HomeMy WebLinkAboutPC 07-14-2026 Youtube and Zoom TranscriptWEBVTT
1
00:00:09.700 --> 00:00:15.510
Community Hall: Hello, and welcome to the Planning Commission meeting for
Tuesday, July 14th. Please rise for the Pledge of Allegiance.
2
00:00:36.450 --> 00:00:53.309
Community Hall: Thank you very much. So, before we move to the approval
of minutes, I would like to just reorder some agenda items, for the,
flow… Oh, I'm sorry. You're right. We will do the roll call first. City
Clerk, may we please have the roll call? Commissioner Fung? Present.
3
00:00:53.310 --> 00:01:00.260
Community Hall: Commissioner Linscog? Here. Commissioner Rao? Here. Vice
Chair Sharp? Here. Chair Kasolcheron? Here.
4
00:01:03.070 --> 00:01:17.710
Community Hall: Thank you very much. Okay, now we will move to reorder
some agenda items. I would like to move the staff and commission reports
and future agenda setting to after agenda. Item 2, which is the study
session, but before agenda. Item 3, the Atp.
5
00:01:17.900 --> 00:01:27.959
Community Hall: So, just, informing everyone of that change. Now we will
move on to the approval of the minutes for the June 23rd Planning
Commission meeting. Do we have any motion for that?
6
00:01:30.250 --> 00:01:31.120
Community Hall: So, more.
7
00:01:32.020 --> 00:01:33.089
Community Hall: Do we have a second?
8
00:01:34.790 --> 00:01:35.690
Community Hall: Second.
9
00:01:36.250 --> 00:01:38.740
Community Hall: Thank you. City Clerk, may we have a vote.
10
00:01:49.480 --> 00:01:51.530
Community Hall: The motion carries unanimously.
11
00:01:51.980 --> 00:01:58.040
Community Hall: Thank you. Great. So we will then move on to oral
communications. Do we have any oral communications?
12
00:02:01.340 --> 00:02:03.269
Community Hall: We have no speakers, Chair.
13
00:02:03.490 --> 00:02:12.460
Community Hall: Alright, thank you. Moving on. So, we will now move on to
the study session on permit streamlining and simplification for small
home upgrades.
14
00:02:12.600 --> 00:02:14.650
Community Hall: On the city work program.
15
00:02:14.780 --> 00:02:16.760
Community Hall: Do we have a staff report for this?
16
00:02:25.770 --> 00:02:26.530
Community Hall: Oh.
17
00:02:26.780 --> 00:02:45.099
Community Hall: There we go. Thank you. Now I can tell. I just wanted to
do some quick introductions, because we have three new staff members here
for this item tonight. So, as the chair noted, the item is focusing on
the permitting process for small residential upgrades. I know there's
been a lot of discussion in the past about permit streamlining.
18
00:02:45.100 --> 00:02:47.060
Community Hall: This is focused on just a really.
19
00:02:47.070 --> 00:02:51.750
Community Hall: particular aspect of that, of small residential projects.
I believe this is a…
20
00:02:52.230 --> 00:02:59.249
Community Hall: Cwp. Item number 4. So this will be something that will
ultimately going back to city council.
21
00:02:59.480 --> 00:03:19.060
Community Hall: To start the presentation tonight, we have planner Julie
Garofalo, who had done a lot of the research on this, and she will be
giving the presentation. And since this is very much focused on the
building division's work, we have both Sean Hatch, who is the city's
building official, and Fong De Vries, who is the deputy building
official.
22
00:03:19.470 --> 00:03:28.700
Community Hall: And they should be able to answer probably all your
questions about the building process. I don't want to give you too much
of a build up, but anyhow, just wanted to get those introductions out of
the way.
23
00:03:29.090 --> 00:03:34.259
Community Hall: And again, this is a study session item, so however you
would like to give us information, that would be helpful.
24
00:03:34.490 --> 00:03:40.699
Community Hall: Thank you. And with that I'll turn it over to Jul Can you
hear me?
25
00:03:41.350 --> 00:03:55.139
Community Hall: Good evening, City of Cupertino residents, members of the
public, staff, and Planning and Zoning Commission officials. My name is
Julia Garofalo, the Assistant Planner here at City of Cupertino, along
with Fong Devries, the Deputy Building Official.
26
00:03:55.330 --> 00:04:13.629
Community Hall: our Chief Building Official, to present to you a review
of the Community Development Department's assigned CityWork program
priority goal efforts on permit streamlining and simplification for small
home upgrades. Tonight's study session intends to review outreach
findings, discuss current ongoing permit streamlining efforts, and review
27
00:04:13.630 --> 00:04:16.109
Community Hall: And receive direction on next steps.
28
00:04:19.269 --> 00:04:36.990
Community Hall: The City Work Program outlines major priorities for the
upcoming two fiscal years and aligns staff efforts with the goals
established by city leaders and, by extension, the community. This
framework promotes transparency and accountability by directing resources
towards initiatives that best serve community needs and priorities.
29
00:04:37.060 --> 00:04:42.759
Community Hall: The permit streamlining city work program goal of
tonight's focus is identified as
30
00:04:43.040 --> 00:04:53.430
Community Hall: Develop a suite of improvements to improve access to and
speed the processing of permits for small home upgrades to enhance
compliance and improve overall efficiency, improve
31
00:04:53.620 --> 00:05:09.660
Community Hall: turnaround times, set service level agreements for staff
and outsource reviewers, set customer service, keep KPIs, create
templates to reduce back and forth, and improve internal staff expertise
to reduce consulting expenses.
32
00:05:10.960 --> 00:05:22.609
Community Hall: The types of projects considered small home upgrades
includes additions of 250 square feet or less, kitchen and bathroom
replacements for additions, relocation of appliances and fixtures.
33
00:05:22.610 --> 00:05:32.089
Community Hall: and equipment upgrades such as EV charging, heat pumps,
furnace or water heaters, HVAC systems, and whole house or partial re-
piping.
34
00:05:34.600 --> 00:05:43.439
Community Hall: In March 2025, after a series of priority goal workshops,
the City Council approved the fiscal year 25 to 27 City Work Program
priority items.
35
00:05:43.600 --> 00:06:00.999
Community Hall: In fiscal year 25, community development staff began work
on the division's city work program goal. In February this year, a
benchmarking outreach survey was distributed to 12 local building
officials, in which we received 6 responses on comparable building permit
metrics.
36
00:06:01.000 --> 00:06:04.070
Community Hall: Today, staff is ready to report on findings and progress.
37
00:06:06.010 --> 00:06:16.629
Community Hall: A benchmarking survey is a tool used to collect and
compare data on processes, performance metrics, and practices across peer
jurisdictions. This survey data has been included as attachment 1.
38
00:06:16.760 --> 00:06:32.170
Community Hall: The survey responses focused on several key areas,
including permitting programs and metric reporting, turnaround times,
comparing expected versus actual performance, permit and staffing
volumes, review processes and business support features.
39
00:06:32.260 --> 00:06:47.449
Community Hall: response times for both applicants and staff, service
level agreements and key performance indicators, and overall efficiency
factors. This data is being used to evaluate how Cupertino compares with
surrounding cities to help inform future decision making.
40
00:06:48.980 --> 00:07:08.159
Community Hall: A review of peer cities shows that all jurisdictions
provide detailed checklists and handouts for small home remodel permits,
while only one city publicly reports key performance indicators.
Permitting system platforms vary, although three cities use Acela, and
overall response times are generally consistent across agencies.
41
00:07:08.350 --> 00:07:23.040
Community Hall: Notably, Cupertino is processing a higher volume of
permits with fewer staff compared to peer cities. Across jurisdictions,
the most common cause of repeats to plan submittal includes incomplete
applications and applicants unfamiliarity with code requirements.
42
00:07:23.110 --> 00:07:30.239
Community Hall: In terms of transparency, most cities, including
Cupertino, have made permitting turnaround metrics publicly available.
43
00:07:30.750 --> 00:07:43.030
Community Hall: Finally, while many jurisdictions experienced a decline
in small home remodel permits activity from FY23 and FY24, Cupertino saw
an increase in permit submissions during that same period.
44
00:07:46.030 --> 00:08:03.500
Community Hall: Participant cities have been given an anonymous
identifier for presentation purposes, as this benchmarking effort is
designed to identify trends, best practices, and opportunities for
improvement, rather than to evaluate and rank specific cities. Please
note that the data may have limitations and should be interpreted with
caution.
45
00:08:03.760 --> 00:08:14.770
Community Hall: Cupertino's actual average first round review for the
building division is 13 days, while the actual average first round review
amongst all divisions in Cupertino for building permits is 19 days.
46
00:08:16.920 --> 00:08:29.229
Community Hall: This is a graph of the total residential building permit
applications in Cupertino, which have increased by 48% from 2021 to 2025,
reflecting sustained demand for home improvement projects.
47
00:08:30.780 --> 00:08:46.370
Community Hall: Cupertino's average building permit turnaround time in
days by division from 21 to 25 is as follows. Building permit review
requires coordinated input across multiple agencies, including building,
planning, public works, Santa Clara County Fire, and Cupertino Sanitary
District.
48
00:08:46.650 --> 00:08:59.530
Community Hall: Review timelines are influenced by coordination across
multiple agencies and divisions to ensure proposed projects comply with
the applicable codes and regulations and result in a safe and functional
environment.
49
00:08:59.990 --> 00:09:09.590
Community Hall: The city tracks average review times by division,
including the elapsed time when the task is with the applicant between
review cycles, pending a response, and resubmittal.
50
00:09:09.670 --> 00:09:27.029
Community Hall: The building division also utilizes contract plan review
consultants during peak periods to help maintain service levels. Overall,
the reported metrics combine increasing permit values… volumes with
average review timelines by division, providing context for evaluating
system-wide performance.
51
00:09:28.930 --> 00:09:29.870
Community Hall: The current…
52
00:09:30.590 --> 00:09:43.959
Community Hall: Currently, the city offers several service features to
support applicants, homeowners, and contractors when navigating the
permitting process, which include over-the-counter, same-day plan review,
the option to schedule pre-submittal meetings to help reduce review
cycles.
53
00:09:43.960 --> 00:09:48.290
Community Hall: The access to detailed checklists, handouts, and
permitting system guides.
54
00:09:48.290 --> 00:10:06.569
Community Hall: Applicants can also take advantage of an electronic plan
submittal and review, email notifications, and permit status tracking. In
addition, the City provides walk-in counter services, maintains
responsive and accessible staff, and utilizes a customer service
accountability platform to help manage and track inquiries.
55
00:10:08.640 --> 00:10:20.880
Community Hall: The City is actively advancing permit streamlining
through a combination of technology and process improvements, including
exploring AI-supported pre-screening, a plan review, and plan review in
coordination with IT.
56
00:10:20.920 --> 00:10:35.099
Community Hall: expanding staff training and the use of Microsoft Copilot
to improve internal efficiency, and developing clear, standardized plan
review checklists for all small home remodel permits to simplify
submittal requirements and reduce review cycles.
57
00:10:35.400 --> 00:10:52.319
Community Hall: The building division continues to support the available
service features of instant online permits for a range of common
residential projects, with plans to expand this program to include
additional minor projects like kitchen and bathroom remodels, HVAC
changeouts, and heat pumps.
58
00:10:52.830 --> 00:11:00.149
Community Hall: Staff is also collaborating with IT to update the online
permit portal to improve functionality and support.
59
00:11:00.220 --> 00:11:15.849
Community Hall: the submission of all permit types, and to implement e-
check payment capabilities for permit fees. Finally, staff continues to
monitor and respond to changes in state law, which can directly affect
review timelines, application requirements, and the city's ongoing
efforts to
60
00:11:16.050 --> 00:11:19.859
Community Hall: Streamline permit processing across all divisions.
61
00:11:20.400 --> 00:11:26.829
Community Hall: At last, that concludes the presentation. Staff requests
the opportunity for discussion at this time. Thank you.
62
00:11:29.510 --> 00:11:35.349
Community Hall: Thank you very much, Julia, and welcome. And I'll bring
this back to the Commission for any clarifying questions.
63
00:11:36.320 --> 00:11:38.779
Community Hall: And… Yes, Commissioner Nolenskog
64
00:11:39.010 --> 00:11:54.210
Community Hall: So, did you speak to anybody who actually applies for
permits, like residents or contractors, when you were in that one-year
process where you were also gathering survey results from,
65
00:11:54.470 --> 00:11:57.450
Community Hall: From, you know, other cities.
66
00:12:00.380 --> 00:12:14.840
Community Hall: No, the direction was to reach out to our neighboring
cities, and so that was the direction we followed. So yeah, no, we have
not reached out to citizens or had outreach or that. Okay, so we don't
actually know what the pain points are that we're trying to solve.
67
00:12:16.310 --> 00:12:19.400
Community Hall: I don't… I guess… Sort of.
68
00:12:19.810 --> 00:12:33.310
Community Hall: Yeah, I don't know what the… yeah, I'd like to know, I
guess that's why we're here. Right. So, yeah, any feedback to what that
is, knowing that most of you have gone through the permit process
yourself, yeah, we'd love to hear it. Okay. Absolutely, yeah. Thank you.
69
00:12:34.210 --> 00:12:35.570
Community Hall: Any other questions.
70
00:12:35.690 --> 00:12:41.789
Community Hall: Commissioner Rao. Yeah, I was curious following up on
that. That direction was from where?
71
00:12:43.640 --> 00:12:44.870
Community Hall: Our director.
72
00:12:45.140 --> 00:12:45.980
Community Hall: Okay.
73
00:12:46.300 --> 00:12:52.119
Community Hall: Yeah, it just seems like… The applicants would be a prime
source of feedback, and
74
00:12:52.520 --> 00:12:58.540
Community Hall: I believe there's also a survey that the city conducts
for planning permits and building permits.
75
00:12:59.020 --> 00:13:01.689
Community Hall: There is a survey on our website, yeah, that
76
00:13:01.930 --> 00:13:07.340
Community Hall: I rarely get anybody filling it out, right? So, yeah,
there's avenues to do so.
77
00:13:07.460 --> 00:13:19.659
Community Hall: But I don't… I rarely get any, right? So, yeah, I would
love the feedback, not scared of it. Yeah, I appreciate it, for sure.
It'd be useful, right? It would be, very, yeah. I can say that I've had…
78
00:13:20.300 --> 00:13:33.329
Community Hall: residents that have been hesitant to provide feedback.
Let's just leave it at that, because they feel like they might not pass
the permits if they give feedback. So there's sorry I've completed there
yet.
79
00:13:33.850 --> 00:13:37.440
Community Hall: The other question I have is, I'm curious why planning is
not
80
00:13:38.090 --> 00:13:40.939
Community Hall: Is planning part of the simplification, or…
81
00:13:41.050 --> 00:13:48.179
Community Hall: Is it building only, or I guess I'm planning is a part of
the process of reviewing building permits. And so this is
82
00:13:48.460 --> 00:13:51.229
Community Hall: Encompassed in that, review.
83
00:13:51.710 --> 00:13:58.490
Community Hall: So, the… The scope of the CWP item includes both
simplification of planning.
84
00:13:58.630 --> 00:14:14.800
Community Hall: permits as well as building permits? This is just
building permits. When people do remodels, and when they do small
additions, they don't involve planning as a permit. They come in as a
building permit. Yeah, if I could just… all of these would be ministerial
items that would go through building.
85
00:14:15.050 --> 00:14:18.769
Community Hall: Building permits are still reviewed by other divisions,
though.
86
00:14:19.220 --> 00:14:24.269
Community Hall: There's four divisions that make up community
development. Planning, building, code enforcement, and housing.
87
00:14:24.430 --> 00:14:41.999
Community Hall: So planning does review building permits in addition to
the discretionary planning permits. So the scope of this project includes
review cycles within planning as well as building, is that right? The
entire process, correct. Anybody who would be looking at a project that
fit the description of a small home remodel. Okay, so the…
88
00:14:42.230 --> 00:14:45.019
Community Hall: presentation as well as the comments, I guess I'm…
89
00:14:45.180 --> 00:14:59.430
Community Hall: I'm wondering why building is fielding the questions. Are
they fielding the questions on behalf of both planning and building? How
should we… how should commissioners direct questions? Yes, building's
here because this is really the process they're… they primarily oversee.
90
00:14:59.640 --> 00:15:07.410
Community Hall: Okay. These are building permits, after all. None of
these are things that would come before this commission, for instance. So
you do have planning review.
91
00:15:07.720 --> 00:15:12.209
Community Hall: But building is the lead on that, which is why we wanted
building here for their expertise.
92
00:15:14.040 --> 00:15:18.949
Community Hall: And is this, project now on the council calendar already
or is there time to
93
00:15:19.010 --> 00:15:36.519
Community Hall: do another iteration to get applicant interest and
feedback? There is not a definite council date. There was… expectation
probably would have been late September or October to take it, but
there's no hard date for that. Okay. And unlike the development projects
you get, we don't have AB130 or anything to worry about here. Okay,
great. Thank you.
94
00:15:37.610 --> 00:15:41.400
Community Hall: Any other questions? Yeah, sorry, I have one more. So,
95
00:15:42.110 --> 00:15:52.950
Community Hall: All in all, just reading this, this report is, it's, it's
an incredibly disappointing report. It's so top level. There's so many
just obvious questions here that are.
96
00:15:53.070 --> 00:15:55.269
Community Hall: Not addressed, like, you know.
97
00:15:55.670 --> 00:16:10.230
Community Hall: basically the most important constituent is the
contractors and the residents, and no one spoke to them to find out what
their pain points are, so we don't know what problems we're trying to
solve, so I feel like that's a…
98
00:16:10.230 --> 00:16:14.020
Community Hall: That's a really big lack. You know, looking at…
99
00:16:14.020 --> 00:16:34.099
Community Hall: looking at the the increase. It's a pretty significant
increase in the number of days that it takes on on all the departments.
Right? So that's a pretty significant thing. So it would have been great
to see a little bit more analysis on what caused those increases, whether
it was
100
00:16:34.210 --> 00:16:52.910
Community Hall: you know, staff shortages, whether it was, you know, the
types of permits shifted, you know, so there are some more time-intensive
permits that are being asked, like, what is causing that? And just doing
a little bit more of a deep dive would have been really helpful, because
I feel like we're being asked to
101
00:16:52.910 --> 00:17:05.079
Community Hall: Provide feedback when we're not getting all the
information we need to be able to give that feedback. You know, like, the
other thing is, you know, we, we get these, this little paragraph of,
102
00:17:05.589 --> 00:17:13.580
Community Hall: Of, like, potential next steps, and one of the things it
says is we're going to see if we can do more instant online permits.
103
00:17:13.690 --> 00:17:26.630
Community Hall: That's great, but how many, you know, like, of the
instant permits, online permits that we have right now, what percentage
of total permit applications do those represent? How much impact will it
have?
104
00:17:26.630 --> 00:17:41.539
Community Hall: if we, like, what are the levers that we need to be
shifting? We don't know that, because we don't have that information,
right? So if 80% of the permits are currently, you know, online permits,
and we shift, you know, another 5%,
105
00:17:41.580 --> 00:18:01.100
Community Hall: It's not going to move the needle for us, right? But if
it's 40% and we're going to add another 20%, yeah, significant impact. So
again, there's just not enough data here to make any kind of meaningful
conclusions or make any kind of recommendations. And I can just keep
going, you know, I mean, it's just like.
106
00:18:02.300 --> 00:18:18.950
Community Hall: like, how… what is the comparison of the types of permits
that we have versus the other cities? You know, where are the pain points
from… between us versus the other cities? Why are our numbers so much
higher than other cities? Like, what's the… you know, what's causing that
difference, and is that causing the increase?
107
00:18:19.350 --> 00:18:30.259
Community Hall: I don't know. How many people are not applying for
permits because it's too complicated? Don't know, right? So, I reached
out to… I recently got a new
108
00:18:30.550 --> 00:18:49.239
Community Hall: heat pump HVAC and a new heat pump water heater, and the
company that installed my new heat pump water heater is one of the bigger
ones in the Valley. So I reached out to them, and I asked them, you know,
how much work do you do in Cupertino, and and what has been your
experience?
109
00:18:49.240 --> 00:18:52.120
Community Hall: And I will read you what they wrote back to me.
110
00:18:52.130 --> 00:18:55.159
Community Hall: They said… Through the chair, are we doing clarifying
questions?
111
00:18:55.540 --> 00:19:02.430
Community Hall: Oh yeah, sorry, I can wait. Yes, we are on clarifying
questions. I'll wait. Okay. Thank you for clarifying that, Chair.
112
00:19:03.030 --> 00:19:13.010
Community Hall: Do we have any other clarifying questions? Sorry to break
your train. I did have some clarifying questions for staff trying to get
a sense of.
113
00:19:13.310 --> 00:19:21.779
Community Hall: the ongoing streamlining projects that's in the staff
report, is that considered a part of the CWP, or is that just
coincidental that
114
00:19:22.360 --> 00:19:30.609
Community Hall: IT is sort of doing these things, and these are other
projects that are just ongoing activity. How much of that is actually CWP
related?
115
00:19:30.930 --> 00:19:32.419
Community Hall: Or it may not be at all.
116
00:19:33.190 --> 00:19:34.150
Community Hall: So.
117
00:19:34.220 --> 00:19:41.710
Community Hall: Most of the streamline for, like, kitchen remodel,
bathroom remodel, and heat pumps, I think
118
00:19:41.730 --> 00:19:58.910
Community Hall: this was on our path of getting it to streamline, because
both Sean and I do recognize the feedback that we get from the applicant
and neighboring cities. Even we didn't… even though we didn't go out with
an official surveying, but, you know, through our
119
00:19:58.910 --> 00:20:06.839
Community Hall: experience that we've seen, like, hey, these can help
out. And the reason why we didn't have that before is because we don't
have the technology
120
00:20:06.840 --> 00:20:24.609
Community Hall: to kind of support that, and as with technologies come,
with AI comes, I think that gives us basically the leverage to be able to
provide these more instant services, whereas we didn't have that before.
And then with the… with the work-study program, it basically…
121
00:20:24.680 --> 00:20:43.819
Community Hall: you know, light the fire under us to move it faster,
right? And so I think that's why both Sean and I had no issues of moving
things and helping out resident and moving project along, and I think
whether it's, like, you know, with your comment in terms of did we get
feedback from the residents and other contractor, I think
122
00:20:43.820 --> 00:21:07.680
Community Hall: The direction wasn't given to us in that sense when we
were trying to prep the survey, right? It was, as Sean mentioned, it was
giving the direction that, hey, let's survey out there to see what other
cities are doing and are we meeting up to those city expectation? And
based on the report that we got back is that, yeah, we met with the
expectation and at some point even more.
123
00:21:07.880 --> 00:21:14.439
Community Hall: But with your feedback, obviously today, it's like, yes,
let's go out, do a survey to see what is our pain point.
124
00:21:14.440 --> 00:21:29.120
Community Hall: how can we help these residents, right, get their project
moving along? I mean, we all understand we own homes and want projects to
move along as quickly as possible, right? And so, without understanding
that part, I think that's where…
125
00:21:29.120 --> 00:21:46.000
Community Hall: this is why we're, like, this year was our year of, like,
pushing AI, pushing projects to streamline the process a lot more. So I
think next year you're gonna see that changes in, in, at least in the
building, permitting, side of things. Thank you. I did have a follow-up
on the
126
00:21:46.290 --> 00:21:48.850
Community Hall: Direction, or lack thereof, perhaps.
127
00:21:50.220 --> 00:22:02.669
Community Hall: Is it helpful to staff to bring this to Planning
Commission multiple times? I know we do projects like ODS, where we have
come in a few times, and is that gonna actually help to avoid.
128
00:22:03.710 --> 00:22:06.410
Community Hall: Sort of feedback, like, what we are…
129
00:22:06.830 --> 00:22:11.280
Community Hall: Maybe you see… we'd love to make sure that staff time is
spent.
130
00:22:11.470 --> 00:22:26.230
Community Hall: in a way that is not wasted and at the same time it's,
it's meeting everybody's expectations. So just wondering if it helps to
come in a few times and everybody's happy with the direction it's going.
131
00:22:26.520 --> 00:22:30.429
Community Hall: You know, I probably wouldn't always say yes to that
question, but this time I would.
132
00:22:31.290 --> 00:22:35.120
Community Hall: I think, for the reasons identified, is that…
133
00:22:36.150 --> 00:22:43.879
Community Hall: Out of the gate, this is lacking things you wanted to
see, so it's gonna limit what you can say tonight. I think you can still
provide comments.
134
00:22:44.460 --> 00:22:45.730
Community Hall: But I think…
135
00:22:46.690 --> 00:22:52.099
Community Hall: Given that it's not where you'd like it to be, this kind
of reminds me of a meeting on the oversized vehicles.
136
00:22:52.390 --> 00:22:55.270
Community Hall: Where…
137
00:22:55.890 --> 00:23:04.760
Community Hall: the first draft wasn't far enough along to get meaningful
insight, so it needed to come back. And because this doesn't have a time
restriction.
138
00:23:05.090 --> 00:23:10.720
Community Hall: I don't see why this could not come back to you, and my
experience with the City Council is they want
139
00:23:10.950 --> 00:23:13.320
Community Hall: full planning commission review.
140
00:23:13.820 --> 00:23:15.519
Community Hall: Before they're considering it.
141
00:23:15.960 --> 00:23:17.509
Community Hall: So, my answer is yes.
142
00:23:17.860 --> 00:23:25.619
Community Hall: And so, I know you haven't solicited feedback from
applicants, but has anyone volunteered feedback, formally or informally?
143
00:23:25.810 --> 00:23:30.470
Community Hall: To staff on feedback that could have been included or is
available.
144
00:23:31.890 --> 00:23:43.120
Community Hall: Yeah, I mean, no, we, I mean, right, we're, we're here
every day and meet with everybody and happy to do it, right? We've got a
great crew, so yeah, we, we always hear about it, right? I mean, yeah,
I'm sure some people.
145
00:23:43.180 --> 00:24:02.210
Community Hall: the permitting and the government being scared that, oh,
if I say something, I'm not going to get my permit. I mean, none of us
down there that way, so we never give off that persona. So, I don't think
we're a space that people aren't comfortable coming and talking to us.
So, yeah, we hear about it all the time, and I think that's what sparks
the thing that, that
146
00:24:02.210 --> 00:24:10.489
Community Hall: We're always working on it to make it better, right? We
know the pinpoints, I mean, that we hear the most is, like, our portal is
terrible. Acela's portal is brutal
147
00:24:10.490 --> 00:24:29.679
Community Hall: And so, they're working on it, and also IT is… we're
working on doing a wrapper to make it easier and more user-friendly. We
know that's a pinpoint, right? And so, that's why we still offer the, you
know, we'll pick up the phone and schedule the inspection for you,
because we know it's not friendly, right? And so, that's been an ongoing
thing, just having those resources to do it, right? So…
148
00:24:29.760 --> 00:24:40.890
Community Hall: There's that, I mean, but for the most part, it's pretty
systematic, right? What… what we find, I mean, not that I'm going off on
a tangent, but it's, like, kind of what we find, like, this… this
happened last week, where
149
00:24:40.890 --> 00:24:53.269
Community Hall: from a council member, somebody reached out and said,
hey, I can't get my permit, so, you know, who do I talk to? So, I look
into it and go, oh, what's going on here? And it's… it's… it's been
through 5 rounds of plan reviews, just for a
150
00:24:53.270 --> 00:25:05.919
Community Hall: But the designer cannot answer the comment from sanitary,
and it's gone 3 separate rounds, right? But instead of the… and I'm not
pointing fingers, but instead of saying, oh, it's me, I don't understand
it, it's,
151
00:25:05.920 --> 00:25:19.880
Community Hall: the city, right? Which I get, I'm in this environment,
and I've been doing this a long time, but that kind of happens quite a
bit, you know? So it's, you know, the message is, it's so important to
hire a good person to do your design.
152
00:25:19.900 --> 00:25:23.210
Community Hall: And also a good one to build it, right? But that's easy
to say, I know
153
00:25:23.470 --> 00:25:27.790
Community Hall: it's hard to find, good people, right? So… Thank you,
Chair.
154
00:25:29.480 --> 00:25:34.970
Community Hall: so I'm in the middle of a remodel, not a minor one.
155
00:25:35.610 --> 00:25:42.729
Community Hall: And… all the problems with permitting were the
contractor's fault, not the city's, I'll say that.
156
00:25:43.080 --> 00:25:44.640
Community Hall: I'm sure he's not listening.
157
00:25:46.300 --> 00:25:51.160
Community Hall: But, I mean, one thing… In Cupertino, we've…
158
00:25:51.460 --> 00:26:00.440
Community Hall: There should be a checklist that says, oh, most cities in
Santa Clara County are like this, but Cupertino has these special things,
like…
159
00:26:00.760 --> 00:26:06.980
Community Hall: The bird-safe windows, and… Even something as…
160
00:26:07.310 --> 00:26:12.420
Community Hall: Small is… he got in trouble because he… He leased a…
161
00:26:13.110 --> 00:26:19.929
Community Hall: bin for all the trash, and he didn't lease it from
Recology, and apparently that's required in Cupertino, but he didn't
know.
162
00:26:20.240 --> 00:26:25.030
Community Hall: So we… so something in the checklist should have you
know.
163
00:26:25.150 --> 00:26:29.480
Community Hall: Those little differences between Cupertino and, you know,
maybe…
164
00:26:29.650 --> 00:26:32.470
Community Hall: the San Jose or surrounding cities.
165
00:26:33.070 --> 00:26:35.429
Community Hall: I could go on for an hour about
166
00:26:35.460 --> 00:26:43.050
Community Hall: my remodel. But I won't, because this is clarifying
questions. Thank you. Do we have any other clarifying questions,
Commissioner Fung.
167
00:26:43.050 --> 00:27:02.070
Community Hall: All right, I had a few. I think my first is going back to
kind of the scope of this item. So it's interesting to me, the scope of
the item is, I'm going to go back and read it, is permit streamlining and
simplification for small home upgrades. But when I look in the survey,
there's actually questions around.
168
00:27:03.270 --> 00:27:19.860
Community Hall: are there cycles for… to help review… reduce review
cycles for small businesses or commercial business permits? And are
expedited review options available for, again, small business or
commercial business? So, I guess I want to clarify, is this…
169
00:27:20.030 --> 00:27:26.990
Community Hall: is the scope of this CWP item flexible? Does it… are we
also talking businesses, or are we just talking residential?
170
00:27:27.540 --> 00:27:40.450
Community Hall: I can try to answer that. I think we had collaborated a
little bit with the Economic Development Department and through those
questions and just to kind of help them get some data, but that does not
pertain to this CWP item.
171
00:27:40.570 --> 00:27:52.650
Community Hall: Got it, thank you. I was also curious about, in the staff
report, and thank you, I think this is a really important item, and I
know it's, you know, sort of difficult to tackle, but I do think it's
important that we discuss all this.
172
00:27:52.840 --> 00:27:56.920
Community Hall: There was an interesting so the chart around the the
staffing.
173
00:27:56.980 --> 00:28:03.570
Community Hall: So, I see that we have consultant support. Is there an
amount of headcount for that?
174
00:28:03.570 --> 00:28:18.369
Community Hall: Or is it, you know, is there a number of hours? It's just
sort of hard to understand what that means. I'll let Building answer
that. Planning does not have any consultant support, but I will let
Building answer for what support they have for building permit review for
building-related items.
175
00:28:19.000 --> 00:28:26.009
Community Hall: So, currently, we have, 2 contracts with 4 consultants,
and with that, we don't…
176
00:28:26.010 --> 00:28:49.760
Community Hall: like require a certain number of staffing from the
consultant is basically on project base. So how many project we sends to
them. And the reason why we have the consultant is for the influx of
building permits we get, right, receive. So we would assign to them when
we have a high volume of permit where our staff is unable to meet that
deadlines, right?
177
00:28:49.760 --> 00:29:09.310
Community Hall: And, you know, later on we'll break down for you in terms
of, you know, type of projects we sent out to the consultant, type of
project we receive. And so that way give you a better idea of, you know,
what type of projects we keep and the turnaround time in regards to that
and the number of projects we receive as well.
178
00:29:09.550 --> 00:29:18.950
Community Hall: But a very low percentage of overall projects are we
sending to the consultants, right? It's less than 10% of what we have
coming in, most of it.
179
00:29:19.090 --> 00:29:29.010
Community Hall: Yeah, we want to keep it in-house, right? And so, the
basic kind of just fee, so that you know, too, is the consultants and
their contract, they take 65% of our plan check fee.
180
00:29:29.150 --> 00:29:37.479
Community Hall: to do the review, so then we keep 35 for the processing
and whatnot. But we try to, like I said, keep that in-house as much as we
can, so…
181
00:29:37.770 --> 00:29:57.100
Community Hall: Well, that's very impressive, then, that you manage, you
know, multiples the amount of permits with your 2 staff on average, how
many people does a small home upgrade go through from start to finish? Is
it just the the 2 reviewers, or within the city of Cupertino? I mean.
182
00:29:57.610 --> 00:30:08.050
Community Hall: Yeah, I would say your typical remodel, is gonna be
building and sanitary. If it's strictly remodel, if they're doing windows
and such, obviously then our friends in the planning division
183
00:30:08.180 --> 00:30:20.139
Community Hall: have a look. It's rare that a remodel or a small
addition, you know, triggers, the fire department or public works, would
be the other ones. But, so yeah, it's, you know, two or three that look
at it, so…
184
00:30:20.930 --> 00:30:25.770
Community Hall: Not bad. Yeah, we got a pretty good little over-the-
counter kind of process. The unfortunate thing
185
00:30:26.150 --> 00:30:31.200
Community Hall: I guess, is that Cupertino Sanitary is its own district,
and so they're not here at the city.
186
00:30:31.390 --> 00:30:48.710
Community Hall: So that poses, you know, a problem that they're at a
different location, but we've worked out with them. When they come here,
they get their permit number and all that, and then they head over there,
and they'll usually kind of work it and send us over an approval so that
we can get it out the door the same day. Some people don't want to do
that and just wait, but…
187
00:30:49.150 --> 00:30:53.739
Community Hall: if you want your permit that day, you'll go run around,
you know, they're just behind Panera.
188
00:30:54.050 --> 00:31:09.490
Community Hall: So it's not far away. And just to, like, you know, Julia
was mentioning in the presentation with, the graph that you've seen in
terms of turnaround time for each department, that report we pull out of
Project Docs, which is our plan review, system.
189
00:31:09.490 --> 00:31:26.729
Community Hall: In that system, unfortunately, we can't separate out,
like, the type of permit, so this is collectively for all residential,
which includes basic remodel to new, single-family, so that's why we… we
kind of put the disclaimer to say that it… it doesn't ref…
190
00:31:26.800 --> 00:31:41.800
Community Hall: Yeah, yeah, it's not just specifically for small remodel.
If, you know, Commissioner really wants to, we can ask our, you know,
developer to see if they can help us break that down, just so that it
gives you a better sense of what it is.
191
00:31:41.800 --> 00:31:53.289
Community Hall: But usually like for kitchen bathroom remodel with the
middle is five day turnaround and we get that out pretty quick. Heat
pump, water heater, ACs, that's two days for us.
192
00:31:53.290 --> 00:32:02.110
Community Hall: PV is the same thing as well. And so most of these
smaller projects, we do get out like really quickly. And unfortunately,
we.
193
00:32:02.150 --> 00:32:19.720
Community Hall: Not unfortunately. We do provide services over the
counter, but with the… ever since COVID, as you know, most people prefer
just emailing us, which makes them go through the standard process,
right? If they were to show up at the counter, they would get review and
issue or feedback the same day. But…
194
00:32:19.720 --> 00:32:27.699
Community Hall: For some weird reason, we haven't received that high
volume of people wanting to come at the counter. And so that's the…
195
00:32:27.990 --> 00:32:48.539
Community Hall: The kind of situation that we're in at the moment. Yeah.
Okay. Thank you. That would actually be helpful information to have
because when I look at this, I actually get the opposite impression. It
says, you know, first round review 19 days. And then, you know, on the
graph it says it looks like the numbers somewhere around 27 or 28. So
it's actually really interesting to know that there's a two day
turnaround on some.
196
00:32:48.540 --> 00:32:50.700
Community Hall: Okay, thank you. Any other questions?
197
00:32:51.440 --> 00:32:54.460
Community Hall: Actually, I would have… so, so…
198
00:32:54.750 --> 00:33:04.909
Community Hall: The correct interpretation of the graph really is that
you know the the larger numbers that you're seeing here for permit that
that's including new home construction, things like that. So that's
really what's driving that.
199
00:33:05.140 --> 00:33:11.759
Community Hall: Great. I would actually, maybe I can also pick this up in
the follow-up comments, but
200
00:33:11.900 --> 00:33:16.969
Community Hall: I would also suggest, perhaps, if you have a breakdown of
the kinds of
201
00:33:17.210 --> 00:33:23.349
Community Hall: The kinds of common jobs. I realize you don't pick the
work that comes to you.
202
00:33:23.570 --> 00:33:27.710
Community Hall: But at the same time, it's interesting for me, you know.
203
00:33:27.940 --> 00:33:33.890
Community Hall: Commissioner Linscott said she got a heat pump, right?
And that must be very common now.
204
00:33:34.060 --> 00:33:52.949
Community Hall: So you know, I think that having those sorts of
breakdowns are interesting. Maybe we're past the time when people are
getting ev chargers or photovoltaic systems really commonly. But I think
just understanding those kind of categories are actually pretty
interesting versus somebody who's having a kitchen remodel.
205
00:33:53.110 --> 00:34:03.449
Community Hall: I think it would be useful, to understand the scope of
what's going on, and in particular, I think, you know, when you're
talking about something like, if somebody's getting,
206
00:34:03.540 --> 00:34:13.560
Community Hall: you know, batteries for their solar. You know that that's
probably extremely, you know. I'm sure that's very much a you know. You
have a recipe for getting that through. So
207
00:34:13.790 --> 00:34:14.990
Community Hall: Great. Thank you.
208
00:34:16.270 --> 00:34:24.249
Community Hall: Commissioner Wiscott, yes. Yeah, just a quick question.
So, are you able to provide the information in terms of how much of,
like.
209
00:34:24.360 --> 00:34:32.409
Community Hall: Roughly what percentage of the permits are, you know,
instant online versus, you know, more, you know, hands-on?
210
00:34:33.659 --> 00:34:43.450
Community Hall: We can provide you with that report to follow up at the
moment. I we can't call that number off the top of our head, but we can
definitely provide you with that breakdown. Yeah, okay, thank you.
211
00:34:44.739 --> 00:34:51.379
Community Hall: Any other clarifying questions? Yeah, I did have some
questions. So, in the process that we currently follow, so we have to go
through
212
00:34:51.659 --> 00:34:57.649
Community Hall: Planning review before building sees the permits, is that
correct? Or…
213
00:34:57.760 --> 00:35:09.530
Community Hall: Is that a sequential process? Is that a way to
parallelize the process? Is it all de-parallel? I can answer that. So it
depends on the kind of, work you're doing. If you are looking to build a
balcony, for example.
214
00:35:09.530 --> 00:35:28.319
Community Hall: That does require a planning permit. So that's not part
of a home remodel, right? The scope of what we're looking at tonight. To
the extent that these home remodel permits are concerned, those are
parallel. They happen once building routes it, it routes it to all
divisions and departments at the same time, and that's when that review
occurs concurrently.
215
00:35:28.320 --> 00:35:32.340
Community Hall: So, is there a list of items that are out of the scope of
216
00:35:32.640 --> 00:35:35.720
Community Hall: the CWP, because it is considered not a
217
00:35:35.910 --> 00:35:57.430
Community Hall: simple or a minor home remodel? This is focused on small
remodels, streamlining small remodel permits. Understood, but is there a
list of what would be out of that scope for the benefit of the public or
the commissioner's review? I believe it was described in the
presentation, which was additions up to… Could we put up that slide if
someone has that slide handy, if it is in the presentation?
218
00:36:00.740 --> 00:36:01.470
Community Hall: Oh.
219
00:36:10.990 --> 00:36:15.970
Community Hall: Thank you. So… On this list, just staying on the slide
for a second.
220
00:36:16.360 --> 00:36:23.339
Community Hall: Is there a view of how we compare on over-the-counter
permits for these items?
221
00:36:23.580 --> 00:36:27.699
Community Hall: Specifically things like HVAC and heat pump installation,
and…
222
00:36:28.000 --> 00:36:31.559
Community Hall: I don't know if home window replacement is part of this
or not.
223
00:36:32.190 --> 00:36:40.500
Community Hall: I'm gonna let Fang answer that. I mean, at this point,
she doesn't have the data she mentioned, but we… I think that is data we
could probably get.
224
00:36:40.840 --> 00:36:48.699
Community Hall: Yeah, we can definitely get you the numbers, for each of
these type of permits. So the question, just to be clear, is
225
00:36:49.050 --> 00:36:59.180
Community Hall: how do we fare competitively to the other cities on the
over the counter permits for these categories? And if you could keep the
slide up, please, if it's possible.
226
00:37:00.260 --> 00:37:04.220
Community Hall: And, and so on that slide, once again, is
227
00:37:05.200 --> 00:37:08.740
Community Hall: Window replacement, considered a small home remodel.
228
00:37:09.630 --> 00:37:13.739
Community Hall: Yeah, window replacement is considered part of small home
remodel.
229
00:37:13.970 --> 00:37:22.399
Community Hall: And is that an over-the-counter permit today, or… It can
be over-the-counter, today as well, yep. Okay, because I had a resident
230
00:37:22.720 --> 00:37:27.220
Community Hall: That, told me that they applied for a window replacement
and
231
00:37:27.550 --> 00:37:30.699
Community Hall: The permit feedback said their fence was 12 feet.
232
00:37:31.170 --> 00:37:35.279
Community Hall: And I don't know what's the correlation between window
replacement and fence height.
233
00:37:35.410 --> 00:37:38.940
Community Hall: And he thinks his fence is not 12 feet, so…
234
00:37:39.170 --> 00:37:48.580
Community Hall: I can understand 7 feet being 8 feet, but I don't know
how a fence goes from 7 to 12 feet in the resident's view versus the
reviewer's view.
235
00:37:49.350 --> 00:37:50.410
Community Hall: I mean, that's…
236
00:37:50.470 --> 00:38:07.890
Community Hall: that's not a building, requirement? I can try to answer.
I mean, to the extent that residents do show, you know, improvements on
their plans, and those are… do not meet the code, we will identify those
and let them know, hey, you know, you have an unpermitted addition, or
you have a shed that doesn't meet setbacks.
237
00:38:07.890 --> 00:38:18.949
Community Hall: things like that. We do identify that through the review
process, and that is when… otherwise, we would never know. There's a 12-
foot fence, but in terms of, you know, what that…
238
00:38:18.950 --> 00:38:19.630
Community Hall: Up.
239
00:38:19.700 --> 00:38:33.740
Community Hall: pertains to the permit itself, the window replacement
itself, maybe not, but there is an unpermitted addition or structure on
their property. So if it is just a window replacement, not additional
work as a part of that, but just the window replacement.
240
00:38:33.890 --> 00:38:37.779
Community Hall: So planning would still be looking at… For bird safety,
yes.
241
00:38:38.720 --> 00:38:55.340
Community Hall: So you'd be looking at all aspects of the home besides
the window replacement? We would look at the window replacement itself
for bird safety, but to the extent that something is indicated on the
plans, or is just apparent, you know, when you pull up something, that's
when we would comment on it, yes.
242
00:38:56.450 --> 00:39:05.120
Community Hall: And is this something that is seen as an area of
simplification? Because the restaurant is now terrified to replace his
windows. He's like, first of all, I don't have a 12-foot fence, I
243
00:39:05.310 --> 00:39:10.500
Community Hall: A 7-foot fence. Secondly, this is a neighbor Fence that
has existed forever.
244
00:39:10.670 --> 00:39:16.799
Community Hall: So, just throwing out an anecdote, but the meta point
being, I guess, he's now concerned about
245
00:39:17.050 --> 00:39:19.349
Community Hall: ever being able to replace Windows, I guess.
246
00:39:19.560 --> 00:39:26.760
Community Hall: Well, I mean, to the extent that, you know, the residents
don't want us to identify any code enforcement, you know, like,
unpermitted things.
247
00:39:26.930 --> 00:39:31.210
Community Hall: Sure, I mean, if that's the direction that we receive, we
will not be looking at anything else.
248
00:39:31.810 --> 00:39:34.659
Community Hall: Yeah, I think the question is at what point.
249
00:39:35.420 --> 00:39:42.390
Community Hall: Are these sort of focused on the item being applied for?
For example, if they applied for a HVAC replacement.
250
00:39:42.960 --> 00:39:46.130
Community Hall: Would that end up in a inspection of all?
251
00:39:46.290 --> 00:39:52.459
Community Hall: Aspects of his property for other violations,
potentially, or… Not unless it's, you know…
252
00:39:52.610 --> 00:39:59.419
Community Hall: indicated on the plans. Like, you know, you have a
thousand square foot home, and you're replacing an HVAC, but, you know,
now you're showing
253
00:39:59.740 --> 00:40:08.109
Community Hall: on your permits. Do you have a 3,000 square foot home as
an example? It's a terrible exaggeration, but if that were to occur we
would possibly flag it.
254
00:40:08.790 --> 00:40:15.999
Community Hall: And so on this point, particularly, is the window
replacement or HVAC replacement over-the-counter permits today?
255
00:40:16.870 --> 00:40:28.909
Community Hall: Yes, they are. Okay. So, I mean, this sounds like a one-
off. I mean, I'd love to know the address. I'm happy to look into it, or
you can tell them, come see Sean, right? I'm happy to look into that,
because, yeah, that seems very…
256
00:40:29.100 --> 00:40:34.909
Community Hall: Thank you. I appreciate that. Thank you. Well, I'd
actually like to follow up on that. So, in the process of
257
00:40:34.910 --> 00:40:52.049
Community Hall: I think it's fine to flag when things are not conformant,
but especially if a resident was not planning on making a change
elsewhere and, you know, nothing… and it's not unsafe. I guess the
question would be if… if staff notices something that's not conforming,
does the resident
258
00:40:52.200 --> 00:40:57.230
Community Hall: Have to immediately change it, especially if it's not a
health and safety hazard, or is there a leeway?
259
00:40:59.480 --> 00:41:12.109
Community Hall: I'll let Sean answer that. Right, yeah, I mean, it's kind
of an open question. We don't go there looking for this stuff, right? But
if it's something gross, or, you know, grossly out of code, I mean, the
code changes every 3 years, right? So…
260
00:41:12.110 --> 00:41:21.820
Community Hall: You're gonna go to homes all the time with stuff that's
like, that's not code compliant, but you know, it was permitted that way.
So that's the key, it's like, if we can see that this was done
261
00:41:22.020 --> 00:41:40.689
Community Hall: then that's when it's going to be flagged, right? But,
you know, I get that concern a lot. Like, on Thursday, I'm going to the
neighborhood block leader meeting, too, and, right, I've gone… this will
be my second time, and that's always… if you come to my house, are you
going to find all the other stuff? And it's like, that's not what I, you
know, direct our inspectors to do by any
262
00:41:40.690 --> 00:41:45.739
Community Hall: We want to make sure your water heater's installed
correctly, your furniture, mini-split, you know
263
00:41:45.740 --> 00:41:54.929
Community Hall: But yeah, if they come to your property, and I mean, you
know, it's just the integrity of the job, that if you see something that
clearly was done without permits, it's gonna be brought up.
264
00:41:55.250 --> 00:42:04.019
Community Hall: Right? That's the direction that's… I've always been
provided and kind of gone with, right? So, yeah, I mean, if that was
something Council wanted to…
265
00:42:04.320 --> 00:42:12.800
Community Hall: The Commission wanted to recommend, that's, you know,
code enforcement's a huge part of what we do, right? It is a time-
consuming
266
00:42:13.200 --> 00:42:14.910
Community Hall: Function, so…
267
00:42:15.080 --> 00:42:25.209
Community Hall: But an important one, too, you know, in some aspects. But
yeah, fence. Is a fence gonna hurt anybody? No, probably not, right?
Well, how much time would you say that you spend on…
268
00:42:25.210 --> 00:42:38.999
Community Hall: tangential discoveries unrelated to the thing at hand? We
are reactive, not proactive, so we don't drive around, we don't do it.
The only reason I come for unpermitted stuff is because somebody
269
00:42:39.270 --> 00:42:46.129
Community Hall: Right, no, I'm not saying that you're going after… I'm
saying, you know, in your workday, how much of your time actually
270
00:42:46.190 --> 00:43:09.500
Community Hall: intentionally or not gets spent on this type of thing. Is
it it doesn't happen very often or it does? No, it doesn't happen very
often. Our inspectors usually go out there and unless it like bluntly
violate the code, then, you know, just a glimpse of it, you can kind of
tell. But they don't just walk around the premises trying to find, you
know, unpermitted works. Okay, thank you.
271
00:43:10.040 --> 00:43:10.820
Community Hall: Yes.
272
00:43:10.960 --> 00:43:13.830
Community Hall: So I think I think
273
00:43:14.260 --> 00:43:26.139
Community Hall: Commissioner Rao and Commissioner Kristolcher raise a
really good point, because I've had a similar experience. You know, it's
like, many, many, many years ago, I called in for a permit for a bathroom
fan.
274
00:43:26.380 --> 00:43:36.229
Community Hall: Actually, I think I came in person. I came in person to
get a bathroom fan, permit, and the person I spoke to, and I don't
remember who he was, very nice person.
275
00:43:36.330 --> 00:44:00.949
Community Hall: said, "Well, how old is your shower? Is it a low-flow
shower? And what about your toilet? Is it a low-flow toilet? And you
really need to replace those as well." And I was like, "Okay, I am
leaving now." And I walked away because I wasn't ready to sign up for a
$20,000 remodel. So I never did get that bathroom feed sink fan, and I'm
admitting it now in public.
276
00:44:01.040 --> 00:44:14.510
Community Hall: So, you know, and I'm sure they meant well, but, you
know, that project creep there is definitely something to kind of think
about.
277
00:44:15.680 --> 00:44:30.359
Community Hall: I can respond to that real quick. I mean, so the message
I give to staff, right, is, please don't do that. And the message is, if
you don't touch it, we're not going to make you update it, right? Like I
said, the code's updated every 3 years, so it's, you know… but I…
278
00:44:30.360 --> 00:44:40.860
Community Hall: at least under my realm, yeah, if this is within the last
15 years, I'd like to know… oh, geez. Okay, anyway, so yeah, no, I… that
is not the MO, right? So…
279
00:44:41.400 --> 00:44:42.900
Community Hall: Yeah, I had a…
280
00:44:43.610 --> 00:44:51.139
Community Hall: Go ahead, Vice Cheshire. You can go first. No. I I
appreciate that. I ran in, I said, do we have to
281
00:44:51.470 --> 00:45:10.689
Community Hall: replace all the toilets in the house when we remodeled
one bathroom and put in the low-flow toilet, I don't know, is the
inspector gonna come and say, no, these are 1.6 gallons, and now the rule
is 1.2 gallons, you have to change everything? And I said, I don't think
we have to do that. We didn't, you know, we didn't touch those, and…
282
00:45:10.800 --> 00:45:16.370
Community Hall: But the contractor really doesn't know. They would
probably like to sell you everything.
283
00:45:16.490 --> 00:45:19.950
Community Hall: So I think it's important for that to be clear to
284
00:45:20.160 --> 00:45:31.150
Community Hall: people as only the things you're touching. And I don't…
yeah, it seems odd about the fan. If you're only putting in a fan, why
would you have to change the toilet and the shower head?
285
00:45:33.260 --> 00:45:34.210
Community Hall: Anyway.
286
00:45:34.480 --> 00:45:38.260
Community Hall: Commissioner Rao. Yeah, thank you, Chair. So there's,
287
00:45:39.170 --> 00:45:45.110
Community Hall: Is there… are there any metrics around if you did the
first round of review comments?
288
00:45:45.510 --> 00:45:47.590
Community Hall: But then it came back for review again.
289
00:45:48.160 --> 00:46:02.180
Community Hall: Are the subsequent set of review comments a follow-up on
comments already given, or are we going into a new cycle of review
comments, where you go from, you know, here's the first round, and the
second round's a totally new set, and the third round's a different set?
290
00:46:02.370 --> 00:46:04.899
Community Hall: Or are there incidents where that has happened?
291
00:46:06.420 --> 00:46:26.199
Community Hall: I've been doing this a long time, and that is a pet
peeve, right? You get one shot at this, and so that's the comma, so we
don't come up with new ones. The only time that would happen is the plans
change during the plan review, right? That happens all the time. Oh, the
owner wanted to add this, or I'm doing this, and then it might trigger a
new comment that way, but at least myself.
292
00:46:26.230 --> 00:46:30.449
Community Hall: Fong and the two other PlanCheck engineers we have, no,
that is not…
293
00:46:30.940 --> 00:46:39.229
Community Hall: not the plan. So, yeah, if I hear otherwise, I would love
to know that. And does the system provide you metrics, or…
294
00:46:39.450 --> 00:46:42.890
Community Hall: Or alerts when that happens, is there a way to track
that?
295
00:46:44.320 --> 00:46:55.000
Community Hall: Okay. No, yeah, it doesn't. We, we generate a plan check
correction letter, and it's uploaded into a folder, so it's not like
it's, you know what I mean, integrated into the system.
296
00:46:55.340 --> 00:47:02.530
Community Hall: Yeah, that would take some doing. Does the, does the
metrics that you collect provide you feedback on the.
297
00:47:03.320 --> 00:47:06.969
Community Hall: On the experience with different reviewers.
298
00:47:07.120 --> 00:47:12.969
Community Hall: Sometimes the feedback we get from residents varies
widely based on who they're working with, and
299
00:47:13.250 --> 00:47:17.670
Community Hall: So just curious if there's any way that the system gives
you feedback
300
00:47:18.000 --> 00:47:24.430
Community Hall: That allows, department directors to look at the data and
make corrective adjustments on
301
00:47:24.710 --> 00:47:30.519
Community Hall: What could we learn from a very positive experience
versus something that could be better?
302
00:47:31.340 --> 00:47:40.689
Community Hall: certainly open to that. We don't… we don't have… I mean,
do we hear about this? Yeah, just in the nature that we're code
enforcement. People don't like being told what to do.
303
00:47:40.820 --> 00:47:49.840
Community Hall: So, you know, I hate that most people don't like me, and
that's okay, just because that's what I do. I signed up for it, right? So
I would be hesitant in that.
304
00:47:49.960 --> 00:48:08.760
Community Hall: Because, yeah, I mean, do we hear about the plan
reviewers? They're too restrictive, you know, they're too detailed. Yeah,
we do. And then we always talk about it and kind of explain and get away
from that, right? We want to just get the big ticket items. I can't get
everything in the code on a set of plans. But then on the flip side, what
you hear out in the field is, well, it wasn't on the plans.
305
00:48:08.970 --> 00:48:22.800
Community Hall: well, okay, where do I stop and begin, right? So it's
kind of a fine line. But yeah, I mean, you know, there is, like, again,
the survey where people do… I just rarely get a survey filled out, and I
think it's the fear, right? And I don't know why, I don't think I'd come
306
00:48:22.900 --> 00:48:30.649
Community Hall: I believe one of the concerns I heard from residents was
that the survey includes the permit number, which makes the survey non-
anonymous.
307
00:48:30.990 --> 00:48:36.919
Community Hall: And so it would be good if the survey can be fixed to not
require that, and that way people feel comfortable leaving feedback.
308
00:48:38.350 --> 00:48:56.729
Community Hall: Excuse me, Chair. I mean, this is really good discussion.
I appreciate all the questions back and forth, but it sounds like we're
moving beyond questions of presentation, so maybe it's a good time for
public comment. Yep, I was going to actually break for that pretty soon,
so why don't we go ahead and do that then? City Clerk, do we have any
public comments?
309
00:48:57.750 --> 00:49:01.190
Community Hall: We have no speakers in person, and no hands raised on
Zoom.
310
00:49:02.070 --> 00:49:07.749
Community Hall: All right, well, moving right back, are we, are there any
other clarifying questions?
311
00:49:09.220 --> 00:49:19.859
Community Hall: Actually, I so I in trying to look at the way you do
improvements. And you know, given the the kind of tenor of the discussion
we've had. I'm curious.
312
00:49:20.820 --> 00:49:32.970
Community Hall: I think it would be great to report on how you get… how
you encourage uniformity among your… among your staff. It's a little bit
the opposite of, you know, did somebody have a good experience or a bad
experience because somebody happens to be picky?
313
00:49:32.970 --> 00:49:45.489
Community Hall: It's more… and I think you actually almost addressed that
a little bit when you said, you know, if somebody had raised this thing,
you know, we'll have a discussion about that. And I think that that's
actually an important part of that.
314
00:49:45.500 --> 00:49:51.070
Community Hall: You know, I think a, a goal, a good goal.
315
00:49:51.110 --> 00:49:55.250
Community Hall: For this kind of review is that it doesn't matter who
316
00:49:55.280 --> 00:50:07.149
Community Hall: you know, who you got when you, when you got the desk,
when, you know, when you hit the desk, or when they read the email, that
you got a good consistent, a consistent objective. And I would say those
are the kinds of things where.
317
00:50:07.150 --> 00:50:15.989
Community Hall: you know, in terms of your your measurable objectives.
You know, I think that's actually a that would actually be a good one.
318
00:50:16.670 --> 00:50:17.330
Community Hall: So.
319
00:50:17.990 --> 00:50:24.430
Community Hall: And just to kind of follow up back on that one, I think
that's why we're looking to the AI,
320
00:50:24.460 --> 00:50:49.279
Community Hall: screening of fronts to give the resident that capability
is for us to provide the checklist right the standard checklist and they
can just run through that to make sure if their their project is complete
and and address our standard plan review comments understanding that
structural design is a little bit different and that will do will need
our plan director to look into more detail but the very
321
00:50:49.280 --> 00:51:01.949
Community Hall: basic, like, you know, non, analysis type of comments,
we're looking at putting on, on, on the checklist, and then having that
AI run through that pre-screen. So this should
322
00:51:02.100 --> 00:51:16.160
Community Hall: basically standardize a little bit more with the plan
review process. Sure, sure. And I think that's also an opportunity for it
to become clear to the public what it is that you know. How are these?
How are these criteria derived? And
323
00:51:16.190 --> 00:51:22.820
Community Hall: And driven. I also will say, maybe it's because I haven't
done anything that's required a permit for a long time.
324
00:51:22.990 --> 00:51:37.669
Community Hall: I actually, you know, one of the things that kind of came
up here, and I think this has been a principle we've seen before, you
know, when a plan is presented, you review it in its entirety, not just
focusing on the parts, the specific parts that you need. I think that's
actually a good thing.
325
00:51:37.790 --> 00:51:39.990
Community Hall: You know,
326
00:51:40.190 --> 00:51:56.109
Community Hall: when when that highlights something that would be an
issue, you know, incidentally highlights something would be an issue. I I
think you know, hopefully, the the penalty of that is that it may be
difficult for you to do the window change if you have something, you
know, out of code and non-compliant.
327
00:51:56.890 --> 00:52:05.770
Community Hall: But then it doesn't mean that you know somebody. You're
you're gonna get an order from the city to take your fence down unless
that's a true safety issue.
328
00:52:08.210 --> 00:52:26.920
Community Hall: All right, any other comments? Yes. Yeah, so, a few
comments. So, one is this list of what is a small home upgrade and what
is not. It would be great to get a more comprehensive list, and, and just
to understand, you know, what it is, what it isn't, and kind of what is
in the scope, because I think that
329
00:52:27.140 --> 00:52:41.819
Community Hall: it would be great to have that be part of the
conversation as well. And then for them, you know, for each one of them,
if it's easier… if it's easier to do, like, in the table, just be like,
what is the current process? Is it online? Is it, you know, manual? Just
so we understand.
330
00:52:41.820 --> 00:53:01.510
Community Hall: what is currently online, what is, you know, automated,
fully automated, what is proposed to be automated, just so we have a
sense for kind of the scope of the change that is being proposed. And
then we can look at also, you know, the types of… I mean, all the permits
comprehensively that this would cover. We love reading small print here,
so…
331
00:53:01.610 --> 00:53:16.689
Community Hall: You know, we're happy to read it. And, so, so that's one
thing. And then, the other thing is, yes, I would, I would highly
recommend… So it sounds like a lot of the issues that you have been
identifying is just,
332
00:53:16.690 --> 00:53:22.440
Community Hall: And from… just from reading the report, like, people are
not submitting everything they're supposed to submit up front, and then…
333
00:53:22.480 --> 00:53:28.460
Community Hall: when that happens, there's a lot of churn, and that's
where the delays happen, right? So,
334
00:53:28.660 --> 00:53:30.170
Community Hall: I I think there's
335
00:53:30.380 --> 00:53:40.750
Community Hall: maybe it's because it's different from city to city. And
maybe it's because you're dealing with people who don't do this on a day
in day out basis like you guys do. So it would be helpful to understand,
you know.
336
00:53:40.750 --> 00:53:54.309
Community Hall: Is there a pattern to the types of things that are being
missed? You know, so we know exactly kind of where the problems are, like
they always miss, you know, like in the case of, I'll just throw that
out, but let's say, you know, it's HVAC.
337
00:53:54.310 --> 00:54:08.879
Community Hall: they always miss the decibel report, you know? It's like,
I don't know. Or, you know, if there's any patterns like that, where it's
like, oh yeah, that's an easy fix, you know? It's like, we can just be
like, did you include the decibel report? You know, did you include the
blah blah bl
338
00:54:09.190 --> 00:54:13.839
Community Hall: So I think that would be really helpful. So can I read
the letter now?
339
00:54:14.070 --> 00:54:14.890
Community Hall: All right.
340
00:54:15.340 --> 00:54:29.539
Community Hall: Yeah, absolutely. Sorry, were we still doing questions,
or are we interleaving? It seemed that people had moved beyond questions
at this point, but you can still ask questions. Okay, we can come back
with more questions, right? Yes, yeah, yeah, go ahead. Okay, so,
341
00:54:29.540 --> 00:54:42.579
Community Hall: I won't share the name, but it's a big company that does
a lot, and I asked them how many permits they do in Cupertino, and they
said about 50 a year in Cupertino, so… and they work in the South Bay.
342
00:54:42.580 --> 00:54:59.619
Community Hall: So this is what they wrote. They said, we process a large
number of permits in Cupertino each year, and we'd be glad if our
comments could help improve the permitting process. Our main concerns are
simple permits cannot be submitted through the online portal and must
instead be submitted by email.
343
00:55:00.030 --> 00:55:08.080
Community Hall: I don't… I don't have the details to what that means.
Applications submitted by email often experience significant processing
delays.
344
00:55:08.530 --> 00:55:26.480
Community Hall: The permit review process generally takes longer than in
many other cities, and this is for heat pump water heaters. In other
jurisdictions, these processes are much more automated, which helps
reduce turnaround times. Other than that, we've had a very positive
experience working with the city staff, and we appreciate their
assistance.
345
00:55:29.590 --> 00:55:35.409
Community Hall: Oh, thank you. Appreciate that. No, and that's… that's
noted, and that was kind of mentioned in our portal.
346
00:55:35.510 --> 00:55:41.190
Community Hall: Yeah, it's lacking. I don't know about significant delays
on the emails, because I think we're…
347
00:55:41.570 --> 00:56:00.119
Community Hall: stick around 48 hours. It's funny, people, you know,
they… they don't want to come in, like Phuong said, and so you have your…
we get so many emails every day, because nobody wants to come. If people…
it was half and half, that'd be really nice. But… so it takes a day or
two for us to process those, right? Which is unfortunate. If the… and
two, a lot of these…
348
00:56:00.120 --> 00:56:07.889
Community Hall: They could go online and do it. They will be able to.
Well, the heat pump one will be able to, but some of them then go online,
but yet they don't want to
349
00:56:07.890 --> 00:56:18.579
Community Hall: mess with it, right? So, I've heard from several
contractors that they're not very tech-savvy, and they would much rather
use email than the online portal. Right, I know. So that's a barrier, so
I think
350
00:56:18.580 --> 00:56:35.070
Community Hall: this is why I go back to, you really need to be talking
to them, because I think you'll hear what their pain points are, because,
you know, you guys are in this portal day in, day out, but I heard this
over and over and again from several of my contractors, you know, the
solar guys, the roof guys, the plumbing guys, you know, it's like, they
were just like.
351
00:56:35.070 --> 00:56:44.089
Community Hall: This portal is really difficult. We don't want to deal
with it. We'd rather just send an email. And it's just like, okay, well,
you know, so, yeah, so.
352
00:56:46.880 --> 00:56:47.840
Community Hall: For sure.
353
00:56:48.570 --> 00:56:54.709
Community Hall: Oh, sorry, it looked like you were reaching. I am. So, I
have a question, because it affected me.
354
00:56:54.870 --> 00:57:01.440
Community Hall: when they submit plans, If the project takes a long time.
355
00:57:01.770 --> 00:57:02.530
Community Hall: Like.
356
00:57:02.830 --> 00:57:07.570
Community Hall: Our contractor specified a specific bird safe, Light
fixture.
357
00:57:08.210 --> 00:57:15.900
Community Hall: And by the time it was time to put in the light fixtures,
that was discontinued. So, is it normal to specify, like, a specific
358
00:57:16.230 --> 00:57:28.600
Community Hall: model exact thing for that? I don't know. I can help
answer that. Okay. Yes, it is, because every light fixture that is,
proposed can be different.
359
00:57:28.610 --> 00:57:42.980
Community Hall: And we've had instances where people propose something,
and then we go out to do the final inspection, and it's completely
different and doesn't meet the requirements either. So it is easy when
we're doing the review, and when the building inspector goes out
360
00:57:42.980 --> 00:57:59.750
Community Hall: matches up what you said you were going to put in, it's
easy for them to do that inspection to make sure that it's all what was
approved. Okay, and when it doesn't match because it's not available,
what happens then? You can just revise the plans. It's not a hard
process. You would just come in, you would say, hey, you know what, I
just want to
361
00:57:59.750 --> 00:58:18.790
Community Hall: revise the plans to not have this light now, I want this
one. Still meets the requirements, we do the review, and it's just a
little revision to the plans. So, can the homeowner do that, or does it
have to be the contractor? I will look at Sean for that. You know, if the
plans are stamped and signed, it's that person kind of has the copyright.
362
00:58:18.790 --> 00:58:27.240
Community Hall: to that, so we would need their authority to change their
plans, so typically… but if it's a designer, the homeowner drew their own
plans? Yeah, absolutely. Thank you.
363
00:58:28.680 --> 00:58:40.369
Community Hall: Commissioner Rao? Yeah, I had another question on the
turnaround times. I've heard anecdotally that the turnaround time from
planning is significantly longer than building.
364
00:58:40.520 --> 00:58:45.780
Community Hall: And perhaps, understandably so, they're dealing with
commercial projects and larger projects, different scope.
365
00:58:46.190 --> 00:58:48.380
Community Hall: Not a like-for-like comparison, but…
366
00:58:48.600 --> 00:58:54.969
Community Hall: Is there a way to look at this to see how you might
eliminate planning review for a certain category of permits where
367
00:58:55.110 --> 00:58:59.800
Community Hall: It may be feasible, maybe looking at competitively, how
are other cities doing this?
368
00:59:00.130 --> 00:59:05.380
Community Hall: And I, I guess the one approach to simplification is how
do you make things faster.
369
00:59:05.620 --> 00:59:13.729
Community Hall: The other approach is, how do you eliminate friction and
reduce steps and reduce load on staff as well? And so, maybe that's
something to look at to see.
370
00:59:14.060 --> 00:59:22.669
Community Hall: Are there other cities doing things in certain ways where
planning does not need to get involved, and are there some best practices
there that will eliminate that and reduce load as well?
371
00:59:24.730 --> 00:59:29.899
Community Hall: On the similar lines, ministerial approvals, looking at
other cities, what they do versus…
372
00:59:30.080 --> 00:59:32.109
Community Hall: What we do, and how we might
373
00:59:32.420 --> 00:59:43.479
Community Hall: look at ministerial approvals as a way to simplify as
well. Sure, I mean, to the extent that building staff can also review the
zoning requirements for setbacks and things like that, if that review can
be done at a one-stop shop.
374
00:59:43.620 --> 00:59:53.319
Community Hall: Planning can be eliminated from that review, but if the
community continues to have a desire to ensure that buildings and
structures meet setbacks and
375
00:59:53.320 --> 01:00:04.109
Community Hall: you know, all those plant… the stuff that's in the zoning
title is complied with. That review does not occur with… in the building
department. They only look at the building code.
376
01:00:04.340 --> 01:00:09.439
Community Hall: So, to that… to the extent that those permits don't need
to be reviewed for that.
377
01:00:09.700 --> 01:00:11.490
Community Hall: Yeah, we don't need to look at plans
378
01:00:11.620 --> 01:00:15.839
Community Hall: Yeah, I'll leave the feedback at a high level, right?
Look at the
379
01:00:15.970 --> 01:00:19.470
Community Hall: Competitive data to see if there are opportunities and
leave it at that.
380
01:00:21.830 --> 01:00:39.990
Community Hall: All right, so I did have some comments on this. First
one, absolutely agree with Commissioner Linskog. I think when I was
looking at this, I was thinking about, you know, where is the data? I
think you are actually sitting on a lot of data from the applicant side
on, you know, what are the total SLAs for a given project, and
381
01:00:39.990 --> 01:00:55.189
Community Hall: maybe for the longer ones, what is causing the delay. And
I've spoken with staff about that before, so I understand why that data
was not looked into, because it would be a very manual exercise, you'd
have to anonymize all the data, and make sure that, you know, you're just
not giving away any personal information. But…
382
01:00:55.190 --> 01:01:09.889
Community Hall: to the extent that that could be done, I think it would
actually… like, there's no need to survey the public. Like, you have the
data right in front of you, actually. It's looking at, you know, your
Accela and seeing, you know, where did projects get stopped, what were
the questions that people were asking, and
383
01:01:09.890 --> 01:01:16.239
Community Hall: Or what are the, you know, documents they were missing,
or things like that. So if there's a way to look into that data.
384
01:01:16.320 --> 01:01:26.320
Community Hall: I understand it would be a sort of cleaning exercise to
get through it, but I think you'd probably get a lot of the answers in
terms of what is causing delays.
385
01:01:27.270 --> 01:01:35.269
Community Hall: I do think, that the… I support the clear checklists and
instant online permits, I think that's great. And I think…
386
01:01:35.450 --> 01:02:00.119
Community Hall: So I know one of the pain points that was listed was, or
not the pain points, but the cause of delays was just that a lot of it is
on the contractor end, on the applicant's side. Full disclosure, I'm
currently going through a renovation right now, and every time I think
there's an issue and I realize, oh, that was actually on the GC's end or
something that they missed. That said, I think when applicants are
consistently missing
387
01:02:00.120 --> 01:02:06.409
Community Hall: Things, again, this is like, where are the, they're the
trends, where are the things consistently missed, and if they are.
388
01:02:06.410 --> 01:02:09.230
Community Hall: I think that we the city can ask.
389
01:02:09.760 --> 01:02:16.800
Community Hall: how can we make that information easier for them to find
and access? So one thing I noticed on our website is that
390
01:02:17.040 --> 01:02:35.019
Community Hall: we… when I go to find building permits, there is no one
page for small home upgrades, and… and I think it's actually a little bit
hard to find the permit form itself, and all the associated, like,
checklists and requirements. And I've noticed for some other cities, it's
a pretty clear flow. You go to a page that shows you
391
01:02:35.150 --> 01:02:42.769
Community Hall: renovations by home type. So, like, ADU, small home
upgrade, you know, major residential, things like that. And so, you sort
the
392
01:02:42.770 --> 01:02:57.200
Community Hall: information by home upgrade type, and then within that,
you lead people to all their information. So I think there may be
something that can be done with the website, actually, and that would
help free up staff, because then you can, instead of fielding all these
questions, you can just point them back to the website.
393
01:02:57.200 --> 01:03:00.200
Community Hall: So hopefully that would save you some time.
394
01:03:00.200 --> 01:03:05.489
Community Hall: And, you know, maybe helping clarify some of the code
requirements as well.
395
01:03:05.550 --> 01:03:19.089
Community Hall: And then, you know, I would say, to the extent that… I
know it's… it can be tricky, but to the extent that specificity can be
increased on where… where needed, I think it's helpful for… for the… the
customer. Like, you know, I currently…
396
01:03:19.090 --> 01:03:32.670
Community Hall: where the back and forth is happening for us is sometimes
there's certain measurements that are needed, but the contractor did not
provide those exact specific measurements, and so, like, the more clear
that you can get, I actually think more information and more direction is
better.
397
01:03:32.700 --> 01:03:35.260
Community Hall: and then…
398
01:03:36.430 --> 01:03:44.229
Community Hall: I think, you know, as a whole, I think staff is already
doing a lot of work here. So, oh, and the final one.
399
01:03:44.410 --> 01:03:49.520
Community Hall: So we had discussed this earlier, but if we can get
better data on the turnaround types.
400
01:03:49.600 --> 01:04:07.040
Community Hall: times for different types of home permits. I think that
would be really helpful, because it sounds like not all of the permit
types need streamlining. Some of them, if they're going through in two
days, we can just move past that, and just figure out which ones are. But
yeah, I think as a whole, it's, you know, the whole user journey of
401
01:04:07.140 --> 01:04:19.180
Community Hall: on on both the applicant and the staff side of where we
can speed things up. So those are my comments for now any other comments.
Yeah, I'd be happy to add some comments here. Thank you. Chair.
402
01:04:19.630 --> 01:04:28.290
Community Hall: So I would recommend if you do a follow-up survey to the
applicants in particular and to residents to try and get AI to write the
survey.
403
01:04:28.560 --> 01:04:36.659
Community Hall: Because AI can be pretty good at this if you can
particularly give it some prompts to look at how do you simplify this
from the perspective of the applicant.
404
01:04:36.890 --> 01:04:44.719
Community Hall: And from the perspective of residents as the
stakeholders, you know, they were the stakeholders. How would you… how
would you simplify it and have AI write the survey? Because…
405
01:04:45.030 --> 01:04:56.060
Community Hall: this is a pet peeve of mine. I see the surveys, and I
feel that didn't really ask the question if I were a resident or an
applicant that I would like to see asked. And so, would love to see some
objective
406
01:04:56.740 --> 01:05:01.219
Community Hall: non-involved entity, like an AI tool, write the survey,
so just something to look at.
407
01:05:01.520 --> 01:05:04.909
Community Hall: The other thing that I want to bring up is when I look at
these
408
01:05:05.260 --> 01:05:07.770
Community Hall: Permit streamlining efforts in progress.
409
01:05:08.320 --> 01:05:12.240
Community Hall: It may be worth looking at other things we should stop.
410
01:05:12.510 --> 01:05:24.849
Community Hall: Or deprioritize in order to focus on the things you need
to do, because there's so much ahead of you that you haven't even looked
at yet, because you don't have the applicant feedback and the rest in
feedback, and maybe that wasn't the direction, and we need to
411
01:05:25.130 --> 01:05:27.490
Community Hall: Either give you direction here or otherwise, but…
412
01:05:27.880 --> 01:05:33.590
Community Hall: I would encourage looking at what you stop doing as one
of the things to simplify as well.
413
01:05:33.860 --> 01:05:39.880
Community Hall: And AI… You know, your benefits vary. It may hallucinate,
it may do whatever, so…
414
01:05:39.990 --> 01:05:48.149
Community Hall: If you ask the applicant whether AI is the single burning
topic on their minds, they may they may tell you what really matters for
them. Right? So that's something.
415
01:05:48.420 --> 01:05:52.070
Community Hall: The other thing I'd add is, it'd be good to get a clear
416
01:05:52.220 --> 01:05:57.280
Community Hall: Benchmark on the experience with the consultant staff
versus in-house staff.
417
01:05:58.530 --> 01:06:08.350
Community Hall: And use that data to make the case for whether the
staffing has to be in-house for this critical function. We have a lot of
other places that may not have the
418
01:06:08.500 --> 01:06:14.850
Community Hall: The kind of impact that planning and building have on our
city from a long-term perspective, so just looking at
419
01:06:15.250 --> 01:06:21.000
Community Hall: Is it better to get in-house staff in certain cases
because this is a critical function, so maybe that's something to look
at.
420
01:06:22.030 --> 01:06:25.020
Community Hall: And I will yield my time, so someone else can…
421
01:06:25.090 --> 01:06:36.960
Community Hall: Sorry. Oh, go ahead. Okay, I just have a quick comment. I
do think we do need to do a survey, because I agree there's a lot of data
that's available in your databases.
422
01:06:36.960 --> 01:06:57.260
Community Hall: But it would be really interesting to see because I think
there is a lot of data just, you know, when you talk to people into, oh,
I got really confused when I did this and I know I may have missed
something. And so you're not going to get that kind of the qualitative
feedback just from looking through the admittedly extensive data you guys
have.
423
01:06:57.260 --> 01:06:58.629
Community Hall: So getting that
424
01:06:58.640 --> 01:07:12.009
Community Hall: I think would be valuable. I would also really like to
see if we can, get a sense for how many people did not apply for permits
because they thought it was scary or confusing, and kind of, you know.
425
01:07:12.050 --> 01:07:15.539
Community Hall: What is the kind of low hanging fruit?
426
01:07:15.590 --> 01:07:35.520
Community Hall: Or they don't know that they need a permit. Like, did you
know you need a permit to replace a bathroom fan or a window, right? It's
like, oh gosh, no, I don't think I do. But like, oh, okay. And if we made
it really easy and it was cheap and online and instant, you know, it's
like, so getting that context I think would be really interesting as
well.
427
01:07:36.750 --> 01:07:41.370
Community Hall: Just want, you know, so I guess I'm sending out any type
of survey to
428
01:07:41.500 --> 01:07:59.779
Community Hall: people's email that I have, right? So I'm not going to be
hitting anybody that hasn't come and visited us here. You get what I'm
getting. I don't have everybody's email. I mean, I can put something on
my website, but I have a survey on there that nobody puts anything on, so
I want this to be meaningful. So, you know, if we're going to go down
this
429
01:07:59.910 --> 01:08:12.220
Community Hall: this thing, which is fine, it's, you know, the database I
have is from the permit record kind of info, right? Hitting the
developers, the contractors, and the homeowners, and getting some
feedback. So, anyway, I'm just throwing that out there, where
430
01:08:12.360 --> 01:08:21.060
Community Hall: You know, but the questions you're kind of after, I hear
you loud and clear. Yeah, I think the city as a whole can solve that one.
Well, yeah, we have emails, I guess.
431
01:08:25.399 --> 01:08:37.140
Community Hall: I just want to add to that comment really quickly, if you
might consider removing the permit number so that the survey is
anonymous, and maybe also use some of the city outreach methods, you
know, email and social media and so on.
432
01:08:37.250 --> 01:08:39.459
Community Hall: Hopefully, you can get some more feedback there.
433
01:08:40.649 --> 01:08:41.729
Community Hall: Commissioner Fung.
434
01:08:41.899 --> 01:08:52.109
Community Hall: Yeah, yeah, it's a couple, a couple of minutes. So one of
the things we talked about that I mentioned a little earlier were maybe
kind of binning up and categorizing some of the really common ones.
435
01:08:52.210 --> 01:08:55.920
Community Hall: I think that that's that would be a point of interest to
the Council.
436
01:08:56.149 --> 01:08:58.990
Community Hall: And and I think that also
437
01:08:59.189 --> 01:09:03.039
Community Hall: When it comes to setting your performance indicators.
438
01:09:03.370 --> 01:09:09.020
Community Hall: That… You know, you probably wouldn't have a special edit
if, for instance.
439
01:09:10.160 --> 01:09:19.870
Community Hall: solar solar installation was a common was on the the
common list, you know. That would be the areas where you know,
demonstrate that you excel, or
440
01:09:19.970 --> 01:09:33.139
Community Hall: you know, I think that there's a good feedback there,
because there are many, many things that your department would have to
deal with. The common ones, those are the ones you really, you know, you
really want to put the focus on and emphasize.
441
01:09:33.160 --> 01:09:52.749
Community Hall: I think it was notable to me, at least, that there was a
comment about your staffing being lower, you know. And so, 1st of all, I
would say, the information you gave us around the consulting. Your use of
consulting is useful to have explicitly in that report. But but I would
also say.
442
01:09:52.790 --> 01:09:59.740
Community Hall: This is also a good context to say, you know, what would
it? What would another person mean? Or
443
01:09:59.830 --> 01:10:03.499
Community Hall: you know, the way that question is often asked is, what
if I had a different tool?
444
01:10:03.910 --> 01:10:11.860
Community Hall: So, the one that… I'm sure that I can guarantee the one
that the Council wouldn't want you to say is, we'd like to replace the
portal. Although, I think…
445
01:10:12.390 --> 01:10:30.579
Community Hall: from the people you've… what you've heard here, and what
we've heard from you, that actually would probably be a high payoff
thing. So I… I think that would definitely, you know, try to, include
some analysis on that, about what would… what would that mean if, you
know… I'm sure that's going to be a big investment, you know, half a
million bucks or a million bucks, right?
446
01:10:30.690 --> 01:10:36.579
Community Hall: What would that mean to your ability to, you know, to do
your jobs and serve the public?
447
01:10:37.670 --> 01:10:39.119
Community Hall: And I think that's it for me
448
01:10:39.840 --> 01:10:55.309
Community Hall: Commissioner Rao? And I was gonna add, you know, on this
topic of outreach, we have our ATP members here, they seem to have done
fantastic outreach. I see there are yard signs all over the city, maybe
the ATP team might share some best practices on how to get yard signs all
over the city.
449
01:10:55.310 --> 01:11:02.430
Community Hall: And, we might get some planning and building outreach
through yard signs or whatever, Has worked for,
450
01:11:02.720 --> 01:11:07.949
Community Hall: For the community, I guess, low-tech works. The other
thing that might work is a banner on Stevens Creek for
451
01:11:08.250 --> 01:11:13.760
Community Hall: whatever reason, people have to drive on Stevens Creek,
they see the banner, so maybe those are low-tech methods that might work.
452
01:11:15.300 --> 01:11:27.379
Community Hall: I had one other comment, and I'm not sure how much this
may apply to the small home upgrades versus larger ones, but a feedback I
did receive from a general contractor was
453
01:11:27.380 --> 01:11:39.010
Community Hall: around, sometimes the delays can happen when the plan
check reviewer changes, so I'm not sure how often that happens with a
small home upgrade, if it's not as much as more large thing.
454
01:11:40.990 --> 01:12:05.940
Community Hall: The turnaround time shouldn't be affected by any plan
reviewer. So like our typical is the initial review is 15 business day,
and then subsequent reviews are like 10. And it sticks with the same
person, I think was part of the question, right? Yeah, we don't switch it
up. Unless they go on vacation. Unless they happen to be gone. And people
are like, hey, Bong's on vacation. I want my plan. Then I'll dive in.
455
01:12:05.940 --> 01:12:11.300
Community Hall: and do it, but otherwise, you start it, you finish it.
Yeah, that's the most efficient way, right? So…
456
01:12:11.540 --> 01:12:12.220
Community Hall: Got it.
457
01:12:12.350 --> 01:12:14.950
Community Hall: Great any other feedback from Commission.
458
01:12:16.100 --> 01:12:25.780
Community Hall: Yeah, I do have one more. So, I know we talked a little
about what's in scope and what's out of scope, and certain things might
be considered not a minor remodel or simple remodel.
459
01:12:25.980 --> 01:12:38.929
Community Hall: And maybe that's an area that you might also look at to
see if something is outside the definition. How do you pull it into the
definition of simple remodel? Because if your processes are different for
minor versus non-minor.
460
01:12:39.190 --> 01:12:43.789
Community Hall: Are there projects that can be left-shifted so that they
also gain the benefit of this, so…
461
01:12:44.420 --> 01:12:45.090
Community Hall: Thank you.
462
01:12:46.210 --> 01:12:55.820
Community Hall: If I can just comment quickly on that, that's why I asked
for the list of what they consider minor versus not, so that we as a body
get a chance to give input on that.
463
01:12:57.570 --> 01:12:59.079
Community Hall: Yep, I agree with that as well
464
01:13:00.040 --> 01:13:09.869
Community Hall: Okay, and with that, then we will, conclude the study
session, and we will move on to, again, I had flipped the order, so we
will move to staff and commission reports next.
465
01:13:14.000 --> 01:13:21.930
Community Hall: Let's go through. Do we have any staff and commission
reports? I actually don't have a staff report for the commission. All
right. Any commission reports?
466
01:13:22.680 --> 01:13:29.239
Community Hall: So, no staff reports, but are there new projects that are
in the pipeline that
467
01:13:29.690 --> 01:13:33.620
Community Hall: Staff may want to talk about any new or any progress on.
468
01:13:33.760 --> 01:13:45.270
Community Hall: There isn't anything that is ready for the Commission's
review at this time, so till that point, we can't really discuss the
projects. All the projects that are on the City's website are currently
in review.
469
01:13:45.940 --> 01:13:48.430
Community Hall: And do we think ODS might be…
470
01:13:49.070 --> 01:13:59.850
Community Hall: ODS? At this point, that project is a little bit on hold,
because we've kind of shifted our focus on the, health and safety
element, and, other project, the housing element.
471
01:13:59.910 --> 01:14:09.290
Community Hall: Update. So, that has been on ice for a little bit, but,
once we're able to get those two under our belt, then we'll be shifting
our priorities.
472
01:14:11.710 --> 01:14:17.769
Community Hall: Any other commission reports? Yeah, as a commission
report, I want to reiterate the rest and feedback that we got.
473
01:14:18.020 --> 01:14:22.339
Community Hall: Concern around going from a window remodel to a fence.
474
01:14:22.910 --> 01:14:28.159
Community Hall: Has severely undermined confidence, in some of the
475
01:14:28.540 --> 01:14:31.799
Community Hall: Some of the ability to reach out, so we just need to…
476
01:14:32.010 --> 01:14:40.590
Community Hall: think about that, just want to share that feedback, and
make sure we can… I will follow up on staff's offer to see how we can
help that incident output.
477
01:14:41.070 --> 01:14:47.399
Community Hall: That is not an isolated episode. I've had another episode
or two where people have been really…
478
01:14:47.590 --> 01:14:54.229
Community Hall: Concerned about the scope expansion on what they thought
was something they were starting with and went somewhere else beyond
that, though.
479
01:14:54.350 --> 01:14:55.150
Community Hall: Thank you.
480
01:14:56.960 --> 01:15:02.420
Community Hall: All right. And then we will move to future agenda
setting. Any agenda requests?
481
01:15:03.450 --> 01:15:12.910
Community Hall: Commissioner. Thank you, Chair. I would like to see if we
can agendize a panel session with applicants along the lines of what we
just finished up, if there is a way to do a
482
01:15:13.120 --> 01:15:29.440
Community Hall: study session with applicants to get feedback, but not
just as a survey, but in the presence of commissioners, so that we can
ask the applicants questions, and we can have a more informed
conversation. I don't know how we would agendize that, but I will leave
that for staff to consider. Maybe that's…
483
01:15:29.590 --> 01:15:30.689
Community Hall: Something we could do.
484
01:15:32.960 --> 01:15:34.240
Community Hall: Do I have a second?
485
01:15:35.270 --> 01:15:39.840
Community Hall: I will second that, and I think we will discuss that with
Staff. Thank you. Thank you.
486
01:15:40.070 --> 01:15:42.060
Community Hall: Any other agenda requests?
487
01:15:42.780 --> 01:15:43.560
Community Hall: Yes.
488
01:15:45.230 --> 01:15:49.340
Community Hall: Applicants for projects that come before the Planning
Commission.
489
01:15:49.650 --> 01:15:58.529
Community Hall: Or were we looking at smaller… Small… that was in the
context of the CWP, so looking at how do we simplify… how do we simplify…
490
01:15:58.760 --> 01:16:08.519
Community Hall: permits, yeah, for single-family homes. If I may ask a
question about that, I mean, is that part of this project that, you know,
was presented tonight, or is that a completely separate thing?
491
01:16:10.090 --> 01:16:20.760
Community Hall: I don't know. I would leave that to staff's discretion on
how you would treat that, but as an agenda item, I believe that just
provides for some informed deliberation, and
492
01:16:21.060 --> 01:16:33.010
Community Hall: and a study that would be for staff to then look into how
you might want to use it. Well, Commissioner Rao, perhaps, would it make
more sense to form a subcommittee to research
493
01:16:33.420 --> 01:16:36.929
Community Hall: Applicant perspectives on small home upgrades, is that
kind of…
494
01:16:37.310 --> 01:16:54.129
Community Hall: The intent? I will leave that to the chance discretion
along with, staff. Okay, so maybe we have this as an agenda item to
either form a subcommittee on, applicant perspectives, or hold some form
of study session panel. Yeah, that's acceptable. Okay. Thank you.
495
01:16:54.320 --> 01:17:01.879
Community Hall: You know, Chair, since the subject of streamlining
permits for small home projects is the topic tonight.
496
01:17:02.100 --> 01:17:03.479
Community Hall: That may be appropriate.
497
01:17:03.990 --> 01:17:06.320
Community Hall: To form a subcommittee now.
498
01:17:07.710 --> 01:17:25.929
Community Hall: If there's interest, if you're ready, rather than to
agendize an item to form a subcommittee. If that's something that we can
approve the formation of now, I'd be open to that. May I ask the city
attorney a question? That agenda item was closed, to my understanding.
Are we reopening that?
499
01:17:27.720 --> 01:17:33.590
Community Hall: It's a study session, I mean, sure, sure, would you be
willing to reopen the study session?
500
01:17:34.150 --> 01:17:40.809
Community Hall: Yes, I would be willing to reopen the study session to
discuss formation of a subcommittee. Thank you. Okay.
501
01:17:41.290 --> 01:17:42.390
Community Hall: And.
502
01:17:42.770 --> 01:17:56.160
Community Hall: So, would the next step on this just to be… have a vote?
Yeah, so I… I guess in that context, I move to propose the formation of a
subcommittee for the study of applicant feedback in the context of
503
01:17:56.650 --> 01:18:00.529
Community Hall: Single-family home permit simplification for minor
remodels.
504
01:18:01.770 --> 01:18:02.750
Community Hall: But…
505
01:18:05.230 --> 01:18:11.449
Community Hall: Was that a second? What'd you say? Yes, I had seconded
earlier, but I'll second it again, and it sounds like Commissioner
Linscock
506
01:18:11.890 --> 01:18:20.570
Community Hall: No, I was just trying to understand. So, are we talking
kind of like doing focus groups with, with applicants of small… is…
507
01:18:21.600 --> 01:18:38.580
Community Hall: If I could just come in, you know, you would form a
subcommittee, so you would take two folks, and you vote to appoint them,
and then those two would decide the format in which they're going to
implement this process. Got it, okay. Can I make one comment?
508
01:18:39.380 --> 01:18:44.779
Community Hall: I don't think it should just be single-family homes. It
could be townhouses, or condos.
509
01:18:45.130 --> 01:18:48.430
Community Hall: So I would suggest you modify that just.
510
01:18:49.140 --> 01:18:53.079
Community Hall: Somehow. So accepted. Even apartment buildings, right?
511
01:18:53.890 --> 01:18:58.210
Community Hall: Well, how about we limit it to R1 and R2? Is that okay?
512
01:18:58.870 --> 01:19:03.729
Community Hall: It's… it should be limited to the item that's subject of
the study session.
513
01:19:05.570 --> 01:19:14.850
Community Hall: Okay… And that includes… any small remodel, not just a
single-family home, correct? Correct.
514
01:19:16.940 --> 01:19:27.999
Community Hall: So the subcommittee should review, the the presentation
to see the limitations for what the item was about. The agenda item vice
chair says simplification of small home upgrades. So
515
01:19:28.880 --> 01:19:34.880
Community Hall: And is the purpose of the subcommittee to recommend… so…
but everyone on the… on the…
516
01:19:35.290 --> 01:19:44.469
Community Hall: on the Planning Commission would participate in whatever
format the subcommittee decides for the interaction with the… with the
residents?
517
01:19:44.760 --> 01:20:00.300
Community Hall: Is that what we're talking about? As the mover of this
motion, I would say this is no different than any other subcommittee. The
subcommittee would come back to the Planning Commission, and then the
Commission weighs in, and we may then make that a broader set of
recommendations from the full Commission.
518
01:20:01.040 --> 01:20:04.970
Community Hall: So, sorry, can you… can you restate the purpose of the
subcommittee?
519
01:20:05.340 --> 01:20:08.450
Community Hall: The purpose of the subcommittee is to bring back.
520
01:20:09.470 --> 01:20:14.189
Community Hall: Feedback from applicants for single family home.
521
01:20:14.650 --> 01:20:15.880
Community Hall: Small.
522
01:20:16.980 --> 01:20:30.830
Community Hall: small upgrades and the streamlining of those permits. I
think, to clarify, it would not be single-family home, it would be, small
home upgrades as defined by the, study session. Correct. By the building
department, but…
523
01:20:30.950 --> 01:20:47.429
Community Hall: So I… But the question is whether you're bringing back
feedback from those people, or whether you're bringing back a
recommendation about collecting feedback. Yeah, that's what I thought it
was. So if it's… because I think we should all be involved in that
hearing session, listening session.
524
01:20:47.810 --> 01:20:57.739
Community Hall: So if it's… if the purpose of the subcommittee is to come
back with a recommendation on how we collect that feedback, and then we
all participate in that feedback session.
525
01:20:57.850 --> 01:21:06.850
Community Hall: I'm supportive of that, but if it's that the subcommittee
would go gather that feedback, and then bring it back to the Planning
Commission, then I'm not supportive of that.
526
01:21:08.010 --> 01:21:15.739
Community Hall: So, originally, this item was suggested as a future
agenda item, and I was advised to use a subcommittee, so I'm looking for
guidance from
527
01:21:15.850 --> 01:21:23.549
Community Hall: all sites, though we have lost the building staff, so we
have actually reopened the item in the absence of the staff that were
here originally. So…
528
01:21:24.290 --> 01:21:29.800
Community Hall: Personally, I would… Like the subcommittee to go out and
gather the feedback, because
529
01:21:30.030 --> 01:21:35.520
Community Hall: You are not gonna get applicants to come to this meeting,
or contractors to come to this meeting.
530
01:21:35.650 --> 01:21:38.710
Community Hall: to give feedback. I mean, we would have to…
531
01:21:39.110 --> 01:21:43.539
Community Hall: Trust whoever's on the subcommittee to go and do the
outreach.
532
01:21:43.930 --> 01:21:46.900
Community Hall: And so as a point of
533
01:21:47.720 --> 01:21:54.230
Community Hall: inquiry to the CAO, I guess. Do we need two motions? One
to form a subcommittee, and then to appoint members?
534
01:21:57.890 --> 01:22:09.790
Community Hall: Candidly, I don't… I'm not sure how this body as a whole
can go out there and solicit the information that Commissioner Linskog is
suggesting, and so I'm a little baffled. I simply heard the suggestion to
form a subcommittee.
535
01:22:09.900 --> 01:22:20.899
Community Hall: on the item that's within what was discussed, and I
thought my suggestion would just facilitate, you know, handling this
business now. But…
536
01:22:20.940 --> 01:22:37.230
Community Hall: you know, everyone's raising some really good questions
in your discussion, and so maybe we should go back to square one and
bring, you know, think this through a little more carefully. Perhaps the
chair can discuss this with the liaison to come up with the best process
to get this, because I do understand
537
01:22:37.550 --> 01:22:54.950
Community Hall: that obtaining the feedback of applicants and contractors
is a critical piece of information to get. The question is, what's the
best way to get that? I mean, candidly, if there was a bunch… if there
were public comments from applicants and contractors, that would help
solve part of the problem, so maybe it's a matter of
538
01:22:55.570 --> 01:23:02.869
Community Hall: you know, better publicizing that this is an item on the
agenda? I don't know. So, I want to suggest, Chair, that,
539
01:23:02.990 --> 01:23:20.510
Community Hall: we go back to future agenda, there's a motion, there's a
second, and then, Chair, you can have the further discussion with the
liaison as to how best to proceed. Thank you, Attorney Wu. I withdraw my
motion to form a subcommittee based on advice from the Attorney, and we
may go to future agenda items where I can…
540
01:23:20.790 --> 01:23:22.319
Community Hall: We propose the item.
541
01:23:22.700 --> 01:23:38.089
Community Hall: All right. So we are re-closing the study session. Well,
before you close that, though we did give direction to the building
department to go out and get collective feedback. We're not. So there
isn't any reason that you would do this in a subcommittee.
542
01:23:38.350 --> 01:23:39.080
Community Hall: I…
543
01:23:39.390 --> 01:23:47.839
Community Hall: I personally doubt that it would be possible to have a
productive subcommittee that has balanced, you know, that gathers
balanced feedback.
544
01:23:48.300 --> 01:23:50.009
Community Hall: you know.
545
01:23:50.960 --> 01:23:56.300
Community Hall: in a way that that can be done better than than the what
we're asked, what we've asked the building partner to do.
546
01:23:56.330 --> 01:24:15.630
Community Hall: Otherwise, what you'll get is, I know this angry guy,
right? We had a number of, we've had a number of kind of anecdotes here,
which are, you know, the personal experience of the people on the
Planning Commission, right? So, to try to avoid that problem, I would
just say, you know, we've given a clear direction to the…
547
01:24:16.270 --> 01:24:17.490
Community Hall: Building department.
548
01:24:18.380 --> 01:24:26.410
Community Hall: All right, thank you. This has been an excellent
discussion. We will reclose the study session, go back to future agenda
setting, and it sounds like there was a motion to
549
01:24:26.830 --> 01:24:39.060
Community Hall: have this agendized as a future item, and that I will
discuss with the staff liaison. And so the item that was proposed and
seconded remains, or do we need to restate the…
550
01:24:39.460 --> 01:24:41.319
Community Hall: Future agenda item, one more time.
551
01:24:41.910 --> 01:24:44.770
Community Hall: Just to be clear, Commissioner, this is restated.
552
01:24:46.030 --> 01:24:53.750
Community Hall: I move, or I propose a future agenda item to have a study
session with A.
553
01:24:54.340 --> 01:24:57.440
Community Hall: Selection of applicants that may allow for.
554
01:24:58.010 --> 01:25:00.759
Community Hall: An understanding of their pain points.
555
01:25:00.950 --> 01:25:04.410
Community Hall: In the presence of Commissioners and to learn from.
556
01:25:04.970 --> 01:25:08.150
Community Hall: From the study session, any further improvements we may
make?
557
01:25:09.740 --> 01:25:12.990
Community Hall: right? And that was seconded by me. So
558
01:25:13.650 --> 01:25:26.400
Community Hall: Thank you very much. This has been a good discussion. We
will move on if there are no future other future agenda setting items.
Okay, we have a request for a five minute break. Thank you.
559
01:31:29.730 --> 01:31:30.730
Community Hall: Contest.
560
01:31:32.800 --> 01:31:43.390
Community Hall: Alright, thank you very much, everyone. We will now
return to the meeting, and we are on Agenda Item 3, which is the review
of the draft Active Transportation Plan to provide a recommendation to
City Council.
561
01:31:44.240 --> 01:31:46.479
Community Hall: And do we have a staff report?
562
01:31:47.870 --> 01:31:49.010
Community Hall: We do chair.
563
01:31:51.810 --> 01:31:55.909
Community Hall: And presentation. Alright, so… Is it showing?
564
01:31:56.090 --> 01:31:57.380
Community Hall: No. Alright.
565
01:31:57.620 --> 01:31:58.929
Community Hall: There we are.
566
01:31:59.370 --> 01:32:07.269
Community Hall: Good evening, Planning Commission. My name is Matthew
Schrader, Senior Transportation Planner. I'm going to provide an update
on the ATP and where we
567
01:32:08.800 --> 01:32:12.790
Community Hall: So, the last time we were before the Planning Commission
was in February.
568
01:32:13.570 --> 01:32:17.290
Community Hall: Where the commission… Through the chair, we don't see it
on Zoom.
569
01:32:19.910 --> 01:32:21.009
Community Hall: Are you on Zoom?
570
01:32:21.120 --> 01:32:25.959
Community Hall: I'm not on Zoom, I'm through the desk here. Okay, we see
it now. Thank you. Okay, thank
571
01:32:26.750 --> 01:32:38.500
Community Hall: So we were here last in February, where the Commission
provided, some feedback that, was about the project prioritization
criteria and the project list specifically.
572
01:32:38.500 --> 01:32:51.579
Community Hall: These recommendations were consistent with what we heard
from the BPC, which was that the school proximity scoring might be
overweighted and that the Vision Zero high injury network scoring should
be increased.
573
01:32:53.120 --> 01:33:07.260
Community Hall: So we then went to the City Council in April and
communicated those recommendations from the Commissions. We also
presented all the Phase 2 materials that were also presented to the BPC
and Planning Commission.
574
01:33:07.260 --> 01:33:16.699
Community Hall: At that meeting as well, we walked the City Council
through what it would look like, if they chose that recommended scoring
approach, so…
575
01:33:16.720 --> 01:33:23.150
Community Hall: Projects that relied more heavily on the school proximity
scoring would fall, whereas projects that
576
01:33:23.250 --> 01:33:33.740
Community Hall: naturally, relied on the Vision Zero scoring would
increase, and then if a project was located on a suggested route to
school or a high-injury network, those remain relatively flat.
577
01:33:34.110 --> 01:33:43.160
Community Hall: So at that meeting, council provided direction to staff
to go and rescore the projects using the commission recommended scoring
adjustment.
578
01:33:45.470 --> 01:34:04.140
Community Hall: So, staff then went and rescored the projects as part of
Phase 3, and the core of Phase 3 was really just consolidating all of the
work that had been developed in Phases 1 and 2, and putting that into a
comprehensive document, the draft ATP, for public review. So, the
document
579
01:34:04.260 --> 01:34:20.340
Community Hall: is comprised of all the materials that were developed in
Phases 1 and 2, the existing conditions, the network recommendations,
public input received, and it's all, consistent with the direction that
Council has provided throughout the course of the project.
580
01:34:22.590 --> 01:34:41.570
Community Hall: So the draft plan was available for public review for 30
days and most of the comments we received were similar to the type of
comments that we gathered in phases 1 and 2. There were specific comments
and requests for sidewalk gap closures. There were things that were
actually outside the scope of the ATP like
581
01:34:41.670 --> 01:34:55.900
Community Hall: railroad right-of-way acquisition. There were a bunch of
minor comments related to the style of the document, so request to change
map symbology, or, choose a different image for a specific page.
582
01:34:55.950 --> 01:35:03.259
Community Hall: And then the only substantive change that was made was we
added language in chapter one.
583
01:35:03.270 --> 01:35:19.929
Community Hall: Really emphasizing the importance of e-bike and electric
micromobility education, specifically for students. This was previously
included in Chapter 6 as a programmatic recommendation, but given the
community's strong interest in the topic.
584
01:35:19.930 --> 01:35:28.429
Community Hall: We felt it was important to bring it forward in the plan,
make it very visible, and really emphasize that this is something that's
a community priority.
585
01:35:30.640 --> 01:35:44.240
Community Hall: So the next steps are to go to the BPC for review and
then to city council for adoption consideration in September. And the
recommended action is to recommend that the city council adopt the active
transportation plan.
586
01:35:46.970 --> 01:35:52.030
Community Hall: Great. Thank you, David and Matthew. And we'll bring this
back to the Commission now. Any clarifying questions?
587
01:35:55.530 --> 01:36:07.929
Community Hall: All right. Well, I do if I'm I'll go first. How many of
these projects? So you know, I the list is very extensive, hundreds of
items. How many do we intend to get done within like a 2 to 4 year cycle.
588
01:36:09.310 --> 01:36:21.089
Community Hall: There's no specific number. Project delivery will depend
on a variety of factors. We'll look at what's possible within the
pavement maintenance schedule, what grant opportunities are present and
we could pursue.
589
01:36:21.290 --> 01:36:32.820
Community Hall: Is their community supportive at the time? And
ultimately, project delivery is going to depend on the council
authorization and being able to move the project through the CIP process.
590
01:36:33.000 --> 01:36:45.669
Community Hall: Okay, so Council looks at the list, and they pick…
they're not necessarily going, you know, top-down from highest number of
points to lowest. They could literally pick from anywhere in the list.
That's correct. I see. Okay, that's helpful. And…
591
01:36:47.040 --> 01:36:56.399
Community Hall: So, I vaguely recall this, but projects cannot get
removed from this list once they're on it? Like, if the community doesn't
agree with them or anything, how does that work?
592
01:36:56.580 --> 01:37:11.110
Community Hall: There's no reason that council would not be able to amend
the plan to remove projects. It just doesn't make sense, and it's very
uncommon. Okay, got it. Thank you. And then my final question was on.
593
01:37:11.320 --> 01:37:17.599
Community Hall: one of the pages that said the improvement costs are
estimated at 43 million dollars.
594
01:37:17.750 --> 01:37:33.419
Community Hall: And I know that's probably a very high-level estimate,
but does that include grant funding or not? And, you know, what's behind
that number? That's… so we had HMH as a sub to come up with those
construction estimates, and that's looking at all of the projects in the
list and their total construction costs.
595
01:37:34.890 --> 01:37:35.710
Community Hall: Okay.
596
01:37:35.900 --> 01:37:46.049
Community Hall: Not including grant funding then? No, so that's just how
much is it going to cost if you wanted to go out and build all the
projects in the list? Okay, thank you very much. Any other questions from
commission?
597
01:37:46.230 --> 01:37:59.980
Community Hall: Oh, yeah, I had a couple of questions. But just to
clarify, isn't it? I think the majority of the bike pet projects are some
of the most efficient in terms of how much grant money we're able to get.
If I remember correctly, is that right?
598
01:38:00.540 --> 01:38:05.280
Community Hall: a lot of recently completed projects have been funded
through grants. Yeah.
599
01:38:05.290 --> 01:38:23.399
Community Hall: Okay, so a couple of questions. One is, on page 86, which
is the recommended transportation technology corridors, I noticed that
Foothill Boulevard was not included, and then the lower half of Miller
slash Wolf.
600
01:38:23.400 --> 01:38:36.769
Community Hall: So the second half of the south end of Miller, which I've
driven on many times, and cars go really, really fast on that, and it's
kind of crazy. Can you talk a little bit about why those two were
excluded?
601
01:38:36.910 --> 01:38:41.380
Community Hall: Yeah, so in the… when we're here last, I think, February
10th.
602
01:38:41.380 --> 01:38:57.830
Community Hall: The FEB 10 staff report kind of lays out the methodology
for selecting those corridors, and it was first based off of looking at
typology C intersections, which were the recommendations for traffic
signal and control improvements, and then their relationship to the
Vision Zero high injury network.
603
01:38:57.830 --> 01:39:04.279
Community Hall: And then, once we had those established, where within
those corridors are their highest rates of
604
01:39:04.280 --> 01:39:21.169
Community Hall: collisions, where the primary collision factor can be
associated with red light running or some sort of confusion at the
intersection. And then lastly, we looked at which intersections the city
actually owns and maintains, because that's going to determine our
ability to actually
605
01:39:21.190 --> 01:39:22.870
Community Hall: Put technology in the field.
606
01:39:23.560 --> 01:39:30.590
Community Hall: Okay, got it. And then I had one other question… Okay.
607
01:39:31.020 --> 01:39:48.630
Community Hall: Oh yeah, the shared use path on the Union Pacific
Railroad Trail, I think we would all love to see that happen, as soon as
possible, but I was just curious, that you included it. Have you had any
conversations with UPRR? Because last I checked, they weren't picking up
the phone when we called.
608
01:39:49.260 --> 01:40:00.099
Community Hall: No, there have been no new conversations with the
railroad, but having a project like that included in a long-range plan is
advantageous in the event that things change quickly.
609
01:40:00.540 --> 01:40:01.769
Community Hall: Got it. Thank you.
610
01:40:03.070 --> 01:40:04.539
Community Hall: Any other questions.
611
01:40:04.920 --> 01:40:07.560
Community Hall: Commission Commissioner. Oh, sorry, vice chair.
612
01:40:09.890 --> 01:40:11.090
Community Hall: Oh!
613
01:40:11.300 --> 01:40:15.089
Community Hall: So, I was wondering about the enforcement side of this.
614
01:40:15.210 --> 01:40:17.470
Community Hall: What kind of funding is needed?
615
01:40:17.830 --> 01:40:22.200
Community Hall: To do more enforcement, especially of…
616
01:40:22.590 --> 01:40:24.200
Community Hall: Well, I'll give you an example.
617
01:40:24.510 --> 01:40:32.709
Community Hall: Crossed with the traffic signal on Pacifica and De Anza,
and cars zoomed through, almost hitting me.
618
01:40:33.270 --> 01:40:38.610
Community Hall: The person driving it is in this room, actually. I won't
name them.
619
01:40:38.800 --> 01:40:43.669
Community Hall: But… I know the sheriff does this kind of enforcement of
walk signals.
620
01:40:43.770 --> 01:40:47.080
Community Hall: And pedestrians on some intersections.
621
01:40:47.890 --> 01:40:49.960
Community Hall: How much money does it cost?
622
01:40:50.390 --> 01:40:58.280
Community Hall: to do more of that type of enforcement? Is that hiring
additional deputies, or just redirecting their efforts?
623
01:41:00.040 --> 01:41:19.659
Community Hall: That's a good question, Vice Chair, and we don't have
budgets calculated for increases in enforcement. I think initially it
would be just having discussions with the sheriffs and directing them
towards what we have heard or seen or experienced as being the problem
areas of the city.
624
01:41:19.990 --> 01:41:34.120
Community Hall: And relying on their expertise as well to… to place their
officers where they're most needed, and if we find that in the future we…
we do need to supplement that, we can look at diving into the budget. You
know, as well, the…
625
01:41:34.450 --> 01:41:44.020
Community Hall: The… with the technology corridors, one of the tools
there is red light photo enforcement, and so staff is currently doing
some research on
626
01:41:44.120 --> 01:41:50.710
Community Hall: other cities that have red light photo enforcement just
to learn whatever we can about how it works.
627
01:41:50.750 --> 01:42:09.829
Community Hall: With the thought of maybe, you know, one day if we
implement those as one of our technology corridors, and hopefully that
would relieve, you know, some of the burden on the sheriffs for red light
running to, to focus efforts elsewhere. That remains to be seen. It's
part of what we're studying, right? I mean, I see it, in page 70 in other
places, and
628
01:42:10.180 --> 01:42:15.680
Community Hall: So, I presume there's no grants for that kind of thing,
like there is for actually physical…
629
01:42:15.870 --> 01:42:17.840
Community Hall: Projects like bike lanes.
630
01:42:18.230 --> 01:42:22.799
Community Hall: grant opportunities for… Projects like that are limited.
631
01:42:23.120 --> 01:42:23.970
Community Hall: Okay.
632
01:42:24.080 --> 01:42:25.319
Community Hall: Alright, thank you.
633
01:42:26.720 --> 01:42:27.690
Community Hall: Commissioner Rao
634
01:42:28.410 --> 01:42:35.439
Community Hall: Can staff comment on which roads and how many will have
street parking taken away if this is adopted?
635
01:42:36.670 --> 01:42:59.970
Community Hall: None are going to have street parking immediately taken
away. That was addressed through the scoring criteria. So we do know that
there are projects that have potential impacts to certain roadways. We
don't know the full extent of what those impacts actually are. But when
we went to go score the projects because we knew that in certain areas we
are going to have to remove on street parking in order to accommodate the
improvement.
636
01:43:00.120 --> 01:43:17.080
Community Hall: those projects were automatically deducted 10 points. And
then similarly, if there were any potential impacts to arterials, those
projects were also deducted 10 points. So we don't know the full scope of
what those impacts are, but we're trying to address that within the
project prioritization process.
637
01:43:17.650 --> 01:43:22.680
Community Hall: And how would we know, and when would we know what the
full impact of those are?
638
01:43:23.750 --> 01:43:38.309
Community Hall: So, through this plan, we also developed the Project
Impact Assessment Guidelines, which were reviewed by the Planning
Commission in February, and that states that if a project is initiated by
Council, and once we are at 30% design.
639
01:43:38.380 --> 01:43:44.880
Community Hall: Those impacts are learned. We'll then present the
findings to Council. Council will make a judgment on whether or not
640
01:43:45.020 --> 01:44:01.650
Community Hall: further analysis is required to fully understand those
impacts, what the traffic operations issues are as a result of the
project, and then they can either discontinue the project, modify the
design. So that is something that is also being proactively addressed
through this plan.
641
01:44:02.960 --> 01:44:04.399
Community Hall: And would we…
642
01:44:04.760 --> 01:44:12.719
Community Hall: Be getting grant funding if that 30% design stage council
recommendation was to not proceed further, would that be.
643
01:44:13.020 --> 01:44:22.889
Community Hall: a cost borne by the general fund and by the city, or
would that be something that is grant-subsidized? There's different types
of grants, so there's grants that will fund design.
644
01:44:23.180 --> 01:44:40.989
Community Hall: So we can say that we want to pursue a specific program
in order to bring a project at 30%. Just because we are going to make
modifications to the design doesn't prevent us from being awarded that
grant funding. And once we have a 100% design.
645
01:44:41.050 --> 01:44:53.900
Community Hall: It's regardless of what the initial project
recommendation in the plan is, the mere fact that we're looking to secure
grant funding will be awarded grant funding for a project, even if
646
01:44:54.500 --> 01:44:56.970
Community Hall: It went through that impact assessment.
647
01:44:57.530 --> 01:45:00.329
Community Hall: And the process you just described has…
648
01:45:00.550 --> 01:45:04.049
Community Hall: Our city ever used that and been successful to.
649
01:45:04.160 --> 01:45:07.230
Community Hall: Offset the cost of a 30% design.
650
01:45:07.470 --> 01:45:13.450
Community Hall: To only to decide that we will not proceed further and
yet be offset by grant funds.
651
01:45:14.470 --> 01:45:27.890
Community Hall: No, so this is a new process that we're setting out, and
I think there's a little bit of confusion here. So, on the design side of
things, if Council initiates a project and says, hey, we want to look to
see
652
01:45:27.990 --> 01:45:41.680
Community Hall: They can even say, alright, at a conceptual level, what
does this project look like? A 5-10% design. We can try and go and secure
grant funding for that, or 30%. That's a project in itself that…
653
01:45:41.850 --> 01:45:48.580
Community Hall: grant partner would look at an award, and then, you know,
Council will tell us, alright, you're at 30%,
654
01:45:48.880 --> 01:46:02.230
Community Hall: these impacts aren't acceptable, you need to change the
design, and that's fine. And we'll go and bring the project to 100% in
its new form, and then we'll go out and secure capital funding for the
program through a separate grant program.
655
01:46:02.340 --> 01:46:05.339
Community Hall: Or funding for the project through a separate program.
656
01:46:06.440 --> 01:46:16.429
Community Hall: And are we aware of any other cities that has used grant
funding for 30% design level studies before the city chooses to actually
proceed or not?
657
01:46:20.260 --> 01:46:30.599
Community Hall: Could staff comment on what is an approximate cost to the
city if we should have to pay for a 30% design in order to determine if
we proceed further or not?
658
01:46:31.980 --> 01:46:37.560
Community Hall: It depends on the project. Yeah, you took the words out
of my mouth. It depends on the project.
659
01:46:37.900 --> 01:46:51.369
Community Hall: you know, depending on the project, it is potentially
something that could could even be done at staff level, or or with just
some very minimal consultant support. If we're just talking about a 30%
660
01:46:51.370 --> 01:47:04.799
Community Hall: design, not full construction documents. There would, you
know, you just need a basic layout and some traffic analysis, and the
extent to which we could potentially even do in-house. If we did have to
hire a consultant, we'd be probably looking at
661
01:47:06.040 --> 01:47:12.349
Community Hall: 10, maybe 20… 1,000 on the high end, depending if we had
a major roadway.
662
01:47:12.540 --> 01:47:14.990
Community Hall: But it's, it wouldn't be a.
663
01:47:15.380 --> 01:47:16.840
Community Hall: A huge chunk of money.
664
01:47:17.880 --> 01:47:21.959
Community Hall: Thank you, and could staff remind me once again if we
665
01:47:22.890 --> 01:47:34.809
Community Hall: I believe we assumed that we would be grant funded for
this Phase 1, Phase 2, and the process to date, and we needed to accept
the report in order to make sure those grants did actually pay out. Is
that…
666
01:47:35.170 --> 01:47:51.429
Community Hall: That's correct. So the ATP is being funded through our
TDA3 allocation, which I think is what either Palo Alto or Mountain View
is also doing. And in order to receive reimbursement, we need to complete
the project.
667
01:47:52.360 --> 01:47:56.199
Community Hall: Thank you. And so, would you be able to clarify if we
668
01:47:56.500 --> 01:48:02.330
Community Hall: If Council rejected this report, we would not get the
grant funding, but we would have to accept
669
01:48:02.710 --> 01:48:04.860
Community Hall: In order to get the grant funding.
670
01:48:06.570 --> 01:48:07.480
Community Hall: Yes.
671
01:48:09.180 --> 01:48:14.950
Community Hall: But we could… but Council could accept with certain… of
672
01:48:15.170 --> 01:48:18.799
Community Hall: Under what conditions could this be accepted with?
673
01:48:19.070 --> 01:48:24.160
Community Hall: Council just needs to adopt the active transportation
plan. Okay.
674
01:48:24.560 --> 01:48:29.239
Community Hall: Well, is there a difference between accepting a study?
675
01:48:29.580 --> 01:48:30.920
Community Hall: Or a report.
676
01:48:31.400 --> 01:48:32.789
Community Hall: and adopting.
677
01:48:34.450 --> 01:48:35.290
Community Hall: That.
678
01:48:35.550 --> 01:48:38.899
Community Hall: That might be a question for Michael. I, I, in my mind,
no.
679
01:48:39.400 --> 01:48:54.410
Community Hall: it's the plan that the Council has agreed will be the
roadmap for active transportation for the next 5 or 10 years. And that
also might be a question we need to ask MTC staff who program TDA3
dollars.
680
01:48:55.510 --> 01:49:01.670
Community Hall: So, if… if council decides to not adopt This plan.
681
01:49:02.050 --> 01:49:03.999
Community Hall: What is the cost to the general fund?
682
01:49:06.560 --> 01:49:09.180
Community Hall: $315,000?
683
01:49:10.750 --> 01:49:15.170
Community Hall: And adopting the plan means adopting all the projects in
it, or
684
01:49:16.000 --> 01:49:27.360
Community Hall: Yeah, adopting the projects, adopting the programmatic
recommendations. And again, these are just suggestions. And ultimately,
all of the projects are going to be delivered through the CIP process.
685
01:49:27.750 --> 01:49:35.870
Community Hall: And so, the… Recommendation from this body, and
potentially from Council, could be that the report is adopted.
686
01:49:36.180 --> 01:49:42.250
Community Hall: Bought with a… subsequently more with a substantially
modified recommended project list.
687
01:49:42.640 --> 01:49:48.039
Community Hall: I'm trying to understand what is the parameters we can
work under… The council can decide…
688
01:49:48.530 --> 01:49:55.320
Community Hall: whatever project list they want to be included in the
plan and call that an active transportation plan.
689
01:49:55.540 --> 01:50:03.680
Community Hall: But, you know, to clarify, adopting the plan and all
hundred and… 70-some-odd projects.
690
01:50:04.260 --> 01:50:07.289
Community Hall: Does not commit the city to completing.
691
01:50:07.610 --> 01:50:17.739
Community Hall: 170 some odd projects at any time in the future. So we
just, we just need to have the plan. So council adopting the plan is not
council's promise to
692
01:50:18.350 --> 01:50:19.880
Community Hall: complete the plan.
693
01:50:20.060 --> 01:50:28.839
Community Hall: You know, we have an adopted bike plan, we have an
adopted PED plan that has plenty of projects still unfinished.
694
01:50:29.070 --> 01:50:30.730
Community Hall: Or not even started, because…
695
01:50:31.670 --> 01:50:45.470
Community Hall: plans evolve over time, communities change, and, you
know, MTC and the agencies understand that. So we just need a roadmap to
get us in a direction. If it changes later, if the plan is not filled
out.
696
01:50:45.610 --> 01:50:48.310
Community Hall: That's fine, we just need to have that roadmap in place.
697
01:50:48.910 --> 01:51:00.480
Community Hall: Thank you, Joe. I think, to clarify on Commissioner Rao's
point, so this Commission could adopt this plan, but with some
recommendations for consideration by Council, correct? Okay, I see.
698
01:51:00.880 --> 01:51:02.199
Community Hall: Any other questions.
699
01:51:03.460 --> 01:51:14.789
Community Hall: Commissioner Fung. Yeah. Actually, if I could. Payne,
that's a little you. You talked about the the rescoring that was done on
projects that had things like removal, parking impact or removal of
driving lanes.
700
01:51:15.840 --> 01:51:21.370
Community Hall: I'm curious whether… You know.
701
01:51:23.200 --> 01:51:27.590
Community Hall: The motivation for some of these projects, you know, is
to get a positive.
702
01:51:27.710 --> 01:51:30.059
Community Hall: You know, safety outcome.
703
01:51:30.330 --> 01:51:33.960
Community Hall: And… And when you score something downward.
704
01:51:34.840 --> 01:51:36.930
Community Hall: That may have impact on the.
705
01:51:37.490 --> 01:51:41.099
Community Hall: you know, the… what you could deliver. And I'm curious…
706
01:51:42.080 --> 01:51:46.689
Community Hall: You wouldn't… I wouldn't ask you to do it on everything,
but I think it would actually be very useful if…
707
01:51:47.150 --> 01:51:53.209
Community Hall: If that were something that could be, that effect could
be illustrated so that people could understand the scoring impact.
708
01:51:53.580 --> 01:52:01.500
Community Hall: in particular, I think this comes into play on the kind
of really big projects That,
709
01:52:01.700 --> 01:52:03.870
Community Hall: Commissioner Lenskog had brought up.
710
01:52:05.460 --> 01:52:12.509
Community Hall: I I think that maybe I'm wrong. You know, Foothill is
probably driven by the fact that we don't control a lot of that.
711
01:52:12.820 --> 01:52:13.590
Community Hall: Right.
712
01:52:13.720 --> 01:52:16.959
Community Hall: the territory there. So maybe that's a different factor.
But
713
01:52:17.130 --> 01:52:20.209
Community Hall: A miller, that would be something where.
714
01:52:20.460 --> 01:52:31.210
Community Hall: you know, that's pretty much… it's pretty much our
choice, and there's an impact that's… that's coming from… from the
changing the scaling model. And… and so I think that it's kind of
interesting, you know, if you look at the…
715
01:52:31.360 --> 01:52:33.680
Community Hall: If you look at Division 0 objectives.
716
01:52:33.810 --> 01:52:45.339
Community Hall: what was the effect of the of that down scoring by 10
points, you know, and I think that that actually would be a very useful
thing to illustrate, at least in a couple, you know. Maybe that that
example.
717
01:52:45.710 --> 01:52:46.909
Community Hall: just so that
718
01:52:48.320 --> 01:53:00.490
Community Hall: I remember one of the feedbacks that we had had was, you
know, around these things that had to do with waiting. You know, the
waiting for schools had been very, very, very high in the previous
719
01:53:00.840 --> 01:53:04.009
Community Hall: Things, so, so I think that,
720
01:53:04.370 --> 01:53:10.800
Community Hall: to make this effective, to maximize the effectiveness for
the you know, the final adoption.
721
01:53:11.000 --> 01:53:20.550
Community Hall: To it just to maybe to understand a little bit a little
bit deeper in in illustrative cases of of the effect of the of the effect
of the scoring.
722
01:53:23.950 --> 01:53:27.560
Community Hall: Any other clarifying questions from Commission. Yes,
Chair.
723
01:53:28.090 --> 01:53:33.179
Community Hall: So, I'm looking at this outreach phase, and thank you for
all the,
724
01:53:33.880 --> 01:53:38.630
Community Hall: Sincere efforts that went into the outreach, I was, you
know, happy to witness some of that.
725
01:53:39.880 --> 01:53:44.650
Community Hall: How… During the outreach phase, did we communicate that
726
01:53:44.810 --> 01:53:51.529
Community Hall: To residents that we might be losing street parking. Was
that, was that explicitly stated during outreach to.
727
01:53:51.640 --> 01:53:54.870
Community Hall: Residents that we could lose street parking because of
this project.
728
01:53:55.010 --> 01:54:08.689
Community Hall: No, that was not communicated. Again, we don't know the
full extent of what those impacts are, so it would be misleading to
potentially misrepresent what is actually going to be built when we're
just trying to gather public input.
729
01:54:08.690 --> 01:54:15.999
Community Hall: about whether or not people support these kinds of
improvements. And again, we tried to address those impacts with
730
01:54:16.000 --> 01:54:21.339
Community Hall: the project scoring. So, understanding that on certain
roadways.
731
01:54:21.500 --> 01:54:36.630
Community Hall: parking removal is going to be required, and that project
is going to be deducted and ranked appropriately on the project list, as
a result of that. And again, we have the project impact assessment
guidelines, which try and mitigate those impacts, whenever possible.
732
01:54:36.990 --> 01:54:41.060
Community Hall: But do you think the outreach could have asked a question
with all of the caveats you…
733
01:54:41.190 --> 01:54:54.180
Community Hall: just paraphrased, you know, is there a way that outreach
could have occurred with all of those caveats included? It's just not
something that's typically done in an active transportation plan when
we're looking at, alright, at a very high level.
734
01:54:54.180 --> 01:55:06.650
Community Hall: given the width of the roadway, what's possible here, and
you lay out, okay, this is a project that's gonna provide the maximum
safety benefits within what's available to us. So…
735
01:55:06.990 --> 01:55:25.360
Community Hall: Those conversations about impacts happen later when we're
at the design phase, and that's when the community will provide their
input and council will make a determination on, all right, is this
something that we want to do, understanding that we have differing public
opinion on this specific project?
736
01:55:25.840 --> 01:55:27.990
Community Hall: The staff believed that that.
737
01:55:28.480 --> 01:55:34.389
Community Hall: Disclosure may have materially altered the feedback that
you could have received during outreach.
738
01:55:34.550 --> 01:55:35.530
Community Hall: I don't.
739
01:55:35.670 --> 01:55:48.650
Community Hall: I was at all those outreach events and you saw me. You
saw me at, I don't know, six, maybe several at the senior center. And
candidly, people were very supportive.
740
01:55:48.810 --> 01:55:49.630
Community Hall: Okay.
741
01:55:49.740 --> 01:56:06.589
Community Hall: of the projects, of the plan, of wanting to make the city
more walkable and bikeable, and those conversations about impacts and
what those mean, and the realities come later when Council is going to be
making those decisions. So, I don't think the outreach was impacted by
not
742
01:56:06.760 --> 01:56:11.339
Community Hall: Fully disclosing the fact that there are potential
impacts that are currently unknown.
743
01:56:11.790 --> 01:56:17.249
Community Hall: And I think if I could just add, you know, I think we're
kind of unfairly picking on
744
01:56:17.800 --> 01:56:28.620
Community Hall: Parking is an impact as well. It's getting a lot of
discussion here, but, you know, every project potentially has some impact
to somebody about something. You know, parking might impact
745
01:56:28.980 --> 01:56:30.770
Community Hall: Half a dozen projects.
746
01:56:31.130 --> 01:56:42.249
Community Hall: other projects, like trails, might go behind residences,
and there might be those kind of impacts, and we haven't discussed those,
or never have in the past. You know, Ragnar Creek Trail
747
01:56:42.490 --> 01:56:57.869
Community Hall: you know, 60, 70 people would have said that would… it's
gonna be a very big impact. Not parking, but an impact. Turns out it
wasn't. No one's complained about it since the trail opened. So, every
project potentially has something that's going to affect somebody.
748
01:56:58.310 --> 01:57:09.109
Community Hall: And that's something that we would flesh out as Matt is
saying, you know, when it gets to the point that it's being considered
for inclusion in a cip or
749
01:57:09.110 --> 01:57:19.410
Community Hall: If it gets to that point, you know, 30% design phase, and
we will determine what the impacts are, whether it's parking or something
else, and make that disclosure to the affected parties.
750
01:57:20.910 --> 01:57:26.469
Community Hall: Thank you. I… I appreciate the perspective, but
751
01:57:26.830 --> 01:57:29.440
Community Hall: I was there in many of those outreach events.
752
01:57:29.850 --> 01:57:35.400
Community Hall: And it is my belief the seniors would have reacted
differently had they been asked the right questions.
753
01:57:35.620 --> 01:57:43.210
Community Hall: Including, with all of the caveats, if they've been told,
you might See some parking impacts that.
754
01:57:43.570 --> 01:57:47.039
Community Hall: Would have impacted the feedback we got from the seniors.
755
01:57:47.480 --> 01:58:06.730
Community Hall: Yeah, the last thing I'll add is this plan in comparison
to the 2016 plan is way less ambitious in terms of the actual network
recommendations. So the 2016 plan had envisioned class four bike lanes
all the way on Stelling, all the way on Blaney, all the way, I want to
say Homestead. And we've.
756
01:58:07.000 --> 01:58:18.429
Community Hall: kind of really pulled back from that, understanding that
there's a lot of driveways there, and those projects are going to be both
technically challenging, and from a community perspective, you know.
757
01:58:18.870 --> 01:58:30.879
Community Hall: deliverability is going to depend on public buy-in, and
those could be potentially contentious. So, when we came up with these
network recommendations, we were very mindful to limit those impacts
whenever possible.
758
01:58:31.220 --> 01:58:32.120
Community Hall: Thank you.
759
01:58:32.410 --> 01:58:35.410
Community Hall: I will leave my time for other commissioners.
760
01:58:36.170 --> 01:58:37.070
Community Hall: Vice chair.
761
01:58:38.430 --> 01:58:44.430
Community Hall: So when you have an item with a lot of dislikes, like… On
page 30…
762
01:58:44.880 --> 01:58:48.100
Community Hall: the Kim Street and Regnark Creek Trail intersection.
763
01:58:48.340 --> 01:58:52.149
Community Hall: Did all those dislikes? Were those all from people?
764
01:58:52.440 --> 01:58:55.270
Community Hall: Whose property's backed up to the trail.
765
01:58:55.770 --> 01:58:59.040
Community Hall: I mean, could we… like David said, we saw the same thing
766
01:58:59.270 --> 01:59:02.460
Community Hall: With the part of the trail that's been completed, and
now…
767
01:59:02.740 --> 01:59:05.730
Community Hall: You know, nobody complains about it, everybody uses it.
768
01:59:05.870 --> 01:59:10.069
Community Hall: So I'm just wondering where all those dislikes came from
on that item.
769
01:59:10.330 --> 01:59:30.289
Community Hall: Yeah, I think that map came from phase one that's since
been removed from the final draft because it's kind of confusing to read.
A couple of the maps were removed. So we have the final draft document
that was included as part of the packet. But to your point, yes, that is
when you looked at the written comments.
770
01:59:30.290 --> 01:59:36.630
Community Hall: there were comments from folks, along the creek there
who, were concerned about the impacts.
771
01:59:39.940 --> 01:59:41.380
Community Hall: Any other questions.
772
01:59:42.620 --> 01:59:46.180
Community Hall: Commissioner Rao Yeah, I want to go back to…
773
01:59:46.380 --> 01:59:50.939
Community Hall: Are staff able to quantify if You have a certain…
774
01:59:51.310 --> 01:59:57.080
Community Hall: number of streets where you think we could lose parking.
It's not confirmed, but do you think we might lose parking?
775
01:59:59.210 --> 01:59:59.980
Community Hall: Yeah.
776
02:00:00.120 --> 02:00:01.470
Community Hall: We know what those are.
777
02:00:01.850 --> 02:00:04.750
Community Hall: How many streets do we think we could lose street
parking?
778
02:00:05.910 --> 02:00:08.510
Community Hall: I think it's 3. I think they're…
779
02:00:09.330 --> 02:00:14.149
Community Hall: Stelling, portions of Stelling, not all of Stelling,
Blaney.
780
02:00:14.280 --> 02:00:21.919
Community Hall: portions of Blaney and Miller, south of Stevens Creek and
north of Caida Barcelona.
781
02:00:23.530 --> 02:00:31.569
Community Hall: So, to play that back, portions of Stelling could lose
street parking. Yeah. Portions of Blaney could lose street parking. And
what was the other one?
782
02:00:31.870 --> 02:00:35.779
Community Hall: Miller. And portions of Miller could lose street parking.
783
02:00:36.450 --> 02:00:39.410
Community Hall: Is there any targeted outreach, like.
784
02:00:39.830 --> 02:00:47.450
Community Hall: we do with planning and building to do a thousand feet
radius impact notice? Have we done any sort of outreach to those
785
02:00:47.560 --> 02:01:04.340
Community Hall: potentially identified projects where they might want to
provide additional feedback to the outreach? These are just concepts. If,
in the event that Council chooses to move forward with those as a
project, again, that's stuff that will be addressed with our
786
02:01:04.620 --> 02:01:24.389
Community Hall: project impact assessment. In the event that Council
looks at those parking impacts and says, you know what, the safety
benefits of this project outweigh the on-street parking impacts, and
we're going to move forward with the design, there would be extensive
outreach to those residents to notify them of the full extent of the
impacts, so they could be
787
02:01:24.930 --> 02:01:27.949
Community Hall: Aware of the process and the project.
788
02:01:29.090 --> 02:01:34.830
Community Hall: And are there any scenarios where a project may not
actually be its own CIP and therefore could
789
02:01:34.990 --> 02:01:37.589
Community Hall: could actually proceed without coming back to Council.
790
02:01:38.840 --> 02:01:45.549
Community Hall: There may be times when… Minor striping improvements
would happen, but none of those would be.
791
02:01:45.760 --> 02:02:03.889
Community Hall: projects with impacts. Like, those projects,
understanding the community dynamic and public feelings towards things
like that, all of those projects would go through the City Council for
them to decide on whether or not that's something they want to pursue.
792
02:02:04.770 --> 02:02:09.769
Community Hall: And using a recent example was, were floating bus stops a
CIP project?
793
02:02:13.170 --> 02:02:17.249
Community Hall: Yes, that was part of Stevens Creek Boulevard 2A and 2B.
794
02:02:19.820 --> 02:02:22.430
Community Hall: Help me understand that. So, it was part of the…
795
02:02:23.180 --> 02:02:31.629
Community Hall: Stevens Creek Boulevard, 2A, 2B… Sorry, that's Phase 2A
and Phase 2B of the Class 4 Separated Bikeway Project on Stevens Cree
796
02:02:32.100 --> 02:02:38.679
Community Hall: And so the CIP was the overall Phase 2A, Phase 2B
project, not the floating bus stop itself.
797
02:02:39.050 --> 02:02:39.970
Community Hall: Correct.
798
02:02:40.860 --> 02:02:45.489
Community Hall: The floating bus stop was a component of the larger
project.
799
02:02:45.950 --> 02:02:51.410
Community Hall: And so, in this particular report, the identified 3
streets that we just mentioned.
800
02:02:51.650 --> 02:02:55.540
Community Hall: Would they be part of a larger project such that
residents may not notice that
801
02:02:55.740 --> 02:03:00.150
Community Hall: There is impact to street parking because some larger
project was adopted.
802
02:03:01.200 --> 02:03:07.899
Community Hall: No, they would be… because of that being the component
they would, they would go to council.
803
02:03:10.310 --> 02:03:13.370
Community Hall: So, any street parking removal.
804
02:03:14.950 --> 02:03:16.299
Community Hall: We'll go to council.
805
02:03:16.760 --> 02:03:23.629
Community Hall: Yes, it has to go to Council regardless, because removal
of street parking requires an ordinance and a
806
02:03:23.870 --> 02:03:33.150
Community Hall: modification of the municipal code. But even aside from
that, the project itself would come to city council for approval before
that time.
807
02:03:33.640 --> 02:03:38.890
Community Hall: Are there scenarios besides the buffered bike lane or the
Class 4 bike lane?
808
02:03:39.330 --> 02:03:43.200
Community Hall: Where we would still lose street parking because the
street is not.
809
02:03:43.520 --> 02:03:46.789
Community Hall: Broad enough to both accommodate parking and a
810
02:03:47.070 --> 02:03:49.099
Community Hall: Buffered by Clint, I guess.
811
02:03:49.890 --> 02:04:01.720
Community Hall: Not a separated bike lane, but a buffered bike lane. The
three that Matt mentioned are the only streets in the plan that we
foresee could potentially impact on street parking. And those are
separated bike lanes?
812
02:04:03.150 --> 02:04:05.520
Community Hall: No, so…
813
02:04:05.840 --> 02:04:17.149
Community Hall: The Miller project, I believe, is just a Class 2 bike
lane, standard bike lane, and then Stelling is a combination of Class 4
and Class 2B.
814
02:04:17.440 --> 02:04:28.720
Community Hall: And similarly with Blaney, but Blaney, it would be class
four over the highway and then class two B through the residential.
815
02:04:28.840 --> 02:04:32.639
Community Hall: Is there a map you might project while you're describing
that? It's really hard to…
816
02:04:33.040 --> 02:04:39.909
Community Hall: both visualize and follow. I don't know if you have a map
in your presentation or the staff report that can be shared as you're
answering that question.
817
02:04:40.090 --> 02:04:43.189
Community Hall: Yeah, I can look into the staff report.
818
02:04:48.260 --> 02:04:51.140
Community Hall: While he's looking, chair,
819
02:04:51.780 --> 02:04:56.690
Community Hall: At some point, we should move on for deliberation, but
before then, take public comment.
820
02:04:57.510 --> 02:05:07.060
Community Hall: Yeah, I think we, if it may take him a while, let's break
for public comments. City Clerk, do we have any public comments? We have
one request to speak virtually, Jennifer Griffin.
821
02:05:09.340 --> 02:05:10.720
Community Hall: Welcome, Jennifer.
822
02:05:10.720 --> 02:05:13.810
Jennifer Griffin: Thank you very much. Can you all hear me?
823
02:05:14.360 --> 02:05:15.480
Community Hall: Yes, we can hear you.
824
02:05:15.480 --> 02:05:20.410
Jennifer Griffin: Okay, thank you. Thanks to everyone, to staff, and…
825
02:05:20.550 --> 02:05:28.300
Jennifer Griffin: everyone in the city for participating to try to make
our active transportation plan a good one that
826
02:05:28.410 --> 02:05:44.089
Jennifer Griffin: that the main goal of this is that everyone is safe,
and I think that we have had a lot of discussion about that, lots of
different input, lots of different plans to make sure that Cupertino has
a robust
827
02:05:44.360 --> 02:05:57.609
Jennifer Griffin: plan that will make sure that everyone and everything
is safe. It's a… it's very, very difficult, and there's a lot of external
and internal pressures with this type of thing, but I think that
828
02:05:57.700 --> 02:06:06.820
Jennifer Griffin: there has been a lot of work, good work done, to try to
make sure that everyone is being heard. In that regard,
829
02:06:07.300 --> 02:06:16.379
Jennifer Griffin: I will just make a few comments. I have been extremely
concerned about children on e-bikes. I think I have
830
02:06:16.660 --> 02:06:27.400
Jennifer Griffin: mentioned this before. There have been many, many
accidents in other cities and in in areas. I I'm in Santa Cruz a lot down
at the
831
02:06:27.510 --> 02:06:35.099
Jennifer Griffin: Rio Del Mar beach areas, and I cannot even begin to
tell you what I have seen down there. We have
832
02:06:35.220 --> 02:06:53.869
Jennifer Griffin: 10-year-olds on e-bikes speeding up and down Rio Del
Mar Beach with no helmets, doing wheelies, and I'm… and they're going
fast, so I'm not sure what type of class bike that is. I have seen
adults, too, exhibiting extremely poor
833
02:06:53.950 --> 02:07:11.959
Jennifer Griffin: judgment. I mean, crossing in front of traffic, where
there's no crossing area, no helmets, riding recklessly, in and out of
traffic, so I'm not blaming children. Adults have been doing this too.
One of the problems is that I do not
834
02:07:12.200 --> 02:07:13.350
Jennifer Griffin: C…
835
02:07:13.560 --> 02:07:32.540
Jennifer Griffin: a lot of enforcement, but then again, it's difficult to
enforce something like this. I hope in Cupertino that there can be a
robust education of schools to make sure that children that are riding e-
bikes or scooters or something with a motor
836
02:07:32.710 --> 02:07:34.730
Jennifer Griffin: That they know…
837
02:07:34.770 --> 02:07:53.010
Jennifer Griffin: what they're up against, and that their parents
realize, potentially, the risk that they are taking if the children are
not properly educated. I think that we can make this safer. One of the
cities recently has said that no children under 12 years old
838
02:07:53.010 --> 02:08:03.790
Jennifer Griffin: can ride e-bikes to school. I think the city said no
one… no child under 12 could be on an e-bike. That's a bit drastic, but
then again.
839
02:08:03.790 --> 02:08:18.070
Jennifer Griffin: That is one of my main concerns. The other thing is
making sure that traffic flows smoothly. We want to make sure everyone
can drive and be safe. And whatever you're doing, please be safe. Thank
you.
840
02:08:18.880 --> 02:08:22.620
Community Hall: Thank you, Jennifer. We have no remaining requests to
speak, Chair.
841
02:08:22.790 --> 02:08:26.169
Community Hall: Thank you. So we'll bring it back. I think, Staff, have
you found the
842
02:08:26.570 --> 02:08:31.269
Community Hall: We have the map up now, so if we can share screen.
843
02:08:32.940 --> 02:08:37.770
Community Hall: So here we have the network recommendations map, which is
included on page 62.
844
02:08:37.880 --> 02:08:40.960
Community Hall: We'll start on Miller, which… Through the chair.
845
02:08:41.490 --> 02:08:46.680
Community Hall: Okay, there we go. I think there's a lag in this showing
up on Zoom, so I was gonna say, we might wanna pa
846
02:08:46.810 --> 02:08:53.510
Community Hall: So, on Miller here, we have the standard bike lane, which
is just the parallel striping.
847
02:08:53.590 --> 02:09:03.880
Community Hall: North of Cayeta Borsalona, south of Stevens Creek. Over
here on Blaney, we have buffered bike lanes all the way to the
overcrossing of 280.
848
02:09:03.880 --> 02:09:16.630
Community Hall: and connecting to Homestead, and then we have a
continuation of the existing buffered bike lane on Stelling down to
Prospect, and again, only Class 4 over, Interstate I-280.
849
02:09:16.640 --> 02:09:17.730
Community Hall: Alright, 280.
850
02:09:22.690 --> 02:09:27.080
Community Hall: And, and so, when you say we don't know if we might lose
parking.
851
02:09:27.770 --> 02:09:29.470
Community Hall: What does that really mean?
852
02:09:29.620 --> 02:09:36.019
Community Hall: It means we don't know the number of parking stalls that
would need to be removed in order to build the project.
853
02:09:36.290 --> 02:09:39.950
Community Hall: So we know we will lose parking, we just don't know how
many Correct.
854
02:09:44.040 --> 02:09:50.659
Community Hall: Oh, so does the state require that cities dedicate part
of the public streets?
855
02:09:50.810 --> 02:09:54.490
Community Hall: For parking lots, if there's not sufficient off-street
parking?
856
02:09:54.750 --> 02:09:55.480
Community Hall: Okay.
857
02:09:56.530 --> 02:10:01.860
Community Hall: Why are we concerned about
858
02:10:02.190 --> 02:10:04.740
Community Hall: You know, it's great to have a parking space, but…
859
02:10:04.890 --> 02:10:11.759
Community Hall: You know, we maintain those streets, we spend money on
paving them, And I'm just concerned…
860
02:10:12.090 --> 02:10:13.610
Community Hall: You know, the city's…
861
02:10:13.880 --> 02:10:22.239
Community Hall: are very limited in imposing parking mandates, parking
minimums on new projects, and I don't want to be encouraging
862
02:10:22.390 --> 02:10:28.739
Community Hall: Developers to say, oh, We're not going to include enough
parking because we're just, you know.
863
02:10:29.180 --> 02:10:35.589
Community Hall: Our residents can just park their excess cars out on the
street, and the city's not gonna ever wanna use that.
864
02:10:36.090 --> 02:10:39.240
Community Hall: Real estate for something different, like a bike lane.
865
02:10:39.370 --> 02:10:55.109
Community Hall: I just don't like the whole idea of exporting parking
onto public streets, and this goes with ADUs as well, you know. You can't
require parking for ADUs, but you lose the off-street parking if it's…
they're ADUs in a garage.
866
02:10:55.290 --> 02:11:07.090
Community Hall: And yet I don't like the whole expectation that, oh,
we'll just export all these extra cars onto the streets instead of using
them for the public benefit.
867
02:11:07.980 --> 02:11:13.370
Community Hall: So I guess I… I differ a lot with one of my fellow
commissioners on… on that.
868
02:11:15.050 --> 02:11:16.940
Community Hall: All right. Do we have any other questions?
869
02:11:17.060 --> 02:11:18.450
Community Hall: Yes, chair.
870
02:11:18.910 --> 02:11:24.439
Community Hall: So, can staff guide us on this recommended programs
versus encouraged? What is…
871
02:11:24.710 --> 02:11:28.740
Community Hall: The difference between these, and how should we view them
while adopting this, or…
872
02:11:29.250 --> 02:11:37.109
Community Hall: Or making recommendations. Can you please clarify that
point? I'm looking at the final draft. It has a section called
recommended programs with.
873
02:11:37.450 --> 02:11:40.490
Community Hall: A number of policies, and then there's a set of
874
02:11:40.750 --> 02:11:44.190
Community Hall: Encouragement programs with a number of recommendations.
875
02:11:44.770 --> 02:11:56.880
Community Hall: Yeah, so those… those are just the programmatic
recommendations, and they're broken out into different categories. So I
think there's education, engineering, enforcement, and…
876
02:11:57.020 --> 02:12:06.089
Community Hall: another that I'm blanking on, but they're all under the
umbrella of programmatic recommendations, things that are non-
infrastructure projects.
877
02:12:07.560 --> 02:12:11.060
Community Hall: And where in this category list is
878
02:12:11.560 --> 02:12:16.200
Community Hall: Technology-based enforcement, such as speeding cameras
and red light cameras.
879
02:12:18.660 --> 02:12:23.380
Community Hall: Probably in enforcement. Let me see, though.
880
02:12:24.970 --> 02:12:28.340
Community Hall: I see tickets and bike patrols and targeted.
881
02:12:33.790 --> 02:12:41.840
Community Hall: I am seeing enforcement, but I only see 3 categories
here, which is traffic tickets, bike patrols, and target.
882
02:12:47.220 --> 02:12:47.950
Community Hall: Okay.
883
02:12:50.270 --> 02:13:05.169
Community Hall: So, this is a large report. Is there sections that we
should ignore and focus on other sections? Are you specifically asking
about red light cameras? Yes, red light cameras, speeding cameras were
not part of the enforcement. I guess I'm on page 70 of this report.
884
02:13:06.400 --> 02:13:14.129
Community Hall: Right, but they are contained as projects within the
trans… the technology corridor section of the… Okay.
885
02:13:18.120 --> 02:13:22.959
Community Hall: All right. I think we're probably ready to move on to
comments. So any comments from the Commission.
886
02:13:24.270 --> 02:13:25.800
Community Hall: Commissioner Lynn Scott.
887
02:13:27.640 --> 02:13:34.149
Community Hall: Go ahead, Commissioner Linscock okay, so, so a couple of
comments,
888
02:13:34.360 --> 02:13:44.460
Community Hall: One is… well, actually, it's also a question. So, are all
parking spaces the same? Are some used and not used, or are they all,
like.
889
02:13:44.680 --> 02:13:45.680
Community Hall: used.
890
02:13:48.610 --> 02:14:00.369
Community Hall: There's different utilization across the city. That's
something that we would learn as part of the 30% when we do the impact
assessment and do a in-the-field, parking utilization survey.
891
02:14:00.520 --> 02:14:06.849
Community Hall: Okay, so… but it's safe to say not all parking spaces in
the city are… are always used.
892
02:14:08.520 --> 02:14:23.279
Community Hall: Depending on the time of day. Correct. Okay, thank you.
So I guess my comments on this is, I actually want to commend the staff.
I think you guys have done a really good job of trying to listen to all
the feedback you've gotten over the last
893
02:14:23.410 --> 02:14:29.729
Community Hall: Year now from from what 3 constituent bodies and plus the
the public.
894
02:14:29.770 --> 02:14:48.550
Community Hall: And balancing all of that, rejiggering the scores based
on all the feedback you got and trying to come up with a plan that, you
know, satisfies all the competing requests you've been given.
895
02:14:48.780 --> 02:14:56.489
Community Hall: Yeah, I mean, it's, like you said, it's nowhere near as
ambitious a plan as the previous one, but, you know.
896
02:14:56.950 --> 02:15:11.679
Community Hall: times change. So… so I think, you know, you guys have
done a really good job with this plan, so I just want to commend you guys
on that. Beyond that, yeah, I mean, I think I asked a lot of the
questions I had, so I think I'm good otherwise.
897
02:15:13.320 --> 02:15:14.869
Community Hall: Any other comments.
898
02:15:16.090 --> 02:15:17.320
Community Hall: Commissioner Hong?
899
02:15:18.680 --> 02:15:22.090
Community Hall: Sure, I'll echo that as well. I think that,
900
02:15:22.500 --> 02:15:27.350
Community Hall: I felt that the update is responsive to the feedback that
we had given.
901
02:15:27.540 --> 02:15:28.270
Community Hall: Oh.
902
02:15:29.140 --> 02:15:35.429
Community Hall: maybe with that one caveat in in the area that I'd
commented on before that that
903
02:15:38.830 --> 02:15:42.540
Community Hall: I don't know that it's necessarily your charter to solve
the political problem.
904
02:15:42.690 --> 02:15:45.979
Community Hall: Of, of coming up with a set of recommendations, so…
905
02:15:46.160 --> 02:16:01.530
Community Hall: you know, there is no mechanism other than to have a
waiting. And and you know it seems like it's seems like it's sensible,
seems like it's applied. You know. I think that these particular changes
were very responsive to the to the varying feedback.
906
02:16:01.660 --> 02:16:03.709
Community Hall: That you're getting,
907
02:16:04.190 --> 02:16:12.089
Community Hall: I would just say that, you know, when it comes for
adoption, if there's a mechanism through which you can illustrate the
effect.
908
02:16:12.310 --> 02:16:15.869
Community Hall: You know, what is the effect of making this weighting
change?
909
02:16:15.980 --> 02:16:20.319
Community Hall: So people have a… have visibility on that. I think that
would be,
910
02:16:20.540 --> 02:16:29.540
Community Hall: That would be really, really the only addition, I would
say. I also, I think, I think I'd ask some questions about e-bikes, and
I, it's, it's amazing to me.
911
02:16:29.870 --> 02:16:40.740
Community Hall: how the e-bike map… e-bike map can look different, so
different than the bike map, and I would love to talk to you about that
sometime. I don't really… it's funny to me, guys, I don't really see how
that could be, but
912
02:16:40.860 --> 02:16:48.550
Community Hall: You know, again, I found it to be very interesting, you
know, something new on every page, so thank you.
913
02:16:49.780 --> 02:17:08.079
Community Hall: I'd like to make my comment. So, I agree with the
Commission. I think there's some excellent projects here, and I know that
a lot of work has gone into it. I think the pedestrian improvements
especially will, you know, I hear feedback from the community about
concerns about crossings, and I think that that'll be really helpful. And
I think for me, the one area that
914
02:17:08.080 --> 02:17:12.389
Community Hall: you know, if we were to make a recommendation to Council
that I would like to
915
02:17:12.430 --> 02:17:31.159
Community Hall: Maybe caveat or, or recommend that council, potentially
reconsider is, since the last time that we saw this report, we have seen
an evacuation study, and I think we have seen a lot of concern from the
community around their ability to get out.
916
02:17:31.160 --> 02:17:34.920
Community Hall: from the west side safely. We've even seen,
917
02:17:35.030 --> 02:17:48.380
Community Hall: community… a resident-made traffic reports and evacuation
reports, and… and so we know there's a lot of concern from the west side
and their ability to… to get out, and specifically, I'm looking at
Foothill.
918
02:17:48.379 --> 02:17:57.280
Community Hall: In the evacuation study, there are portions of Foothill
that are multiples over capacity from a volume-to-capacity standpoint,
and so I think
919
02:17:57.590 --> 02:18:21.890
Community Hall: You know, knowing this new information that we have now,
and I understand that this is an active transportation report, and it
doesn't quite look into evacuation, but at the same time, I don't feel
like we should look at transportation in isolation without considering
the other factors that impact our roadways and what we might want to, for
example, be able to use emergency shoulder lanes for in the event of an
evacuation.
920
02:18:22.020 --> 02:18:35.649
Community Hall: My main ask would be, you know, if this commission is in
agreement that we make a recommendation that council may want to revisit
some of the items that some of the list items that impact the west side.
921
02:18:36.080 --> 02:18:38.550
Community Hall: And that's my comment. Any other comments?
922
02:18:39.110 --> 02:18:40.410
Community Hall: Commissioner Rao.
923
02:18:40.750 --> 02:18:46.189
Community Hall: Yeah, Chad, the west side is a very broad term as someone
that lives there, so I don't know that we…
924
02:18:47.049 --> 02:18:51.039
Community Hall: Depends on what is west side, could be west above, could
be west of the answer, but
925
02:18:51.219 --> 02:18:54.760
Community Hall: Let me just… Sort of,
926
02:18:54.940 --> 02:18:57.580
Community Hall: Offer up that the sidewalks would be.
927
02:18:57.900 --> 02:19:04.209
Community Hall: in general, a very good project. Are there sidewalks
proposed on Schofield Drive? I know there's a lot of projects here, but
the Schofield
928
02:19:04.730 --> 02:19:10.989
Community Hall: And the answer… If there's sidewalk absent, there's
sidewalk proposed. Okay.
929
02:19:11.340 --> 02:19:16.510
Community Hall: So, in general, I'm supportive of sidewalks where
feasible.
930
02:19:17.110 --> 02:19:21.369
Community Hall: Is there a distinction the report makes between where a
sidewalk could be?
931
02:19:21.540 --> 02:19:27.109
Community Hall: constructed without… Loss of homeowner property versus
where.
932
02:19:27.270 --> 02:19:34.040
Community Hall: We'd have to… Encroach into homeowner property. For
example, the section of McClellan opposite Bonavista High
933
02:19:34.299 --> 02:19:38.759
Community Hall: Is that a section that you'd have to encroach into
homeowner property? Is that a distinction that's
934
02:19:39.180 --> 02:19:56.419
Community Hall: No, again, that's a level of specificity that's beyond
this report. We do make a distinction and make clear that there are
certain neighborhoods within the city that have a self-designation as
semi-rural, which exempts them from some sidewalk requirements. So,
again, that…
935
02:19:56.640 --> 02:20:00.650
Community Hall: It's a level of detail that's beyond… This high-level
document.
936
02:20:02.480 --> 02:20:11.169
Community Hall: Yeah, so in general, I'm supportive of sidewalk
improvements, except where we may lose homeowner property, where I think
we need to be a little bit more
937
02:20:11.310 --> 02:20:15.370
Community Hall: careful in applying judgment to those scenarios. I know
it's a balancing act, but
938
02:20:15.850 --> 02:20:22.140
Community Hall: I would be supportive of sidewalks, more broadly,
supportive of the pedestrian scale lighting.
939
02:20:22.310 --> 02:20:25.580
Community Hall: And obviously, much of the pedestrian improvements.
940
02:20:25.710 --> 02:20:30.740
Community Hall: Have staff clarified which of these pedestrian
improvements would need
941
02:20:30.900 --> 02:20:32.580
Community Hall: No right turn on drag.
942
02:20:34.350 --> 02:20:51.339
Community Hall: No, again, this is such a high level plan. When you're
looking at a specific intersection, that kind of detail would be learned
once a project has been initiated and we have a consultant on board to
look at what makes the most sense from an engineering perspective.
943
02:20:52.800 --> 02:20:57.279
Community Hall: However, out of the categories that you had, where you
had, I think
944
02:20:58.420 --> 02:21:06.740
Community Hall: recommendations, right? Was that the category? Yeah,
engineering recommended programs. I think you had certain programs around
re-engineering.
945
02:21:07.020 --> 02:21:13.350
Community Hall: The intersections… I think it was, curb extensions at
intersections.
946
02:21:13.720 --> 02:21:17.070
Community Hall: Would curb extensions imply a no-write turn on red?
947
02:21:17.620 --> 02:21:22.820
Community Hall: No, and we do have a programmatic recommendation to look
at right on red, but I…
948
02:21:22.940 --> 02:21:34.030
Community Hall: The program recommendation, when you read the
description, makes clear that radon red would only be allowed if it's
clear that there's not going to be any negative impact to traffic
operations.
949
02:21:35.090 --> 02:21:43.070
Community Hall: And pedestrian improvements generally don't trigger no
right turn on red restrictions.
950
02:21:43.280 --> 02:21:46.209
Community Hall: As well. Generally, it's either because of…
951
02:21:46.470 --> 02:21:52.529
Community Hall: a particular bike facility, or other safety concerns not
directly related to
952
02:21:52.680 --> 02:21:55.950
Community Hall: pedestrians. I don't think we've… I can't think
953
02:21:57.130 --> 02:22:03.619
Community Hall: Cupertino with the no-right turn on red due to
pedestrians, except maybe Bub McClellan with the scramble phase.
954
02:22:04.570 --> 02:22:06.550
Community Hall: And how about Kobe extensions?
955
02:22:06.840 --> 02:22:12.610
Community Hall: they don't trigger right… no right on red, either. Would
they impede right turns on red because of a curb extension?
956
02:22:13.960 --> 02:22:19.399
Community Hall: I mean, if a car is… if it's a single lane approach, and
there is a car at the…
957
02:22:19.760 --> 02:22:34.359
Community Hall: at the intersection on a red light, waiting to proceed
straight forward, but can't because the light's red, and there's a car
behind him that wants to turn right, but physically can't because he's
blocking the lane.
958
02:22:34.590 --> 02:22:38.879
Community Hall: He won't be able to turn right, but if the car that wants
to turn right is at the front of the line.
959
02:22:39.530 --> 02:22:46.789
Community Hall: and it's a red light, he can turn right. So if we take
the example of, let's just say, Stelling and Stevens Creek.
960
02:22:47.520 --> 02:22:53.710
Community Hall: That is an intersection today that allows for items on
red, Traffic.
961
02:22:54.090 --> 02:22:56.790
Community Hall: Is able to make heightens on tread to the extent.
962
02:22:56.950 --> 02:23:06.830
Community Hall: That you don't have the limitation you described. Would
the proposed projects under this engineering recommended programs impact
Stelling and Stevens Creek's ability to make right turns on red?
963
02:23:09.740 --> 02:23:12.350
Community Hall: Again, we don't know. These are just concepts.
964
02:23:14.420 --> 02:23:23.839
Community Hall: And if there are impacts, they'll be presented before
council, and council will make a judgment call on, is this okay, or is it
not okay?
965
02:23:24.540 --> 02:23:32.610
Community Hall: Will every one of the projects listed here, I know there
are several pages worth of projects in this list, will every one of them
go back to Council for
966
02:23:32.930 --> 02:23:35.269
Community Hall: Recommendation and direction.
967
02:23:37.950 --> 02:23:50.200
Community Hall: As Matt mentioned earlier, you know, smaller projects
that may only involve, you know, striping or minor improvements probably
would not, because it would be clear that there would be no impacts.
968
02:23:50.450 --> 02:24:03.169
Community Hall: Anything larger than that, would probably necessarily go
to Council, if only because there would be a budget request involved. So
if you adopted a non-separated bike lane project.
969
02:24:03.410 --> 02:24:06.309
Community Hall: But it could be implemented using just striping.
970
02:24:06.560 --> 02:24:10.459
Community Hall: And it could result in loss of parking. Would that go to
council?
971
02:24:11.570 --> 02:24:12.480
Community Hall: Yes.
972
02:24:14.250 --> 02:24:17.990
Community Hall: And that is not just a loss of parking, that's striping.
973
02:24:18.400 --> 02:24:34.259
Community Hall: causing a loss of parking, but it would still go to
Council. It's not a CIP, though. But it probably would be a CIP, because
a project like that would be of a scope where it would take more money
than we could just accomplish with our operating budget, so it would most
likely go to Council, but because of
974
02:24:34.980 --> 02:24:41.150
Community Hall: what we've put in the ATP about projects that would
potentially have parking impacts would
975
02:24:41.790 --> 02:24:54.839
Community Hall: be evaluated at the 30% level and go to Council, this
would fall under that category, and so we would go to Council. It doesn't
matter if it's a concrete buffer, or a stripe buffer, or what the
physical improvement is that triggers the loss of parking.
976
02:24:55.100 --> 02:24:57.110
Community Hall: Now, the projects that oh.
977
02:24:58.360 --> 02:25:11.260
Community Hall: the projects that have been completed recently, where we
were able to do them as part of the pavement maintenance project, or
program, those were the Cristo Rey bike lanes and the Rodriguez bike
lanes. So…
978
02:25:11.500 --> 02:25:29.700
Community Hall: essentially existing conditions, but we realized, you
know, we can make improvements there. Similarly, when looking at this
plan, the projects that we would look at when resurfacing streets would
be the Bike Boulevard project. So, where can we lay down those cheryl
markings? That's what we're talking about.
979
02:25:33.000 --> 02:25:34.129
Community Hall: We'll deal more time.
980
02:25:34.510 --> 02:25:36.690
Community Hall: Are there any other comments, vice chair?
981
02:25:37.410 --> 02:25:41.879
Community Hall: So on Bollinger, where one side is San Jose.
982
02:25:42.160 --> 02:25:45.540
Community Hall: What's San Jose's position on?
983
02:25:45.810 --> 02:25:47.860
Community Hall: This bike lane project.
984
02:25:49.530 --> 02:25:55.430
Community Hall: We haven't had a conversation as part of this plan with
them, but they were previously supportive of.
985
02:25:55.530 --> 02:26:07.740
Community Hall: the Safe Streets for All grant that, we were previously
awarded, so I would imagine that we would have the same support in the
future for a project like this, but again, that's a project that would
986
02:26:08.030 --> 02:26:11.410
Community Hall: Go through council approval and authorization.
987
02:26:11.930 --> 02:26:13.910
Community Hall: Okay, and on the,
988
02:26:14.920 --> 02:26:24.880
Community Hall: Oh, I just lost it. The very eastern side here, you have
something going through Lawrence Middy Park and going across.
989
02:26:25.280 --> 02:26:27.709
Community Hall: Or under 280 or over 280.
990
02:26:28.770 --> 02:26:38.910
Community Hall: Yeah, that would be under 280 to connect to, Stevens
Creek. So is that… that's an existing underpass, right? Yeah. You
wouldn't… okay.
991
02:26:39.110 --> 02:26:48.590
Community Hall: And you don't go any further east into San Jose, I guess.
Okay. Okay.
992
02:26:48.700 --> 02:26:50.790
Community Hall: Yeah, that's my questions, thank you.
993
02:26:51.770 --> 02:26:54.579
Community Hall: Any other comments or questions. Thank you. Chair.
994
02:26:55.230 --> 02:27:01.640
Community Hall: So I'm I'm looking at this bike network, and there's a
fairly large number of buffered bike lane projects.
995
02:27:02.170 --> 02:27:05.610
Community Hall: But you only mentioned 3 where we could lose street
parking, so…
996
02:27:05.880 --> 02:27:13.899
Community Hall: Are we saying the rest of them would narrow the lanes,
and therefore we would not lose street parking? No, I was mistaken
earlier. So, Bollinger would also be that,
997
02:27:14.090 --> 02:27:32.129
Community Hall: would go through the same process. When looking at other
projects with impacts, non-parking related, I think it's Mariani and
Lazineo, the center left turn lane there. In order to accommodate the
bike lanes, we would need to eliminate those. And…
998
02:27:32.250 --> 02:27:35.490
Community Hall: as far as I can recall, those are all of the roadways.
999
02:27:36.940 --> 02:27:41.090
Community Hall: Okay, so which of these projects would lead to lane
removal?
1000
02:27:42.080 --> 02:27:44.689
Community Hall: A lane reduction? None of them.
1001
02:27:47.130 --> 02:27:54.169
Community Hall: No late introductions. Well, we don't know. So Bollinger,
again, potentially could.
1002
02:27:54.910 --> 02:28:06.919
Community Hall: But that would be part of a study, and similar to you
know what we are going to look at under the safe streets for all. Grant
that we we previously were awarded. We would look at several
1003
02:28:07.290 --> 02:28:10.159
Community Hall: Concepts, one of which would…
1004
02:28:10.510 --> 02:28:19.060
Community Hall: be removal of a lane, and that would go through a large
public process and city council, and everybody would be aware and have a
chance to
1005
02:28:19.380 --> 02:28:29.190
Community Hall: weigh in on it. So that's one potential project that
would remove a lane, and then, as Matt just mentioned, Mariani near De
Anza, if we were to
1006
02:28:29.640 --> 02:28:33.049
Community Hall: Put bike lanes on that street near the De Anza
intersection.
1007
02:28:33.320 --> 02:28:46.259
Community Hall: There would be a… one of the… I think it's a left turn
lane that would potentially need to be removed, just because there
physically isn't enough space for a bike lane. It wouldn't be any parking
removal, because there's no parking there now.
1008
02:28:46.990 --> 02:28:56.650
Community Hall: But it would be a turn lane that would potentially be
removed, and that's also something that we would have to study, the
capacity of the intersection. How about rainbow between Stelling and De
Anza?
1009
02:29:00.700 --> 02:29:04.110
Community Hall: Is that… I think there's a…
1010
02:29:04.420 --> 02:29:06.809
Community Hall: Proposed buffer bike lane on Rainbow
1011
02:29:07.110 --> 02:29:13.230
Community Hall: Yeah, the consultant didn't communicate that there would
be impacts on Rainbow. That's a pretty wide roadway.
1012
02:29:15.240 --> 02:29:21.550
Community Hall: Yeah, we could… we could most likely accommodate a buffer
bike lane or something similar to that on Rainbow without
1013
02:29:21.760 --> 02:29:23.089
Community Hall: impacting the parking.
1014
02:29:24.420 --> 02:29:29.200
Community Hall: And let me caveat the question, without impacting parking
and without lane reduction.
1015
02:29:32.450 --> 02:29:37.299
Community Hall: So… You know, you could obviously keep parking, but lose
a lane, so…
1016
02:29:37.520 --> 02:29:39.680
Community Hall: We would not lose a lane. Right.
1017
02:29:40.640 --> 02:29:47.499
Community Hall: Yeah, so again, let me reiterate a point. Any project
that has a parking or a lane reduction impact
1018
02:29:47.880 --> 02:29:50.800
Community Hall: Regardless of if we're talking about it right now.
1019
02:29:50.930 --> 02:29:56.219
Community Hall: if it's on the plan, and it has one of those impacts
would would go to council with the impact.
1020
02:29:59.030 --> 02:30:00.860
Community Hall: And given stuff has
1021
02:30:01.220 --> 02:30:08.240
Community Hall: Seen all of the feedback that you've received through
written comments and public comments and extended amount of feedback. Do
you believe?
1022
02:30:08.380 --> 02:30:10.239
Community Hall: There is public sentiment that.
1023
02:30:10.830 --> 02:30:23.279
Community Hall: would like to not see lane reduction, or do you believe
lane reduction is actually a good thing? I personally believe there's
plenty of appetite for making these types of safety improvements around
the city.
1024
02:30:23.430 --> 02:30:25.150
Community Hall: With little introductions. Yes.
1025
02:30:25.350 --> 02:30:32.459
Community Hall: Okay. If necessary. Again, we would do the outreach and
go to council, but my own experience, probably Matt's as well.
1026
02:30:32.910 --> 02:30:41.079
Community Hall: is that I've I've not received much, if any negative
feedback regarding lane reductions. We haven't done many of them.
1027
02:30:41.300 --> 02:30:49.430
Community Hall: But, and staff have seen… Similarly with parking removal.
And staff have seen the feedback you've received in written comments and
public comments.
1028
02:30:50.050 --> 02:30:54.700
Community Hall: Over the course of the various projects that you've had
in the recent… Yes.
1029
02:30:55.200 --> 02:30:58.650
Community Hall: And you believe Lane Reduction is… Okay, thank you.
1030
02:30:59.460 --> 02:31:01.490
Community Hall: Any other comments vice chair.
1031
02:31:02.540 --> 02:31:06.570
Community Hall: So, the lane reduction, how many inches is each lane
reduced?
1032
02:31:06.810 --> 02:31:14.320
Community Hall: Well, I think when we're talking about lane reduction, we
mean lane removal. Oh, lane removal. Okay, I was thinking, like, on…
1033
02:31:14.680 --> 02:31:20.509
Community Hall: De Anza, I think the lanes got a little bit narrower,
didn't they? Some of them got narrower, some of them got
1034
02:31:20.650 --> 02:31:24.260
Community Hall: Okay, and so how much narrower did those get? Like…
1035
02:31:24.370 --> 02:31:26.890
Community Hall: Half a foot or. It varies.
1036
02:31:27.140 --> 02:31:28.489
Community Hall: Some half a foot.
1037
02:31:29.220 --> 02:31:30.160
Community Hall: Okay.
1038
02:31:30.350 --> 02:31:36.149
Community Hall: And I'm looking back to Bollinger, so I'm thinking of
Palo Alto, where
1039
02:31:36.420 --> 02:31:44.500
Community Hall: They kind of encourage people to use the Bike Boulevard
on Bryant, which goes all the way into Mountain View, and discourage
1040
02:31:45.270 --> 02:31:49.539
Community Hall: kind of people from using the really busy street, like
Alma Avenue.
1041
02:31:49.660 --> 02:31:56.300
Community Hall: So I'm just thinking, you know, Bollinger's really not
that pleasant of a street to bike on if people know
1042
02:31:56.430 --> 02:32:05.060
Community Hall: that there's the alternative of the Bike Boulevard,
including Recknart Creek, and Cala de Barcelona, and Barnhart, whatever.
So do we…
1043
02:32:06.150 --> 02:32:16.599
Community Hall: Any education campaign to say, hey, you know, you really
might want to think about, you know, using the bike boulevard instead of
these major arterials.
1044
02:32:17.860 --> 02:32:24.420
Community Hall: That could be something that we would consider as part of
a plan if we were going to do something like that, absolutely.
1045
02:32:25.000 --> 02:32:25.730
Community Hall: Okay.
1046
02:32:28.030 --> 02:32:37.959
Community Hall: Any other comments? Yes, Chair. Yes. So can staff talk
about the time sensitivity of moving this through its process? Is there a
1047
02:32:38.290 --> 02:32:46.120
Community Hall: Is there any particular timing to making sure the grant
is actually Received versus not received.
1048
02:32:47.050 --> 02:32:54.220
Community Hall: I would need to confirm with MTC staff to understand what
our obligations are, under TDA3.
1049
02:32:54.350 --> 02:32:57.570
Community Hall: We had provider project timeline,
1050
02:32:58.310 --> 02:33:05.040
Community Hall: And I'm not familiar with MTC requirements as they relate
to TDA3 projects.
1051
02:33:05.260 --> 02:33:19.840
Community Hall: And is this the final round of reviews you expect? I know
it's never final, but do you… is it your belief that this is the final
round and it goes to Council for final approval? Yes, absolutely. When we
went to Council in April,
1052
02:33:20.160 --> 02:33:28.640
Community Hall: The feedback we got was, was very positive. The only
recommendation that they had was regarding,
1053
02:33:29.290 --> 02:33:36.219
Community Hall: doing the the relative weighting the criteria based on
what the commissions had recommended.
1054
02:33:36.500 --> 02:33:41.349
Community Hall: That was pretty much the only… the only comment. And we
did that.
1055
02:33:41.760 --> 02:33:53.099
Community Hall: So, I'm confident that we've got a document that the
Council is going to be pleased with. And is this already on the calendar
for Council? I believe it's…
1056
02:33:53.270 --> 02:34:00.789
Community Hall: It's tentative, tentatively scheduled. These things have
a way of shifting, but right now. Do you know what that date is?
September.
1057
02:34:01.110 --> 02:34:04.020
Community Hall: 14th, I think. Okay, September 14th.
1058
02:34:04.240 --> 02:34:08.049
Community Hall: So that's less than 6 weeks away before we have a new
1059
02:34:08.390 --> 02:34:11.200
Community Hall: Council that comes in with an election.
1060
02:34:12.360 --> 02:34:21.540
Community Hall: Is that right? September 14th? That's correct. Okay. Is
there any reason to do this 6 weeks sooner, rather than wait to see a new
council and what they might…
1061
02:34:22.130 --> 02:34:23.699
Community Hall: And what the…
1062
02:34:24.080 --> 02:34:39.830
Community Hall: of what the direction might be from a new council six
weeks later? Not that I can see. We've gone through a very intensive
process of full discussions with commissions three times each. Council
will be the third time. Extensive public outreach.
1063
02:34:39.980 --> 02:34:42.560
Community Hall: it's kind of time to
1064
02:34:43.770 --> 02:34:49.359
Community Hall: wrap this up and move on with delivering projects. But
staff does observe that we could have
1065
02:34:50.240 --> 02:34:58.290
Community Hall: We do have two council members changing, and potentially,
we could have three council members changing. Councils change, yes, but
we we have work to do.
1066
02:34:58.920 --> 02:35:09.219
Community Hall: a project of this magnitude that lasts for a decade, do
we believe should be adopted 6 months, I mean 6 weeks, before 3 or 5
council members could potentially be changed?
1067
02:35:10.140 --> 02:35:13.000
Community Hall: Again, my opinion is that we're ready to adopt.
1068
02:35:14.430 --> 02:35:20.080
Community Hall: Chair, I'm gonna recommend, maybe taking a motion, and
then To facilitate further discussion.
1069
02:35:20.280 --> 02:35:35.319
Community Hall: Yes, I would like to make a motion that the Planning
Commission adopt the draft resolution that recommending that the City
Council adopt the active transportation plan, but with the additional
note that Council
1070
02:35:35.420 --> 02:35:44.469
Community Hall: rethink or reevaluate projects that might impact
evacuation risk in very high fire hazard zones? And that would be my
motion.
1071
02:35:44.660 --> 02:35:47.829
Community Hall: I will second that for the purpose of discussion.
1072
02:35:49.590 --> 02:36:04.500
Community Hall: If I can just make a quick comment on that, as I think
staff has repeatedly told us over and over and over again, these are
concepts, these are not real projects yet, and when the actual projects
come in front of us.
1073
02:36:04.680 --> 02:36:24.439
Community Hall: each project will be evaluated in terms of its impact on
evacuation routes. I mean, I'm looking at a lot of the projects on the
west side. You know, a buffered bike lane is just paint on the ground. It
doesn't impact evacuation. So it seems premature to be
1074
02:36:24.440 --> 02:36:31.920
Community Hall: I don't know what we are, what we are asking the Council
to do, because there's there's no, there's no specifics yet.
1075
02:36:32.130 --> 02:36:34.420
Community Hall: So… so that's…
1076
02:36:34.630 --> 02:36:47.000
Community Hall: that's… it feels premature to be making that kind of
recommendation. I will answer that. So there is a proposal for a
separated bike lane on Foothill Boulevard, which would narrow the lane
1077
02:36:47.030 --> 02:36:57.749
Community Hall: it would render the shoulder lane of that road unusable
in the event of an evacuation. And for me, this is really just, I feel
that we have a responsibility to
1078
02:36:57.800 --> 02:37:08.070
Community Hall: to acknowledge, you know, when we approve this entire
plan, that… that we have noted that there is a risk with one of these
recommendations that I… it's not that I, you know.
1079
02:37:09.050 --> 02:37:23.039
Community Hall: approve all of this, without even considering any other
safety ramifications, because the truth is, I do think that we have a
responsibility to acknowledge these things. So that is where I'm going
with that. And the report…
1080
02:37:23.040 --> 02:37:31.510
Community Hall: does not really mention evacuation risk anywhere. And so
that is why I am calling it out separately to
1081
02:37:31.740 --> 02:37:36.669
Community Hall: for the public record that we are aware that some of
these projects have that impact.
1082
02:37:37.080 --> 02:37:39.249
Community Hall: And so would the, would the chair.
1083
02:37:39.510 --> 02:37:46.410
Community Hall: Accept a… A friendly amendment to consider.
1084
02:37:46.750 --> 02:37:49.210
Community Hall: Smaller sized motions, rather than…
1085
02:37:49.520 --> 02:37:57.190
Community Hall: Make the adoption as its own motion, but to consider
smaller motions so we can deal with the individual changes that we would
like to see.
1086
02:37:59.130 --> 02:38:09.449
Community Hall: how would you propose that working? That we just approve
the entire thing in one motion, and then… I would just omit the adopt the
mo… adopt the project part, and state the rest of your motion.
1087
02:38:10.220 --> 02:38:27.069
Community Hall: So I believe you read out your motion. If you just left
out the adopt part, then we would just tackle that one piece, and then we
could do a few more. Alright. So I have a little different comment. So
1st of all, I wish there was a like button, because I really, I really
did think your your comment was appropriate. And
1088
02:38:27.180 --> 02:38:32.050
Community Hall: I wonder whether if we make a recommendation, I think
that
1089
02:38:34.320 --> 02:38:49.819
Community Hall: I think that would be would be useful is in the context
of how this decision of how the recommendation is made. If there was a
scoring mechanism that measured, you know, measured these projects
against the evacuation routes.
1090
02:38:49.910 --> 02:39:01.470
Community Hall: but that that not be something that has to be done before
it comes to Council. You know, so I think the recommendation is you would
have a report like that. That would be something that would come into
consideration when the projects actually move forward.
1091
02:39:03.080 --> 02:39:10.519
Community Hall: it, I think that is important, and with all due respect
to Commissioner Linskog, I think it is important enough to recognize that
we
1092
02:39:10.750 --> 02:39:24.170
Community Hall: you know, that we wanted to make that recommendation.
Yeah, no, I… to clarify my comment, I don't mean to say vacation is not
important, and I think your recommendation is absolutely correct. So I
think what I was reacting to was the…
1093
02:39:24.240 --> 02:39:39.650
Community Hall: the wording that said to maybe, you know, strike projects
that are on the west side, but if we have a motion that says, you know,
add evacuation routes as a criteria, in evaluating these projects, I'm
100% in agreement with that. Yeah.
1094
02:39:40.190 --> 02:39:46.830
Community Hall: So I wouldn't. I wouldn't recommend that we change. Ask
them to change the weighting that was done to date.
1095
02:39:47.090 --> 02:39:50.600
Community Hall: Just that there be a recommendation that they develop an
addendum.
1096
02:39:51.260 --> 02:39:55.250
Community Hall: I would be open to that, so I will amend the motion to
1097
02:39:55.400 --> 02:40:04.770
Community Hall: Let me think about this. That council consider an
addendum waiting that considers the
1098
02:40:05.710 --> 02:40:10.329
Community Hall: impact to evacuation risk of any project. I'll second
that.
1099
02:40:10.710 --> 02:40:16.999
Community Hall: And so, chair, that would send it right back to the
drawing board to do more work, to add an addendum, is that right?
1100
02:40:19.180 --> 02:40:23.930
Community Hall: No, I think… I mean, what… You know, within our…
1101
02:40:25.130 --> 02:40:36.640
Community Hall: appendices, one of the ones… I don't know if it would be
the one where we talk about the 30% design, or a different one. We'd have
to look and see the appropriate place. We could add language somewhere.
1102
02:40:36.820 --> 02:40:44.430
Community Hall: to that effect, that, you know, every project,
regardless, I mean, even if they don't have parking impacts, I mean, any
project
1103
02:40:44.670 --> 02:40:50.579
Community Hall: Would also be considered in light of impacts to, you
know, potential evacuation.
1104
02:40:50.900 --> 02:40:54.069
Community Hall: routes. So, kind of like an overlay, right?
1105
02:40:54.740 --> 02:40:59.650
Community Hall: Yeah, we'll we'll figure out how to do it before we get
to the Council. Yeah.
1106
02:40:59.780 --> 02:41:06.429
Community Hall: But yeah, I don't, I don't know, I don't think you even
need to complete that before. I think it just needs to be.
1107
02:41:07.300 --> 02:41:24.400
Community Hall: you present the report as you have today, you know, with
whatever changes that might come up here, but as it is today, with the
intent to develop a scoring system that would become a compliment, you
know, become part of this recommendation down the line. Sorry, are you
recommending that
1108
02:41:24.530 --> 02:41:25.850
Community Hall: That an actual…
1109
02:41:26.150 --> 02:41:36.700
Community Hall: Criteria be added that provides a particular score in
terms of. Impact to. Evacuation because I don't know how that would ever
be.
1110
02:41:37.180 --> 02:41:39.010
Community Hall: Able to be evaluated.
1111
02:41:39.460 --> 02:41:46.609
Community Hall: Quantitatively, I think… I think it would be more of a
quantitative discussion once we consider a project that
1112
02:41:46.820 --> 02:41:55.879
Community Hall: you know, is this something that could affect evacuation
routes? And how do we determine that impact? But I don't know how it
would be included as a criteria. Okay.
1113
02:41:56.110 --> 02:42:02.310
Community Hall: Well, I mean, that's interesting, Reb, because I would
think that what that would be is, if you have a proposed project.
1114
02:42:02.410 --> 02:42:11.280
Community Hall: Then there would be an overlay over the mechanism. You
know the pathways that people believe would be the evacuation routes, and
then then you measure the impact. So
1115
02:42:11.400 --> 02:42:15.979
Community Hall: You know, so realistically, something that's way on the
east side probably doesn't have
1116
02:42:16.690 --> 02:42:28.609
Community Hall: doesn't have a scoring effect, whereas, you know, the
change on Foothill, you know, on the southern part of Foothill would be…
Yeah, it would probably only be a small handful of projects that… Yeah.
1117
02:42:28.620 --> 02:42:45.770
Community Hall: Yeah, yeah. I, I think, I think the important part really
is, I, I, I very agree very much with your sentiment that, that this is
at a point where it's, it's ready to, to be, to go. So I didn't, I
wouldn't want this to be a barrier, but at the same time, you know, I
think that
1118
02:42:46.010 --> 02:42:55.990
Community Hall: you'll certainly get back to the Council. You're going to
have the same question. You know, if if you're talking about changes, you
know, making a significant change on Stilling, or you know, on Bob.
1119
02:42:56.120 --> 02:43:03.389
Community Hall: or on Foothill, then it would be, have you considered
what the evacuation effect is? Sure.
1120
02:43:05.460 --> 02:43:15.340
Community Hall: Great. So are we ready to maybe have a vote on this? No,
no, we are not ready to have a vote. The motion was still a discussion
stage. I'm not ready to have a vote.
1121
02:43:15.850 --> 02:43:21.480
Community Hall: So, could staff talk about the changes around Finch
Avenue? Around Pupertino High, there's a number of changes where
1122
02:43:21.730 --> 02:43:25.189
Community Hall: Separated bikeways are proposed. How does it affect the
school drop?
1123
02:43:25.610 --> 02:43:29.320
Community Hall: Where people do pause by the curb to drop people off.
1124
02:43:29.610 --> 02:43:43.990
Community Hall: without impeding traffic behind them. Again, this is just
a concept, something similar to the Lawson Bikeway project. We would work
closely with the high school district to deliver the project to minimize
impacts to, you know.
1125
02:43:44.460 --> 02:43:51.500
Community Hall: Traffic circulation at pick up and drop off, and it's a
pure concept, so this, we're talking about unknowns.
1126
02:43:54.470 --> 02:44:01.839
Community Hall: So, more broadly, how do we believe the school drop will
be affected around any of our schools from the proposed? We don't know.
1127
02:44:02.370 --> 02:44:03.990
Community Hall: Okay. We would look at that.
1128
02:44:05.550 --> 02:44:07.259
Community Hall: Do we have any…
1129
02:44:07.460 --> 02:44:10.729
Community Hall: preliminary assessment of what the impacts might be? No.
No.
1130
02:44:11.270 --> 02:44:11.960
Community Hall: Okay.
1131
02:44:14.790 --> 02:44:18.530
Community Hall: Sure, I'm gonna make a… Substitute motion.
1132
02:44:19.560 --> 02:44:29.219
Community Hall: And I'm gonna make a substitute motion that the project
be… excluded from The proposed… Separated bike lanes.
1133
02:44:29.580 --> 02:44:31.810
Community Hall: And… the…
1134
02:44:32.000 --> 02:44:37.770
Community Hall: streets that were specified that could lose parking. I
believe there were 3 streets that were mentioned. Sorry, I…
1135
02:44:37.990 --> 02:44:50.299
Community Hall: I think that what we had wanted to do. If if you're going
to make a substitute motion on an entirely different topic, I think we
should have motions on on individual items. Let's get this motion done,
and then we'll move on to your
1136
02:44:50.300 --> 02:45:04.609
Community Hall: separate motion next. It sounds like it's on a very
different topic, if that's okay. That would probably be okay, if you can
read your motion one more time. The motion was not related to the overall
adoption of the, ATP. It was that Council,
1137
02:45:05.540 --> 02:45:14.420
Community Hall: Consider… A, an additional Well, actually, sorry. Let me
think about this. So after our discussion, it was
1138
02:45:15.180 --> 02:45:22.620
Community Hall: This would be a motion that… Council… Consider…
1139
02:45:22.910 --> 02:45:29.309
Community Hall: an additional, is it… did we call it, like, a matrix, or
just a… it's not a matrix, it's a…
1140
02:45:29.410 --> 02:45:32.909
Community Hall: How would you describe what we discussed? I would…
1141
02:45:33.190 --> 02:45:51.239
Community Hall: I think the best place to put what you were talking about
would be in the project impact assessment guidelines, where we make clear
that for certain projects with those kinds of sensitivities, that they
undergo some sort of evacuation route analysis as part of, you know, the
project delivery process.
1142
02:45:51.790 --> 02:45:53.640
Community Hall: Okay. So we can build that out.
1143
02:45:54.980 --> 02:46:00.000
Community Hall: Okay, so… My motion would be that we
1144
02:46:00.260 --> 02:46:05.160
Community Hall: Add on a modification to the…
1145
02:46:05.310 --> 02:46:14.259
Community Hall: Active transportation plan that factors in the impact of
evacuation risk in very high fire hazard zones.
1146
02:46:14.680 --> 02:46:16.020
Community Hall: That's my motion.
1147
02:46:16.190 --> 02:46:17.530
Community Hall: I'll second that.
1148
02:46:17.960 --> 02:46:21.350
Community Hall: and city clerk. May we please have a vote Thank you.
1149
02:46:22.730 --> 02:46:26.830
Community Hall: Can I ask? So you were not. You were not adopting the
1150
02:46:27.520 --> 02:46:39.289
Community Hall: the proposal is as submitted. I thought that would be a
separate. Yeah. So this is a this is an addendum, not. Yes, we're we're
voting on the addendum. Okay, yes, thank you.
1151
02:46:40.060 --> 02:46:41.170
Community Hall: Do you understand?
1152
02:46:41.890 --> 02:46:42.550
Community Hall: Okay.
1153
02:46:49.130 --> 02:46:55.700
Community Hall: The motion carries unanimously. All right, thank you. And
now, Commissioner Rao, you may make also addendum motion.
1154
02:46:56.280 --> 02:47:02.530
Community Hall: And I want to reiterate, you know, supportive of much of
what is in the report for
1155
02:47:02.800 --> 02:47:06.539
Community Hall: The sidewalk improvements, I think the sidewalks are
critical. Safety…
1156
02:47:06.910 --> 02:47:13.980
Community Hall: in the absence of sidewalk is a huge issue. I walk on
Schofield, I walk on many of these sidewalks that you mentioned, all
called A.
1157
02:47:14.360 --> 02:47:16.470
Community Hall: Hotel.
1158
02:47:17.330 --> 02:47:20.879
Community Hall: McClellan, it is scary to walk on some of these
1159
02:47:21.070 --> 02:47:23.930
Community Hall: Now, we may not be able to lose
1160
02:47:24.360 --> 02:47:28.109
Community Hall: Land that belongs to homeowners, so I would.
1161
02:47:28.610 --> 02:47:33.980
Community Hall: I would make a motion that we exclude from the report.
1162
02:47:34.770 --> 02:47:38.090
Community Hall: Any recommended projects that impact?
1163
02:47:39.940 --> 02:47:41.310
Community Hall: Street parking.
1164
02:47:42.350 --> 02:47:43.720
Community Hall: Lane reduction.
1165
02:47:44.550 --> 02:47:49.030
Community Hall: And… Introduce separated bike lanes.
1166
02:47:50.090 --> 02:47:51.499
Community Hall: So, 3 things.
1167
02:47:51.680 --> 02:47:54.919
Community Hall: street parking, Late reduction.
1168
02:47:55.150 --> 02:48:11.409
Community Hall: And separated bike lanes. Can I just clarify, do we have
the authority as a Planning Commission to exclude, or are you
recommending that we recommend that Council excludes? Yes. The… the
motion would be to recommend that Council exclude from the report
1169
02:48:11.510 --> 02:48:19.290
Community Hall: Any projects that impact street parking, cause lane
reduction, Or involve separated micros.
1170
02:48:20.930 --> 02:48:21.930
Community Hall: I'll second that.
1171
02:48:22.230 --> 02:48:22.900
Community Hall: Okay.
1172
02:48:25.090 --> 02:48:31.049
Community Hall: Could we have a word? I would just comment here that, you
know, we have talked about the fact that those were
1173
02:48:31.500 --> 02:48:36.629
Community Hall: any any project in that category would come back for a
evaluation.
1174
02:48:36.760 --> 02:48:40.459
Community Hall: You know, as part of the CIP. So I don't think this is
necessary.
1175
02:48:40.920 --> 02:48:43.680
Community Hall: Do we have the vote? Yeah, okay.
1176
02:48:51.450 --> 02:48:56.580
Community Hall: The motion fails, with Chair Kosolcheron and Commissioner
Rao voting yes.
1177
02:48:57.600 --> 02:49:03.010
Community Hall: All right, and so I… do you have any other motions? Yes,
I'm going to attempt to…
1178
02:49:03.240 --> 02:49:05.799
Community Hall: Try and see if we can do this differently.
1179
02:49:06.630 --> 02:49:10.140
Community Hall: I'm going to propose a motion that we exclude
1180
02:49:10.770 --> 02:49:14.750
Community Hall: Could… could staff help me out here? What were the three
streets I had? Blaney, Mill
1181
02:49:14.950 --> 02:49:16.460
Community Hall: And what was the third you had?
1182
02:49:17.160 --> 02:49:23.500
Community Hall: We had Blaney, Miller, Stelling, and Bollinger all with
potential impacts.
1183
02:49:24.270 --> 02:49:29.949
Community Hall: As well as… the center turn lanes on Mariani and Lozaneo.
1184
02:49:30.800 --> 02:49:31.730
Community Hall: Okay.
1185
02:49:32.990 --> 02:49:44.759
Community Hall: So I'm going to make a motion that we exclude the
projects that would potentially impact parking on Blaney, on Miller,
Bollinger, and Stelling from this report.
1186
02:49:44.870 --> 02:49:48.610
Community Hall: Or… Recommend that Council exclude these from the report.
1187
02:49:48.790 --> 02:49:50.019
Community Hall: Do I have a second?
1188
02:49:52.630 --> 02:49:58.730
Community Hall: I, I think I, I have a sense of how, Commission will vote
on this. I mean, I will, I will second it.
1189
02:49:59.210 --> 02:50:01.130
Community Hall: Okay, could we have a word, please?
1190
02:50:12.190 --> 02:50:16.420
Community Hall: The motion fails with Chair Gasol-Schron and Commissioner
Rao voting yes.
1191
02:50:18.100 --> 02:50:19.000
Community Hall: So.
1192
02:50:19.570 --> 02:50:31.189
Community Hall: Can I make a motion now? Go ahead. I'm gonna make a
motion that the Planning Commission adopt the draft resolution
recommending that the City Council adopt the Active Transportation Plan
as recommended by staff. I'll second.
1193
02:50:32.260 --> 02:50:45.229
Community Hall: All right. May we have a vote, please. Chair. I thought
we were doing mini motions to work through the recommendations in the
doc. We haven't finished through that yet, so maybe consider some
substitute motion here. I would like to
1194
02:50:45.560 --> 02:50:48.059
Community Hall: You'll know after we do this vote. Yeah, exactly.
1195
02:50:48.390 --> 02:50:50.320
Community Hall: Let's go after the chase. Let's
1196
02:50:50.720 --> 02:50:56.260
Community Hall: Well, we could have a substitute motion if you had a
second, so we haven't made a motion, we don't have a second
1197
02:50:56.620 --> 02:51:13.429
Community Hall: I think the motion was seconded right? Vice chair, you
know, maybe for to help this be a little bit more efficient. If you could
discuss what other substitute motions you were thinking of making,
because I I think I have a sense of of how they they might end up, and I
1198
02:51:13.540 --> 02:51:15.209
Community Hall: you know, rather…
1199
02:51:15.310 --> 02:51:28.009
Community Hall: Yes, I would want to explicitly make a motion here, just
so we have on the record how we stand on these various streets and
neighborhood impacts that we are going to be causing, and what our
positions on these are.
1200
02:51:28.230 --> 02:51:36.920
Community Hall: And so, with that in mind, I would like to make a
substitute motion that we exclude… The… Proposed.
1201
02:51:37.290 --> 02:51:40.460
Community Hall: bike lane project around Finch Avenue.
1202
02:51:40.630 --> 02:51:47.730
Community Hall: and the related streets around Cupertino High. You know,
I understand where you're going with this, and I, you know, I…
1203
02:51:47.890 --> 02:51:54.770
Community Hall: I think… Out of… Respect for the others on this
commission and their time, you know, I think.
1204
02:51:54.990 --> 02:52:10.839
Community Hall: I think we know that we don't have consensus on this.
We've already had two failed motions, and so I think I'd rather just, I
think the point has been made. I'm making the motion, do we have a
second? If we do not have a second, let the minutes reflect the motion
was made and no second exists.
1205
02:52:12.330 --> 02:52:17.859
Community Hall: Is there a second for the motion that we not impact the
streets around Cupertino High?
1206
02:52:18.380 --> 02:52:23.990
Community Hall: With a proposed Bike lane that may impact school drop and
pick.
1207
02:52:24.590 --> 02:52:26.090
Community Hall: Is there a second for that?
1208
02:52:26.910 --> 02:52:32.289
Community Hall: Yeah, like I said, you know, I think I would normally
second it. I just, you know, I…
1209
02:52:32.910 --> 02:52:42.070
Community Hall: I can read the sentiment of this commission, so… Okay. I
will hope the city clerk reflects the motion occurred, and the motion
failed. Thank you.
1210
02:52:43.900 --> 02:52:46.019
Community Hall: Are we ready to vote. Yes, we are.
1211
02:52:47.130 --> 02:52:52.179
Community Hall: And could the chair, once again, repeat the motion on the
table that we're voting on?
1212
02:52:52.670 --> 02:52:57.039
Community Hall: I believe the motion was just to approve the draft
resolution.
1213
02:52:57.410 --> 02:53:03.000
Community Hall: That's adopted or is presented. Adopt the draft
resolution. Adopt the draft resolution. Yes.
1214
02:53:06.840 --> 02:53:09.660
Community Hall: The motion carried with Commissioner Rao voting no.
1215
02:53:10.120 --> 02:53:16.970
Community Hall: All right. Thank you very much. So I think that concludes