CC Resolution No.10020RESOLUTION NO. 10020
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
APPROVING THE FINAL MAP AND IMPROVEMENT PLANS OF TRACT
NO. 8998, LOCATED AT 11350 AND 11354 SOUTH STELLING ROAD;
DEVELOPER, ZANKICH CONSTRUCTION, INC.; ACCEPTING
CERTAIN EASEMENTS; AUTHORIZING SIGNING OF FINAL MAP
AND IMPROVEMENT PLANS; AUTHORIZING THE EXECUTION OF
AGREEMENT IN CONNECTION THEREWITH
WHEREAS, there has been presented to the City Council for approval and for
authorization to record final map of Tract No. 8998, located at 11350 and 11354 SOUTH
Stelling Road, showing certain avenues, drives, places, and roads by Zankich
Construction, Inc., and
WHEREAS, there has been presented to the City Council a proposed agreement
for the construction of streets, curbs, and gutters and for other improvements, and good
and sufficient bonds, fees, and deposits as set forth in Exhibit "A" having been presented
for the faithful performance of said work and the carrying out of said agreement; and said
map, agreement, and bonds having been approved by the City Attorney;
NOW, THEREFORE, BE IT RESOLVED THAT
ao
Said final map and improvement plans of Tract No. 8998, be and the same
are hereby approved.
b. The offer of dedication for roadway and for easements is hereby accepted.
Co
The City Engineer and the City Clerk are hereby authorized to sign said
final map.
d. The City Engineer is hereby authorized to sign the improvement plans.
eo
The Mayor and the City Clerk are hereby authorized to execute the
agreement herein referred to.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 1 st day of December, 1997, by the following vote:
Resolution No. 10020
Page 2
Vote Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
Burnett, Dean, James, Statton, Chang
None
None
None
ATTEST:
Ci~ ~~-'
ROVED:
Mayor, City of Cupertino l\
Resolution No. 10020
Page 3
EXHIBIT "A"
SCHEDULE OF BOND, FEES, AND DEPOSITS
DEVELOPMENT:
LOCATION:
Tract No. 8998
Zankich Construction, Inc.
11350 and 11354 South Stelling Road
A. Faithful Performance Bond: Off-site
On-site
B. Labor and Material Bond:
ONE HUNDRED FIFTY-THREE THOUSAND AND 00/100 DOLLARS
C. Checking and Inspection Fees:
NINE THOUSAND TWO HUNDRED FIFTY AND 00/100 DOLLARS
D. Indirect City Expenses:
E. Development Maintenance Deposit: $
THREE THOUSAND AND 00/100 DOLLARS
F. Storm Drainage Fee: Basin 3 $
ONE THOUSAND FIVE HUNDRED FIFTY-ONE AND 87/100 DOLLARS
G. One Year Power Cost: $
TWO HUNDRED TWENTY-FIVE AND 00/100 DOLLARS
H. Street Trees:
I. Map Checking Fee:
THREE HUNDRED NINETY-NINE AND 00/100 DOLLARS
J. Park Fee: Zone II
$153,000.00
$ 32,000.00
$153,000.00
$ 9,250.00
N/A
3,000.00
1,551.87
225.00
By Developer
$ 399.00
$ 78,750.00
SEVENTY-EIGHT THOUSAND SEVEN HUNDRED FIFTY AND 00/100 DOLLARS
K. N/A
L. As specified in
Item 23 of agreement
Water Main Reimbursement:
Maps and/or Improvement Plans: