Loading...
HomeMy WebLinkAboutCC 10-06-2026 Item No. 13. Coach House Development Project_Staff PresentationCC 10-06-2026 #13 Coach House Presentation City Council October 6, 2026 Housing Development 1655 South De Anza Boulevard Project Site Address 1655 S. De Anza Blvd 7357 Prospect Road Zoning District P (CG, Res 5-15) Request 35-unit housing development and removal of 15 trees City of Saratoga City of San Jose Prospect Road S. D e A n z a B l v d Project Background Existing Uses ●13,500-square-foot commercial building Previous Approvals ●2023 approval for a mixed-use development with 34 residential units and 7,500 square feet of commercial space Applications ●SB330 Application submitted on September 12, 2025 ●Formal application submitted on September 29, 2025 State Housing Laws ●Housing Accountability Act (HAA) Cannot make project infeasible or reduce density. ●Housing Crisis Act (“SB 330” or “HCA”) Streamlines permit processing and locks-in fees and standards. Vesting Date: September 12, 2025 ●Density Bonus Law Allows for additional units, waivers, concessions, and reduced parking standards. ●No Net Loss (SB 166) Sites to accommodate RHNA by income level must be available. Proposal Data Project Data Required Proposed Maximum Density Up to 15 units/acre 26.5 units/acre* Building Height 30’ max.44’-9”** Setbacks Front (S. De Anza)35’27’-5”** South (Prospect)20’7’-6”** Interior Sides 6’11’-6” West 15’ to 50’34’** Private Open Space 60 s.f. / unit no dimension less than 6’ > 60 s.f. / unit Parking 1 space per unit (35 spaces)77 spaces * Density Bonus Eligible **Density Bonus Waiver Project Details ●Five residential buildings ●35 units (5 BMR, 30 market rate) ●Four stories (Three stories and a roof deck) ●Units ranging from 2,137 sq. ft. to 2,704 sq. ft. (gross) ●47 new onsite trees, including replacements for the 15 protected development trees proposed to be removed ●Vesting tentative map for condominium purposes BMR Unit Project Design View from S. De Anza Blvd Project Consistency Analysis ●Project is consistent with applicable objective standards. ●One Density Bonus concession to waive requirement for a retail component. ●11 Density Bonus waivers relating to: a.Setbacks b.Landscape Buffers c.Street Improvements d.Height and Story Limitation e.Floor Area Maximum f.Design Features Setback Waivers Required 20’ Setback Provided 7’-6” Setback Required 35’ Setback Provided 27’-5” Setback Required 50’ Setback Provided 34’ Setback Required 50’ Setback Provided 46’-6” Setback Landscape Buffer Waivers Required 25’ Buffer Provided 20’-7” Buffer Required 35’ Buffer Provided 27’-5” BufferRequired 20’ Buffer Provided 5’ to 9’ Buffer Street Improvement Waiver Required 10’ Planting Strip Provided 8’ Planting Strip Height, Floor Area, and Stall Size Project Data Required Proposed Maximum Height 30’43’-9” to 44’-9” (All Buildings) # of Stories 3 stories max.4 stories Building Plane Slope 1:1 Encroachment Floor Area Ratio 85% max.163% ●Proposed public art plaza on the northeastern corner of the property along S. De Anza Boulevard. ●To be reviewed and approved by Arts and Culture Commission after project approval. Public Art Dedication S. D e A n z a B l v d Park Land Dedication ●Staff recommends payment of in-lieu fee. ●Project is conditioned to pay in-lieu fee of $1,620,000 for the 30 market rate units. ●Consistent with Quimby Act requirements. BMR Requirements Number of Units Number of Bedrooms Average Unit Size BMR Units 5 3-4 2,364 square feet Market-Rate Units 30 3-4 2,414 square feet 5 BMR units – 3 very-low, 1 moderate, and 1 median Proposed BMR units are comparable to market rate units in type and size: AB 130 Exemption AB 130 Exemption Memorandum prepared: ●A Phase I ESA and Transportation Analysis were reviewed in association with the environmental review. ●Project was found to qualify for a statutory exemption under Public Resources Code Section 21080.66. Planning Commission September 8th Planning Commission Hearing: ●5-0 vote to recommend approval ●Discussion: ●Project noticing ●Traffic impacts ●Connection to the north ●Conceptual Plan requirements ●Phase I ESA ●Landscaping and screening ●Loss of retail Recommended Actions That the City Council adopt the draft resolutions to: 1.Find the project exempt from CEQA; 2.Approve the following permits: a.Architectural & Site Approval (ASA-2025-014); b.Tentative Final Map (TM-2025-006); c.Use Permit (U-2025-005); and d.Tree Removal Permit (TR-2025-030).