12. 2010-11 fee scheduleOFFICE OF ADMINISTRATIVE SERVICES
CUPERTINO
CITY HALL
10300 TORRE AVE=NUE • CUPERTINO, CA 95014 -3255
TELEPHONE: (40E) 777 -3220 - FAX: (408) 777 -3366
SUMMARY
Agenda Item No. /A
SUBJECT
Meeting Date: April 20, 2010
Adopt the fiscal year 2010 -11 fee schedule (Resolution No. 10 -072), as submitted and consider a
separate proposal to increase fees for long - range planning and permit system improvements.
BACKGROUND
All user fees are reviewed each year in conj•umction with the preparation of the budget. City
policy is to ensure that to the extent possible fees cover the cost of providing services. The
majority of the fees proposed for your consideration are calculated based on the actual cost to
perform the service. Fees were increased by a cost of living factor of 2 %, reduced or eliminated,
set at the County /State regulated rate, or appropriate vendor cost. However some fees, such as
recreation, are predicated on what the market will bear in relation to what other competitive
entities charge for the same service.
Highlights of changes to this year's fee schedule include:
General Fees:
➢ Permit and licensing fees increased by 2 %.
➢ General city service costs, document charges, and parking fines were unchanged.
➢ Petitions for Reconsideration fee is recommended at $500, or 10% of our cost to process.
Engineering, Planning, and Building Fees:
➢ Fees in Public Works and Community Development schedules show a 2% cost of living
increase except those described below:
• Geotechnical, structural, landscape and storm water engineering plan reviews
involving outside specialists request a $1,000 to $5,000 refundable deposit to
cover the cost of the review. ":the geotechnical and structural fees are currently
charged, the landscape and storm water reviews are required by new state
regulations.
• A planned development permit fee category, similar to use permit fees, was added
to reflect the existence of this specific permit class.
• Building fees for small residential additions, home swimming pool demolitions,
and window replacements were reduced to better serve the community.
• New building fees were added to cover particular permit situations such as
accessibility hardship exemptions, review of alternate materials and construction
12 -1
Apri120, 2010
Page 2
methods, permit extensions, plan check application extensions, and temporary
structures.
• Policies for refunds, work done without a permit, and adjustments for building
fees are now disclosed in the fee schedule.
• A separate proposal to raise engineering, planning and building fees to cover the
cost of long -range planning studies and projects and to eventually replace the
current permit computer and online system is discussed in a separate section
below. This proposal is not reflected in the attached fee schedule resolution.
Recreation Fees:
➢ A comparative market analysis of similar facilities in the area to the Blackberry Farm Golf
Course concluded that current pricing is below the average rate. In addition, the cost for the
use of water has tripled in recent years to over $100,000 due to more water being used to
keep water features, like the ponds, and less water is available from the creek. New utility
company meters have also reported a higher usage of water than in the past. Increased green
fees of $2 per round and golf package increases of 7% to 24% will enable the golf course,
which operates as a separate enterprise of the City, to maintain positive financial returns and
achieve average pricing.
➢ Room rental classifications are more fully described. Rental rates increased at Monta Vista
Recreation Center and Creekside Park Building and for non - residents and non - resident
businesses at Quinlan Community Center.
➢ Blackberry Farm picnic areas and rates have been changed to address different group sizes
and uses. Swim pass options have been added for this summer season.
➢ Senior Center annual membership cost increased. All other Center fees unchanged.
Long Range Planning and Permit System Improvement Proposal:
Currently, Building fees only have a built -in overhead rate ($13,000 per year) to fund the current
permitting system. While our current permitting system allows applicants to submit basic
information online, it does not have online features such as, online submission of applications
and plan review. As a result, online permitting can only be offered for very small projects such
as roofing tile replacement and water heater replacements that do not require plans. Additionally,
Pentamation, our current software company, has moved to a new software platform for online
permitting and reduced its support for the system we currently use. The combination of old
software and reduced vendor support has resulted in increased staff time to troubleshoot and
monitor even the small number of online permits (currently, about ten vendors use the system).
Community Development is proposing to update the overhead cost for a new permitting system
and to apply it to all development fees for Planning, Building, and Engineering services, all of
whom use the system. hnplementation of new permitting software, including online features, is
at the top of the list of recommendations from the Matrix permit process study. A new online
permitting system will increase customer service by allowing applicants to submit applications
and plans online, staff to check plans electronically, and customers the ability to check comments
12 -2
Apri120, 2010 Page 3
and submit corrections at their convenience without making a trip to City Hall. It will have the
added benefit of reducing copying costs and reducing the permitting process by eliminating the
time taken to mail or deliver plans (see Attachment B for additional features of online permitting
systems). Based on discussions with Matrix, permit software providers, our Information
Technology Division and cities that have implemented such software, staff has estimated the cost
of a new permitting system at about $500,000 (to be spread out over several years, which is
typical for the City) with $50,000 in annual maintenance. The proposal is to charge about 75%
of that cost to permit users. This would increase fees by about 3.02% over the amounts proposed
in the attached Planning, Building, and Engineering fee schedules. The Matrix report had
recommended a technology fee of 4% since that was typical for most cities, such as Los Gatos
and Santa Clara, which typically charge 100°0 of the cost of the permitting system to permit
users.
The City regularly spends between $100,000 to $200,000 annually on long -range studies and
projects such as General Plan updates,. Housing Element, Specific Plans, Conceptual Plans and
Master Plans to provide for additional development opportunities and keep the City's documents
updated. The City Council has expressed an interest in recouping some of the costs for such
projects. One of the recommendations by Matrix is to include the cost of long -range studies and
projects in the development fee schedule. Many cities have included the cost of long -range
studies in their development fee schedules. For example, Los Gatos adds a 10% surcharge on
planning application fees for advance planning projects and Cupertino formerly charged a
Stevens Creek Specific Plan Fee to cover the cost of the preparation of the original Heart of the
City Specific Plan. This proposal is to add $50,000 or about 25% of the cost of long -range
projects to the built -in overhead for development fees. This will increase Planning, Building and
Engineering fees by approximately 1.34% over the amounts shown in the attached fee schedule.
This Community Development staff proposal was brought to the Fiscal Strategic Plan Committee
this year. The Committee supported the development fee for long -range studies and projects but
had some concerns about charging 100% of the cost of online permitting to permit users. Staff
therefore, recommends charging 75% of the cosy: of the online permitting system to permit users.
RECOMMENDATION:
Adopt the fiscal year 2010 -11 Fee Schedule as submitted and consider a separate proposal to
increase fees for long -range planning and permit: system improvements.
Sub m' ed by:
David Woo
Director of Finance
Reviewed by:
Carol Atwood
Director of Administrative Services
Submitted by:
Aarti Shrivastava
Director of Community Development
Approved for submission:
, ;�kK
David W. knapp
City Manager
12 -3
April 20, 2010
Page 4
Attachment A: Fee Schedule Resolution
Attachment B: Online permitting system features
Attachment C: List of California cities that include technology and long -range planning costs in
their fee structure
gAfinance \budget \feeschedules\201Wee schedule staff report 2010 4- 20- 10.doc
12 -4
ATTACHMENT A
RESOLUTION NO: 10 -072
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
RESCINDING RESOLUTION NUMBERS 09 -051 AND 09 -070
AND ADOPTING USER FEES
WHEREAS, the State of California requires i:ees charged for service rendered not to exceed
the cost of delivering said services; and
WHEREAS, a public hearing has been held to review user fees; and
WHEREAS, the City Council of the City of Cupertino has established guidelines for setting
user fees;
NOW, THEREFORE, BE IT RESOLVED that:
1. User fees are established per attached Schedules A thorough E
2. User fees are effective July 1, 2010
PASSED AND ADOPTED at a regular meet:',ng of the City Council of the City of Cupertino
this 20th day of April 2010 by the following vote:
Vote Members of the City Coun
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
City Clerk
.APPROVED:
:!Mayor, City of Cupertino
12 -5
CITY OF CUPERTINO
SUMMARY OF USER FEES
Resolution 10 -072
Fees Effective July 1, 2010
Department Schedule
General A
Engineering B
Planning C
Building D
Recreation E
12 -6
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule A - General
Photocopies - per sheet $0.20
Microfilm/Microfiche Printout $0.50 /frame
Budget Documents - CD Only
$13.00 each
Comprehensive Annual Financial Reports (CAFR) - CD Only
$13.00 each
Returned Check Charge
$25.00
Late Payment on 30 Day Delinquent City Invoices
12% per annum
Property Liens Administrative Fee
$40 /book/block /parcel lien
Municipal Code Book
Vendor Invoice
Williamson Act Filings
$105.00
Candidate Statement Fee (County Regulated Fee)
Current County Registrar Cost
Video /Audio Service
VHS
$13.00 /tape
DVD
$21.00 /DVD
CD
$13.00 /CD
Audio Cassette
$2.15 /tape
Notary Fee (State Regulated Fee) $10.00 /signature
Fingerprinting Processing (State $32 plus City Fee $13) $45.00
Handbill Permit $61.00
Renewals $31.00
Solicitor Permit (Includes fingerprinting) $92.00
Renewals $46.00
Massage Establishment Fee (Includes fingerprinting /background
$356.00
check and business start -up inspection)
Establishment with Therapist Permit
$387.00
Renewals (Includes two inspections per year)
$92.00
Massage Therapist Fee (Includes fingerprinting /background ck)
$295.00
Therapist with Managing Employee
$325.00
Renewals
$61.00
G: 1FinancelBudget \FEESCHEDULES120101Fee Schedule_A_General ?010.x1s 12-7 1
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule A - General
Massage Managing Employee (Includes fingerprint /bkgrnd ck)
$295.00
Managing Employee with Therapist Permit
$325.00
Renewals
$61.00
Massage Permit Appeal (DeniaVRevocation)
$155.00
Taxi Driver Permit (Includes fingerprinting /background check
$306.00
Renewals
$184.00
All Municipal Code Parking Violations
$55.00
CVC Parking Citation Dismissals Admin. Fee (State Regulated Fee)
$25.00
Noise Variances
$177.00
Duplicate Business Licenses
$27.00
Small Income Business License
$65.00
Business License Database
$107.00
New Business Monthly Reports
$22.50 /month
Community Festivals
$9.00 /day /vendor
Farmers Market
$2.25 /week/vendor
Flea Markets
$9.70 /month /vendor
Sign Removal (Public Right -of -Way)
$31.00 /sign
Dangerous Dog Annual Registration Fee
$184.00
Internet Processing Fee
$2.00 /transaction
False Alarms
$153.00
Petitions for Reconsideration
$500.00
Abatement Fee
Actual Cost *
Compilation of New Records (requests greater than 1/2 hour)
Actual Cost *
Graffiti Cleanup
Actual Cost *
Event Video Taping /Editing
Actual Cost *
Damage to City Property
Actual Cost
Grounds, Streets, Facilities, Traffic Engineering/Maintenance
Code Enforcement
Actual Cost
G:1 Finance \Budget\FEESCHEDULES120101Fee Schedule A_General 2010.xis 12-8 2
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule A - General
Public Requests for GIS Printed Maps
Standard pre - formatted maps
PIotted maps
Printed maps
Custom request maps
Prints or plots of aerial photography, see Engineering fees
Public Requests for GIS Data
Digital data layers for GIS data
Custom request data layers on CDROM
Ortho - rectified aerial photography
$25.00
$2.00
Actual Cost *
$25.00 /layer
$200.00 for all city layers
Actual Cost *
$25.00 /tile
$300.00 full City of Cupertino (153 tiles)
* Actual cost is: 1) Employee hourly rate plus 55% for benefits and overhead, and 2) cost of materials,
contractors and supplies.
G:\ Finance \Budget\FEESCHEDULES120101Fee Schedule_A_General :'_010.xis 12-9 3
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule B - Engineering
Street Cuts Miscellaneous
- Cost of Improvements $10,000 or under
$237.00
- Cost of Improvements between $10,001 and $15,000
$354.00
- Cost of Improvements $15,001 and over
5% of cost
- Utility, greater of $1,537 minimum or 5% of cost of improve.
$1,537.00 minimum
Grading permit; greater of $2,363 min. or 6% of cost of improve.
$2,363.00 minimum
Parcel Map /Tract Map (Map Checking Fee)
$237.00
- Parcel Map (1 -4 lots)
$3,840.00
- Tract Map (> 4 lots)
$7,973.00
Plan Check and Inspection
$2,719.00
- Review of Building Permit Only
$592.00
Review of Public /Private Improvement Plans:
- Residential; greater of $2,517 min. or 5% of cost of improve.
$2,517.00 minimum
- Commercial; greater of $4,062 min. or 6% of cost of improve.
$4,062.00 minimum
Geotechnical Review
*Cost of review + 10%
$2,000.00 deposit required
Structural Review
*Cost of review + 10%
$2,000.00 deposit required
Green Bldg Code Landscape Plan Review Fee
*Cost of review + 10%
applies to 10k ft or greater development area in 2010
$1,000.00 deposit required
'C3 Stormwater Management Plan Review Fee
*Cost of review + 10%
applies to l Ok W or greater development area in 2010
$5,000.00 deposit required
Confirmation of Planning Applications
$255.00
Annexation (plus county filing fee)
$1,652.00
Certificates of Compliance
$1,417.00
Encroachment Permits
- Residential
$237.00
- Non - Residential
$237.00
- Annual Utility Company
$413.00
- Pool Permit
$591.00
Lot Line Adjustment
$2,719.00
G:\ Finance \Budget\FEESCHEDULES\2010\Fee Schedule Engineering 2010.xlsx 12-10 1
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule B - Engineering
Engineering Copies
- Microfiche $23.50 /sheet **
- Improvement Plans $23.50 /sheet **
- Traffic Reports /Plans $23.50 /sheet **
- Microfilm $0.58 /frame **
Transportation Permit (State Regulated Fee)
- Single $16.00
- Annual Utility Company $90.00
- Additional Engineering Investigation or Coordination $59.00/hr.
Telecommunications Facility Fee (5% increase per year)
- Installation Rate $2.18 /lineal ft. of conduit /yr
- Occupancy Rate $1.16 /lineal ft. of leased conduit /yr
Banners
- Large Banners Across Stevens Creek Boulevard $379.00
- Small Banners on Light Poles (for 20 poles) $747.00
Aerial Photo Custom Work
24" x 36" $59.50 /sheet
8 1/2" x 11 " $11.60 /sheet
Soil /Geo Report Research
$1,417.00
Schools - Traffic Request
$1,455.00
Special Events
$1,288.00
Block Party
No Charge
Parades
$1,090.00
Vacation of Public Street ROW/PUE
$545.00
Small Traffic Calming Request $1,022.00
Rural /Semi -Rural Classification Application $710.00
Comprehensive Neighborhood Traffic Request $2,033.00
Certificate of Correction $155.00
Floodplan Evaluation $60.00
Permit Parking Study $1,037.00
Streamside Permit $369.00
*Outside Agency Review /Services Vendor Invoice plus 10% City Admin Fee
** Price is for first sheet only. Each additional sheet is $11.44.
G:\ Finance \Budget\FEESCHEDULES120101Fee Schedule Engineering 2010.xisx 12-11 2
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule C - Planning
Major
Five thousand or more square feet commercial; 10,000 or more square feet office /residential; eight or more
residential units.
Minor
Less than 5,000 square feet commercial; less than 10,000 square feet office /residential; less than eight
residential units.
Appeal
A request from the project applicant or interested party to reverse or amend a decision made by staff or an
advisory body. An appointed public official serving on the board that made the decision subject to the appeal,
an appointed public official serving on a board that is directly affected by the decision and the City Council
members are exempted from the fee requirement.
Directors Application
An application that receives final approval by staff either via an advertised public hearing or non - hearing format.
The application may involve a pre - application meeting and/or Environmental Review committee review.
Temporary Sign Permit
A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into the
temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the submittal of
a deposit to guarantee removal of the sign upon expiration of the temporary permit.
Tentative Map Five or more parcels.
Parcel Map Four or less parcels.
Housing Mitigation Fee
Fee collected is used to construct new affordable residential units for Cupertino residents and employees. The
fees mitigate the need for affordable units caused by expanding offices, retail, hotel and industrial buildings
creating new jobs and new residential development creating a need for more affordable development.
An impact fee shall be assessed on any new retail, hotel and office /industrial development applications. The
following uses shall be exempt from the impact fee, but still required to provide Below Market Rate Housing as
part of a residential development: projects in a redevelopment project area and mixed use projects providing
two thirds residential and one third retail /office. Developments in the P(MP) zoning district shall be assessed
a fee of $2.60 per square foot.
An in -lieu fee shall be assessed on all new residential units in developments of and on new single family lots
created through a subdivision. Existing single family lots are exempt.
Note: Mixed use applications will be classified based upon the highest intensity and review process. The Director
of Community Development will have discretion to classify projects based upon the above criteria. 12-12
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule C - Planning
General Plan Amendment Authorization - Major
$4,243.00
General Plan Amendment Authorization - Minor
$2,121.00
Study Session
$4,243.00
General Plan Amendment - Major
$13,216.00
General Plan Amendment - Minor
$6,609.00
Development Agreement
$17,476.00
Zoning - Minor
$3,273.00
Zoning < one acre
$6,545.00
Zoning one to five acres
$9,950.00
Zoning> five acres
$13,557.00
Tentative Map
$14,423.00
Use Permit - Major
$14,423.00
Exception
$2,540.00
Planned Development Permit - Minor
$6,736.00
Planned Development Permit - Major
$14,423.00
Hillside Exception
$6,389.00
Parcel Map
$6,736.00
Use Permit - Minor
$6,736.00
Planning Commission - Architectural and Site Approval
$6,736.00
Planning Commission Interpretation
$3,295.00
Design Review Committee - Architectural and Site Approval
$3,258.00
R -1 Design Review
$2,261.00
R -1 Exception
$2,540.00
Minor Residential Permit
$1,137.00
Environmental Impact Report (Plus State & County Filing Fees)
$25,233.00
Negative Declaration - Major (Plus State & County Filing Fees)
$3,882.00
Negative Declaration - Minor (Plus State & County Filing Fees)
$1,940.00
Categorical Exemption (Plus County Filing Fee)
$224.00
Applications may be subject to an hourly fee of $128.50, for applicable staff time, for cost recovery. This hourly rate
applies to large projects that require a level of staff support greater than the scope of work included in the regular fee
schedule and will be based on the time required to process the entire project. The applicant will be notified if this fee
is applicable to their project.
12.13
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule C - Planning
Amendment to Development Approval
$3,852.00
Sign Exception
$1,904.00
Fence Exception
$647.00
Director - Variance
$1,626.00
Director - Minor Modification
$1,137.00
Tree Removal Permit
First Tree
$163
Each Additional Tree
$83
Retroactive Tree Removal Permit
$2,908
Tree Management Plan
$1,137
Temporary Use Permit
$1,299.00
Temporary Sign Permit
$190.00
Sign Program
$652.00
Appeals
$165.00
Zoning, Planning, Municipal Code (Building Permit Fees)
Commercial/Multi- Family
$0.27/sq. ft.
Residential Single Family
$0.13 /sq. ft.
Wireless Master Plan Fee: Equipment Mount on Existing Light
Utility Pole
$5.90
Wireless Master Plan Fee: Other Personal Wireless Facility
$1,181.00
Housing Mitigation In -Lieu Fees
Residential"
$2.72/sq. ft.
Office /Industrial /Hotel/Retail/R &D
$5.18 /sq. ft.
P(MP)
$2.60 /sq. ft.
Zoning Verification Letter
$171.00
"Recommended for review during FY 10/11 by the Fiscal Strategic Plan Committee
Applications may be subject to an hourly fee of $128.50, for applicable staff time, for cost recovery. This hourly rat,
applies to large projects that require a level of staff support greater than the scope of work included in the regular fee
schedule and will be based on the time required to process the entire project. The applicant will be notified if this fee
is applicable to their project. 12-14
CITY OF CUPERTINO
Resolution 10-072
Fees Effective July 1, 2010
Schedule D - New Construction Plan Check Fees
12-15
G:1 Finance \Budget\FEESCHEDULES120i01Fee Schedule Building 2010.xlsx
Construction Types:
-A, 1 -B
Construction Types:
II -A, III -A, V -A
Construction Types:
II -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A -1
-
1,0
$7,291
$5.50
$6,076
$4.581
$4,861
$3.66
-
-
_
5,000
$7,511
$15.09
$6,259
$12.58
$5,008
$10.06
-
_
-
10,000
$8,266
$3.77
$6,888
$3.14
$5,511
$2.52
-
-
20,000
$8,643
$5.65
$7,203
$4.71
$5,762
$3.76
-
-
50,000
$10,338
$3.02
$8,615
$2.51
$6,892
$2.01
-- --
100,000
$11,846
$11.84
$9,871
$9.87
$7,897
$7.89
A -2
-
250
$7,266
$21.93
$6,055
$18.28
$4,844
$14.62
-
-
1,250
$7,485
$60.14
$6,238
$50.12
$4,990
$40.10
-
-
2,5 00
$8,237
$15.01
$6,864
$12.51
$5,492
$10.01
-
-
5,000
$8,612
$22.54
$7,177
$18.79
$5,742
$15.02
-
12,500
$10,304
$12.02
$8,586
$10.02
$6,869
$8.02
-
25,000
$11,806
$47.23
$9,838
$39.35
$7,871
$31.48
A -3
-
1,0
$7,291
$5.50
$6,076
$4.58
$4,861
$3.66
-
-
5,000
$7,511
$15.09
$6,259
$1158
$5,008
$10.06
-
_
-
10,000
$8,266
$3.77
$6,888
$3.14
$5,511
$2.52
-
_
-
20,000
$8,643
$5.65
$7,203
$4.71
$5,762
$3.76
-
-
50,000
$10,338
$3.02
$8,615
$2.51
$6,892
$2.01
100,000
$11,846
$11.84
$9,871
$9.87
$7,897
$7.89
A-4, A -5
-
500
$5,960
$9.00
$4,968
$7.50
$3,974
$6.00
-
-
2,500
$6,141
$24.65
$5,118
$20.54
$4,094
$16.43
-
-
5,000
$6,757
$6.17
$5,631
$5.14
$4,505
$4.11
-
-
10,000
$7,066
$9.25
$5,888
$7.71
$4,711
$6.17
25,000
$8,453
$4.93
$7,045
$4.11
$5,636
$3.28
-
50,000
$9,685
$19.37
$8,072
$16.15
$6,457
$12.91
A
A Occupancy Tenant Improvements
500
$3,301
$4.97
$2,751
$4.14
$2,201
$3.32
-
_ -
2,500
$3,401
$13.66
$2,834
$11.38
$2,267
$9.11
5,000
$3,742
$3.41
$3,119
$2.84
$2,494
$2.27
- -
10,000
$3,912
$5.13
$3,260
$4.27
$2,609
$3.42
-
-
25,0
$4,681
$2.73
$3,901
$2,28
$3,121
$1.83
50,000
$5,366
$10.73
$4,471
$8.95
$3,578
$7.15
B
Banks
500
$7,174
$10.81
$5,979
$9.02
$4,782
$7.21
-
�- - -J - --
- 2,500
$7,390
$29.70
$6,158
$24.76
$4,927
$19.81
-
-
5,000
$8,133
$7.43
$6,777
$6.19
$5,422
$4.95
-
_
-
10 , 0 0_0
$8,504
$11.14
$7,086
$9.28
$5,670
$7.43
25,000
$10,175
$5.93
$8,479
$4.94
$6,783
$3.95
50,000
$11,655
$23.31
$9,713
$19.42
$7,771
$15.54
B
Laundromat
$6,804
$25.67
$5,671
$21.39
$4,536
$17.12
-
_ -
1,000
$7,010
$70.39
$5,842
$58.66
$4,673
$46.93
$7,714
$17.61
$6,429
$14.68
$5,142
$11.74
4,000
$8,066
$26.39
$6,721
$21.99
$5,377
$17.60
-
-
10,000
$9,649
$14.08
$8,041
$11.73
$6,433
$9.38
20,000
$11,057
$55.28
$9,214
$46.06
$7,371
$36.85
B
Medical Office
500
$8,498
$12.83
$7,081
$10.69
$5,666
$8.55
-
- -
- 2,500
$8,754
$35.16
$7,296
$29.29
$5,836
$23.44
5,000
$9,633
$8.80
$8,028
$7.33
$6,422
$5.87
10,000
$10,073
$13.19
$8,395
$10,99
$6,716
$8.79
2
$12,052
$7.03
$10,042
$5.85
$8,034
$4.69
50,000
$l - 3,8091
$27.62
$11,508
$23.01
$9,206
$18.41
12-15
G:1 Finance \Budget\FEESCHEDULES120i01Fee Schedule Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Plan Check Fees
12-16
G:1 Finance\Budget\FEESCHEDULES1201 Wee Schedule Building 2010.xlsx
Construction Types:
I -A, 1 -B
Construction Types:
fl-A, III -A, V -A
Construction Types:
II -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf * I
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
B
Offices
1,000
$8,097
$6.11
$6,748
$5.09
$5,398
$4.07
_
-
5,000
$8,342
$16.77
$6,952
$13.97
$5,562
$11.18
-
-
10,000
$9,180
$4.19
$7,650
$3.50
$6,120
$2.79
-
-
20,000
$9,600
$6.27
$8,000
$5.22
$6,400
$4.18
$11,482
$3.36
$9,5681
$2,79
$7,655
$2.23
100,000
$13,160
$13.16
$10,9671
$10.97
$8,774
$8.77
B
B Occupancy Tenant Improvements
300
$2,840
$7.14
$2,367
$5.95
$1,894
$4.75
-
1,_5
$2,926
$19.58
$2,438
$16.32
$1,951
$13.06
3,000
$3,220
$4.90
$2,683
$4.08
$2,147
$3.26
-
-
6,000
$3,366
$7.33
$2,805
$6.12
$2,244
$4.90
15,000
$4,027
$3.92
$3,356
$3.26
$2,685
$2.61
30,000
$4,615
$15.38
$3,846
$12.82
$3,077
$10.25
E
Preschool /School
100
$7,420
$55.97
$6,184
$46.64
$4,946
$37.31
-
_
-
500_
$7,644
$153.52
$6,370
$127.94
$5,096
$102.35
-
-
_
1,000
$8,411
$38.38
$7,010
$31.99
$5,608
$25.59
-
2,000
$8,796
$57.56
$7,3291
$47.97
$5,863
$38.37
-
-
5,000
$10,523
$30.70
$8,768
$25.59
$7,015
$20.47
_
10,000
$12,058
$120.57
$10,049
$100.48
$8,038
$80.38
E
E O ccupancy Tenant Im provements
$4,464
$33.67
$3,720
$28.06
$2,977
$22.45
_
$4,599
$92.37
$3,833
$76.97
$3,067
$61.58
_5
1,000
$5,061
$23.09
$4,217
$19.24
$3,374
$15.39
-
J -
2,000
$5,292
$34.63
$4,410
$28.86
$3,528
$23.09
-- - 5,000
$6,331
$18.48
$5,276
$15.40
$4,220
$12.32
10,000
$7,255
$72.54
$6,046
$60.46
$4,836
$48.36
F -1, F -2
Factory/industrial
1,000
$9,021
$51
$7,518
$5.67
$6,014
$4.54
-
-
5,000
$9,294
$18.67
$7,744
$15.56
$6,196
$12.44
-
-
10,000
$10,227
$4.65
$8,5231
$3.88
$6,818
$3.10
- - - - --
- -- - -- - - - -�-
- 20,000
$10,692
$7.01
$8,910
$5.84
$7,128
$4.67
-
_ _
-
50,000
$12,795
$3.73
$10,664
$3.11
$8,531
$2.49
100,000
$14,664
$14.67
$12,220
$12.22
$9,776
$9.77
F
F Occ upancy Tenant improvements
1,000
$6,619
$4.99
$5,517
$4.16
$4,413
$3.33
- - -
5,000
$6,819
$13.71
$5,683
$11.42
$4,547
$9.14
-
- --- ._.._._._.__..__.- ____._- ___-
10,
$7,505
$3.41
$6,254
$2.84
$5,0041
$2.27
-
-
20,000
$7,845
$5.15
$6,538
$4.29
$5,230
$3.44
-
-
50
$9,391
$2.72
$7,826
$2.27
$6,261
$1.82
100,000
$10,752
$10.75
$8,961
$8.96
$7,169
$7.17
H -1
H -1 Occupancies
100
$7,759
$58.53
$6,466
$48.78
$5,173
$39.03
-
_
- -
500
$7,993
$160.54
$6,661
$133.78
$5,329
$107.03
-
-- -
1,000
$8,796
$40.11
$7,330
$33.43
$5,863
$26.74
- -
2,000
$9,197
$60.21
$7,664
$50.17
$6,132
$40.14
-
5,000
$11,003
$32.11
$9,169
$26.76
$7,335
$21.41
^ -
10,000
$12,609
$126,081
$10,5081
$105.071
$8,406
$84.06
12-16
G:1 Finance\Budget\FEESCHEDULES1201 Wee Schedule Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Plan Check Fees
12-17
G: 1Finance \Budget\FEESCHEDULES120101Fee Schedule Building 2010.xlsx
Construction Types:
I -A, I -B
Construction Types:
11 -A, III -A, V -A
Construction Types:
11 -13, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf
H -2 to
Hazardous Ro
100
$6,189
$46.69
$5,158
$38.90
$4,126
$31.12
H -5
-
500
$6,375
$128.03
$5,313
$106.69
$4,251
$85.35
-
-
1,000
$7,015
$32.01
$5,846
$26.67
$4,677
$21.34
-
-
2,000
$7,335
$48.01
$6,113
$40.00
$4,890
$32.01
-
_
-
5,000
$8,776
$25.60
$7,313
$21.34
$5,850
$17.07
------- - - -• --
- - - - - --
10,000
$10,056
$100.55
$8,380
$83.79
$6,704
$67.03
H
H Occupancy T enant Improvements
100
$5,820
$43.90
$4,850
$36.59
$3,880
$29.26
-
-
- __...... _
-
500
$5,995
$124.38
$4,9951
$100.32
$3,997
$80.25
1,_0_00
$6,597
$30.12
$5,4971
$25.10
$4,398
$20.08
-
_
-
2,000
$6,898
$45.16
$5,748
$37,63
$4,599
$30.10
5,000
$8,252
$24.07
$6,877
$20.06
$5,501
$16.04
10,000
$9,456
$94.55
$7,880
$78.80
$6,304
$63.04
1 -1 to 1 -4
Institu tional
500
$6,650
$10.04
$5,542
$8.36
$4,433
$6.69
-
- - - - - -
2,5 00
$6,851
$27.52
$5,709
$22.93
$4,567
$18.34
- --
-- -`- - -- -
-- -- 5,000
$7,539
$6.87
$6,283
$5.73
$5,026
$4.59
-
_
-
10,000
$7,883
$10.33
$6,569
$8.61
$5,256
$6.89
25,000
$9,432
$5.50
$7,861
$4.58
$6,288
$3.66
- -
- 50,000
$10,806
$21.61
$9,006
$18.01
$7,205
$14.41
1
1 Occupancy Te nant Improvements
100
$4,064
$30.65
$3,387
$25.54
$2,710
$20.44
$4,187
$84.08
$3,489
$70.06
$2,791
$56.05
- - -- -� - -
- -- - 1,000
$4,607
$21.01
$3,839
$17.51
$3,072
$14.01
_
2,000
$4,817
$31.53
$4,014
$26.27
$3,211
$21.01
$5,762
$16.81
$4,803
$14.00
$3,842
$11.21
_5,
10,000
$6,603
$66.02
$5,502
$55.02
$4,403
$44.02
M
Market
2,000
$6,552
$2.48
$5,461
$2.06
$4,368
$1.65
-
- ---------- _.. - -_
-
..... -- -- -
10,000
$6,750
$6.76
$5,625
$5.64
$4,501
$4.51
-
-
20,000
$7,427
$1.71
$6,189
$1.43
$4,952
$1.14
-
_ -
4_0,00_0
$7,769
$2.53
$6,474
$2.11
$5,179
$1.68
-- - ~ ^ -- -
- - 100,000
$9,287
$1.36
$7,739
$1.13
$6,191
$0.91
200,000
$10,642
$5.32
$8,868
$4.44
$7,095
$3.55
M
M Occupancy Tenant Improvements
300
$3,898
$9.79
$3,248
$816.00
$2,598
$6.53
-
-
1,500
$4,015
$26.88
$3,346
$22.40
$2,677
$17.91
-
-
3,000
$4,418
$6.73
$3,682
$5.61
$2,945
$4.49
-
-
6,000
$4,620
$10.08
$3,850
$8.40
$3,081
$6.72
-
-
15,000
$5,528
$5.39
$4,607
$4.49
$3,685
$3.59
30,000
$6,336
$21.11
$5,280
$17.60
$4,224
$14.08
R -2
Apar tment Bldg
800
$7,685
$7.25
$6,404
$6.04
$5,123
$4.83
-- - -- - --
4,000
$7,917
$19.86
$6,598
$16.55
$5,278
$13.24
8,000
$8,711
$4.98
$7,260
$4.15
$5,807
$3.32
- -- - - -- -
16,000
$9,109
$7.44
$7,591
$6.20
$6,074
$4.96
-
_ -
40,000
$10,895
$3.98
$9,080
$3.32
$7,264
$2.65
80,000
$12,486
$15,61
$10,406
$13.01
$8,325
$10.40
R -2
Apartment Bldg - Repeat Unit
800
$3,916
$3.69
$3,263
$3.08
$2,611
$2.46
4,000
$4,035
$10.12
$3,362
$8.44
$2,690
$6.75
-
-
8,000
$4,440
$2.53
$3,700
$2.11
$2,960
$1.69
16,000
$4,643
$3.80
$3,868
$3.17
$3,095
$2 -53
-
- - -
40,000
$5,554
$2.03
$4,628
$1.69
$3,703
$1.35
80,000
f $6,365
$7.96
$5,304
$6.63
$4,2441
$5.30
12-17
G: 1Finance \Budget\FEESCHEDULES120101Fee Schedule Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Plan Check Fees
12 -18
G: 1Finance %Budget%FEESCHEDULES120101Fee Schedule Building 2010.xlsx
Construction Types:
1 -A, I -B
Construction Types:
II -A, III -A, V -A
Construction Types:
II -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf * I
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
R -1
Hotels & Motels
3,000
$11,430
$2.88
$9,525
$2.40
$7,620
$1.92
15,
$11,774
$7.88
$9,812
$6.57
$7,849
$5.25
-
-
30,000
$12,957
$1.97
$10,797
$1.63
$8,638
$1.31
-
-
60,000
$13,545
$2 -96
$11,288
$2.47
$9,031
$1.97
-
-
150,000
$16,209
$1.58
$13,508
$1.32
$10,806
$1.06
-- - - - --
- -- 300,000
$18,5851
$15,4871
$5.161
$12,390
$4.13
R -3
Dwellings - Custom, Models,
499
SEE MISCELLANEOUS FEE SCHEDULE
First Mast P
1,000
$3,595
$27.94
$2,9961
$23.28
$2,396
$18.63
_
-
2,500
$4,014
$27.91
$3,345
$23.26
$2,676
$18.60
-- ....-- - - - - --
-
-- -.._.- - --
-
- - -- - - --
4,000
$4,432
$10.47
$3,694
$8.72
$2,955
$6.98
-
-
6,000
$4,641.
$73.31
$3,868
$61.09
$3,095
$48.87
-
-
8,000
$6,108
$31.45
$5,090
$26.20
$4,072
$20.97
10,000
$6,737
$67.36
$5,615
$56.14
$4,492
$44.91
R -3
Dwellings - Produc Phase
1,000
$1,867
$1.39
$1,556
$1.15
$1,245
$0.92
-
of Master Plan
2,500
$1,889
$1.40
$1,573
$1.16
$1,259
$0.93
-- .- .._---------
-
- - - - -.
(repeats)
_..
4,000
$1,909
$1.06
$1,591
$0.89
$1,272
$0.70
-
_ -
6,000
$1,930
$33.50
$1,609
$27.91
$1,287
$22.33
- 8,000
$2,600
$10.49
$2,167
$8.73
$1,733
$6.99
10,000
$2,810
$28.09
$2,341
$23.41
$1,873
$18.73
R -3
Dwellings-Alternate_ Materials
1,000
$6,178
$55.83
$5,147
$46.53
$4,118
$37.22
-
-
2,500
$7,015
$55.83
$5,846
$46.53
$4,677
$37.22
-
_ _ -
4,000
$7,852
$20.95
$6,544
$17.46
$5,235
$13.96
-
- - -- J -
6,0
$8,272
$146.58
$6,893
$122.16
$5,515
$97.73
-
-
_
8,000
$11,203
$62.83
$9,337
$52.37
$7,469
$41.89
_
10,000
$12,460
$124.59
$10,383
$103.83
$8,306
$83.06
R-3_
D H - Custom, Models,
1,000
$6,701
$13.96
$5,584
$11.64
$4,467
$9.31
_
-
_
Fi rst Master Plan
2,500
$6,910
$55.83
$5,758
$46.53
$4,607
$37.22
-
_ _ _
-
4
$7,747
$10.50
$6,457
$8 -75
$5,166
$7.00
-
- ......... - --
-
- - -- --
6,000
$7,958
$62.82
$6,632
$52.35
$5,306
$41.88
-
-
8,000
$9,214
$73.29
$7,679
$61.07
$6,143
$48.86
10,000
$10,680
$106.79
$8,900
$89.00
$7,120
$71.20
R -3
Dwellings- Hillside - Production Phase
1,000
$3,811
$6.98
$3,176
$5.81
$2,540
$4.65
- - - -_..
of Master Plan
2,500
$3,915
$29.74
$3,262
$24.79
$2,611
$19.83
-
_ _ _
(repeat
4,000
$4,362
$5.22
$3,635
$4.36
$2,907
$3.49
_
-
_ -
6,000
$4,466
$32.36
$3,721
$26.97
$2,978
$21.58
$5,114
$38.41
$4,261
$32.02
$3,409
$25.61
_8
10,000
$5,882
$58.81
$4,902
$49.01
$3,921
$39.21
R -3
Dwellings- Hillside - Alternate Materials
1,000
$12,634
$27.92
$10,528
$23.27
$8,423
$18.62
- -`- -
- - 2,500
$13,052
$111.71
$10,877
$93.10
$8,702
$74.47
4,000
$14,728
$20.92
$12,273
$17.43
$9,819
$13.94
-
-
6,000
$15,146
$125.68
$12,622
$104.73
$10,097
$83.79
-
-
8,000
$17,660
$146.55
$14,717
$122.13
$11,773
$97.71
_ -- -- - -~
10,000
$20,591
$205.91
$17,160
$171.59
$13,728
$137.27
R -3.1
Group Care
1,000
$13,178
$9.95
$10,982
$8.28
$8,786
$6.63
-
- ___...- _..._._......____. -
5,000
$13,576
$27.25
$11,313
$22.72
$9,051
$18.17
-
-
10,000
$14,938
$6.82
$12,449
$5.69
$9,959
$4.55
-
20,000
$15,621
$10.22
$13,018
$8.52
$10,414
$6.81
-
-
50,000
$18,687
$5.45
$15,572
$4.54
$12,458
$3.63
- _
100,000
$2 .4101
$21.41
$17,8421
$17.84
$14,273
$14.27
12 -18
G: 1Finance %Budget%FEESCHEDULES120101Fee Schedule Building 2010.xlsx
CITY OF CiUPERTINO
Resolution 10-072
Fees Effective July 1, 2010
Schedule D - New Construction Plan Check Fees
12-19
G:1 Finance\BudgetlFEESCHEDULES120101Fee Schedule Building 2010.xlsx
Construction Types:
I -A, I-B
Construction Types:
H -A, III -A, V -A
Construction Types:
11 -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf "
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf •
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf'
R -4
Group Care -
10 0
$8,867
$66.89
$7,389
$55.74
$5,911
$44.59
-.... - -
T -_ - 500
$9,135
$183.48
$7,613
$152.90
$6,090
$122.32
-
-
-
1,000
$10,053
$45.86
$8,377
$38.22
$6,702
$30.57
-
-
2,000
$10,511
$68.81
$8,759
$57.33
$7,008
$45.87
5,000
$12,575
$36.69
$10,479
$30.57
$8,384
$24.46
10,000
$14,410
$144.10
$12,008
$120.07
$9,607
$96.06
R
R O ccupancy Tenant Im provements
80
$3,843
$36.22
$3,202
$30.18
$2,562
$24.14
-
-
400
$3,958
$99.38
$3,299
$82,82
$2,639
$66.26
-
-
800
$4,356
$24.83
$3,630
$20,70
$2,904
$16 -55
-
-
1,600
$4,555
$37.26
$3,796
$31.05
$3,037
$24.84
4,00
$5,449
$19.89
$4,541
$16.58
$3,633
$13.26
^
8,000
$6,245
$78.05
$5,204
$65.05
$4,163
$52.03
S -1
M oderate- Hazard Storage _
600
$8,682
$10.91
$7,235
$9.10
$5,788
$7.28
3,000
$8,944
$29.93
$7,454
$24.94
$5,962
$19.95
-
6,000
$9,841
$7.48
$8,201
$6.23
$6,561
$4.99
-
-
12,000
$10,290
$11.24
$8,576
$9.37
$6,860
$7.50
-
-
30,000
$12,314
$5.99
$10,262
$4.99
$8,209
$3.99
60,000
$14,110
$23.51
$11,758
$19.59
$9,407
$15.68
S -2
-
Lo w- Hazard Storage
-
10,000
$10,715
$0.81
$8,930
$0.67
$7,144
$0.54
50,000
$11,038
$2.21
$9,198
$1.85
$7,359
$1.48
-
-
100,000
$12,147
$0.55
$10,122
$0.46
$8,097
$0.37
_
200,000
$12,701
$0.84
$10,584
$0.69
$8,468
$0.56
-
-
500,000
$15,203
$0.44
$12,669
$0.37
$10,135
$0.30
1,000,000
$17,420
$1.74
$14,516
$1.45
$11,613
$1.16
S
S Occupancy Tenant Improvements
600
$5,265
$6.62
$4,388
$5.521
$3,510
$4.42
-
-
3,000
$5,424
$18.15
$4,520
$15.13
$3,616
$12.10
6,000
$5,969
$4.55
$4,974
$3.78
$3,980
$3.03
-
-
12,000
$6,241
$6.82
$5,200
$5.68
$4,161
$4.55
-
- - --
-
- -- -- -
30,000
$7,469
$3.61
$6,224
$3.01
$4,979
$2.41
-_-
- 60,000
$8,552
$14.25
$7,126
$11.87
$5,701
$9.51
U
Private Ga Bldg
40
$4,249
$80.13
$3,541
$66.77
$2,833
$53.42
-
-
200
$4,377
$219.77
$3,648
$183.14
$2,918
$146.51
-
-
400
$4,817
$54.94
$4,014
$45.78
$3,211
$36.62
800
$5,036
$82.42
$4,197
$68.68
$3,357
$54.94
-
-
2,000
$6,026
$43.94
$5,021
$36.62
$4,017
$29.29
4,000
6,9041
$172.59
$5,753
$143.83
$4,603
$115.06
-
Deferred Submittal -All Except R -3
1,000
$6,127
$4.62
$5,106
$3.85
.0851
$3.08
-
-
5,000
$6,311
$12.69
$5,260
$10.57
$4,208
$8.46
-
-
10,000
$6,946
$3.17
$5,788
$2.64
$4,631
$2.11
-
-
20,000
$7,263
$4.74
$6,0521
$3.96
$4,842
$3.16
-
50,000
$8,686
$2.55
$7.2381
$2.12
$5,791
$1.70
100,000
$9,961
$9.97
$8,301
$8.30
$6,641
$6.64
_ -
De ferred Submittal -R -3 - -- -
1,000
$3,242
$6.51
$2,702
$5.43
$2,162
$4.35
-
-
2,500
$3,340
$22.38
$2,783
$18.65
$2,227
$14.92
-
-
_
4,000
$3,676
$8.37
$3,064
$6.98
$2,451
$5.58
-
-
6,000
$3,843
37.721
$3,202
$31.43
$2,563
$25.14
__.- ______
____ -
8,000
$4,598
$33.581
$3,8321
$27.98
$3,066
$22.39
__ •,_.___
10,000
$5,2691
$52.681
$4,3911
$43.90
$3,5131
$35.13
12-19
G:1 Finance\BudgetlFEESCHEDULES120101Fee Schedule Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Plan Check Fees
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
12 -20
G:1 FinanceWudget \FEESCHEDULES120101Fee Schedule Building 2010.xlsx
Construction Types:
I -A, I -B
Construction Types:
II -A, 111 -A, V -A
Construction Types:
II -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf * I
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf
-
Stan dard Comm. Foundation wo /Podium
500
$8,498
$12.83
$7,081
$10.69
$5,666
$8.55
__._._..- _
2,500
$8,754
$35.16
$7,296
$29.29
$5,836
$23.44
_
- -- -- -
5,000
$9,633
$8.80
$8,028
$7.33
$6,422
$5.87
10,
$10,073
$13.19
$8,395
$10.99
$6,716
$8.79
25,000
$12,052
$7.03
$10,042
$5.85
$8,034
$4.69
50,000
$13,809
$27.62
$11,5081
$23.01
$9,206
$18.41
-
Stan dard Comm. Foundation
3,000
$9,729
$2.45
$8,107
$2.04
$6,487
$1.63
w /Podium
15,000
$10,023
$6.70
$8,352
$5.59
$6,683
$4.47
-
_
-
3 0,000
$11,029
$1.69
$9,190
$1.41
$7,353
$1.12
_
-
60,0
$11,535
$2.51
$9,612
$2.09
$7,690
$1.67
150,000
$13,7931
$1.34
$11,494
$1.121
$9,1961
$0.90
300,000
$15,8041
$5.261
$13,170
$4.391
$10,5371
$3.51
SHELL
BUILDINGS
-
All Other Shell Buildings
500
$11,084
$16.73
$9,237
$13.94
$7,389
$11.15
_
-
2,500
$11,418
$45.86
$9,516
$38.22
$7,613
$30.57
-
-
5,000
$12,565
$11.49
$10,471
$9.57
$8,377
$7.65
-
10,000
$13,139
$17.19
$10,949
$14.32
$8,759
$11.45
25,00_0
$15,718
$9.18
$13,097
$7.65
$10,478
$6.12
_ -
50,000
$18,014
$36.03
$15,0111
$30.021
$12,0091
$24.02
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
12 -20
G:1 FinanceWudget \FEESCHEDULES120101Fee Schedule Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Consbuction Inspection Fees
12-21
G: Finance \BudgetlFEESCHEDULES1201Wee Schedule Building 2010. >:Isx
Construction Types:
I -A, I -B
Construction Types:
II -A, III -A, V -A
Construction Types:
II -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
(a
Thresshold
Sire
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
I Size
Cost for
Each
Additional
100 sf *
A -1
-
1,000
$2,049
$71.46
$1,708
$59.56
$1,366
$47.64
'
-
5,000
$4,908
$83.96
$4,090
$69.96
$3,272
$55.97
'
-
10,000
39,105
$85.68
$7,588
$71.40
$6,071
$57.12
'
-
20,000
$•17,673
$39.04
$14,727
$32.54
$11,783
$26.03
'
-
50,000
$29,385
$25.55
$24,488
$21.301
$19,590
$17.03
100,000
$42,161
$42.16
$35,134
$35.13
$28,108
$28.11
A -2
-
250
81,210
$168.78
$1,008
$140.65
$807
$112.53
-
-
1,250
;)2,897
$198.28
$2,415
$165.23
$1,932
$132.18
-
-
2,500
1 )5,376
$202.361
$4,480
$168.64
$3,585
$134.91
-
-
5,000
$10,435
$92.201
$8,696
$76.84
$6,957
$61.47
-
-
12,500
$97,351
$60-311
$14,459
$50.27
$11,567
$40.21
25,000
$14,890
$99.56
$20,742
$82.97
$16,594
$66.37
A -3
-
1,000
$2,049
$71.46
$1,708
$59.56
$1,366
$47.64
'
-
5,000
14,908
$83.96
$4,090
$69.96
$3,272
$55.97
-
-
10,000
99,105
$85.68
$7,588
$6,071
$57.12
-
-
20,000
$17,673
$39.04
$14,727
$11,783
$26.03
'
-
50,000
$ ':9,385
$25.55
$24,488
$19,590
$17.03
100,000
$4.2,161
$42.16
$35,134
d$74.49
$28,108
$28.11
A -4, A -5
-
500
$1,282
$89.38
$1,068
$854
$59.59
-
2,500
$13,070
$105.02
$2,558
$2,047
$70.01
'
-
5,000
$5,695
$107.17
$4,746
$89.31
$3,797
$71,45
-
-
10,000
$11,053
$48.84
$9,211
$40.70
$7,369
$32.56
'
-
25,000
$18,379
$31.97
$15,316
$26.63
$12,253
$21.31
50,000
$2.6,370
$52.73
$21,975
$43.95
$17,580
$35.16
A
A Occupancy Tenant Improvements
500
$803
$56.00
$670
$46.67
$535
$37.33
-
-
2,500
$1,923
$65.77
$1,603
$54.81
$1,282
$43.85
'
-
5,000
$3,567
$67.13
$2,973
$55.94
$2,378
$44.76
'
-
10,000
$6,924
$30.591
$5,770
$25.50
$4,616
$20.40
'
-
25,000
$11,513
$20.00
$9,595
$16.67
$7,675
$13.33
50,000
$16,513
$33.03
$13,761
$27.52
$11,009
$22.02
B
Banks
500
$1,508
$105.16
$1,256
$87.63
$1,D05
$70.10
'
-
2,500
$3,611
$123.55
$3,009
$102.96
$2,408
$82.37
'
-
5,000
$6,700
$126.10
$5,583
$105.08
$4,467
$84.07
-
-
10,000
$13,004
$57.47
$10,837
$47.89
$8,669
$38.31
'
-
25,000
$21,623
$37.60
$18,020
$31.32
$14,416
$25.06
50,000
$31,022
$62.05
$25,8521
$51.70
$20,682
$41.36
B
Laundromat
200
$825
$143.73
$687
$119.78
$550
$95.82
'
-
1,000
$1,974
$168.85
$1,646
$140.71
$1,316
$112.57
'
-
2,000
$3,663
$172.35
$3,052
$143.63
$2,442
$114.90
'
-
4,000
$7,110
$78.53
$5,925
$65.44
$4,740
$52.36
'
-
10,000
$11,821
$51.39
$9,852
$42.82
$7,881
$3426
20,000
$13,960
$84.80
$14,134
$70.67
$11,307
$56.53
B
Medical Office
500
$1,454
$101.38
$1,211
$84.49
$969
$67.59
-
-
2,500
$3,481
$119.12
$2,901
$99.27
$2,321
$79.41
-
-
5,000
$6,459
$121.57
$5,383
$101.31
$4,306
$81.05
-
-
10,000
$1;2,537
$55.38
$10,448
$46.14
$8,358
$36.91
-
-
25,000 1
$20,844
$36.25
$17,370
$30.20
$13,896
$24.16
50,000
$2!3,906
$59.81
$24,921
$49.84
$19,937
$39.87
12-21
G: Finance \BudgetlFEESCHEDULES1201Wee Schedule Building 2010. >:Isx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Inspection Fees
12 -22
G:1 Finance \BudgetlFEESCHEDULES120101Fee Schedule -D- Building 2010.xlsx
Construction Types:
I -A, I -B
Construction Types:
I! -A, 111 -A, V -A
Construction Types:
11 -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
B
Offices
1,000
$2,469
$86.13
$2,058
$71.77
$1,647
$57.42
-
-
5,000
$5,914
$101.17
$4,929
$84.31
$3,943
$67.45
-
-
10,000
$10,973
$103.26
$9,144
$86.06
$7,316
$68.84
-
-
20,000
$21,299
$47.06
$17,750
$39.22
$14,200
$31.38
-
-
50,000
$35,417
$30.77
$29,514
$25.64
$23,611
$20.51
100,000
$50,801
$50.80
$42,335
$42.33
$33,868
$33.86
B
B Occupancy Tenant Improvements
300
$797
$92.58
$664
$77.15
$531
$61.72
-
-
1,500
$1,908
$108.76
$1,590
$90.64
$1,272
$72.51
-
-
3,000
$3,539
$111.02
$2,949
$92.52
$2,360
$74.01
-
-
6,000
$6,870
$50.59
$5,725
$42.15
$4,580
$33.72
-
-
15,000
$11,422
$33.10
$9,519
$27.59
$7,615
$22.07
30,000
$16,388
$54.62
$13,656
$45.52
$10,925
$36.42
E
Preschool /School
100
$572
$199.20
$477
$165.99
$381
$132.7
-
-
500
$1,368
$234.00
$1,140
$195.00
$912
$156.00
-
-
1,000
$2,538
$238.86
$2,115
$199.05
$1,693
$159.24
-
-
2,000
$4,927
$108.81
$4,106
$90.68
$3,285
$72.54
-
-
5,000
$8,191
$71.22
$6,826
$59.34
$5,462
$47.47
10,000
$11,752
$117.51
$9,794
$97.93
$7,835
$78.35
E
E Occupancy Tenant Improvements
100
$572
$199.20
$477
$165.99
$381
$132.79
-
-
500
$1,368
$234.00
$1,140
$195.00
$912
$156.00
-
-
1,000
$2,538
$238.86
$2,115
$199.05
$1,693
$159.24
-
-
2,000
$4,927
$108.81
$4,106
$90.68
$3,285
$72.54
-
-
5,000
$8,191
$71.22
$6,826
$59.34
$5,462
$47.47
10,000
$11,752
$117.51
$9,794
$97.93
$7,835
$78.35
F -1, F -2
Factory/industrial
1,000
$2,456
$85.63
$2,046
$71.36
$1,637
$57.09
-
-
5,000
$5,880
$100.58
$4,901
$83.82
$3,920
$67.05
-
-
10,000
$10,909
$102.69
$9,092
$85.58
$7,273
$68.46
-
-
20,000
$21,179
$46.78
$17,650
$38.97
$14,119
$31.18
-
-
50,000
$35,211
$30.61
$29,343
$25.51
$23,474
$20.41
100,000
$50,516
$50.51
$42,097
$42.10
$33,678
$33.68
F
F Occupancy Tenant Improvements
1,000
$2,172
$75.78
$1,810
$63.15
$1,449
$50.51
-
-
5,000
$5,204
$89.02
$4,337
$74.17
$3,468
$59.34
-
-
10,000
$9,654
$90.86
$8,045
$75.72
$6,436
$60.58
-
-
20,000
$18,740
$41-391
$15,617
$34.49
$12,493
$27.59
-
-
50,000
$31,156
$27.09
$25,965
$22.58
$20,772
$18.06
100,000
$44,704
$44.71
$37,254
$37.25
$29,803
$29.80
H -1
H -1 Occupancies
100
$572
$199.20
$477
$165.99
$381
$132.79
-
-
500
$1,368
$234.00
$1,140
$195.00
$912
$156.00
-
-
1,000
$2,538
$238.86
$2,115
$199.05
$1,693
$159.24
-
-
2,000
$4,927
$108.81
$4,106
$90.68
$3,285
$72.54
-
-
5,000
$8,191
$71.22
$6,826
$59.34
$5,462
$47.47
10,000
$11,752
$117.51
$9,794
$97.931
$7,835
$78.35
12 -22
G:1 Finance \BudgetlFEESCHEDULES120101Fee Schedule -D- Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective! July 1, 2010
Schedule D - New Construction Inspection Fees
12 -23
G:1 Finance l3udgetlFEESCHEDULES120101Fee Schedule Building 2010.xlsx
Construction Types:
I -A, I -B
Construction Types:
II -A, III -A, V -A
Construction Types:
I1 -13, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
(-D
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf
H -2 to
Hazardous Rooms
100
$572
$199.20
$477
$165.99
$381
$132.79
H - 5
-
500
$1,368
$234.00
$1,140
$195.00
$912
$156.0
-
-
1,000
$2,538
$238.86
$2,115
$199.05
$1,693
$159.24
-
-
2,000
$4,927
$108.811
$4,106
$90.68
$3,285
$72.54
-
-
5,000
$8,191
$71.22
$6,826
$59.34
$5,462
$47.47
10,000
$11,752
$117.51
$9,794
$97.93
$7,835
$78.35
H
H Occupancy Tenant Improvements
100
$572
$199.20
$477
$165.99
$381
$132.79
-
-
500
$1,368
$234.00
$1,140
$195.00
$912
$156.00
-
-
1,000
$2,538
$238.86
$2,115
$199.05
$1,693
$159.24
-
-
2,000
$4,927
$108.811
$4,106
$90.68
$3,285
$72.54
-
-
5,000
$8,191
$71.22
$6,826
$59.34
$5,462
$47.47
10,000
$11,752
$117.51
$9,794
$97.93
$7,835
$78.35
I -1 to 1 -4
Institutional
500
$944
$65.86
$787
$54.88
$630
$43.90
-
-
2,500
$2,262
$77.37
$1,884
$64.47
$1,508
$51.58
-
-
5,000
$4,196
$78.96
$3,496
$65.80
$2,797
$52.64
-
-
10,000
$8,144
$35.98
$6,787
$29.98
$5,429
$23.98
-
-
25,000
$13,540
$23.55
$11,284
$19.62
$9,026
$15.70
50,000
$19,427
$38.85
$16,190
$32.37
$12,951
$25.9
I
1 Occupancy Tenant Improvements
100
$457
$159.35
$381
$132.79
$305
$106.2
-
-
500
$1,095
$187.20
$912
$156.00
$730
$124.80
-
-
1,000
$2,030
$191.09
$1,693
$159.24
$1,354
$127.40
-
-
2,000
X3,942
$87.06
$3,285
$72.541
$2,628
$58.04
-
-
5,000
$6,553
$56.97
$5,462
$47.47
$4,369
$37.98
10,000
$9,402
$94.01
$7,835
$78.35
$6,268
$62.68
M
Market
2,000
$3,020
$52.66
$2,517
$43.89
$2,013
$35.11
-
-
10,000
37,233
$61.86
$6,028
$51.55
$4,822
$41.24
-
-
20,000
$13,419
$63.14
$11,183
$52.61
$8,946
$42.10
-
-
40,000
$26,047
$28.77
$21,706
$23.98
$17,365
$19.19
-
-
100,000
$43,314
$18.81
$36,095
$15.68
$28,876
$12.55
200,000
$132,127
$31.06
$51,772
$25.89
$41,418
$20.71
M
M Occupancy Tenant Improvements
300
$778
$90.46
$649
$75.38
$519
$60.31
-
-
1,500
$1,864
$106.28
$1,553
$88.57
$1,243
$70.86
-
-
3,000
$3,458
$108.48
$2,882
$90.40
$2,306
$72.32
-
-
6,000
:x6,713
$49.42
$5,594
$41.18
$4,475
$32.95
-
-
15,000
$11,161
$32.34
$9,301
$26.95
$7,441
$21.56
30,000
$16,011
$53.37
$13,343
$44.47
$10,674
$35.58
R -2
Apartment Bldg
800
61,453
$63.34
$1,211
$52.79
$968
$42.23
-
-
4,000
$3,480
$74.39
$2,900
$62.00
$2,320
$49.59
-
-
8,000
;66,455
$75.95
$5,380
$63.29
$4,304
$50.63
-
-
16,000
$12,531
$34.59
$10,442
$28.83
$8,354
$23.06
-
-
40,000
$20,832
$22.63
$17,361
$18.87
$13,889
$15.1
80,000
$29,888
$37.36
$24,907
$31.13
$19,925
$24.91
R -2
Apartment Bldg - Repeat Unit
800
$1,453
$63.34
$1,211
$52.79
$968
$42.2
-
-
4,000
$3,480
$74.39
$2,900
$62.00
$2,320
$49.59
-
-
8,000
$6,455
$75.95
$5,380
$63.29
$4,304
$50.63
-
-
16,000
$12,531
$34.59
$10,442
$28.83
$8,354
$23.06
-
-
40,000
$20,832
$22.63
$17,361
$18.87
$13,889
$15.10
80,000
$29,888
$37.36
$24,907
$31.13
$19,925
$24.91
12 -23
G:1 Finance l3udgetlFEESCHEDULES120101Fee Schedule Building 2010.xlsx
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction inspection Fees
12 -24
G:1 FinancelBudgetlFEESCHEDULES 120101Fee Schedule D_ Building 2010.xlsx 10
Construction Types:
I -A, I -B
Construction Types:
II -A, III -A, V -A
Construction Types:
II -B, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
R -1
Hotels & Motels
3,000
$4,863
$56.55
$4,053
$47.12
$3,242
$37.70
-
-
15,000
$11,649
$66.41
$9,708
$55.34
$7,766
$44.27
-
-
30,000
$21,610
$67.80
$18,009
$56.50
$14,407
$45.20
-
-
60,000
$41,951
$30.90
$34,959
$25.74
$27,967
$20.59
-
-
150,000
$69,759
$20.21
$58,132
$16.84
$46,506
$13.47
300,000
$100,069
$33.35
$83,3911
$27.80
$66,713
$22.24
R -3
Dwellings - Custom, Models,
499
SEE
MISCELLANEOUS FEE SCHEDULE
First Master Plan
1,000
$2,256
$100.09
$1,879
$83.42
$1,504
$66.73
-
2,500
$3,757
$64.49
$3,131
$53.74
$2,505
$43.00
-
-
4,000
$4,724
$82.52
$3,938
$68.77
$3,150
$55.01
-
-
6,000
$6,374
$82.11
$5,313
$68.42
$4,250
$54.73
-
-
8,000
$8,017
$113.7.51
$6,680
$94.79
$5,345
$75.83
10,000
$10,292
'$102.92
$8,577
$85.76
$6,861
$68.61
R -3
Dwellings - Production Phase
1,000
$2,256
$100.09
$1,879
$83.42
$1,504
$66.73
-
of Master Plan
2,500
$3,757
$64.49
$3,131
$53.74
$2,505
$43.00
-
(repeats)
4,000
$4,724
$82.52
$3,938
$68.77
$3,150
$55.01
-
-
6,000
$6,374
$82.11
$5,313
$68.42
$4,250
$54.7
-
-
8,000
$8,017
$113.75
$6,680
$94.79
$5,345
$75.83
10,000
$10,292
$102.92
$8,577
$85.76
$6,861
$68.61
R -3
Dwellings - Alternate Materials
1,000
$2,256
$100.09
$1,879
$83.42
$1,504
$66.73
-
-
2,500
$3,757
$64.49
$3,131
$53.74
$2,505
$43.00
-
-
4,000
$4,724
$82.52
$3,938
$68.77
$3,150
$55.01
-
-
6,000
$6,374
$82.11
$5,313
$68.42
$4,250
$54.73
-
-
8,000
$8,017
$113.75
$6,680
$94.79
$5,345
$75.83
10,000
$10,292
$102.92
$8,577
$85.76
$6,861
$68.61
R -3
Dwellings - Hillside - Custom,
1,000
$2,570
$100.10
$2,141
$83.42
$1,714
$66.74
-
Models First Master Plan
2,500
$4,071
$64.50
$3,393
$53.75
$2,715
$43.00
-
-
4,000
$5,039
$82.51
$4,200
$68.75
$3,359
$55.00
-
-
6,000
$6,690
$82.09
$5,575
$68.41
$4,460
$54.72
-
-
8,000
$8,331
$113.79
$6,943
$94.83
$5,554
$75.87
10,000
$10,607
$106.07
$8,840
$88.39
$7,071
$70.71
R -3
Dwellings - Hillside - Production
1,000
$2,570
$100.10
$2,141
$83.42
$1,714
$66.74
-
Phase of Master Plan
2,500
$4,071
$64.50
$3,393
$53.75
$2,715
$43.00
-
(repeats)
4,000
$5,039
$82.51
$4,200
$68-751
$3,359
$55.00
-
-
6,000
$6,690
$82.09
$5,575
$68.41
$4,460
$54.72
-
-
8,000
$8,331
$113.79
$6,943
$94.83
$5,554
$75.87
10,000
$10,607
$106.071
$8,840
$88.39
$7,071
$70.71
R -3
Dwellings - Hillside - Alternate MateriE
1,000
$2,570
$100.10
$2,141
$83.42
$1,714
$66.74
-
-
2,500
$4,071
$64.50
$3,393
$53.75
$2,715
$43.00
-
-
4,000
$5,039
$82.51
$4,200
$68.75
$3,359
$55.00
-
-
6,000
$6,690
$82.09
$5,575
$68.41
$4,460
$54.72
-
-
8,000
$8,331
$ `113.791
$6,943
$94.83
$5,554
$75.87
10,000
$10,607
$106.07
$8,840
$88.39
$7,071
$70.71
12 -24
G:1 FinancelBudgetlFEESCHEDULES 120101Fee Schedule D_ Building 2010.xlsx 10
CITY OF CU PERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Inspection Fees
12 -25
G: XRnance \BudgetlFEESCHEDULES120101Fee Schedule Building 2010.:dsx 11
Construction Types:
I -A, 1 -B
Construction Types:
II -A, Ill -A, V -A
Construction Types:
II -B, 111 -B, IV, V -B.
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
0 1
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
R -3.1
Group Care
1,000
$2,693
$93.93
$2,244
$78.27
$1,796
$62.62
-
-
5,000
$6,450
$110.34
$5,375
$91.95
$4,301
$73.56
-
-
10,000
$11,967
$112.64
$9,973
$93.86
$7,978
$75.09
-
-
20,000
$23,231
$51.311
$19,359
$42.76
$15,487
$34.20
-
-
50,000
$38,623
$33.57
$32,187
$27.98
$25,7491
$22.38
100,000
$55,409
$55.41
$46,174
$46.18
$36,9401
$36.93
R-4
Group Care
100
$437
$152.12
$364
$126.78
$291
$101.42
'
-
500
11,045
$178.71
$871
$148.93
$697
$119.15
-
-
1,000
;11,938
$182.42
$1,615
$152.01
$1,293
$121.60
-
-
2,000
53,762
$83.11
$3,136
$69.26
$2,509
$55.41
-
-
5,000
56,256
$54.38
$5,214
$45.31
$4,171
$36.25
10,000
>8,974
$89.74
$7,479
$74.79
$5,984
$59.83
R
R Occupancy Tenant Improvements
80
$434
$188.85
$362
$157.38
$289
$125.90
-
-
400
1 51,038
$221.85
$865
$184.88
$692
$147.90
-
-
800
$1,925
$226.44
$1,605
$188.70
$1,284
$150.96
-
-
1,600
$3,737
$103.16
$3,115
$85.97
$2,491
$68.77
-
-
4,000
$6,212
$61.51
$5,177
$56.26
$4,142
$45.00
8,000
1;8,913
$111.40
$7,427
$92.84
$5,942
$74.27
S -1
Moderate - Hazard Storage
600
$1,443
$83.90
$1,203
$69.91
$962
$55.93
-
3,000
$3,456
$98.54
$2,881
$82.12
$2,305
$65.70
-
6,000
$6,413
$100.57
$5,344
$83.81
$4,275
$67.04
-
-
12,000
$12,448
$45.82
$10,373
$38.18
$8,298
$30.55
-
-
30,000
$20,694
$29.99
$17,246
$24.99
$13,796
$19.99
60,000
$19,692
$49.49
$24,744
$41.24
$19,795
$32.99
S -2
Low- Hazard Storage
10,000
$13,941
$48.62
$11,617
$40.51
$9,294
$32.42
-
-
50,000
$13,389
$57.151
$27,825
$47.62
$22,260
$38.10
-
-
100,000
$61,964
$58.29
$51,637
$48.57
$41,310
$38.86
-
-
200,000
$120,255
$26.58
$100,212
$22.15
$80,170
$17.72
-
-
500,000
$200,003
$17.39
$166,670
$14.49
$133,336
$11.59
1,000,000
$286,940
$28.69
$239,117
$23.91
$191,293
$19.13
S
S Occupancy Tenant Improvements
600
$1,217
$70.731
$1,014
$58.95
$811
$47.15
-
-
3,000
12,915
$83.111
$2,429
$69.26
$1,944
$55.41
-
-
6,000
45,408
$84.80
$4,507
$70.67
$3,605
$56.53
-
-
12,000
$10,495
$38.64
$8,746
$32.19
$6,998
$25.76
-
-
30,000
$17,450
$25.29
$14,542
$21.07
$11,634
$16.86
60,000
$25,036
$41.73
$20,864
$34.77
$16,691
$27.82
U
Private Garage /Agricultural Bldg
40
$487
$424.44
$406
$353.71
$325
$282.96
-
-
200
$1,166
$498.62
$972
$415.51
$778
$332.41
-
-
400
$2,164
$508.92
$1,803
$424.11
$1,443
$339.28
'
-
800
$4,199
$231.88
$3,499
$193.23
$2,799
$154.59
-
-
2,000
$6,981
$151.73
$5,819
$126.43
$4,655
$101.14
4,000
$10,016
$250.391
$8,347
$208.66
$6,677
$166.92
-
Deferred Submittal -All Except R -3
1,000
$378
$13.17
$315
$10.98
$252
$8.78
-
-
5,000
$904
$15.45
$754
$12.88
$603
$10.30
-
-
10,000
$1,677
$15.79
$1,398
$13.16
$1,118
$10.53
-
-
20,000
$3,256
$7.20
$2,714
$6.00
$2,171
$4.80
'
-
50,000
$5,417
$4.72
$4,514
$3.94
$3,611
$3.14
100,000
$7,776
$7.77
$6,480
$6.48
$5,184
$5.18
12 -25
G: XRnance \BudgetlFEESCHEDULES120101Fee Schedule Building 2010.:dsx 11
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - New Construction Inspection Fees
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
12 -26
G:1 Finance \Budget\FEESCHEDULES1201Wee Schedule -D- Building 2010.xlsx 12
Construction Types:
I -A, I -B
Construction Types:
II -A, 111 -A, V -A
Construction Types:
11 -13, III -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf
-
Deferred Submittal -R -3
1,000
$0
$0.00
$o
$0.00
$0
$0.00
-
-
2,500
$0
$0.00
$0
$0.00
$0
$0.00
-
-
4,000
$0
$0.00
$0
$0.00
$0
$0.00
-
-
6,000
$0
$0.00
$0
$0.00
$0
$0.00
-
-
8,000
$0
$0.00
$0
$0.00
$0
$0.00
10,000
$0
$0.00
$0
$0.00
$o
$0.00
-
Standard Comm. Foundation wo/Podit
500
$1,390
$96.94
$1,158
$80.78
$927
$64.63
-
-
2,500
$3,329
$113.90
$2,774
$94.92
$2,219
$75.94
-
-
5,000
$6,177
$116.23
$5,147
$96.88
$4,118
$77.49
-
-
10,000
$11,988
$52.97
$9,990
$44.15
$7,992
$35.31
-
-
25,000
$19,933
$34.66
$16,611
$28.89
$13,289
$23.11
50,000
$28,599
$57.20
$23,833
$47.66
$19,066
$38.13
-
Standard Comm. Foundation
3,000
$3,527
$41.00
$2,939
$34.17
$2,352
$27.34
-
w /Podium
15,000
$8,447
$48.16
$7,040
$40.14
$5,632
$32.11
-
-
30,000
$15,672
$49.15
$13,059
$40.98
$10,448
$32.77
-
-
60,000
$30,4171
$22.40
$25,346
$18.67
$20,279
$14.93
-
-
150,000
$50,5791
$14,661
$42,1481
$12.21
$33,722
$9.77
300,000
$72,5591
$24.181
$60,4631
$20.161
$48,375
$16.13
SHELL BUILDINGS
-
All Other Shell Buildings
500
$1,625
$113.38
$1,355
$94.49
$1,084
$75.59
-
-
2,500
$3,893
$133.19
$3,244
$111.00
$2,595
$88.79
-
-
5,000
$7,223
$135.97
$6,020
$113.30
$4,816
$90.65
-
-
10,000
$14,021
$61.92
$11,685
$51.60
$9,348
$41.29
-
-
25,000
$23,311
$40.53
$19,425
$33.781
$15,540
$27.03
50,0001
$33,445
$66.89
$27,8711
$55.741
$22,297
$4459
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
12 -26
G:1 Finance \Budget\FEESCHEDULES1201Wee Schedule -D- Building 2010.xlsx 12
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Consolidated Schedule of Total Construction Fees
12-27
G:t Finance%BudgetlFEESCHEDULES1201 Wee Schedule Building 2010.xisx 13
Construction Types:
I -A, I -B
Construction Types:
li -A, III -A, V A
Construction
Ii -B, III -B,
Types:
IV, V B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Sase'Cost
Threshold
Size
Cost or
Each
Additional
100 sf *
Base Cost
@ Threshold
Size
Gost for
Each
Additional
100 sf *
base Cost
@
Threshold
Size
Go - sTTo - r
Each
Additional
100 sf *
A -1
-
1,000
$9,340
$76.96
$7,783
$64.14
$6,227
$51.31
-
-
5,000
$12,418
$99.041
10,348
$82.53
$8,279
$66.03
-
-
10,000
$17,370
$89.45
$14,475
$74.54
$11,581
'$59.63
-
20,000
$2.6,315
$44.71
$21,929
$37.26
$17,543
$29.81
-
-
50,000
$3.9,728
$28.55
$33,108
$23.80
$26,486
$19.04
-
-
100,000
$;4,005
$54.01
$45,005
$45.00
$36,004
$36.00
A -2
-
250
1.8,476
$190.70
$7,063
$158.91
$5,650
$127.13
-
-
1,250
$10,383
$258.40
$8,652
$215.34
$6,922
$172.27
-
-
2,500
$13,612
$217.42
$11,344
$181.18
$9,075
$144.95
-
-
5,000
$19,048
$114.76
$15,874
$95.63
$12,698
$76.51
-
-
12,500
$27,655
$72.35
$23,046
$60.29
$18,437
$48.23
-
-
25,000
$36,699
$146.80
$30,583
$122.33
$24,466
$97.86
A -3
-
1,000
$9,340
$76.96
$7,783
$64.14
$6,227
$51.31
-
-
5,000
$12,418
$99.04
$10,348
$82.53
$8,279
$66.03
-
-
10,000
$17,370
$89.45
$14,475
$74.54
$11,581
$59.63
-
-
20,000
$26,315
$44.71
$21,929
$37.26
$17,543
$29.81
-
-
50,000
$39,728
$28.55
$33,108
$23.80
$26,486
$19.04
-
-
100,000
$54,005
$54.01
$45,005
$45.00
$36,004
$36.00
A -4, A -5
-
500
$7,242
$98.39
$6,035
$81.99
$4,828
$65.59
-
-
2,500
$9,210
$129.67
$7,675
$108.06
$6,140
$86.45
-
-
5,000
$12,452
$113.34
$10,376
$94.45
$8,301
$75.56
-
-
10,000
$18,119
$58.09
$15,100
$48.41
$12,079
$38.73
-
-
25,000
$26,833
$36.89
$22,360
$30.74
$17,888
$24.59
-
-
50,000
$36,054
$72.11
$30,046
$60.09
$24,037
$48.07
A
A Occupancy Tenant Improvements
500
$4,104
$60.97
$3,420
$50.81
$2,736
$40.65
-
-
2,500
$5,323
$79,431
$4,436
$66.19
$3,549
$52.95
-
-
5,000
$7,309
$70.56
$6,091
$58.80
$4,873
$47.04
-
-
10,000
$10,837
$35.71
$9,031
$29.76
$7,225
$23.81
-
-
25,000
$16,194
$22.74
$13,495
$18.95
$10,796
$15.16
50,000
$21,878
$43.76
$18,232
$36.46
$14,586
$29.17
B
Banks
500
$8,681
$116.00
$7,234
$96.66
$5,788
$77.33
-
-
2,500
$11,001
$153.21
$9,167
$127.67
$7,334
$102.14
-
-
5,000
$14,831
$133.54
$12,360
$111.28
$9,887
$89.03
-
-
10,000
$21,508
$68.57
$17,924
$57.14
$14,339
$45.72
-
-
25,000
$31,794
$43.53
$26,495
$36.28
$21,196
$29.02
-
-
50,000
$42,677
$85.35
$35,565
$71.13
$28,451
$56.90
B
Laundromat
200
$7,628
$169.40
$6,357
$141.17
$5,086
$112.94
-
-
1,000
$8,984
$239.24
$7,486
$199.37
$5,989
$159.50
-
-
2,000
$11,377
$189.93
$9,480
$158.28
$7,584
$126.62
-
-
4,000
$15,175
$104.93
$12,645
$87.44
$10,117
$69.95
-
-
10,000
$21,470
$65.46
$17,892
$54.55
$14,314
$43.64
-
-
20,000
$28,017
$140.08
$23,347
$116.73
$18,678
$93.39
B
Medical Office
500
$9,951
$114.21
$8,292
$95.17
$6,635
$76.14
-
-
2,500
$12,235
$154.27
$10,196
$128.56
$8,156
$102.85
-
-
5,000
$15,092
$130.34
$13,409
$108.62
$10,728
$86.89
-
-
10,000
$22,609
$68.57
$18,841
$57.14
$15,073
$45.72
-
-
25,000
$32,894
$43.28
$27,412
$36.07
$21,930
$28.85
50,000
$43,715
$87.43
$36,429
$72.86
$29,1431
$58.29
12-27
G:t Finance%BudgetlFEESCHEDULES1201 Wee Schedule Building 2010.xisx 13
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Consolidated Schedule of Total Construction Fees
12 -28
G:1 Finance\Budget\FEESCHEDULES1201 Wee Schedule Building 2010.xlsx 14
Construction Types:
I -A, I -B
Construction Types:
fl-A, III -A, V A
Construction
II-B, III -B,
Types:
IV, V-13
IBC
Class
IBC Occupancy Type
Project Size
Threshold
ase Gost
@
Threshold
Size
Gost or
Each
Additional
100 sf *
Base Cost
@ Threshold
Size
Gost for
Each
Additional
100 sf *
tsase cost
@
Threshold
Size
Gost or
Each
Additional
100 sf *
B
Offices
1,000
$10,567
$92.23
$8,805
$76.86
$7,045
$61.49
-
-
5,000
$14,256
$117.94
11,8791
$98.29
$9,504
$78.63
-
-
10,000
$20,153
$107.46
$16,794
$89.55
$13,435
$71.64
-
-
20,000
$30,898
$53.33
$25,749
$44.44
$20,599
$35.55
-
-
50,000
$46,897
$34.13
$39,081
$28.44
$31,266
$22.75
100,000
$63,9601
$63.96
$53,301
$53.30
$42,641
$42.64
B
B Occupancy Tenant Improvements
300
$3,637
$99.72
$3,031
$83.09
$2,425
$66.47
-
-
1,500
$4,833
$128.35
$4,028
$106.95
$3,222
$85.56
-
-
3,000
$6,758
$115.92
$5,632
$96.60
$4,506
$77.28
-
-
6,000
$10,236
$57.93
$8,530
$48.27
$6,824
$38.62
-
-
15,000
$15,449
$37.03
$12,874
$30.85
$10,300
$24.68
-
-
30,000
$21,002
$70.00
$17,502
$58.34
$14,002
$46.67
E
Preschool /School
100
$7,991
$255.19
$6,659
$212.65
$5,328
$170.12
-
-
500
$9,012
$387.54
$7,510
$322.95
$6,008
$258.36
-
-
1,000
$10,949
$277.23
$9,124
$231.03
$7,300
$184.82
-
-
2,000
$13,722
$166.40
$11,435
$138.67
$9,148
$110.94
-
-
5,000
$18,7141
$101.90
$15,595
$84.92
$12,476
$67.93
-
-
10,000
$23,809
$238.09
$19,842
$198.41
$15,873
$158.72
E
E Occupancy Tenant Improvements
100
$5,035
$232.881
$4,196
$194.07
$3,357
$155.26
-
-
500
$5,966
$326.39
$4,973
$271.99
$3,978
$217.59
-
-
1,000
$7,598
$261.94
$6,333
$218.28
$5,066
$174.62
-
-
2,000
$10,218
$143.47
$8,515
$119.56
$6,812
$95.65
-
-
5,000
$14,522
$89.68
$12,102
$74.73
$9,681
$59.78
-
-
10,000
$19,0061
$190.06
$15,839
$158.38
$12,671
$126.71
F -1, F -2
Factory/Industrial
1,000
$11,475
$92.44
$9,563
$77.03
$7,650
$61.62
-
-
5,000
$15,173
$119.26
$12,644
$99.38
$10,116
$79.50
-
-
10,000
$21,136
$107.35
$17,614
$89.46
$14,091
$71.57
-
-
20,000
$31,871
$53.78
$26,559
$44.82
$21,247
$35.86
-
-
50,000
$48,006
$34.35
$40,005
$28.62
$32,004
$22.90
-
-
100,000
$65,180
$65.18
$54,317
$54.32
$43,454
$43.45
F
F Occupancy Tenant Improvements
1,000
$8,792
$80.76
$7,326
$67.30
$5,861
$53.84
-
-
5,000
$12,022
$102.69
$10,019
$85.58
$8,015
$68.46
-
-
10,000
$17,157
$94.28
$14,297
$78.57
$11,438
$62.86
-
-
20,000
$26,585
$46.54
$22,154
$38.78
$17,724
$31.03
-
-
50,000
$40,548
$29.82
$33,789
$24.85
$27,032
$19.88
-
-
100,000
$55,457
$55.46
$46,214
$46.21
$36,971
$36.97
H -1
H -1 Occupancies
100
$8,330
$257.73
$6,942
$214.77
$5,553
$171.82
-
-
500
$9,361
$394.54
$7,800
$328.78
$6,241
$263.03
-
-
1,000
$11,334
$278.97
$9,445
$232.48
$7,556
$185.98
-
-
2,000
$14,123
$169.02
$11,769
$140.85
$9,416
$112.68
-
-
5,000
$19,194
$103.33
$15,995
$86.11
$12,796
$68.88
-
-
10,000
f24,3601
$243.60
$20,301
$203.001
$16,240
$162.40
12 -28
G:1 Finance\Budget\FEESCHEDULES1201 Wee Schedule Building 2010.xlsx 14
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Consolidated Schedule of Total Construction Fees
12 -29
G: 1Finance \BudgetlFEESCHEDULES1201Wee Schedule D_ Building 2010.xlsx 15
Construction Types:
I -A, I -B
Construction Types:
II -A, ill -A, V A
Construction Types:
II -B, 111 -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
ase os
I
Threshold
Size
Cost or
Each
Additional
100 sf *
Base Cost
@ Threshold
Size
Cost tor
Each
Additional
100 sf *
13ase Cost
@
Threshold
Size
Cost or
Each
Additional
100 sf *
H -2 to
Hazardous Rooms
100
$6,760
$245.88
$5,633
$204.90
$4,507
$163.92
H -5
-
500
1.7,743
$362.06
$6,453
$301.72
$5,163
$241.38
-
-
1,000
1.9,554
$270.85
$7,962
$225.71
$6,369
$180.57
-
-
2,000
$12,262
$156.85
$10,219
$130.71
$8,175
$104.57
-
-
5,000
$16,967
$96.80
$14,140
$80.67
$11,312
$64.53
10,000
$21,807
$218.07
$18,173
$181.73
$14,539
$145.38
H
H Occupancy Tenant Improvements
100
$.6,390
$243.09
$5,325
$202.581
$4,260
$162.06
-
-
500
1.7,363
$354.41
$6,136
$295.35
$4,909
$236.28
-
-
1,000
$9,135
$268.97
$7,612
$224.14
$6,090
$179.31
-
-
2,000
$11,824
$153.97
$9,854
$128.31
$7,883
$102.65
-
-
5,000
$16,443
$95.28
$13,703
$79.40
$10,962
$63.52
10,000
$21,207
$212.07
$17,673
$176.72
$14,139
$14138
1 -1 to 1 -4
Institutional
500
$.7,594
$75.88
$6,329
$63.23
$5,063
$50.59
-
-
2,500
39,111
$104.89
$7,593
$87.41
$6,075
$69.93
-
-
5,000
$11,734
$85.84
$9,778
$71.53
$7,823
$57.23
-
-
10,000
$16,026
$46.30
$13,355
$38.59
$10,684
$30.87
-
-
25,000
$22,972
$29.05
$19,143
$24.21
$15,315
$19.37
50,000
$":;0,233
$60.47
$25,194
$50.39
$20,156
$40.31
I
I Occupancy Tenant Improvements
100
34,521
$190.01
$3,767
$158.34
$3,014
$126.67
-
-
500
1.5,281
$271.28
$4,401
$226.07
$3,521
$180.85
-
-
1,000
$6,637
$212.11
$5,531
$176.76
$4,425
$141.40
-
-
2,000
3.8,758
$118.60
$7,299
$98.83
$5,839
$79.06
-
-
5,000
$12,316
$73.77
$10,264
$61.47
$8,210
$49.18
-
-
10,000
$16,004
$160.04
$13,337
$133.37
$10,670
$106.69
M
Market
2,000
$9,571
$55.14
$7,976
$45.95
$6,381
$36.76
-
-
10,000
$13,983
$68.65
$11,652
$57.21
$9,322
$45.77
-
-
20,000
$,20,847
$64.84
$17,373
$54.03
$13,899
$43.22
-
-
40,000
$13,815
$31.31.
$28,179
$26.09
$22,5441
20.87
-
-
100,000
$52,600
$20.19
$43,833
$16.83
$35,0671
$13.46
200,000
$72,793
$36.40
$60,661
$30.33
$48,529
$24.26
M
M Occupancy Tenant Improvements
300
$4,676
$100.25
$3,896
$83.54
$3,117
$66.84
-
-
1,500
$5,879
$133.16
$4,899
$110.97
$3,919
$88.77
-
-
3,000
$7,876
$115.22
$6,563
$96.01
$5,251
$76.81
-
-
6,000
$11,333
$59.50
$9,444
49.591
$7,555
$39.67
-
-
15,000
$16,688
$37.72
$13,907
$31.44
$11,125
$25.15
30,000
$2,346
$74.49
$18,622
$62.07
$14,898
$49.66
R -2
Apartment Bldg
800
$9,137
$70.58
$7,615
$58.81
$6,092
$47.05
-
-
4,000
$11,396
$94.27
$9,497
$78.55
$7,597
$62.84
-
-
8,000
$15,166
$80.93
$12,638
$67.44
$10,111
$53.95
-
-
16,000
$21,640
$42.05
$18,033
$35.04
$14,427
$28.03
-
-
40,000
$;:1,733
$26.60
$26,444
$22.17
$21,155
$17.74
80,000
$42,373
$52.97
$35,312
$44.14
$28,249
$35.31
R -2
Apartment Bldg - Repeat Unit
800
$ :5,369
$67.03
$4,474
$55.86
$3,580
$44.69
-
-
4,000
$7,514
$84.51
$6,261
$70.43
$5,010
$56.34
-
-
8,000
$10,894
$78.48
$9,078
$65.40
$7,263
$52.32
-
-
16,000
$17,173
$38.39
$14,311
$31.99
$11,449
$25.59
-
-
40,000
$"'6,386
$24.67
$21,989
$20.55
$17,591
$16.44
80,000
$: 6,2521
$45.311
$30,2111
$37.76
$24,168
$30.21
12 -29
G: 1Finance \BudgetlFEESCHEDULES1201Wee Schedule D_ Building 2010.xlsx 15
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Consolidated Schedule of Total Construction Fees
12 -30
G:1 FinancelBudget\FEESCHEDULES1201 Wee Schedule Building 2010.xlsx 16
Construction Types:
I -A,1 -B
Construction Types:
It -A, 111 -A, V -A
Construction Types:
II -B, 111 -B, IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
base Cost
@
Threshold
Size
Cost or
Each
Additional
100 sf *
Base Cost
@ Threshold
Size
Cost for
Each
Additional
100 sf *
t5ase Cost
@
Threshold
Size
Cost or
Each
Additional
100 sf *
R -1
Hotels & Motels
3,000
$16,292
$59.42
$13,577
$49.52
$10,861
$39.62
-
-
15,000
$23,423
$74.31
$19,519
$61.93
$15,616
$49.54
-
-
30,000
$34,570
$69.78
$28,808
$58.15
$23,046
$46.52
-
-
60,000
$55,504
$33.85
$46,252
$28.21
$37,002
$22.57
-
-
150,000
$85,968
$21.79
$71,640
$18.16
$57,312
$14.53
300,000
$118,6531
$39.551
$98,877
$32.96
$79,101
$26.37
R -3
Dwellings - Custom, Models,
499
SEE MISCELLANEOUS
FEE SCHEDULE
First Master Plan
1,000
$5,850
$128.02
$4,875
$106.68
$3,900
$85.35
-
2,500
$7,771
$92.44
$6,475
$77.04
$5,180
$61.63
-
-
4,000
$9,157
$92.95
$7,631
$77.46
$6,105
$61.97
-
-
6,000
$11,016
$155.41
$9,180
$129.51
$7,344
$103.61
-
-
8,000
$14,124
$145.20
$11,770
$121.00
$9,416
$96.84
10,000
$17,028
$170.28
$14,191
$141.90
$11,352
$113.52
R -3
Dwellings - Production Phase
1,000
$4,122
$101.51
$3,436
$84.59
$2,748
$67.67
-
of Master Plan
2,500
$5,645
$65.91
$4,705
$54.92
$3,763
$43.94
-
(repeats)
4,000
$6,634
$83.55
$5,528
$69.62
$4,422
$55.70
-
-
6,000
$8,304
$115.60
$6,920
$9633
$5,537
$77.07
-
-
8,000
$10,617
$124.23
$8,847
$103.52
$7,078
$82.82
10,000
$13,101
$131.01
$10,918
$109.17
$8,735
$87.34
R -3
Dwellings - Alternate Materials
1,000
$8,433
$155.96
$7,027
$129.97
$5,622
$103.97
-
-
2,500
$10,772
$120.35
$8,976
$100.29
$7,181
$80.23
-
-
4,000
$12,577
$103.44
$10,481
$86.20
$8,385
$68.96
-
-
6,000
$14,646
$228.70
$12,205
$190.58
$9,764
$152.46
-
-
8,000
$19,219
$176.58
$16,017
$147.15
$12,814
$117.72
10,000
$22,7521
$227.51
$18,959
$189.59
$15,168
$151.67
R -3
Dwellings-Hillside - Custom, Models,
1,000
$9,270
$114.07
$7,726
$95.06
$6,181
$76.05
-
First Master Plan
2,500
$10,982
$120.34
$9,152
$100.28
$7,321
$80.23
-
-
4,000
$12,787
$93.00
$10,655
$77.50
$8,525
$62.00
-
6,000
$14,647
$144.91
$12,206
$120.76
$9,765
$96.61
-
-
8,000
$17,544
$187.08
$14,621
$155.90
$11,697
$124.72
10,000
$21,2871
$212.86
$17,739
$177.38
$14,191
$141.91
R -3
Dwellings- Hillside - Production Phase
1,000
$6,3811
$107.08
$5,317
$89.24
$4,254
$71.39
-
of Master Plan
2,500
$7,987
$94.25
$6,656
$78.54
$5,325
$62.83
-
(repeats)
4,000
$9,401
$87.73
$7,834
$73.11
$6,267
$58.49
-
-
6,000
$11,155
$114.46
$9,296
$95.38
$7,437
$76.31
-
-
8,000
$13,444
$152.21
$11,203
$126.84
$8,963
$101.47
10,000
$16,489
$164.88
$13,741
$137.40
$10,992
$109.92
R -3
Dwellings- Hillside - Alternate Material
1,000
$15,204
$128.02
$12,670
$106.68
$10,136
$85.35
-
-
2,500
$17,1241
$176.21
$14,270
$146.84
$11,416
$117.47
-
-
4,000
$19,767
$103.47
$16,472
$86.22
$13,178
$68.98
-
-
6,000
$21,837
$207.73
$18,197
$173.11
$14,558
$138.49
-
-
8,000
$25,991
$260.35
$21,659
$216.961
$17,327
$173.57
10,000
$31,198
$311.98
$25,9981
259.98
$259.981
$20,799
$207.98
12 -30
G:1 FinancelBudget\FEESCHEDULES1201 Wee Schedule Building 2010.xlsx 16
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Consolidated Schedule of Total Construction Fees
12 -31
G:1 FinancetBudgetlFEESCHEDULES 120101Fee Schedule Building 2010.xlsx 17
Construction Types:
I -A, I -B
Construction Types:
11 -A, III -A, V -A
Construction
11-13, III -B,
Types:
IV, V B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base os t
t D,
Threshold
Siee
(;ost Tor
Each
Additional
100 sf *
Base Cost
@ Threshold
Size
Cost Tor
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost or
Each
Additional
100 sf
R -3.1
Group Care
1,000
$15,871
$103.87
$13,226
$86.56
$10,580
$69.25
-
-
5,000
$20,025
$137.63
$16,688
$114.69
$13,350
$91.75
-
-
10,000
$26,907
$119.45
$22,422
$99.54
$17,938
$79.63
-
-
20,000
$38,851
$61.53
$32,376
$51.27
$25,901
$41.02
-
-
50,000
$57,309
$39.05
$47,758
$32.54
$38,207
$26.03
100,000
$76,834
$76.83
$64,029
$64.03
$51,223
$51.22
R-4
Group Care
100
$9,304
$219.02
$7,752
$182.51
$6,202
$146.01
-
-
500
$10,179
$362.19
$8,483
$301.82
$6,787
$241.46
-
-
1,000
$11,991
$228.27
$9,992
$190.23
$7,994
$152.18
-
-
2,000
$14,273
$151.92
$11,895
$126.60
$9,516
$101.28
-
-
5,000
$18,831
$91.06
$15,692
$75.88
$12,554
$60.71
10,000
$23,384
$233.83
$19,487
$194.86
$15,589
$155.89
R
R Occupancy Tenant Improvements
80
$4,275
$225.08
$3,563
$187.56
$2,850
$150.05
-
-
400
$4,995
$321.211
$4,163
$267.67
$3,331
$214.14
-
-
800
$6,281
$251.281
$5,234
$209.40
$4,188
$167.52
-
-
1,600
$8,291
$140.44
$6,909
$117.03
$5,528
$93.63
-
-
4,000
$11,661
$87.36
$9,718
$72.80
$7,775
$58.24
8,000
$15,156
$189.44
$12,630
$157.87
$10,105
$126.30
S -1
Moderate - Hazard Storage
600
$1 D,125
$94.81
$8,437
$79.01
$6,750
$63.20
-
3,000
$12,401
$128.47
$10,333
$107.06
$8,267
$85.65
-
6,000
$15,254
$108.08
$13,545
$90.06
$10,836
$72.05
-
-
12,000
$22,739
$57.05
$18,949
$47.54
$15,160
$38.03
-
-
30,000
$33,008
$35.98
$27,507
$29.98
$22,006
$23.99
60,000
$43,801
$73.00
$36,501
$60.83
$29,201
$48.67
S -2
Low- Hazard Storage
10,000
$24,655
$49.43
$20,545
$41.19
$16,437
$32.95
-
-
50,000
$44,427
$59.37
$37,022
$49.47
$29,618
$39.58
-
-
100,000
$74,111
$58.84
$61,759
$49.04
$49,407
$39.23
-
-
200,000
$132,955
$27.39
$110,796
$22.83
$88,637
$18.26
-
-
500,000
$215,126
$17.85
$179,272
$14.87
$143,418
$11.90
1,000,000
$304,359
$30.44
$253,633
$25.36
$202,906
$20.29
S
S Occupancy Tenant Improvements
600
$13,482
$77.35
$5,401
$64.46
$4,321
$51.57
-
-
3,000
$3,338
$101.25
$6,949
$84.38
$5,558
$67.50
-
-
6,000
$11,376
$89.34
$9,479
$74.45
$7,584
$59.56
-
-
12,000
$113,736
$45.45
$13,947
$37.88
$11,157
$30.30
-
-
30,000
$24,918
$28.90
$20,765
$24.08
$16,612
$19.27
60,000
$33,588
$55.98
$27,989
$46.65
$22,392
$37.32
U
Private Garage /Agricultural Bldg
40
$4,735
$504.57
$3,946
$420.48
$3,157
$336.38
-
-
200
$5,543
$718.38
$4,619
$598.65
$3,695
$478.92
-
-
400
$13,979
$563.85
$5,817
$469.88
$4,653
$375.90
-
-
800
$9,235
$314.291
$7,696
$261.91
$6,157
$209.53
-
-
2,000
$13,007
$195.66
$10,839
$163.05
$8,672
$130.44
4,000
$16,920
$422.98
$14,100
$352.49
$11,280
$281.99
-
Deferred Submittal -All Except R -3
1,000
$6,504
$17.79
$5,421
$14.82
$4,337
$11.86
-
-
5,000
$7,216
$28.14
$6,013
$23.45
$4,811
$18.76
-
-
10,000
$3,623
$18.96
$7,185
$15.80
$5,749
$12.64
-
-
20,000
$10,519
$11.95
$8,765
$9.95
$7,012
$7.96
-
-
50,000
$11,102
$7.24
$11,752
$6.03
$9,402
$4.82
100,000
$1'x,720
$17.72
$14,767
$14.771
$11,814
$11.81
12 -31
G:1 FinancetBudgetlFEESCHEDULES 120101Fee Schedule Building 2010.xlsx 17
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule O - Consolidated Schedule of Total Construction Fees
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
12 -32
G:1 Finance \Budget\FEESCHEDULES1201Wee Schedule Building 2010.x1sx 18
Construction Types:
I -A, I -B
Construction Types:
II -A, III -A, V A
Construction
II -B, III -B,
Types:
IV, V -B
IBC
Class
IBC Occupancy Type
Project Size
Threshold
Base cost
@
Threshold
Size
cost or
Each
Additional
100 sf *
Base Cost
@ Threshold
Size
Gost for
Each
Additional
100 sf *
base L;ost
@
Threshold
Size
Cost or
Each
Additional
100 sf
-
Deferred Submittal -R -3
1,000
$3,242
$6.51
$2,702
$5.43
$2,162
$4.34
-
-
2,500
$3,340
$22.38
$2,783
$18.65
2,2271
$14.92
-
-
4,000
$3,676
$8.38
$3,063
$6.98
2,4511
$5.58
-
-
6,000
$3,843
$37.72
$3,203
$31.43
2,5621
$25.14
-
-
8,000
$4,598
$33.58
$3,831
$27.98
$3,065
$22.38
10,000
$5,269
$52.69
$4,391
$43.90
$3,513
$35.12
-
Standard Comm. Foundation wo/Podlu
500
$9,887
$109.76
$8,239
$91.47
$6,592
$73.18
-
-
2,500
$12,082
$149.06
$10,069
$124.22
$8,055
$99.37
-
-
5,000
$15,809
$125.04
$13,175
$104.20
$10,539
$83.36
-
-
10,000
$22,061
$66.16
$18,384
$55.13
$14,708
$44.10
-
-
25,000
$31,985
$41.691
$26,654
$34.75
$21,323
$27.80
50,000
$42,408
$84.81
$35,340
$70.681
$28,272
$56.54
-
Standard Comm. Foundation w/Podiun
3,000
$13,255
$43.45
$11,046
$36.21
$8,838
$28.97
-
-
15,000
$18,470
$54.86
$15,390
$45.72
$12,314
$36.58
-
-
30,000
$26,699
$50.84
$22,249
$42.37
17,8011
$33.90
-
-
60,000
$41,9521
$24.91
$34,959
$20.76
$27,970
$16.61
-
-
150,000
$64,3721
$15.991
$53,641
$13.33
$42,917
$10.66
300,000
$88,3631
$29.451
$73,6321
$24.541
$58,912
$19.64
SHELL BUILDINGS
-
All Other Shell Buildings
500
$12,710
$130.11
$10,5911
$108.43
$8,473
$86.74
-
-
2,500
$15,312
$179.05
$12,760
$149.21
$10,208
$119.37
-
-
5,000
$19,787
$147.41
$16,490
$122.84
$13,192
$98.28
-
-
10,000
$27,158
$79.15
$22,632
$65.96
$18,105
$52.77
-
-
25,000
$39,031
$49.71
$32,526
$41.42
$26,021
$33.14
60,0001
$51,4571
$102.911
$42,881
$85.761
$34,305
$68.61
Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
12 -32
G:1 Finance \Budget\FEESCHEDULES1201Wee Schedule Building 2010.x1sx 18
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Mechanical, Electrical Plumbing
Fee Types
Fee
ADMINISTRATIVE AND MISC. FEES
Travel and Documentation Fees:
$ 43
MECHANICAL. PERMIT FEES
Mechanical Permit Fee
$ 43
Stand Alone Mechanical Plan Check (hourly rate)
$ 129
UNIT FEES:
Residential Appliance
New multi - family residential buildings (apartments and concominiums) having three or more
living units not including the area of garages, carports and other non - commercial automobile
storage areas constructed at the same time, per square foot
$ 0.07
New and single and two- family residential buildings not including the area of garages, carports
and other minor accessory buildings constructed at the same time, per square foot
$ 0.08
New commercial buildings and completely remodeled spaccis not including the area of
garages, per square foot
$ 0.14
For the repair of alteration of, or addition to each heating appliance, refrigeration unit, cooling
unit, VAV boxes, absorption unit, or each heating, cooling, absorption, or evaporative cooling
system, including installation of controls regulated by this Code (Commercial)
$ 65
For each air - handling unit, A/C units, heat pumps to and including 10,000 cubic feet per
minute, including ducts attached thereto. Does not apply to central type (Commercial)
$ 129
For each air - handling unit, A/C units, heat pumps to and including 10,000 cubic feet per
minute, including ducts attached thereto. Does not apply to central type (Residential)
$ 65
Repair /Alteration /Addition to each heating appliance, refrigeration unit, cooling unit, absorption
unit, or each heating, cooling, absorption, or evaporative cooling system, including installation
of controls regulated by this code. (Commercial)
$ 129
Repair/Alteration/Addition to each heating appliance, refrigeration unit, cooling unit, absorption
unit, or each heating, cooling, absorption, or evaporative cooling system, including installation
of controls regulated by this code. (Residential)
$ 65
For each air - handling unit A/C unit, heat pump over 10,000 cfmp to and including 3HP, or
each absorption system up to and including 100,000 Btu /h. ;Residential
$ 129
For the installation or relocation of each comme or indu strial -type hood
$ 129
For the installation of each residential hood that is served by a mechanical exhaust, including
the ducts for such hood
$ 33
For the installation or relocation of each forced -air or gravity -type furnace or burner, including
ducts and vents attached to such appliance, up to and including 100,000 Btu /h
$ 129
For each ventilation system which is not a portion of any heating or air conditioning system
authorized by a permit
$ 97
For each ventilation fan connected to a single duct
$ 22
For the installation or relocation of each forced air or gravity type furnace or burner, including
ducts and vents attached to such appliance over 100,000 Btu/h
$ 129
For the installation or relocation of each floor furnace, includ vent
$ 65
For the installation or relocation of each suspended heater, ecessed wail heater or floor-
mounted unit heater (Commercial)
$ 65
For the installation or relocation of each suspended heater, •ecessed wall heater or floor -
mounted unit heater (Residential)
$ 65
For the installation, relocation or replacement of each appliance vent installed and not
included in an appliance permit (Commercial)
$ 65
-33
G: FinancelBudgetlFEESCHEDULES t20101Fee Schedule—D Building 201 O.xlsx 19
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Mechanical, Electrical Plumbing
Fee Types I Fee
For the installation, relocation or replacement of each appliance vent installed and not
$ 0.08
included in an appliance permit (Residential)
$ 65
For the installation or relocation of each boiler or compressor to and including three
horsepower, or each absorption system to and including 100,000 Btu /h (29.3 kw)
$ 97
For the installation or relocation of each boiler or compressor over three horsepower to and
For repair or alteration of drainage or vent piping, floor, area, condensate piping
including 15 horsepower, or each absorption system over 100,000 Btu /h and including
500,000 Btu /h
$ 119
For the installation or relocation of each boiler or compressor over 15 horsepower to and
For each gas piping system of one (1) to four (4) outlets (Commercial)
including 30 horsepower, or each absorption system over 500,000 Btu /h to and including
1,000,000 Btu/h
$ 140
For the installation or relocation of each boiler or compressor over 30 horsepower to and
For each gas piping system of five (5) or more, per outlet
including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including
1,750,000 Btu /h
$ 162
For the installation or relocation of each boiler or refrigeration compressor over 50
Kitchen type trap and /or system
horsepower, or each absorption system over 1,750,000 Btu/h
1
$ 183
For each appliance or piece of equipment regulated by this Code but not classed in other
$ 22
appliance categories, or for which no other fee is listed in this Code
$ 65
OTHER FEES:
Other Mechanical Inspections (per hour) 1 $ _ 129
PERMIT FEES
Plumbing Permit Fee 4) 43
Stand Alone Plumbing Plan Check (hourly rate) 1 $ 129
UNIT FEES:
New multi - family residential buildings (apartments and condominiums) having .three or more
living units not including the area of garages, carports and other non - commercial automobile
storaae areas constructed at the same, per square foot 1 $ _ 0.07
New single and two- family residential buildings not including the area of garages, carports and
other minor accessory buildings constructed at the same time, per square foot
$ 0.08
New commercial buildings and completely remodeled spaces not including the area of
garages, per square foot
$ 0.14
For installation, alteration or repair of water piping water treating equipment
$ 43
For repair or alteration of drainage or vent piping, floor, area, condensate piping
$ 43
For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage
piping and backflow protection therefore)
$ 9
For each gas piping system of one (1) to four (4) outlets (Commercial)
$ 65
For each gas piping system of one (1) to four (4) outlets (Residential)
$ 65
For each gas piping system of five (5) or more, per outlet
$ 65
For each industrial waste pre - treatment interceptor, including its trap and vent, excepting
kitchen type grease traps functioning as fixture traps
$ 33
Kitchen type trap and /or system
$ 9
For each building sewer, sanitary sewer, and each trailer park sewer (Commercial)
$ 22
For each building sewer, sanitary sewer, and each trailer park sewer (R esidential)
$ 22
Storm/rainwater systems per drain
$ 9
For each water heater and /or vent (Commercial)
$ 26
For each water heater and /or vent (Residential)
$ 26
Water service (Residential)
$ 22
Re -pipe per fixture (Commercial)
$ 7
Re -pipe per fixture (Residential)
$ 12
12 -34
G:1 FinancelBudget lFEESCHEDULES120101Fee Schedule Building 2010.x1sx 20
CITY OF CUPERTINO
Resolution 10-
Fees Effective July 1, 2010
Schedule D - Mechanical, Electrical Plumbing
Fee Types
Fee
For each lawn sprinkler system on any one meter, including backflow protection devices
therefore
$ 65
For atmospheric type vacuum breakers/backflow not included in item 1
1 to 5
$ 65
over 5 each additional
$ 65
For each private sewage disposal system
$ 129
For each cesspool
$ 129
OTHER FEES:
Other Plumbing and Gas Inspections (per hour)
$ 129
ELECTRICAL PERMIT FEES
Electrical Permit Fee
$ 43
Stand Alone Electrical Plan Check (hourly rate)
$ 129
SYSTEM FEES:
New multi - family residential buildings
(apartments and condominiums) having three or more living units not including the area of
garages, carports and other non - commercial automobile storage areas constructed at the
same time, per square foot
$ 0.07
New single and two-family residential
buildings not including the area of garages, carports a and other minor accessory buildings
constructed at the same time, per square foot
$ 0.08
New commercial buildings and completely remodeled spaces
not including the area of garages, per square foot
$ 0.14
UNIT FEES:
Residential Appliances
For fixed residential appliances or receptacle outlets for same, including wall - mounted
electric ovens; counter mounted cooking tops; electric ranges, self- contained room
console, or through -wall air conditioners; space heaters; food waste grinders; dishwashers
washing machines; water heaters; clothes dryers; or other motor operated appliances not
exceeding one horsepower (HP) in rating, each
$ 22
Non - Residential Appliances
For residential appliances and self - contained factory- wired, non - residential appliances non
exceeding one horsepower (HP), kilowatt (KW), or kiluvotampere (kVA) in rating including
medical and dental devices; food, beverage, and ice cream cabinets; illuminated show
cases; drinking fountains; vending machines; laundry machines; or other similar types of
equipment, each
$ 43
Services (Temporary Power)
For services of 600 volts or less and not over 200 amperes in rating, each (Commercial)
$ 43
For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each
(Commercial)
$ 65
For services over 600 volts over 1,000 amperes in rating, each (Commercial)
$ 76
For services of 600 volts or less and not over 200 amperes in rating, each (Residential)
$ 43
For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each
(Residential)
$ 65
For services over 600 volts over 1 ,000 amperes in rating, each (Residential)
$ 7
35
G:1 Finance %Budget\FEESCHEDULES120101Fee Schedule Building 2010.xlsx 21
CITY OF CUPERTINO
Resolution 10-
Fees Effective July 1, 2010
Schedule D - Mechanical, Electrical Plumbing
Fee Types
Fee
Signs, Outline Lighting and Marquees
For signs, outline lighting systems or marquees supplied from one branch circuit, each
$ 43
For additional branch circuits within the same sign, outline lighting system or marquee,
each
$ 22
Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits
For electrical apparatus, conduits and conductors for which a permit is required but for
which no fee is herein set forth
$ 129
Power Device /Apparatus
For motors, generators, transformers, rectifiers, synchronous converters, capacitors,
industrial heating, air conditioners and heat pumps, cooking or baking equipment and
other apparatuses, as follows: Rating in horsepower (HP), kilowatts (kW), kilovolt- amperes
(WA), or kilovolt- amperes - reactive (KVAR):
$ 129
1 unit
$ 33
2 through 5 units, each additional
$ 33
6 and over, each additional
$ 33
Busways
For trolley and plug -in -type busways, each 100 feet or fraction thereof
$ 22
Receptacle, Switch and Lighting Outlets
For receptacle, switch, lighting or other outlets at which current is used or controlled,
except services, feeders and meters follows:
First 20
$ 43
Additional outlets, each
$ 3
Lighting Fixtures
For lighting fixtures, sockets or other lamp holding devices .
First 20
$ 66
Additional fixtures, each
$ 4
For pole or platform - mounted lighting fixtures, each
$ 14
For theatrical -type lighting fixtures or assemblies each
$ 12
OTHER FEES:
Other Electrical Inspections (per hour)
$ 129
12 -36
G:1 FinancelBudget \FEESCHEDULES120101Fee Schedule—D Building 2010.xlsx 22
CITY OF CIJPERTINO
Resolution 10-072
Fees Effective July 1, 2010
Schedule D - Miscellaneous Items
Work Item
Unit
Fee
Standard Hourly Rate
$ 129
Accessibility Hardship _ff�Tp�fion_
I hour
$ 169
Acoustical Review
Single Family Home/Duplex—New
each
$ 582
Single Family Home/Duplex—Addition/Alteration
each
$ 646
Multi-Family/Commercial
each
$ 259
Additions (R3 Occ) - Plan Check Fees
Over the counter-(not hillside-has conventional framing-
up to 250 sf
$ 258
Minimum 2 hours).
Plan Check Fees (not hillside).
up to 250 sf
$ 985
Plan Check Fees (not hillside ).
251-499 sf
$ 1,467
each additional hour
I hour
$ 129
Additions (R3 Occ) - Inspection Fees
Inspection Fees (Not Hillside)
up to 250 sf
$ 953
Inspection Fees (Not Hillside)
.
251-499 sf
$ 1,193
A d d r e ss Assignment
per hour
$ 323
Administrative/Clerical Fee - 112 hour flat rate
1/2 hour
$ 40
(covers changes in contractor/architect information and permit extensions)
—
Alternate Materials and Methods of Construction
1 hour
$ 169
Antenna—Telecom Facility
. Radio
each
$ 388
Cellular/Mobile Phone, free-standing
each
$ 1,034
Cellular/Mobile Phone, attached to building
each
$ 1,034
Arborfrrellis
AwninglCanopy (supported by building)
each
$ 323
Balcony Addition
each
$ 711
Carport
each
$ 582
Certifications
Special Inspector Qualifications (initial review)
each
$ 259
Special Inspector Qualifications (renewal / update)
each
$ 129
Special Inspector Certification Application
each
$ 4,393
Materials Testing Lab Certification
each
$ 2,714
Chimney
each
$ 517
Chimney Repair
each
$ 517
�qlose �Openings
Interior wall
each
$ 453
Exterior wall
each
$ 453
Commercial Coach (per unit)
each unit
each
$ 776
$ 905
Covered Porch
Deck (wood)
each
$ 453
Deck Railing
each
$ 453
Demolition
'Commercial
(up to 3,000 sf)
each
$ 517
Commercial (each add'l 3,000 sf)
each 3,000 sf
$ 259
Residential (up to 3,000 sf)
each
$ 517
Residential (each add'[ 3,000 sf)
each 3,000 sf
$ 129
Demolition
Swimming Pool Residential
each
$ 297
Swimming Pool Commercial (up to 3,000 so
each
$ 518
Swimming Pool Commercial (each add'I 3,000 sf)
- Disabled
each 3,000 sf
$ 259
Access Compliance Inspection
per hour
$ 129
Door
New door (non structural)
each
$ 259
New door (structural shear wall/masonry)
each
$ 388
Duplicate/Replacement Job Card
each
$ 65
Extensions
Plan Check Applications (within 180 days of Submittal)
1 hour
$ 169
Permits (within 180 days of Issuance)
Start construction
169
Resume or complete construction
2 hours
209
12-37
G. Schedule Building 2010.)1sx 23
CITY OF CUPERTINO
Resolution 10-072
Fees Effective July 1, 2010
Schedule D - Miscellaneous Items
Work Item
Unit
Fee
Standard Hourly Rate
$ 129
Fence
No n-masonry, over 6 feet in height _ _
....... ....... .
up to 100 Lf.
$ 388
Non-masonry, each additional 100 If
each 100 Lf.
$ 65
Masonry, over 6 feet in height
up to 100 I.f.
$ 646
Masonry, each additional 1 00"'If-1..-
each 100 Lf.
$ 259
Fireplace
Masonry
each
646
Pre-Fabricated/Metal
each
$ 453
Flag pole (over 20 feet in height)
each
$ 356
Foundation
each
776
Garage (detached) ----------
Wood frame up to 1,000 sf
each
$ 1,163
Masonry up to 1 sf
each
$ 1,163
-------
Interior Tenant Improvement Prep
each
$ 387
Inspections
Outside of normal business hours, 0-2 hours (minimum charge) _
up to 2 hrs
$ 387
Each additional hour or portion thereof
I hour
$ 194
Reinspection fee—per hour
1 hour
$ 129
Partial Inspection
per hour
$ 129
Courtesy Inspection - 2 hour minimum
2 hours
$ 258
Inspections for which no fee is specifically indicated —per hour (minimum charge
112 hour)
1 hour
$ 129
C ancelled inspection Wout advance notice
1 hour
$ 129
Life Safety Report
each
$ 776
Lighting pole
each
$ 388
each add'l pole
each
$ 388
Modular Structures
each
$ 776
Modification of Technical Code
I hour
$ 169
Partition—Commercial, Interior (up to 30 Lf.)
up to 30 H.
$ 453
Additional partition
each 30 Lf.
$ 97
� ia
Partitio nt 1, Interior (up to 30 I.f.)
up to 30 Lf.
$ 453
Additional partition
each 30 I.f.
$ 97
Patio Cover/ Sun Room
Wood frame
up to 300 sf
$ 646
Metal frame
up to 300 sf
$ 646
--------------
Other frame
up to 300 sf
$ 646
Additio - - patio
each 300 sf
$ 517
Enclosed, wood frame
up to 300 sf
$ 776
Enclosed, metal frame ..... ... ...... - - --------
Enclosed, other frame
up to 300 sf
$ 776
up to 300 sf
$ 776
Ad d itional enclosed patio
each 300 sf
$ 646
Photovoltaic System
Residential
each
$ 212
Multi-Family Res/Commercial, up to 8 kilowatts
up to a kW
$ 516
Multi-Family Res/Commercial, each additional I kilowatt
each 1 kW
$ 8
Pile Foundation
Cast C� Place Concrete (first 10 piles)
up to 10
$ 905
Additional Piles (increments of 10)
each 10
$ 776
Driven (steel, pre-stressed concrete)
up to 1
$ 905
Additional Piles
each 10
$ 776
Product Review
per hou
$ 129
Remodel — Residential
Kitchen
up to 300 sf
$ 582
Bath
up to 300 sf
$ 582
Other Remodel
up to 300 sf
$ 388
Additional remodel
each 300 sf
$ 65
Other Remodel
1000 sf
$ 3,900
Additional remodel
each 300 sf
$ 256
Other Remodel
2500 sf +
$ 5,181
Additional remodel
each 300 sf
$ 185
12-38
G Schedule Building 2010.xtsx 24
CITY OF CUPERTINO
Resolution 10-072
Fees Effective July 1, 2010
Schedule D - Miscellaneous Items
Work Item
Unit
Fee
Standard Hourly Rate
129
Re-roof
Residential
each 100sf
$ 14
Multi-Family Dwelling
each 100 sf
$ 14
Commercial .. . ...........
Commercial (first 5,000 so
each
$ 356
Commercial (each add'i 2,500 sf)
each 2,500 sf
$ 162
Retaining Wall (concrete _!?r_masonry)
Standard (up to 50 If)
up to 50 I.f.
$ 776
Additional retaining wall
each 50 I.f.
$ 646
Special Design, 3-10' high (up to 50 10
up to 50 Lf.
$ 905
Additional retaining well
each 50 I.f.
$ 776
Special Design, over 10' high (up to 50 If)
up to 50 I.f.
$ 969
Additional retaining wall
Gravity/Crib Wall, 0 -10' high (up to 50 10
each 50 I.f.
$ 840
up to 50 I.f.
$ 969
Additional Gravity /Crib Wall
each 50 I.f.
$ 840
Gravity/Crib Wall, over 10' high (up to
up to 50 I.f.
$ 969
Additional Gravity/Crib Wall
each 50 I.f.
$ 840
Revisions
Commercial New
each
$ 776
Tenant Improvement
each
$ 776
SFDWL
each
$ 776
Addition
each
$ 646
Remodel
each
$ 646
Roof Structure Replacement
up to 100 sf
$ 646
Additional roof structure replacement
each 100 sf
$ 517
Sauna—steam
each
$ 711
Stone and Brick Veneer (interior or exterior)
up to 400 sf
$ 582
All Other
up to 400 sf
$ 388
Additional siding
each 400 sf
$ 194
Signs
Directional
each
$ 259
Each additional Directional Sign
each
$ 129
Ground/Roof/Projecting Signs
each
$ 323
Master Plan Sign Check
each
$ 323
Rework of any existing Ground Sign
each
$ 323
Other Sign
each
$ 323
—
Reinspection Fee
each
$ 65
_ _
Wall/Awning Sign, Non-Electric
each
$ 259
Wall, Electric
each
$ 259
Shed over 120 square feet
each
$ 387
Skylight
Less than 10 sf
Greater than 10 sf or structural
each
$ 388
each
$ 711
Solar Panels
system
$ 212
Stairs—First Flight
first Right
$ 323
Each additional
per flight
$ 194
Storage Racks
0-8' high (up to 100 If)
first 100 If
$ 323
each additional 100 If
each 100 If
$ 65
over 8' high (up to 100 lf)
first 100 If
$ 356
each additional 100 If
each 100 If
$ 97
Stucco Appl
up to 400 sf
$ 453
Additional Stucco Application
each 400 sf
$ 33
Supplemental Inspection Fee—If a project requires significantly more inspections than
average, the Building Official may charge additional inspection fees
First 1/2 hour minimum
first 30 min
$ 65
Each Additional hour J
per hour
$ 129
Overtime Plan Check Fee
per hour
$ 1194
12-39
G:1Finance\BudgetkFEESCHEDULES1201 Wee Schedule Building 201 0.)dsx 25
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule D - Miscellaneous Items
Work Item
Unit
Fee
Standard Hourly Rate
$ 129
Supplemental Plan Check F (after 2nd review)
First 112 hour minimum
first 30 min
$ 65
Ea ch Additional hour
_ per hour
$ 129
Swimm Po ol /Sp
Vinyl -lined (up to 800 sf} - -- -- - - -- _
each —�
$ 905
each
$ 646
_F iberglass _ _
Gunite (up t o 80 sf) _
each
$ 1,422
Additional pool (over 8 sf _ _ _
each 1 sf
T
$ 194
C pool (up to 800 sf) _
each
$ 1,809
_
Commercia p ool (over 800 sf) —
_ each
$ 227
Spa or Hot Tub (P re- fab ricated) _
e
$ 323
Te Occupancy Permit -flat rate
2 hours
$ 258
Permit for Tem porary Structure
each
$ 387
Window or Sliding G lass D oor
Repl acement (first 8 windows _
first 8 v
$ 388
_ _
Replacement (each add'I 8 windows)
each 8
$ 129
New Window (non structu
each
$ 453
Ne window (structural shear wall /masonry --- ---
each
$ 776
Bay Window (st ructural)
each
$ 776
Refunds - Plan Check Fees
1st review not started (within 3 Business of Submittal) 100% of Plan Review Fees
Plan review more than 3 Business Days after the Date of Submittal No refund
Refunds - Building Permit Fees
No inspections within 180 days of permit issuance 80% of permit fees
No inspections more than 180 days after permit issuance No refund
Inspections were provided No refund
Work without permit -based on current permit and $ Double fees
plan check fees
FOOTNOTE:
Fee Adjustments: In instances where the strict application of fees from this schedule would constitute a substantial
inequity to an applicant or to the City, the Chief Building Official shall be authorized to adjust such fees on a case -by-
case basis. Any such adjustments shall be recorded in writing and entered into the appropriate files.
12 -40
G: 1Finance %Budget\FEESCHEDULES12010 \Fee Schedule Building 2010.xlsx 26
CITY OF CUPERTINO
Resolution 10- -072
Fees Effective Jule 1, 2010
Schedule E - Recreation
Recreation classes and excursion fees shall be determined as follows:
Classes
1. Determine the maximum hourly rate paid to instructor.
2. Multiply the instructor's hourly rate by the number of class meetings.
3. Determine the minimum number of participants and divide into the instructor's cost.
4. Add indirect overhead percent - 32 %.
5. Add 20% to establish non - resident fee.
6. Add cost for specialized equipment or supplies.
Special Conditions For classes taught by contract instructors, the indirect overhead is
only added to the City's percentage.
Excursions
1. Transportation cost divided by the number of participants plus overhead transfer.
2. Add 20% to establish non - resident fee.
3. Add any admission cost, supplies or leadership cast.
Additional factors that may be used to determine the class or excursion user fee
The total number of participants in a given activity may generate additional revenue
whereby the total program cost may be reduced.
Classes that traditionally have waiting lists may have the user fee increased.
Programs in competition with adjacent cities or the private sector may require fees to be
increased or decreased to remain competitive.
12-41
G: 1FinancelBudget \FEESCHEDULES120101Fee Schedule E Parks Recreation 2010xis
M
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Facility Use Fee Schedule (Staff Use Only)
CLASSIFICATIONS
Group I: City of Cupertino activities that are open to the public. Official city sponsored programs.
Group II: Clubs with 51 % resident membership, recreation programs and events with full or
affiliated city co- sponsorship and open to the public.
Group III: Programs and events sponsored by Cupertino based non -profit recreation, education
or community service organization with 51 % resident participation.
These organizations must show an official structure and status.
Group IV: Cupertino Residents /Cupertino Businesses - Private, special interest or business groups
for functions not open to the public. These functions would include parties, banquets,
receptions, industrial conferences, seminars, trade shows, etc.
Group V: Programs and events sponsored by non - resident non-profit recreation, education or
community service organization. These organizations must show official structure and status.
Group VI: Non - Residents/ Non - Resident Businesses - Private, special interest or
business groups for functions not open to the public. These functions would include
parties, banquets, receptions, industrial conferences, seminars, trade shows, etc.
12-42
G:I Flnance \Budget\FEESCHEDULES120101Fee Schedule_ E_Parks Recreation 2010xls
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Quinlan Community Center
ROOM RENTAL SCHEDULE PER HOUR
Cupertino Room
Co- Sponsored (Group I1)
Cupertino Non - Profit (Group III)
Resident/Cupertino Business (Group IV)
Non - Resident Non -Profit (Group V)
Non- Resident/Non- Resident Business (Group VI)
Social Room
Co- Sponsored (Group II)
Cupertino Non -Profit (Group III)
Resident/Cupertino Business (Group IV)
Non - Resident Non -Profit (Group V)
Non- Resident/Non- Resident Business (Group VI)
Conference Room*
Co- Sponsored (Group II)
Cupertino Non - Profit (Group III)
Resident/Cupertino Business (Group IV)
$20
$20
$45
$25
$55
$10
$10
$40
Non - Resident Non - Profit (Group V) $25
Non- Resident/Non- resident Business (Group VI) $50
*Note: Conference Room is not available to rent the mont]is of June, July, or August
Security Staff
Security staff is required when alcohol is served at any City facility. $25.00 per hour.
Fri 5:00 pm -Sun
$80
$80
$230
$140
$280
$60
$60
$90
$75
$110
$25
$25
$60
$50
$75
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150 ..00 for any time up to the first half hour,
and $t50.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V,VI and VI. Security deposit is due at time of reservation.
The Department Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
Quinlan Community Center
Cupertino Room - Res /Cupt Bus. /Cupt. Bus. Promotional & Non -Res. $750
All Other Rooms =Res /Cupertino Business $300
All Rooms - Co- Sponsored /Cupt Non- Profit/Non- Res./I�[on -Profit $300
General Liability Insurance - All groups required $1M w /e.ndorsement - $2M w /alcohol, w /endorsement to policy
showing City of Cupertino as Additional Insured.
Mon -Fri up to 5:00 pm
$30
$30
$140
$50
$170
12 -43
G:\Finance\Budget\FEESCHEDULES\2010\FeeSchedule Recreation 2010.)ds
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Monta Vista Recreation Center /Creekside Park Building
Room Rental Schedule Per Hour
Monta Vista Creekside Park
Recreation Center Buildin>;
Classroom
Co- Sponsored (Group Il)
$30
$30
Cupertino Non -Profit (Group III)
$30
$30
Resident/Cupertino Business (Group IV)
$55
$55
Non- Resident/Non -Profit (Group V)
$40
$40
Conference Room/Kitchen
Co- Sponsored (Group 11)
$30
N/A
Cupertino Non -Profit (Group 111)
$30
N/A
Resident/Cupertino Business (Group IV)
$55
N/A
Non- Resident/Non -Profit (Group V)
$40
NIA
Security Staff
Security Staff is required when alcohol is served at any City facility. $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour,
and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Security Deposit
A $100 security deposit shall be required for Groups 111, IV, V and VI. Security deposit is due at time of reservation.
The Department Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
12-44
G:\ Finance \Budget\FEESCHEDULES\2010\Fee Schedule_ E_Parks Recreation 2010.xis
CITY OF CUPERTINO
Resolution 10 -D72
Fees Effective July 1, 2010
Schedule E - Recreation
Senior Center
Annual Membership
End of Aug. to End of Oct. Membership Sale
Day Pass Fee
Class Pass
Day Trip Pass
Room Rental Schedule Per Hour
Reception Room
Resident
Non - Resident
$25
$30
$17
$22
$5
$5
$10
$15
$20
$25
Evenings and
Weekenrlc *
Co- Sponsored (Group II)
$12
Cupertino Non - Profit (Group III)
$80
Resident/Cupertino Business (Group IV)
$230
Non- Resident/Non -Profit (Group V)
$140
Classroom, Conference Room, Arts & Crafts Room Bay Ro
Co- Sponsored (Group II)
$12
Cupertino Non -Profit (Group III)
$60
Resident/Cupertino Business (Group IV)
$90
Non- Resident/Non -Profit (Group V)
$75
* Senior Center rooms are not available for rental Monday through Thursday 8:00 a.m. to 10:00 p.m. and
Friday, 8:00 a.m. to 5:00 p.m.
Security Staff
Security Staff is required when alcohol is served at any City facility. $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be zharged $150.00 for any time up to the first half hour,
and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V and VI. Security deposit is due at time of reservation.
The Department Director may also require a deposit based on the nature of an event. The security deposit will
be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
Cupertino Senior Center
Reception Hall - Group IV $750
All Other Rooms - Group IV $300
Group II, Ill, V - All Rooms $300
12-45
G: kFinancelBudgetlFEESCHEDULES 120101Fee schedule_ E_Parks Recreation 2010-xis
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Outdoor Facilities
Memorial Softball Field
Cupertino residents/businesses only
$25.00
Non - Residents
$40.00
Field can be reserved for a maximum of 2 hours. THERE IS NO FEE FOR
CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES
Field preparation (includes dragging, watering, chalking, and bases)
$36.50
Field Attendant (2 hour minimum). Field Attendant is required any time lights or field
$8.25/hr
preparation is requested.
Lights (in the evening)
$5.00/hr
Memorial Park Amphitheater
Cupertino resident/resident business
$55.00
Non- Resident/Non- Resident business
$75.00
Memorial Park Gazebo
Cupertino resident/resident business
$55.00
Non- resident/non- resident business
$75.00
Picnic Areas (daily rate)
Cupertino residents
$55.00
Cupertino business
$75.00
Non - residents
$80.00
Non - resident business
$100.00
Electricity at Memorial or Linda Vista Park
$25.00
Sports Field Fees
Adult Leagues (two hour minimum)
$50.00/hr
Deposit
$600.00
Youth Leagues (participant/season)
Resident
$11.00
Non - resident
$22.00
12-46
G:1 Finance \Budget\FEESCHEDULES120101Fee Schedule_ E_Parks Recreation 2010.xis 6
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Blackberry Farm
Picnic Areas (Daily Rate) *
Area 1 - 200 -300 Person Picnic Area
Area 2 - 100 Person Picnic Area
Area 3 - 100 Person Picnic Area
Area 4 - 50 Person Picnic Area
Area 5 - 50 Person Picnic Area
Area 6 - 25 Person Picnic Area
Pool Pass for Picnic Area Groups
Day -Use Pass Only
Weekday Tuesday - Friday
Weekend Saturday - Sunday
Picnic area fees are due in full at the time of reservation.
* Organizations may rent multiple areas.
Swim Pass Options
10 -day Pass
Season Swim Pass (May -Sept)
Individual Pass
2- Person Pass
3- Person Pass
4- Person Pass
5- Person Pass
6- Person Pass
7+ - Family Members - per person
Resident
Non - Resident
$250
$500
$100
$200
$100
$200
$50
$100
$50
$100
$25
$50
$2 per person $3 per person
$4.00 $6.00
$6.00 $8.00
Resident Non - Resident
$40 $60
$100
$140
$160
$200
$170
$210
$180
$220
$190
$230
$200
$240
$5
$7
12-47
G: 1Finance \BudgetlFEESCHEDULES120101Fee Schedule E Parks Recreation 2010.xis 7
Annual Passes
One Year
CITY OF CUPERTINO
$295.00
$330.00
Resolution 10 -072
Single
$420.00
Fees Effective July 1, 2010
One Year
Couple
Schedule E - Recreation
$880.00
One Year
Sports Center /Child Watch/Teen Center
$900.00
$980.00
Type Resident
Non - Resident
Day Passes
$7.00
$10.00
Monthly Passes
$48.00
Multi- Purpose Room
One Month
Single $55.00
$65.00
One Month
Couple $75.00
$90.00
One Month
Family $95.00
$115.00
Annual Passes
One Year
Juniors ( <17)
$295.00
$330.00
One Year
Single
$420.00
$455.00
One Year
Couple
$805.00
$880.00
One Year
Family
$900.00
$980.00
One Year
Senior
$375.00
$405.00
Sports Center Conference Room Rental Rates
$40.00
$48.00
Multi- Purpose Room
$60.00
$72.00
ADDITIONAL CONDITIONS
1. The Cupertino Tennis Club will be charged $10.00/hour during primetime and $6.00/hour per court
during non - primetime for all C.T.C. sponsored activities other than U. S.T.A. leagues and practices.
2. All competitors in C.T.C./U.S.T.A. leagues participating at the Sports Center must purchase an annual
pass.
3. Individuals may purchase a ten pack of day passes, $60.00 Resident, $90.00 Non - Resident.
4. Specials will be offered on an on -going basis.
Child Watch Fees
One visit $5.00
Ten visits $45.00
One Month Pass $100.00
Teen Center
Rental Rate $200.00 Per 3 hours
Deposit $750.00
Overtime Rate: $100.00 first hour; $50.00 each half hour after.
Daily Rate
10 Day Pass
Teen Resident Teen Non - Resident
No Cost $5.00
No Cost $40.00
12-48
G:1 Finance \BudgehFEESCHEDULES120101Fee Schedule_ E Parks Recreation 2010.)ds 8
CITY OF CUPE:RTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Community Nall
ROOM RENTAL SCHEDULE PER HOUR
M on -Thurs Up to Fri -5:00 p.m.-
5:00 P.M. Sun
Co- Sponsored (Group II) $80 $250
Cupertino Non - Profit (Group III) $80 $250
Resident /Cupertino Business (Group IV) $80 $250
Non - Resident Non - Profit (Group V) $80 $250
Non- Resident/Non- Resident Business (Group VI) $100 $300
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation shall be char,;ed $150.00 for any time up to the first half hour,
and $150.00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies
to all City facilities.
Security Deposit
A security deposit shall be required for All Classifications (Groups). Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The security
deposit will be refunded if no damage occurs, rooms are left in clean condition, and permits conclude on time.
Community Hall
All Classifications - Monday thru Thursday $300
All Classifications - Friday thru Sunday $750*
*If a non -profit 501c form is provided, the fee is $300
12-49
G:\FlnanceWudget\FEESCHEDULES\201OXFeeSchedule Recreation 2010.)ds
CITY OF CUPERTINO
Resolution 10 -072
Fees Effective July 1, 2010
Schedule E - Recreation
Blackberry Farm Golf Course
Daily Green Fee Schedule
Weekends
Resident Non - Resident
9 -Holes $17.00 $19.00
Senior $17.00 $19.00
Junior
$14.00 $16.00
Weekdays
Resident Non - Resident
$16.00 $17.00
$14.00
$14.00
$15.00
$15.00
Second 9 Holes (all players) $11.00 $13.00 $11.00 $13.00
All Groups and Tournaments pay the full rate (Cupertino residents still appies). Staff is authorized to set
merchandise fees according to current cost.
Annual Rate (Weekdays Only)
Adults (17 -61)
Jr /Sr
Cupertino Residents
$1,040
$965
Non - Residents
$1,225
$1,135
Semi - Annual Rate (Weekdays Only)
Res.
Res.
Cupertino Residents
$610
$520
Non - Residents
$645
$575
Super Annual Rate (Good on Weekends & Holidays)
Cupertino Residents
$1,175
$1,175
Non - Residents
$1,315
$1,315
Super Semi - Annual Rate (Good on Weekends & Holidays)
Cupertino Residents
$595
$595
Non - Residents
$700
$700
()nick Passes
Weekday Weekday Weekday Weekday
Golf fees may be increased/decreased at the discretion of the City Manager, Resolution No. 04 -350.
12 -50
G:1 FinancelBudget tFEESCHEDULES12010\Fee Schedule E_Parks Recreation 2010.xis 10
Senior
Adult
Senior
Adult
Weekend
Weekend
Res.
Res.
NR
NR
Res.
NR
Savings
# of Plays
per round
10
$1
$130
$150
$150
$160
$160
$180
20
$2
$240
$280
$280
$300
$300
$340
30
$3
$330
$390
$390
$420
$420
$480
40
$4
$400
$480
$480
$520
$520
$600
50
$5
$450
$550
$550
$600
$600
$700
Golf fees may be increased/decreased at the discretion of the City Manager, Resolution No. 04 -350.
12 -50
G:1 FinancelBudget tFEESCHEDULES12010\Fee Schedule E_Parks Recreation 2010.xis 10
ATTACHMENT B
ONLINE PERMITTING SYSTEM FEATURES
FEATURES
Pentamation
(current system — only for
Building Division)
New Online
Permitting System
Intuitive
X
Customization
x (extra cost for each
modification)
X
Minimum Tech Support
Required
x
X
Modules (see below)
Land
x
X
Infrastructure
X
Revenue
X
Financial
X
x (allows links)
Service
X
Administration
x
X
Adaptable Reports
x
Fee Calculation
X
X
GIS Capable
x (extra cost for each
modification)
X
Interdepartmental Tracking
X
Parcel -Based System
X
X
Plan Review Tracking
x
X
Permit Status Tracking
x
X
Problem-Flag Tracking
x
X
Adjacent Owner's List
Generation with a Specified
Radius
X
Online Application Submission
X (smell projects only)
X
Online Document (plans)
Submission
X
Concurrent Plan Review by
De is
X
Online Application Status
Checkin
x: (no plans)
X
Web -Based System
X
Online Payment
x
X
Online GIS Viewing
x (w /custom)
X
12 -51
FEATURES
Pentamation
(current system — only for
Building Division)
New Online
Permitting System
Compatibility with other City
systems
X
Automated Document
Distribution
X
Automated Task and Expiry
Date
x
X
Reminders
X
Scalable System
X
Sign-off Tracking
x
X
Document Annotation
x
X
Miscellaneous features
X
Key — X = Yes, x = limited, blank = no
• Intuitive — Easy to program, modify programming and manage the "master tables"
and "master databases" without technical support.
• Modules —
✓ Land - Building Permits, Inspections, and Code Enforcement Management
✓ Infrastructure - Road, Pavement, Sanitary System, and Parks and Recreation
Management
✓ Revenue - Tax, Utility, and Property Management
✓ Financial - Asset, Payroll, Budget, and Human Resource Management
✓ Service -- Business License, Service Request, and Public Health and Safety
Management
✓ Administration - Document Manager
• Adaptable Reports - Allows staff to create customized reports suited to the
department's needs and populate the reports with information stored in the
database.
• Fee Calculation - Allows automatic online calculation of fees.
• GIS Capable - Viewing, manipulation, and creation of GIS data and ability to
interface with independent commercial GIS software from vendors such as ESRI or
Autodesk.
• Inter - Departmental Tracking - Allows sharing of status amongst internal staff (at
City Hall, in the field, and offsite such as Sanitary district, Fire Department) and
external customers from an online portal.
12 -52
• Parcel -Based System - All the data within the system is attached to either a specific
project or parcel. This allows formation of a historical record of activity at a certain
parcel that can be linked through GIS.
• Plan Review Tracking - Plan Review Tracking allows staff to determine the status of
a plan review application. It is a critical feature of any permitting system. All of the
software systems reviewed in the guide have an Interdepartmental Tracking feature.
• Problem -Flag Tracking - Provides staff and applicants information for applications
which require additional attention such as payment of a bond prior to issuing an
occupancy certificate.
• Adjacent Owner's List Generation with a Specified Radius - Allows staff to create a
list of parcel and property owners that abut a certain parcel or parcels (requires GIS
parcel data).
• Online Application Submission - Enables the public to submit permit applications
over the internet.
• Online Document Submission - Enables the public to submit electronic documents
over the internet with their application, review plan comments and resubmit plans
based on the comments.
• Online Application Status Checking - Enables the public to check the status of their
permit and plan review applications over the internet without contacting the
department.
• Web -Based System - Entirely web -based ,systems are accessed online using a web
browser by staff and the applicant.
• Online Payment - Enables the public to securely pay fees with credit cards over the
internet.
• Online GIS Viewing - Online GIS Viewing enables the public to view information
over the internet.
• Compatibility with other City systems - Able to interface with Pentamation
(Finance), Laserfiche (City's electronic document repository), and GIS without
customization or technical support.
• Scalable System - Refers to the system's ability to handle additional activity or users
without extensive modification.
• Sign -off Tracking - Allows staff and the applicant to determine which departments
or individuals have signed -off and which haven't and comments related to the
same.
3
12 -53
• Document Annotation - Allows staff to mark up and redline electronic documents
submitted for review without needing to leave the system or purchase additional
software. Applicants can review this information online.
• Miscellaneous features
✓ Deactivate old fields, add new fields automatically assign tasks and allow quick
and easy customization of features without technical support.
✓ Tree style navigation - easier to go from screen to screen. All the different
"parts" of a development application are merged so that if someone looks up an
address, he /she doesn't have to go to 3 different persons in three different
departments to see what each department is doing for a specific parcel.
✓ Enhanced search functions - system is capable of searching for records
containing a likeness or partial data match entered by the user.
✓ Track cumulative increases in floor area of existing structures over time.
12 -54
ATTACHMENT C
TECHNOLOGICAURECORDS MANAGEMENT FEES CHARGED BY CITIES
Sunnyvale - currently included w/ Bldg Permit fees, new FY it will show as a separate
line item called GIS software (or something similar) and will be a % of
permit fees
Los Altos Hills - flat fee of $15.00 for a "Plan Retention" fee per page of plan sets
submitted
Petaluma - Community Development fees ;subject to a 1% "Records Management" fee
and a 5% "Technology" fee.
Sacramento - "Technology Fee" of 8% of Building Permit and Plan Review fees
Los Gatos - "Computer Surcharge" of 4% of permits fees ($1.00 minimum)
Pasadena - "Records Management Maintenance" fee of 3% of Bldg permit fees
San Carlos - "Technology Fee" added to the cost of the Bldg permit (anywhere from
$1.00 to $17.00 depending on the cost of the permit)
Palo Alto - flat fee of $23.00 per Planning Application file for "Records Management"
a per plan sheet of $3.00 for "Microfilming" and a $2.00 "Permit
Automation" fee. Building Permits are also charged a $2.00 "Permit
Automation" fee
Menlo Park - flat fee for "Document Preparation and Storage" per application of $2.50
per plan set sheet and $3.50 per 17 sheets of 8 x 11. ($2.50 minimum on
Building permits)
Santa Clara - flat fee of $35.00 for "Archiving' per sheet of Engineering drawings. The
Building department includes some % of "Overhead and Administration"
in its Permit Fees, this amount is not called out.
San Jose - "Record Retention" fee of 10% of Bldg permit costs ($20 minimum, $2000
maximum)
Mountain View - (starting 7/1/2010) will charge a "Technology - Related" fee of 4% of
the Bldg permits
Hayward - "Technology" fee of 2% of Bldg permit fees and a flat fee for
"Administrative Fee" of $79.00 for each misc. type Building permit
12 -55
Milpitas - "Permit Automation" fee of 2.5% of total Bldg permit fee and a
"Digitizing" fee of $1.00 per first 10 8 1 /2 x 11 sheets and $0.50 for each
additional 8 1 /2 x 11sheet, sheets larger than 8 1 /2 x 11 are charged $4.00 each
K
12 -56
LONG RANGE PLANNING FEES CHARGED BY CITIES
Sunnyvale - Planning Applications: 0.05% General Plan Maintenance Fee.
Los Gatos - Planning Applications: 10% on all fees for Advance Planning. Additional
10% General Plan update fee for major planning applications.
Building Permits: Advanced Planning fee of 10% of planning application
fee (additional), General Plan update surcharge 0.5% of bldg valuation for
new construction and additions, Route 85 Study Plan surcharge 10% of
planning application fee for projects in Route 85 Study Plan Area.
San Jose - General Plan Update Fee GP of 1.25% on major planning applications
(with a "GP" footnote).
San Carlos - General Plan Surcharge of 3.4% for planning applications.
Campbell - General Plan Maintenance Fee of 6% on all building permits
City of Monterey - General Plan Fee of 15% on all building permits.
12 -57
MIHH
MI[YEIH
SIT S:IHXH
-, -1Z
Carol Atwood
From: David Woo
Sent: Tuesday, April 20, 2010 9:45 AM \ t ///
To: Carol Atwood � Cc: Aarti Shrivastava; Mark Linder t Subject: RE: Cc mtg / ��
Attachments: Potential Revenue from Fee Increase.xlsx / ,
CUPERTINO
Carol, to answer the Council question of how much revenue will we "lose" if we don't approve
the fee increase, it'll be about $180,000 ($100,000 golf course enterprise and $80,000
general funds). See attached. Be aware that this number and tonight's fee schedule do not
include recreation courses advertised in the recreation catalog.
1 772 7„ ,,,, ,, 11 L....,
II H
1
Potential Revenue from Fee Increase
Potential
2008/09 Fee Revenue
Revenue (1) Increase Increase (2)
General Fund
Building $2,716,366 2% $54,327
Planning 379,821 2% 7,596
Engineering 490,804 2% 9,816
Senior Ctr Membership 55,518 $3 6,385
BBF picnic & pool (2009/10) 126,000 0% -
Parking Fines 184,564 0% -
Recreation Facility Rentals 161,222 0% -
Other Service Charges 81,150 2% 1,623
Total General Fund 4,195,445 79,747
Enterprises
BBF Golf Course 580,621 $2 /round 100,000
Sports Center membership 410,206 0% -
990,827 100,000
(1) Last full year of data.
(2) Assuming same business volume.