Loading...
HomeMy WebLinkAboutAH Summary 03-08-2012 OFFICE OF COMMUNITY DEVELOPMENT ��. CITY HALL 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 C U P E RT 1 N O (408)777-3308•FAX(408)777-3333•planninq@cupertino.orq To: Mayor and City Council Members Planning Commissioners From: Aarti Shrivastava, Director of Community Development Date: March 12, 2012 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE March 8, 2012 Chapter 19.12 of the Cupertino Municipal code provides for A eal of decisions made at an Administrative Hearin 1. Application TM-2012-02, TR-2012-07, Mike McClellan (Susan Beslet), 21185 Rainbow Drive Description Tentative Map Permit to subdivide a .67 gross acre parcel into 3 lots ranging from 6,550 to 6,797 square feet; Tree Removal Permit to allow the removal of one Deodar cedar and four Coast Live Oak trees in conjunction with a 31ot subdivision Action The application was approved at the Administrative Hearing. The approval is effective March 8, 2012. The fourteen-calendar day appeal will expire on March 26, 2012. Enclosures: Administrative Hearing Report of March 8, 2012 Resolution No(s) 1 &2 Plan set OFFICE OF COMMUNITY DEVELOPMENT CTTY HALL 10300 TORRE AVENUE • CUPERTINO,CA 95014-3255 C U P E RT 1 N O (408)777-3308 • FAX(408)777-3333 • planning@cupertino.org ADMINISTRATIVE HEARING STAFF REPORT Agenda Item No. � Agenda Date: March 8,2012 Applications: TM-2012-02,TR-2012-07 Applicant: Mike McClellan(Susan Beslet) Project Location: 21185 Rainbow Drive (NW Corner of Rainbow Drive and Charsan Lane) Application Summary: 1. Tentative Map (TM-2012-02) to subdivide a .67 gross acre parcel into three (3) lots ranging from 6,550 to 6,797 square feet;and 2. Tree Removal Permit (TR-2012-0� to allow the removal of one (1) Deodar Cedar, one (1) Monterey Pine, one (1) Afghan Pine, one (1) Holly Oak, and five (5) Coast Live Oak trees in conjunction with a three (3) lot subdivision RECOMMENDATION: Staff recommends that the Director of Community Development: Approve the Tentative Map (TM-2012-02) and Tree Removal Permit (TR-2012-0� per the draft resolutions. PROJECT DATA: General Plan Designation Low Density(1-5 DU/Gross Acre) Zoning Designation R1-6 (Single-Family Residential,6,000 square feet minimum size) Existing/Proposed Land Use Single-Family Residential Total Existing Gross Lot Area .67 acres(29,185 square feet) Total Existing Net Lot Area .50 acres(21,780 square feet) (prior to 10'dedication) Proposed Net Lot Areas: Lot A .15 acres (6,550 square feet) Lot B .15 acres(6,550 square feet) Lot C .16 acres(6,797 square feet) Existing Density 1.49 DU/Gross acre Proposed Density 4.47 DU/ Gross acre Project Consistency with: General Plan Yes Zoning Yes Environmental Review Categorically Exempt per Section 15315,Class 15(Minor Land Divisions)of the California Environmental Quality Act(CEQA) BACKGROUND: Site Description The subject property is located at the northwest corner of Rainbow Drive and Charsan Lane, and is surrounded by single-family homes. The other homes on Charsan Lane were built as part of a TM-2012-02,TR-2012-07 Rainbow&Charsan Subdivision March 8,2012 Page 2 subdivision in 1980s. Currently the site consists of a one-story single-family residence with a pool and a shed at the rear of the property. The home is accessed by a circular driveway along Rainbow Drive that leads to the residence. All of the existing structures are proposed to be demolished prior to the recordation of the final map. DISCUSSION: ° �• Subdivision Design The project proposes to create three � lots that are oriented in a north to � south direction along Charsan Lane. Main access to Lots A and B are from �: , � . Charsan Lane. Vehicular access to ��F the corner lot Lot C will be from ` „�.- 'w�� ( ) �6� ��; � Rainbow Drive. The driveways for �� {, .�-� _ z ; all three lots will be placed in ��� alternating locations so that two ����� ������� �� ���� ;� driveways will not be located next to each other. The ro osed lot attern '° g P P P Ag � is consistent and compatible with the �' ,. _ _ .. . s..,_. . . �,a.. surrounding neighborhood. � ' ��, Conformance with General Plan and ;; ,a,� s,;;�, Zoning � �=� u The project is consistent with the � . " General Plan density allowing a Site Aerial maximum of three (3) dwelling units on the site based on its gross acreage. The project meets the minimum 6,000 square foot lot size and the 60 feet lot width requirements as prescribed by the R1-6 zone.The proposed lots range from 6,550 to 6,797 square feet in size. Site Improvements The project is proposing the construction of a new detached sidewalk along both Rainbow and Charsan. Ten feet of Charsari s frontage will be dedicated for a new curb, gutter, sidewalk, and landscape strip. The applicant will work with staff at the time of the residential design review on the number, location,and species of the new street trees within the landscape strip. Conceptual House Plans Conceptual site plan and elevations for all three lots have been provided to demonstrate that the new lots can facilitate reasonable and compatible house designs. The architectural details illustrated in Attachment 1 are intended to represent the level of design quality anticipated for the future residences. The details are attractive and will enhance the neighborhood. The final site, floor plan, landscaping, and elevation design for the three new homes will go through another public review under separate Two- Story/Residential Design Review applications, and the applicant is expected demonstrate similar levels of design qualities and features at that time. The applicant has agreed to a condition that requires full planning approval for all three homes prior to recordation of the final map. Tree Removals Five (5) private specimen trees and four (4) street trees are proposed to be removed as part of the project. Generally the reasons for these removals are due to poor health and locations in the necessary public TM-2012-02,TR-2012-07 Rainbow&Charsan Subdivision March 8,2012 Page 3 improvement or building areas. Eighteen (18) non-protected trees are also proposed for removal, some of which are insignificant in size or not suitable for transplanting. The City's Consulting Arborist reviewed and concurred with the project's removal request (Attachment 2). The arborist recommended that a specimen Oak tree (Tree #89) located at the rear of the property be retained. The final location of the tree replacements will be reviewed by staff in conjunction with the full submittal of the design review for the three (3) homes at a later date. Other Department/Agency Review The City's Public Works Department, Building Division, the Santa Clara County Fire Department, and the Cupertino Sanitary District reviewed the proposal and have no objections to the project. Their pre- hearing comments have been incorporated as conditions of approval. The Cupertino Sanitary District states that sanitary sewer service can be provided to the proposed parcels via Charsan Lane. Outreach/Noticing The City sent out notices to property owners within 300 feet of the property. Notice posters were also placed on the trees proposed for removal. No public comments were received at the time of staff report production. Prepared by: George Schroeder,Assistant Planner� Approved by: Gary Chao,City Planne ��^ Attachments Draft Resolutions Attachment 1: Conceptual site plan and elevations Attachment 2: Arborist's Report dated February 4,2012 Plan Set CITY OF CUPERTINO 10300 Torre Avenue Cupertino,California 95014 RESOLUTION N0. 1 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO SUBDIVIDE A .67 GROSS ACRE PARCEL INTO THREE LOTS RANGING FROM 6,550 TO 6,797 SQUARE FEET AT 21185 RAINBOW DRIVE (NW CORNER OF RAINBOW DRIVE AND CHARSAN LANE) SECTION I: PROTECT DESCRIPTION Application No.: TM-2012-02 Applicant: Mike McClellan(Susan Beslet) Location: 21185 Rainbow Drive (APN#362-10-052) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Meeting of the City of Cupertino received an application to allow a Tentative Map to subdivide a .67 gross acre parcel into three (3) lots ranging from 6,550 to 6,797 square feet. WHEREAS,the Administrative Hearing Officer finds: 1) That the proposed subdivision map is consistent with the City of Cupertino General Plan. 2) That the design and improvements of the proposed subdivision are consistent with the General Plan. 3) That the site is physically suitable for the type and intensity of development contemplated under the approved subdivision. 4) That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and unavoidable injure fish and wildlife or their habitat. 5) That the design of the subdivision or the type of improvements associated there with is not likely to cause serious public health problems. 6) That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. NOW,THEREFORE,BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter,the Application No. TM-2012-02,is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application TM-2012-02 as set forth in the Minutes of the Administrative Hearing Meeting of March 8, 2012, and are incorporated by reference herein. Resolution No. 1 TM-2012-02 March 8,2012 Page 2 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled, "Rainbow Subdivision,T'hree Lot Residential Subdivision, APN 362-10-052;' dated February 22, 2012 drawn by Westfall Engineers, Inc. consisting of four (4) sheets labeled "Tentative Map- Title Sheet;' "Tentative Map;' "Site Development Plan," and "Demolition Plan;' except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. DEVELOPMENT APPROVAL AND ALLOCATION Approval is granted to subdivide a .67 gross acre parcel into three (3) lots ranging from 6,550 to 6,797 square feet. The City shall deduct two residential units (to account for the project's net increase of two units) from the General Plan allocation for"Other Neighborhoods." 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TR-2012-07 shall be applicable to this approval. 5. BELOW MARKET RATE HOUSING PROGRAM The applicant shall participate in the City's Below Market Rate (BMR) Housing Program by paying the housing mitigation fees as per the Housing Mitigation Manual. The mitigation fees for this project shall be based on the 2011-2012 fiscal year rate of$2.75 per square foot of net addition. 6. PLANNING PERMITS REQUIRED FOR NEW HOMES The applicant and/or owner shall obtain the appropriate approvals from the City for all of the proposed residential homes prior to recordation of the final map. Proposals for two-story residences shall be subject to either a Two-Story or Residential Design Review permit per the Single-Family Residential (R1) Zoning Ordinance prior to applying for building permits. The proposals shall closely resemble the quality and design as indicated on the conceptual drawings submitted with the application for TM-2012-02. 7. DEMOLITION OF STRUCTURES Prior to recordation of the final map, the applicant shall demolish and remove all structures on the property. All demolished buildings and site materials shall be recycled to the maximum extent feasible. The applicant shall provide evidence that materials will be recycled prior to issuance of demolition permit. 8. GREEN BUILDING The City recommends that the applicant incorporate green building measures into the project. The green building measures may include but not be limited to: low VOC paints, maximizing recycled building materials, solar efficiency/energy, energy efficient windows/appliances/mechanical equipments,maximizing onsite water retention,and draught tolerant and pest resistant landscaping. Resolution No.1 TM-2012-02 March 8,2012 Page 3 9. CONSTRUCTION MANAGEMENT PLAN Final map improvement plans shall include a construction management plan detailing how construction activities will be conducted. The plan shall address, but not be limited to the following activities: a. Construction staging area (shall not occur within 15 feet of neighboring residential property lines) b. Construction schedule and hours c. Construction phasing plan,if any d. Contractor parking area e. Tree preservation/protection plan f. Site dust,noise and storm run-off management plan g. Emergency/complaint and construction site manager contacts 10. TREE PROTECTION MEASURES The project shall incorporate the recommended tree protection measures contained in Consulting Arborist Michael Bench's arborist report dated February 4, 2012. Michael Bench or another ISA- certified arborist shall confirm that the tree protection measures are in place prior to construction and demolition and shall confirm the health of the existing tree(s) to remain following construction. 11. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits for the new homes, the applicant shall submit a full landscape project submittal per section 14.15.040 of the Landscaping Ordinance. The Water-Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. 12. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow,and preparation of an irrigation schedule. The landscape installation report shall include the following statement: The landscape and „ irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." 13. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC,Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee,either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; Resolution No.1 TM-2012-02 March 8,2012 Page 4 replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size- adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water,nutrients,pest control or other factors as recommended by a landscaping professional. 14. UTILIT'Y STRUCTURES All new utility structures shall be required to be located underground or screened from public view. 15. CONSTRUCTION HOURS Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays. The developer shall be responsible for educating all contractors and subcontractors of said construction restrictions. Rules and regulation pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of a developer appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. 16. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 17. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 18. NEIGHBOR NOTIFICATION The Developer shall notify property owners on Charsan Lane about the three new homes associated with this approval. Proof of notification shall be provided to the City. 19. NOTICE OF FEES,DEDICATIONS,RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1),these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. PEDESTRIAN CROSSWALKS The developer shall provide pedestrian crosswalk improvements across Charsan Lane (between curb ramps). Final crosswalk improvement plan shall be reviewed and approved by the City Engineer. Resolution No. 1 TM-2012-02 March 8,2012 Page 5 2. STREET WIDENING Public street widening and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. A 10-foot dedication will be required along Charsan Lane. 3. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 4. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. A street light will be required along Charsan Lane at the North-Eastern corner of the project site. 5. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 6. DRAINAGE � Drainage shall be provided to the satisfaction of the City Engineer. Hydrology and pre- and post- development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include,but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. The storm drain system shall be designed to detain water on-site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of the one percent flood water surface elevation to the satisfaction of the City Engineer. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. 7. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 8. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees,including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking&Inspection Fees: $Per current fee schedule ($2,542.00 or 5%) b. Grading Permit: $Per current fee schedule ($2,387.00 or 5°/a) c. Development Maintenance Deposit: $1,000.00 Resolution No.1 TM-2012-02 March 8,2012 Page 6 d. Storm Drainage Fee: $TBD e. Power Cost: ** f. Map Checking Fees: $Per current fee schedule ($3,878.00) g. Park Fees: $Per current fee schedule ($11,250.00) h. Street Tree By Developer **Based on the latest effective PG&E rate schedule approved by the PUC Bonds: a. Faithful Performance Bond: 100% of Off-site and On-site Improvements b. Labor&Material Bond: 100% of Off-site and On-site Improvement c. On-site Grading Bond: 100% of site improvements. The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 9. TRANSFORMERS Electrical transformers, telephone vaults and sunilar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. The transformer shall not be located in the front or side building setback area. 10. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 11. NPDES CONSTRUCTION GENERAL PERMIT When and where it is required by the State Water Resources Control Board (SWRCB), the developer must obtain a Notice of Intent (NOI) from the SWRCB, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality,and BMP inspection and maintenance. 12. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a m;nimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatrnent,on the tentative map,unless an alternative storm water treatxnent plan, that satisfies C.3 requirements,is approved by the City Engineer. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs),which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. Resolution No.1 TM-2012-02 March 8,2012 Page 7 13. EROSION CONTROL PLAN The developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 14. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 15. OPERATIONS AND MAINTENANCE AGREEMENT The developer shall enter into an Operations&Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include,but is not limited to, sidewalk, pavers,and street lights. 16. TRAFFIC CONTROL PLAN T'he developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City.The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 17. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 18. TRASH ENCLOSURES The trash enclosure plan must be designed to the satisfaction of the Environmental Programs Manager. Clearance by the Public Works Department is needed prior to obtaining a building permit. 19. REFUSE TRUCK ACCESS The developer must obtain clearance from the Environmental Programs Manager in regards to refuse truck access for the proposed development. 20. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the City Engineer and shall be of a type approved by the City in accordance with Ordinance No. 125. 21. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 22. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. 23. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 24. SAN TOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval before issuance of a building permit approval. Resolution No. 1 TM-2012-02 March 8,2012 Page 8 25. DEDICATION OF WATERLINES The developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water Company for water service to the subject development. 26. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 27. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E,PacBell, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. SECTION VI: CONDITIONS ADMINISTERED BY THE CUPERTINO SANITARY DISTRICT 1. SANITARY SEWER SERVICE Sanitary sewer service is available for the parcels along Charsan Lane. 2. IMPROVEMENT PLANS Improvement plans for the subject project shall be submitted to the District for review. 3. FEES AND PERMITS Cupertino Sanitary District Fees and Permits shall be required for the subject application. PASSED AND ADOPTED this day of March 8, 2012 at a Regular Meeting of the Administrative Hearing Meeting of the City of Cupertino,State of California,by the following roll call vote: AYES: HEARING OFFICER: Aarti Shrivastava NOES: HEARING OFFICER: none ABSENT: HEARING OFFICER:none ATTEST: APPROVED: /s/George Schroeder /s/Aarti Shrivastava George Schroeder Aarti Shrivastava Assistant Planner Community Development Director CITY OF CUPERTINO 10300 Torre Avenue Cupertino,California 95014 RESOLUTION NO. 2 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW THE REMOVAL OF ONE DEODAR CEDAR,ONE MONTEREY PINE,ONE AFGHAN PINE,ONE HOLLY OAK,AND FIVE COAST LIVE OAK TREES IN CONJUNCTION WITH A THREE LOT SUBDIVISION AT 21185 RAINBOW DRIVE (NW CORNER OF RAINBOW DRIVE AND CHARSAN LANE) SECTION I: PROTECT DESCRIPTION Application No.: TR-2012-07 Applicant: Mike McClellan(Susan Beslet) Location: 21185 Rainbow Drive (APN #362-10-052) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Meeting of the City of Cupertino received an application to allow a Tree Removal Permit to allow the removal of one Deodar Cedar, one Monterey Pine, one Afghan Pine,One Holly Oak,and Five Coast Live Oak trees in conjunction with a three lot subdivision. WHEREAS,the Administrative Hearing Officer finds: 1) That the trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential structures, or interferes with private on-site utility services and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility services; 2) That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the trees. 3) That the protected tree(s) are a detriment to the subject property and cannot be adequately supported according to good urban forestry practices due to the overplanting or overcrowding of trees on the subject property. NOW,THEREFORE,BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter,the Application No. TR-2012-07,is hereby approved;and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application TR-2012-07 as set forth in the Minutes of the Administrative Hearing Meeting of March 8,2012, and are incorporated by reference herein. Resolution No.2 TR-2012-07 March 8,2012 Page 2 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the arborist report entitled, "An Evaluation of the Existing Trees, Rainbow and Charsan Subdivision, 21185 Rainbow Drive, Cupertino, California;' dated February 4, 2012 by Michael L. Bench, Consulting Arborist, and except as may be amended by conditions in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TM-2012-02 shall be applicable to this approval. 3. REQUIRED TREE REPLACEMENTS The applicant shall be responsible for the following tree replacements,in accordance with the City's Protected Trees Ordinance: Removed Tree Re uired re lacements 13" Coast Live Oak Tree 73 Two 24" box trees 13" Coast Live Oak Tree 82 Two 24" box trees 6/5" Coast Live Oak Tree 88 One 24" box tree 15" Coast Live Oak Tree 95 Two 24" box trees 10" Deodar Cedar Tree 80 One 24" box tree 7" Coast Live Oak Tree 72 One 24" box tree 11" Montere Pine Tree 76 One 24" box tree 8" Holl Oak Tree 78 One 24" box tree 12" Af han Pine Tree 79 One 24" box tree The final planting plan shall be reviewed and approved by the Director of Community Development and the Director of Public Works prior to the Two-Story Permit approval. The plan shall consider the following: Coast Live Oak street trees, native/drought tolerant species and visibility for safety purposes. The required replacement trees shall be planted prior to final occupancy of the new homes associated with file no. TM-2012-02 and subsequent planning permits. The Director of Community Development shall have the discretion to require additional tree replacements as deemed necessary.The final tree replacement plan shall be reviewed and approved prior to final building approval. 4. TREE REPLACEMENT BOND The applicant shall provide a tree replacement bond in an amount determined by the City Arborist prior to removals and issuance of demolition and grading permits.The bond shall be returned after the required tree replacements have been planted and verified by the City Arborist. 5. NOTICE OF FEES,DEDICATIONS,RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a Resolution No.2 TR-2012-07 March 8,2012 Page 3 protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this day of March 8, 2012 at a Regular Meeting of the Administrative Hearing Meeting of the City of Cupertino,State of California,by the following roll call vote: AYES: HEARING OFFICER: Aarti Shrivastava NOES: HEARING OFFICER: none ABSENT: HEARING OFFICER:none ATTEST: APPROVED: /s/George Schroeder /s/Aarti Shrivastava George Schroeder Aarti Shrivastava Assistant Planner Community Development Director LEGEND EXISTING PROPOSED � HULDING � • M�NUMENT� • ❑ CURB INLET ■ O AREA DRAIN • ° POLE • O SANITARY SEWER MANHOLE � OO STORM DRAIN MANHOLE O « FIRE HYDRANT � � WATER VALVE e � STREET LIGHT � O CLEANOUT � HOUNDARY LOT LINE -'-'-'-'- CENTERLINE ------- LIMIT OF EASEMENT ----- `°�"°"°a"'°`�"° CURB =_'=_____-__= CURB AND GUTTER ""'-"""-""-"- EDGE OF PAVEMENT - CONTDUR FENCE ------ ---�-�--�--- FLOW LINE ---------- SANITARY SEWER -•-•-•---•----- -------�----�_ STORM DRAIN ---•-•-------•- _��_,_,_.__�__�- ELECTRICAL -�-•-�-�-•-•-•-�_ __.__�___.____ GAS -�-_.��.�_ WATER -�-----�-�-- ABBREVIATIONS AD AFtEA DRAIN BC BEGINNING OF CURVE BVC BEGINMN(}OF VERTICAL CURVE CL CHNTERLINE CO CLEANOUT CONSTR CONTRUCT EC END OF CURVE &X EXISTING EVC END OF VERTICAL CURVE FH FIRE HYDRAN"[' FL FLOWLIN& (7 (}ROUND GR GRATE HDPE HIGH DENSI'fY POLYETHYLENE WV INVERT JP JOIVT POLE MH MANHOLE MON MONUMENT PL PROPERTY LINE PVC POLY VINYL CHLORIDE RCP REINFORCED CONCRE,'T'E PIPE SDI INLET SD STORM DRAIN SDE STORM DRAIN EASEMENT S SCAPE SS SATIITARY SEWER SSE SAIVITARY SEWEREASEMENT STA STATION TC TOP OF CURB TP TOP OF PAVEMETIT TW TOP OF WAT T. VC VERITCAL CURVE W WATER WM WATER METER WV WATER VALVE .�.;,�,Aa L h,p_�70/�-Q�t, ��2-�o�a 1 �.. ,. . ._. �. . �� ,�,�-! . . 1 , �+.I/ P'+�: r �.1i°..%f"s �`��.-�i_o�<IsSC.71 °�� ..; 3 -� °��?o/� � REVISIDN RAINB ❑ W SUBDIVISI ❑ N THREE LOT RESIDENTIAL SUBDIVISION APN 362-10-52 IATE�FEBRUARY 22, 201 SCALE� HOR, VERT, DESIGNED� HB HY�KAREL CYMBAL, RCE 34534 DRAWN� JK DATE� VICINITY MAP N� S�ALE 14583 BIG BASIN WAY, SARAT�GA, CA 95070 (408)867-0244 PROJECT INF�RMATIDN APPUCANT: Maq.ElJJ1N DEVELOPMENT ��e orrn��v�oE Puc� ALAMO� CA 94568 7EL�25-944-D108 FAX 925-944-91� emal mikem.mcdevO�bcqlobal.net OYYNER: SUZ/WNE M.BESLER ENqN� NE5'iFALL ENpNEERS,INC. 1�.58.3�C BASIN WAY SARATOGA,CA 93070 lEL.408-987-0244 FAX 40a-867-8281 emaN jtkaOrre�tf.com RECEIVED BY: TENTATIVE MAP - TITLE SHEET 21185 RAINBOW DRIVE, CUPERTIND APN 362-10-52 JOB N0, 2011-148 1 4 � i I I T>EX.FH II �337.05 357.11 I i I I ,� I � � i +il � - t I I W i I � FISHER AD�. HOUSE I APPLICANT: I I � I i j PARCEL 2 P.M. 607 M 4 I McCLELLAN DEVELOPMENT i--i L- - - - -- .- - - -� 1448 ENTRADA VERDE PLACE ��( �/ 356�6 �-.('`��+��_ �o ALAMO, CA 94568 `ra' � I I `�S 356'8 � ��-�56�s��. -'------' 3�6 N ���0�7�3�� E'h5'4,������� ---.�55 p6 354,26 TEI. 925-944-9108 I� r 69.0� ------'- ����'----�i`�0� �----_�'--------'- --� -- -- -�=�----�_--- FAX 925-944-9108 .3ss.�,� 85.50 I email mikem.mcdevOsbcglobol.net �� � I I� � I � � �. � i �afi.BS / i 355.36 ,354.93 .354.76 � OWNER: � I � `�� �56 f � �'0 / a.0� p0 _. .- .354.03 � � \� � � � � �'�� � .353.35 _. - N - - �y ��-�--�--�- --�--�--�--. � ��Y�'� �Y` I I �" - - - - � s ' .354�93 - - - --� o r.l �_(' 1-� � SUZANNE M. BESLER � � / b.t2 ilF1LK \ f \ .3���s 'I I�' pe � ` .� I 1 �j ,� � Jl ENGINEER: I I Q \ �/ �( . I �55,65 ��-- -- - - _"-- --- - - - 5-� ---{ �3 .14 ` 1 . I ^, �� 'I �� � I,hr� �s\ ��Y� � I \ � i ��4.83 '1 /- OJ63,96 � WESTFALL ENGINEERS, INC. I I L•L o ' JI r--- - •�` - - - � r - - - -- - ` - - - -� r - - I"- �- � -4 - � 14583 BIG BASIN WAY , �, I � e - j � � � I I � �i �1 � � � � SARATOGA, CA 95070 i b� > > 56.1 D 55.04 �-.J � I � � � I � I � I TEL. 406-867-0244 h , 55�87 355. � � -" � I I I � �-� � � FAX 408-867-6261 � I I I � �� , , -- _ �55.�4 � � `�-'�.�.-_Jc> -i ,. 2_6•? E N � � 9 I o 5�� � \ •� I � � ( � � email �itka�westf.com 3 . ,.3=M,93 355H 8 R I M y � I �°�I � O6-�.1 I I �\ \ � I � I I /3 5,04 I � l-� I � S I \ aa�. e znv�c `�.i��c� � � - -r- -� 1p' g' L----------�- --¢e� NOTES: � � I� � • , � `�'�.�1 � � � � T ��s� yN � �Q I .D � I I `ss.3< \��5446 5' 5' i z I I . 5s°s I � I � °o I EXISTING ZONING - RESIDENTIA� R-1 } � � e � �� `•' I n � � 3 s 9 5 �,p g 3 5°�g2 _ , 3j4•��_ _ �_ ^ _ � o � C H U P R O P O S E D Z O N I N G - R E S I D E N T I A L R-1 `� y� �'' ,�6 ` � � I I � I � ` I � I .� � I / �^ ! �' � OT 9 EXISTING LAND USE - RESIDENTIAL � • e 0: , � .�- I '° �J 355.79 � � '" � PROPOSED LAND USE - RESIDENIIAL � 54.85 � T ACT 7999 z a '- � ' J I U1IUTIES: �AS AND ELECTRIC - P.G. dc E. �'�'� �� N, � ° ti � , -___ 0�55 a � �, I I_ B � I 'i� I ►or � � a�, X , � °c�� y�,i5 356,55 � I ss,o� o I TELEPHONE - ATT Nz W 355. Il I t d! 5,�9� sq, ft, �--� �-'- --�� 6,55o sq, ft, - {'''��t'� � � I I��a W A T E R - S A M J O S E W A T E R I �+t l,e � I i ; I � 0.1 5 ncres o�l I A D J. H G U S E � � ss.�e �-�--� p 0,15 acres 1 1_ / 0,15 ncres i n ` COMPANY 1 • J� � I w t t I I I A ( I I � I ���, I SANITARY SEWER - CUPERTINO p O 355,34 c� O �.�+` y �J ' , 9� � i I � .3ss.an I !asg,:4 k I I i I C� C. I I p p p t_ I G�r�, � f�<,z4 SANITARY DISTRICT �� � � ,ns' y y ._5 5.2 9 A I � I I 3ss,1' � 'o • I TOTAL AREA TO BE SUBDIVIDED - 0.5 � ' � y^� � ���,�� o i I � /� I � � I I I I � I � (i� + DENS TY - 4.45 UNITS PER ACRE BASED ( ' I � e. .�.��NEW 10' I I � I I I � I � I + I I �pe _ _ _ _ � - - � ss.o� � i z ON A GROSS AREA OF 0.67 ACRES (includes � t + ' . ss: s � � 55 2 � I i � 20' half street for Charsan and 30' half I � N , ' ,�'� � � �- � � �as.s��) � � � � I i I street for Rain 5.96 UNITE PER ACRE BASED � � ' 1 I J�J � � v� � ( I � / cI� r� �I � I 35g�Q�� - - - - - - - - - --�- - -Jw �� ON A NETAREA. 1 .s ,es N �'35n q I ��6.09 \ � �rp � I ���m�sa.� I >�i � - SITE IS NOT SUBJECT TO INUNDATION ' � 359.1 I f�< %355.29 31. I I Li�S.SaZ p qb I 4e'�'� _'I N J -� - -- - - - �l y .OS "3-L� ��.�._ 3 5 V1 � �3�'g9 i�+ ��I � a� �5�,49 \����.� . - - - - - - �� � 8� * �_, � A X 1 ` �' 1 %J v yb 50..96 T I �� �pA'�" .354.i4 - MET. �.\ � / w "� ' � �""��� Q f� � �� I--y I j I I ,�Sa.ss :�__-� SHED h•� f I la N ' 11 ` \ 5�3 I = � I I I �G 4_.`---�`�'- I .953��05 � / w � ` �°, �f n' -----I--- �--- ----35 N I v JI -- --------- --------- - ---- ---------- ---- Z ' � � �-- - �-- .353.IS �--- 55 ' I � / •/ m� /� � I� l ��\ ° o,�s � .� 3 � � � � � 1 v", �' .3..4 2G 5� 86 a �A: 54, 9 / .353,46 L�� X I / af � 1 � ' .p � � '�8po4p � � a�asa 99 � � � 4" P.C.C. SIDEWALK %�,l I 1 � � ° � . �^y ` r .7' �e.ea " 5 65.50' 3 53� �, �� � � 9 ��� � I � N�yr � ' ' � � �a. � " ° � 1�1 DEDICATI❑N . � . ti �p. . � s a. 3 n.�, a. Q � 4 � .�.J � % / c� I�// a s �T �. ee p � I .�& a 3 0 ,> s CONSTRUCT TRANSI110N TO MONOUTHIC SIDEWALK / ��� IF ,1 �' > \\ 53.96 ' _ . ..; 1 ;Q �6 . � .. . .. .s. .�a. ` � �T a. Q , . I °�. �• � .:4 , . . � a l.,l'o .ee� t`. � / � ��x �,� � \ �•� .yrti `��_. . `t• �..JR_�' 4 � �° 'e'. .0 4,z0 ..'�. I '353,� °' °. 0 . � . I CY�,w c I �i \ , /�_ - •3S 3 � r y� � � ( � _v�. ------\�- --Cf , __�F7CE�N-TOP-BF- --0- I,1, -----'-1._�,--'-- �-- - -- - �I•- .a s. 9 � / N I 'I� � i � ��s'S� - - S - - - s?�N 00°06'30° E 17 69'° p -� � -- -- ---�-` 4 s . . -_ - - - - - - � i �''N ( " �� I �° 9S �� �9 DRIVEWAY PER � 9P �i � '----_- �� I� \ a DETAIL 1-20 d EX. CURB J g �3��_ � / / Su�!H 1 J � � EXISTI G STORM DRAIN 1`, � --�___ I i2, 3�3�85 RIM(��` yp�- D-SD-}-SD-SD-SD�SD-SD-SD-SD-So SD-SD-SD-SD-SD-SD-SD-SD--SD�SD &GU D ER SD E SD2�R�sn-s n�7 S D _. S D S D-S D-S i!-S D�- S D-S D S D-S D-SD-SD-SD-SD-SD- - ' a� 344.36 INV 4/ I � tt � SD SD-SD-SD I � � I � � \ " � z� �I , al ---____-1 Ij y ' �, �, � �, ____,___________ J � ,53�0- .3 .50 � _ .352.96 - - � - - .352,75- - - 3`�2�b�� N OO��6�3�� E 327� 06�����M�N� _ - �I- - - �35z.19 _ �_�`-�„�-- - � � t � V)1� � ��l1 _,_,_--'�' - - �q�� �of � � h^? � N m N �.---��`_ �L�DDER-STR I I D CR�SSWALK � 'N s,H, ' � E ISTING SANITARY SEWER H A R S A N L A N E � I �� ' S . , � Ex. s's.s. � j � � ' 3 .�3 Iry SS- S-SS SS-SS=SS-SS-SS-SS SS-SS-SS-SS-SS-SS-SS-SS-SS SS-SS-SS-SS-SS-SS-;S-SS-SS-SS-SS-SS SS-� -"`-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS- _�-��`_._. I � v ?-�-�9 v-v v-�-v-v-v-v-v-v-v-v-v-v-u-v-v-v-r-v-v-v-v-v-x-v-v-v�v-v-v-v-s�---�T+=v-v-v-v-v-v-v-v-v-v-v-v-v-v-v-v- � I I 1 �v � c .asa aa EX.6 WATER `...._----._-- � � � � I� I� ' ,j_ �s�,-.� - _ � = � = � - = = _ ^ � � = = _ = _ -..��,�.��_ - - --.- -- - _ -,-=-_.�" .5� - - -. -,.�- - - - - - - � - - - - = -35��� ��CEIVED I � ' y ` � � �_ 4 ?.,..�'y.� f`"';��....�±, / /�v�^�, ���•� � ( ! �1/ � l/�/ I I � � ,, ' I .I /.�SZ��' BASIS OF BEARINGS �Lj1 �°* _ , *.'; � ",.'; i:is� I I , � � /°•fT .;�. � �%�'� I NO'06�30"E A CENTER LINE BETWEEN TWO MONUMENTS OF CHARSAN LANE AS SHOWN ���n/� I I � ON THE TRACT MAP FOR TRACT 7999, RECORDED IN BOOK 575 OF MAPS AT PAGE 12. � �''� ✓ U �oC,l .:.a �. ....,>. - _ ,_..,..:_-,., 4 P.C.C. SIDEWALK EX.A.C. ' '3 ��� ��9� SANTA CLARA COUNTY RECORDS. I I /q � � --- - - -- - - .:i53,02 " '�, BENCHMARK � • llR° I� �� . ..,._. � -� �� • ,�y� ( BM1084 EL. 344.22 BRASS DISK ON TOP OF CONCRETE HEADWALL LOCATED AT THE `'' ;: '"' ,,,,,.,.._ .,__,_.... I • - , ; ' .,. 3 os ,/ ��'06 EAST CORNER OF INTERSECTION OF SPRR AND REGNART CREEK, BETWEEN McCLELLAN - `���'� I � ROAD AND RAINBOW DRIVE. I I 1N , i��SION I&GUTTER TYPICAL SECTIcONe� I ATE�FEBRUARY 22, 2012 SCALE� HoR. �•=�o- WESTFALL ENG I NEERS, I NC, VERT, DESIGNED� HB BY�KAREL CYMBAL, RCE 34534 CHECKED HY� KC DATE� 14583 BIG BASIN WAY, SARATOGA, CA 95070 C408>867-0244 I � ��� TENTATIVE MAP McCLELLAN DEVEL�PMENT 21185 RAINBOV DRIVE, CUPERTIN❑ JOH N0, 2011-148 SHE 2 DF 4 � il II � � IwsP i �� I� � � �\ � I I � ( I I��' � I �\3�5.93 �c\ s ,� ��s� � � ��� s � ( { j � � 1 � � � 135�89 p EX.FH �357.06 357,11 11 i � � +I i SITION TO MONOLITHIC SIDEWALK FISHER PARCEL 2 P.M. 607 M 4 ----- --- - "�--- -- I ADJ. HL�USE ! L_ __ __ � _. __ � __ -.I ------�� .ST�� � I -tn � � v� U�1 - v- ' f A. x I i . o �Ik�''f' �� 356 < �A �gA.96 W�'� .354.74 W -I -y i ' I� N y � '`�\ � 'N J �, �3p � / � � i I � I �`� _ �'f / l, �� �- I � 355 --- --- - `�--------- -------- , 1---- � - - � -- � ------------- ---- ----------- � a � .353.15 � I� H �' �% � °'��s. I � 355 I I I � � � % �=I �°n� .3 4.23 �/f5?.Bfi � .- .9: . 54, 9 � 355 ` .353.46 �( \ � � 1 .p e r 'r B�o�p� � ) I m�'�,354.99 � I I r� � ' 4" P.C.C. SIDEWALK � i � I O N ! �`.y� �+a rl 4B.%Y� 4.eo I �? s�_ 65.50' 3 � I � 65.50' `��/ �I \ � N ` � \ r� � 4� n ° °' ° ` ° a°• ° �� " ��CONSTRUCT TRANSITION TO MONOLITHIC SIDEWALK 5c� c� � \ �'�o o�� � � J ♦ e 4 LO' �EDICATI��J 'ed , � e � Q A.'33m "� �s ° � Ae 6� � ✓ _e. e a b �,i�� F r�h � 53.96 � n . � .e. . o. s. o . • � . e, .. . .��. .'� � � Fa� G a N �i '� � *8. .�' �---- •�, --354 ° - 's' .t354.2Q _ti.�� r �353,�45�. e �3, : 0 6 I c�X €' \\ OQ "' ^ -" - '_ t.._� _ _____ '_� _____�___ _____-._ .i'�� I , / �w -/ . --'--'--'- ' --f-'--'--' --'----FENCE17Fr1P!!'-BF--i: .-MO n 1 . �I ---------------- - I ------- -- 1 o S k-i , � N � �' - ,..�-� N�0'�6'�Q' E � 179, 69'_ �� ° ° - - - �-��=---� - - - �� - - - w; ' y \ °0 9S a �9 DRIVEWAY PER � � °9 `�---�__ � J DETAIL 1-20 EX. CURB _��~ 352__�_' SDMH ' EXISTING STORM DRAIN ;2� &GUTTER EX.12�RCP �---�., 353�66 RIM� D/-SD-SD-S➢-SD-SD-SD-SD-SD-SD-SD-SD-SD-SO-SD-SD-SD-SD-SD�-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD 344�.36 INV � � y� �� �,53�0 II 3 .50 .352 90 ,352.75 �.6'�N 00'06'30' E 327, 06' MONS- M�N, - �r - - - /'- - - - - - - - .�'- - - - ,752• - - - - - - �. � / � �r� � l" �hJ CHARSAN LANE � j �3 RIM EXISTING SANITARY SEWER EX. 6�S.S. " MH y ' 34, 3 zNy SS-SS-SS SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS--SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS- i � �9 _`._,_----_"' q N I� �f" I � A� I � � -- ° - - -- � .�. __354,34 �- - - -- - - - - � .�. _._. � - -- - - .�..�-._�-�-- � � � � � � I ! f .gg�3� � � �� � � � I 1��� II i , � I I � II � � � � I I �3��0 6 C3 CALCULATIONS (FLOW BASED) TYPICAL DRAINAGE SWALE FOR LOT DRAINAGE AREA 0.07 AC. RLlNOFF COEFFICIF,NT(3000x0.65+3600x03)/6600=0.55 CORRSCTION FACTOR 20/13.9-1.44 DESIGN INTENSIT'Y 1.44x0.17=0.24 in/br DFSIGN FLOW�0.07x0.55x0.24=0.009 cfs SWALE (2 FEET WIDE,2 TO 4 INCHES DEEP) FLOWRATE Q�1.009 cfs SIAPE S=0.01 MANNING n-0.2 VELOCITY 0.141 FPS SWALE DETENTION TA�II:7 MINU'I'FS=420 SECONDS REQIRED SWAI.E LENGT'H 0.141x420=59 feet MINIMUVI LENGTH OF SWALE AVAILABLE IS 85 FEET o I � � C Fi U ° � LOT 9 `' �TRACT 7999 �i � �I3 I ADJ, H�USE Io IM I j asa,z�a �`�' I u� li°�° ( iz I i I � I �� � _ i li i �¢.I S 12' -SD-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD-SD -SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-SS-�S' � � �� �57.�� � � � _ _ _' __ - _ _ � _ __ - _ .� _��� � _ _� .�_ `� '�. _ �_ _ _ �� _ _ - - _ _ _ _ _ _ _ _.._. � � _ � ` _. � - _ � y � � / �- 1�^►�_'F,�-�,.� �� I V_� ( i ��� � �.352.]i i � i � �.- v u�.�,.,�r.�� �� � - _ �ECEIVEI� � n � � ,• +-i.,� F ` ,�,s;F`:,��. Description Area(sq-ft-) Percent � ' ��52.93 � �t • ' ",. existing proposed existing proposed � ����'v,��� NO'O6'3o'E �� �t�' ��b �'�v�a� Driveway(on-s te)�ncrete) 2600 1900 11�.88 8.22 n ::....:.: ....u:>., . ,.. .3 Q� �r� _.. -.. -.--.: -•�.,-- Houses 2706 6000 12.36 27.41 . 53,02 � y � SITE GRADING ,. ... . � EARTH WORK QUANTITIES Patios and walkways 3635 1200 16.60 5.48 �j , �. `^ Landscaping or open 12953 11808 59.16 53.93�?��, vA � � SITE GRADING WILL BE LIMITED TO CREATION OF PAD., BASED �f TH� �1�CTl�A1; HOMES - VOLUME OF CUT 63 C.Y. � ` " �/ /'i 06 VOLUME OF FILL 169 C.Y. PROPOSED FOR EACH LOT. THE MAXIMUM DEPTH OF CUT OR FILL�WILL B��WI�i`HIN QNE-AAIfl- - --�--,-•�-� Total 21894 21894 100 100.00 HALF FOOT OF THE EXISTING GRADE. I � IMPORT 106 C.Y. Note: ` Street improvements within the project site are limited to sidewalk and driveways driveway up to the right of way line. ION On-site driveways,houses,patios and walkways are esGmated. Q BY DATE DATE�FEBRUARY 22, 201 JOB N�, I SCALE� vERT, 1"=10" WESTFALL ENG I NEERS, I NC, S I TE DEVEL�PMENT PLAN SoEET148 Q DESI GNED� HB BY�KAREL CYMBAL, RCE 34534 M c C L E L L A N D E V E L�P M E N T 3 CHECKED HY� KC DATE� 14583 BIG BASIN WAY, SARATOGA, CA 95070 (408)867-0244 21185 RAINBOW DRIVE, CUPERTINO OF PROJ,ENGR� JC 4 e,r I / / l I I .3gj 3� / / / /� �� ! j ; �^f� II � j 11 � I iI I � i � � I � ; �3�3 O 6 11 ' � � � �357.06 357.;1 I I I i I i ( I I li � � � � I W I ( FISHER ADJ. HOUSE ( I I > � � PARC,EL 2 P.M. 607 M 4 ! H EX, FENCE � _� �. _ _ _� �_ � � � � C�NSTR � NSITION TO MONOLITHIC SIDEWALK ! ��sa' A � `S 33`��g,9� �� 356•33 . ------ •------ 356-`O N ����6�3�� E 355�i 2��� ��� ---------.3�'S�p6 354,26 ---�---��----------'��---- �, . � •,� �����-��.Y.O -- � �ii'�.�0� �_----_- —�_ i�� 3 � 4� q .355.67 � 3b 65.50 �----_�--- I / � `�b'� � � �1�13y� .354 93 .354,76 �� i II � � I "�?� I 56 1 �ou��Ai i / r i°`'P�ET � M -- - .� __ � _ �_ ��A.95�,0� � ���M �^.f'Y� .354.03 � 6. '{, ` .3�5,35 � _/ _._ �------ --- ,-1 1- �� �\�r I+ � I \ '' i2 � /// --J — � _REMO WAL�C _�354`93 — — - -- � �� � �\ I I Q .3 .1.. I I � e. ` �..� I �i' _ `55.85 .5.� - 35iD3 I ,3 .1� / � N � A ��, I I I a h'�� � - — — — �-- -- — — - �'I o � i 54.83 � �p�t�ya 53.56 ✓1 ! � � � � r T ! \ p i �6. /"�6. \ I I I �.-� I /I'� - - -�3 6` - - ;-� - - �- - - - - --- i- -I- � p�' r- - � � - - - - -�j � p, f // � r- � � '��]. ` I�� I 56,1 � / I I `� � y I I II I � 5.04 w I Y � � I � 1 ��. `sss = , r [ � I�EM❑BE EX, S I D WALK I �� ° , -- �--�s.�7 _ � � �:5�4 I � I I � � I ���-� ��� �` ��.�� r- I I °'� i � rn �` �A/� � I ,.3�5,93 355H 8 RIM(`l � � �A ��OI�59.� I I `\\ � N �`� I I I I y N! �i��I 1 /// pp � N � \ 347. B INYw �� � � �\ �.1 I I /3 5,04 Vl � �� �--' - ' �S I \ � �� �. . `'�,,� �, � �,��,�.� I ���-- — T —I EX. RES I DENCE � i I � I L�-`_��' -�� 0 y� d�� ^ 3`5,34 335.43 = REMOVE I I , 55.OS � �'S\ w �.y�.I . I I � \355.46 I I I�>I � 0 � } � O �s� � 3S 4 �\� Z ; ` � o ;a�, n � � 3s 95 i ����a� _ — ---�7� — — ---��I°—,�.L�- � II LOT 9 �a n 66 T�. i � � I O .I '"_ �o� I 355,74 � I 3� I � "'�✓ i ` �\'' // TRACT 7999 1`'�`s� 4 ° � q� �ss,e� r` \ \ I °o �RE�IOVE�� I R !- I �Sa es I _l. � � - - -- � � � _ ^ 1� i� � � � N� � I G, r 7 m O� �/ REMOVE W / 55�`�356.55 ++ I 55.07 O�II I I \ � I � I �' I � I I o��3 , ADJ, HOUSE i y Z > a..g �� � f PAYEMENT N . 55,78 I`� 1 �M �� I ! f w I X �_ n O I 3Rs.34 I '� I I a w I I � I I I�I 0 �n� w 9f� I � I � REMOVE f`� I N y I ` � I I ,355.44 � �35$.14 N I I I I � �� �. 35a,2k ! I I � � i I .355.15 C.�, C, I � POQL � r � !� � � y��� � ��SS�. �. �h� I I .�ss.ze I /� I — � — � — — � — I I I RE OVE I I REMOVE ( I � I�a�o `��C � I ' ' � � � D �,.� NEW 10' I I I � I��" � I I I I I I �,08 - - - - - - - � 55 os� ` II Z I ' u I r v— N v ..`s. 6 Ir-��� , J I ' H �� e'y I --1. .�' �53.2�l I 5.57 I I � i I ; T 4 l I � � V I j � a � ' ^� /` � �O. � 35�. � .— — — -- — — — — -� � I � � � � ySa�p' J> L � `� ��� � I I � � -a-9''�� — � W a I I I 3 ,B5 y 354,97 r 1�,n 5b,09" . '�`p 4. L _. 1 ' N I 35�..1 � I v 6'0t \ /�55.29 \.3 . � I I .ya.96 I T rn���� .�-.( ,,I %�( � 1� �'TJ —� - - - - - - � ti �� l3�!"8y i0y /I � ty p�. 55,49 ,� ���....T — — — �— — —— —�355..bZ — ,OS ���8 � --- —.:_.�. 35s.15 � rU � � A- � _ \ $ �� 4 � A X ( �•- � ^^ ` / �W y �5q,9n � VP .35a.7a ��MET. / � I W I �� ! ` 'N � ` r� 3p / �y I I � I I ��'89 —f-'"r I EM�� � I I / y � �� � a �3 5'� '� �a � i I �� 3�4"�--�._ " R �ios o � � v� � � . ---------�--__ �_ I \ ,� �-------5— --------- ----i�---- -�_,-------- a ---- --------- ---- Z � e � 1 � .353 15 I .� / � y / ` a O��s, I � �y f � � I '. '"1/ .353,46 /��g I y 0 r .3�4,2\ �54.0( �9: J 54, 9 q� / I y R8' I ( ��,354,99 � � ��� � }� 1 I p N���\_V. � cy9 e�uPi � ��� f` 48.72' a.BO v'p 5 65.50� 3 c,'� �� ! Q N ' \ r'p ° � �. ' a . . . ' — -- - - � � � � � �.o� �r � �;� " � \ . ���p' 'e � t ° < 10' DEDICATION� , . '08 4 , ° �r. ,a. 33�,'o a s . �. °° p, -° , /. °. � �� F rri f 5"s.96 . . � a. . a > �� �� .e. .��. n, e . � . .. Cn . . . � a �.�.'� :-- .. �a� 6 . a N � \ ��p� 'h� ��---- 354 _ ° ,-- " _ _ .133a.20 � � 353d O � 3•• 6 I �X J , � —�--r —___ �-- — —_ � __ �Nw �I€I \ � • ------- --�—---- -------------� ---- ^ - -------�---t._�.------- - ---- —- � a---------------- - a� / X I y° `' s�?-�9 -- — — s�'.s-- — — -- `�— — — — 4 h N '0�'_34' � �1_7� 5�.— r > s . _ — — -- -- -- — — -- -- W= � �^ � °� S 8 �9 � RE'f►1�BE Ex,��€-r�€_ �� / y ;52-� SDMH ' � EXISTING STORM DRAIN �2� EX.12�RCP �_''---_. 344.36 INV� D'—SD—SD—SD—SD—SD��SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD--SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD—SD- 1 N� I f �� � 53�0- � .3 .50 - - - \.352..98 - - - - .352,75- - - 3�2'E3 N 00'06'30' E_ 327, 06' 'MONS_M�N, - - - - — �. � , � dl�� � �" �'h� CHARSAN LANE �y � SS��3 RIM EXISTING SANITARY SEWER EX. 6'S.S. ' 34� 3 INV SS—SS—SS SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS— � 2.99 �--"._�--'._.- �V y � • � r�� TREES TO BE REMOVED 25"BLUE GUM (�71) 7" COAST LIVE OAK (#72) 13"COAST LIVE OAK(�73) 4" APPLE (#74) 15" PINE(�75) 11"PINE(�76) 4" COAST L1VE OAK (#77) 8" HOLLY OAK(�78) 12"PINE(�7) 10"CEDAR (�80) 24'PINE(/�81) 13" COAST LIVE OAK(j�82) 12" CHERRY(#83) 6-5"XYLOSMA(�84) B" TANGERINE(�l85) 12"CAMPHOR (�t86) 6,6,6,5 DRACAENA(�687) 6-5"COAST LIVE OAK (�88) 9" PALM (#90) 8,7,6,6,6, PA�M (�91) 6,6 PLUM (�92) 6,5,4, PLUM (�93) 13,3,3 CHERRY(#94) 15" COAST LIVE OAK(#95) 10,6,3,3,3, PLUM (#96) 2-9"PRIVET(�97) 12' --SD—SD—SD—SD—SD—SD—SO—SD—SD—SD--SD—SD �52 :9 _ —SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS—SS— � � �� // .354.3• _.f-"`—_ j'� J q' I ,.- ��/ �5'7_i.9_ _ � _ � � — — — — — — — � ^ � — — — '-- — — — — — — +- ^'33�61 — — — -�~-�i�i�?.4�`'�q'p f�;� ' 1� — — — — — — — — — — — — — — — — — —,352.11 1\.L�Ll ♦ ' �9�-o� �t��'� EI� N � �f— !S e..:..� ..�5;.,, �X"� � � � �/�52 93\/ W �., , . .'3 ... ._Ser� � � � � ► ���Q�,�� No�o6�3o�E .� .�—� �o�a �( �� ., 6 I .3 .7fd� ��'vl ,:,...�-:...:��..�.. �...:........:..�.�.--. ....... .....�.......,>..,, ,.�.,.,;..:. .�53.D2 /`n� � � .. ,.. ��'„—.....__ �r�, �� � �. . _ ;. ,, I� /3�`3�06 e.�.:, � '.����s �_,,.::..:,_.�...... .. .._.:._. .�..:..,.,._., I _ RECYCLE BUILDING MATERIALS TO � � � THE MAXIMUM EXTENT POSSIBLE. I IBEI�LSIDN II v�°'� DATE�FEBRUARY22, 201 SCALE� HoR, �•=10- WESTFALL ENG I NEERS, I NC, VERT, DESIGNED� HB BY�KAREL CYMBAL, RCE 34534 CHECKED BY� KC DATE� 14583 BIG BASIN WAY, SARAT�GA, CA 95070 (408)867-0244 DEM❑LITI❑N PLAN McCLELLAN DEVEL�PMENT 21185 RAINBOW DRIVE, CUPERTIN❑ JOH N�, 2011-148 SHE 4 ❑F 4 E'3� F SS—