Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CC Resolution No. 07-038
RESOLUTION NO: 07- 038 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RESCINDING RESOLUTION NO. 06-065 SCHEDULE D - BUILDING FEES AND ADOPTING NEW SCHEDULE D - BUILDING FEES WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: 1. Replace current Building Fee Schedule D with the new Building Fee Schedule D as attached 2. These fees are effective May 7,2007. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 6th day of March, 2007 by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAIN : Wang, Kwok, Lowenthal, Mahoney, Sandoval None None None ATTEST: APPROVED: ~~ City Clerk CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Plan Check Fees Construction Types: Construction Types: Construction Types: I FR,IIFR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * A-1 - 1,000 $6,906 $5.21 $5,755 $4.34 $4,604 $3.47 - ------'---- ---------_._-~ - - 5,000 $7,114 $14.29 $5,929 $11.91 $4,743 $9.53 - ----- - - 10,000 $7,829 $3.58 $6,524 $2.98 $5,219 $2.38 --- - _00- ----.------ ,. - ------ ------- - - 20,000 $8,186 $5.35 $6,822 $4.46 $5,458 $3.57 ---- ---------- 1- -- - - 50,000 $9,792 $2.86 $8,160 $2.38 $6,528 $1.90 100,000 $11,220 $11.22 $9,350 $9.35 $7,480 $7.48 A-2 - 1,000 $6,906 $5.21 $5,755 $4.34 $4,604 $3.47 --- ~-- --- ------- 1-- - --- ---------- 1---- - - 5,000 $7, 11~ $14.29 $5,929 $11.91 $4,743 $9.53 --------------- --- - - 10,000 $7,829 $3.58 ~6,?24 __ ..!?Jl~ $5,219 $2.38 -- -- - ----- - --- ------- -- - - 20,000 $8,186 $5.35 $6,822 $4.46 $5,458 $3.57 -- ----- - - ----------- ---- - - 50,000 $9,792 $2.86 $8,160 $2.38 $6,5~ $1_90 _________n_ - 100,000 $11,220 $11.22 $9,350 $9.35 $7,480 $7.48 A-2.1 - 500 $5,646 $8.53 $4,705 $7.10 $3,764 $5.68 .. __._____n__ ________n___ -- - - - - ----- - - 2,500 $5,816 $23.35 $4,847 $19.46 $3,878 $15.57 _____________.m" --- - - 5,000 $6,400 $5.84 $5,334 $4.87 $4,267 $3.90 __ __n____ ----- .. - - 10,000 $6,692 $8.76 $5,577 $7.30 $4,462 $5.84 ------------- - - __~~,OOQ_ $8,007 $4.67 $6,671e.- $3.89 $5,338 $3.11 --- 50,000 $9,174 $18.35 $7,645 $15.29 $6,116 $12.23 A-3 - 250 $6,882 $20.77 $5,735 $17.31 $4,588 $13.85 - --------- _____________n__ - - 1,250 $7,090 $56.97 $5,908 $47.48 $4,727 $37.98 ------------ ------ - - - 2,500 $7,802 $14.22 $6,502 $11.85 $5,202 $9.48 --- n _ - -- - - 5,000 $8,158 $21.36 $6,798 $17.80 $5,439 $14.24 - ---- -- --- -- ---------- - - 12,500 $9,759 $11.39 $8,133 $9.49 $6,506 $7.59 -- -------------- -- - ----- --- 25,000 $11,183 $44.73 $9,319 $37.28 $7,455 $29.82 A A Occupal1c:}lT~nant Improvements 500 $3,127 $4.71 $2,606 $3.93 $2,084 $3.14 ___ _n____ --------- ------ I-- ------- - - 2,500 $3,221 $12.94 $2,684 $10.78 $2,147 $8.62 ----------- I-r--------- - e- --------- - - 5,000 $3,544 $3.23 $2,954 $2.69 $2,363 $2.15 __u_ n __ - -- -------- - - - 10,000 $3,706 $4.86 $3,088 _$4.0~ $2,470 $3.24 --- ----".------". -- -------- - - 25,000 $4,434 $2.59 $3,695 $2.16 $2,956 $1.73 -- ----------- - -- ..----- __n________ _ __.. --- 50,000 $5,082 $10.16 $4,235 $8.47 $3,388 $6.78 B Banks 500 $6,795 $10.25 $5,662 $8.54 $4,530 $6.83 - ---- n_ _m__ - - 2,500 $7,000 $28.14 $5,833 $23.45 $4,667 $18.76 - - - 5,000 $7,703 $7.04 $6,419 $5.86 $5,136 $4.69 - -- ---------- - - 10,000 $8,055 $10.55 $6,713 $8.79 $5,370 $7.03 ----- --- --- --------- __n __ - - __ ?5,_00Q.. $9 ' 6l.1l $5.61 $8,031 $4.68 $6,425 $3.74 ------------- I-- ------ - -- - 50,000 $11,040 $22.08 $9,200 $18.40 $7,360 $14.72 B Laundromat 200 $6,445 $24.32 $5,371 $20.27 $4,297 $16.21 - -- - --- -- 1--- --- ----- ------ ------- ---- - - 1,000 $6,639 $66.68 $5,533 $55.56 $4,426 $44.45 --- --- - - 2,000 $7,306 $16.68 $~ $13.90 $4,871 $11.12 - - - ----.- e----- ---- - ---- -- ---------- - - 4,000 $7,640 $25.00 $6~ $20.83 $5,093 $16.66 - ---- -- ------------------ - - 10,000 $9,140 $13.34 $7,616 $11.11 $6,093 $8.89 n______ -- -- 1- ___ n__ __ --- ------- 20,000 $10,473 $52.37 $8,728 $43.64 $6,982 $34.91 B Medical Office 500 $8,049 $12.15 $6,708 $10.13 $5,366 $8.10 ----- -- _n_ - - 2,500 $8,292 $33.30 $6,910 $27.75 $5,528 $22.20 --------------- - - 5,000 $9,125 $8.34 $7,604 $6.95 $6,083 $5.56 - - - 10,000 $9,542 $12.49 $7,951 $10.41 $6,361 $8.33 --- -- - - 25,000 $11,415 $6.66 $9,513 $5.55 $7,610 $4.44 - 50,000 $13,080 $26.16 $10,900 $21.80 $8,720 $17.44 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Plan Check Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II, III, IV, V-N Base Cost - Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf · Size 100 sf. Size 100 sf · B Offices 1,000 $7,670 $5.79 $6,392 $4.82 $5,113 $3.86 --'- ~--_.._--_. - ----- - - 5,000 $7,901 $15.89 $6,584 $13.24 $5,268 $10.59 -------..-------- f--------------- - - -~- ----._---" ---- - ---- ------------- - - 10,000 $8,696 $3.98 $7,246 $3.31 $5,797 $2.65 ------ ---------- -- - - 20,000 $9,093 $5.94 $7,~r.~ $4.95 $6,062 $3.96 ----- --------- -------- ------- - - 50,000 $10,875 $3.18 $9,063 $2.65 $7,250 $2.12 -- ----- - 100,000 $12,465 $12.47 $10,388 $10.39 $8,310 $8.31 B B Occupancy Tenant Improve,!,~~s...._ _ 300 $2,434 $6.12 $2,029 $5.10 $1,623 $4.08 -- ------_._-~ -- -...-...----- - - - -- ------- _.0- -------- -----~ - - - 1,500 $2,508 $16.79 $2,090 $13.99 $1,672 $11.19 - --1- -'---- --- ----------- - --- -- .. - - 3,000 $2,759 $4.20 $2,300 $3.50 $1,840 $2.80 ------- ----- -- ..n_ c- - - 6,000 $2,885 $6.29 $2,405 $5.24 $1,924 $4.19 - ---------- ___.____n___ - - 15,000 $3,452 $3.36 $2,876 $2.80 $2,301 $2.24 1-------- f---- 30,000 $3,956 $13.19 $3,296 $10.99 $2,637 $8.79 E-1 Preschool/Sc;hool (50+ Occupancy) _ __ 900 $7,932 $6.64 $6,610 $5.54 $5,288 $4.43 u..__"._____ -------- -- -- - --- ---------- - - 4,500 $8,172 $18.24 $6,810 $15.20 $5,448 $12.16 ----- ----------'-- -- -- --------- -- - - __ __~,90Q. $8,992 $4.54 $7,494 $3.79 $5,995 $3.03 ------------ - ------ --- I-- - - 18,000 $9,401 $6.86 $7,835 $5.71 $6,2~ $4.57 ------ i------ - --- - - 45,000 $11,252 $3.65 $9,377 $3.04 $7,502 $2.43 --- -- - ------- 90,000 $12,893 $14.33 $10,744 $11.94 $8,595 $9.55 E-2, E-3 Preschool/School (<50 Occupancy) 100 $7,028 $53.02 ~5,85? $44.18 $4,685 $35.35 .--.-- --_._----~---- - - 500 $7,240 $145.43 $6,034 $121.19 $4,827 $96.95 ------ ----------- ---- - - 1,000 $7,967 $36.36 $6,640 $30.3.Q $5,312 $24.24 ----- ------------ - - 2,000 $8,331 $54.53 $6,943 $45.44 $5,554 $36.35 ---- ---------- - - 5,000 $9,967 $29.09 $8,306 $24.24 $6,645 $19.39 ____n ----___--_.0__- - ---- 10,000 $11,421 $114.21 $9,518 $95.18 $7,614 $76.14 E E Occuea.'1.cy.Tel1ant Improvements 100 $4,228 $31.89 $3,524 $26.58 $2,81~ $21.26 I-- ------- ---_._-~- --- ____m_ - - 500 $4,356 $87.50 $3,630 $72.91 $2,904 $58.33 - "_H'__ ------- ---------- ---. ----------- - - 1,000 $4,793 $21.87 $3,~ $18.23 $3,196 $14.58 ----------- ____n__________ - - 2,000 $5,012 $32.81 $4,177 $27li $3,341 $21.87 - n__ I-- -- - ~-_.._-_..- - _______n____.__ - - 5,000 $5,996 $17.51 $4,997 $14.59 $3,~ $11 .67 - - ~._- - -- -------- _ ----- 10,000 $6,872 $68.72 $5,726 $57.26 $4,581 $45.81 F-1, F-2 Factory/Industrial 1,000 $8,545 $6.45 $7,121 $5.38 $5,697 $4.30 - --- - ________._._.___n_______ - ------- - - - 5,000 $8,803 $17.69 $7,336 $14.74 $5,869 $11.79 __._ ___.___n._~~~_~ .n.. .-. - - - -.... ------- -...-- - - - 10,000 $9,687 $4.41 $8,073 $3.6~ $6,458 $2.94 - ------~ - - - --~.__._.._.__.- - - 20,000 $~ $6.64 $8,440 $5.53 $6,752 $4.43 -- ---- -- -1- ----- ----- - - - 50,000 $12,120 $3.54 $10,1~ $2.95 $8,080 $2.36 ----.- -- ------ - - 100,000 $13,890 $13.89 $11,575 $11.58 $9,260 $9.26 F F Occupancy Tenant ImprclVements 1,000 $6,27Q $4.73 $5,225 $3.94 $4,18Q $3.15 1__ m _ ____1__ - - 5,000 $6,459 $12.99 $5,383 $10.83 $4,306 $8.66 - -- - - 10,000 $7,109 $3.23 $5,924 $2.69 $4,739 $2.15 -- ------ - - 20,000 $7,431 $4.88 $6,193 $4.OZ I- $4,954 $3.25 --- - - ----------- - - 50,000 $8,895 $2.58 $7,413 $2.15 $5,930 $1.72 - - --- - - ------ 100,000 $10,185 $10.19 $8,488 $8.49 $6,790 $6.79 H-1 f:l-1 Occupancies 100 $7,349 $55.44 $6,124 $46.20 $4,899 $36.96 - - _.-- -- -~-- -.-.-.---- .- ------ - - 500 $7,571 $152.07 $6,309 $126.73 $5,047 $101.38 - -- .-.-..... -------- -_.~---~...- - - 1,000 $8,331 $37.99 $6,943 -- !~~---~ $5,554 $25.33 - -- -- -----------------~- --.--- _._- I- --'-- - - 2,000 $8,711 $57.03 $7,259 $47.53 ___$5,807 $38.02 -- -------- .-.- - - 5,000 $~ $30.42 $8,685 $25.35 $6,948 $20.28 _______n______ -. ". ~..- ~_.._- -- 10,000 $11,943 $119.43 $9,953 $99.53 $7,962 $79.62 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Plan Check Fees Construction Types: Construction Types: Construction Types: IFR,II FR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * H-2 to Hazardous Rooms 1~ ~~5,~ $44.22 $4,885 $36.~ $3,908 $29.48 ~-~ __n_ - f--~--------- - - ------- .-- H-8 - 500 $6,038 $121.28 $5,Q~ I-Ji10_~ I-_~__ $4,02~ $80.85 ------- ~~- .-------- - - 1,000 ~ -~~ $5,~ $25.26 $4,430 $20.21 - - - 2,000 __ $6,918 $45.48 $5,790 $37:~Q $4,632 $30.32 ------- ~-- -------- - - - 5,000 $8,312 $24.26 $6,927 $20.21 $5,542 $16.17 -- -- -- - ----- --'"--- --~-- I ~------ 10,000 $9,525 $95.25 $7,938 $79.38 $6,350 $63.50 H H Occupancy TeI1ant Improvements__ 100 ---~~~ $41.58 _ $4,593 ~~.6_~ $3,674 $27.72 /-- --~- - ~ - - - ~~-- - - 500 $5,678 $114.03 __ __~,731 $95.03 $3,785 $76.02 ~-- 1--- - ------- I-- - -- - - - 1,000 ~_t~ $28.53 ___ $5,202 _ $~~.J~ $4,165 $19.02 -- - ------- - ~ - ---~ - - 2,000 !~~ $42.77 ___~4_~5 - $~?~~ $4,356 $28.51 ---- - I-~ -- - - 5,000 $7,817 $22.80 ___J~,~ $19.00 $5,211 $15.20 -- I~ - --~.. I-- -- ------- 10,000 $8,957 $89.57 $7,464 $74.64 $5,971 $59.71 I Institutional -~ -~_. $9.51 -~,?~ I- -- $7.92 $4,199 $6.34 - I-~ - ~ -- --- -_.--~ ------ -- - - 2,500 $6,489 $26.06 $5,408 $21.72 $4,326 $17.38 ---~---~~ -- --- - .------- . - - 5,000 $7,141 $6.52 $5,951 __ $5.43 $4,760 ~ $,!~ -- -- .,-.- ------- - - 10,000 $7,466 $9.78 $6,222 $8.15 $4,978 $6.52 -- ------ --- - __-------C__ \--- --- I---m .----.- --- -- - - 25,000 $8,934 $5.21 $7,445 $4.34 $5,956 $3.47 1- ------------ ---- ..._~.- -- t-- -- -- --- -----~--- - _.------- 50,000 $10,236 $20.47 $8,530 $17.06 $6,824 $13.65 I I Occupancl'Tenant Improvel11en~s_ 100 $3,849 $29.04 J~,207 $24.20 $2,566 $19.36 -~- e----'--"--- ~ ---------.- -- -- ---------.. - - 500 $3,965 $79.64 $3,304 $66.37 $2,643 $53.10 ----- -- --~ - ------ ----- - - 1,000 _ n $4,36~ $19.91 _~3,636 $16.59 $2,909 $13.27 ------- ~-- ---- ---- ~-- - - 2,000 $4,562 $29.86 $3,80? $24.88 $3,042 $19.91 --- -- 1---- ~------ -- - - - -- - - 5,000 $5,458 $15.92 _$4,~ $13.27 $3,639 $10.62 u_ _____ -- ----------- ----- /-- --- 10,000 $6,254 $62.54 $5,212 $52.12 $4,170 $41.70 M Market 2,000 $6,206 $2.35 $5,172 $1.96 $4,137 $1.56 --------..- - -- --- -- -- ------ ----- - - 10,000 $6,394 $6.41 $5,328 $5.34 $4,262 $4.27 __un "--- - ---- -- ---- ----- _ __e_ - - - 20,000 $7,034 $1.62 $5,862 $1.35 $4,690 $1.08 - ------- - - ~---- - ----------- - - 40,000 $7,358 $2.40 $6,132 $2.00 $4,906 $1.60 --------- --~ ~----- -- - - --~.- - - - 100,000 $8,796 $1.28 $7,330 $1.07 $5,864 $0.86 --- ------ - ------- 1-- -------." - 200,000 $10,080 $5.04 $8,400 $4.20 $6,720 $3.36 M M Occupancy Tenant Improvements 300 $3,646 $9.16 ~},038 $7.63 $2,431 $6.11 ---- ---------- ----- -- -- ---- ~-- -- - - 1,500 $3,756 $25.14 ~~g $20.95 $2,504 $16.76 - -- - ___c__ 1------ --~---- - -- - - 3,000 $4,133 $6.30 $3,444 $5.25 $2,755 $4.20 - n_u__ I-----u --- ----------- ---- -- - - 6,000 $4,322 $9.43 $3,602 !~- $2,881 $6.29 ----- ~ I- ___u_~ ------- - ----- -~-- - - 15,000 --~ $5.04 _ $4,30~ I--- ~41Q $3,447 $3.36 -- I---~ - u _..n -- ---" -- 30,000 $5,927 $19.76 $4,939 $16.46 $3,951 $13.17 R-1 Apartment Bldg 800 _E.~ $6.87 $6,066 $5.72 $4,853 $4.58 ------ ~ - - - -- -- ----- - - 4,000 $7,499 $18.82 $6,249 1--$1?68 $4,999 $12.54 I- ---- I- - - 8,000 $8,25_! $4.72 $6,876 $3.93 $5,501 $3.14 -....--------.-. - _u___ I-__u~ u _ -- ----- - - _~~,OQ.Q. $~,-~ $7.05 $7,190 $5.87 $5,752 $4.70 - -- --~ ~ --~--- _Ou I- - - 40,000 $10,320 $3.77 _$8,~ $3.14 $6,880 $2.51 --~---- - ----- - - 80,000 $11,827 $14.78 $9,856 $12.32 $7,885 $9.86 R-1 Apartment Bldg - Rep~CltU.I1it 800 $3,709 $3.50 $3,091 $2.92 $2,473 $2.33 - -- -- _______u__ ____u_ 1----- - --'---- - - 4,000 $3,821 $9.59 $3,184 $7.99 $2,548 $6.39 ------- ---- - ---- ------- - - --'---- - 8,000 $4,205 $2.40 $3,504 $2.00 $2,803 $1.60 ~-- --------- u ----- ---~-- --- ----- ----- - __c_ - - 16,000 $4,397 $3.60 $3,664 $3.00 $2,931 $2.40 ---- -- -- ---~ --- '--- -~.- -- ---------- _u__ - - 40,000_ _ $5'~~1- $1.92 $4,384 $1.60 $3,507 $1.28 ------- ~-- -- - ------".----- 80,000 $6,029 $7.54 $5,024 $6.28 $4,019 $5.02 UBC Class R-1 R-3 - - - - R-3 - - - - R-3 - - - - R-3 - - - - R-3 - - - - R-3 - - - - R-2_1, 2.3 Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each Project Size Threshold Additional Threshold Additional Threshold Additional Threshold Size 100 sf" Size 100 sf" Size 100 sf" 3,000 __!1.o_&~ ___ ~?."7~ ___J~,021 $2.27 $7,218 $1.81 15,000 _ _ $11.J~ $7.46__ $9,?94 _ ~?~ _ $7,435 $4.98 30,000 $12,272" $1.86 $10,227___11.55 $8,182 __ $1.24 60,000 $12,830 $2.80 $10,692 __ $2.3~ $8,554___11:87 :. _ ____.150,00q $15,354 ____~.~O !!2.~?95 ________~!~ _ $1_Q,~~ _ $1.00 300,000 $17,604 $5.87 $14,670 $4.89 $11,736 $3.91 Dwellings- Cu~to!l1, Models'--_______ 1,000 _ $3,405 $26.46 ___~._ ~ ____$2,270 _ $17.64 First Master Plan ___ _ 2,500 $3,802 _ $26.4~ __~~~8 $22.03 $2,535 $17.62 4,000 $4,198 $9.92 $3,499 $8.26 $2,799 $6.61 ---_..~-- -- - --- .. 6,000 ----.!.04,--397 _ .J~~.~ _~},6~f- $57~_6._ $2,931 $46.29 _~~I-_ ~~~_ _ $29.79 __ _~~,!g! _ ~ _ $3,857 $19.86 10,000 $6,381 $63.81 $5,318 $53.18 $4,254 $42.54 -I- u _1,000_ _ $1,768_ . _~ u.. $1,474 $1.09 $1,179 $0.87 2,500 $1,788 $1.32 $1,490 $1.10 $1,192 $0.88 ..- ---------- - -------- ,. ._4,00g $1,808~g $1,507 $0.84 $1,205_.$0.67 __6.,C)QO $1,828 ._ $31.73 $1,523 $26.44 $1,219 $21.15 8,000 ___~.?-,~~9.~ _ _~_2,052 $8.281- $1 ,64~ $6.62 10,000 $2,661 $26.61 $2,218 $22.18 $1,774 $17.74 1,000 _ $5,851 $52.89 _ __ $4,87..6 $44.08 __ $3,~.9! ~~.~ 2,500 ~.?~.04 $52.89 1--__~~,~:3Z $44.081-_ ~4,~ _ $35.26 __~,009_ $7,438 $19.85 _ $6,198 ___$16.~4 $4,958 __ $13.23 6,000 __ $7,835____$138.861 $6,529__!!15.71 $5,~~~___ $9~5Z. 8,000 .!!.0,612____~5~.52 $~,8~ ___ $49.60 $7,074. $39.68 10,000 $11,802 $118.02 $9,835 $98.35 $7,868 $78.68 1,000 _1~,_347 $13.23 _.~5~ __~ _. $4,231 $8.82 _2,500 _ _ ~ $52.89 $5,4_5~ ___ _ $44.08 $~,364- $35.26 _ _____~'_QQ9 $7,339 _$~.~ $.?,~ _ $8.2~ $4,892 $6.63 -______6.'~_ _E.~I-_ __$59.50 __$6,281 $49.59 $~~ $39.67 -_______~,OOO I-- $8,728 ___~69'~1- $.7,273 ___$.57.851-- ~5,81~ __ $46.28 10,000 $10,116 $101.16 $8,430 $84.30 $6,744 $67.44 ___.J,Q.OQ. $3,609 ______~~:~O ----.!.3,9Q~__ _ $5.50 $2,406____ $4.40 2,500 f- $.~,7.Q!3 _ __ _ $28..1~ _ .$3,090 $23.48 $2,472 $18.78 4.QQQ..1-__$4,131 __ $4.95 _ $3,~_ _ $4J.? $2,754 __~3.30 6,000 $4,230 $30.66 $3,525 $25.55 $2,820 $20.44 ------------- _ --- 8,000 $4,843 $36.39 $4,036 $30.33 $3,229 $24.26 _ ______ __ ____HUn ----- --------- f---------- --::.::. 10,000 $5,571 $55.71 $4,643 $46.43 $3,714 $37.14 1,000 $11,967 $26.4-5. ____ $9,97? $22.04 $7,978 $17.63 - _I- __ _ 2,500_ $12,363 $105.82 $10,303 _ $88.~~ $8,242__.-!70.54 4,000 $13,951 $19.82 $11,626 $16.51 $9,300 $13.21 ____u__ __n ------- -- ------ -------- - 1-- 6,000 $14,347 $119.06 $11,956 $99.21 $9,565 $79.37 . __un_un_Un _ - -- --- --- -- - - --- 8,000 $16,728 $138.83 $13,940 $115.69 $11,152 $92.55 -- -------------- I- --- - - - - ---- 10,000 $19,505 $195.05 $16,254 $162.54 $13,003 $130.03 ....!.QQ.. $8,399 $63.36 __ $6,99.9. $52.80 __~~,59~ $42.24 500_ __ $8'_13?3 ---.!.!.Z~._82 _ _$.7,2J.Cl $144.83 $5,768 $115.86 1,_9_QQ.. __~~,~~ $43.44 $7,935_ $36:~ $6,348 _n~28.96 2,000 $9,956 __ $65.18 $8,297 ____ $54.3!. $6,637 __.!4-_3~ __ 5,00Q. $11,911 $34.75 $9,926 E~~~ $?'~I-__ ~ 10,000 $13,649 $136.49 $11,374 $113.74 $9,099 $90.99 UBC Occupancy Type Hotels & Motels _Dwellings - ProductionF'l1~~e of Master Plan (repeats) Dwellings-Alternate Materials CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Plan Check Fees - - -- Dwellil1.9s-Hillside -..fust<l.m-,- MO.9_e_ls, First Master Plan Dwellings---:Hillsi<:le:.?ro~uction Phas of Master Plan (repeats) Dwellings-Hillside - Alternate M.ater!a Group Care, i\lon-Amb. (6+) ---- -- -I-- CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Plan Check Fees Construction Types: Construction Types: Construction Types: IFR,II FR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * R-2.2 Group Care, Ambulatory(6+) 1,000 $9,986 $7.53 $8,321 $6.28 $6,651 $5.02 -- ---_.~~---_.- --- ---..'- -.--- -- - - 5,000 $10,287 $20.65 $8,573 $17.21 $6,858 $13.77 -~--_._----- - .-- 0 - 10,000 $11,320 $5.17 $9,433 $4.31 $7,546 $3.45 --- - --~----- .--'~ --- -- _____________H_ - - 20,000 $11,837 $7.74 $9,864 $6.45 $7,891 $5.16 --- .- - '-----"---- --~_.~- ____un. - - - - 50,000 $14,160 $4.13 $11,800 $3.44 $9,440 $2.75 -- ---- ____n_ -- -.- '- 1---------- 100,000 $16,224 $16.22 $13,520 $13.52 $10,816 $10.82 R-2.1.1, Group Care, Non-Amb. (1-5) 1,000 ..J9,98~ $7.53 $8,321 $6.28 $6,657 $5.02 - -------. ----- -------"-- 2.3.1 - 5,000 $10,287 $20.65 --$~~} $17.21 $6,858 $13.77 ------ ---- - - - 10,000 ~1_1~3~ $5.17 $9,433 $4.~1 $7,546 $3.45 f-- 1-- - - 20,000 ~11,~ _ $7.74 $9,864 $6.45 $7,891 $5.16 -- - - ______~Q,99Q.. _ .114,160 $4.13 $11,800 _~3.~ $9,440. $2.75 ---- I-- 100,000 $16,224 $16.22 $13,520 $13.52 $10,816 $10.82 R-2.2.1 Group Care, Non~mb. (1-5) I-- _ 1, QQ.Q.. _$12,482 $9.42 _"!!Qc402 . E.~ $8,321 $6.28 - - --- -_.~-- ~- _______u ._ - - 5,000 $12,859 $25.82 $10,716 1--~?1.51 $8,573 $17.21 -- -- __u I- - - 10,000 c-- ~14,150 $6.46 $11,791 $5.39 $9,433 $4.31 - -------...- - - 20,000 1--$__14,796 $9.68 $12,330 $8.07 1-_ $9,~ $6.45 - --_.-. -_.~ -- --..-- -------~- . - - - 50,000 $17,700 $5.16 $14,750 $4.30 $11,800 $3.44 ------ ..----.-- ~- 1--- ------ --~-- _____ _n _ ---------- 100,000 $20,280 $20.28 $16,900 $16.90 $13,520 $13.52 R I~Occupancy Tenant.JIl1P!ovements 80 $3,639 $34.31 __ $3,03~ $28.59 $2,426 $22.87 -- -------.-.--- -- ..-- --'- -'~--- - - 400 $3-,~ $94.14 $3,124 $78:4~ $2,499 $62.76 - -- .- ----- 1------- --- ---.. --'-- - - 800 $4,126 $23.52 $3,438 $19.60 $2,750 $15.68 - - .- - - ------- -- - - 1,600 $4,314 $35.30 $3,595 $29.41 $2,876 $23.53 - -- - ----- .-.. .- ~-- ----- ----- - - ___ 4,000 $5,161 $18.84 _$4,301 $15.70 1 ___ ___ $3,~__4~ $12.56 --------- - ---.-- ----.- ~--. .~ ------ 8,000 $5,915 $73.93 $4,929 $61.61 $3,943 $49.29 8-1 Moderate Hazard 8tora9~ 1,200 !9,~~ $6.05 $8,020 ~E'O,! _un $6,416 $4.04 -- -- -------- -- -- -- I"-~- - - 6,000 _ $9,91,!__ $16.59 ____!.8,?~ $~ $6,610 $11.06 --- -- --- ----- - - 12,009__ $10,910 $4.16 ~ $3.46 $7,273 $2.77 ------- ---- ---- ---- . ------_....- ----- 0 - 24,000 $11,408 $6.21 $9,507 $5.18 $7,606 $4.14 - - --- --- -----..... ------ - - 60,000 $13,644 $3.33 $11,370 $2.78 $9,096 $2.22 ----- e- -- - ______n_____ - - 120,000 $15,642 $13.04 $13,035 $10.86 $10,428 $8.69 S-2 Low Hazard Storage 1,800 $9,624 $4.04 _$8,020 $3.36 $6,4~ $2.69 - - - 0 9,000 $9,914 $11.07 u_ $8,~6~ $9.23 $6,610 $7.38 ----------- ~--- -- - - 18,000 $10,911 $2.78 n ~,()9.2 $2.31 $7,27~ $1.85 --- ----- - ----- - - 36,000 $11,410 $4.15 $9,509 $3.45 $7,607 $2.76 ------ --~- _._- --- --- - ----- - - 90,000 $13,649 $2.21 $11,374 $1.84 $9,099 $1.47 ------ --~-- --.. --------"- f----- --------- 180,000 $15,633 $8.69 $13,028 $7.24 $10,422 $5.79 8-3 Repair Garage 600 $8,223 $10.34 $6,853 $8.62 $5,482 $6.90 ----- ~---- - .'--- e- ---- '--- -- - (not H-4) 3,000 $8,472 $28.35 $7,060 $23.63 $5,648 $18.90 ---- e---- . - -- - - 6,000 $9,322 $7.08 $7,769 $5.90 $6,215 $4.72 -- -- -- - -- - -~- >- ----- - - 12,000 $9,7~ $10.65 $8,123 $8.87 $6,498 $7.10 ------------- ,-- --- -- -'--- ---- ----- - - 30,000 $11,664 $5.67 $9,720 $4.73 $7,776 $3.78 -- -------- .-- f---- - ~. ------ 60,000 $13,365 $22.28 $11,138 $18.56 $8,910 $14.85 8-3 rvIot~Y~hicle Fuel Dis~l:ln~i~_____ 100 $6,824 $51.47 $5,686 $42.89 $4,549 $34.31 ----'- I-- - (inclucjing canopyt _______ 500 $7,029 $141.21 $5,858 $117.68 $4,686 $94.14 -I-- --- - - 1,000 $7,736 $35.28 $6,~~ $29.40 $5,157 $23.52 ________________ 0- ------ - -- ----- 1---- - - 2,000 $8,088 $52.94 $6,740 ~~ $5,392 $35.29 --- 1---- -- ------'-- 1--- - - 5,000 $9,677 $28.23 $8,064 $23.53 $6,451 $18.82 --- ----- ------- -----------. 10,000 $11,088 $110.88 $9,240 $92.40 $7,392 $73.92 SHELL BUILDINGS - All Other Shell Buildings UBC Class S-4 - - - - S - - - - U-1 - - - - - - - - - - - - - - - - - - - - - - - - CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Plan Check Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each Project Size Threshold Additional Threshold Additional Threshold Additional Threshold Size 100 sf * Size 100 sf * Size 100 sf * 10,000 __ $10,14~ _ $Ol?.. __$8,458 $0.64 $6,766 $0.51 50,000 __!2Q_'~~I--"-_~~~!Qf-_~L131- $1.75 _ $6,970 $1.40 100,PQ9- _~1,?_05 JO~ ____!9,5~ _ ~Q.~ _ $7,670 $0.35 200,000_ $12,030 ~:!~ __ $10,0?.5 $0.66 _un $8,020 $0.53 _-__ 500,000 __~14,400 ~~? $12,000 $0.35 ___ $9,600 $0.28 1,000,000 $16,500 $1.65 $13,750 $1.38 $11,000 $1.10 S OccupancYI_en~_nt Improve_m.e!l~\- _ 600 ___$~ $6.27____ $4, 156 ~~ __~,324 _ _~ ___- __ 3,000~'~f- _$~ ___~ _ $14.33 $3,425_~:~~ _____ - _1-_ _6,000 $5,653 $4.31 __ _ $4,71_1 _ _~~.?~ $3,!~ ____ $2.87 __ .. ___ _ _!bQQQ. $5,911 _ __ $6.46 e- $4,926 ____!~.3.8 $3,9i!___ $4.31 ____ - _ 30,000 $7,0741___~_3..~~ .$_?C~~I- ~~I- $4,716 $2.28 60,000 $8,100 $13.50 $6,750 $11.25 $5,400 $9.00 Private C3.arage/Shed/AgriculturaJ_Bld~_ 40 $4,024 ----.ES~~ _~,3541- _ $63.~5 $2,683 $50.60 - u__ 200 _~_~~__ $208.17 __..R,45~ $173.48_ _ ~2,76~ $138.78 _~.QQ._$4,5~ $52.04 $3,802 _ $43.36 $3,041 $34.69 800 $4,770 $78.07 $3,975 $65.05 $3,180 $52.04 _ -- - 2,000 $5.707 L $41.63 $4,756 - $34.691-- $3,805 - $27.75 4,000 $6,539 -$163.49 $5,450 -- $136.24 $4,360 $108.99 1,000 $5,803____ ~.i.38 _~4.,~36_ $3.65 $3,869 $2.92 5,000 __$5,9!8 ~1_~:()2_ _~,!,9~ $1().P.! _ $3,986 $8.01 10,000 $6,579 _ __!3.:0() !?,483 _ $2.?Q1- $4,386 $2.00 20,000 $6,879 $4.50 $5,733 $3.75 $4,586 $3.00 _ n__ _ n________ _ _____ --- 50,000 $8,228 $2.42 _ _$6,~~? $2:01 __ __$~,48~ $1.61 100,000 $9,435 $9.44 $7,863 $7.86 $6,290 $6.29 1,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19 2,500 -~,995 $26.77 ---$3,329 $22.31 ----$2,664 - $17:85 un ___ __________ ------ 1--"-_______ -____ 4,000 $4,397_ $10.02 $3,664 _ ~.~~ __~~,_9~_ __~ 6,000 $4,597 $45.12 $3,831 $37.60 $3,065 $30.08 _____ ----8,00<[ __ $5,50()-- $4Q.1Z___....!~,5~_-=$~3.~ $3,666 $26.78 10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42.02 500 ____~a...~ $12.15 $6,708 ---.!!().!3 $5,3661-___ $8.10 2,500 $8,292 $33.30 $6,910 $27.75 $5,528 $22.20 ----- 5,000 $9,125 -----~$a34 $7j504 --- $6.95 $6,083 -- $5.56 - - - - - _____ _'--- - -- ~ ------ I--- -- -- 1_ 10,000 ___ $9,542 ~.4.~ __ $7,9~1 $10.41 ___$6,36.!1-~'~~ _ 25,000 I- !~ _n_ $6~~ $9,51~ _.._..!?~ $7,6101-__ $4.44 50,000 $13,080 $26.16 $10,900 $21.80 $8,720 $17.44 Standard Comm. Foundation 3,000 $9,216 . $2.32 $7,679 $1.93 $6,144 $1.54 _ __ _______ ----- --------.-f------~ - ---- '-=----:' - ---'-'-c.- ~ w/Podium _______ ___1--_1 ?-,QQQ.. _ ..!9~ ~__ __ $6.35_ $7 ,911 _~ $6,329 $4.23 ~C>.QQQ. $10,446 $1.60 $8,705 _..!!:~ _ $6,964__...1!.()7 60,000 $10,926 $2.38 $9,105 $1.98 $7,284 $1.58 150,000 $13,065 $1.27 $10,887 --$1:-06 $8,710 ----$6.85 -- I--"- 300,000 $14,970 $4.99 $12,475 $4.16 - $9,980- $3.-33 UBC Occupancy Type Open Parking Garage (det(lche.clL Deferred Submittal-j\IIExcept R-3 _ Deferred Submittal-R-3 Standard Comm. Foundatiol1_"",o/Podil - 500 2,500 --.---- - 5,000 ______ - ____. 10,000 m__ _ _ _ .1.~,()00 50,000 $13:~()___~?,9~ _ J!_().~ ~36__~1- _$7,211 $28.96 $9.06 $7,935 $7.25 ------- - ----- $13.57 $8,297 $10.85 ------- ----~..- $7:~1-__.!~'_~ _ __~ $28.44 $11,375 $22.75 $10,499 $15.84 --~.!~c-- $10,8.!~___ $'"!~f-- _J9~1--___ $11,902 $10.88 $9,918 .u~ $12,446 $16.28 $10,371 -- $14,888 $8.70 $12,406 $17,063 $34:i3f- $14,219 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. UBC Class A-1 - - - - A-2 - - - - A-2.1 - - - - -- A-3 - - - - A - - - - B - - - - B - - - - B - - -~ - - Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each Project Size Threshold Additional Threshold Additional Threshold Additional Threshold Size 100 sf * Size 100 sf * Size 100 sf * __1,000 ___j!,~~S> $67.70 $1,617 ___$56A1 $1,294 ~45.1~ 5,000 $4,648 $79.5~ _ $3,~ _ ___ $66.~1 $3~ $53.02 10,000 $8,624 $81.16 $7,187 $67.63 $5,750 $54.10 - ---------_._.~- - 20,000 $16,740 __ $36.~ $13,950 $30.82 $11,160 $24.65 50,000 $27,834 __~~ $23,195 $20.17 $18,556_ $16.14 100,000 $39,936 $39.94 $33,280 $33.28 $26,624 $26.62 1,000 $~-,940 ____~~T70 $1,617 $56A1 $1,294 $45.13 5,000 ~~ ____~L9.5~ $3,874~66~~ _ $3,099 $53.02 10,000 __ $8,624 ~~1.~ $7,187 ____$67!3? $5,750 $54.10 20,00Q $16,740 $3~ $13,950 $30.82 $11,160 $24.65 50,000 $27,834 $24.20 $23,195 $20.17 $18,556 ____!1?14 1 00,000 $39,936 $39.94 $33,280 $33.28 $26,624 $26.62 500 $1,214 $84.67_____!~,Q1.1 $7~ $809 __ $56A5 - ___ _ 2,500 $2,907 _~~~ _ m_g.4?3 $82.90 ~ $1,~~~ __ $66.32 5.QClQ..~~,?.9..4 $101.52 ~4,~ $84.60 ~~ ~ $3,596 $67.68 10,000 $1Q~!0 __ $46.26 $8,725 $38.55 _____~'9.~Q $30.84 ___-_ _~_ __25,000 1-_ $17,4Q9_ $30.28 _~!4~ $25.23 _ ~!1..~~_ $20.18 50,000 $24,978 $49.96 $20,815 $41.63 $16,652 $33.30 - 250 $1,146 $159.88 $955 $133.23 $764 $106.59 -----~- - ---.----- - 1,250 ___~2,744 $187.82 _ ~_ $2,287 $156.51 $1,830 $125.21 -n ____ 2,50Q $5,092 $191.69~,243 $159.7~ $3,395 $127.79 - ___ _____ 5,000 _ $9,~~_ $87.34 ____ $8,237 ~72.7~ $6,590 $58.22 - ___ __ ___!?,~OO_ $16,434.~~!__~__$13,695 $47.~_ $10,956 _$38.09 25,000 $23,576 $94.31 $19,647 $78.59 $15,718 $62.87 A Occupancy Tenant Improv~ments_ ____.5.99 _ ~ __ _ $53.04 $633 ~.. ._ $~ $507 _~.~? - 2,500 $1,821 $62.30 _n...!!.~18 $51.92 $1,214 __ $41.54 - _ __ 5,000 $3,379 $63.59 ___$2,~16 $52.99 $2,252 $42.39 - 10,000 $?,558 __ u_ $28:~ $5,4~ $24.15 $lJ..3!l $19.32 - 25,000 $1(),~ ___~1~.95 $9,088 $15.79_ $7,270 $12.63 50,000 $15,642 $31.28 $13,035 $26.07 $10,428 $20.86 __500 $1 ,428 $99.~ $1,1901___$83.01 $952 $6~A~ 2,500 __$3,'!.~0 $117.03!2-,~~ $97.53 $2,280 $78.02 5,000 $6,346 $119A5 $5,288 $99.54 $4,231 $79.63 10,000 $1~d1.!!~54.~_ $10,265J45'~E3 $8,212 $36.29 25,000 $20,483 $35.61 $17,069 $29.68 $13,655 $23.74 - -~_::.:.::.. ~- -- ----... 50,000 $29,385 $58.77 $24,488 $48.98 $19,590 $39.18 200 $781 $136.15 $650 $113.46 $520 $90.77 -- I ~.. - ~. __1,000. ..~!'8lQ .J.!5Q.~~ $1,558 $133.~ $1,247 ___~_1_QE3.63 2,000 _ _!~-,469 $163.26 $2,891 $136.05 $2,313__$lQ~~~4 ~,QQQ.. __ $6.7.3~ $74.39 _ ~ _____$131.99 $4,490 _ $49.59 10,000 __~.!!., $48.68 $9,331 $40.56 _ $7,465. _ $32A5 20,000 $16,065 $80.33 $13,388 $66.94 $10,710 $53.55 _ _ _ 500 $1,376 $96.03 $1,147 $80.03 $918._ $64.02 2,500 $3,297 $112.83 $2,748 $94.03 $2,198 $75.22 . _ _______ - 5,000 $6,118 . _ $115.16 $5,098 $95.96 $4,~ $76.Z!. - _ _ 10,000 $11,876 $52A6 $9,896 ___~3.~ $7,~17 _ ___J34:9.7 -_25,000 _ $19,744 $3~.34 _ $16,453 $28.61 $13,163 $22.89 50,000 $28,328 $56.66 $23,606 $47.21 $18,885 $37.77 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Inspection Fees UBC Occupancy Type Banks Laundromat Medical Office -- - ~ - - ~ - CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Inspection Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf * B Offices 1,000 $2,~ $81.58 $1,949 $67.98 $1,559 $54.39 ~ . .~.. I-~ --- ----- --- - - 5,000 $5~ $95.84 $4,668 $79.86 $3,735 $63.89 - ~ -- _ _~___-'-C --- - - 10,000 $10,~ $97.~ $8,661 $81.51 ___~,929 __ $65.21 -~-- --- ---- -- -------- - - 20,000 $20,175 $44.58 $16,813 $37.15 $13,450 $29.72 -- --- --- ~. - - ...- ~. _..__..---.-- - ----- - - 50,000 $33,548 $29.15 $27,956 $24.29 $22,365 $19.43 - ---- ----- f------~-- ---------- -- -- __c~_ 100,000 $48,120 $48.12 $40,100 $40.10 $32,080 $32.08 B B OC~lJeclncy TenantJmprov.Elrnents 300 $714 $82.98 $595 $69.15 $476 $55.32 ~ - --..-- ~__...__..."._ n_ - - - 1,500 $1,709 _ $97.49 $1,424 $81.24 $1 ,140 $64.99 -- ----.-..--.-- --- - - e-- 3,000 $3,172 $99.51 $2,643 $82.93 $2,114 $66.34 - ---.......... ------=-:.::..:. -- -- --~.- ---.--... -. --- - - 6,000 $6,157 $45.34 $5,131 $37.78 $4,105 $30.23 --- -- - - 15,000 $10,238 $29.67 $8,531 $24.73 $6,825 $19.78 - -'---- -~-- - - -- ....-._------- 30,000 $14,688 $48.96 $12,240 $40.80 $9,792 $32.64 E-1 Preschool/School (50+ Occupancy) 900 $2,160 $83.72 $1,800 $69.77 $1 ,440 $55.81 - -- ----- --------- -- ______n_______ - - 4,500 $5,174 $98.36 $4,312 $81.96 $3,449 $65.57 -----...-- -------- __n_ - - 9,000 $9,600 $100.40 $8,000 $83.66 $6,400 $66.93 1-- -- ---------.- - - - 18,000 $18~ $45.73 $15,530 $38.11 $12,424 $30.49 - -- ----- - - 45,000 $30,~ $29.94 $25,819 $24.95 $20,655 $19.96 --- ..- --- '-'- ---- -~----- - ~-- 90,000 $44,456 $49.40 $37,046 $41.16 $29,637 $32.93 E-2, E-3 Preschool/Schoolt:~QOc:clJeal1clJ ~_ 100 $541 $188.69 $451 $157.24 $361 $125.79 ---..- -.'.----..------ --- ----- 1- - - - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 - - "-'--"'-'--- - . -- -.-.------ - - - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84 .,---- ----- ___.._._.___ u_ - - 2,000 $4,667 $103.08 $3,889 $85.90 $3,11 1. $68.72 -~--- --- ---- --~ - - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97 ... ~ - e- "'-- - --'--- --------'- - -- -- 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 E E Occupancy TElnant Improvements 100 $541 $188.69 $451 $157.24 $361 $125.79 .-.----"-.--- -- - -- _.'._--.'- -- - - 500 $1,296 $221.66 $1,080 $184.71 $864 $147.77 -- -- ------ --~- __ ____n_ f------~ - - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84 ----- - - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72 - -,_....__._.~. ~- --------- - - 5,000 $7,759 $67.46 $6,~ $56.21 $5,173 $44.97 ----- --- -----.- -- ----- -.--..-..- -~ - ----- --- -------.--- 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 F-1, F-2 Factory/Industrial ~-- 1,000 $2,325 $81.11 $1,938 $67.59 $1,550 $54.07 -------~- ..-.- - - --~---- - --------- - - _ __5-2002. $~ $95.28 $4,641 $79.40 $3,713 $63.52 - -~ ~ -~ --~- ----- ~ - --~------ - - - - - 10,000 $10,334 $97.28 $8,611 $81.06 $6,889 $64.85 --- - ----------- - - 20,000 $20,061 $44.31 $16,718 $36.92 $13,374 $29.54 - --------- .. - - 50,000 $33,353 $29.00 $27,794 $24.16 $22,235 $19.33 -~ r --..-- --p- -~ ---- - 100,000 $47,850 $47.85 $39,875 $39.88 $31,900 $31.90 F F Occupancy Tenant Improvements 1,000 $2,057 $71.78 $1,714 $59.81 $1,372 $47.85 -- -- ------ - -- - - - 5,000 $4,928 $84.32 $4,107 $70.26 $3~ $56.21 -.-. --_.._-----~- ~- - ~ ----'--'-- --------_. -.- -_.- - - 10,000 $9,144 $86.07 $7,620 $71.73 $6,09.Q $57.38 ------ - - 20,000 $17,751 $39.21 $14,793 $32.67 $11,834 $26.14 _____._ _________u__ __un -- ----~._-_.. - - 50,000 $29,513 $25.67 $24,594 $21.39 $19,675 $17.11 --- - -- ---.- ----_.- - --------'-- -...- 100,000 $42,345 $42.35 $35,288 $35.29 $28,230 $28.23 H-1 H-1 Occupancies 100 $541 $188.69 $451 $157.24 $361 $125.79 - -- ____u_~ - ---- I--~.._------- - - 500 $1~ $221.66 $1,080 $184.71 $864 $147.77 ~ .. -- --- ---'-- ______u~..______ - - 1,000 $2~ $226.26 $2,003 $188.55 $1,603 $150.84 - ------ - - 2,000 $4,667 $103.08 $3,889 $85.~ $3,111 $68.72 --.---.------ -------_.._- - - 5,000 $7,759 $67.46 ..~ ___ $6.~ $56.21 $5,173 $44.97 ..__...u___.____. __ ----- 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Inspection Fees Construction Types: Construction Types: Construction Types: IFR,IIFR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * H-2 to Hazardous Rooms 100 $5i! $188.69 $451 ___$15~ $361 $125.79 ------- ----------- ---- __.~.u__~ ------------- _._ n'---- ___c__ f.--- H-8 - ~ $1,296 $221.66 $1,080 $184.71 $864 $147.77 ---- n _ - - 1,000 $2,404 $226.26 $2,003 $188.55 $1,603 $150.84 I ------- ~._-- ----------..-- 1- - - 2,000 $4,667 $103.08 $3,889 $85.90 $3,111 $68.72 - -------- __n_ - - 5,000 $7,759 $67.46 $6,466 $56.21 $5,173 $44.97 1- -- -- ---- 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 H H Occupancy Tenant Impro"-El.Il1~nts 100 f---- -~ $188.69 $451 $157.24 $361 $125.79 -- ---- - -- ----" f------ - - - 500 __n~_1 ,2~ $221.66 $1,080 _!184.7.1 $864 $147.77 ----- ------ ---------" - - 1,000 ---~~~~ $226.26 $2,003 $188.55 $1,603 $150.84 - ---- - _____0 f- - - 2,000 $4,667 $103.08 $3,889 $85.9Q $3,111 $68.72 - ---~. - - 5,000 $7,759 $67.46 j6,~~6 $56.21 $5,173 $44.97 I - 10,000 $11,132 $111.32 $9,276 $92.76 $7,421 $74.21 I Institutional 500 $894 $62.38 $745 $51.99 $596 $41.59 ------- - __'0__- 1---- ----~_. --- ----- ---- ---- - - 2,500 $2,142 $73.28 $1,785 $61.07 $1,428 $48.86 - --------.-... ------ 1--- --- - - 5,000 $3,974 $74.80 $3,312 $62.33 $2,649 $49.86 ---------- --------..-. ---.. -- --- - - 10,000 E~ $34.08 $6,428 ~2~.<l() $5,142 $22.72 -- -- _____0._._- -- - --~-- - - - 25,000 $~~ $22.31 _ $10,688. $18.59 $8,550 $14.87 ---- ---------- ---- - -- 50,000 $18,402 $36.80 $15,335 $30.67 $12,268 $24.54 I I Occupancy l"~nant_lrnProvements_ 100 $433 $150.95 $361 $125.79 $288 $100.63 1---- -- ~-"- ------- .,...- - - 500 ~ $177.32 $864 ___$!4IlZ $691 $118.22 - -- --- - ._------ I-- -~ - - - 1,000 $1,_9~ $181.01 $1,603 $150.84 $1,282 $120.67 - -- - .- ------- 1------ -- - --- -----.---1-- - - _ 2,00Q $3,73~ $82.46 $3,111 $68.72 $2,489 $54.97 ----- ----- - - ..------ 1---- --- -------- --- - - 5,000 $6,207 $53.96 15,173 ~- $4,138 $35.98 ------~--- ------ ---.- ~-- 10,000 $8,905 $89.05 $7,421 $74.21 $5,937 $59.37 M Market 2,000 ~?Q $49.89 $2,383 $41.57 $1,907 $33.26 -------- ---- -- - .-- ----- -- --------- - - 10,000 $6,851 $58.60 $5,709 $48.83 $4,567 $39.06 -------------- -- ---- -- - __.n - - - 20,QOO $12,710 $59.81 $10,592 $49.84 $8,474 $39.87 __n ______________n ___.n___ - - ___n___ - - 40,000 $24,672 $27.26 f-- $29~ $22.72 $16,448 $18.17 ---- --~..- ---- ---- ------~._~ - - 1QQ.QQ.Q. $41,028 $17.82 ~,~~ ~~!~ $27~ $11 .88 - -- __ n_ -- e- ~..- I-- --~_. 200,000 $58,848 $29.42 $49,040 $24.52 $39,232 $19.62 M _M Occupancy Tenar"l!Jr11prclVements 300 $696 $80.90 $580 ~~ $464 $53.94 ---- -- -- --_..- - - 1,500 $1,667 $95.06 $1,389 $7~~ $1,111 $63.37 - - --~- ----..-- ---- __n_ - - 3,000 $3,092 $97.02 $2,577 $80.85 $2,062 $64.68 ----- --- . - ------- -- -- ----- -- - - - 6,000 $6,003 $44.20 $5,003 $36.83 $4,002 $29.47 ,- ---- ---- - - 15,000 -_.._~~ $28.92 $8,318 u_$24.1.o $6,65~ $19.28 30,000 $14,319 $47.73 $11,933 $39.78 $9,546 $31.82 R-1 Apartment Bldg 800 I----~-~~ $60.00 $1,146 $50.00 $917 $40.00 --------- - -.----- ---------~- --------- - - - 4,000 _ $3,296 $70.46 $2,746 __u~~8.~ $2,197 $46.98 --~ '__n__._ --- ----- - - - 8,000 $6,114 $71.94 $5,095 $~.~ $4,076 $47.96 ---------- - -- --~- --~_. - - 16,000 $11,869 $32.76 $9,891 ---~~ $7,913 $21.84 --- -- - - ------- ----- --- - - 40,000 $19,733 $21.44 $16,444 $17.87 $13,155 $14.30 -- - -------- -..- ---- ._--~ - ------. -_.------ 80,000 $28,310 $35.39 $23,592 $29.49 $18,874 $23.59 R-1 Ap~rtment Bldg - Ree~at Unit _ 800 $1,376 $60.00 $1,146 $50.00 $917 $40.00 ------~ - ---- - - 4,000 $3,296 $70.46 $2,746 $5~~ ---~~ $46.98 ---------- - - - 8,000 $6,114 $71.94 $5,095 $59.95 $4,076 $47.96 -------- - ..--- - - 16,000 $11,869 $32.76 $9,891 ~27.~Q _ _.._~$7 ,9.1l1-- $21.84 - --- ---- 1----- ----- ---- - - 40,000 $19,733 $21 .44 _ $16,~~ ~1Z~ $13,155 $14.30 - - ----------- -.-------- ------- - ..---- 80,000 $28,310 $35.39 $23,592 $29.49 $18,874 $23.59 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Inspection Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * R-1 Hotels & Motels 3,000 $4,606 $53.57 $~,838 $44.64 $3,071 $35.71 --- --- --- _._w._____ ---- --- - -. -- - - 15,000 $11,034 $62.90 $9,195 $52.42 $7,356 $41.94 - ..~---- - - - 30,000 $20,470 $64.22 $17,058 $53.52 $13,646 $42.82 --.--- -- .-------"- --- ------- ,- - - 60,000 ~3~,.?E $29.27 $33,114 $24.39 $26,491 $19.51 -- -----,- - - 150,000 $66,078 $19.14 $55,065 ~15.9~ $44,052 $12.76 --_..~ ----------- - ------- ----- i-- 300,000 $94,788 $31.60 $78,990 $26.33 $63,192 $21.06 R-3 _[)wellings - Custom,.M~<:lels, 1,000 $2,136 $94.82 .J!.Z8Q $79.01 $1,424 $63.21 - ~_. -----..-- ------ - - First Master Plan 2,500 $3,558 $61.10 $2,965 $50.91 $2,372 $40.73 -----------. --- - -----~-~- ~----- ---_.- ---~ --- - - 4,000 - ._!'!,~ $78.17 $3,729 $65.14 $2,983 $52.11 - - - .,-- - __m .---. - - 6,000 $6,038 $77.78 $5,0~2 $64.81 $4,025 $51.85 ---------.. - - - -- - - - - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062 $71.83 - - -~._- ------ - - 10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64.99 R-3 Dwellings - Production Phase 1,000 $2,136 $94.82 $1,780 $79.01 $1,424 $63.21 -------- -- - ---- ----------...- I-- ------- - of Master Plan 2,500 __ $3,5~~ $61.10 $2,965 $50.91 $2,372 $40.73 -- ------ -- ------. -------~- .~ .------ - (repeats) 4,000 $4,475 $78.17 $3,729 $65.14 $2,983 $52.11 .---- - - - 6,000 $6,038 $77.78 $5,032 $64.81 $4,025 $51.85 ----- ------ ~..._..- -_._._----_._~- --- - -"" --------- - - 8,000 $7,594 $107.75 $E),328 _ $8Q.~ $5,062 $71.83 ---~--_._..- - _m___ ----- -- 10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64.99 R-3 Dwellings-Alternate lV1ateri~~_ 1,000 $2,136 $94.82 $1,780 $79.01 $1,424 $63.21 --- ----'- .- ----.- ----~_._._- - - 2,500 J~ $61.10 $2,965 $50.91 $2,372 $40.73 -- -- -- - - -~ $4,475 $78.17 $3,729 $65.14 $2,983 $52.11 - ---- --- ~ ---. - - 6,000 _ ..!6-,0]~ $77.78 _$5,032 $64.81 $4,025 $51.85 - -- ----- --- - - 8,000 $7,594 $107.75 $6,328 $89.79 $5,062 $71.83 --- -----.-. -oo- 10,000 $9,749 $97.49 $8,124 $81.24 $6,499 $64.99 R-3 Dwell ings-Hillsid~__gustom, 1 ,QQQ. ---$~~ $94.82 $2,029 $79.02 $1,623 $63.21 - -- --'-- -~.. ------..----.-. - - Models First Master Plan 2,500 $3,857 $61.10 $3,214 $50.92 $2,571 $40.73 --- 1-- ----- - - - 4,000 $4,773 $78.15 $3,978 $65.13 $3,182 $52.10 ------- - -------- _________n - - - - 6,000 --$-~ $77.76 $5,280 $64.80 $4,224 $51.84 _ -------- - --- ---1-- - - -- ~ $7,891 $107.79 $6,576 $89.83 $5,261 $71.86 ----- ----- I.. _ ___~__ u_ -- -- 10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98 R-3 Dwellings-Hillsicle - Production _1,QQQ. $1,~ $94.82 $2,029 ._...._~ $1,623 $63.21 .------ -- r- - -----~- ------ - Phase of Master Plan ~.. $3,857 $61.10 $3,214 $50.92 $2,571 $40.73 ------- ------- --.-. ----------~ -- ----- - (repeats) 4,000 $~ $78.15 $3,978 $65.13 $3,182 $52.10 f- - -- - ----.. - - 6,000 $6,336 $77.76 $5,2~g $64.80 $4,224 $51.84 -------~- -----~---- _ - ----- - - l3,Q.QQ. -~~ $107.79 $6,576 $89.~ $~,261 . $71.86 . ------ --- e- -- --- -~ 10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98 R-3 Dwellings-Hillside - Alternate Materia 1,000 $2,434 $94.82 $2,029 ~~79.<g $1,623 $63.21 I . _________n_ ----- ------ " - - ---- ----- -- - - 2,500 ..!~,~ $61.10 $3,214 $50.92 $2,571 $40.73 ------- - - 4,000 $4,773 $78.15 . $3,97.8 $65.13 $3,182 $52.10 ------- -- - - - - 6,000 $6,336 $77.76 $5,280 $64.80 $4,224 $51.84 ------ - ------ 1---- ---- -------~. - - 8,000 $7,891 $107.79 $6,576 $89.83 $5,261 $71.86 --- -"- ------ --'- - ~----- --- -~ 10,000 $10,047 $100.47 $8,373 $83.73 $6,698 $66.98 R-2.1, Group Care, Non-Amb. (~~_ 100 $413 $144.10 $344 $120.08 $275 $96.07 - - _0-- ----. -- - --------- e--- ___ I- ._~~ 2.3 500 $989 $169.28 $825 $141.07 $660 $112.86 -I- -- ---- --'---- - --- .- ---- ---------~_. - -- 1---- ---- ---,- - - 1,000 $1,836 $172.79 ___n?3Q $!4~._~ $1,224 $115.19 ---~.. --- -- - - - 2,000 $3,564 $78.73 ... _.!.?,~70 ~~~.~ $2~ $52.49 ------------- I-- --- - - - 5,000 $5,926 $51.50 $4,9.38 $42.92 $3,950 $34.34 -------.- _m 10,000 $8,501 $85.01 $7,084 $70.84 $5,667 $56.67 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Inspection Fees Construction Types: Construction Types: Construction Types: I FR,IIFR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * R-2.2 I <3roue Care, Ambulat()ry~+)u 1,000 $2,040 $71.18 $1,700 $59.32 $1,360 $47.45 - . .--- \-.--.. ._--~- - ----~- ----"- - - 5,000 $4,888 $83.62 $4,073 $69.68 $3,258 $55.74 ---- --_._---~- ~- --- ---- ------- - -~- e- - - 10,000 $9,068 $85.36 $7,557 $71.13 $6,046 $56.90 - ------------ - -~- ----- -------.. ---- 1----- -~ - - 20,000 $17,604 $38.88 _ _n~~4,~ $32.40 $11,736 $25.92 --~--- ---.---- - - 50,000 $29,268 $25.44 $24,390 $21.20 $19,512 $16.96 ------ ---'-'--- .~ ----_._--~ - ----- 100,000 $41,988 $41.99 $34,990 $34.99 $27,992 $27.99 R-2.1.1, Group Care,_Non-Amb. (1-5) 1,000 $2,040 $71.18 $1,700 $59.32 $1,360 $47.45 - - --------- ------~ - un 2.3.1 - 5,000 $4,888 $83.62 $4,073 $69.68 $3,258 $55.74 --~ ---------..-- ------- -- - - - 10,000 $9,068 $85.36 $!c~5Z. $71.13 $6,046 $56.90 - ___un --..-- - - 20,000 $17,604 $38.88 $ !~'E57.Q $32.40 $11,736 $25.92 ~- - --------..-- - - 50.QQQ. $29,268 $25.44 $24,390. $21.20 $19,512 $16.96 -- - ---"---- ----- ---- - - e- 100,000 $41,988 $41.99 $34,990 $34.99 $27,992 $27.99 R-2.2.1 Group C~~e-, Non-Amb. (1-5) 1,000 $2,550 $88.98 $2,125 $74.15 $1,700 $59.32 ---"~ -.--- --- ------ -- - - 5,000 $6,110 $104.52 $5,0~1 $87.10 $4,073 $69.68 ---------~ - ------ C-------'--- \- --~. --.------- -- --- -- - - - 10,000 $11,336 $106.70 _$9,446 $88.91 $7,557 $71.13 ---------- -"-- ~'--- --- - --- --- . - - 20,000 $22,005 $48.60 $18,338 $40.50 $14,670 $32.40 - -------- -~- ------"--- ------- - - - 50,000 $36,585 $31.80 $30,488 $26.50 $24,390 $21.20 - - - ----- ~-_._.,- -"-- ~___c_ ------- __n__ 100,000 $52,485 $52.49 $43,738 $43.74 $34,990 $34.99 R R Occupancy Tenantll1"1pro\,/~ments 80 $410 $178.89 $342 $149.08 $273 $119.26 --~-- --.--- . --- -------- - - 400 $983 $210.14 $819 $175.12 $655 $140.10 -------- -- - -~ -..------.... - --- --- - - - 800 $1,823 $214.49 $1,519 $178.74 $1,215 $142.99 __n_.o__ - ---~- -----.-- ~_._- --- ---~_._- - - _ 1,600__ $3,539 $97.72 $2,949 $81.43 $2,359 $65.14 -----1- ---..---- ------ - - 4,000 $5,884 $63.95 $4,904 $53.29 $3,923 $42.63 -- ---- - -- - 8,000 $8,442 $105.53 $7,035 $87.94 $5,628 $70.35 S-1 Mode!ate Hazard Stora9~ _ 1,200 $2,433 $70.73 $~,027 $58.94 $1,622 $47.15 ----.- n_______ I-- ---- ------ - - 6,000 $5,828 $83.06 $4,856 $69.21 $3,885 $55.37 ----_._- ~- -----~ - - ---"---- - - ----------- - - 12,000 $10,811_ $84.81 $9,009 $70.68 $7,207 $56.54 - - --------- ----"-- ---- - - 24,000 $20,988 $38.63 $17,490 $32.19 _ $13,992 $25.75 ---------- I- ------ - - 60,000 $34,893 $25.28 $29,078 $21.06 $23,262 $16.85 ------ --- -- 1-'------ - -- 120,000 $50,058 $41.72 $41,715 $34.76 $33,372 $27.81 S-2 Low Hazard Storage 1,~ $3,400 $65.90 $2,833 $54.91 $2,267 $43.93 -- -- ---------"- e- - - 9,000 $8,145 $77.42 $6,787 $64.51 $5,430 $51.61 --- --- \--'---- 1------- - ---- ---- - - 18,000 $15,112 $79.04 $12,593 $65.86 $10,075 $52.69 ---- -~---- -~-- f-- ----------- _u___ -----" - - 36,QQQ.. $29,338 $36.00 $24,449 $30.00 $19,559 $24.00 -- 1---------- -_.-- 1-- - - 90,000 $48,776 $23.57 $4 0 ,64!5 $19.64 $32,517 $15.71 . -- ----- - ------- ---~.-"---- _____u ---------- ------ l-- 180,000 $69,984 $38.88 $58,320 $32.40 $46,656 $25.92 S-3 Repair Garage 600 $1,367 $79.47 ..J1, 13~ $66.22 $911 $52.98 - --- ----------~ -------- ---~- - ---- -- (not H-4) 3,000 $3,274 $93.35 E,z28 _ $77..z.g $2,183 $62.23 ---- _._-~_._- - - 6,000 $6,074 . $95.27 $5,062 $79.39 $4,049 $63.51 -------~ ~-~ 1------ - - 12,000 _ ~.z.~ $43.40 $9,825 $36.17 $7,860 $28.93 --- -~ - - ------- - -- 30,000 $19,602 $28.41 $16,335 $23.68 $13,06~ $18.94 -- ----- - ~--- .----- C-- ------- 60,000 $28,125 $46.88 $23,438 $39.06 $18,750 $31.25 S-3 Motor Vehicle Fuel Dispensing 100 $521 $181.69 $434 $151.41 $347 $121.13 ------ - -. ~---- .n - Jinc:~~ing canopy) 500 $1,248 $213.42 $1,040 $177.85 $832 $142.28 - -- -- - - 1,000 $2,315 $217.85 $1,929 $181.54 $1,543 $145.23 - -- - - - ------ ------ ----- - - 2,000 $4,493 $99.26 $3,744 $82.71 $2,995 $66.17 -------- - '---- -- -----.- - -- 5,000 $7,471 $64.94 _ $6,22_6 $54.11 $4,981 $43.29 ---'- _. -~-- -- ----- --- - 10,000 $10,718 $107.18 $8,931 $89.31 $7,145 $71.45 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - New Construction Inspection Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * S-4 Open Parking Garage (detached) 10,000 $13,205 $46.06 $11,004 $38.38 $8,803 $30.71 ......----- . ------- - un - - 50,000 $31,628 $54.14 $26,356 $45.11 $21,085 $36.09 - ------- ---- - - 100,000 $58,695 $55.22 $48,913 $46.01 $39,130 $36.81 ~.._-~- ------ '- ------- ~----- ______ne_ -- - - 200,000 $113,910 $25.18 $94,~?~ $20.98 $75,940 $16.79 1-___ ~-_.,.- - 500,000 $189,450 $16.47 __ $157,8Z? $13.73 $126,300 $10.98 ---- - ----- I-- - -_.-.--- --------- - - -.------ _ -- 1,000,000 $271,800 $27.18 $226,500 $22.65 $181,200 $18.12 S S Occupancy Tenant Impro,,-~~nt!>__ 600 $1,152 $67.00 $960 $55.83 $768 $44.67 -- -------- '- ----~-- ------ --- -- - 3,000 $2,760 $78.72 $2,300 $65.60 $1,840 $52.48 - - --------- _ I--- ---"- 1---- ---- ------- e----- -- _____o.m..' I-- -. ------ - - 6,000 _ _ $5,122 __ $80.33 _$4,268 $66.94 $3,415 $53.55 ---- -- - !-.--- ------- - -"....----- - - 12,000 $9,941 $36.60 __ $8,28_~ $30.50 $6,628 $24.40 ------- . - ---'---- ---- __ _un__ _ - - _ 30,000 $16,529 $23.96 _ $13,7~~ $19.96 $11,019 $15.97 -------- -- --.--- _ -----.- - 60,000 $23,715 $39.53 $19,763 $32.94 $15,810 $26.35 U-1 Private Garage/~hed/Agricultural ~Idg 40 $461 $402.05 $384 $335.04 $307 $268.03 -- - _____n-'---- -.--- -_..-- __u_ _ - - 200 _ ~1,104 $472.31 ___~9JJl I- . $393.59 $736 $314.87 ------ ------- - . $1,366 - - 400 ___g,O,!~ $482.07 l1lQ? $401.73 $321.38 I - ---- 1-___ - ------- --- - - 800 $3,977 $219.65 $3,314 $183.04 $2,651 $146.43 - _...--- I- ---- --_.--- $95.81 - - 2,000 $6,613 $143.72 $5,511 $119.76 $4,409 - --- -- - ----.- $23ill ----- I-- --- 4,000 $9,487 $7,906 $197.65 $6,325 $158.12 - Deferred Submittal-All Except R-3 1,000 $358 $12.47 $298 $10.39 $238 $8.32 --------. _ - - 5,000 $857 $14.64 $714 $12.20 $571 $9.76 -- --- - ---~_. .-------- f-- - - __~Q,O~ $~ $14.96 -~-~~ _ $_~.46 $1,059 $9.97 -... ~ -- - $4.55 - - 20,000 $3,08~ $6.82 $2,570 $5.68 $2,056 --------- - -- ------.- f----- -- -- $3,420 -----.. - - _ 50,000 __~1~Q --~ __ $4,275 _ _____~~ 71 $2.98 - --- --- ----~ 100,000 $7,365 $7.37 $6,138 $6.14 $4,910 $4.91 - Deferred Submittal-R-3 .. 1,000 $0 $0.00 $0 $0.00 $0 $0.00 -- ----- - ---- - - - - - 2,500 $0 $0.00 $0 $0.00 $0 $0.00 - - 4,000 ---~ $6~6o+ $0 ~..Q.QQ $0 $0.00 - __ - _n___ -----.- --- - - ------... --- --- - - 6,000 $0 $0.00 $0 _ _____$O.QQ $0 $0.00 ---- -----"...- - - 8,000 $0 $0.00 $0 $0.00 $0 $0.00 ------ ----------- -I- ----"- - - -- -----~ 10,000 $0 $0.00 $0 $0.00 $0 $0.00 - Standard Comm. Foundatio~ wo/Podil 500 $1,316 $91.82 $1,097 $76.52 $877 $61.22 ----- ---..- - - __________n__ . I- -- - - ------- - - 2,500 $3,153 $107.90 $2,627 $89.91 $2,102 $71.93 - --------- 1--.-- _._~ --------.- ~ ------- - - 5,000 $5,850 $110.10 $4,875 $91.75 $3,900 $73.40 u_ -- .- --$5D.18 - --.- -----~- ----- - - 10,000 $11,355 $9,463 -~~ $7,570 $33.45 -- e---- ------~-_.- 1------ - - _25,000 u. $18,881 $32.84 $15,734 $27.36 $12,588 $21.89 - ---- !- ---- ------- --- - ---. 50,000 $27,090 $54.18 $22,575 $45.15 $18,060 $36.12 - Standard Comm. Foundation 3,000 $3,340 $38.84 $2,783 $32.37 $2,227 $25.90 - ---- -------- - f-.~- $45.62 ---.- n____.'~ I-- -$30.41 - w/Podium 15,000 $8,001 $6,667 $38.02 $5,334 _n --- -- - ----- e---n-- - ------ - m _-'---'---- ---.---------- ...-0- f-n --- - - 30,000 $14,844 $46.56 $12,3}Jl $38.80 $9,896 $31.04 - --- -- -------'-- --. ----.---.. - - - $19.269 ~~------ - - 60,000 $28,812 $21.22 __ $24,0~ 1---$17.68 $14.15 ------. n --~ ------ - - 150,000 $47,910 $13.88 $39,923 $11.57 $31,942 $9.25 --------- --- e---- ------ -.-. - 0-------..-- - -- f- $19.09 -----. 300,000 $68,730 $22.91 $57,273 $45,822 $15.27 SHELL BUILDINGS - All Other Shell Buildin~s 500 $1,539 $107.40 $1,283 $89.50 $1 ,026 $71.60 --------- I- ---- -----..- mn__ 1-__. '--- ------~-- - - 2,500 $3,687 $126.17 -~~~ $105.14 $2,458 $84.11 -------. ------- I- ---~ - - - 5,000 $6,842 $128.79 $5,701 $107.33 1-____$4,~ $85.86 - ------ $58.66 _ ~_6_8 ~---- ---~--- - - 10,000 $13,281 ____$48~~ 1--_ $8,854 $39.11 _____n__ I--- -- -- .-----~-- ~--- - - 25,000 $22,080 $38.40 $18,400 $32.00 $14,720 $25.60 ------. -- f-------- - I- _ --- - ._---- 50,000 $31,680 $63.36 $26,400 $52.80 $21 ,120 $42.24 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: IFR,IIFR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * A-1 - 1,000 _ _~8,~46 $72.90 $7,372 $60.75 $5,898 $48.60 --------.- -- --------~- - - 5,000 $11,762 $93.82 $9,802 $78.18 $7,842 $62.54 -- -- ----- - 1------ - - 10,000 $16,453 $84.73 $13,711 $70.61 $10,969 $56.49 ---- ------_.~ ------ _n_ _ - -- - - 20,000 $24,926 $42.35 $20,772 $35.29 $16,618 $28.23 - ----- ---- -- -- -- - - -- ------------ - - - 50,000 ___ $37&32 $27.05 $31,360 $22.54 $25,088 $18.03 -- . --------- - n - - 100,000 $51,156 $51.16 $42,630 $42.63 $34,104 $34.10 A-2 - 1,000 $8,846 $72.90 $7,372 $60.75 $5,898 $48.60 ------ _ .c...:.. - - - 5,000 $11,762 $93.82 $9,802 $78.18 $7,842 $62.54 ---- ____n_.. .__ --------- - - 10,000 $16,453 $84.73 $13,711 $70.61 $10,969 $56.49 ------- - - 20,000 $24,~2~ $42.35 $20,772 $35.29 $16,618 $28.23 -..- -- ------ - - 50,000 $37,632 $27.05 $31,360 $22.54 $25,088 $18.03 --- ----- _.- ---------.-- ------- - - 100,000 $51,156 $51.16 $42,630 $42.63 $34,104 $34.10 A-2.1 - 500 $6,860 $93.20 $5,716 _$77..66 $4,573 $62.13 ,------- -- - ------'-. -- -- ---.. - - 2,500 $8,723 $122.83 $7,270 $102.36 $5,816 $81.89 -------- .__c._ ______u.u_ ----------... - --- - - 5,000 $11,794 $107.36 $9,829 $89.47 $7,863 $71.58 -----..--,-- --- - - - - 10,000 $17,162 $55.02 $14,302 $45.85 $11,442 $36.68 ----- -- - -.---- --- ...- - - - 25,000 $25,416 $34.94 $21,180 $29.12 $16,944 $23.30 _n - -- -.- - --~_."....- -- - - 50,000 $34,152 $68.30 $28,460 $56.92 $22,768 $45.54 A-3 - 250 $8,028 $180.63 $6,690 $150.53 $5,352 $120.42 - - -------- --. --.--.-- -----------... .- n -------- ---- - - 1,250 $9,834 $244.77 $8,1~ $203.98 $6,556 $163.18 --- - --------- -. - - 2,500 $12,891. $205.95 $10,745 $171.63 $8,596 $137.30 ------------ - - 5,000 $18,043 $108.71 $15,036 $90.59 $12,029 $72.47 ---- ---- - --- -- - - 12,500 $26, ~~6 $68.54 $21,830 $57.11 $17,464 $45.69 ----- ------ . -- - - 25,000 $34,763 $139.05 $28,969 $115.88 $23,175 $92.70 A A Occupancy Tenant Improvemen~ 500 $3,8~? $57.75 $3,239 $48.13 $2,591 $38.50 - - - 2,500 $5,042 $75.24 $4,202 $62.70 $3,361 $50.16 ___n______ - - 5,000 $6,923 $66.84 $5,769 $55.70 $4,615 $44.56 ------------ - - 10,000 $10,265 $33.83 $8,554 $28.19 $6,843 $22.55 ------ -. .- .. ._n__ - - 25,000 j15,3~~ $21.54 $12,783 $17.95 $10,226 $14.36 .-- 1-.-.- - -- 50,000 $20,724 $41 .45 $17,270 $34.54 $13,816 $27.63 B Banks 500 $8,223 $109.88 $6,852 $91.56 $5,482 $73.25 ---- - -- ------------. - - 2,500 $10,420 $145.13 $8,683 $120.94 $6,947 $96.75 ---"--- - - --- ______________n - - - 5,000 $14,048 $126.50 $11,707 $105.41 $9,366 $84.33 ------ - - - 10,000 $20,373 $64.96 $16,978 $54.13 $13,582 $43.30 _n_ __.n _ _ --------- - - 25,000 $30,116 $41.24 ___ $25,0~_ $34.36 $20,078 $27.49 ------ ----------... ~--- ------- - ..- - - 50,000 $40,425 $80.85 $33,688 $67.38 $26,950 $53.90 B Laundromat 200 _ ___..___E225 $160.47 $6,021 $133.72 $4,817 $106.98 I- ----- _____n._ -----..-.-. - - -----.- - - 1,000 $8,509 $226.62 $7,091 $188.85 $5,673 $151.08 ------ -- -----~-- -------.- -------- - - 2,000 ... __'!1Q,?75 $179.91 $8,980 $149.93 $7,184 $119.94 -- -I- - - - - 4,000 $14,374 $99.39 $11,978 $82.83 $9,582 $66.26 - ---- -------- -.. ----- --------"- - - 10,000 $20,3E $62.01 $16,948 $51.68 $13,558 $41.34 -- ------------- ----'----- --- - - - -- -- -- - - 20,000 $26,538 $132.69 $22,115 $110.58 $17,692 $88.46 B Medical Office 500 $9,425 $108.18 $7,855 $90.15 $6,284 $72.12 m ___ ___ ------ - - - 2,500 $11,589 $146.13 $9,658 $121.78 $7,726 $97.42 ---- ----- - - 5,000 $15,242 $123.47 $12,702 $102.8~ $10,162. $82.31 ---------- - - 10,000 .. $21~ $64.96 $17,846 $54.13 $14,277 $43.30 ------ ---- - - - 25,000 $31 ,159 $41.00 $25,966 $34.16 $20,773 $27.33 - -- 50,000 $41,408 $82.82 $34,506 $69.01 $27,605 $55.21 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: I FR, IIFR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf* B Offices 1,000 $10,008 $87.37 $8,340 $72.81 $6,672 $58.25 ---- -- -- -------- -- .. -----~--~ - ~ - .-..--- --- - ----------- - - - 5,000 ~~,~~ $111.72 $11,253 $93.10 $9,002 $74.48 --.--- ---- ~-~- --- - - - 10,000 $19,089 $101.79 $15,908 $84.8:3.. $12,726 $67.86 ___ ________~u___ - - 20,000 __...E9 ,2~8_ $50.52 $24,390 $42.10 $19,512 $33.68 - ..-....--- -. ----.....- - - 50,000 n m~~,4~~ $32.33 $37,019 $26.94 $29,615 $21.55 ----- -. - 100,000 $60,585 $60.59 $50,488 $50.49 $40,390 $40.39 B B Occupancy Tenantlrll[.)r()v_ements 300 $3,148 $89.11 $2,623 $74.26 $2,099 $59.41 -- .-..--- -- -------------- --- ------ - - 1,500 $4,217 $114.26 $3,514 $95.21 $2,811 $76.17 . - -- ------ --- - - 3,000 $5,93~ $103.71 _$:4, 9~ $86.43 $3,954 $69.14 ------ ---- -- ..------ -- . ~ __n___________ - - 6,000 $9,042 $51.63 E,535,- $43.03 $6,028 $34.42 -- ------------- ---------- - - 15,000 $13,689 $33.03 $11,408 $27.53 $9,126 $22.02 __ _____---00- .---- f--- ___m__. ----- -- - - . .-.- --- - - 30,000 $18,644 $62.15 $15,536 $51.79 $12,429 $41 .43 E-1 Preschool/Scho()1 (5.9! Occupancy) _ 900 __ $10,()~~ $90.38 $8,410 $75.32 $6,728 $60.26 --- - . ----..-----. .-- ------------. - - 4,500 $13,346 $116.58 $11,122 $97.15 $8,897 $77. 72 - -----------..-..- - - - 9,000 $18,592 $104.94 $15,494 $87.45 $12,395 $69.96 ---- - --..-- - - 18,000 $2~..9}7 $52.59 $23,364 $43.82 $18,691 $35.06 1- ---- . ----------- e- - - 45,000 $4~235 $33.59 $35,196 $27.99 $28,157 $22.39 - __n________ e.-. m - - 90,000 $57,348 $63.72 $47,790 $53.10 $38,232 $42.48 E-2, E-3 Preschool/School (<50 Occupancy) 100 $7,569 $241.72 $6,308 $201.43 $5,046 $161.15 - -------- --"------- -_._-----.--- -- --------. ------ - $244.73 - - 500 __$~,536 $367.10 $7,113 $305.91 $5,691 - ---- ---- . --- ----... -------- --.-.. - - 1,000 $1g~??! $262.61 $8,643 _$218.~_ $6,914 $175.07 -- -- -I. - --------- - - 2,000 $12,998 $157.63 $10,831 $131.35 $8,665 $105.08 - -- 1-- - ---------- .. --- .... - - 5,000 $17,726 $96.53 $14,772 $80.44 $11,818 $64.35 -- --- --- ---------- -- - - 10,000 $22,553 $225.53 $18,794 $187.94 $15,035 $150.35 E E Occupancy Tenant ImprOVeITl(~n.!s._ 100 . _~2.?~ $220.60 $3,974 $183.83 $3,179 $147.07 .. - ---------- -------.-- .-- - - 500 $5,652 $309.17 _ _ $~,Z.1Q $257.64 $3,768 $206.11 --. -.--- -- -- ----~ - --.-.------- --------------- .- - - 1,000 $7,197 $248.12 _m__$~~ .!206J6 $4,798 $165.41 -- - -- ----------..-- - - 2,000 $9,679 $135.91 $8,066 $113.25 $6,452 $90.60 .- .---~ -~_.- .-- ~.. -- - - 5,000 $13,756 $84.95 $11,463 $70.79 $9,171 $56.63 - - ----- - _m..__~_ -~~_. .- -- - - 10,000 $18,003 $180.03 $15,003 $150.03 $12,002 $120.02 F-1, F-2 Factory/Industrial --- 1,000 $10,870 $87.56 $9,058 $72.97 _ $7,247 $58.37 -- ------.---. - - 5,000 _~1.!372 $112.97 $11,977 $94.14 $9,582 $75.31 - ------.-- - -..- _...--- --- ------- - - - 10,000 J20,021 $101.69 $16,684 $84.74 $13,347 $67.79 ------- ._.n ~_._---- - - 20,000 $30,189 $50.95 $25,158 $42.45 $20,126 $33.96 - ~----- - -. - ..._:~ _____._ __ _0__" m_ - 50,000 $45,473 $32.54 $37,894 $27.11 $30,315 $21.69 - - --.-.- -_._-~ n ___ - - 100,000 $61,740 $61.74 $51,450 $51.45 $41,160 $41.16 F F Occupancy Tenant Improvements 1,000 $8,327 $76.50 $6,939 $63.75 $5,~ $51.00 ._~- --- -.-------- - - 5,000 $11,387 $97.28 $9,489 $81.06 $7,592 $64.85 ---.- __n_______ __ ~ --- - - ------ ..... - - 10,000 $16~ $89.31 $13,543 $74.43 $10,834 $59.54 - - --..----- - -------- ..--. - -- -~Q,QqQ $25,182 $44.09 E(),9~ $36.74 $16,788 $29.39 .----- .....----- -- - - 50,000 $38,408 $28.25 $32,006 $23.54 $25,605 $18.83 _._~~ ----- -=--=- ----- ------ .... - - - 100,000 $52,530 $52.53 $43,775 $43.78 $35,020 $35.02 H-1 H-1 Occupancies 100 $7,890 $244.13 $6,575 $203.44 $5,260 $162.75 -- --- ~ f- ..-.--- --.-----..-- -- ..-" --- ____n____.. ---- - - 500 $8,866 $373.73 $7,389 $311.44 $5,911 $249.15 I.. .. - ---=- -. . ---"---- .----- - - 1,000 $10,735 $264.26 $8,946 $220.21 $7,157 $176.17 -...... ---~ ----- ~_m_ ------- - - ---___.__0.. - - 2,000 $13,378 $160.11 $11,148 $133.42 $8,918 $106.74 __n .-.- -- ~.--._. -----_____.0. -. ---.---- - - 5,000 ~~~,~~1_ $97.88 $15,151 $81.56 $12,121 $65.25 --------- -----------~. - - 10,000 $23,075 $230.75 $19,229 $192.29 $15,383 $153.83 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: IFR,IIFR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class USC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * H-2 to Hazardous Rooms 100 ~?~ $232.91 $5,335 $194.09 $4,268 $155.27 - - _n_. _ ~--~-- ~ ---_.~ - ~ - H-8 - ------ ?~ $7,334 $342.96 $6,112 $285.80 $4,889 $228.64 -~- -_.__._-~_. 1-- - - 1,000 --~ $256.56 $7,541 $213.80 $6,033 $171.04 - --- --- I- - - ~ _~OQ() $11,615 $148.58 $9,679 $123.81 $7,743 $99.05 -- - - 5,000 $16,072 $91.69 $13,393 $76.41 $10,715 $61.13 -- -- --- -~-I- - '- ----- 10,000 $20,657 $206.57 $17,214 $172.14 $13,771 $137.71 H H Occupancy Ten~!1t Improvel!lent!)_ 100 $6,053 $230.27 $5,044 $191.89 $4,035 $153.51 -- ~- -- -~-- ----~~ - - - 500 __ $6,974 $335.72 ~,~11 $279.76 $4,649 $223.81 -- ---- --- --~------~- - - 1,000 $8,652 $254.78 $7,210 $212.31 $5,768 $169.85 -- -~--'---- - - ~ ~- ---..----- -- - - 2,000 $11,200 $145.85 $9,333 $121.54 $7,467 $97.23 ------ ---- - - - 5,000 $15,575 $90.26 $12,9!~_ $75.21 $10,384 $60.17 - 10,000 $20,088 $200.88 $16,740 $167.40 $13,392 $133.92 I Institutional ___5~ c- E~ $71.88 _~,~9~ --$~ -~ $4,795 $47.92 ~ -.- -~~ ~---- -- - - 2,500 $8,630 $99.36 $7,192 $82.80 $5,754 $66.24 --- ___n --------- - ----- f------- ----~ -- - - - 5..QQQ. $11,114 $81.31 $9,262 $67.76 $7,410 $54.21 - ----- -------- ------ t-- --- ------~_...- - _.--- - - 1 0,000 $15,180 $43.86 _ $12,650 $36.55 $10,120 $29.24 -- ------- ----~- - - - 25,000 $21,759 $27.52 $18,133 $22.93 $14,506 $18.34 ---------- ---- - ------------ 50,000 $28,638 $57.28 $23,865 $47.73 $19,092 $38.18 I I OccupancyTenant Improvements__ 100 $4,282 $179.99 _ $3,56_8 $149.99 $2,854 $119.99 ______c_ ~_._~ ______u__ __ - - 500 $5,002 $256.97 $4,16_8 $214.14 $3,334 $171.31 ----------- -----'-- ~------ - - ~- - - 1,000 ~?~~~ . $200.92 $5,239 $167.43 $4,191 $133.94 - -- I- - ---.- ~------- ------ -- - - 2,000 ~~,.2~ $112.34 ~ ~ $6,913 $9~.~ $5,530 $74.89 - .---------- - - _ ____~,9~ 1-__ ~11 ,666 $69.88 _--.J~,~ C- __ $58.23 $7,777 $46.58 --- ------- -- -- -- - - 10,000 $15,160 $151.60 $12,633 $126.33 $10,106 $101.06 M Market 2,000 $9,066 $52.23 $7,555 $43.53 _____ $6,044 $34.82 ---~- n_______ _ -------- - - 10,000 $1~,~ $65.03 $11,037 $54.19 $8,830 $43.35 -~ ~ -- ._0' _ n____ __:~ I- -.----- 1----- - - 20,000 $19,747 $61.42 $16,456 $51.18 $13,165 $40.94 -f- -- - - -I ~ - - 40,000 $32,030 $29.66 $26,692 $24.71 $21,354 $19.77 - ---- ---,.-- ----- - ,"-'-- I- ---- ~ --- - - 100,000 ~~9,82~ _ $19.13 ___ $41,5~ I-_J15~_ $33,216 $12.75 -- _______ I- 200,000 $68,952 $34.48 $57,460 $28.73 $45,968 $22.98 M M Occupancy Tenant Improvements 300 $4,342 $90.08 $3,61~ $75.07 $2,894 $60.06 ---- I--~ - ---- - ----- ~ - - - 1,500 $5,423 $120.18 $4,519 $100.15 $3,615 $80.12 ----------..---- - ----- - ------ ~-- -~ ------ -~ - - 3,000 $7,225 $103.29 $6,021 $86.08 $4,817 $68.86 - ----- - - 6,000 $10,324 $53.64 $8,603 $44.70 $6,883 $35.76 - ---- i- ----- ----- f-- - - - 15,000 $15,152 $33.96 $12,626 $28.30 $10,101 $22.64 _un -------- -------- ~- 30,000 $20,246 $67.49 $16,871 $56.24 $13,497 $44.99 R-1 Apartment BI~~ 800 $8,654 $66.85 $7,212 $55.71 $5,770 $44.57 -----..- -~- -------"- ..------ - - -- - - ------ - - 4,000 $!.O~~ $89.29 $8,995 $74.41 $7,196 $59.53 ---- ----" - ----------.- -~-_._-~ -"- ~- - - 8,000 $14,~~ $76.66 $11,971 $63.88 $9,577 $51.1 0 ----- - ..---- ----- I--_H_~_ ~._- ------ -- ----~-- - - _J6,000 ~ $20,498 $39.83 ~17,082 $33.19 $13,665 $26.55 ____u_ - - -- -----_._-~ ----- - - 40,000 f---$~ - $25.20 $25,~4~ _____~21.QQ $20,038 $16.80 - -- -------- - ---'-- ---- --~-- 80,000 $40,138 $50.17 $33,448 $41.81 $26,758 $33.45 R-1 Apartment131ct9 ~ Repeat Ul1i~__ _ 800 $5,085 $63.50 $4,238 -~~ - $3,390 $42.33 -- --.. --- - - 4,000 $7,117 $80.05 $5,931 --~ $4,745 $53.37 ------------ - ------------ n_ ------ - - 8,000 $10,319 $74.34 $8,599 $61.95 $6,879 $49.56 ---- ---- -- - - 16,000 $16,266 $36.36 $13,555 $30.30 $1Q~ $24.24 In_-- - ----- - -- n - - ---~,gQQ.1- $24,994 $23.36 $20,828 ~1__~ $16,662 $15.58 -~ --------.~ - -~ ~---- 80,000 $34,339 $42.92 $28,616 $35.77 $22,893 $28.62 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7,2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: I FR, IIFR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * R-1 Hotels & Motels 3,000 $15,432 $56.29 $12,860 $46.91 $10,288 $37.53 - ----- -- ------- _ ____.u__._ '----- .. - - 15,000 $22, 18~ $70.39 $18,489 $58.66 $14,791 $46.93 - .._---~- -- _..___________m_. - - 30,000 __ ~~2,746 $66.10 $27,288 $55.08 $21,830 $44.06 -------- - - - - 60,000 $52,574 $32.06 $43,812 $26.72 $35,050 $21.38 -~-~ - - - 150,000 !81,~~ $20.64 ~67,8~ $17.20 $54,288 $13.76 ------ -- ~ ------- .. 300,000 $112,392 $37.46 $93,660 $31.22 $74,928 $24.98 R-3 Dwellings - Custom,I\i1..c>9_els, 1,000 $5,541 $121.27 $4,618 !10~.O~ $3,694 $80.84 - -----------'"-- -- -- - First Master Plan 2,500 $7,360 $87.57 $6,133 $72.97 $4,907 $58.38 ------------ -- . --.----- --- - -----. - - 4,000 Jla.,~4 $88.05 $7,228 $73.38 $5,782 $58.70 ----'- --------- - - - 6,000 __ _ !19,435 $147.21 $8,696 $122.68 $6,956 $98.14 - ------ . - - 8,000 $13,379 $137.54 $11,149 $114.61 $8,919 $91.69 ------ -- - -~---~ - - - -- ------------ . 10,000 $16,130 $161.30 $13,441 $134.41 $10,753 $107.53 R-3 Dwellings - Production Phase 1,000 $3,905 $96.15 $3,254 $80.13 $2,603 $64.10 __u__ ------ - ----- e----~--- -- -- ---~-- - - - - of Master Plan 2,500 $5,347 $62.43 $4,456 $52.03 $3,565 $41.62 - ----- ---- - ------ -- - -----~- -- - (repeats) 4,000 !~'.?~ $79.14 $5,~ $65.95 $4,189 $52.76 --------- _ - --~ - - 6,000 $7,866 $109.50 $6,555 $91.25 $5,244 $73.00 ---~ -- - -- - - 8,000 $10,056 $117.68 $8,380 $98.06 $6,704 $78.45 --- ----- ~ ~ --- ------------- 10,000 $12,410 $124.10 $10,341 $103.41 $8,273 $82.73 R-3 Dwellings-Alternate Materials 1,000 $7,987 $147.73 $6,656 $123.11 $5,325 $98.49 - -- --'--- --- - - ___n____ - - - 2,500 $10,203 $114.00 $8,503 $95.00 $6,802 $76.00 -- -- - - 4,000 $11,~ $97.98 $9,928 $81.65 $7,942 $65.32 -- -- -..------ - - 6,000 $13,873 $216.63 $11,561 $180.53 $9,248 $144.42 __ _u_ ___ _______ __ - - - 8,000 $18,205 $167.27 $15,171 $139.39 $12,137 $111.51 - -- 10,000 $21,551 $215.51 $17,959 $179.59 $14,367 $143.67 R-3 Dwellin9s-Hillside - Custom, Models, 1,000 $8,~ $108.05 $7,318 $90.04 $5,854 $72.03 ------------- . ------------ - - ------..---- - First Master Plan 2,500 $10,402 $113.99 $8,668 $94.99 $6,935 $75.99 ------ ------- -- ------- - - 4,000 $12,112 $88.10 $10,093 $73.41 $8,074 $58.73 ---- - -- ------ - -- --- - -- ------ - - 6,000 $13,874 $137.27 $11,561 $114.39 $9,249 $91.51 - -- __u _ ----- ----------... .-- - - 8,000 $16,619 $177.21 $13,849 $147.68 $11,079 $118.14 --------- -- 10,000 $20,163 $201.63 $16,803 $168.03 $13,442 $134.42 R-3 Dwellings-Hillside - Production Phas 1,000 $~ $101.44 $5,036 $84.53 $4,029 $67.62 ---------- -- - of Master Plan 2,500 $7,565 $89.28 $6,304 $74.40 $5,043 $59.52 --- __ _________n. ___ ----- - --------- - (repeats) 4,000 $8,904 $83.10 $7,420 $69.25 $5,936 $55.40 - -----'--- --------- - ~ u_ ___ ____ _____ - - 6,000 $10,566 $108.42 $8~ $90.35 $7,04i $72.28 ---" - - 8,000 $12,734 $144.18 $10,612 $120.15 $8,490 $96_12 -- - ----- -- - --- - ---- u_ _ 10,000 $15,618 $156.18 $13,015 $130.15 $10,412 $104.12 R-3 Dwellings-Hillside - Alternate Materia 1,000 $1i,401 $121.27 $12,001 $101.05 $9,601 $80.84 ----..- - - 2,500 $16,220 $166.92 $13,517 $139.10 $10,813 $111.28 - - 4,000 $18,724 $98.01 $15,603 $81.68 $12,482 $65.34 -- -----'--- - -- - - ~- - --- 1---- -- - - 6, OQQ.. $20,?~4 $196.77 $17,2E.. $163.98 $13,789 $131.18 - ---- - ---~""~- -- '- - - 8,000 $2~,f?)~ $246.62 $20,516 $205.51 $16,413 $164.41 ------- ---- --~-_. ------- --- - ------------- 10,000 $29,552 $295.52 $24,626 $246.26 $19,701 $197.01 R-2.1, GroupCa.r~,_ f-.Jon-Amb. (6+) 100 $8,812 $207.46 $7,343 $172.89 $5,875 $138.31 ---~ - -- -------- ------- ~ ------ 2.3 - 500 $9,642 $343.08 $8,035 $285.90 $6,428 $228.72 -- ----------"-- - - -------- - - 1,000 $11,357 $216.23 $9,465 $180.19 $7,572 $144.15 --- ----- _ ----~-~ ---------- - - 2,000 $13,520 $143.90 $11,266 $119.92 $9,013 $95.94 ------ - --- ------- - - ---~-- - - 5,000 $17,837 $86.26 $14,864 $71.8.!3. $11,891 $57.50 ----------- ---- ------ -- 10,000 $22,150 $221.50 $18,458 $184.58 $14,766 $147.66 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II,III,IV,V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * R-2.2 Group <;are, Ambulatory (6-j-L_ 1,000 $12,026 $78.71 $10,022 $65.60 $8,017 $52.48 -- --~--- --- f---- '~ --- - - 5,000 $15,175 $104.29 _ $12,646 $86.91 $10,116 $69.53 --'-~ ----- ----- ------ - - 10,000 $20,389 $90.52 $16,99_1 $75.43 $13,593 $60.34 -- - ---'--- ------ I-- -..-- ---- - - 20,000 $29,441 $46.62 _ ___ $~,534 $38.85 $19,627 $31.08 -- ------- -I- ~--- - -----------.- - - 50,000 $43,428 $29.59 _J~~...!QQ $24.66 $28,952 $19.73 --- --- +- -~-- - --- 100,000 $58,224 $58.22 $48,520 $48.52 $38,816 $38.82 R-2.1.1, Group Care, NO~...t\rnb. (1-5) 1,~ $12,026 $78.71 $10,022 , ~~5~~ I- - $8,017 $52.48 -- ---- -- -----"-'-- - -...-----.-- 2.3.1 ----------1 - 5,000 $15,175 $104.29 $12,646 $86.91 $10,116 $69.53 --------- ------- .-- - ----'- --- - - 10,000 $20,389 $90.52 $16,991 $75.43 $13,593 $60.34 -- -- ------- ___u___ '-"--'-- - ------ - - 20,~ $29,441 $46.62 _....E~,?34 $38~~,_ . $19,627 $31.08 - ---~- --.- - - 50,000 $43,428 $29.59 __$36, ~ 90 $2_4.~Q $28,952 $19.73 -- -- -------- - '':' 100,000 $58,224 $58.22 $48,520 $48.52 $38,816 $38.82 R-2.2.1 Group Care, Non-Amb.(1-5) 1,000 $15,033 $98.39 $12,527 $81.99 $10,022 $65.60 ---.-- --- -- ---- - - - 5,000 $18,~ $130.37 $15,807 $108.~i_ $12,646 $86.91 _______ n_ - - 10,000 $25,~~ $113.15 $21,239 $94.29 $16,991 $75.43 -- --------- ~._ _____~. H ----------- - - __?O,QQQ.I- $36,801 $58.28 ~30,6~ $48.57 $24,534 $38.85 - --- I--- - - - - 5Q.QQQ. _ $54,285 $36.99 $45,238 $30.83 $36,190 $24.66 - -- -- --- --- -----~._- ---~ 1--' --_.- ~ ._--~- --- 100,000 $72,780 $72.78 $60,650 $60.65 $48,520 $48.52 R R Occup~ncYJen.?nt Imllro\lement~ 80 $4,050 $213.20 $3,375 $177.67 $2,700 $142.13 _.c-'--- e-----~. ------'.- I---~-- - - 400 $4,732 $304.26 $3,943 $253.55 $3,155 $202.84 ----- - .- _.-- - '--'--- - - 800 $5,949 $238.02 $4,957 $198.35 $3,966 $158.68 - -- --- --- - -_..-- ------"-- --- -. - - 1,600 $7,853 $133.03 . $6,54~ $110.86 $5,235 $88.69 ------ -_..~ I---'~ ~ -- ------ - ---~ - - 4,000 $11,046 $82.75 $9,205 $68.96 $7,364 $55.17 ---..- - .-~ 1---------'--- ~_..._~- 1----- ---- - ----- 8,000 $14,356 $179.45 $11,963 $149.54 $9,571 $119.63 S-1 Moderate Hazard Storage 1,200 $12,056 $76.76 $10,047 $63.97 - $8,038 $51.18 --- ------ -..- ---.- ------. ----- ------ - - 6,000 $15,741 $99.69 $13,118 $83.08 $10,494 $66.46 -- -----..- ---~ ----.. '- - ---- ---- - - 12,000 $21,72? $88.95 $18,_19_2 $74.13 $14,482 $59.30 e- - - 24,000 $32,3~6 $44.86 $26,997 $37.38 $21,598 $29.91 -- - - 60,000 $48,546 $28.59 $40,45_5 $23.83 $32,364 $19.06 I- -------.-.- 1- - -'-- - - 120,000 $65,700 $54.75 $54,750 $45.63 $43,800 $36.50 S-2 Low Hazarcj~torage 1,800 $13,024 $69.93 $10,853 1-- $58.28 $8,683 $46.62 .....----- ----- - - ~OQQ. $18,059 $88.49 $15,049 $73.74 $12,039 $58.99 --------- ----- --------- ---~ - - 18,000 $26,023 $81.78 $21,686 $68.15 e--_..!!I,~ $54.52 - . ~._- - - - 36,000 $40,743 $40.15 $33,953 $33.46 $27,162 $26.77 - --- _______..__u.___ -.-_._- ..- .- .--- - - 90,000 $62,424 $25.77 $52,020 $21 .48 $41,616 $17.18 - ---~---- --'- t-- ...-- .-.--- ,-- 1------ - - 180,000 $85,617 $47.57 $71,348 $39.64 $57,078 $31.71 8-3 Repair Gara~e 600 $9,590 $89.81 $7,992 $74.84 $6,393 $59.87 ---- - -- --- ___n..... ----.-- - -- - - (not H-4) 3,000 $11,745 $121.70 $9,788 $101.41 $7,830 $81.13 - --- --_._~ ------- -- - - 6,000 $15,396 $102.38 ..$12,830 $85.31 $10,264 $68.25 ------- ---- - - --- - - 12,000 ...E~~~~ $54.04 $17,949 $~~.O~ I-_m $14,~ $36.03 e---- - - -- --~Q,QQQ.. $31,266 $34.08 .. _ $26,Q.~~ ~~~- $20,844 $22.72 - ~_.- -- ------... 60,000 $41 ,490 $69.15 $34,575 $57.63 $27,660 $46.10 S-3 Motor Vehicle Fuel [)isp_ensing 100 $7,344 $233.16 $6,120 $194.30 $4,896 $155.44 - - - ------- --- -- ------ - (including canoe}'L______. 500 $8,277 $354.63 $6,898 $295.53 $5,518 $236.42 - .---- ---- --. -~ - - 1,000 $10,050 $253.16 $8,375 $210.96 $6,700 $168.77 - -------- ..- -- -. _._~---- ...- - - 2,000 $12,582 $152.21 $10,485 $126.84 $8,388 $101.47 ---- . ----- ---- -----..... ----~ - - 5,000 $17,148 $93.18 ~_Jl~,.2_90 $77.65 $11,432 $62.12 - - -- --_._--~ 10,000 $21,807 $218.07 $18,173 $181.73 $14,538 $145.38 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II, III, IV, V-N Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 sf * Size 100 sf * Size 100 sf * S-4 Open Parking Garage (detached) 10,000 $23,354 $46.82 $19,461 $39.02 $15,569 $31.22 un n_n__~~ -- -- - - 50,000 $42,083 $56.24 $35,069 $46.86 $28,055 $37.49 ----'---- -- ----- ~ f- - - 100,000 $70,200 $55.74 $58,500 $46.45 $46,800 $37.16 ---- ---~ - - 200,000 $125,_~~0 $25.95 $104,9?_0 $21.62 $83,960 $17.30 -------- - --- - - 500,9.QQ. $203,775 $16.91 $169,813 $14.09 $135,850 $11.27 ------~ - ----- - ____u 1,000,000 $288,300 $28.83 $240,250 $24.03 $192,200 $19.22 S S OccupancyTenant Improv~ents _ 600 $6,139 ----~~ $5,116 $61.06 $4,093 $48.85 -- -- --------- ___u_ . - - 3,000 $7,898 $95.91 $6,581 $79.93 $5,265 $63.94 ---- - -------- --~- f----- --,- I-- --~-- - - 6,000 $10,775 $84.63 $8,979 $70.53 $7,183 $56.42 n ______n___ -- ---- ----- ---- _un_ _ __ - - 12,000 $15,853 $43.06 $13,211 $35.88 $10,568 $28.70 ----- ----~ -- I-- ------ - ------ - - - 30,000 $23,603 $27.38 $19,669 $22.81 $15,735 $18.25 __u_ ~ -------~ ---~ ~--- f------ ~- - ------ --------- --~ ..------- 60,000 $31,815 $53.03 $26,513 $44.19 $21,210 $35.35 U-1 Privat~ <3.arage/Shed~A.g ri~ltu ra I Bldg 40 $4,485 $477.95 $3,738 $398.29 $2,990 $318.63 ----260 ---- ~-- - _.------- -~-----_._- - - $5,250 $680.48 $4,375 $567.06 $3,500 $453.65 - - - - - - ---460 -- $6,611 ---- .-~-- $445.09 $4,407 __ ._ _n_ - - $534.11 $5,509 $356.Q7 --- ----~ ~------ --~ ---- -- - - 800 $8,747 $297.71 $7,289 $248.09 $5,832 $198.47 _n__ --- -- --- --$-185.34 ----..-- - --- - - 2,000 n _.1.~~,_320 $10,267 $154.45 $8,213 $123.56 un - - ------ - ----- -- -- 4,000 $16,027 $400.67 $13,356 $333.89 $10,684 $267.11 - Deferred Submittal-All Except R-3 1,000 $6,161 $16.85 $5,134 $14.04 $4,107 $11.23 --'- -- ---- ------"----- ---- - - - 5,000 $6,835 $26.66 $5,696 $22.21 $4,557 $17.77 1- -- ---- --- --:~-$8, 1~~ _.------ I- -- $6,806 --" ---- ---- - - - 10,000 _ __ $17.96 $14.96 $5,445 __..!!1.~ ----- --- ~:303 -- ---- - - - _n 20,000_ $9,963 $11.32 $9.43 $6,642 $7.54 ______un" -- ---- -----"- -~ - $8,905 - - 50,000 $13,358 $6.86 $11,131 $5.71 $4.57 100,060 ------- ---- __un___ u _ $11,190 $16,785 $16.79 $13,988 $13.99 $11.19 - Deferred Submittal-R-3 1,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19 -------- --'--- ---~ ___0' ------ -- --- ----- - - 2,500 $3,995 $26.77 $3,329 $22.31 $2,664 $17.85 - --- ---- - - - - 4,000 _ $4,~~ $10.02 $3,664 ----~ $2,931 $6.68 -~ --.---- .. ~---- - - 6,000 $4,597 $45.12 $3,831 $37.60 $3,065 $30.08 ____u__ --------- - ---~ -- n______-'--- - -------- ---- - - 8,000 $5,500 $40.17 $4,583 $33.48 $3,666 $26.78 __u __ -------.-.--- - ---- __u _ -- ----.- 10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42.02 - Standard Comm. Foundation wo/Podil 500 $9,365 $103.97 $7,804 $86.64 $6,243 $69.32 ----- ----- --- $1'1,445 ------- ~---~ -- u_-~ - - 2,500 e--- $141.~Q. $9,537 $117.66 $7,630 $94.13 -- - - ------- - ----- _uun___ -'-- .....-------- -~- - - 5,000 $14,975 $118.44 $12,479 $98.70 $9,983 $78.96 - - --~-- ----'---..,- ~ - ---- ~ ~ --.----- - - 10,000 . _ _$20,897 $62.67 __$17,414_ $52.22 $13,931 $41.78 --- ----.-- _ u_ ---'--- ~9.50 ------ - - - 25,000 $30,296 $25,247 $32.91 $20,198 $26.33 ----. --- >---- -- --- $33,475 f- - ---~- $26)80 --- ~-- 50,000 $40,170 $80.34 $66.95 $53.56 - Standard Comm. Foundati~.'1._'^'.iP()di.lJl" 3,000 $12,556 $41.16 $10,463 $34.30 $8,371 $27.44 '---- --- f---.- ------- - - 15,000 $17,495 $51.97 _ ~14,578 $43.31 $11,664 $34.65 -- >----- - ----- ~6:861 --- $32.1 f - - 30,000 $25,290 $48.16 $21,074 $40.13 -.. - $39,738 -$me - - . $19.66 - - 60,000 $33,114 $26,493 $15.73 --------- - ----_..~ u____ - - 150,000 $60,975 $15.15 $50,810 $12.62 $40,652 $10.10 _u _____________ ---.-".-- __..__un__ - 300,000 $83,700 $27.90 $69,747 $23.25 $55,803 $18.60 SHELL BUILDINGS - All Other Shell ~uildings 500 ____ $12,o.~ ----..!!~ $10,032 $102.71 $8,O~ $82.17 -~ -- 1------ -- - - 2,500 $14,503 $169.61 $12,086 $141.34 $9,669 $113.07 - - ..----- _.-- ~- ----'- un__ - - 5,000 $18,743 $139.64 $15,619 $116.36 $12,496 $93.09 -- - -- -~--- -- $17,150 --- - - 10,000 ___ $25,725 $74.98 $21 ,438 u$~ $49.98 -25,060 ----~ --'~ --- - - $36,971 $47.09 $30,809 $39.24 $24,648 $31.39 - --------~f__ -----'--- -------- --~ -- --- - - 50,000 $48,743 $97.49 $40,619 $81.24 $32,495 $64.99 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Consolidated Schedule of Total Construction Fees Construction Types: Construction Types: Construction Types: I FR, II FR II, III, V-1 HR II, III, IV, V-N Bale Cost COlt for Base COlt COlt for Base COlt Cost for @ Each @ Each @ Each UBC Project Size Threlhold Additional Threlhold Additional Threlhold Additional Clall UBC Occupancy Type Threlhold Size 100 If * Size. 100 If * Size 100 If * S-4 Open Parking Garage (detached) 10,000 $23,354 $46.82 $19.461 $39.02 $15,569 $31.22 1--- $42,083 $56.24 - - 50,000 $35,069 $46.86 $28,055 $37.49 1----. .--- I--- - 100,000 $70,200 $55.74 $58,500 $46.45 $46,800 $37.16 -------- 1----. $125,940 $25.95 -- - - 200,000 $104,950 $21.62 $83,960 $17.30 ----- t-- -----------~-----'----------- - - 500,000 $203,775 $16.91 $169,813 $14.09 $135,850 $11.27 - ~ -- -- 1,000,000 $288,300 $28.83 $240,250 $24.03 $192,200 $19.22 S S Occupancy Tenant Improvements 600 $6,139 $73.27 $5,116 $61.06 $4,093 $48.85 ~___ ___ __ u___ _______________ _ __ --- - - 3!QQQ.. $7,898 $95.91 $6,581 $79.93 $5,265 $63.94 -- -~-~ - - ____~~Q9.Q ~~(J,775 $84.63 $8,979 $70.53 $7,183 $56.42 - ~ .-...----.---.--- e-- - - 12,000 _....!15,~ _ $43.06 $13,211 $35.88 $10,568 $28.70 ___-_.0- ... -------- --'-'-- -- - - 30,000 $23,603 $27.38 1---_ $19,669 $22.81 $15,735 $18.25 --- -.- - ._---------------~- 60,000 $31,815 $53.03 $26,513 $44.19 $21,210 $35.35 U-1 Private Garage/Shed/Agricultural Bldg ~ $4.485 $477.95 $3,738 $398.29 f----- $2,990 $318.63 - f-- -~-------- - 200 $5,250 $680.48 $4,375 $567.06 $3,500 $453.65 ------- 1---__' 400 $6,611 $534.11 $5,509 $445.09 $4,407 $356.07 - - ---~- 800 $8,747 $297.71 $7,289 $248.09 $5,832 $198.47 - - -- $12,320 $185.34 $154.45 $123:56 - - 2,000 $10,267 $8,213 -- 4,000 $16,027 $400.67 $13,356 $333.89 $10,684 $267.11 - Deferred Submittal-AII Except R-3 1,000 $6,161 $16.85 $5,134 $14.04 $4,107 $11.23 ----- ---.---. - - 5,000 $6,835 $26.66 $5,696 $22.21 $4,557 $17.77 ---- - ------ - - 10,000 $8,168 $17.96 $6,806 $14.96 $5,445 $11.97 -- ..'.-.-. -- 1------ - - 20,000 $9,963 $11.32 $8,303 $9.43 $6,642 $7.54 -- -- ------ - - 50,000 $13,358 $6.86 $11,131 $5.71 $8,905 $4.57 u_ - ~~-- 100,000 $16,785 $16.79 $13,988 $13.99 $11,190 $11.19 - Deferred Submittal-R-3 1,000 $3,878 $7.79 $3,232 $6.49 $2,586 $5.19 -- --..-- 1---- $17-:85 - - 2,500 $3,995 $26.77 $3,329 $22.31 $2,664 -.-- -.---.--..----.---. -- $4,397 $10.02 $3,664 $8.35 - $6.68 - - 4,000 $2,931 - $4,597 $45.12 ~ $3,065 --- - - 6,000 $3,831 $37.60 $30.08 -_.,~ ... .--.. ----- $5,500 $40.17 -$26:78 - - 8,000 $4,583 $33:~ _ _ _ $3,666 ----- 10,000 $6,303 $63.03 $5,253 $52.53 $4,202 $42:02 - Standard Comm. Foundation wo/Podh 500 $9,365 $103.97 $7,804 $86.64 1--__ ~~~<43 $69.32 - ___ n______ . --.. . $-94.13 - - 2,500 $11,445 $141.20 $9,537 $117.66 $7,630 on -"----------~-- $14,975 $118.44 $98.70 _ - - --- ----.-- --- - - 5,000 $12,479 $9,983 $78.96 - - - $20,897 $62.67 $17,414 $52.22 $13,931 ---------- - - 10,000 $41.78 -- - -. -.- . ---..... -- - - 25,000 $30,296 $39.50 $25,247 $32.91 $20,198 $26.33 - -- 50,000 $40,170 $80.34 $33,475 $66.95 $53.56 $26,780 - !)_ta_n.c:lai.c1..9~r:!',!,.:~~ndation w/Podiul 3,000 $12,556 $41.16 $10,463 $34.30 $8,371 $27.44 ---- ---- - - 15,000 $17.495 $51.97 $14,578 $43.31 $11,664 $34.65 __. _-0-_____----. - - 30,000 $25,290 $48.16 $21,074 $40.13 $16,861 $32.11 - -.-..-..--.-.---. -.--- - - 60,000 $39,738 $23.60 $33,114 $19.66 $26,493 $15.73 ~~--._-_. ---- $10.10 - - 150,000 $60,975 $15.15 $50,810 $12.62 $40,652 -- ----- ~ 300,000 $83,700 $27.90 $69,747 $23.25 -$18-:-60 $55,803 SHELL BUILDINGS - All Other Shell Buildings 500 $12,038 $123.25 $10,032 $102.71 $8,025 $82.17 - - 2,500 $14,503 $169.61 $12,086 $141.34 $9,669 $113.07 - - - - 5,000 $18,743 $139.64 $15,619 $116.36 $12,496 $93.09 -- ----- $25,725 $74.98 $21 ,438 on $49.98 - - 10,000 $62.48 $17,150 -- 25,000 $36,971 $47.09 $30,809 $39.24 $24,648 $31.39 - - ----- ---.-.-- ~____ _u__ 50,000 $48,743 $97.49 $40,619 $81.24 $32,495 $64.99 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Mechanical, Electrical & Plumbing Fee Types Fee ADMINISTRATIVE AND MISC. FEES ITravel and Documentation Fees: T$ 40.79 MECHANICAL PERMIT FEES Mechanical Permit Fee $ 40.79 Stand Alone Mechanical Plan Check (hourlv rate) $ 122.38 UNIT FEES: Residential AppHance New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot to and including 100,000 BtuIh $ 122.38 New and single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $ 122.38 New commercial buildings and completely remodeled spaces not including the area of garages, per sauare foot $ 122.38 For the repair of alteration of, or addition to each heating appliance, refrigeration unit. cooling unit, VAV boxes, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including instaUation of controls regulated by this Code (Commercial) $ 61.19 For each air-handling unit, AlC units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto. Does not apply to central type Commercial) $ 122.38 For each air-handling unit, AlC units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto. Does not apply to central type Residential) $ 61.19 Repair/Alteration/Addition to each heating appIiarice, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. (Commercial) $ 122.38 Repair/Alteration/Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. (Residential) $ 61.19 For each air-handling unit AlC unit, heat pump over 10,000 cfmp to and including 3HP, or each absorption system up to and including 100,000 BtUlh. I/Residential) $ 122.38 For the instaUation or relocation of each commercial or industrial-type hood $ 122.38 For the installation of each residential hood that is served by a mechanical exhaust, Including the ducts for such hood $ 30.60 For the Installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and includino 100,000 Btulh $ 122.38 For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit $ 91.79 For each ventilation fan connected to a single duct $ 20.40 For the installation or relocation of each forced air or gravity type furnace or burner, including ducts and vents attached to such appliance over 100,000 BtU/h $ 122.38 For the installation or relocation of each floor furnace, including vent $ 61.19 CITY OF CUPERTINO Resolution 07-038 Fees Eft'ective May 7, 2007 Schedule D - Mechanical, Electrical & Plumbing Fee Types Fee For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater (Commercial) $ 61.19 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater (Residential) $ 61.19 For the installation, relocation or replacement of each appliance vent installed - and not included in an appliance permit (Commercial) $ 61.19 For the installation, relocation or replacement of each appliance vent installed and not included in an aDDIianee Dermit (Residential) $ 61.19 For the installation or relocation of each boiler or compressor to and including threa horsepower, or each absorption system to and including 100,000 Btuth 1(29.3 kw) $ 91.79 For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 BtuJh and Including 500,000 BtuJh $ 112.18 For the installation or relocation of. each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btuth to and includina 1,000,000 BtuJh $ 132.58 For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 BtuJh to and including 1,750,000 Btuth $ 152.98 For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 BtuJh $ 173.37 For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code S 61.19 OTHER FEES: Other Mechanicallnsoections (Der hour) $ 122.38 PLUMBING/GAS PERMIT FEES Plumbing Permit Fee $ 40.79 Stand Alone Plumbina Plan Check (hourly rate) $ 122.38 UNIT FEES: New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same, per square foot $ 61.19 New single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constNcted at the same time, per square foot $ 61.19 New commercial buildingS and completely remodeled spaces not including the area of aaraaes, oer SQuare foot $ 61.19 For installation, alteration or reoairof water oiDino water treatina eauipment $ 40.79 For repair or alteration of drainage or vent piDing, floor, area, condensate piping $ 40.79 For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection therefore) $ 8.16 For each gas pipina sYStem of one (1 to four (4) outlets (Commercial) $ 61.19 For each aas Dipina system of one (1 to four (4) outlets (Residential) $ 61.19 For each aas oipina system of five (5 or more, Der outlet $ 61.19 CITY OF CUPERTINO Resolution 07-038 Feel Effective May 7, 2007 Schedule D - Mechanical, Electrkal & Plumbing Fee Types Fee For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen type grease traps functioning as fixture traps $ 30.60 Kitchen tyoa trao and/or system $ 8.16 For each building sewer, sanitary sewer, and each trailer park sewer I (Commercial) $ 20.40 For each building sewer, sanitary sewer, and each trailer park sewer I (Residential) $ 20.40 Storm/rainwater systems oar drain $ 8.16 For each water heater and/or vent (Commercial) $ 24.48 For each water heater and/or vent (Residential) $ 24.48 Water service (Residential) $ 20.40 Re-plpe oar fixture (Commercial) $ 6.12 Re-pipe per fixture (Residential) $ 10.20 For each lawn sprinkler system on anyone meter, including backflow protection devices therefore $ 61.19 For atmospheric type vacuum breakers/backflow not included in item 1 1 to 5 $ 61.19 over 5 each additional $ 61.19 For each private sewace disposal system $ 122.38 For each cesSpOOl $ 122.38 OTHER FEES: Other Plumbina and Gas Inspections (per hour) $ 122.38 ELECTRICAL PERMIT FEES Electrical Permit Fee $ 40.79 Stand Alone Electrical Plan Check (hourly rate) $ 122.38 SYSTEM FEES: New multi-family residential buildinas (apartments and condominiums) having three or more IMng units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per SQuare foot $ 0.06 New sinale and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per SQuare foot $ 0.04 New commercial buildings and completely' remodeled spaces not includlno the area of aaraaes, per SQuare foot $ 0.02 UNIT FEES: Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall- mounted electric ovens; counter mounted cooking tops; electric ranges, self- contained room console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers washing machines; water heaters; clothes dryers; or other motor operated appliances not exceeding one horsepower (HP) in rating, each $ 20.40 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Mechanical, Electrical & Plumbing F.. Types Fee Non-Residential ADPIiances For residential appliances and self-contained factory-wired, non-residential appliances non exceedinl10ne horsepower (HP), kilowatt (KW), or kilovotampere (kVA) in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each $ 40.79 Services (Temporary Power) For services of 600 volts or less and not over 200 amperes in rating, each (Commercial) $ 40.79 For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each (Commercial) $ 61.19 For services over 600 volts over 1,000 amperes in rating, each (Commercial) $ 71.39 For services of 600 volts or less and not over 200 amperes in rating, each (Residential) $ 40.79 For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each (Residential) $ 61.19 For services over 600 volts over 1,000 amperes in rating, each (Residential) $ 71.39 Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each $ 40.79 For additional branch circuits within the same sign, outline lighting system or marquee, each $ 20.40 Miscellaneous ADDaratus, Conduits, Conductors, and Special Circuits For electrical apparatus, conduits and conductors for which a permit is reQuired but for which no fee is herein set forth $ 122.38 Power Device/ADDSratus For motors, generators, transformers, ractifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatuses, as follows: Rating in horsepower (HP), kilowatts (kW), kilovolt-amperes (kVA), or kilovolt-amperes-reactive (KVAR):' $ 122.38 1 unit $ 30.60 2 through 5 units, each additional $ 30.60 6 and over, each additional $ 30.60 Busways For trolley and plug-ln-type busways, each 100 feet or fraction thereof $ 20.40 Raceptacle, Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters follows: First 20 $ 40.79 AddrnonalouUets,each $ 2.04 Lighting Fixtures For lighting fixtures, sockets or other lamD holding devices First 20 $ 61.19 Additional fixtures, each $ 3.06 For pole or platform-mounted lighting fixtures, each $ 12.24 For theatrical-type lighting fixtures or assemblies each $ 10.20 OTHER FEES: Other Electrical Inspections (per hour) . $ 122.38 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Mechanical, Electrical & Plumbing L Fee Types Fee Minutes Consumed: Hours Consumed: Productive Hours per FTE: FTE Consumed: Note: This table would be used if, for example, someone just wants a permit for a water heater or electrical panel. Please review & revise the time requirements for the various fixture types. CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Miscellaneous Items Work Item Unit Fee IStandard Hourly Rate $ 122 Acoustical Review . -- Single Family Home/Duplex-New each . 551 -~ Single Family Home/Duplex-AdditionlAlteration each . 612 Multi-Family/Commercial each . 245 Address Assignment per hour . 306 Antenna- Telecom Facility Radio each $ 367 CellularlMobile Phone, free-standing each . 979 -- _CellularlMobile Phone, attached to building each . 979 Application Meeting First Hour hourly rate . 122 Each additional hour hourly rate . 122 ArborlTrellis Awning/Canopy (supported by building) each . 3~ Balcony Addition each . 673 Carport each $ 551 Certifications __Special Inspector Certification Application each . 4,161 I-----Materials Testing Lab Certification each . 2,570 ~himney each $ 490 ~_himney Repair each . --~ ~!ose Existing Openings Interior wall each . 428 1---------- -- ~-xterior wall eech . 428 C_o.rn.I11It~_ll~~C?Il~h (peI-unit) each unit__ . 734 Covered Porch each . 857 Deck (wood) each . 428 Deck Railing each . 428 Demolition Commercial (up to 3,000 sf) each . -~ Commercial (each add'13,000 sf) each 3,000 sf . 245 Residential (up to 3,000 sf) each . 490 Residential (each add'13,000 sf) each 3,000 sf . 122 Disabled Access Complianca Inspection per hour . 122 Door New door (non structural) each . 245 New door (structural sheer walVmasonry) each . 367 Duplicate/Replacement Job Card each . 61 Fenca Non-masonry, over 6 feet in height up to 100 I.f. . 367 Non-masonry, each additional 100 If each 100 I.f. . 61 Masonry, over 6 feet in height up to 100 l.t. $ 612 Masonry, each additional 100 If each 100 I.f. . 245 Fireplaca Masonry each . 612 Pre-Fabricated/Metal each . 428 Flag pole (over 20 feet in height) each . 337 Foundation Repair each . 734 ~~rage (detached) -- Wood frame up to 1,000 sf each . 1,101 Masonry up to 1,000 sf each . 1,101 Inspections Outside of normal business hours, 0-2 hours (minimum charge) up to 2 hrs . 245 Each additional hour or portion thereof 1 hour $ 122 Reinspection fee--Der hour 1 hour . 122 Inspections for which no fee is specifically indicated-per hour (minimum charge = 1/2 hour) 1 hour . 122 Life Safety Report each . 734 Lighting pole eech $ 367 each add'l pole each $ 367 Modular Structures each . 734 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Miscellaneous Items Work Item Unit Fee Istandard Hourly Rate S 122 ~ition-Commercial, Interior (up to 30 I.f.) up to 30 1.1. $ 428 Additional partition each 30 U. $ 92 P~_~.tion-Residential, Interior (up to 30 I.f.) up to 30 1.1. S 428 i-=_~dditional partition each 30 1.1. $ 92 Patio Cover t--Wood frame up to 300 sf S -------~ - --. ------ Metal frame ~~o 300 sf S -~ t-- -- Other frame up to 300 af $ .~ .._--_.-----_.--~~~- ~._---------- --_._---~-~~-~--_.~ ._-_._~- ~ I-- __~~ditional patio each 300 af S 490 Encloaed, wood frame up to 300 af S 734 Encloaed, metal frame up to 300 af $ 734 Encloaed, other frame up to 300 af $ 734 Additional enclosed patio each 300 af $ 612 Photovoltaic Syatam Reaidential each $ 300 Commercial, up to 4 kilowatta upt04kW $ 612 Commercial, each additiorial1 kilowatt each 1 kW $ 245 Pile Foundation Caat in Place Concrete (first 10 piles) . up to 10 $ 857 Additional Pllea (increments of 10) each 10 $ 734 Driven (steel, pre-streased concrete) up to 10 $ 857 Additional Piles (incrementa of 10) each 10 $ 734 Product Review per hour $ 122 Remodel-Reaidential Kitchen up to 300 af $ 551 Bath up to 300 sf $ 551 Other Remodel up to 300 sf $ 367 Additional remodel each 300 af $ 61 Re-roof Reaidential each 100 af $ 13 Multi-Family Dwelling each 100 af $ 13 Commercial Commercial (first 5,000 af) each $ -~ Commercial (each add'12,500 sf) each 2,500 af $ 153 Retaining Wall (concrete or masonry) -- Standard (up to 50 If) up to 50 I.f. $ 734 Additional retaining wall each 50 I.f. $ 612 Special Deaign, 3-10' high (up to 50 If) up to 50 I.f. $ 857 Additional retaining wall each 50 I.f. $ 734 t- Special Design, over 10' high (up to 50 If) up to 50 I.f. $ 918 Additional retaining wall each 50 I.f. $ 795 Gravity/Crib Wall, 0-10' high (up to 50 If) up to 50 I.f. $ -~ Additional Gravity/Crib Wall each 50 I.f. $ 795 Gravity/Crib Wall, over 10' high (up to 50 If) up to 50 I.f. $ 918 Additional GravltvlCrib Wall each 50 I.f. $ 795 Reviaiona Commercial New each $ 734 Tenant Improvement each $ 734 SFDWL each $ 734 Addition each $ 612 Remodel each $ 612 Roof Structure Replacement uo to 100 sf $ 612 Additional roof structure replacement each 100 af $ 490 Sauna-steam each $ 673 Si~!I.L___ Stol1e_!rld Brick Veneer (interior or exteriofl..___ up to 400 sf $ 551 ._~-- -.-.- All Other up to 400 af $ 367 -- ----~- ---- - Additional aiding each 400 af $ 184 Signa Directional each $ 245 I-- Each additional Directional Sign each $ 122 Ground/RooflProjecting Signs each $ 306 CITY OF CUPERTINO Resolution 07-038 Fees Effective May 7, 2007 Schedule D - Miscellaneous Items Work Item Unit Fee Istandard Hourly Rate $ 122 Master Plan Sign Cheek each $ 306 Rework of any existing .Ground Sign each $ 306 Other Sign each $ 306 Reinspection Fee each $ 61 Wall/Awning Sign, Non-Electric each $ 245 Wall, Electric each $ 245 Skylight Less than 10 sf each $ 367 Greater than 10 sf or structural each $ 673 Solar Panels system $ 300 Staira-::-First Flight first flight $ 306 Each additional flight per flight $ 184 Storage Reeks 0-8' high (up to 100 If) first 100 If $ 306 each additional 100 If each 1 00 If $ 61 ~ 8' high (up to 100 If) first 100 If $ 337 _on each additional 1 00 If each 1 00 If $ 92 ~ Stucco Applications up to 400 sf $ 428 Additional Stucco Application each 400 sf $ 31 Supplemental Inspection Fee-If a project requires significantly more inspections than average, the Building Official may charge additional Inspection fees First 1/2 hour minimum first 30 min $ 61 Each Additional hour per hour $ 122 Supplemental Plan Check Fee (after 2nd review) -- First 1/2 hour minimum ._,..._-_.~----- -~~- first 30 mln $ -------~~ Each Additional hour per hour $ 122 Swimming PooVSpa Vinyl-lined (up to 800 sf) each $ 857 Fiberglass each $ 812 Gunite (up to 800 sf) each $ 1,346 Additional pool (over 800 sf) each 100 sf $ 184 Commercial pool (up to 800 sf) each $ 1,713 Commercial pool (over 800 sf) each $ 214 Spa or Hot Tub (Pre-fabricated) each $ 308 Window or Slidina Glass Door Replacement (each 8 windows) each 8 $ 367 New Window (non structurel) each $ 428 New window (structural shear walVmasonry) each $ 734 Bay Window (structural) each $ 734 -~._-~-_._--- --