HomeMy WebLinkAboutRM-2026-011 -A0.5 New Site PlanSUBMITTAL/REVISIONS
SHEET NUMBER
LICENSED A RCHITECT
STATE OF CALIFORNIA
11
6
9
C
A
N
D
L
E
L
I
G
H
T
W
A
Y
CU
P
E
R
T
I
N
O
,
C
A
9
5
0
1
4
CA
N
D
L
E
L
I
G
H
T
W
A
Y
H
O
M
E
RE
N
O
V
A
T
I
O
N
PERMIT
RESUBMITTAL 03/30/20261
06/22/20262
PLANNING
RESUBMITTAL
A0.5
NEW SITE PLAN
1 3/16" = 1'-0"
NEW SITE PLAN
(E) HOUSE
(E) DRIVEWAY(N) REAR YARD
1,145 S.F.
GRADE SLOPE
0 14'8'4'2'
CA
N
D
L
E
L
I
G
H
T
W
A
Y
(E) FRONT YARD
´-
1
1
"
´-
0
"
′
´-
1
1
"
′ -5"
(E) GARAGE
´-
0
"
NEW SITE PLAN NOTES
1 (N) PROPERTY LINE SEWER CLEANOUT, REFERENCE DETAIL 2/A0.5
2 (N) ROOF EAVE
3 (N) INFILL TOP SOIL TO SLOPE A MINIMUM 5% AWAY FROM THE
FOUNDATION FOR THE FIRST 10-FEET AROUND THE PERIMETER, PER
R403.1 OF THE CRC
4 (N) BATHROOM REAR ADDITION BUILDING SEWER CLEANOUT
5 (E) SHRUBS TO REMAIN. WILL NOT IMPACT NEW ADDITION
6 (E) GAS METER TO REMAIN
PROPERTY LINE
NOTE:
SITE PLAN DRAWINGS BASED ON SURVEY DRAWINGS
PREPARED BY A REGISTERED ENGINEER DATED 01.15.2026
NEW ADDITION
ROOF EAVE TO BE
1" BEHIND EXISTING REAR
YARD EASEMENT
FACE OF EXTERIOR WALL
FACE OF EXTERIOR WALL
AREA OF WORK FACE OF EXTERIOR WALL
ALL NEW ROOF CORNERS: ROOF EAVE
SANITARY NOTES
1.CONDITIONS/REQUIREMENTS TO BE MET DURING CONSTRUCTION:
INSTALL NEW PROPERTY LINE CLEANOUT TO DISTRICT'S STANDARDS. SEE DETAIL
2/A0.5. THE PROPERTY LINE CLEANOUT MUST BE WITHIN 5 FEET OF THE PROPERTY
LINE. CLEANOUT SHALL BE THE SAME DIAMETER AS THE STREET PORTION OF THE
SERVICE LATERAL. GRAVITY LATERAL IS 4” DIAMETER. (O.C. 4101)
2.CUPERTINO SANITARY DISTRICT INITIAL (VISUAL) INSPECTION REQUIRED. THE
CONTRACTOR SHALL LEAVE THE NEW PIPE INSTALLATION EXPOSED. DO NOT
BACKFILL. OWNER TO CONTACT DISTRICT 48 HOURS PRIOR TO SCHEDULING A
DISTRICT INSPECTOR FOR A VISUAL INSPECTION. (O.C. 5203)
3.CUPERTINO SANITARY DISTRICT FINAL (CCTV) INSPECTION AND APPROVAL OF THE
NEW PROPERTY LINE CLEANOUT, POINT OF CONNECTION, AND DISTRICT LATERAL IS
REQUIRED PRIOR TO CLEARANCE FOR CITY OF CUPERTINO FINAL INSPECTION.
OWNER MUST ALLOW DISTRICT AT LEAST 48 HOURS' NOTICE TO SCHEDULE A DISTRICT
INSPECTOR FOR A VIDEO INSPECTION. DISTRICT TO PROVIDE THE BUILDING
DEPARTMENT WITH WRITTEN NOTIFICATION UPON COMPLETION OF INSPECTION. (O.C.
7102)
4.STORM WATER SURFACE OR ROOF DRAINS AND OTHER GENERAL SURFACE WATER
RUNOFF SHALL NOT BE DISCHARGED TO THE SANITARY SEWER.
5.THE CUPERTINO SANITARY DISTRICT RECOMMENDS INSTALLING THE REQUIRED
IMPROVEMENTS NEAR THE BEGINNING OF THE PROJECT IN CASE ANY UNFORESEEN
ISSUES ARISE WITH THE INSTALLATIONS.
6.THE APPLICANT MAY POTENTIALLY BE REQUIRED TO UPGRADE THEIR SANITARY
SEWER LOWER LATERAL IF THE DISTRICT FINDS THE STRUCTURAL CONDITIONS OF
THE PIPE TO BE UNSATISFACTORY.
7.THE SEGMENT OF THE HOUSE LATERAL (LATERAL FROM PROPERTY LINE TO HOME)
BETWEEN THE PROPERTY LINE CLEANOUT AND THE POINT OF CONNECTION TO THE
STREET LATERAL (LATERAL FROM PROPERTY LINE TO SEWER MAIN) MUST BE PVC
SDR 26. A CUPERTINO SANITARY DISTRICT LATERAL PERMIT WILL BE REQUIRED ($300)
IF THE POINT OF CONNECTION TO THE DISTRICT STREET LATERAL IS BEYOND THE
PROPERTY LINE AND THE HOUSE LATERAL NEEDS TO BE EXTENDED IN ORDER TO
CONNECT. LATERAL PERMIT WILL ONLY BE ISSUED TO LICENSED UNDERGROUND
CONTRACTOR REGISTERED TO WORK IN THE CUPERTINO SANITARY DISTRICT.
INSTRUCTIONS FOR CONTRACTOR'S REGISTRATION CAN BE FOUND ON OUR WEBSITE
WWW.CUPERTINOSANITARYDISTRICT.ORG UNDER CONTRACTORS. (O.C. 5305)2 N.T.S.
PROPERTY LINE CLEANOUT DETAIL
PROPERTY LINE
PROPERTY LINE
7 (N) OVERHEAD ELECTRICAL LINE AT (N) ELECTRICAL METER LOCATION
BETWEEN REAR
SETBACK AND NEW
HOME ADDITION
ROOFLINE
2