HomeMy WebLinkAbout26-010 C2R_Service Order #3 dated 10-22-26 to Replace a Section of Storm Drain PipeContract/Purchasing Action
Personnel Information
Name Ricardo Alvarez Department Public Works
Division Streets Division Date 10.19.2026
Service Order
Upload Quote
Quote, Description of Project,
Scope of Service, Schedule of
Performance and
Compensation
City of Cupertino - Repair existing 12 inch SD line.pdf
Service Order Amount $17,850.00
Master Agreement
Number
2026-014 Contract
Start Date
01/26/2026 Contract End
Date
06/30/2028
Firm Name C2R Engineering Address 100 Mountain View Ave, Los
Altos, CA 94024, USA
Phone (415) 559-2841
Consultant/Contractor
Name
Trevor Connolly Consultant/Contractor
Email
info@c2rengineering.com
Project Name SO 3 Replace a
Section of Storm Drain
Pipe
Project Location Wolfe Rd. & Pruneridge
Cupertino Project
Manager Name
Ricardo Alvarez Cupertino Project
Manager Email
ricardoa@cupertino.org
Master Agreement
Maximum Compensation
$220,000.00 Total Previously
Encumbered to Date
$29,800.00
Encumbrance this
Service Order
$17,850.00 Master Agreement
Unencumbered Balance
$172,350.00
SO GL #230-81-855 700-702 NWS Project Code
Comments This project is to replace a section of storm drain pipe, to avoid any potential
flooding in the near future.
Signature
10/20/2026 PDT
Consultant/Contractor Signature Date
10/20/2026 PDT
Manager/Supervisor Signature Date
Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above
fund for the above contract as estimated and that fund are available as of this date of signature.
10/22/2026 PDT
Email: info@c2rengineering.com
Date: 10/20/2026 PDT
Email: ricardoa@cupertino.gov
Date: 10/20/2026 PDT
Management Analyst Signature Date
Email: PWMA@cupertino.gov
Date: 10/22/2026 PDT
C2R Engineering Inc
Lic # 994397
PO Box 1017
Mountain View
CA 94043
Phone: (415) 559-2841
ESTIMATE
DATE: Oct 19th, 2026
TO:
Ricardo Alvarez
Public Works
City of Cupertino
FOR:
Remove and replace 6’ section of 12” storm drain pipe
DESCRIPTION
SCOPE
A. USA area
B. Mobilize
C. Provide and maintain Traffic Control
D. Sawcut, demo and remove approx. 6’ of curb and gutter
E. Excavate and remove clogged section of 12” SD pipe
F. Install new 12” RCP and connect to existing using 12” ARC couplings
G. Backfill around pipe with ¾” drain rock
H. Backfill and compact trench with Class II
I. Restore curb and gutter
J. Pave and restore asphalt area to match existing
K. Demobilize
Exclusions:
Permits
Work related to traffic loops is excluded (if needed)
Work will take approximately 2 days.
Estimate $ 17,850.00
SO 3 Replace a Section of Storm Drain Pipe -
Service Request
Created:10/20/2026
Status:Signed
Transaction ID:1d360190-4d5e-421d-9764-cf32f4aae969
"SO 3 Replace a Section of Storm Drain Pipe - Service Request"
history
Sundari Pilaka created the document
10/20/2026 2:45:46 PM PDT - IP address 64.165.34.3
Document was emailed to Trevor Connolly
10/20/2026 2:45:47 PM PDT
Trevor Connolly opened the document
10/20/2026 2:46:32 PM PDT - IP address 73.222.202.204:55260
Trevor Connolly signed the document
10/20/2026 2:47:06 PM PDT - IP address 73.222.202.204:55260
Document was emailed to ricardoa@cupertino.gov
10/20/2026 2:47:07 PM PDT
ricardoa@cupertino.gov opened the document
10/20/2026 2:52:54 PM PDT - IP address 64.165.34.3:36291
ricardoa@cupertino.gov signed the document
10/20/2026 2:53:33 PM PDT - IP address 64.165.34.3:36291
Document was emailed to Public Works Management Analyst
10/20/2026 2:53:34 PM PDT
Public Works Management Analyst opened the document
10/22/2026 3:54:34 PM PDT - IP address 71.198.170.154:53105
Public Works Management Analyst signed the document
10/22/2026 3:54:43 PM PDT - IP address 71.198.170.154:53105
Document was successfully signed and filed
10/22/2026 3:54:43 PM PDT