08050048 CITY OF CUPERTINO
• 4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 36907036 . 00
DATE ISSUED. . . . . . . : 05/05/2008
RECEIPT # . . . . . . . . . : BS000004662
REFERENCE ID # . . . : 08050048
SITE ADDRESS . . . . . : 10114 E ESTATES DR
SUBDIVISION . . . . . . .
CITY CUPERTINO
IMPACT AREA . . . . . . .
OWNER. . . . . . . . . . . . . : RAJ & SMITA LIMAYE
ADDRESS . . . . . . . . . . : 10114 E ESTATES DR
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
RECEIVED FROM . . . . : RAJENDRA V LIMAYE
CONTRACTOR . . . . . . . : JOSE MENDEZ LIC # 29513
COMPANY . . . . . . . . . . : JM DRAIN CLEANING AND PLUMBING
ADDRESS 1725 ROGERS AVE STE C
CITY/STATE/ZIP . . . : SAN JOSE, CA 95112
TELEPHONE . . . . . . . . : (408) 903-8184
• FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 200 . 00 0 . 50 0 . 00 0 . 50 0 . 00
1PPERMITFE FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00
IPRWHEATR UNITS 1 . 00 24 . 48 0 . 00 24 .48 0 . 00
1TRAVDOC FLAT RATE 1 . 00 40. 79 0 . 00 40 . 79 0 . 00
------------ ---------- ---------- ----------
TOTAL PERMIT 106 . 56 0 . 00 106 . 56 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 106. 56 VISA
---------------
TOTAL RECEIPT 106 . 56
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
518 WATER HEATER
•
CITY OF CUPERTINO
"�(��' WATER HEATER
•CUPEkTINO PERMIT APPLICATION FORM
APN # Dae:
3�90 70 (a,v 6 Date: 200
Building Address: 1 0 l ) ,}f E
(
Owner's Name: Phone #:
201 �- m� Y C4og) zi- 25 - 6 $ I D
Contractor: J ; Phone #(%)LQ 5 2 //ol
Cupertino Business License #: Z 1 S 13 Contractor State License #:
6`(2Cyy T69( 2-
Contact:
ontact: ��,� `o eq�, fie //o Phone #:
Fax #:
Building Permit Info:
Bld g ❑ Elect 0--� Plumb ❑� Mech
Residential Commercial ❑
Job Description: �� X Ve�� jar a 4-a -A k � e ss W&jey Aeaje,.
Strapped On Platform Bonded 91' New Location ❑ Replacement
Valuation: zfe,?,F- ebo Lj
Green Building: Please complete relevant portion of the Green Building Checklist & attach it to
the application or if applicable, include in plan set & the sheet index.
Green Building Points achieved:
'd. CITY OF CUPERTINO
WATER HEATER
CUPEkTINO PERMIT APPLICATION FORM
Quantity Fee ID Fee Description Fee Permit Type
Group
1PCWHEATR Commercial Water B PCWHEATR
HeaterNent
1BSEISMICOM Seismic Commercial B
1PRWHEATR Residential Water B PRWHEATR
HeaterNent
1BSEISMICRE Seismic Residential B
1PPERMITFEE Plumbing Permit P •
/ 1TRAVDOC Travel & B
Documentation
1 BU LLIC Business License B
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
pry}' Plans See below
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points
11. Permeable Paving, Note L-1 2 points
C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, detail S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 2oints
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, Note/S ec. A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS 40 points
o /l ti krf -
1419-0
1o�B
cc P
ern-'
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is
• not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project.
INPUT Resources Energy IAQ1HeaII&=
A. rte
F1 R; cle Job Site Construction&Demolition Waste
65%=1 point;75%,= 2 points;80%=4 points up to 4 Resource pts 0
2.Salvage Reusable Building Materials 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
8.Design Resource-Efficient Landscapes and Gardens__ 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 1 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pts 0
2.Use Recycled Content Aggregate 2 Resource pts y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesl;;;F p
1 1 1
C.Structural Frame
1.Substitute Solid Sawn Lumber with Engineered Lumber = 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0
B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors
b.Wall 3 Energy pts y=yes 0 _
3 Energy pts y=yes p
c.Roof 3 Energy pts y=yes p
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
a.Subfloors 1 Resource pt y=yes 0
• Sheathing
athing 1 Resource pt y=yes 0
- S ----
1 1
INPUT ReSOUTCeS Energy AQIHeafth
D.Exterior Frms
�1.Use Sustainable Decking Materials
a.Recycled content 3.Resource pts y=yes 0 •
b.FSC Certified Wood 3 Resource pts y=yes 0
2.Use Treated Wood That Does Not Contain Chromium/Arsenic + 1 IAQ/Health pt y=yes 0
3.Install House Wrap under Siding 1 IAQ/Heaith pt y=yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
1 1 1
E.Plumbing
1.Install Water Healer Jacket 1 Energy pt y=yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0
'3– etRetR rofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
14.Replace Toilest with Ultra-Low Flush Toilets
j(1 point each,up to 3 points) —_ Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0
B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
1 1 1
r.crecmcar
1.Install Compact Fluorescent Light Bulbs(CFLs)
,(6 bulbs=2 points,10 bulbs 0 points, 12 bulbs=4 points) Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to •
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
'T.Inst—alf Energy Star Dishwasher 1 Energy pt y=yes 0
�2.Install Washing Machine with Water and Energy
Conservation FeaturesI 1 Energy pt y=yes 0
3.Install Energy Star Refrigerator 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pts y=yes 0
1 1 1
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y=yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
i3.Install Recycled-Content,Fiberglass Insulation with —71
jNo Added Formaldehyde 31AQ/Health pts y=yes 0
4.-Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0
b.Ceilings 4 Resource pts y--yes 0 •
6.Alternative Insulation Products(Cotton,spray-foam)
a.Walls 4 Resource pts y=yes 0
I).Cemngs 4 Resource pts y=yes 0
INPUT Resources Energy IAQ/HeatW
I.Windows
I1.Install Energy-Efficient Windows �I
• a.Double-Paned 1 Energy pt Y--yes 0
I Low-Emissivity(Low-E) 2 Energy pts Y--yes 0
9Y P
1 c.Low.Conductivity Frames _ 2 Ener is
Y=Yes 0
2.Install Low Heat Transmission Glazing — 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
11.Use Duct Mastic on All Duct Joints _ J jj 2 Energy pts y=yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAO/Heallh pt y--yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Heallh pts y=yes 0
5.Install Solar Attic Fan 2 Energy pts y=yes 7 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts y=yes 0
S.Install Sealed Combustion Units
a.Furnaces 31AQ/Health pts y=yes 0
b.Water Heaters 31AQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
13.Retrofit Wood Burning Fireplaces
• a.Install EPA certified wood stoveslnserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 41AQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2,Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=16 points) _ Up to 16 Energy pts p
(6.Select Safe and Durable f3oofing Matenals __ —� 1 Resource t
` -- --- - --- — -- —� P Y=Yes 0
7.Install Radiant Barney 3 Energy pts y=yes p
I
L.Natural Heating and Cooling 1 1
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts , y=yes 0
3,Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
1 1 1
INPUT Resources Energy IAQIHealth
M. n oor v uahty an Ems es
L1 Use Low/No-VOC Paint 1 IAQ/Health is y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0
�3 •
.Use Low/No C A
VOdhesives IAQ/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
,7.Seal all Exposed Particleboard or MDF _ 4 IAO/Heaith pts y=yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0
2.UsRapidlrials
e y Renewable Flooring Mate — j 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0
4,Install Natural Linoleum in Place of Vinyl 5 IAO/Health pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 1 1
Total Points Available: 140 130 57
Total Points Project Received: 0 0 0 •
G:datalprogstgreenbuildngguidelines4emodelersrgmenpointsfmal2.12.04protected.xls
•
i Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408) 777-3228
CITY OF Fax(408) 777-3333
#UPEkTINO
Building Department
JOB ADDRESS: j 0 j j Lt C i�-Y)-r , ;'v 0 PERMIT#
( A Jam/Z,, Fj�O -- "-00 L((jo-
OWNER'S NAME: PHONE # fpo,9) 4 23`- 68 O
GENERAL CONTRACTOR j FAX #
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the followinginformation:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing /+� Yu 2-1 r 13
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
•
Own actor 9 gnature Date