HomeMy WebLinkAboutR-2026-001, RM-2026-002 - A-01 SITE PLAN & CMPA-01
CLIENT NAME:
REVISIONS:
DRAWN BY:
MVB
SCALE AS NOTED
DATE PRINTED:
SHEET NUMBER:
SITE PLAN, C3
FORM
BU
D
D
H
E
RE
S
I
D
E
N
C
E
5/22/26
SUJATHA BUDDHE
10
8
6
3
W
I
L
K
I
N
S
O
N
A
V
E
CU
P
E
R
T
I
N
O
,
CA
,
95
0
1
4
DATE REV # DESCRIP.
MARIA BARMINA
DESIGNER
5753 GREENRIDGE ROAD
CASTRO VALLEY CA 94552
T: 650.704.4501
mbarmina@yahoo.com
AP
N
#
:
35
6
-
1
3
-
0
2
3
N
9.9'
10.9'
18'-7 1/2"
24
'
-
1
0
3
/
8
"
6'
-
3
1
/
2
"
32
'
-
3
7
/
8
"
13
'
-
8
3
/
8
"
49
'
-
0
5
/
8
"
53
'
-
1
1
/
2
"
46
'
-
4
7
/
8
"
41
.
5
'
4'-0"10
'
-
0
"
20
'
-
0
"
15'-0"
15'-0"
(E) WATER METER
(E) GAS
(E) ELEC
PANELPL
PL
PL
PL
SEWER CO
(E) STREET LIGHT
(E) ELEC
(E) RETAINING WALL
(E) RETAINING WALL
(N) PROPOSED
ADDITION AT MAIN LEVEL
(N) PROPOSED
ADDITION AT MAIN LEVEL
(E)5" TUSCARORA CRAPE MYRTLE
STREET TREE
(E) 17" PICUS TREE
TO REMOVE
(E) STEPS
(N) PATH
FOR PEDESTRIANS
(N) PATH
FOR DRIVEWAY
(E) CURBCUT
TO REMAIN
6' WOOD FENCE
AND GATE
(N) 6' WOOD FENCE
AND GATE
ROOF OUTLINE
ROOF OUTLINE
ROOF OUTLINE
ROOF OUTLINE
BAY
WINDOW
(E) 3" ORANGE
TO REMOVE AND
REPLACE W/
NEW SCREENING TREE
(E) 6" JAPANESE
MAPLE
2ND FLR WINDOW2ND FLR WINDOW
2ND FLR WINDOW/DOOR2ND FLR WINDOW/DOOR
2ND FLR WINDOW
LARGE NEIGHBOR TREE
(E) CORNER REMAINS
CLOSEST TO REAR
PROPERTY LINE
(N) TREES
(N) TREES
(N) DRIVEWAY
PERMEABLE PAVERS
(E) HOUSE
1ST FLOOR
(E) HOUSE
2ND FLOOR
W I L K I N S O N A V E
20' REAR SE
T
B
A
C
K
20' FRONT SETBACK
5'
S
I
D
E
S
E
T
B
A
C
K
CONC. SIDEWALK
GREEN BELT/
GRAVEL AREA
72.26'
71.00'
12
6
.
1
7
'
11
3
.
0
0
'
5'
S
I
D
E
S
E
T
B
A
C
K
(E) POOL
(E) RAISED
DECK
LAWN
(E) DECK
(N) PROPOSED
ADDITION
(N) PORCH
2ND FLR
(N) BALCONY
2ND FLR
(N) BALCONY
LAWN
GREEN BELT/
GRAVEL AREA
10' P.U.E10' P.U.E
2ND FLR
(E) BALCONY
REQ'D SCRE
E
N
I
N
G
:
P
L
A
N
T
I
T
A
L
I
A
N
C
Y
P
R
E
S
S
RE
Q
'
D
S
C
R
E
E
N
E
I
N
G
:
P
L
A
N
T
I
T
A
L
I
A
N
C
Y
P
R
E
S
S
RE
Q
'
D
S
C
R
E
E
N
E
I
N
G
:
P
L
A
N
T
I
T
A
L
I
A
N
C
Y
P
R
E
S
S
RE
Q
'
D
S
C
R
E
E
N
E
I
N
G
:
P
L
A
N
T
I
T
A
L
I
A
N
C
Y
P
R
E
S
S
Date Form Completed:
Completed by:
SCVURPPP C.3. Data Form Page 1 of 4 September 2019
Permit Provision C.3 Impervious Surface Data Form
1. Project Information
Project Name: ____________________________________APN # _________________________
Project Address:
Cross Streets:
Applicant/Developer Name:
Project Phase(s): ______of______ Engineer:
Project Type (Check all that apply): New Development Redevelopment
Private Public
Residential Commercial Industrial Mixed Use Institutional
Restaurant Uncovered Parking Retail Gas Outlet Auto Service (SIC code) _________
Other __________________________________________
Project Description: _______________________________________________________________
Project Watershed/Receiving Water (creek, river or bay):________________________________
Which Projects Must Comply with Stormwater Requirements?
All projects that create and/or replace 10,000 sq. ft. or more of impervious surface on the project site must
fill out this worksheet and submit it with the development project application.
All restaurants, auto service facilities, retail gasoline outlets, and uncovered parking lot projects
(stand-alone or part of another development project, including the top uncovered portion of parking
structures) that create and/or replace 5,000 sq. ft. or more of impervious surface on the project site must also
fill out this worksheet.
Interior remodeling projects, routine maintenance or repair projects such as re-roofing and re-paving, and
single family homes that are not part of a larger plan of development are NOT required to complete this
worksheet.
What is an Impervious Surface?
An impervious surface is a surface covering or pavement that prevents the land’s natural ability to absorb and
infiltrate rainfall/stormwater. Impervious surfaces include, but are not limited to rooftops, walkways, paved
patios, driveways, parking lots, storage areas, impervious concrete and asphalt, and any other continuous
watertight pavement or covering. Pervious pavement, underlain with pervious soil or pervious storage
material (e.g., drain rock), that infiltrates rainfall at a rate equal to or greater than surrounding unpaved areas
OR that stores and infiltrates the water quality design volume specified in Provision C.3.d of the Municipal
Regional Stormwater Permit (MRP), is not considered an impervious surface.
For More Information
For more information regarding selection of Best Management Practices for stormwater pollution prevention
or stormwater treatment contact:
(5013-5014, 5541, 7532-7534, 7536-7539)
City of Cupertino
Permit :
SCVURPPP C.3. Data Form Page 2 of 4 September 2019
2. Project Size
a. Total Site Area: ______________acres b. Total Site Area Disturbed: ____________________ acres
(including clearing, grading, or excavating)
Site Totals
Total Existing
(Pre-project)
Area (ft2)
Existing Area
Retained1 (ft2)
Existing Area
Replaced2 (ft2)
New Area
Created2 (ft2)
Total Post-
Project Area (ft2)
c.Total Impervious Area (IA)
d. Total new and replaced impervious area
e.Total Pervious Area (PA)3
f. Total Area (IA+PA)
g. Percent Replacement of IA in Redevelopment Projects: (Existing IA Replaced ÷ Existing Total IA) x 100% _______%
3. State Construction General Permit Applicability:
a. Is #2.b. equal to 1 acre or more?
Yes, applicant must obtain coverage under the State Construction General Permit (see
https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html)
No, applicant does not need coverage under the State Construction General Permit.
4. MRP Provision C.3 Applicability:
a. Is #2.d. equal to 10,000 sq. ft. or more, or 5,000 sq. ft. or more for restaurants, auto service
facilities, retail gas outlets, and stand-alone uncovered parking?
Yes, C.3. source control, site design and treatment requirements apply
No, C.3. source control and site design requirements may apply – check with local agency
b. For redevelopment projects, is #2.g. equal to 50% or more?
Yes, C.3. requirements (site design and source control, as appropriate, and stormwater
treatment) apply to the entire site
No, C.3. requirements only apply to the impervious area created and/or replaced
c. Does the project create and/or replace 5,000 sf or more of impervious surface parking?
Yes, C.3. requirements may apply to the entire site – check with local agency
No
5. Hydromodification Management (HM) Applicability:
a.Does the project create and/or replace one acre or more of impervious surface AND is the total
post-project impervious area greater than the pre-project (existing) impervious area?
Yes (continue)No – exempt from HM, go to page 3
b. Is the project located in an area of HM applicability (green area) on the HM Applicability
Map? ( www.scvurppp.org/hmp-map)
Yes, the project must implement HM requirements
No, the project is exempt from HM requirements
1 “Retained” means to leave existing IA in place. An IA that goes through maintenance (e.g., pavement resurfacing/slurry
seal/grind), but no change in grade is considered “retained”.
2 The “new” and “replaced” IA are based on the total area of the site and not specific locations on site. For example, impervious
parking created over a pervious area is not “new” IA, if an equal amount of pervious area replaces IA somewhere else on the site.
Constructed IA on a site that does not exceed the total pre-project IA will be considered “replaced” IA. A site will have “new”
IA only if the total post-project IA exceeds the total pre-project IA (total post-project IA – total pre-project IA = New IA).
3 Include bioretention areas, infiltration areas, green roofs, and pervious pavement in PA calculations.
SCVURPPP C.3. Data Form Page 3 of 4 September 2019
6. Selection of Specific Stormwater Control Measures:
Site Design Measures
Minimize land disturbed
(e.g., protect trees and soil)
Minimize impervious
surfaces (e.g., reduction in
post-project impervious
surface)
Minimum-impact street or
parking lot design (e.g.,
parking on top of or under
buildings)
Cluster structures/ pavement
Disconnected downspouts
(direct runoff from roofs,
sidewalks, patios to
landscaped areas)
Pervious pavement
Green roof
Other self-treating4 area
(e.g., landscaped areas)
Self-retaining4 area
Interceptor trees3
Rainwater harvesting and
use (e.g., rain barrel, cistern
for designated use) 5
Preserved open space:
_______ ac. or sq. ft. (circle
one)
Protected riparian and
wetland areas/buffers
(Setback from top of bank:
_______ft.)
Other _______________
Source Control Measures
Wash area/racks, drain to
sanitary sewer5
Covered dumpster area,
drain to sanitary sewer6
Sanitary sewer connection
or accessible cleanout for
swimming
pool/spa/fountain6
Beneficial landscaping
(minimize irrigation, runoff,
pesticides and fertilizers;
promotes treatment)
Outdoor material storage
protection
Covers, drains for loading
docks, maintenance bays,
fueling areas
Maintenance (pavement
sweeping, catch basin
cleaning, good
housekeeping)
Storm drain labeling
Other _______________
Treatment Measures
None (all impervious
surface drains to self-
retaining areas)
LID Treatment
Bioretention area
Flow-through planter
Tree Well Filter or Trench
with bioretention soils
Rainwater harvest/use (e.g.,
cistern or rain barrel for
designated use, sized for
C.3.d treatment)
Infiltration trench
Infiltration well/dry well
Subsurface Infiltration
System (e.g. vault or large
diameter conduit over drain
rock)
Other _______________
Non-LID Treatment Methods
Proprietary high flow rate
tree box filter7
Proprietary high flow media
filter (sand, compost, or
proprietary media)7
Vegetated filter strip8
Extended detention basin8
Vegetated swale8
Other _______________
Flow Duration Controls for Hydromodification Management (HM)
Extended
Detention basin
Underground tank or
vault
Bioretention with outlet
control
Other
______________
4 See SCVURPPP C3 Handbook for definitions. https://scvurppp.org/2016/06/20/c-3-stormwater-handbook-june-2016/
5 Optional site design measure; does not have to be sized to comply with Provision C.3.d treatment requirements.
6 Subject to sanitary sewer authority requirements.
7 These treatment measures are only allowed if the project qualifies as a “Special Project”.
8 These treatment measures are only allowed as part of a multi-step treatment process (i.e., for pretreatment).
SCVURPPP C.3. Data Form Page 4 of 4 September 2019
7. Stormwater Treatment Measure (STM) Sizing for Projects with Treatment Requirements
Stormwater Treatment Measure (STM) Hydraulic Sizing Criteria Used*
*Key: 1a: Volume – WEF Method
1b: Volume – CASQA BMP Handbook Method
2a: Flow – Factored Flood Flow Method
2b: Flow – CASQA BMP Handbook Method
2c: Flow – Uniform Intensity Method
3: Combination Flow and Volume Design Basis
8. Alternative Certification: Was the treatment system sizing and design reviewed by a qualified third-
party professional that is not a member of the project team or agency staff?
Yes No Name of Third-party Reviewer___________________________
9. Operation & Maintenance Information
A.Property Owner’s Name _________________________________________
B.Responsible Party for Stormwater Treatment/Hydromodification Control O&M:
a.Name:_________________________________________
b. Address:_________________________________________
c.Phone/E-mail: _________________________________________
This section to be completed by Municipal staff.
O&M Responsibility Mechanism
Indicate how responsibility for O&M is assured. Check all that apply:
O&M Agreement
Other mechanism that assigns responsibility (describe below):
________________________________________________________________________________________
STAFF O
Reviewed By:
Community Development Department Public Works Department
Planning Division: ______________ Engineering: _______________
Building Division: _______________ Other (Specify):_______________
Return form to: Public Works Department Data entry performed by: __________________
SITE PLAN 1/8" = 1'-0"
DEBRIX BOX
PORTA POTTY
2% SLOPE AT
LANDSCAPE AWAY
FROM HOUSE
PERIMETER TYP.
DIRECT DRAINAGE
TOWARDS LAWN
WATER LINE
ON STREET
SEWER LINE
ON STREET
PROPOSED PERSONNEL PARKING
STORM WATER DRAINAGE DURING CONSTRUCTION SHALL BE
MANAGED AND RETAINED TO PREVENT EROSION, RUNOFF,
AND /OR FLOODING OF ADJACENT PROPERTIES:
WATER SHALL BE FILTERED BY USE OF FIBER ROLL/WATTLES,
SILT FENCES, ETC.
AROUND THE AREA OD PROPOSED WORK & /OR RETENTION
BASINS OF SUFFICIENT
SIZE SHALL BE UTILIZED TO RETAIN STORM WATER ON SITE.
OUTLINE OF WATTLES/ROLLS & LOCATION OF RETENTION
BASIN IS SHOWN ON SITE
ENCOMPASSING AREA OF GRADING AND FOUNDATION WORK.
DIRECT DRAINAGE
TOWARDS LAWN
PLANT NEW TREE
GIKGO BILOBA OR
PRINCETON CENTRY
CLEAN UP AREA
1) SCOPE
A. NOT USED
B. PROVIDE SUPERVISION, LABOR, EQUIPMENT TOOLS, MATERIALS, AND
SUPPLIES TO COMPLETE THE PROJECT PER THE DRAWINGS AND
SPECIFICATIONS, AND GENERAL TERMS AND CONDITIONS.
C. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT THE
WORK DONE ON THIS PROJECT SHALL BE IN STRICT COMPLIANCE WITH
APPLICABLE CODE REQUIREMENTS.
D. TREE PROTECTION FENCING TO BE PROVIDED
B. NOT USED
C. ADJACENT PROPERTY AND AREAS: PROTECT ANY ADJACENT AREAS
AND IMPROVEMENTS FROM DAMAGE. ANY DAMAGE TO ADJACENT
AREAS, STREETS AND THE LIKE SHALL BE RESTORED TO ORIGINAL
CONDITION WITH NO COST TO THE OWNER.
D. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT NO DIRT OF
CONSTRUCTION DEBRIS ENTERS THE STORM DRAIN SYSTEM.
E. NO ON-SITE STORM DRAIN INLETS EXIST ON THE SITE
F. ANY CITY STORM DRAIN INLET USED SHALL BE PROTECTED FROM
DEBRIS WITH SAND BAGS SURROUNDING THE STORM DRAIN INLET GRATE
FOR THE DURATION OF THE PROJECT
G. AT THE END OF EACH WORKDAY AND JUST PRIOR TO RAINFALL
ROADWAYS AND SIDEWALKS MUST BE SWEPT AND CLEANED OF ALL
MATERIALS ATTRIBUTED TO THE PROJECT. WATER CANNOT BE FLUSHED
DOWN THE PAVEMENT IN PLACE OF SWEEPING.
SITE PLAN NOTES:
E. CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY MUST HAVE AN
APPROVED STREET WORK PERMIT FROM THE PUBLIC WORKS
DEPARTMENT, ENGINEERING DIVISION. THE PERFORMANCE OF THIS WORK
IS NOT AUTHORIZED BY THE BUILDING PERMIT ISSUANCE BUT IS SHOWN ON
THE BUILDING PERMIT FOR INFORMATION ONLY.
2) PROTECTION AND CONTROLS
A. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE
EXISTING SITE AND ITS IMPROVEMENTS THROUGHOUT THE WORK. ALL
DAMAGE DONE TO THE EXISTING PROPERTY SHALL BE REPAIRED OR
REPLACED AT CONTRACTOR'S EXPENSE.
65% CONSTRUCTION WASTE REDUCTION REQUIRED
RODENT PROOFING REQUIRED FOR UNDER FLOOR CRAWL SPACE
PROVIDE RAT PROOFING FOR THIS AREA
GRADING: FOR GRADING SEE CIVIL DRAWINGS
WATER SHALL BE AVAILABLE ON SITE FOR
DUST CONTROL DURING ALL GRADING OPERATIONS
- WORK HOURS: 8:00AM - 5:30PM MONDAY - FRIDAY
- NO HAULING OR HEAVY EQUIPMENT PERMITTED
ON SATURDAYS NO WORK PERMITTED ON SUNDAYS OR
HOLIDAYS
1. CONSTRUCTION TRAILER: CONSTRUCTION TRAILER
IS PROPOSED TO BE USED ON THIS PROJECT
2. DEBRIX BOX: DEBRIX BOX IS PROPOSED TO BE USED
ON THIS PROJECT, SEE SITE PLAN
3. PARKING FOR CONSTRUCTION PERSONNEL:
ALL CONSTRUCTION PARKING SHALL BE LOCATED AT
SIDEWALK
4. TRUCK TRAFFIC ISSUES - N/A
5. SANITARY FACILITIES: WE PLAN ON RENTING
PORTA POTTY , SEE SITE PLAN
6. CLEAN UP AREA: WE WILL SET UP CLEANING AREA
BEHIND THE HOUSE (SEE SITE PLAN).
WHEN ON SITE CLEANING OF EQUIPMENT IS REQUIRED
FOR CEMENT FORMS AND TRUCKS,
PAINT BRUSHES, PLASTERING TOOLS, AND SUCH,
THEN A CLEAN-UP AREA MUST BE SPECIFIED
AND POSTED A SIGN. THIS AREA MUST NOT BE
LOCATED
BENEATH ANY TREE'S CANOPY OR IN
ANY PROPOSED PLANTING AREA. RUN OFF FROM THE
CLEAN UP AREA CAN BE CONTAINED BY
PROVIDING A TEMPORARY BASE OF WOOD CHIPS OR
OTHER NATURAL
ABSORBENT MATERIAL TO BE DISPOSED OF OFF SITE
7. CONSTRUCTION MATERIAL STORAGE: ALL MATERIAL
STORAGE WILL
BE LOCATED IN EXISTING GARAGE.
IF ANY ADDITIONAL STORAGE AREA IS REQUIRED,
IT SHALL NOT BE LOCATED WITHIN THE DRIP LINES
OF ANY TREES.
GREEN HALO REGISTRATION:
WASTE MANAGEMENT PLAN NOTES:
BUDDHE RESIDENCE 356-13-023
10863 WILKINSON AVE, CUPERTINO
COLUMBUS AVENUE
MARIA BARMINA
1 1 TO BE DETERMINED
EXPAND (E) FOOTPRINT OF THE HOUSE: ADD FLOOR AREA AT MAIN LEVEL FRONT
TO CREATE (N) LIVING ROOM, ENTRY, OFFICE AND PORCH. RELOCATE KITCHEN.
ADD UPPER LEVEL WITH (N) MASTER SUITE. RECONFIGURE (E) BEDROOM LEVEL
TO INCREASE NUMBER OF BATHS. RETURN GARAGE TO GARAGE USE
COYOTE WATERSHED
8276sf (0.19 acre)545.11sf (0.0125 acres)
n/a
SUJATHA BUDDHE
4114.86 0 545.113976.51 4521.62
4521.62
4161.14 03616.03 0 3616.03
8276 7592.54 545.11 8137.65
6.5
ALL ON SITE DRAIANGE
SHALL FLOW TOWARDS
THE STREET AND
AWAY FROM
COMMON
PROPERTY LINES
FOR PROPOSED
DOWNSPOUT
LOCATIONS SEE
ROOF PLAN
NO HERITAGE
TREES EXIST ON SITE
NO TREE PROTECTION
REQUIRED
LOT DRAINAGE: Each residential lot shall be designed to drain toward the
streets, alleys, common driveways, or common areas. The drainage paths for the
privately owned lots shall be designed such that the drainage paths do not cross the
common property lines unless an exception is approved by the Public Works
Department due to unavoidable circumstances (such as to provide drainage to an
existing Heritage tree).
SE
W
E
R
L
I
N
E
4
"
WA
T
E
R
L
I
N
E
3
/
4
"
GA
S
L
I
N
E
T
O
S
T
R
E
E
T
FRONT YARD = 20X71 = 1420 SQ.FT.
(100%):
LAWN (PERVIOUS) = 910 SFT
(E) DRIVEWAY 380SF to be redone in
permeable pavers (190sf of permeable
surface to be provided)
PATHS NON PERMEABLE = 130SF
______________________________
40% IMPERVIOUS MAX ALLOWED:
190 + 130 = 320SF OF NON
PERMEABLE (22.5%)
Required Front Yard Tree
In order to help mitigate the visual mass and bulk of new second
story construction and cohesively integrate new architecture into
the existing neighborhood, the City of Cupertino requires a new
front yard tree for all new second story homes and additions.
Per Cupertino Municipal Code Chapter 19.28.120, the tree must
be at least a 24-inch box with low to moderate water using tree
that typically grows to a mature height of more than 30 feet,
planted at a minimum height of six feet, as measured from
adjacent grade. California native trees are preferred. The tree
shall be planted in front of new second stories in the center 50%
of the front yard setback area.
Privacy trees must be a minimum twenty-four (24) inch box tree
and eight (8) foot height at planting and privacy shrubs must be
minimum fifteen (15) gallons and six (6) feet in height at planting.