HomeMy WebLinkAbout25-068 Burr Plumbing and Pumping_Service Order #2 dated 9-21-26 for Storm Line Clean, Hydro Flush & Video Inspection at Various LocationsContract/Purchasing Action Personnel Information Name Ricardo Alvarez Department Public Works  Division Streets Division Date 09.15.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Proposal -#13618-City of Cupertino-Storm Drain Cleaning & Inspecting @ 5 Locations.pdf Service Order Amount $8,950.00 Master Agreement Number 2025-028 Contract Start Date 04/24/2025 Contract End Date 06/30/2028 Firm Name Burr Plumbing Address 1645 Almaden Rd, San Jose, CA 95125, USA Phone (408) 287-2877 Consultant/Contractor Name Burr Plumbing Consultant/Contractor Email burr@bp2inc.com Project Name SO 2 Storm Line Clean, Hydro Flush & Video Inspection at Various Locations Project Location various locations through out the city Cupertino Project Manager Name Ricardo Alvarez Cupertino Project Manager Email ricardoa@cupertino.org Master Agreement Maximum Compensation $75,000.00 Total Previously Encumbered to Date $9,870.00 Encumbrance this Service Order $8,950.00 Master Agreement Unencumbered Balance $56,180.00 SO GL #230-81-855 700-702 NWS Project Code Comments This service is to clear out several storm drains through out the city. Signature       09/15/2026 PDT  Consultant/Contractor Signature Date       09/15/2026 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.    09/21/2026 PDT  Email: burr@bp2inc.com Date: 09/15/2026 PDT Email: ricardoa@cupertino.gov Date: 09/15/2026 PDT    Management Analyst Signature Date Email: PWMA@cupertino.gov Date: 09/21/2026 PDT 1 | P a g e Burr Plumbing & Pumping, Inc. Initial _________ 1645 Almaden Rd. San Jose, CA 95125 * Tel (408) 287-2877 * Fax (408) 287-2844 License#730349 A, C36, D21 PROPOSAL No. 13618 Proposal submitted to: City of Cupertino Date Submitted: 09-14-26 Description: Storm Drain Cleaning (5 locations) Phone Number: 777-7606 Job Name: Street: 10555 Mary Ave. Job Location: 5 Separate Locations City, State, ZIP: Cupertino, CA 95014 Job Phone: Fax Number: 777-3399 Cell Phone: 650-7220254 E-Mail: ricardoa@cupertino.org Contact: Ricardo Alvarez We hereby submit specifications and estimates to utilize a Vactor combination flush truck to attempt to flush, root cut and potentially video 5 separate sections of storm drain as identified below. Scope of Work: 1. Vacuum clean all basins and pressure wash each basin as necessary. 2. Hydro flush, as required, to clear debris and/or roots from five identified locations (as directed by City of Cupertino representative). 3. Video inspect work as necessary and based on flushing efficacy Various tooling will be available to help affect desired cleaning results, including hydraulic roots saws, chain flail saws, grenade bombs, flushing heads, etc. Burr Plumbing will basic traffic control equipment including a Vactor mounted arrow board. Cupertino stated that they would be providing Public Works assistance. Burr Plumbing will provide occasional video inspections throughout project to gauge efficacy of work being completed as well to determine source of problem areas (difficult to pass or properly clean). Locations to include: 1) Pruneridge @ Wolfe (15” storm line); 2) Homestead between Blue Jay and DeAnza (12” storm line); 3) 1157 Yorkshire (12” DI access); 4) 20808 Shelly Drive (12” DI Access); 5) 10348 Bonny Drve (12” DI Access). Exclusions: 1. All engineering, soil testing and surveying. 2. All permits, drawings or related fees, as required, will be additional. 3. Repair of any unmarked lines, including; PG&E, water, cable, telephone, fiber optic, irrigation, etc. 4. Any and all required bonds or posting of certificates of deposits required. 5. Wall, ceiling, flooring, framing and surface finish repairs. 6. Responsibility for any existing or other systems and work not directly related to our work 7. Responsibility for any electrical, plumbing, drains, fire sprinkler and/or controls not expressly included in this proposal. 8. Any changes or deviations from this proposal will be executed only on written order and will become an extra charge over the cost of this proposal. 9. Any unknown or unforeseen circumstances. 2 | P a g e Burr Plumbing & Pumping, Inc. Initial _________ 1645 Almaden Rd. San Jose, CA 95125 * Tel (408) 287-2877 * Fax (408) 287-2844 License#730349 A, C36, D21 PROPOSAL No. 13618 We Propose to hereby furnish material and labor – in accordance with above specifications For the sum of: Eight Thousand, Nine Hundred & Fifty Dollars ($8,950) Payment to be made as follows: Payment due upon completion of scope of work Signature: Burr Plumbing & Pumping, Inc. Note: Proposal may be withdrawn if not accepted within 30 days. The person signing below represents that he or she is authorized by the Owner to accept this proposal on behalf of the Owner listed above, and further represents that he or she has read, understood and agreed to the terms and conditions set forth on the last page of this Proposal. STATE LAW REQUIRES ANYONE WHO CONTRACTS TO DO CONSTRUCTION WORK TO BE LICENSED BY THE CONTRACTORS’ STATE LICENSE BOARD IN THE LICENSE CATEGORY IN WHICH THE CONTRACTOR IS GOING TO BE WORKING --IF THE TOTAL PRICE OF THE JOB IS $500 OR MORE (INCLUDING LABOR AND MATERIALS). LICENSED CONTRACTORS ARE REGULATED BY LAWS DESIGNED TO PROTECT THE PUBLIC. IF YOU CONTRACT WITH SOMEONE WHO DOES NOT HAVE A LICENSE, THE CONTRACTORS’ STATE LICENSE BOARD MAY BE UNABLE TO ASSIST YOU WITH A COMPLAINT. YOUR ONLY REMEDY AGAINST AN UNLICENSED CONTRACTOR MAY BE IN CIVIL COURT, AND YOU MAY BE LIABLE FOR DAMAGES ARISING OUT OF ANY INJURIES TO THE CONTRACTOR OR HIS EMPLOYEES. YOU MAY CONTACT THE CONTRACTORS’ STATE LICENSE BOARD TO FIND OUT IF THIS CONTRACTOR HAS A VALID LICENSE. THE BOARD HAS COMPLETE INFORMATION ON THE HISTORY OF LICENSED CONTRACTORS, INCLUDING ANY POSSIBLE SUSPENSIONS, REVOCATIONS, JUDGMENTS, AND CITATIONS. THE BOARD HAS OFFICES THROUGHOUT CALIFORNIA. PLEASE CHECK THE GOVERNMENT PAGES OF THE WHITE PAGES FOR THE OFFICE NEAREST YOU OR CALL 1-800-321-CSLB FOR MORE INFORMATION. The services to be provided by Burr Plumbing & Pumping, Inc. DO NOT include any engineering work, and the customer is responsible for providing all engineering determinations. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. Burr Plumbing & Pumping, Inc. is authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature: Company: 3 | P a g e Burr Plumbing & Pumping, Inc. Initial _________ 1645 Almaden Rd. San Jose, CA 95125 * Tel (408) 287-2877 * Fax (408) 287-2844 License#730349 A, C36, D21 PROPOSAL No. 13618 Conditions of Proposal 1. Allowing Burr Plumbing & Pumping, Inc. (“Burr”) to commence work or preparation for work constitutes acceptance by you of this Proposal and all its terms and conditions. Quotations herein, unless otherwise stated, are for immediate acceptance and are subject to change. 2. BURR shall be paid monthly progress payments, or as outlined in this proposal. if progress payments are provided in this proposal, on or before the 10th day of each month for the value of the work completed plus the value of materials and equipment suitably stored less the aggregate of previous payments made to BURR. Final payment shall be made within 30 days of substantial completion of the work described in this proposal. Payment for goods is due on delivery of the goods to the project site. 3. Back charges shall not be considered valid unless contained in a writing signed by BURR before the work is executed. 4. All sums not paid when due shall bear interest at the rate of 1½% per month from the due date until paid or the maximum legal rate permitted, whichever is less; all costs of collection, including the actual attorney’s fees and costs incurred by BURR, the actual expert fees incurred by BURR and costs as defined by the California Code of Civil Procedure shall be paid by Owner or its representatives. 5. If Owner or its representative fail to make a payment to BURR as provided herein, BURR may stop work without prejudice to any other remedy it may have. 6. Owner or its representative is to prepare all work areas to accept the work of BURR under the contract. BURR will not be called upon to start work until sufficient areas are ready to insure that BURR may continue to work until completed. 7. After acceptance of this Proposal, BURR shall be given a reasonable time in which to make delivery of materials, equipment and labor and to complete its work under this Proposal. BURR shall not be liable for delays or defaults where occasioned by any causes of any kind and extent beyond its control, including but not limited to delays caused by the owner, general contractor, architect and/or engineers, armed conflict, acts of terrorism or economic dislocation resulting therefrom, embargos, shortages of labor, equipment or materials, production facilities delays or transportation delays, labor difficulti es, civil disorder of any kind, the actions of civil or military authorities, vendor priorities an d allocations, fires, floods, accidents and acts of God. 8. All workmanship is guaranteed against defects in workmanship for a period of one year from the date of installation. This warranty is in lieu of all other warranties, express or implied, including any warranties of merchantability or fitness for a particular purpose. BURR will not be responsible for special, incidental or consequential damages and shall not be responsible for damage to its work occasioned by other parties. Any repair work necessita ted by damage caused by others directed by the Owner or its representatives to be performed will be considered extra work. BURR’s responsibility for damage or loss in transit ceases upon delivery in good condition to a public carrier. 9. Work called for herein is to be performed during BURR’s regular working hours. Overtime rates will be charged for all work performed outside such hours as an extra cost to Owner or its representative. 10. All materials shall be furnished in accordance with the respective industry tolerances for variation in color, thickness, and size, finish, texture and performance standards. 11. Notwithstanding any provision contained in this Proposal or the contract documents between Owner and General Contractor, BURR may file a mechanic’s lien, stop notice, payment bond claim or other claim on its own behalf in the event that any payment due to BURR is not made as and when provided for in the terms of this Proposal. 12. The subcontract form used between BURR and Owner’s General Contractor will be the A401 subcontract, then current, as published by the American Arbitration Association. Where there is a conflict between the terms of that subcontract form and this Proposal, or when the contract documents between Owner and its General Contractor conflict with the terms of this Proposal, then this Proposal shall govern. 13. Owner or its representative shall furnish all temporary site facilities, including suitable covered storage facilities and ho isting as required at no cost to BURR. 14. Owner and its representative, including its General Contractor, shall make no demand for liquidated or delay damages in any sum which may exceed any such sum specifically provided for in this Proposal, and no liquidated damages may be assessed against BURR for delays or causes attributable to other contractors or arising outside the scope of this Proposal. 15. Owner or its representative, including Owner’s General Contractor, shall purchase and maintain property insurance upon the full value of the entire work and/or materials to be supplied which shall include the interest of BURR. Owner or its representative, including Owner’s General Contractor shall furnish to BURR evidence that it has named BURR as an additional insured on said policy of insurance in an amount of no less than $1 million. SO 2 Storm Line Clean, Hydro Flush & Video Inspection at Various Locations - Service Request Created:09/15/2026 Status:Signed Transaction ID:fd0b692e-0002-4b60-81fe-c80f558f52d3 "SO 2 Storm Line Clean, Hydro Flush & Video Inspection at Various Locations - Service Request" history Sundari Pilaka created the document 09/15/2026 3:43:44 PM PDT - IP address 64.165.34.3 Document was emailed to Burr Plumbing 09/15/2026 3:43:45 PM PDT Burr Plumbing opened the document 09/15/2026 4:20:02 PM PDT - IP address 23.24.196.58:58370 Burr Plumbing signed the document 09/15/2026 5:48:49 PM PDT - IP address 23.24.196.58:25078 Document was emailed to ricardoa@cupertino.gov 09/15/2026 5:48:50 PM PDT ricardoa@cupertino.gov opened the document 09/15/2026 7:24:45 PM PDT - IP address 134.16.41.173:55296 ricardoa@cupertino.gov signed the document 09/15/2026 7:26:12 PM PDT - IP address 134.16.41.173:55296 Document was emailed to Public Works Management Analyst 09/15/2026 7:26:13 PM PDT Public Works Management Analyst opened the document 09/21/2026 10:07:43 AM PDT - IP address 71.198.170.154:57188 Public Works Management Analyst signed the document 09/21/2026 10:08:17 AM PDT - IP address 71.198.170.154:57188 Document was successfully signed and filed 09/21/2026 10:08:17 AM PDT