Loading...
HomeMy WebLinkAboutR-2026-001, RM-2026-002 - A-01 SITE PLAN & CMPA-01 CLIENT NAME: REVISIONS: DRAWN BY: MVB SCALE AS NOTED DATE PRINTED: SHEET NUMBER: SITE PLAN, C3 FORM BU D D H E RE S I D E N C E 5/22/26 SUJATHA BUDDHE 10 8 6 3 W I L K I N S O N A V E CU P E R T I N O , CA , 95 0 1 4 DATE REV # DESCRIP. MARIA BARMINA DESIGNER 5753 GREENRIDGE ROAD CASTRO VALLEY CA 94552 T: 650.704.4501 mbarmina@yahoo.com AP N # : 35 6 - 1 3 - 0 2 3 N 9.9' 10.9' 18'-7 1/2" 24 ' - 1 0 3 / 8 " 6' - 3 1 / 2 " 32 ' - 3 7 / 8 " 13 ' - 8 3 / 8 " 49 ' - 0 5 / 8 " 53 ' - 1 1 / 2 " 46 ' - 4 7 / 8 " 41 . 5 ' 4'-0"10 ' - 0 " 20 ' - 0 " 15'-0" 15'-0" (E) WATER METER (E) GAS (E) ELEC PANELPL PL PL PL SEWER CO (E) STREET LIGHT (E) ELEC (E) RETAINING WALL (E) RETAINING WALL (N) PROPOSED ADDITION AT MAIN LEVEL (N) PROPOSED ADDITION AT MAIN LEVEL (E)5" TUSCARORA CRAPE MYRTLE STREET TREE (E) 17" PICUS TREE TO REMOVE (E) STEPS (N) PATH FOR PEDESTRIANS (N) PATH FOR DRIVEWAY (E) CURBCUT TO REMAIN 6' WOOD FENCE AND GATE (N) 6' WOOD FENCE AND GATE ROOF OUTLINE ROOF OUTLINE ROOF OUTLINE ROOF OUTLINE BAY WINDOW (E) 3" ORANGE TO REMOVE AND REPLACE W/ NEW SCREENING TREE (E) 6" JAPANESE MAPLE 2ND FLR WINDOW2ND FLR WINDOW 2ND FLR WINDOW/DOOR2ND FLR WINDOW/DOOR 2ND FLR WINDOW LARGE NEIGHBOR TREE (E) CORNER REMAINS CLOSEST TO REAR PROPERTY LINE (N) TREES (N) TREES (N) DRIVEWAY PERMEABLE PAVERS (E) HOUSE 1ST FLOOR (E) HOUSE 2ND FLOOR W I L K I N S O N A V E 20' REAR SE T B A C K 20' FRONT SETBACK 5' S I D E S E T B A C K CONC. SIDEWALK GREEN BELT/ GRAVEL AREA 72.26' 71.00' 12 6 . 1 7 ' 11 3 . 0 0 ' 5' S I D E S E T B A C K (E) POOL (E) RAISED DECK LAWN (E) DECK (N) PROPOSED ADDITION (N) PORCH 2ND FLR (N) BALCONY 2ND FLR (N) BALCONY LAWN GREEN BELT/ GRAVEL AREA 10' P.U.E10' P.U.E 2ND FLR (E) BALCONY REQ'D SCRE E N I N G : P L A N T I T A L I A N C Y P R E S S RE Q ' D S C R E E N E I N G : P L A N T I T A L I A N C Y P R E S S RE Q ' D S C R E E N E I N G : P L A N T I T A L I A N C Y P R E S S RE Q ' D S C R E E N E I N G : P L A N T I T A L I A N C Y P R E S S Date Form Completed: Completed by: SCVURPPP C.3. Data Form Page 1 of 4 September 2019 Permit Provision C.3 Impervious Surface Data Form 1. Project Information Project Name: ____________________________________APN # _________________________ Project Address: Cross Streets: Applicant/Developer Name: Project Phase(s): ______of______ Engineer: Project Type (Check all that apply): New Development Redevelopment Private Public Residential Commercial Industrial Mixed Use Institutional Restaurant Uncovered Parking Retail Gas Outlet Auto Service (SIC code) _________ Other __________________________________________ Project Description: _______________________________________________________________ Project Watershed/Receiving Water (creek, river or bay):________________________________ Which Projects Must Comply with Stormwater Requirements? All projects that create and/or replace 10,000 sq. ft. or more of impervious surface on the project site must fill out this worksheet and submit it with the development project application. All restaurants, auto service facilities, retail gasoline outlets, and uncovered parking lot projects (stand-alone or part of another development project, including the top uncovered portion of parking structures) that create and/or replace 5,000 sq. ft. or more of impervious surface on the project site must also fill out this worksheet. Interior remodeling projects, routine maintenance or repair projects such as re-roofing and re-paving, and single family homes that are not part of a larger plan of development are NOT required to complete this worksheet. What is an Impervious Surface? An impervious surface is a surface covering or pavement that prevents the land’s natural ability to absorb and infiltrate rainfall/stormwater. Impervious surfaces include, but are not limited to rooftops, walkways, paved patios, driveways, parking lots, storage areas, impervious concrete and asphalt, and any other continuous watertight pavement or covering. Pervious pavement, underlain with pervious soil or pervious storage material (e.g., drain rock), that infiltrates rainfall at a rate equal to or greater than surrounding unpaved areas OR that stores and infiltrates the water quality design volume specified in Provision C.3.d of the Municipal Regional Stormwater Permit (MRP), is not considered an impervious surface. For More Information For more information regarding selection of Best Management Practices for stormwater pollution prevention or stormwater treatment contact: (5013-5014, 5541, 7532-7534, 7536-7539) City of Cupertino Permit : SCVURPPP C.3. Data Form Page 2 of 4 September 2019 2. Project Size a. Total Site Area: ______________acres b. Total Site Area Disturbed: ____________________ acres (including clearing, grading, or excavating) Site Totals Total Existing (Pre-project) Area (ft2) Existing Area Retained1 (ft2) Existing Area Replaced2 (ft2) New Area Created2 (ft2) Total Post- Project Area (ft2) c.Total Impervious Area (IA) d. Total new and replaced impervious area e.Total Pervious Area (PA)3 f. Total Area (IA+PA) g. Percent Replacement of IA in Redevelopment Projects: (Existing IA Replaced ÷ Existing Total IA) x 100% _______% 3. State Construction General Permit Applicability: a. Is #2.b. equal to 1 acre or more? Yes, applicant must obtain coverage under the State Construction General Permit (see https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html) No, applicant does not need coverage under the State Construction General Permit. 4. MRP Provision C.3 Applicability: a. Is #2.d. equal to 10,000 sq. ft. or more, or 5,000 sq. ft. or more for restaurants, auto service facilities, retail gas outlets, and stand-alone uncovered parking? Yes, C.3. source control, site design and treatment requirements apply No, C.3. source control and site design requirements may apply – check with local agency b. For redevelopment projects, is #2.g. equal to 50% or more? Yes, C.3. requirements (site design and source control, as appropriate, and stormwater treatment) apply to the entire site No, C.3. requirements only apply to the impervious area created and/or replaced c. Does the project create and/or replace 5,000 sf or more of impervious surface parking? Yes, C.3. requirements may apply to the entire site – check with local agency No 5. Hydromodification Management (HM) Applicability: a.Does the project create and/or replace one acre or more of impervious surface AND is the total post-project impervious area greater than the pre-project (existing) impervious area? Yes (continue)No – exempt from HM, go to page 3 b. Is the project located in an area of HM applicability (green area) on the HM Applicability Map? ( www.scvurppp.org/hmp-map) Yes, the project must implement HM requirements No, the project is exempt from HM requirements 1 “Retained” means to leave existing IA in place. An IA that goes through maintenance (e.g., pavement resurfacing/slurry seal/grind), but no change in grade is considered “retained”. 2 The “new” and “replaced” IA are based on the total area of the site and not specific locations on site. For example, impervious parking created over a pervious area is not “new” IA, if an equal amount of pervious area replaces IA somewhere else on the site. Constructed IA on a site that does not exceed the total pre-project IA will be considered “replaced” IA. A site will have “new” IA only if the total post-project IA exceeds the total pre-project IA (total post-project IA – total pre-project IA = New IA). 3 Include bioretention areas, infiltration areas, green roofs, and pervious pavement in PA calculations. SCVURPPP C.3. Data Form Page 3 of 4 September 2019 6. Selection of Specific Stormwater Control Measures: Site Design Measures Minimize land disturbed (e.g., protect trees and soil) Minimize impervious surfaces (e.g., reduction in post-project impervious surface) Minimum-impact street or parking lot design (e.g., parking on top of or under buildings) Cluster structures/ pavement Disconnected downspouts (direct runoff from roofs, sidewalks, patios to landscaped areas) Pervious pavement Green roof Other self-treating4 area (e.g., landscaped areas) Self-retaining4 area Interceptor trees3 Rainwater harvesting and use (e.g., rain barrel, cistern for designated use) 5 Preserved open space: _______ ac. or sq. ft. (circle one) Protected riparian and wetland areas/buffers (Setback from top of bank: _______ft.) Other _______________ Source Control Measures Wash area/racks, drain to sanitary sewer5 Covered dumpster area, drain to sanitary sewer6 Sanitary sewer connection or accessible cleanout for swimming pool/spa/fountain6 Beneficial landscaping (minimize irrigation, runoff, pesticides and fertilizers; promotes treatment) Outdoor material storage protection Covers, drains for loading docks, maintenance bays, fueling areas Maintenance (pavement sweeping, catch basin cleaning, good housekeeping) Storm drain labeling Other _______________ Treatment Measures None (all impervious surface drains to self- retaining areas) LID Treatment Bioretention area Flow-through planter Tree Well Filter or Trench with bioretention soils Rainwater harvest/use (e.g., cistern or rain barrel for designated use, sized for C.3.d treatment) Infiltration trench Infiltration well/dry well Subsurface Infiltration System (e.g. vault or large diameter conduit over drain rock) Other _______________ Non-LID Treatment Methods Proprietary high flow rate tree box filter7 Proprietary high flow media filter (sand, compost, or proprietary media)7 Vegetated filter strip8 Extended detention basin8 Vegetated swale8 Other _______________ Flow Duration Controls for Hydromodification Management (HM) Extended Detention basin Underground tank or vault Bioretention with outlet control Other ______________ 4 See SCVURPPP C3 Handbook for definitions. https://scvurppp.org/2016/06/20/c-3-stormwater-handbook-june-2016/ 5 Optional site design measure; does not have to be sized to comply with Provision C.3.d treatment requirements. 6 Subject to sanitary sewer authority requirements. 7 These treatment measures are only allowed if the project qualifies as a “Special Project”. 8 These treatment measures are only allowed as part of a multi-step treatment process (i.e., for pretreatment). SCVURPPP C.3. Data Form Page 4 of 4 September 2019 7. Stormwater Treatment Measure (STM) Sizing for Projects with Treatment Requirements Stormwater Treatment Measure (STM) Hydraulic Sizing Criteria Used* *Key: 1a: Volume – WEF Method 1b: Volume – CASQA BMP Handbook Method 2a: Flow – Factored Flood Flow Method 2b: Flow – CASQA BMP Handbook Method 2c: Flow – Uniform Intensity Method 3: Combination Flow and Volume Design Basis 8. Alternative Certification: Was the treatment system sizing and design reviewed by a qualified third- party professional that is not a member of the project team or agency staff? Yes No Name of Third-party Reviewer___________________________ 9. Operation & Maintenance Information A.Property Owner’s Name _________________________________________ B.Responsible Party for Stormwater Treatment/Hydromodification Control O&M: a.Name:_________________________________________ b. Address:_________________________________________ c.Phone/E-mail: _________________________________________ This section to be completed by Municipal staff. O&M Responsibility Mechanism Indicate how responsibility for O&M is assured. Check all that apply: O&M Agreement Other mechanism that assigns responsibility (describe below): ________________________________________________________________________________________ STAFF O Reviewed By: Community Development Department Public Works Department Planning Division: ______________ Engineering: _______________ Building Division: _______________ Other (Specify):_______________ Return form to: Public Works Department Data entry performed by: __________________ SITE PLAN 1/8" = 1'-0" DEBRIX BOX PORTA POTTY 2% SLOPE AT LANDSCAPE AWAY FROM HOUSE PERIMETER TYP. DIRECT DRAINAGE TOWARDS LAWN WATER LINE ON STREET SEWER LINE ON STREET PROPOSED PERSONNEL PARKING STORM WATER DRAINAGE DURING CONSTRUCTION SHALL BE MANAGED AND RETAINED TO PREVENT EROSION, RUNOFF, AND /OR FLOODING OF ADJACENT PROPERTIES: WATER SHALL BE FILTERED BY USE OF FIBER ROLL/WATTLES, SILT FENCES, ETC. AROUND THE AREA OD PROPOSED WORK & /OR RETENTION BASINS OF SUFFICIENT SIZE SHALL BE UTILIZED TO RETAIN STORM WATER ON SITE. OUTLINE OF WATTLES/ROLLS & LOCATION OF RETENTION BASIN IS SHOWN ON SITE ENCOMPASSING AREA OF GRADING AND FOUNDATION WORK. DIRECT DRAINAGE TOWARDS LAWN PLANT NEW TREE GIKGO BILOBA OR PRINCETON CENTRY CLEAN UP AREA 1) SCOPE A. NOT USED B. PROVIDE SUPERVISION, LABOR, EQUIPMENT TOOLS, MATERIALS, AND SUPPLIES TO COMPLETE THE PROJECT PER THE DRAWINGS AND SPECIFICATIONS, AND GENERAL TERMS AND CONDITIONS. C. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT THE WORK DONE ON THIS PROJECT SHALL BE IN STRICT COMPLIANCE WITH APPLICABLE CODE REQUIREMENTS. D. TREE PROTECTION FENCING TO BE PROVIDED B. NOT USED C. ADJACENT PROPERTY AND AREAS: PROTECT ANY ADJACENT AREAS AND IMPROVEMENTS FROM DAMAGE. ANY DAMAGE TO ADJACENT AREAS, STREETS AND THE LIKE SHALL BE RESTORED TO ORIGINAL CONDITION WITH NO COST TO THE OWNER. D. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT NO DIRT OF CONSTRUCTION DEBRIS ENTERS THE STORM DRAIN SYSTEM. E. NO ON-SITE STORM DRAIN INLETS EXIST ON THE SITE F. ANY CITY STORM DRAIN INLET USED SHALL BE PROTECTED FROM DEBRIS WITH SAND BAGS SURROUNDING THE STORM DRAIN INLET GRATE FOR THE DURATION OF THE PROJECT G. AT THE END OF EACH WORKDAY AND JUST PRIOR TO RAINFALL ROADWAYS AND SIDEWALKS MUST BE SWEPT AND CLEANED OF ALL MATERIALS ATTRIBUTED TO THE PROJECT. WATER CANNOT BE FLUSHED DOWN THE PAVEMENT IN PLACE OF SWEEPING. SITE PLAN NOTES: E. CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY MUST HAVE AN APPROVED STREET WORK PERMIT FROM THE PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION. THE PERFORMANCE OF THIS WORK IS NOT AUTHORIZED BY THE BUILDING PERMIT ISSUANCE BUT IS SHOWN ON THE BUILDING PERMIT FOR INFORMATION ONLY. 2) PROTECTION AND CONTROLS A. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE EXISTING SITE AND ITS IMPROVEMENTS THROUGHOUT THE WORK. ALL DAMAGE DONE TO THE EXISTING PROPERTY SHALL BE REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE. 65% CONSTRUCTION WASTE REDUCTION REQUIRED RODENT PROOFING REQUIRED FOR UNDER FLOOR CRAWL SPACE PROVIDE RAT PROOFING FOR THIS AREA GRADING: FOR GRADING SEE CIVIL DRAWINGS WATER SHALL BE AVAILABLE ON SITE FOR DUST CONTROL DURING ALL GRADING OPERATIONS - WORK HOURS: 8:00AM - 5:30PM MONDAY - FRIDAY - NO HAULING OR HEAVY EQUIPMENT PERMITTED ON SATURDAYS NO WORK PERMITTED ON SUNDAYS OR HOLIDAYS 1. CONSTRUCTION TRAILER: CONSTRUCTION TRAILER IS PROPOSED TO BE USED ON THIS PROJECT 2. DEBRIX BOX: DEBRIX BOX IS PROPOSED TO BE USED ON THIS PROJECT, SEE SITE PLAN 3. PARKING FOR CONSTRUCTION PERSONNEL: ALL CONSTRUCTION PARKING SHALL BE LOCATED AT SIDEWALK 4. TRUCK TRAFFIC ISSUES - N/A 5. SANITARY FACILITIES: WE PLAN ON RENTING PORTA POTTY , SEE SITE PLAN 6. CLEAN UP AREA: WE WILL SET UP CLEANING AREA BEHIND THE HOUSE (SEE SITE PLAN). WHEN ON SITE CLEANING OF EQUIPMENT IS REQUIRED FOR CEMENT FORMS AND TRUCKS, PAINT BRUSHES, PLASTERING TOOLS, AND SUCH, THEN A CLEAN-UP AREA MUST BE SPECIFIED AND POSTED A SIGN. THIS AREA MUST NOT BE LOCATED BENEATH ANY TREE'S CANOPY OR IN ANY PROPOSED PLANTING AREA. RUN OFF FROM THE CLEAN UP AREA CAN BE CONTAINED BY PROVIDING A TEMPORARY BASE OF WOOD CHIPS OR OTHER NATURAL ABSORBENT MATERIAL TO BE DISPOSED OF OFF SITE 7. CONSTRUCTION MATERIAL STORAGE: ALL MATERIAL STORAGE WILL BE LOCATED IN EXISTING GARAGE. IF ANY ADDITIONAL STORAGE AREA IS REQUIRED, IT SHALL NOT BE LOCATED WITHIN THE DRIP LINES OF ANY TREES. GREEN HALO REGISTRATION: WASTE MANAGEMENT PLAN NOTES: BUDDHE RESIDENCE 356-13-023 10863 WILKINSON AVE, CUPERTINO COLUMBUS AVENUE MARIA BARMINA 1 1 TO BE DETERMINED EXPAND (E) FOOTPRINT OF THE HOUSE: ADD FLOOR AREA AT MAIN LEVEL FRONT TO CREATE (N) LIVING ROOM, ENTRY, OFFICE AND PORCH. RELOCATE KITCHEN. ADD UPPER LEVEL WITH (N) MASTER SUITE. RECONFIGURE (E) BEDROOM LEVEL TO INCREASE NUMBER OF BATHS. RETURN GARAGE TO GARAGE USE COYOTE WATERSHED 8276sf (0.19 acre)545.11sf (0.0125 acres) n/a SUJATHA BUDDHE 4114.86 0 545.113976.51 4521.62 4521.62 4161.14 03616.03 0 3616.03 8276 7592.54 545.11 8137.65 6.5 ALL ON SITE DRAIANGE SHALL FLOW TOWARDS THE STREET AND AWAY FROM COMMON PROPERTY LINES FOR PROPOSED DOWNSPOUT LOCATIONS SEE ROOF PLAN NO HERITAGE TREES EXIST ON SITE NO TREE PROTECTION REQUIRED LOT DRAINAGE: Each residential lot shall be designed to drain toward the streets, alleys, common driveways, or common areas. The drainage paths for the privately owned lots shall be designed such that the drainage paths do not cross the common property lines unless an exception is approved by the Public Works Department due to unavoidable circumstances (such as to provide drainage to an existing Heritage tree). SE W E R L I N E 4 " WA T E R L I N E 3 / 4 " GA S L I N E T O S T R E E T FRONT YARD = 20X71 = 1420 SQ.FT. (100%): LAWN (PERVIOUS) = 910 SFT (E) DRIVEWAY 380SF to be redone in permeable pavers (190sf of permeable surface to be provided) PATHS NON PERMEABLE = 130SF ______________________________ 40% IMPERVIOUS MAX ALLOWED: 190 + 130 = 320SF OF NON PERMEABLE (22.5%) Required Front Yard Tree In order to help mitigate the visual mass and bulk of new second story construction and cohesively integrate new architecture into the existing neighborhood, the City of Cupertino requires a new front yard tree for all new second story homes and additions. Per Cupertino Municipal Code Chapter 19.28.120, the tree must be at least a 24-inch box with low to moderate water using tree that typically grows to a mature height of more than 30 feet, planted at a minimum height of six feet, as measured from adjacent grade. California native trees are preferred. The tree shall be planted in front of new second stories in the center 50% of the front yard setback area. Privacy trees must be a minimum twenty-four (24) inch box tree and eight (8) foot height at planting and privacy shrubs must be minimum fifteen (15) gallons and six (6) feet in height at planting.