550 - CofO APCITY OF CUPERTIN(a
• BUILDING DEPARTMENT
Certificate of Occupancy
NO. . 550_........
THIS IS TO CERTIFY that the (description of building or structure).
Four Phase Systems
.............................•---.....-----•---•-----.._....-•-•------------------------••----....--------.._.........__....----•------......_....
1050o•N:-De Anza Blvd.
........................................•--....._._................----
.. ................•---••----•--...._..------•----............................._.......--_..._ _.....
Erectedon Lot No- ------------------------------------------Block No. ........................................................
Additioncrew ....... Fire Zone ...........?II........--•---•------•--•---•--•........
Street No. ---.--10500-N_--De A'n'-z- Blvd--------------Occ. Group ...... B-2
.-•---........-...._._....---...-_.._...
Owner ... Sobrato Proiperties US@ Zcne Planned Industrial
-------------- _.......... ..........................................
Jorge De Quesada Inc. AIA
Architect .. ......••--••----------•..........................................................•---............
Contractor .... Webcor
--------.........................................................................................................
BuildingPermit No. .-.......................................Plan No. -----------------:........................................
•has been inspected and the following occupancy thereof is hereby authorized.
OCCUPANCIES Max. Allowable F oor Loads per sq. t. M
Basement ..........................TEMPORARY CERTIFICATE OF CCUPANCY
.............................................................................---.......---........__..............._...-----........•---
stfloor ......--•-••-•....................................................................................................................
.._.......--•...............................................4........----._........ -............................................................
2nd floor ...................
------- ------------•---....----.......---•--.....-----•----•---•---......---...__. .....---.._....---•-.........----........__...._......--.----
3rdfloor .................................................
......................................-............................................ .............................................................
4th floor .................
........................•---.....--•---......__.....----..._.......__........----.. .............................................................
Add floors as necessary .............................................
.. ... ----•-•----••----------------•----.....---....---._..........__......_----_. .............................................................
Roof ..•
City of CUPERTINO ..........?Mar ch 13, 1981
------------ --- -- .
ILDING OFFICIAL
This certificate must be posted and permanently maintained in a conspicuous place at or
close to the entrance of the building or structure referred to above.