DRC 05-05-11Design Review Committee
May 5, 2011
Cupertino, CA 95014
(408) 777 -3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE DESIGN REVIEW COMMITTEE HELD ON May 5, 2010
ROLL CALL
Committee Members present:
Committee Members absent
Staff present:
Staff absent:
Marty Miller, Chairperson
Clinton Brownley, Commissioner
Don Sun
Simon Vuong
Gary Chao
Chad Mosley
IO=
APPROVAL OF MINUTES:
April 7, 2011
Minutes of the April 7, 2011 Design Review Committee meeting were approved
WRITTEN COMMUNICATIONS:
None
POSTPONEMENTS/REMOVAL FROM CALENDAR:
ORAL COMMUNICATION:
CONSENT CALENDAR:
None
PUBLIC HEARING:
1. Application No.(s): ASA- 2011 -07
Applicant: Rachel Matalon (Gorman residence)
Location: 20199 & 20203 Camarda Ct
Architectural and Site approval to allow EL 831 square foot addition to an existing 3,480
square foot residence in a R -2 (duplex) zoning district
Design Review Committee decision final unless appealed.
Staff Member Vuong explained that per Ordinance, any changes to a property on the R -2
Zone, needed to be approved by the Design Review Committee. The applicant is proposing a
small addition to Unit 1 of their duplex. The existing garage will be replaced with a two -car
garage. The second unit will remain unchanged. All exterior walls, windows and roofing will
match the existing structure in color and materials. The property owner lives on site. The
2 Design Review Committee
May 5, 2011
proposed project is to provide additional living space for another family member. Staff has
received two comments from neighbors following the required neighborhood noticing. One
comment is related to construction noise rather than design or privacy concerns. The project
will need to follow existing standard construction requirements during construction. These
requirements include noise mitigation. The other comment received was regarding the
addition being too large for the area and blocking out sunlight. Staff member Chao stated
that the proposed addition is within the required setbacks per the R -2 Ordinance, further, it is
in the allowed building envelope. It is also a single story addition so will not cast shadows to
block sunlight. Staff supports the project as it conforms to the R -2 Ordinance.
Chair Miller asked about the existing fence on site. Staff member Vuong stated that the fence
would be being removed. That is where the new addition will go. Chair Miller asked about
the drainage issues raised by the neighbors. Staff member Vuong stated that the plans were
reviewed by the Public Works department. They had no concerns at this time, but would be
working with the applicant during construction to make sure the grading and runoffs were
constructed properly to not cause ponding or drainage onto neighboring properties. Staff
member Chao stated that there is a standard condition of approval to address appropriate
drainage. The Public Works department will review the (required) drainage plan submitted
during the building permit process. The neighbor is encouraged to contact the Public Works
department during the plan review phase. Staff member Mosley, from the Public Works
department, was asked about the existing drainage culvert and what sort of drainage
mitigations would be required. He stated that the existing public works storm drain water
easement would remain intact, to be maintained at the current level. They may require a dry
well on site to divert water, they may require sloping from the back of the property to move
the water to the street or they may require a sump pump to collect the water to pump it to the
street. Mr. Kopels, the neighbor, asked for assurance that the current drainage issues would
not be made any worse as a result of the new construction. Staff member Mosley said that
they would work with the applicant to come up with a solution to the problems and felt
confident that they could come up with a resolution that would not only not make the
situation worse, but will make it much better for everyone. Mr. Kopels also asked for some
consideration of the neighbors during construction to help reduce noise, dust and parking.
He submitted some specific concerns in writing and provided pictures for the file. He also
asked that the portion of the property line fence on his property not be damaged during
construction.
Staff member Chao stated the project is not large enough to require that the entire scope of
the Best Management Construction Management Plan be in place, however, there are existing
construction guidelines that are applicable to this project which mirror this Plan. The Design
Review Committee has the authority to include in the conditions of approval extra mitigation
efforts. The City does not have the authority to restrict construction hours and noise above
the Municipal Code and Building Code Ordinances. Staff member Chao suggested that the
neighbors and applicant to work together to come to a compromise to make the project run
smoothly for everyone.
The draft resolution will be modified to include additional provisions from the Best Standard
Construction Management Plan to help mitigate noise, dust and debris and parking concerns.
3 Design Review Committee
May 5, 2011
MOTION: Commissioner Brownley moved to approve ASA- 2011 -07 with the above
mentioned changes to the draft resolution
SECOND: Chairperson Miller
ABSENT: Commissioner Sun
ABSTAIN: none
VOTE: 2 -0 -1
OLD BUSINESS:
None
NEW BUSINESS:
None
Respectfully submitted:
/ s /Beth Ebben
Beth Ebben
Administrative Clerk
g:planning/DRC CommitteelMinutes050511