t Fu 1m)75ll-t38lI " 8' 16' SCAlE: lIB' = ,'.0" ~ W I- Z W U C) Z - 0. 0. o ::I: en W () -d: ...J 0. I-~ W~ ~~ ~g -d:~ ~a 6 o.or. 04JlI.2lIG1 KEY NOTES THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY 1. TILE ROOF TO MATCH (E) BUILDING A- CLAY "S" TILE - MSA MISSION TILE BLEND ~ 2. 7/8" EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A - PAINTED "DARK BROWN" - KM850-N B - PAINTED "MID BROWN" - KM588-D C - PAINTED "BEIGE" - KM587-M 3. CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3" RECESS 4. CEMENT PLASTER EXPANSION CONTROL JOINT, TYP. ~ 5. LIGHT FIXTURE 6. EXPOSED GLULAM BEAM, PAINTED "BEIGE"- ""'--- KM587-M 7. WOOD TREWS - PAINTED "LOAM" - KM413 8. VEENER STONElTILE 9. SKYLIGHT ROOF CANOPY SYSTEM 2c 3 4 9 2b 2a "'1111I f"'1:l'i ~ ~ r~~"\I!'~ t'M'" I't ...., ~ ~~l ""r. \' I'" If ~ f' 1'!'" '~ rlrW"lT'" ~ ,.~T~' ,:~II VT"I" I 1 11 ~ !fV;I'1~, II Ilf .1'''I.r~ If 1:' 'II" f' !fI;~I~ ~~1'11l i.Ilo~.~ .,..-IIf''''1 I~I'~ '!!I I"(~ 1\ = IJ'1!"P'i:"'~t<-,",~ ItlU~ ~ 7 7lI7 /I /I ~ / 444 v ~'i.!IIIfl...'~'.' , " . '~l .' y / L /1/1/1/1/1/ /1/ / ~''':''''IM; 'r:j CD ~~~~H ELEVATION o ~8~~:" ELEVATION o ~~::~ ELEVATION BUILDING ELEVATIONS o ~ -- --- - - - -.~--- - -- -'~--l n cu [:;] : I ;, ;....'10 I r-uj I / L? L___n_u_u_u____J D [JOCJ[]DDDD~ fJ N KEY PLAN - not to scale ffi 16' DESIGN REVIEW SUBMITTAL \VHI~r\1 NOT FOR CONSTRUCTION ARC; H . T e C; T" m."S'n<<.SJo..304 DaWs,CA9S61f1 PIlollI 153C1l75B-oC22a fu ISJO)75&-Q8a SCAlE: 118" = 1'.<J" 1617 a" ShcI ~CAt4et2 Phon, (510) IJ&.UU Fu (510) &J&UU 0:: w I- Z W () (!) Z - a. a. o J: tJ) W () <( ...I a. I-~ W~ ~~ O::g <(ffi :!:a 7 o.04.OI.2llll1 o I I I I I I I I I 1____1 _ I ATTIC~ r --I-~'-'""" ----;-- - -----wPOFiiOOFs:~~~$ I I I ----Ii ---~ "N~_"~:::::li<!oA'-I.,;'.~.... - I .......J<__..:,;il..>-..."-'.~.__~.I ....-. ----------~-~- -- 2lot);~$ I I I I I I I ,..~ ... - -, . , ~ - .........., I I I --------- -----------f-------- - ---------------- ---t --------------------------------------~----- I I I I I RESTAURANT I I I I I I I I i m_____m______ ~ ~:___~_::::_:~ _1 ~_:__:_:___:~_::_I~~~:-m~--::-~-~-----~=:J~n -:-----+---------------~- I I I I I j I I OFFICE I I :i : I - ~~$ I ..._=_"___,,~ I ________ -~.--------T------------ I I I I I ~-I- I I .----HEIJ)fR~$ I 1 1 --- l~i$ CD ~~:;.~.:SOUTH BUILDING SECTION ? o I I .._ I .~._~.. ,-,.n- ,_ .~L.~ r-~_.. ~..~. .~...,.""',,..;,~. .. o e ~ e I I I I I I +34'-s" ----~ --------TOPOFWAlL$ ~C~l-- -L -- ----....--""',;i1~. . I ~~ {[ ~--------------- ------- ------ I I I -~. --------- ----- ----- i--------- ------------ ----------- I I - --~~$ RESTAURANT - - Sn:'~:~$ - --2ND~~~$ OFFICE OBBY I __-L I - T~1$ u BUILDING SECTIONS DESIGN REVIEW SUBMITTAL NOT FOR CONSTRUCTION ~ tn7CerS'W8 JGl.tlS'I"Ml.,$lae)04 OIlaq,CA94612 o.-k.CA!l5611 honII 15'lO) BJ6.6W Phot. 153ll7S&o42fll F.. 151O)~!l Fu (SXI)7SIAB c .: C T ~;. 1~ SCALE: 118' = NI' ~ W ~ Z W U C) Z - 0.. 0.. o J: en W U <( ..J 0.. ~~ W~ ::::e::~ ~g <(ffi :iEa s',: ~HI; ~'''' d' H i ~..., I 8' CMU WALL NOTE: AI. TERNA TE DESIGN IS SPUT FACE CUU IN BOTTOM COURSE OF WALL, OUlT VERTICAl. GROUT EVERY 3RD BLOCK FOR DRAINAGE ~ o ~~134"~1~~f\INING WALL A-Om2BOO-Q3 BUILDING SECTIONS 16' SCAlE; 116' =".0' 11'-6" lT~' -----J-- ~ _._ I TCPOFPAlWEf'l" 6'-3" 15'.{l' ~ I '" i I ' , I I ' , I I ' ,,,I 4c;::::"" I +13'-6"... ~ tCP+;~;Z: $ I -~~$ -==}~Elid~;;$ I -l--~ I S~ RESTAURANT 26'~' LA~DSCAPE ELEMENT J ~I ~ ' 01 9 1 ::E ~I ..-..~ I 0 0 ~ 0 US ~ , , ": U-I I I f!-6" 4'-8" I , I unITY ROOM -==t -HfuER+~_g:$ I I ~ T.O.s. SCALE:3'16"-NT NORTH-SOUTH BUILDING SECTION THROUGH OFFICE AND LANDSCAPE AREA 1---1-----~ I I TOP~ ~------,,i;:;f;$ +-_____-"1M~ I H~ I I I ----I-----S~l~_g:$ r-----2ND~$ OFFICE I I I I I I i I -----~~:~-----mT---li I -- ---W:DE;~_g:$ ARCADE il! ji .1 Iii ill ."1./1'... T.OI'I" CD ~~~~~EST BUILDING SECTION DESIGN REVIEW SUBMITTAL ,., H I J\1 NOT FOR CONSTRUCTION ARC HIT [; C T S 1617C1i1rSlltlt OIIW CoI. 94612 ,~ f511l113U6U F. 15'O)B3&-6U9 1tV.caStrft:.So..tt3OC ~CAI5616 PIU'e (533)758-C28B Fa (53ll)75&-OEe 0:::: w I- Z W U C) Z - c.. c.. 0 J: (J) W U <e -I c.. I-~ W~ ~~ O::::g <effi :!:B - 9 1Woo".lI!\.2lllIl' TYPICAL EXTERIOR COLUMN TILE ROOF TO MATCH (E) BUILDING A . CLAY'S' TILE. MSA MISSION TILE BLEND LIGHT FIXTURE EXPOSED GLULAM BEAM, PAINTED 'BEIGE' - 7/8' EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A. PAINTED 'DARK BROWN'. KM850-N B - PAINTED 'MID BROWN" - KM588-D C - PAINTED 'BEIGE" . KM587-M WOOD 1RELLlS. PAINTED "LOAM" - KM413 VEENER STONE/T1LE SKYLIGHT ROOF CANOPY SYSTEM CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3' RECESS CEMENT PLASTER EXPANSION CONTROL JOINT, TYP, 1 TYPICAL CLAY TILE ROOF EXTERIOR LIGHTING ..~a..._ I ~~ ,", SKYLIGHT ROOF CANOPY =-:-1 =;';~~rJ TYPICAL EXTERIOR FINISHES MATERIALS AND FINISHES t~ SCALE: liB' = l'Q -".'J' - ~~---- .." __.I~.,.,___:-l __ _.~:3:.J ~ ..~--- = T".~-- - - -_.- - - .;::.... -, -- - - ::=..:____I.:'~:~ ~"7? .. , ~ ; .~ .~ ~! DESIGN REVIEW SUBMITTAL \'Y H 1~r\1 NOT FOR CONSTRUCTION ARC HIT E C T 5 Ui17ct.yShtl 1D74U1Q1ed.WeXM OIkbnd,CA~612 Da-I\.CA1l5611 ~ (510)1J&.6&I Phc:rc ~1~2U F. 1510)Il6-&M' F. C530)1S&-t3058 c::: W I- Z W (J C) Z - a. a. 0 ::I: en W (J <C ..J a. I-~ Wgs ~~ c:::~ <C~ b: w ~a 10 0I.";0I.GI.2:007 \ \ \ \ \ \ ---_.~~ STEVENS CREEK BLVD. \T H 1"r\1 ARCHITECTS ./'~ /' / / /'--. 1'---.......... ..--" \ j \ J I, "'__~.f{T.-'''' 1'MOC:(I:lIIlt_ ,u:.IQlt__ ~ Greg G. Ing & Associates wmnP'"~ I5851kA..la.rnrJ.. 5uir2OJ s.m /D:it. C.JiIomiA 95116 1l'JL~ JU~ lL I I i \ '\ \, ""-., ! ""------i- i ,.-- '", T---.\ \ lil'i . ,) W ! ! r---:-" I ~ [.)..--'1\ c / m crnt'~w~' > /.- 'In' C <( ;,/ ....J ( .! C <( " C ~ 1J{J\!' ; C 0,. 'j ~ 0.. ( : C I . R c f- \. '" ! .I q''-- ~ '...... i !/. " !. ) o I, j J f CJ) \ i ~f 0:: w t- Z W CJ t') ~CJ ~t') Oz :I:- cn9 w- CJ~ ~al ..J a- t- w ~ 0:: ~ :2: 'E ttl'<j" >..... ,,9:!0 ::JLO 00) co ttl ..:.:: 'c Q) '- Q).!2 u~ cn() c Q) - > 0 Q) .~ -1:: U) Q) 00. r-. ::J 8;() ..... c c c - c C c /'r,.~ "., ,.,)". Plant Legend KEY I QTY. I SIZE eoTANICAL NAME COM"lCN IoUoME IOEMARK$ TREE REPLACE- MENT PLAN TREES LC I ~2 lIS GAL I Lcpno.~ "",,'enuo I &..~... eo. 1'=30'.()" PERMIT SET 2.20.2007 L2 I ~ QTY. I SIZE Tl'SES LC Plant Legend eoiNro.lICAL NAME c:c::t1r1ON NAME ~2 II!I Gal L~tenQtl conr_Lua &lal::l'a,... 80.. YHI,4~ ARCHITECTS OOAI.AlOD.tA_12 -,...- --....-..... lMm Greg G. Ing & Assodates ~A1rhi1nTwr 15851h~A1..m~ Suite201 SulJose. Cali/ami.J 9$126 _IIC.- r...-.m._ It: w I- Z W U e> z c::u a.e> Oz ::1:- 009 w- u::> <2:al ...J a. I- W ~ It: <2: :E ""C ro"," >...... Ola g~ ro co ~c Ol ... OlE U~ me) c: ~ .~ ~1: (fJ CD a Co r-- :J r--e) en ...... TREE REPLACE- MENT PLAN REMA~ PERMIT SET 2-20-2007 L2a ASA-2006-14 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 255 OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL FOR BUILDING C OF THE MARKETPLACE SHOPPING CENTER SECTION I: PROTECT DESCRIPTION Application No.: Applicant: Location: ASA-2006-14 Wayne Okubo (Evershine) 19770 Stevens Creek Boulevard SECTION II: FINDINGS WHEREAS, the City Council has directed the Design Review Committee to review and approve the final architectural and site design of Building C and landscape plans for the Marketplace shopping center in accordance with the conditions of approval for ASA-2005-06 approved by the City Council on February 7, 2006; and WHEREAS, the Design Review Committee has reviewed the architectural and site design for Building C and landscape plans. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the Design Review Committee approves the architectural and site approval and landscape plan, file no. ASA-2006-14, subject to the conditions which are enumerated in this Resolution; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application ASA-2006-14 set forth in the Minutes of the Design Review Committee meeting of, April 19, 2007, and are incorporated by reference as though fully set forth herein. SECTION III. CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set titled: "Marketplace Shopping Center," dated revised April 9, 2007 consisting of 14 pages, except as may be amended by conditions in this resolution. 2. COLOR SCHEME The color scheme for Building C shall match the color scheme presented on the material sheet labeled as page 10 of the plan set dated revised April 9, 2007. Resolution No. 255 April 19, 2007 Page 2 ASA-2006-14 3. USE LIMIT A TION The ground floor of Building C shall be occupied solely by retail uses. The second floor may be occupied by office uses, but the total amount of office square footage on site shall be limited to twenty-five percent (25%) of the shopping center's gross square footage. 4. OUTDOOR SEATING Any outdoor seating areas proposed for Building C shall be reviewed and approved by the Director of Community Development, provided adequate parking is provided to accommodate outdoor seating use. Prior to approval of outdoor seating, the applicant shall demonstrate that adequate parking is provided for the outdoor seating use and provide a table and seating layout plan indicating the number and location of tables and seats to be accommodated in the outdoor seating area and furniture design and type (including seating, tables, outdoor lighting, etc.) to be reviewed and approved, by the Director of Community Development. 5. TRASH ENCLOSURE The final trash enclosure design shall be reviewed and approved by the Public Works Department prior to issuance of building permits. 6. CONSTRUCTION PHASING The applicant shall prepare a construction phasing schedule, demonstrating completion of the planned Building C within two (2) years of this approval. The construction phasing schedule shall detail critical milestones of the construction and shall provide monetary penalties. If the building construction phasing does not comply with the stated milestone dates, the applicant shall post a cash deposit in the amount of $200,000 naming the City as beneficiary. If the critical construction phasing is not completed in accordance with the construction schedule, the City at its own discretion will assess a penalty that shall be deducted from the deposit. The applicant shall agree to this condition in writing prior to issuance of building permits. 7. LANDSCAPE PLAN The final landscape plan is approved based upon the approved plan set with the additional requirement that the Brisbane Box trees be minimum 24-inch box trees at the time of planting. The approved final landscape plan shall also include sheet L1 that was submitted during the DRC meeting of April 19, 2007, titled "Planting Plan" for the Marketplace Shopping Center for Building C. 10. NOTICE OF FEES, DEDICATIONS, RESERV A TIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to DRe SUBMITTAL ARCHITECTS MARKETPLACE SHOPPING CENTER \.HI.4~ Stevens Creek Boulevard Cup e r tin 0, C a I i for n i a Rev i sed A p r i I 9, 2 0 0 7 PROJECT DIRECTORY PROJECT INFORMATION PROJECT INFORMATION VICINITY MAP - not to scale OWNER/DEVELOPER KCR DEVELOPMENT 19770 STEVENS CREEK BLVD. CUPERTINO, CA 95014 TEL: 408.343.1088 LANDSCAPE ARCHITECT GREG G. ING & ASSOCIATES 1585 THE ALAMEDA, STE. #201 SAN JOSE, CA 95126 TEL: 408.947.7090 BUILDING CODE SEISMIC ZONE: CONSTRUCTION TYPE: OCCUPANCY GROUP: BUILDING HEIGHT: USE: ZONING DESIGNATION: CODE EDITION: 4 TYPE V-N BIM 36' MAX. 145' MAX. EXCEPTED OFFICE I RETAIL "Po - PLANNED DEVELOPMENT CALIFORNIA BUILDING CODE 2001 EDITION (2000 UBC WITH 2001 CALIFORNIA TITLE 24) CURRENTLY ADOPTED NEC, UMC, UPC, UFC PARKING SPACE PROVISION PER CITY OF CUPERTINO MUNICIPAL CODE TITLE 19 CHAPTER 19.100 MIXED USE OCCUPANCY CALCULATION MAXIMUM TOTAL FOR WEEKEND - DAYTIME NO. OF SPACES PROVIDED ON-SITE - 592 SPACES SMIIma1'l PI ,..mO" i: .. [)r ,z i; ~ lj)r f i' g CD !il' '.i (Z 0' -.' ~ i ~, i,il if .. ",Il ,> i::l l l' ~ '1'''' .. ,...~ . !i ~~~ E9 ARCHITECT YHLA ARCHITECTS 1617 CLAY STREET OAKLAND, CA 94612 TEL: 510.836.6688 CIVIL ENGINEER/CONSULTANT UNDERWOOD & ROSENBLUM 1630 OAKLAND ROAD, SUITE A114 SAN JOSE, CA 95131 (408) 453-1222 BUILDING AREA GROSS SITE AREA: NET SITE AREA : NO. OF STORIES: 9.9 ACRES (431,494 SF) 9.9 ACRES (431,494 SF) 2 STORY STRUCTURE f l :'I Br8l1~Cr~ ,en S' ~. ,- -iI:l-- -' It I !t I SHEET INDEX GROSSLEASEABLEAREA r~~ :-"~~--:-'~C":"-.. ~ I r .~.._>._~~ flSfl- ;loot, - J~ j TOTAL BUILDING AREA APPROVAL BUILDING C 33, 466 SF D"C . . I ~ir;na+' Ire 1" Vi~. i..'-U_ c. / l, Case Manager J ! . -___~.,:"I .. ~,~~ "" ~...... .. ....' .~ -...- .-.~~_ ".....-.--""~. ....:V.........,.......~~..'t~?_.~~_ PROJECT SITE o COVER SHEET 1 OVERALL PROJECT SITE PLAN 1A SITE & SITE DEMOLITION PLAN 2 PEDESTRIAN CIRCULATION PLAN 3 GROUND FLOOR PLAN - BUILDING C & SITE DETAILS 4 SECOND FLOOR PLAN - BUILDING C & SITE DETAIL 5 ROOF PLAN 6 EXTERIOR ELEVATIONS 7 EXTERIOR ELEVATIONS 8 BUILDING SECTIONS 9 BUILDING SECTIONS & DETAILS (E) BUILDING AREA SHOPPING CENTER BUILDING A BUILDING B 73, 078 SF 24, 461 SF 9,947 SF PROJECT DESCRIPTION ARCHITECTURAL PROPOSED BUILDING AREA MARKETPLACE SHOPPING CENTER, THE SITE FOR THE PROJECT, IS LOCATED ON STEVENS CREEK BOULEVARD AT THE CORNER OF SOUTH PORTAL AVENUE. THE SCOPE OF THE PROJECT CALLS FOR THE CONSTRUCTION OF A 34,151 SF GLA TWO-STORY BUILDING, WHICH WILL REQUIRE THE DEMOLITION OF THE (E) BANK BUILDING IN THE NORTH-EAST CORNER OF THE PROPERTY. THE PROJECT WILL ALSO INCLUDE THE DEMOLITION OF UNITS 19640 OF THE EXISTING COMMERCIAL BUILDING, AND TO PROVIDE NEW OFF-STREET PARKING IN THE ADJACENT AREAS WITHIN THE LOT. LANDSCAPE L 1 HARDSCAPE PLAN L2 TREE REPLACEMENT PLAN L2a TREE REPLACEMENT PLAN L3 IRRIGATION PLAN DEMOLITION SHOPPING CENTER (E) BANK BUILDING (10, 093 SF) (5,174 SF) RECEIVED TOTAL 125, 685 SF APR 0 92007 BY: ~ l I ) U l ===== I E . ---:"j 1 1 1 i KEY NOTES , ~ STEVENS CREEK BLVD. ----- ~ LEGEND //-......., D (E) PEDESTRIAN CIRCULATION _ (N) PEDESTRIAN CIRCULATION II -III 0::: W I- Z W o C) z - 0.. 0.. o J: U) W o <C ...J 0.. I-~ Wgj ~~ ,I Signatu re t 0::: g '. Case Manager 1 <C ~ I~ ) ~~ r ~ '. u ..... -- .-,.....-. -..~_. " .;n-pV~='-~~~~"" __"I~~'.- i-.<~fj. . DESIGN REVIEW SUBMITTAL \~ H IAr\1 ~C8y~':'2 ~~~,~~ ~ \ Phone (510)8J6.6688 Phone (530)758-4288 NOT FOR CONSTRUCTION ARC HIT E C T S ,.. (510)8J6.6688 ,.. (530)758-4388 o.r.04.09.2007 . r....-"""'t~~I.:~.':~~~-::=~1.."..,~._.._~_-n.~~.. ~:.. .,. .......;. :'~~~'''';;\., R l' APPROVAL --8-Stl -~~n()~- -)4'-' ~ Appli~ation Number 'f-/0 -0 ~7 .t ORe 40' PEDESTRIAN CIRCULATION PLAN @ 40' 80' 120' SCALE: 1" -40' ~ r-0 i-0 r-<D i-0 r-<D reD r-<i)@ ~ z :5 q ie STEVENS CREEK BLVD. i-0r-<D ~ ~"f",."O' ,I I II 1 I' ~// ~ ~ _,J 8' ~ ~ :101:, J' 'I, 1,/1: 42'003 112- ,.] ,"'I- ,;,!.- 1 ----..... / .... / , / , , 1// "'----1-..... .... , , , ~- ci 0:: 0:: w f- W :;: OC w !!:. - il Ii I' II 'I Ii II i ~ ~ 11 I! \., _____ -HiHi~ ~-- . 4'.0" '< i:l '<%. "\L / ~ H lJ .- J -.-..... ==r- '-- ~' . ~ r=--'-=~=:J L~-'l] I -- ~ , , l I l I n ! Ii ~ II tm=J:.. Ii 1',- 'I ,I' !. - ~r D I 1 , ./'\:TrT--'~ f..... ".,J 1/ ..... h \LY "- "- 7 ! \\ "~ . ~ / / ~ 1\ 20' SITE & SITE DEMOLITION PLAN Q 60' SCAlE: 1'. 2fJ 20' 40' ~ ,...----------., : RECYCLE l l~~~_______j ~ .J , , , , , , :rRASH : l~~umj ; ~ ~ 8 ~~~~ ENCLOSURE PLAN METAl DOOR ON HOLLOW METM. DOOR FRAME ~ : A.SIOE ElEVATION (REAR ELEVATION SIMIlAR) B. FRONT ElEVAllON C. TRANSVERSE SECTION 0~~~~ ENCLOSURE ELEVATION (~- ''::''::::~'i'i,::'<-, ':-,"C':'"..,-, ~ j f j i I I APPROVA ORe Signature ,!j r .~ \~\.'V'~'=--"=~-- KEY NOTES THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY PROJECT SCOPE 1, NEW BUILDING C 2 STORIES - 34,151 SF GLA 2. (E) BANK BUILDING TO BE DEMOLISHED - (5,174 SF) 3. (E) 19640 MARKETPLACE CENTER TO BE DEMOLISHED - (10,093 SF) 4. (E) CURB TO BE DEMOLISHED, TYP. 5. (N) BICYCLE RACK. SEE 11 SHEET 4 6. (N) PATIO RETAINING WALL SEE 21 SHEET 9 7. (N) STEEL BICYCLE PARKING LOCKER, SEE 3/ SHEET 3 8. PUBLIC ART WORK TO BE APPROVED BY A SEPERATE REVIEW 9. ABOVE GRADE SIDE WALK TO BE APPROVED BY PUBLIC WORKS NOTES 1. FOR (N) PLANTING LOCATIONS AND WALKWAY PAVING PATTERNS SEE LANDSCAPE DRAWINGS -:";;l~C;:;;-,:.:;::~ .. DESIGN REVIEW SUBMITTAL \"H I~~ NOT FOR CONSTRUCTION A R co HIT E co T 5 1611~Snet 1074lhStrW,Sult3(\ll 0IIIdInI,CA94612 o..tr;,CAlI5616 PIaoe (510)636<<186 PIaoe (530)75&-4288 FBI (510)llJ6.6lIe9 FBI (SJO)J56.4388 ~ W I- Z W o C) z - c.. c.. o ::J: tn W o :5 c.. I-~ W~ ~~ ~g <Cffi :E~ ~ l I )ul === ,<C.-"..~~7''''~'.;; ',r"'....:c. ''''''''1- ---"" "'T~"-"-'-'" ,.... -. - "'CZ;;:'"'''''!''''\,' f ~ I APPROVAL -BS4 -~!)n()h -/4 , Application Number tf-/q -07 t ~f '-I.~ \;.~_J ~~ DESIGN REVIEW SUBMITTAL ,.- H I..J~ NOT FOR CONSTRUCTION ARC HIT E C T S ~ ~ ~ STEVENS CREEK BLVD. ------- ~ Ii DRe Signature 40' PEDESTRIAN CIRCULATION PLAN Q 40' 80' ,2(1 SCALE: 1".40' KEY NOTES LEGEND D (E) PEDESTRIAN CIRCULATION _ (N) PEDESTRIAN CIRCULATION ~ W .... Z W U C) Z - D- D- O ::E: en W U c( ..J D- ....~ W~ ~~ ~g c(ffi :Ea 1611a.,.Strwt 10141hSlrtet,Slje304 ClIIkItn:l.CAi4612 ~,CAt5616 Plo'wI (510)8J6.6688 Phl;ne (530)7584l8 Fa (510)8J6.ll68ll Fa (530}158-438B ANE, a..OSE-GRO'MNG GRASS MOWED TO A HEIGHT OF 6" PER LANDSCAPING PLANS & SPECS TOPOFPVMT. MIN. 3 fIDRlZONTAl 1 VERTICAli SUBGRADE 4''()"MIN OUTFALL PER CMLSEE 21 SHEET 3 8 ~~I!ATED SWALE AT LANDSCAPED AREA ,. 2- SIZE OF GRAVEL Wf3" MIN. CLR AROUND CB Flo-GARD FILTER INSERT 0~~~ALL ,.,' , , , , , , , , , , , , ~ ~ B, AXONOMETRIC NOTE: 2 DOOR 2 BI<E CAPACITY 2. LOCKERS 'MTHSTNiD MINIMUM OF 200 LB'S PER SQUARE FOOT INTEGRAl LOCKING HARDWARE, ENGAGES BOTTOM AND SlOE LEVEUNG FEET aN ALl4 CORNERS A PlAN , / 0 I I \ \( . ~ I \ , ;' '......_- r---- I ~ I I I I I ~I~ f:f I I 8 STEEL BICYCLE PARKING LOCKER .r~=-::~-'>-~--'c'~,~~r,', _.,. r APPROVAL GROUND FLOOR PLAN 1~ 1~ 32' SCALE: 1116"= 1'.()" ">"r~."""'r:-~--.~'-' -. C" '" c"" I '" ~ 511 - ~CVtO ,- j"l-f "'" r<D //1 ~x T II ~ ~'.'.:" '-.' .. ~ ~ ..~ r_ ~ 't ORe Signature " ,/ ,/ ,/ / / $"', 9 , , I r-::-::: SCOPE OF PROJECT __n_nl-_..~ " " :: :' C:: I:. 't::]1 ~r::8 '.'\:'. . .1 .. "I :' .c:..:L:, '.,t" '--" r I I \ :I \ , ~I · 8 I I -TI.::J / / __1 :::~':~wt{ t- , , /. I .' \ '. . I ".::.' ~ - .-'" t-- --- . I II I I I I I I I l~ I Y 1..3:-L/ I / / / I I I r , I 17 T II , I \ I / , \ , ~ ""....:..:...t--:r 1''-' :~ ." -'..-i ~ ~'. .'-I'~' .. ~ " ,. , . <I [". c:;.;.t~'.:_:...: :.::j......:.H:'" ;,;;:,'~l;"-?+k." :./.. ", ...;.-~~ ~ ~ rr:--- :: " " " " " " " " " " " r -:::;;J========= -==",.~~~~ =1:r== lIB III III III 34'-6" 24'..0- 19,105 S,F. GLA 20'-6" 52'-6" III HI r I I I I J ~ ~ .w....' I -1.-. 1.1;,., " :W"" . II .~'... ; -' : .1.-:. . :1".' :J ....};:. 1m: ~ :r 1il ::..:: ~II__ CE.....' " ~tiL ~cc -.~; ~ . ~. ~ (A) I, . . 00 I J / ~ r:::- / I I \ I , ^ll^ ~ eI I , ""-~ -t I , 1 " ___ I I , I I )< -,t<....... \ ,/ I" J 1 > ~- \ - ,-" J I /\ ~..::: \ , ' I I ) .....- , , ' I 1 ~< .....1<-...... \ I ' I I) -............ \ , I 1_/ -r I t- I , .1 " ..-, I , " -~r I t~ I IX -1-/ , -.1 \ -r,/ t/I . \ I I I / r , , 1 t I I -'- ,/ " / i ' - I ~/ ., '''~ 1\ ' II V ~-y/ , \ / _.j--' I ". II I 1/ I I' 01 _/1 , -r / I '/ I -t~ , ' I , I (J" I ' I , / I I _/ I-I- I : 1+, I' , I' I Ii; , / +< : I .1 ) , / -11--/ / , I I .: 1 I I;' '- 1....../ -r I / II I' r---:: \ / < f--:.. 1/ i- I \ ,/ ~ I \ "\ , 7 I I f I '\ .,( I f- I ..L>( I I \, I DESIGN REVIEW SUBMITTAL ,yo I...~ NOT FOR CONSTRUCTION ARC H t TEe T S 181701ysn.t 7014lhShel,SlftI>>I CWWd,CA94812 ~,CA9581e I'tIlnrI (510)83IW68e PlrIllI (530)1564. Fa (510)83&.6688 Fa (530)1sa.4J81 0:: w t- Z W o C) z - D.. D.. o J: en W o ::s D.. t-~ W~ ~~ O::g <Cffi :Ea ~t=='---'- ~ PlAN !g ,:, II II II II r 5'.'''''' \ B.ElEVATION ~ C. AXONOMETRlC ;:; !2 FINISH GFWlE 8 ~~~OUND MOUNT BICYCLE RACK ;.-;f'.,-r- -.' -'.- ~.~ 't " I f , I I i I I APPROVAL f1Sti -~oot') -JJ.f ORe Application i'J1j'T!t~r 'f-/q:.Q2 ~~lfdCUj i I Signature '. ~ ~ I I ....~~,. . '.: ' -. ~...:.....':;~k4-'_ ':,,;:.: ;.-_......-~._--':...t;,,~ ....,._~.:..-...,,,."-:-...~.;.~._;,;;~.~;;~~, .~;;;.::..;.~~.~:.......... ~;::::-::;z:.:r~~; SECOND FLOOR PLAN 16' 8' 0 1~ 32' SCALE: 1/16"-1'-0" Q ~~,-------r-~~ .~ ~ -~---~--~ -~~, ~ " / -/1- ---;'1 1- - -1- ~~ ~\- ~. r; ~ ----0- - - Il I . I ..... _ I _.._ u I-',iy - 1r:-1" --U-T--j , I I, ~,i "rl' ! Ii ~' II !i !i ji I: 4{)'-O- j $ 11- I rt III W ~ D 46'.0- D ii (10,:,,: I! Ii D I' 1 I I I I cID I (]5 :J1b I . ~ "'~ \ ~' . ~,-t, / /1.- ',' . J _ ~ .~r, 4;:~(.", ~ ~ . .....-r1C ~ - - - - -, -,- - - - - - --+ - - ......11 -f *~!~ I- t-t +- t-t +- 1-1 +-!-; -H- t- III I ! 9,974 SJ. G.L.A . III . "1 42'-0- ;Jf:~----~-- . ~~~~~ I DrJii~ 38'-<)' CORRIDOR - ~O'-o-:-r=1 I 1_ 44'.0" rID w~ ~~ / ~ - III tv II'" l.~ (; I . /11 " ~ I 81 I / -+. I \ 9 li III 1 III .. ~ ~ - ~ ft=.nl~ ~~ X=Df , , , , ~ , , . , , , , , , , , , . . , ~~'1 4,423 S.F. G.L.A ~ f-. / / i---.--< 1/ II . ,\ -. 49'-0- I. ~ \ )'?l ~ \1 - " \ ...., \ . . DESIGN REVIEW SUBMITTAL NOT FOR CONSTRUCTION l.l~ 1617Cl1y$lreet 1014lh$nel.SlAIII3Ool OIICInd,CA94ll'Z ~CA95616 PII;r!e (510)836-e8ll8 Phl:Ine (~j15&-428l1 Fax (510)83lWill8i Fax (530)758-t388 ~ W .... Z W o C) z - a.. a.. o J: en W o <C ..J a.. ....~ W~ ~~ ~g <C~ :Ea .~~- [] [] [] '1,' "'2cj'," "" ~"({1f; i H~ H I ! c I W"jp c ~ J "~ f ------------fz o\, III I ~ ! If I I I I! I I i I WI W &f> i &f>lli I I I I I I I I I I I I -, [] [] / { /~ \', ~ I , \ 1.1,,__ [] [] ~--l' C Ii [] .,,"'.,," 11 C Ii ~I[] G., II [] --~~.---II C Ii [] ---;;II ~......""i,.I. [] [] [] ~^ u ~;? C ' ~, ' ,I I @~ ...11 r-~---~-~~ ~~-~ fjj /~~Ii' IITTI'llri,I.~ ~J . I I I I I \^ iWA '\.~ . .J LLU I'.. I,! I '?"""""'"''''U''=''' I, ,[ \ / '" ii' '\ ~ ._ ~J__. U I /7-~~' ~LJ \:J ~~c ROOF PLAN 16' 8' 0 16' SCALE: 1116" -1'Q 3Z Q r-.'~'~'~~,.=C"~...._'-_..._-~."~".,,~.- ' APPROVAL ' .1..... ..... DRC-- ---- -- /~- I I / / I " \ . \ I I '0:' o I I II I' : I; , i I I~ :(1 I '! --------, DESIGN REVIEW SUBMITTAL NOT FOR CONSTRUCTION I I \ \ .., *~ \ / }. I '// 'i r' ~ "~-, ~! , I I- I I /1 r' II. '/~- I ~-- ~ ~ \ J- ;] i-l. \1 L;t- "I- . I \1 ii. II :1 H II ). I~t. / ,I r '_y)-. \~i'j-, \ ' I \ J =4\/ ',-- ,- I . \ , I..!~ If;' ![.~ H m " f;1' 1 I {\ '?t' -t / .j I"" i , / j 1\ / I " ~ i I \ e Cq~ ~d.L/':C-u ' I t Case anayer J , ;~_"__-,,"T.,,-,_j''''''--f''':~dJ;;.,.;~ -f 0::: w .... z w o C) z - D.. D.. o ::J: en w o <( ...J D.. ....~ We:: ~ ~~ O:::g <(ffi :EB 16HCllrtSftet 7OHlhSQet,$IAII304 o.ldIInd,CA94ll12 OIYlI,CA95616 Phone (510)lI36-<<l66 Prone (530)756-4268 F. (510)Dl-686lI Fe (530)158-4388 CD ~8~~_:H ELEVATION 2a CD WEST ELEVATION ( .' _. ~~"""".~)Il:'~' .1 ._.. ._ ~... ~ -_1-............... 1/8"=1'-0" '~ .,.. ~ f APPROVAL ftSfJ -dOOto .-iJf i Application Number I ORe 4--1 q -0 '7 t ~te l' ~ -" j , Signature {~~fJlut~tj' I. ~ Case Manayer .) ~~~:';"~-:;:'?'A.':<l"'_:.~.:..._;.=.~',;i~,fn__~t;;:,..";,...;;~:;~.. "'7-;rJ KEY NOTES THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY 1. TILE ROOF TO MATCH (E) BUILDING A- CLAY "S" TILE - MSA MISSION TILE BLEND 2. 7/8" EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A - PAINTED "DARK BROWN" - KM850-N B - PAINTED "MID BROWN" - KM588-D C - PAINTED "BEIGE" - KM587-M 3. CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3" RECESS 4. CEMENT PLASTER EXPANSION CONTROL JOINT, TYP. 5. LIGHT FIXTURE 6. EXPOSED GLULAM BEAM, PAINTED "BEIGE"- KM587-M 7. WOOD TRELLIS - PAINTED "LOAM" - KM413 ~-~-:--------~~1J-- -~:FlJ~~' .--: i [] : ... j ~ :.. .. ": ! I : ~ . I iO'" V 0" 9 : r---.J L__________________i N KEY PLAN - not to scale E9 16' DESIGN REVIEW SUBMITTAL \TH I..~ NOT FOR CONSTRUCTION ARC HIT E C T S 16110ays-. 1Q14"S1JM<.5<i1lt304 00l4.-.d. CA 9<612 0...... CA 91616 """'" (510) _ """'" (530) 156-4288 Fa. (510) 1136-6689 Fa. (530) 156-4366 BUILDING ELEVATIONS SCALE: 118'. ".{)' ~ W I- Z W o C) z - a.. a.. o J: U) W o <( -I a.. I-~ W~ ~~ ~g <(~ :Ea 6 Dalo: 04.ll9.2007 :I:!,', I rT' p.;'f"',-, r,' ",''''I'''' 1"'1'\' "I ". rT'''ir~ UJ' w ,.,. '~, n, '1' ''I'' "I" 'Nl' 1"11';1 'Tl'1 f'I" "ITI',"" r'p' ~q '!II! l' '\ .1fIl' 'I"'ll! '=1',' ""r,l, ~" r,~ "1 .'.. " '! ' \ " '" ! ,.... .. '" " ..,'. " ...", " '" ..,.." ' '" · 'f"'" .., ".. "1 " ' 'F \ =i _, \ ., //////// // / v/ // //// V v v v V / / V / v __II ~ I - , ,. ~ ___ ,/ / ~ / / / / / / / L / / ~ ~'. - . ,~........, ~ ~,. .,~ · _ "'"""'_" ''''r-_ [7:A':?>: I/I/X// /~~:~v/~ If""""'_-""'lil! 'T'''_'"''I!'I!' ~,. _ .. I I I-/' ,,/1 / 1/ /, / V / / /I 1/ ~ / Y I~ i CD ~8~~:H ELEVATION 2a CD ~~~:" ELEVATION CD NORTH ELEVATION ri'::~""-:--':':~':-~""-' ......, y r''''~'~ - .., , ~ ~.'_' "." ft.. .. ......".~~..... 1/16'= 1'.()' 1 .., ;;: APPRO'i\L A-S: ,,-- ' ; v ~ ,. ~ "0 · -if ~; 1 tJu - / ~ il Ii "''''Ii.......;"... . \~ ORe !.j k1 ~~ Signature ~ ..\ l. BUILDING ELEVATIONS 1 i I , J KEY NOTES THE FOLLOWING NOTES APPLY TO THIS SHEET ONLY 1. TILE ROOF TO MATCH (E) BUILDING A- CLAY "SO TILE - MSA MISSION TILE BLEND 2. 7/8" EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A - PAINTED "DARK BROWN" - KM850-N B - PAINTED "MID BROWN" - KM588-D C - PAINTED "BEIGE" - KM587-M 3. CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3" RECESS 4. CEMENT PLASTER EXPANSION CONTROL JOINT, TYP. 5. LIGHT FIXTURE 6. EXPOSED GLULAM BEAM, PAINTED "BEIGE"- KM587 -M 7. WOOD TRELLIS - PAINTED "LOAM" - KM413 8. VEENER STONEfTlLE 9. SKYLIGHT ROOF CANOPY SYSTEM ~ ~--------- --- - - --- ---l '1] 'CU'" . . : Q :.. ! . :.. .. : : I ',',' ,.... d 10 : r--J L 'v __________________.i D []OCJQDDDD~ [J N KEY PLAN - not to scale EB 16' DESIGN REVIEW SUBMITTAL \THI...~ NOT FOR CONSTRUCTION ARC H . TEe T S 7074lhSlreet.Sd:e304 Oa....CA95616 Phont (530175&-12&! Fa. 1530)7_ SCAlE: 118" = 1'~" Case rvLmager 1617ClaySlreol ~.CA9<6'2 Phont (5'01_ Fa. (510) eJ6.6689 0:: w I- Z W o C) z - c.. c.. o J: en W o <( ...J c.. I-~ W~ ~~ O::g <(~ :Ea 7 Dale: 04.09.2007 i....---.~~.~--~'?:'~~~..,,""". ,."""""",~,-"",,,. """......_,~"..'.,..:"",~..:"-.- ",..:.,-~ - ""'f." :,.r-. ;"1: .... 'APPROVAL A--$rI-(~OOt, -It! ~ I Application Number , ORe 1-/-'1 - I I Signature 'ILl '~M"~ I {/I ") I L_---=.-,,-=~.-.."2J BUILDING SECTIONS 16' SCAlE: 1f8". 1'.{)" ..olIIL+J.r~___________ ~L cp ! ~ 9 9 ~ i ! ! ! ATTIC o ! f i ~ i cp ! --+--~~--- - --~-'-----m>OfROOf~. --------yopOFROOFs.:~. n___n___n_nnn+_n_nnnnn_nnnn_nnn_n_nn~nn- I ! I -~. ----- ---T----- ----- -- -------- RESTAURANT I n___________n_+_n__nnnnnnn_______n_nn____J_____ OFFICE -~ - ~z;.~. - T~~. CD ~:~;;.~.~SOUTH BUILDING SECTION cp ATTIC cp 0 ~ 0 9 ! ! 9 I~ i ! ~~FWALl .....r-3. .......--.<-_ ~OfCOlUMN j ---------------------r------- - -......- ---------------- -j-- ------......- r-A TIlC ~...------- - -- - ---- ----- -- ------......- i OPEN n_n__n __n_ n_ _ _+ nnnn n __n_ nnnnn_n___ RESTAURANT - .lr,o-..... ~ - - ~D;L~. ! _nn_n.1 _nn _nnn nn_ i ~ - _n_______ ~. ~ I LOBBY ! . I --------------------!----------------------------------------t------......- . . T~~'~'~'~~i~ OFFICE BBY Q Gp ~ ! e ! -r-- --- - r---- -------- ----TQpOF.~;:,:$ , -t-~-- - -~+- T5POFROOfS::~lI~~$ DESIGN REVIEW SUBMITTAL NOT FOR CONSTRUCTION IJt1 - H~2~'~ $ SL:'~i. $ -2ND;L~$ - T~1$ 1611ca.,-SNt 7D7oCChSlrMt,~3OI ~CA1M612 DIvlI,CAlI5616 Phone (510)136-6686 Phone (530)7511>4286 F. (510)136066eO F. (5)1)75&4388 0:: w .... z w o C) z - D.. D.. o ::E: en w o :3 D.. ....~ w~ ~~ O::g <(ffi :lEa .. CMU WALL NOTE: ALTERNATE DESIGN IS SPLIT FACE eMU #5@ 1frO.C. PATIO FLOORING IN BOTTOM COURSE OF WALL, OMIT VERTICAl GROUT EVERY 3RD BLOCK FOR DRAINAGE ~ o ~;124~1~_~!,INING WALL A-011l2800-oJ (~__~-~:--:7"C':'">n>'..-..,....".<~-.,-~-__~_""'r:~~-~".'-'" ,-" ~ APPROVAL ttSfJ -- ~ Doh ~-j '-f I Application Number ORe 4-IQ-01 J Signature {ftr<./X?ttL/(U,^" I iL Case Manager ~' ." --.~,.- - ......--- . -,- . .., - . ......- "..- ~-'. - ,"- ~......'" '~~'""!...:""_-::~-:~;),-'V":I:~:I;"-..;.c':'!l-''\"':~;.',,,"'',,-,'~~-A;:,..~.. - "t ? ~ ! BUILDING SECTIONS 1~ SCALE: 118" -1'-0" STEVENS CREEK BLVD. 26'.Q' LANDSCAPE ELEMENT 15'.Q' 11'-6' - ~ - -----mPOfP~~$ 6'-3' RESTAURANT ToPt;~~ $ I ii.:o2~~ ill -L- '24'-6'", I F1NISHfij~ I -l--~ I SlUR.C. al ~I (..)1 ~I ~, 1 9'-6' ~ 1 9 1 ..-..~ I I , 4'-8"" : s==:' , .f-K I I 18 I'" ~ :I: OFFICE Ti:i $ 3'.Q' OVERHANG u ;H '13'-6'", ~ n-nnnt __.8'.()" HEADER 0.0, ill I I 8 ~:~,:~,:OUTH BUILDING SECTION THROUGH OFFICE AND LANDSCAPE AREA I I I I I I I I I I i UTLlTY ROOM i ~ ;;: OFFICE I I ~---~-----~ I I TlP~ ~____"':""7'rr'" I TOPOFWAiI""'" -+------~ I HEAD 0.0, I I I ----I-----s.:1~~iIl r--- -- -2ND;l~$ _____nn_n_____n_n__T_____~-------n---nn-T------n----n-n--- OFFCE ! i i I I ~EADER+::g: $ ARCADE Hi III ~ T.OS. CD ~~~-~EST BUILDING SECTION DESIGN REVIEW SUBMITTAL \'fHI.4~ NOT FOR CONSTRUCTION ARC HIT E C T S 1617a..,.St1IIlt 7074tlS"eUlI~~ o.tlnI,CAMtl12 OM;.CAll5e16 P\o'II (510J83M686 Pl\n (53O}75Io428ll F.. (~'oJ~ FlI!l (53O)15I-t3ll8 0:: w .... z w o C) z - c.. c.. o J: (/) W o <( ..J c.. ....~ W~ ~~ O::g <(ffi ::Ea TILE ROOF TO MATCH (E) BUILDING A - CLAY "S" TILE - MSA MISSION TILE BLEND LIGHT FIXTURE EXPOSED GLULAM BEAM, PAINTED "BEIGE" - KM587-M 7/8" EXTERIOR CEMENT PLASTER SYSTEM ON WOOD FRAMING A - PAINTED "DARK BROWN" - KM85O-N B - PAINTED "MID BROWN" - KM588-D C - PAINTED "BEIGE" - KM587-M WOOD TRELLIS - PAINTED "LOAM" - KM413 VEENER STONEfTILE SKYLIGHT ROOF CANOPY SYSTEM CLEAR GLASS IN ALUMINUM STOREFRONT WINDOW WI 3" RECESS CEMENT PLASTER EXPANSION CONTROL JOINT, TYP. TYPICAL TRELLIS TYPICAL EXTERIOR WALLS & TILE ROOF TYPICAL EXTERIOR COLUMN [2:=.:EZ! "'~~';a "Do .._s...- 1;,..~ TYPICAL EXTERIOR FINISHES MATERIALS AND FINISHES 16' SCALE: 118' = 1 '.()' TYPICAL CLAY TILE ROOF EXTERIOR LIGHTING _,.i. . SKYLIGHT ROOF CANOPY :l;l' ........ ..~ ~, ... .~~e..""-"""-- b. ~"r "'f r-r 4C.~~~""_.~"".... i . r APPROVAL 4S11-..:2oot, -/4- f Appli~atjon Number IDRe ~ I Signature f2 . , .. -~. at _ _ l ~~M~~m ~~t:'~;l~~,.~"".........~.....~~~~. DESIGN REVIEW SUBMITTAL \"'HI~~ NOT FOR CONSTRUCTION ARC HIT E C T 5 1617C&(Street o.Uar.s, CA 94612 ~ g~~l= 'Ta74ttl Stree(. Sub 304 ~.CA95616 P!me ~) /56.<288 F.. (530)758-4J88 D::: w I- Z W (.) C) Z - a.. a.. o ::I: en W (.) <C -I a.. I-~ W~ ~5 D:::g <Cffi :EB 1~~J C C C C <>b~ w ::> z w > <( .-J ;:: cr: o 0... I ~ ::> o (f) if' '"','..-~' .,----..~""""'':r.'. ~.....__.~<,...~",....~~:"?""....-:,'.J.,..- .- v..,., . ) ~ APPROVAL ORe ~ Lj-/0-n'7 Signature (jetb W,~ fl Y ~ -, L~~__~:::~g~r" ~J STEVENS CREEK BLVD. C H ~_____L C C C C C <( C (9 "~~ ~.~. z C 0 ::! ::> OJ w . ";:ID;nv. J;T'~~ l', . i~_' I. r~~L"'-;::"\'~' " . c..' KEY I QTY. I &IZE TlOEE& "Q"r" '''" iI, \\Y . / "~'~"\r: r Ij,!',./~!11' \ i \~i Plant Legend eaT ANICAL NAME COI11CN NAME I..C I &2 11& a..l. I L~~ CDPlr..u er'~ Box ~ \"YHI.4~ ARCHITECTS -=('011)_ """"""""_T,IUI'rf" _(alJ__ """.,0\_ ~ Greg G. Ing &- Associates ~Ardlitedure l585n.e~ Su.i~2Q1 Sm lose, QlifurnU 95126 D:: w I- Z W o C) z 0::0 D.C) Oz ::I:- cn9 W- 0;:) <(0:1 ..J D. I- W :ll::: D:: <( :iE "E ctlv >~ Qlo g~ lD ctl ~ "E Ql ~ Ql 0 ~:c O"iij <nO c ~ g ~t en Ql 00. r-. :J r-.O m ~ TREE REPLACE- MENT PLAN l' = 30'.{)" PERMIT SET 2-20..2007 L2 ~ *1r b.- '3 .,,--.----. ~._- -~.'.-~.,.r.~....__'!:'''=.'_.'.~_''"'''''_.....ry__.~:olltl''''"' . - APPROVAL DRe Signature A-Sf1 -,;lODIo .- 14- Application Number t!-IC}- ., '{;~-_<=I"'--' -.."""".........,._."..... '_,'. """,.'_"'~'..' '';' .,,;,.ti-;.:~.A::";:;';. Plant Legend KEY I Q1'Y, I &IZE SOT ANICAL. NAI"E fIOEEO COI'I'1ON NAME IllEMAIOI<& LC I !J2 I e Gal I Lopnc..taoIcn ccnr..w. I erl~,. ec.c . i J ..____~I \.HIA~ ARCHITECTS ~ Greg G. Ing & Associates UlndsaIpcArdtitccf'lut' 1585 The Alameda.. Suite 201 Sin fOlie, CaJifumj.;, 95126 "VFOUII"".lIlHT.......... __1_ ..,~ ~ TREE REPLACE- MENT PLAN PERMIT SET 2-20-2007 D:: w ~ Z W (,) C) ~(,) R:C) Oz :z:- (1)9 w- u:J <(In ...J D.. ~ w :ll::: D:: <( ::E 'E III V >~ Q)e ~~ COlli ~ '2 Q) ... Q) 0 ...:t::: O'tii rnO c: ~ g- Q) .- -t:: C/) Q) eo. r-- :J r--o Ol ~ L2a L, L ~/ () () (E) BUILDING A I () () L m '41 PAlM 30" OIA TO REMAIN () o o 42 PAlM 30~ 01" TO BE RELOCA TED ~ 00 ~~ ~~ <} '1( ~ <>0 '43 FRAXINU$ 32" DtA ~ BE REt.lOvt:D \ I ~~4R:~~NUS 20. OIA / / 45 FRAXINUS Ig" OIA TO BE REMOVED ~ OJ C j= !2 z G) o ~ !: is '1-46 fRAXINU$ 31~ DIA TO E REMOVED \ \ 147 FRAXINUS 28" DtA I TO REMAIN : ~ " ~~3 B~A;~~D 502'6" DIA )( . 54 MAGNOLIA 12" DIA TO BE REMOVED #49 FRAXINU$ a" Of A TO REMAIN g l> Z <:rs:D 0/'~~ ~ ) / '- ~ /' I \ '50 FRAXlNU$ 11" OtA TO R[t.lAIN EXISTING REDWOODS TO REMAIN 1 FRAXIN 5 . OtA TO REMAIN ~' O~ Ill!,! ilig "'Q ~; o ~ ~- /'P o. ooe:::.::::. -.,,; f~ 0 :> (, :0 "0 . , 0 -U }.;o.. :1] C'. 0 (;) <: )> r- :( ~ ~ :) r 'i I: U " ~ r r !Jl 0 l> .. '" r r m /:; ~ ~ .. 0 < ~ 0 ~ ~ --- II .. '" ": ~ ~ ij iii It ~ ~ .. $ ": ij iii 'l .. 0 "'0 ~ :< .. '" '" '" .. .. .. ~ .. Q) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ M ~ - ~ ~ :J ~ !:!':. _ _u..__ _. _ ~ i! r a r r I: ~ l i r m 0 i ~ 1 r ~ :J i l ! ~ a ~ I i!' , ;; ~ "' CO "' ~ - 1 1 "2 ~ i "'U " !i a ~ ~ ~ "' ~ ~ ~ "1 ~ ~ ;; " < ~ 9 !i I' "'0 " a, i ~ " (j ~ . " ! Q) " ~ -e . ~ " z n r [ f s r ~ ~ Q) l ~ -; ::J i ~ f & :J ! [ 1 r+ 1 il: ~ 1 I, I r. ~ ~ l ~ ~ [ f l ~ q r g Ir i 0 CD ~: Ii "'- ~ ~ ~ J l 'i I s '!, ~ L l~~ ~ .- Hi i ii (Q " ~<<' ~ '" if 1 " ~ 2 J ~ r f ~ i ~ CD i 5 . ~ .E ~ I t m .- ~ :I ::J f ~ '5 '\.'i-> ~ .- .- a. I g- " ~ m :ii:i ;;; III a ~ ~o. !l' ~ h "' H 1 i to ~ ~ _ll ~ U ~ J "- J 2' _I ~I "'C"'td - ~ i '? ):):~ MARKETPLACE SHOPPING CENTER I fi f R- ~ lWff ~-C ~ . ; ;~ ZZ I I 1 ~ BUILDING C .fit !<!Ij 'IJ! ,II! ~= -l Z ; i If f i~ Uillhl ::;- G) 19770 Stevens Creek Boulevard rn'" Cupertino, California 95014 U I ~~ I!I