Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
51322.2
11023 Canyon Vista 63 • LOT NO. CITY OF CUPERTINO APPLICATION FOR BUILDING PERMIT SANITARY NO. 10107 FILE NO. 51, 322.2 DATE 10/12 19 77 Application is hereby made for a permit to Construct Plan Aa- 1 story, ype Single Fam & Gar to be occupied only as Single Family Dwelling in accordance with plot plan, plans and specification filed herewith, ESTIMATED VALUE OF IMPROVEMENTS E 69, 000:11'- FEE E 225.00 PLAN CHECK E OWNER Gateway Const. Co. ADDRESS 10850 Stevens Canyon JU Cupertino PHONE 257-2572 PHONE STATE LICENSE 155136 APPROVED Robert Cowan/m BUILDING INSPECTION RECORD DATE INSPECTOR DATE INSPECTOR FOUNDATION FLOOR STEEL ZZ 41 PRE-GUNITE FRAME BOND BEAMS LATH WALLBOARDSIE%T. 2F. FIREWALLS MEMBRANE LANDSCAPING F.M.O. INSPECTION ._ -MISC- DIAPHRAMS MOORE IUSI RES5 ELECT]ICAL INSPECTION RECORD RESIDENTIAL DATE INSPECTOR COMMERCIAL DATE INSPECTOR UNDERGROUND ROUGH UNDERGROUND ROUGH ROUGH WIRING c o e GH WIRING FINISH WIRING FINISH WIRING FIXTURES INTERIOR FIXTURES MOTORS zEXTERIOR FIXTURES FINAL MOTORS FINAL MISCELLANEOUS INSPECTIONS PLUMBING INSPECTION RECORD HEATING & A/C INSPECTION RECORD DATE 1 INSPECTOR DATE INSPECTOR BACK FLOW REQUIRED UNDERFLOOR S.M. BACK FLOW INSTALLED DUCTS & INSULATION UNDERGROUND ROUGH FLUES & COMB. AIR PARTIAL ROUGH CONDENSATE DRAINS ROUGH COMPLETE FINAL APPLIANCE 1.p•Z ROOF DRAIN & LEADERS MAIN DRAIN FINAL GAS -J FINAL PLUMBING -7 7.n MISCELLANEOUS THE BLDG. OWNED BY RTIFICATE:OF COMPLETION 'BUILDING INSPECTOR'S OFFICE CITY QR,CUPERTINO (IJ 1�� BLDG�PERMITNO._ TED AT �.�� HAS BEEN-I'COMRLEED' FOR USE AS (ALTERED) • n CITY.0 F CUPERTINO - • OFFICE GAS`SERVICE NOTICE To u. You are hereby authorized to connect the GAS service for Owner or Tenant At ]/n .1 i New Servi No. of Meters Reconnect No. of Add. Meters Move Service Move !Meter PLUMBING INSPECTOR OO. / rC' CTRIC SERVICE NOTICE �� BUILDING INSPECTOR'S NOTICE 4Sgj- ` CITY O. CIIPERTINO — To 1,„ 4 You are herebyurhorized t Q,onnect electrical ser ice for �- Owner or Tenant At No. of Wires Size of Wires Size Motor Load Voltage Phas Heating Load K. W. Volt( OFFICE COPY 19 / f) of Switch 1 ("' OA Light 110�New Service / Reconnect No. of Meters ' 1 / \ i{I Heot �1L70 ///{�'''LThre4 Wire �� More Service No. of Add. Meters Power ThreePhase�l---Mov "Meter v ©• ELECTRICAL INSPECTOR "� 11023 Canyon Vista Drive Retaining Wall 63 NO. STREET LOT NO. CITY OF CUPERTINO' APPLICATION FOR BUILDING PERMIT SANITARY FILE NO. 51,322.2 DATE 2/13 19 78 Application is hereby made for a permit to Construct a story, type Block (4' x 240') to be occupied only as Retaining Wall in accordance with plot plan, plans and specification filed herewith. ESTIMATED VALUE OF IMPROVEMENTS $ 4,800 FEE $ 32.00 PLAN CHECK $ OWNER Gateway Const. ADDRESS 10850 Stevens Canyon Road PHONE 257-2572 Same PHONE STATE LICENSE APPROVED James H. Sisk/m BUILDING INSPECTION RECORD DATE INSPECTOR I I DATE INSPECTOR FOUNDATION I FLOOR STEEL PRE-GUNITE FRAME I BOND BEAMS LATH i �- WALLBOARDS - INT. 6 EXT. FIREWALLS MEMBRANE LANDSCAPING F.M.O. INSPECTION -MISC- M00RE 8Usl ELECTRICAL INSPECTION RECORD RESIDENTIAL DATE I INSPECTOR I COMMERCIAL DATE I INSPECTOR UNDERGROUND ROUGH UNDERGROUND ROUGH ROUGH WIRING ROUGH WIRING FINISH WIRING FINISH WIRING FIXTURES INTERIOR FIXTURES MOTORS EXTERIOR FIXTURES FINAL MOTORS MAIN DRAIN FINAL INSPECTIONS PLUMBING INSPECTION RECORD HEATING & A/C INSPECTION RECORD DATE I INSPECTOR i I DATE I INSPECTOR BACK FLOW REQUIRED UNDERFLOOR S.M. BACK FLOW INSTALLED DUCTS 8 INSULATION UNDERGROUND ROUGH FLUES & COMB. AIR PARTIAL ROUGH CONDENSATE DRAINS ROUGH COMPLETE FINAL APPLIANCE ROOF DRAIN 8 LEADERS MAIN DRAIN FINAL GAS FINAL PLUMBING _ MISCELLANEOUS 6-23 GiiNYC.t1 V/S7'0 DR LOT NO. G3 23 NO. STREET CIP! OF CUPERTINO ((((((VAL. CAP. l D P4 A�PPP/LIICATION FOR BUILDING PERMIT l FEE J f = Date CMS /za-r �� Building Per. No.si, t.2z z 0 I!6 t Story Per. No. 3U ApfficotijiJjtftnadefor apermit to G'anigo UG 7' _ a -story, Type.Q.(D G K y X .2 SAO � Structure ^ p LLO to be occJ'ip edLIPas ner'91/V 1AJ4 W 6A- t-• in accordance with a 'Z w Plans, Specifications and Plot -Plan filed herewith. aw Estimated Value of Improvements, 3�Q a u_ PI Ck Fee E O O It is hereby agreed that the requirements of the ..3a GC .n Cupertino Building and Zoning Ordinances and all Fee E p a other laws applicable to the construction, location, and Total Fee E Z use of buildings within the City of Cupertino will be ZO complied with. W Z �19-P�4JAY 72?? &1.1574 .7S-.22 16M STEtJsAlS CAn'✓e 0 211 OWNEj,_ PHONE ADDRESS 00 CONTR. OR AGENT AD RES — U PHONE STATE LICENSE BUILDING INSPECTOV G� 0 .. BUILD* INSPECTOR'S OFFICE • Bldg, Dept. ITY OF CUPERTINQ Office Copy ❑ Backflow Device 7 Sanitary Permit No. ❑ Sewer Connection r Plumbing Permit No� Q• Plumbing Final /�) < _ LojNo. Owner or Tenant At Date Connected I I 19 / Dare.Fin61 Z� u 19 i n' ©" PLUMBING INSPECTOR /, NO. STRe f CITY OF CUPERTINO -(vAL. C �Jf d AP.PLIrATION FOR BUILDING PERMIT FEE :' c: r _ W Doti y' Building Per. No. S Imo: 1,. L 19ZL. s� 0 Sanitar Par. No. lCoO 7 .T t 2.19 Co.vJT,�i,cT A �c.p.�/ O u tea on a hereby made for a permit to = O aritort, fype� M 4 G /9K. Structure /A O � to be occupied only ass/ uta -le FA I" I L�/ QUiA( in accordance with a Z Plans, Specifications and Plot -Plan filed herewith. a W Estimated Value of Improvements, EG, 000 PI Ck Fee S 0 0 It is hereby agreed that the requirements of the pp ut Cupertino Building and Zoning' Ordinances and all Fee $ at 03 other laws applicable to the construction, location, and Z g use of buildings within the City of Cupertino will be Total Fee E z complied with. 3 z OWN! PHONE a Q V CONTR. ORAGENT PHONE STATE LICENSE llD? 1J All�e L/ET Y l�(, LO Ni -CO .CEJ 3 NO. 'CITY OFCUPERTINO• '� YPLICATION FOR ELECTRICAL PERMIT c A 1/� O Permit No. Date �7`�„_ ` 119_ Fees J� Applicationj hereby made to the City of Cupertino for a permit to install electrical wiring and/or fixtures as listed on the reverse side hereof, and agrees to install said wiring and/or fixtures in accordance with the provisions of the Electrical Code of the City of Cupertino, and all other laws applicable thereto. Use of Work To Be Premises Performed Owner L (!!k7 Addrw �Qa �y IOF LAYI'4( Phone BY Contractor, Agem Address Phone 1,� State License Approved (SJ Elect Inspector I AGREE I WILL NOT VIOLATE ANY OF THE WORKMEN'S COMPENSATION LAWS OF THE STATE OF CALIFORNIA. 45 LA 6 OC 3 W Z H w Vy it in OE a O iL a 6 O O O N R, C< _ _ C L L S O O O O 0 0 E E C o x x x EEE Z Z Z Z K N Z Z i5 0 6 1102 .N ss• = LOT NO. NO, T CITY OF CUPERTINO c 6LICATION FOR APPLIANCE PERMIT Permit No. Date, 19 T -I Fee $ e�t-�� O O �� h Applicati6n is hereby made to the City of Cupertino for a permit to install gas appliances as listed on the reverse side hereof, and agrees to install said appliances in accordance with the provisions of the Plumbing Code of the City of Cupertino, and all other laws applicable thereto. Use of Work To Be Premise .sA;n i Performed .O hp,\Vixo--r0 bQrer�(Lta I, Owner qR-hsci1,= e4 Address N (,,aa 'E Q ere Phone By S :'r a 1-��Inn 1. a A li'C'. Address X11 _H A,YY L Q W1 , s.e Contractor, Agent Phone -574 -11A State License 1 `� S Approved Plumbing Inspector IQI AGREE I WILL NOT VIOLATE ANY OF THE WORKMEN'S COMPENSATION LAWS OF THE STATE OF CALIFORNIA. 0 L• N T � - ' LOT NO. G� TI'ir' CITY OF CUPERTINO ' A1PPLICATION FOR APPLIANCE PERMIT 19 I Permit No. Dote \�� , 19 7 Fee S 0 Application is hereby made to the City of Cupertino for a permit to install gas appliances as listed on the reverse side hereof, and agrees to install said appliances in accordance with the provisions of the Plumbing Code of the City of Cupertino, and all other laws applicable thereto. Work To Be Performed ,y/"-V-Ct�L ,ali / Address /") 9 S�+r.G+ 0 'K' t a.,,p+. Address /2 Jr% .tJ.l ec at --e- ag tt5 � State License oL9S 9'94 - C �i Approved " Plumbing Inspector I 1 AGREE I WILL NOT VIOLATE ANY OF THE WORKMEN'S COMPENSATION LAWS OF THE STATE OF CALIFORNIA. O '+ ti a a M i i 1 NDY Cil CUT OCT 17 19?7 'CITY OF CUPERTIINO APPLICATION FOR PLUMBING PERMIT P A 1 D �f Sanitary No. Date Q _ / / • 19 77 Permit No. Fee $ 4740 Application is hereby made to the City of Cupertino for a permit to install plumbing pipes and/or fixtures listed on the reverse side hereof, and agrees to install said prices and/or fixtures in accordance with the provisions of the Plumbing Code of the City of Cupertino, and all other laws applicable thereto. Use of s _J _ _ Work To Be State License -,�J _7 f' `%' Approved Plumbing Inspector I AGREE I WILL NOT VIOLATE ANY OF THE WORKMEN'S `j COMPENSATION LAWS OF THE STATE OF CALIFORNIA. ® LA $ o c N a ap' = V 3 3 m Y o 3 3 3 3 m 0 6 = M O -T W = a O Q J 6OY U > 0 Y O 0\ z L� ^y�� > W YY Q C ' 11) �U = ry� 1 LL O pQj N Q z c W O C a yy Y K a LL LL Y LL c O c C p F 0 � .n F 75 F LZ .n ao- z `° OL m w yYy LL IE 7 $ o c N a ap' = V 3 3 m Y o 3 3 3 3 m 0 6 = 1 o = a Q J > 0 Y v > 1 CUPERTINO SANITARY DISTRICT SANTA C L A R A COUNTY DISTRICT MANAGER -ENGINEER MARK THOMAS & CO. INC. JOHN E. FLEMING 20065 STEVENB CREEK BLVD. CUPERTINO, CA. 95014 (4O8) 253-7071 DISTRICT COUNSEL PHILIP D. ASSAF 630 N. Sax MATEO DRIVE P. O. SOX 152 SAN MATEO, CA. 44401 (415) 342-3523 Building Department City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 Gentlemen: BOARD OF DIRECTORS ROY M. RUSHTON, PREa. MAURICE F. LAURIE, SEC. CURTIS S. HARRISDN EDWARD J. HAHAMIAN DR. JOS. F. UROWN .1� ,� r` � fy -• I-� - March22, MR82 ^ 77} ��' File: CuSD 77-9�7707b) BLDG. CITY aFCCPE71;:0 Re: Lot No. 63, Tract No. 6096�-G-�.33 �. 6 CRancho Deep Cliff, Unit No. 3 11023 anyon xsta Court, Cupertino California Due to the redesign of the retaining wall along the westerly side of Canyon Vista Court, the sanitary sewer lateral con- structed to serve the subject lot is unusable. No physical connection of the house sewer for this lot shall be made to the existing sewer system until written permission is re- ceived from the Cupertino Sanitary District. Yours very truly, MARK THOMAS & CO. INC. District Manager -Engineer by William E. McBee BMc/ds cc: Department of Public Works (Cupertino) Attn: Bruce Donahue cc: Gateway Construction Company, Inc. PLO a , S ' txLLrc�s �P � I IDAT� , "LAIN . BLDG. DEPT. CUP�N ACCOROA ED CRrrNQWrr" COOEE ' Clrr Ofi `OA 7 / OP ANd o OINANCEs. 5 !.i • •Ile_ .. STA I MOL )ZS 3 . c8 tJe'� 5P-4'Wf!E ± FA7M °.t" � y `�,_ • .. ... *� ,.4'- S�r.�- t- - _ _ ;�.� -: l :alp -`at_ � �`=`�}.: _ 1CH;aRLES A. JOHNSON, C 0 N S U L TIN G C I VI L E N G I N E E R 8 4 0 5 U T T E R A V E N U E P A L O A LTO , C A L! F 0 R N! A 94303 January 27th, 1978 Gateway Construction 10850 Stevens Canyon Road Cupertino CA 95014 Attention Mr. Bill Evans Re: Rancho Deep Cliff Phase 111 Dear Bill: Paul Nowack's office is preparing a detail for the 6' retaining wall at the end of Ricardo Road. As directed by the soil engineer we have moved the drain tile down to the bottom of the keyway. We have increased the drain tile from 4"0 to 6"0 and drain rock from 12" to 18". These revisions will remove water from behind the wall which would interfere with the resistance to sliding. We recommend hotmopping the back of the wall to direct water down to the drain and preclude any seep agehrough the concrete block. The footing may ope4 as we discussed with the soil engineer. y, h Jonson s•�•UNITED SOIL ENGINEERING, INC. Soil, Foundation and Geological Engineers 3476 EDWARD AVENUE, SANTA CLARA, CALIFORNIA 95050 (408) 988-2990 File No. 5--909-54 January 27, 1978 Mr. Bill Evans 220 State Street, Suite C Los Altos, California 94022 Subject: Tract No. 6096 Rancho Deep Cliff Unit No. 3 Cupertino, California RECOMMENDATIONS FOR MATER PROBLEM NEAR RETAINING WALL Dear Mr. Evans: Per your request, I inspected the site and reviewed the details for concrete block retaining wall prepared by Paul Nowack and Associates, Inc. for Tract 6096, Rancho Deep Cliff, Unit No. 3, in Cupertino, California. After inspecting the site and reviewing the details, we recommend that 6" diameter perforated pipe be placed at a level lower than the bottom of the key. A layer of 6 inches of rock should also be placed beneath the key. A gravel layer should be continued all the way behind the retaining wall. This would take care of the seepage water and keep the water level lower than the pipe level. All the other details should be kept as shown on the pian. If you_have any questions, please feel free to contact us at your conven- ience. Very truly yours, UNITED SOIL. ENGINEERING, INC. GG '�r'� uhammad �HuP.E. kre Copies: 2 to Mr. Bill Evans INTRA -OFFICE MPO { TO; 13u 6 �Pr, DATE; JAM ACTION: �i.�r9,,L.IV � �G D�-r =• c�R�u�r r9,P�r�� � z,��c�- I,-ra . _0 I= ��� poi - Gca M �Lcc. w•ri' Go.v AD Lfi,pA Lv?LMIMNT Q C►-�ArG_ L �.�. � f`1 ►v C �l•H'ir � L-j-�L6 �,l--f- � 4t f-�- IINN EsTIA01"cl-1-Y DISCUSS R PORT REPLY 3c .4W Signe TO; DATE. - REP LY ATE;REPLY Signed { J. 4 r, —. -- .� �: �!� r� '"�" "-�,�' .`*A n - REv�SPM#saJ j ndtrGE 4±R SJ DE YQLt�NFD fJR A2JSF"P0h J 1X DTSMD JAA 7RFFS AIR N3 aYAJrN. ilAERATrJNF, .(:AL :4b .q -_=-^a. .,:„.. p 14113- �DDn .vmr�Dfy�roa',yepeerc xearn. ntmxr,n rarfnur, A,,tq, be xe 6 p i re Mmefo aaF 3rn m e agn✓r 1 OASLID s ilr J"'/JWnif i a»cru fgfii/ bna. �,� .; :<.�. `%� `/n fmn fshr ar une. -uyn rs, f p x sYd6ee .lrMtldel a ah grrrra=�;o.j -'—` { j,� ;;� ... �`'—� � %NrM' # M..^�+c lDdxd me4e &octad rhrl or vaJr.+'ypmoys a�{,w,.q'�xrli ayuro✓eet !v ••'�. { �"-• lb#Gv,rr A' /d fhv�v.»fd Y E Fa omPf�1.. J,fe..asx^{e: 1A1r /FA16" Sa _ c :^ PR ���� P R rniwFc wnu Y � - . � � f9F f wAferif-p, r ¢ frM/� aff, ©er Yh/ yasaAes at IF "rArtl AP /hr rn�awvl+d.'lr7y ef»1a du rc# �'^'A ,'`' 4 A5'F.Y Jia �c: ,rCn ars 9,zmaMresma ai/s,if er.l'bsole¢mrtrsseruta a•rsp,iyrrm th'rron ,.. ,"„ -e'_ �, •- . 5 a�,ek' zb>n.�r hrrs,n �, a,aMt!=raoM baa �firu ria;7yrncgg �n,5 :,.'. - � r s, ✓mr,¢su vra ,u:,r, ahrY#,ar.wer-�rr„srafs6arrpY.r�evrxyoes"re A�ur/ksuw+,aw�nevf eamfr>{iwer. 4YPIGA4 ORIV@WAY ;3BGT1CtN " DDS ' a#a nacvvvassN 9{ � � J +if E,e54;15 ae•9 S PiW1 t niS FaJ+n<ar darrS Anfuir$R. /A7S I . 1 & t �3rLE G.oP 4T{ f so0 uY d fGs J i cii�/ i .a ua. 4 aJ• 4,r,m, _— _ x 2 .2 a �• av'� '� Sa ,+Oe � 6a yrnaaa an6p�ah.>ed y cavra�rwv tpnrr va i, rrr ay rr r.�syrxar -.Qm, .'' - Dae - #9�,N• r � _ : u 6r �.. a4M •., aE�re ax w/n'imwn ..et.+a¢ ID 1 a� Tiu u"90Al_vg4M 423 6.k5wr 4E6EA{T 'r tti.4"#�fSb1AcA# MiS "x`S .' (, •M• �L... ...Z.,..J:'8�,..,� r`Y' A'vP AA 1...V^i_ 09.11 `v\..•43E2 j 6UI €4 3 D .ff RJ GNs I ..+tAs.-,,a.Y De M1IvYhid M,ayy, ^u hSch ##@':5 - i r3:Weg rAA'a tk' Yfia x f '•'� 5� •a E 0.+2 4E .-<, rf B ?CX Rf7 , Y3 iY t � � t D '� h ✓F AA 1V EU I -J i,A "-. • ,F . /' ,,C� t- " 0 1a N' Pf t ' / f wvF �g -0,: ✓. J Z ;� -J P.�3 b J �%ON d V' .A f,, .: S 't/ w s �pn Lf7 /I Int y� ,iL �/ 11x;}4 IfX �. . j,,,- 1N4 t - rv'�' i V•., 9�i 05 45.99 - ^x`z w "w,:Y r Q. �:,,}! 5 •'� 9t. A!.1 r`i f' tt l-, i 1 .�-a'*e. r x..:Q �{5.f� y- /`j ]-,. t� (. S � �,��fN,./• ,,�,. ±' n ��t '', '� ".��� /"� r'f' "+.v arses me z,, � f �'} _, v � sa `' id e� :mre: \ � ,.,, "� , , , �✓ ,,,cs r� d, i gfi � ._S`r�� .e. W L,� 4�Iiitlra: z Lr ry rl. s 45 � : •241 ai r ._ _�,.—.-_ — — ( zi r r A PAUL E. NOWACK AND ASSOC., INC. CIVIL ENGINEERS -SURVEYORS 224 STATE STREET SUITE E R' TRAC xI � P8 RANCHO DEEP 4FF UNIT - ' LOS ALTOS, CALIFORNIA 94022 OF 4 CALIFORNIACITYCUPSRTI 415/941-2626. .. ^;E".. s - 3 CUPERTINO SANITARY DISTRICT SANTA CLARA C13UNTY DISTRICT MANA13ER-ENDINEER MARK THOMAS & CO. INC: JOHN E. FLEMIND 20065 6TEVEN9 CREEK BLVD. CUPERTITID, CA. 95014 140B) 253-7071 DISTRICT COUNSEL PHILIP D. ASSAF 650 N. SAN MATED DRIVE P. 0. 913x 152 SAN MATED, CA. 944MI [4151 342-3523 Building Department City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 Gentlemen: i BCARD DF DIRECTORS DR. JOS. F. BROWN, PRC6. ROY M. RUSHTON, Ser. MAURICE F. L.A BRIE CURTIS B. HARRISON EDWARD J. HAHAMIAN December 12, 1977 File: CuSD 77-9 (77076)' Re: Tract No. 6096, Rancho Deep Cliff Unit No. 3 Please be advised that the testing of the sanitary sewers constructed to serve the subject project has been completed. Therefore, physical connection of the building sewer line to the lateral sewer may now be made for all lots within the subdivision. Yours very truly, MARK THOMAS & CO. INC. District Manager -Engineer by William E. McBee BMc/ds cc: Gateway Construction Company, Inc. City of Cupertino f. INTER -OFFICE MEMO To: Travice Whitten, Assistant City Engineer From: John Busto, Chief Building Inspector Subject: Street Name Change at Rancho -Deep Cliff I am requesting the street name to read Canyon Vista Drive, which is -now shown on the tract map as Canyon Vista Court in Tract No. 6096, Rancho Deep Cliff Unit No. 3. Canyon Vista Drive was originally proposed and submitted to County Communications, Post Office, etc. and for some reason the tract map was recorded as Carron Vista f Court. . S RANCHO DEEP CLIFF HOME OWNERS ASSOCIATION 10873 Canyon Vista Drive Cupertino, California 95014 December 8, 1977 City of Cupertino Cupertino, California Attention: Mr. John Busto Chief Building Inspector HERE DEC 12 197 BLDG. CITY 0 ; CUPERTIi�4 DEPARTMENT Subject: Proposed Modification of Planting Plan for Rancho Deep Cliff Phase III Dear Sirs: We have reviewed the plan and wish to favor the deletion of the artificial stream and ponds. We feel that it is a complete waste of water and energy. The proposed modification of planting this area and the hillside meets with our approval. Please show that the Rancho Deep Cliff Home Owners Association as being in full support of this modified plan. Very truly yours, Rancho ep iff e Owners Association artin Anders President MA: em GATEWAY CONSTRUCTION CO. GERALD M. SCHWARTZ, PRESIDENT JAMES R. REGNOLDS, VICE PRESIDENT 4600 EL CAMINO REAL • LOS ALTOS, CALIFORNIA . TEL: (415) 941-0950 December 8, 1977 City of Cupertino Cupertino, California Attention: Mr. John Busto Chief Building Inspector DEC 12 1977 Re: Proposed Modification of Planting Plan for Rancho Deep Cliff Phase III BLDG. INSPECTIUN DEPARTMENT Dear Sirs: CITY OF CCPERTINO Please consider our proposed plan. The original plan shows an artificial stream bed and storage ponds at either end. This is located in an area behind 5 units of the Phase II units and below 4 units in Phase III. It is now very apparent this would be of insignificant benefit to the over all esthetics. Noting that the location is directly behind the patio walls of the lower units and out of vision of the upper units; even these adjoining units would lack much direct benefit. More important in view of energy conservation, the use of this sub- stantial water and pump energy does not appear to be appropriate or warranted today. We have reviewed this with the Rancho Deep Cliff Home Owners Association. They have agreed the water and electric conservation is important and that the revised landscape plan is pleasing and an improvement of the original. We would appreciate your early consideration of this proposal, so that our landscape team can tackle the hillside landscape and possibly install it prior to our hoped for heavy rains. JRR: em Sincerely, Gateway Construction Co. James R. Regnolds Vice President i r 4 � 0e it ir' f �► �1 August 11, 1977 l r Job No. 7153 Y Department of Public Works City of Cupertino 10300 Torres Avenue Cupertino, CA 95014. R E. NOWACK AND ASSOCIATISS, INC. CIVIL -ENGINEERS _ LAND SURVEYORS 220 STATE STREET, SUITE E LOS ALTOS, CALIFORNIA 94022 (415) 541-2626 F; 6 I UNITED SOIL ENGINEERING, INC. Soil, Foundation and Geological Engineers 3476 EDWARD AVENUE, SANTA CLARA, CALIFORNIA 95050 (408) 988-2990 File No. 6-909-S2 August 4, 1977 l�,rrr 0:? Mr. Bill Evans 10850 Stevens Canyon Road Cupertino, California 95014 Subject: Proposed Residential Development Cupertino, California TESTING AND INSPECTION DURING GRADING Dear Mr. Evans: fF3 CITY Of CUPS `r`qi?ri11&Vf TI 6 Per your request, our firm has provided testing and observation services during grading operations for the proposed residential development, Tract No. 6096, located on the south side of Stevens Canyon Road near Deep Cliff Drive in Cupertino, California. The work commenced with the general removal and stockpiling of the organi- cally contaminated topsoil. The area designated to receive engineered fill was stripped of all organic material and the exposed surface was scarified to a minimum depth of 8 inches and recompacted to 90% relative compaction in accordance with the soil investigation report prepared by our firm, File No. 6-909-S1, dated August 22, 1975. Field density tests obtained by our firm indicated that adequate compaction was being obtained on the building pad areas during grading operations. The results of these tests, on which acceptance is based, show values in excess of 90% relative compaction for native soil according to the laboratory test procedure ASTM D1557-70. In summary, the proposed building pads are now acceptably completed according to field grade stakes and the recommendations of the previously mentioned soil investigation report, and are ready to receive building improvements. file No. 6-909-S2 Aug+st 4, 1977 Summarized in Table I are the results of the field tests performed by our firm to date. Very truly yours, UNITED SOIL ENGINEERING, INC. Farhang Hamedi-Fard Project Engineer �. S � 1U�.�lt.lh�'ft10�d �USSC1J,sr1, Muhammad Hussain, P.E. FHF:MH:pml Copies: 4 to Mr. Bill Evans 2 United SoiI Engineering, Inc. File No. 6-909-S2 TABLE I SUMMARY OF FIELD DENSITY TEST RFSULTS Dry Test Date Pad No. and Moisture Density Rel. Comp Soil Type No. 1977 Elevation % Dry wt. p.C.f. 0% of Max. & Remark 1 7/22 51-52 8.5 107.0 90.4 A Natural Ground 2 7/22 49-50 12.3 109.5 92.5 A Natural Ground 3 7/25 51-52 13.4 108.5 91.6 A Finished Grade 4 7/25 49-50 8.5 118.0 92.2 B Finished Grade 5 7/26 61-63 8.6 116..0 90.6 8 Natural Ground 6 7/26 61-63 13.7 104.0 92.1 A First Lift 7 7/27 61-63 11.7 1'll.D 93.7 A Finished Grade 8 7/28 53-56 9.9 111.0 93.7 A Natural Ground 9 7/28 53-56 8.6 116.0 92.2 B First Lift 10 7/29 59-60 8.5 117.0 91-.4 B Finished Grade 11 7/29 57--58 9.6 115.0 97.1 A Finished Grade - 12 8/1 56-58 9.6 115.0 97.1 A United Soil Engineering, Inc. 3 Filt No. 6-909-52 r United Engineering, incorporated t 12 11 5 9 .13 17 21 25 Moisture Content - (% of Dry Weight) SAMPLE: A DESCRIPTION: Brown gravelly sandy CLAY LABORATORY TEST PROCEDURE: ASTM D1557-70 -MAXIMUM DRY DENSITY: 118.4 p.c.f. OPTIMUM MOISTURE CONTENT: 14.0% Fig. 1 - Compaction Curve "A" 4 rani i-mrl it Engineering, incorporatec Fig. 2 - Compaction Curve "B" SIO/ 3 C4 OAA UIT/f • UQ LOT NO. 3 ✓ f NO. STREET CITY OF CUPERTINO C" or a;APP.LICATION FOR ELECTRICAL PERMIT � JE1N 9 - 1978 Permit No. Date —19— Fee S 1000 Applica on°i3' hjrebyy made to the City of Cupertino for a permit to instal electrical wiring and/or fixtures as listed on the reverse side hereof, and agrees to install said wiring and/or fixtures in accordance with the provisions of the Electrical Code of the City of Cupertino, and all other laws applicable thereto. Pre of SI/GLE Fl¢li//L Performed Bed 14GEC L Prcmiwa %�� �� Porformed �j r�f� Owner. /T�%E W4y Address 1,04<—(L.,R!Z) Phone �' By Heleu Electrical Cuulraclure. Inc. Address J/ J vaf'e—� Contractor, Agent Phone ;Z " � — a a as State License C•10 439906 Approved I AGREE I WILL NOT VIOLATE ANY OF THE WORKME S U J" COMPENSATION LAWS OF THE STATE OF CALIFORN . 1CI1111l1111111111111111111�11� F = 3 Z u E O N LL S. LL r d C -0 .E Y O L E E E E Z Z Z % K N Z ZY°- d