Loading...
HomeMy WebLinkAboutPC 02-24-2026 Youtube and Zoom TranscriptWEBVTT 1 00:00:19.690 --> 00:00:27.329 Community Hall: and to the republic for which it stands, one nation, under God, indivisible, liberty and justice for all. 2 00:00:30.940 --> 00:00:33.329 Community Hall: Alright, City Clerk, may we please have a roll call? 3 00:00:33.640 --> 00:00:35.660 Community Hall: Commissioner Bombs? Present. 4 00:00:36.080 --> 00:00:36.989 Community Hall: Ireland's go. 5 00:00:38.930 --> 00:00:40.979 Community Hall: You have to tap it to wake it up. 6 00:00:43.430 --> 00:00:49.990 Community Hall: Commissioner Rao? Here. Vice Chair, Erica Zolstrom? Present. All present. 7 00:00:50.600 --> 00:00:55.559 Community Hall: Thank you very much. We will move on to the approval of the minutes. Do we have a motion? 8 00:00:59.220 --> 00:01:03.500 Community Hall: you know, prior to the motion, I believe there's some corrections that 9 00:01:04.040 --> 00:01:10.439 Community Hall: Yes. So, I had… I had a quick correction, so the… 10 00:01:11.350 --> 00:01:25.170 Community Hall: Where is it? Hold on, let me pull it up. on page 12, where it says Chair Kosulcharan conducted a non-binding straw poll to support incorporating emergency response times into programmatic recommendations. 11 00:01:25.200 --> 00:01:43.449 Community Hall: The minutes captured say that, there was a vote in favor from Casolciuro and Linskog and Rao in favor, Scharf and Fong opposed, and no abstentions. That is incorrect. I actually voted to oppose that, straw poll, so if we can correct that, that would be great. Thank you. 12 00:01:46.790 --> 00:01:53.890 Community Hall: Okay, and we had additional corrections, I believe, on item number… 13 00:01:54.330 --> 00:02:00.229 Community Hall: 3, it says, Chair, I've opened the public comment period. We had transitioned the chair, so that should be the new chair. 14 00:02:00.410 --> 00:02:01.539 Community Hall: On item 3? 15 00:02:05.170 --> 00:02:07.730 Community Hall: And the motion as well… well, the motion's right. 16 00:02:08.039 --> 00:02:18.100 Community Hall: the opening is probably something you need to fix, and then… On item number… 5… 17 00:02:20.790 --> 00:02:24.430 Community Hall: This is page, 5, I think. 18 00:02:27.410 --> 00:02:37.260 Community Hall: Yeah, so the motion by Commissioner Lynn Scott to revisit the scoring system put less weight on school routes. I did not support that motion. If you can change that, please. 19 00:02:38.140 --> 00:02:44.340 Community Hall: My motion was actually called out at the end, which was to discard the criteria proposed and use the feedback provided at Council. 20 00:02:45.370 --> 00:02:46.100 Community Hall: Thank you. 21 00:02:50.150 --> 00:02:52.839 Community Hall: City Crook, did you capture that? 22 00:02:53.210 --> 00:02:58.880 Community Hall: All right, so do we have a motion to approve the revised minutes? So moved. Second. 23 00:03:01.440 --> 00:03:02.290 Community Hall: Alright. 24 00:03:17.260 --> 00:03:20.180 Community Hall: Great, thank you very much. Do we have any postponements? 25 00:03:21.380 --> 00:03:28.270 Community Hall: No postponements. Right, then we will move to the oral communications portion of this meeting. City Clerk, how many comments do we have? 26 00:03:34.100 --> 00:03:36.039 Community Hall: No hands raised on Zoom chair. 27 00:03:36.960 --> 00:03:56.119 Community Hall: Wow, okay, then we will move on to the public hearing. So Agenda Item 2 is to consider a hillside exception for grading on slopes exceeding 30% to create yard area, R1 exception for garage design, design review for a new two-story residence, minor residential permits, tree removal permit. 28 00:03:56.120 --> 00:04:02.869 Community Hall: For… This application And I won't read all the numbers. 29 00:04:03.950 --> 00:04:07.920 Community Hall: So, we'll now open the public hearing. Do we have a staff report? 30 00:04:08.380 --> 00:04:26.299 Community Hall: Yes, thank you, Chair, members of the Planning Commission. I just want to very briefly introduce Emmy Sugiyama, who will have both of the public hearing items tonight. I don't really have much more to say on this, so probably have a little preamble on the next item. So, with that, I will turn it over to Emmy. Through the Chair, should we do exported disclosures? 31 00:04:30.530 --> 00:04:33.459 Community Hall: Sure, Commissioner Rao, this sounds like a good time to do that. 32 00:04:33.630 --> 00:04:37.970 Community Hall: All right, let's all due ex parte disclosures, starting with Commissioner Fung. 33 00:04:39.110 --> 00:04:40.180 Community Hall: Nothing to reward. 34 00:04:42.390 --> 00:04:48.059 Community Hall: I did meet with a neighbor in the area and was given a tour of the location. 35 00:04:48.760 --> 00:04:51.240 Community Hall: I have walked around the site on the back side. 36 00:04:53.210 --> 00:04:58.170 Community Hall: I walked around with a neighbor, too. I had no contact with the property owner. 37 00:05:00.000 --> 00:05:03.639 Community Hall: I walked around it, but I haven't spoken to any of the neighbors. 38 00:05:05.090 --> 00:05:07.609 Community Hall: Great, thank you very much. Okay, we'll go back to the staff report. 39 00:05:09.170 --> 00:05:15.650 Community Hall: All right, thank you, Chair Solchiron and Commissioners, good evening. I'll have, video 40 00:05:15.940 --> 00:05:25.090 Community Hall: Have my screen, there we go. Misukuyama planning staff here today to discuss the request for a hillside exception and various residential permits for a project on San Fernando Court. 41 00:05:26.360 --> 00:05:44.779 Community Hall: The subject property is located on San Fernando Court. It's within the Monta Vista neighborhood and is adjacent to Blackberry Farm Park. It is currently surrounded by other single-family residential uses. It is within the R17.5 zoning district, and it currently has a single-family residence on site. 42 00:05:47.670 --> 00:06:05.399 Community Hall: The application includes various residential permits to allow for construction of a new two-story residence. These include a design review permit for design consistency and massing considerations, a minor residential permit for a rear-facing balcony, and an R1 exception for a garage located in front of living space. 43 00:06:05.830 --> 00:06:12.360 Community Hall: The project also includes a request for a hillside exception and tree removal to allow for a flat yard area. 44 00:06:12.650 --> 00:06:20.980 Community Hall: The hillside exception is to allow for grading of more than 500 feet on slopes exceeding 30%, and the tree removals be associated with that grading. 45 00:06:21.630 --> 00:06:32.750 Community Hall: It should also be noted that the design review, minor residential, and tree removal permits are typically reviewed at a staff level, but are being brought before the Commission tonight, due to their connection with the two requested exceptions. 46 00:06:35.940 --> 00:06:44.099 Community Hall: This site plan outlines the proposed two-story residence, with the first floor outlined in light green, and the second floor outlined in dark green. 47 00:06:44.580 --> 00:06:55.789 Community Hall: As previously noted, this project requires a design review permit to allow for a reduced second-story side setback, and a larger second-to-first floor area ratio. 48 00:06:55.910 --> 00:07:03.589 Community Hall: Additionally, the applicant is also seeking a minor residential permit for a proposed rear-facing balcony, which is shown here in yellow. 49 00:07:07.430 --> 00:07:23.559 Community Hall: Design review projects are required to provide an identifiable architectural style that is generally consistent with the neighborhood pattern. To ensure that architectural design requirements are met, staff refers projects to RRM, our third-party architectural firm, for review. 50 00:07:23.760 --> 00:07:36.859 Community Hall: In this case, RRM provided a number of comments, many of which were addressed by the applicant. However, the applicant's design did not address comments related to providing a sloped roof and reducing massing to match the neighborhood. 51 00:07:41.070 --> 00:07:52.379 Community Hall: The applicant also requests an R1 exception to allow for the garage to be located in front of the living area. Staff supports this request based on the lot's shape and topography, and the existing pattern of garages in the neighborhood. 52 00:07:54.360 --> 00:08:01.969 Community Hall: Here you can see the residences on San Fernando Court, with garages aligned with, or in front of living area, demarcated by the yellow circles. 53 00:08:05.060 --> 00:08:07.240 Community Hall: That concludes… 54 00:08:07.470 --> 00:08:26.349 Community Hall: The summary for permits related to the residential development. Staff is recommending approval of the minor residential and R1 exception as proposed, and conditional approval of the design review permit on the condition that the design be revised in accordance with RRM's recommendations to decrease the building height and add sloped roofs. 55 00:08:32.530 --> 00:08:42.930 Community Hall: As for the hillside exception and tree removal, to allow for a greeting of a flat yard area, this site plan indicates the areas where it sloped, or where the project is sloped more than 30%. 56 00:08:43.620 --> 00:08:48.389 Community Hall: That is in the light orange, and then the proposed grading areas are in the dark orange. 57 00:08:48.770 --> 00:08:56.880 Community Hall: The red dots indicate the location of oak trees to be removed to accommodate this grading, 4 of which are over 12 inches and therefore are considered protected. 58 00:08:57.000 --> 00:09:01.200 Community Hall: And then the green dots indicate the location of oak trees to be preserved on site. 59 00:09:05.150 --> 00:09:23.090 Community Hall: The applicant's initial proposal included grading most of the rear yard. However, in working with staff, the applicant has proposed a revised design, as shown here, to reduce the grading to an area bounded by a 5-foot setback from the drip line of the large 36-inch oak tree on- site and a 10-foot buffer from the rear property line. 60 00:09:23.100 --> 00:09:28.790 Community Hall: To accommodate grade drainage, and to provide an additional buffer between the… 61 00:09:28.990 --> 00:09:31.920 Community Hall: proposed grading, and Blackberry Farm Park. 62 00:09:33.850 --> 00:09:49.500 Community Hall: Here you can see a view from Stevens Creek Trail to the project site, indicating that the trees that will remain in orange and the trees that exist between the property and the trail within the park area. The trees in red shown here are to be removed. 63 00:09:53.680 --> 00:10:13.450 Community Hall: For the hillside exception and tree removal permit, staff is recommending that to accommodate the rear yard area, your Commission conditionally approve both of these permits to ensure that the setbacks recommended by staff are maintained, and that retaining walls do not exceed 5 feet in height. The revised design would also eliminate the need to remove one of the five protected trees on site. 64 00:10:15.400 --> 00:10:21.120 Community Hall: And with that, staff recommends that your commission find the project exempt from CEQA, conditionally approve the 65 00:10:21.750 --> 00:10:32.920 Community Hall: Design Review, Minor Res… or, sorry, design review, hillside exception, and tree removal permit, and fully approve the R1 exception and minor residential permit, based on the draft resolutions. 66 00:10:33.990 --> 00:10:36.819 Community Hall: And then I believe that the applicant also has a presentation. 67 00:10:37.920 --> 00:10:55.640 Community Hall: I could just, interrupt something I forgot to say at the outset, is that unlike most of the residential projects that come before the Commission, this is a fully discretionary project, so it is not subject to the Housing Accountability Act or any of the other things that often limit discretionary action on behalf of the Commission, so… 68 00:10:55.730 --> 00:10:59.490 Community Hall: You have, this is more how projects used to be, say, 10 years ago. 69 00:11:01.880 --> 00:11:08.260 Community Hall: Thank you very much, Emmy and Luke. Do we have any questions for the staff from Commission before we move to the applicant presentation? 70 00:11:12.080 --> 00:11:13.350 Community Hall: Commissioner Rao, go ahead. 71 00:11:16.000 --> 00:11:23.399 Community Hall: So… I see a number of variances between what is allowed and what is proposed. 72 00:11:23.570 --> 00:11:26.759 Community Hall: And your staff is recommending approval. 73 00:11:27.110 --> 00:11:29.080 Community Hall: Could staff clarify why that is? 74 00:11:30.460 --> 00:11:47.029 Community Hall: Right, so the design review, I'll start kind of just with that, is kind of a… an exception outlined by our code. It really is just a process that you have to go through to reduce the setbacks en masse, and we see it very often, to be honest. And so that one, we're not seeing as 75 00:11:47.290 --> 00:11:58.950 Community Hall: something too far out of the ordinary. The R1 exception, again, we do have a lot of neighborhoods where the garages are in front of the living area. This is something that was more newly, imposed, and I would say 76 00:11:59.340 --> 00:12:14.800 Community Hall: more strictly codified as we've done more updates to have objective standards, and so we are potentially going to see more lots like this that are confined that may need those R1 exceptions. And then finally, for the hillside exception, this, I will say, is quite… 77 00:12:14.910 --> 00:12:21.689 Community Hall: new. I don't think that we've had something come through like this in quite a while, at least not that I could find, and so that is… 78 00:12:21.960 --> 00:12:40.989 Community Hall: again, written through our code, that if you do exceed 500 square feet of grading on 30% slopes in R1, then you do need a hillside exception, and so, again, it's just the process that's outlined. We're recommending approval, a conditional approval of that, with the consideration given to, again, the setbacks and the modified design, but without strict precedent. 79 00:12:42.760 --> 00:12:43.550 Community Hall: Thank you. 80 00:12:45.430 --> 00:12:47.289 Community Hall: Any other questions from the Commission? 81 00:12:49.370 --> 00:13:06.509 Community Hall: I did have one, if there are no others. The project is listed to be in a liquefaction inundation slope instability hazard zone, and I was curious what measures will be taken just to make sure that any grading that does happen doesn't impact the blackberry farm below. 82 00:13:07.360 --> 00:13:26.130 Community Hall: Great, so the project provided a geotechnical report that was peer-reviewed by one of the city's third-party geologists, and the recommendations of that report must be incorporated within the structural drawings to come, and any redesigns would also need to be re-reviewed by the geologists to make sure that they wouldn't have those impacts. 83 00:13:27.090 --> 00:13:46.410 Community Hall: Okay, thank you. Actually, I did have one more question. There is a note around replanting of removed trees, and that there's an option that the applicant can actually pay an in-lieu fee if the replanting of removed trees is not feasible. What are the scenarios in which replanting a tree is not feasible? 84 00:13:47.100 --> 00:13:51.790 Community Hall: So, in this case, because there is other tree canopy within the rear yard. 85 00:13:51.790 --> 00:14:10.820 Community Hall: the rest of the areas are rather confined, you may find that planting the oak trees that we're recommending for planting, we may not have enough space to accommodate all of those replantings on-site, and for them to thrive and be healthy. So that's why we have that option, is just to ensure that if the space is limited and we're asking for larger trees, we do still collect a fee. 86 00:14:10.820 --> 00:14:12.269 Community Hall: To accommodate that elsewhere. 87 00:14:13.220 --> 00:14:14.290 Community Hall: Okay, thank you. 88 00:14:14.590 --> 00:14:16.440 Community Hall: Any other questions from Commission? 89 00:14:16.990 --> 00:14:21.439 Community Hall: Yeah, so on the… on the tree removal, 90 00:14:21.890 --> 00:14:36.759 Community Hall: I mean, I know we just approved a city work plan to improve our city canopy and figure out, you know, how we… how we build up our city canopy, considering that we have one of the lowest canopies of all the cities in the… in Silicon Valley. How… 91 00:14:36.790 --> 00:14:44.430 Community Hall: is it just that we have no objective standards for that yet, and that's why that's not a consideration, or, like… 92 00:14:44.430 --> 00:14:56.829 Community Hall: how are we okay with, approving so many trees being removed? Right, the threshold for R1 tree removals is relatively low, especially when they're in the 12 inch to 24 inch range, which these are. 93 00:14:56.830 --> 00:15:06.690 Community Hall: We basically require that the applicant show that they will replant and or provide in-lieu fees for that, and that's the finding in and of itself. So. 94 00:15:06.790 --> 00:15:09.689 Community Hall: But again, it's not a very high bar. 95 00:15:10.020 --> 00:15:11.690 Community Hall: Sorry, on that point… 96 00:15:11.740 --> 00:15:30.680 Community Hall: Is this to be considered R1 or RHS, given the sloping where the trees are being removed? So this is zoned R1. We do for… specifically for the grading in the rear yard that we're talking about, and for the hillside exception itself, we are applying some RHS standards. Not all of them, just some to that portion. So would that not be the case for the tree removes? 97 00:15:31.540 --> 00:15:48.590 Community Hall: So, the property is still zoned R1, so the trees are still on an R1 zoned property, so that finding would still be related to the R1 zoning. I understand that they're in connection with the grading, however, those could be removed under that same finding without the grading occurring. 98 00:15:49.700 --> 00:15:55.919 Community Hall: So, can staff clarify what portions of the project would be considered under RHS versus R1? 99 00:15:56.460 --> 00:16:18.459 Community Hall: So, again, it's not necessarily that we're changing the zoning halfway through or anything like that, it's just that we pull over some of the standards from RHS and apply them to this R1 zoned property, and those include standards for things like the retaining wall height, where we can make some additional considerations, also the materials applied to those retaining walls. Really, it's more for specifically the grading and retaining walls that we're looking at, those standards. 100 00:16:18.590 --> 00:16:24.899 Community Hall: And have you had any other similar project in the neighborhood with the backside facing Blackberry Farm that… 101 00:16:25.190 --> 00:16:28.350 Community Hall: Would serve as a precedent for… comparison. 102 00:16:28.490 --> 00:16:42.609 Community Hall: Right, so a number of the neighboring residences do have previous grading, however, that grading occurred prior to us having our hillside exception requirements in place, so we don't have a precedent for this type of discretionary review before you. 103 00:16:43.070 --> 00:16:43.890 Community Hall: Thank you. 104 00:16:46.580 --> 00:16:49.600 Community Hall: Sorry, one more question. What's the fire zone? 105 00:16:49.750 --> 00:16:56.419 Community Hall: That this house is in. That's a good question. I would have to double check that. Can you let me know? Yeah. During this meeting? Thanks. 106 00:16:56.980 --> 00:17:02.809 Community Hall: I did look it up, and I think there is no fire zone, but please do confirm that. Do we have any other questions from Commission? 107 00:17:03.060 --> 00:17:05.719 Community Hall: Okay, then we'll move to the applicant presentation. 108 00:17:13.670 --> 00:17:19.150 Community Hall: Hello, my name's David, I don't really have too much of a presentation. Emmy did a great job, thank you very much. 109 00:17:19.369 --> 00:17:22.210 Community Hall: I designed, the house. 110 00:17:22.460 --> 00:17:25.809 Community Hall: And work with the civil engineer to work on the site in the backyard. 111 00:17:27.839 --> 00:17:39.309 Community Hall: the client came to me 3 years ago, and we… he was gonna purchase the house, and he wanted to know if he could do a modern house, because that's what he really wanted. And we had talked to planning, and they said, yeah, we can go down that route. 112 00:17:39.830 --> 00:17:46.459 Community Hall: So we came up with some designs, gave to planning, and we've gone down this route of figuring all of this out. 113 00:17:46.800 --> 00:17:53.160 Community Hall: Which seems… To be happy with planning, and my clients happy with the house. 114 00:17:53.630 --> 00:17:57.099 Community Hall: And he also wanted to do the backyard, and I was like, well, that's gonna be a little bit trickier. 115 00:17:57.450 --> 00:18:10.889 Community Hall: So we've been working a bunch with planning and public works, on the backyard. Originally, we wanted… my client was hoping to go all the way back to the property line. He wanted to have a sports court and, you know, the whole thing, because the lot… there is no backyard. 116 00:18:12.780 --> 00:18:18.180 Community Hall: That seemed to be an issue, so we worked, with Public Works Planning. 117 00:18:18.630 --> 00:18:27.599 Community Hall: And decided that if we could move the sports court area back 10 feet from property line, that we could, one, save a tree, do quite a bit less grading. 118 00:18:27.750 --> 00:18:36.570 Community Hall: and remove one of the originally proposed four retaining walls in the back, now we're only proposing three to get to that grade. So, less retaining walls, less visual impact. 119 00:18:37.030 --> 00:18:38.210 Community Hall: And… 120 00:18:38.450 --> 00:18:54.309 Community Hall: saving some trees. We also noticed that, originally back in January, when we were supposed to have the first meeting, that we saw some of the neighbors and people of the community were very concerned about the trees, being removed. So we did 121 00:18:54.750 --> 00:19:01.329 Community Hall: By moving the retaining wall back, we are saving one of the trees, which is a larger, more predominant tree, visual, from 122 00:19:01.540 --> 00:19:06.470 Community Hall: the Stevens Creek Trail below. And also, I'm not sure if people… 123 00:19:06.770 --> 00:19:18.929 Community Hall: really realized it, but that property line is 30- something feet back from that… if you're down at Stevens Creek, there's, like, a retaining wall that's kind of a visual thing that you can see, and then the properties kind of go up that steep hill. 124 00:19:19.370 --> 00:19:25.159 Community Hall: And the property line is actually about 30 feet back from that retaining wall, and there's quite a few trees between 125 00:19:25.550 --> 00:19:32.400 Community Hall: the property line, that new 12-inch tree that we're keeping, and that retaining wall down below. So the visual impact from the… 126 00:19:32.600 --> 00:19:40.540 Community Hall: the actual creek will be very similar to what it is now. We are… there were a couple trees that are going to be removed that you will see that the canopy will 127 00:19:40.710 --> 00:19:42.150 Community Hall: Change a little bit. 128 00:19:42.280 --> 00:19:50.260 Community Hall: But… we're not gonna be having a house just open to Stevens Creek. 129 00:19:50.640 --> 00:19:54.290 Community Hall: I heard some quick questions or comments about the construction. 130 00:19:54.440 --> 00:20:10.940 Community Hall: So per Geotech report, we're going to be required to do a pier and grade beam for retaining walls, house, everything. So the piers will be drilled, the dirt will be removed to the top of the property, and then removed off the property to somewhere else, so that we can't retain dirt on the property. 131 00:20:11.260 --> 00:20:22.130 Community Hall: And my client was hoping to plant trees at the rear yard. We have some space there, depending on canopy, of how it works. 132 00:20:22.960 --> 00:20:27.519 Community Hall: He would love to have trees there, just for privacy from the creek trail. 133 00:20:27.950 --> 00:20:33.909 Community Hall: If not… Potentially on the side yard or in the front yard to get some oak trees back. 134 00:20:34.170 --> 00:20:39.469 Community Hall: So that's gonna be the tricky one, as you had mentioned, just based off of the existing canopy. The canopy there is pretty… 135 00:20:40.050 --> 00:20:41.250 Community Hall: Extensive. 136 00:20:42.160 --> 00:20:49.790 Community Hall: So that's all I got, pretty simple, and I'm here if you guys have any questions about the project that you'd like to ask. 137 00:20:50.920 --> 00:20:53.679 Community Hall: Great, thank you very much. Do we have any questions from the Commission? 138 00:20:55.790 --> 00:20:56.900 Community Hall: No questions? 139 00:20:59.920 --> 00:21:03.080 Community Hall: I have one question, but okay, go ahead, Commissioner Rao. 140 00:21:05.130 --> 00:21:13.119 Community Hall: Maybe a question for both staff and the applicant. Was the applicant made aware that a hearing would not be necessary if certain design options were considered? 141 00:21:14.100 --> 00:21:18.960 Community Hall: Yes, but unfortunately, one of those, no matter what, we couldn't do anything about. 142 00:21:19.310 --> 00:21:23.739 Community Hall: And that was the garage facing front. The lot's just too narrow. 143 00:21:24.380 --> 00:21:31.790 Community Hall: there's… there's not much we could have done about that, so we were going down this route anyways. Could staff clarify, was that one exception enough to trigger 144 00:21:32.210 --> 00:21:33.780 Community Hall: A design review? 145 00:21:34.330 --> 00:21:45.109 Community Hall: Right, so that exception would be enough to have a hearing before you all. The design review permit is separate, the R1 exception is what he's referring to. So that one exception of the garage being 146 00:21:45.540 --> 00:21:50.010 Community Hall: further in front than allowed would trigger a hearing. Right. 147 00:21:53.590 --> 00:21:59.359 Community Hall: Were there other alternatives that the applicant considered to further reduce the deviation from the general plan? 148 00:22:00.980 --> 00:22:04.520 Community Hall: Regarding the garage, or the whole design? The whole design. 149 00:22:04.640 --> 00:22:15.809 Community Hall: So that was a tricky one, because my client was very adamant on a more modern design. So we were going down that route, no matter what. Flat roof, parapet style. 150 00:22:17.100 --> 00:22:21.980 Community Hall: Roof overhangs in some areas, so very different style. That was the route we were going. 151 00:22:22.160 --> 00:22:30.250 Community Hall: The garage, we'd played with a couple different options when we found out about that, but it… just the way it's shaped, it's so difficult to make that not… 152 00:22:31.260 --> 00:22:33.230 Community Hall: That would not work, unfortunately. 153 00:22:33.460 --> 00:22:38.150 Community Hall: And question for stuff. Is this the first of its kind in a modern design in this area? 154 00:22:39.090 --> 00:22:41.079 Community Hall: Specifically by BlackBerry Farm. 155 00:22:41.840 --> 00:22:54.039 Community Hall: this close, I believe potentially it is, but I think in other Monta Vista areas, we have had more modern designs. However, they did incorporate the reduced massing and sloped roofing portions of it. 156 00:22:54.170 --> 00:22:59.189 Community Hall: And would this area be considered the Moda Vista Village? No, it does not fall within that. 157 00:22:59.760 --> 00:23:05.550 Community Hall: Would we apply the entire Moda Vista as the basis for comparison, or is there a more narrow comparison? 158 00:23:06.010 --> 00:23:24.180 Community Hall: I think directly in the neighborhood, there have been more contemporary or modern aesthetic houses built there. However, I don't know if many of them have flat roofs. I think that the majority of them, again, do incorporate a sloped roof style, which is why we have that recommendation for the condition. Thank you. 159 00:23:25.440 --> 00:23:27.239 Community Hall: I did want to follow up on that. 160 00:23:27.570 --> 00:23:32.759 Community Hall: Are there any projects we've approved that have been allowed to move forward with all flat roofs? 161 00:23:34.460 --> 00:23:49.499 Community Hall: There are, in other portions of the city where we have existing flat roofs, I'm thinking moreover on the Eichler kind of area, and adjacent to that, where you see a little bit more of that flat roof design, we do have the flat roof design being approved. It really depends on the context of that specific neighborhood. 162 00:23:50.680 --> 00:23:51.839 Community Hall: Okay, thank you. 163 00:23:51.950 --> 00:24:02.000 Community Hall: Question for the applicant, I'm just curious, would you consider, if sloped roofs were added to this home, would it still be considered a modern design? 164 00:24:02.220 --> 00:24:07.910 Community Hall: I mean, of course, you can make a modern design with sloped roof, yes. Would my client like that? 165 00:24:08.220 --> 00:24:08.960 Community Hall: No. 166 00:24:09.860 --> 00:24:11.929 Community Hall: Okay, thank you. Yep. 167 00:24:12.450 --> 00:24:21.839 Community Hall: Can I ask a clarifying question? So, you said the slope roof… is the slope roof necessary with the reduced massing, or are those two separate issues? 168 00:24:22.610 --> 00:24:42.039 Community Hall: Like, could you reduce the massing and keep the flat roofs? Right, I don't know that that was fully considered by RRM, but I think that for the most part, what we see is for flat roof design, we need a significant amount of reduction. This would not result in a significant amount of reduction, it would just be a smaller reduction along with the sloped roof. So I think used in conjunction. 169 00:24:42.270 --> 00:24:45.410 Community Hall: Allows for somewhat of the height… some of the height to be maintained. 170 00:24:45.700 --> 00:24:50.769 Community Hall: So… so the slope roof allows them to keep more massing, in a way. Right, got it. 171 00:24:53.430 --> 00:25:11.339 Community Hall: Do we have any other questions for the applicant? No? All right, thank you very much. We'll move on to public comments. City Clerk, do we have any public comments? We have two speakers in person, and one hand raised on Zoom. Our first speaker is Connie Cunningham, followed by Rhoda Frye, followed by Peggy Griffin. 172 00:25:11.510 --> 00:25:12.840 Community Hall: Welcome, Connie. 173 00:25:17.650 --> 00:25:33.810 Community Hall: Good evening, Chair, Vice Chair, and Commissioners. My name is Connie Cunningham. I'm Chair of the Housing Commission, speaking for myself only. I'm also a member of the Santa Clara Valley Bird Alliance, SCVBA, the Environmental Action Committee. 174 00:25:34.230 --> 00:25:44.400 Community Hall: The subject home is located directly above Blackberry Farm Park Preserve, a nature preserve and a priceless gem in our city. 175 00:25:44.550 --> 00:25:50.470 Community Hall: I implore you, Vote no on hillside exception for grading. 176 00:25:50.580 --> 00:26:00.419 Community Hall: The house is clearly too large for the lot if the only idea for a backyard is to bulldoze a hillside and build retaining walls for its 59 degree slope. 177 00:26:00.610 --> 00:26:11.919 Community Hall: Perhaps this home could have a deck on pillars. This would allow the oak trees to remain in place to provide habitat for birds, other critters, and enjoyment for hundreds of Cupertino visitors. 178 00:26:11.920 --> 00:26:28.099 Community Hall: I also implore you to vote no on the tree removal permit for the removal and replacement of protected native oak trees. The applicant has been given the option of replanting with new trees, taking years to mature, or paying a fee without replacing them. 179 00:26:28.290 --> 00:26:30.079 Community Hall: That is unacceptable. 180 00:26:30.510 --> 00:26:41.479 Community Hall: I strongly suggest also that you revise the design review permit, delete the requirement that says, adding sloped Roof Elements. I like the design as it is. 181 00:26:41.580 --> 00:26:53.829 Community Hall: There are other designs like this in Cupertino and in my neighborhood. This subject location does not have meaningful comparisons to make the applicant change his design. 182 00:26:54.240 --> 00:27:03.670 Community Hall: I am disappointed to see recommendations suggest that the front of the applicant's proposed house be changed significantly to be in sync with neighbors to the front. 183 00:27:03.950 --> 00:27:08.799 Community Hall: And that the city rules also require the applicant to consider the neighbors next door. 184 00:27:08.900 --> 00:27:11.160 Community Hall: to him. However, no thought. 185 00:27:11.210 --> 00:27:17.240 Community Hall: Went into how the backyard of this home would impact neighbors over the back fence. 186 00:27:17.290 --> 00:27:24.679 Community Hall: Cupertino residents enjoy Blackberry Farm Nature Preserve. City residents understand its value. 187 00:27:24.680 --> 00:27:40.209 Community Hall: I often walk Stevens Creek Trail with a friend and with my binoculars. There are red-tailed hawks, owls, pygmy nuthatches, chestnut-backed chickadees, there are fish in Stevens Creek. There are beautiful locations to picnic. I am disappointed. 188 00:27:40.330 --> 00:27:48.529 Community Hall: That after decades, there was this lack of sensitivity to the preserve and its importance to the public. 189 00:27:49.110 --> 00:27:51.170 Community Hall: Deeply disappointed. 190 00:27:51.450 --> 00:27:54.949 Community Hall: This type of nature preserve does not exist in every city. 191 00:27:55.060 --> 00:27:56.510 Community Hall: We are fortunate. 192 00:27:56.670 --> 00:27:59.740 Community Hall: Fortunate to have this priceless gem. 193 00:27:59.980 --> 00:28:02.930 Community Hall: We will lose it if we are not vigilant. 194 00:28:03.380 --> 00:28:05.290 Community Hall: Thank you for your time to speak. 195 00:28:06.130 --> 00:28:22.299 Community Hall: Thank you, Connie. Our next speaker is Rhoda Frye, followed by Peggy Griffin. Welcome, Rhoda. Hi, good evening. Lots of random comments, and speaking of random comments, you have comments on this within the agenda and also outside of the agenda, from comments that were 196 00:28:22.520 --> 00:28:32.330 Community Hall: provided previously. Among the ones that you should have had within the agenda are a two-page letter from the, Santa Clara Valley, 197 00:28:32.710 --> 00:28:43.740 Community Hall: Bird Alliance, saying… that says, just say no, so I hope you read that. I resubmitted it, because it wasn't in the agenda packet. And, you know. 198 00:28:44.000 --> 00:28:51.060 Community Hall: Just from a high level, you're being asked to approve something that the applicant has yet to submit. 199 00:28:51.750 --> 00:28:56.049 Community Hall: So… This mating is premature, and it should be deferred. 200 00:28:56.350 --> 00:29:11.179 Community Hall: I also found some other irregularities in the agenda. For one thing, on the summary, it tells you that the trees are up to 18 inches wide, but then in the resolution, you're being asked to remove trees that are up to 24 inches wide. 201 00:29:11.180 --> 00:29:18.610 Community Hall: And by the way, concurring with the preceding speaker, I don't have an issue with a new home with a flat roof. 202 00:29:19.520 --> 00:29:29.930 Community Hall: And let's see what else I had. Yeah, so you all mentioned how many protected trees would be removed, but what… how many unprotected trees would be removed? It seems like it would be all… 203 00:29:30.360 --> 00:29:32.669 Community Hall: all scraped. 204 00:29:33.290 --> 00:29:51.440 Community Hall: And we have not been… we have not been provided what this project would look like from the park. You know, walking through that area, most homes seem to have decks instead of backyards. I hope you walk the site. The summary should have stated the proximity to the park, the trail, and the creek. 205 00:29:51.550 --> 00:29:55.410 Community Hall: When you look at the property from the park, those retaining walls 206 00:29:55.580 --> 00:30:01.910 Community Hall: Probably with fencing on top of them, will look like a solid wall because of the steep slopes, so you'd be looking up at it. 207 00:30:02.440 --> 00:30:19.130 Community Hall: Right? We need to get a visual on this stuff, right? The property owner bought a tricky lot, no doubt. If they wanted a backyard, they should have bought elsewhere. Please protect our park and, our environment and our recreational values. 208 00:30:19.960 --> 00:30:33.909 Community Hall: please vote no. Yeah, I think I got all my ideas in, plus you've got them in writing. I think this is a no-brainer. I have to say. I'm really disappointed. I know that this agenda item was signed off by 209 00:30:34.230 --> 00:30:40.800 Community Hall: number of folks in the planning department, and I'm baffled as to why 210 00:30:41.060 --> 00:30:47.830 Community Hall: And how that could have possibly happened. And it's undermined… my general… trust in… 211 00:30:48.700 --> 00:30:56.239 Community Hall: in our professional staff, and I feel bad about saying that, but, I think it needs to be said. Thank you. 212 00:30:57.000 --> 00:31:02.330 Community Hall: Thank you, Rhoda. Our next speaker is Peggy Griffin, followed by Lisa Warren. Welcome, Peggy. 213 00:31:04.870 --> 00:31:15.439 Peggy Griffin: Good evening, planning commissioners and staff, I'm in agreement with the previous speakers, 214 00:31:16.420 --> 00:31:20.400 Peggy Griffin: absolutely reject the hillside exception. 215 00:31:20.750 --> 00:31:27.340 Peggy Griffin: They're asking so that they could put a sports court Up. 216 00:31:27.870 --> 00:31:30.859 Peggy Griffin: Next to a reptarian corridor. 217 00:31:31.390 --> 00:31:39.690 Peggy Griffin: So, potentially, you're going to have, in addition to this massive wall, you're going to have lights and sound. 218 00:31:42.600 --> 00:31:55.070 Peggy Griffin: I disagree with that. You need to respect your neighbors, and one of the neighbors is Blackberry Farm. I'm also in support of decreasing the mass and changing the slope 219 00:31:55.330 --> 00:32:01.569 Peggy Griffin: The reason for that is to decrease the mass. At least that's what I… 220 00:32:02.080 --> 00:32:06.370 Peggy Griffin: got out of reading things. Also. 221 00:32:06.540 --> 00:32:15.989 Peggy Griffin: removing the trees, these are big trees, and like the previous speakers say, it takes a long time, and I've seen trees removed, and 222 00:32:16.420 --> 00:32:23.450 Peggy Griffin: They pay in lieu fees, and so it's still bare, or they put a palm tree up where an oak tree stood. 223 00:32:24.290 --> 00:32:36.780 Peggy Griffin: So, if you are considering Tree removal and replacement. Please, no in-lieu fees, and Comparable trees. Not palm trees. 224 00:32:37.190 --> 00:32:45.639 Peggy Griffin: The slope is significant. Let's see. Also, I agree that before you do anything. 225 00:32:45.810 --> 00:32:52.470 Peggy Griffin: you should see, and the public should see, the view from Blackberry Farm. What exactly is this going to look like? 226 00:32:53.700 --> 00:32:55.360 Peggy Griffin: Please vote no. 227 00:32:55.960 --> 00:32:56.900 Peggy Griffin: Thank you. 228 00:32:59.410 --> 00:33:03.500 Community Hall: Thank you, Peggy. We have no speakers in person, and no hands raised on Zoom, Chair. 229 00:33:05.040 --> 00:33:09.829 Community Hall: Okay, thank you very much. Do we have any further questions from the Commission? 230 00:33:11.120 --> 00:33:16.140 Community Hall: Commissioner Rao. Yes, so can you talk about the significant effect 231 00:33:17.310 --> 00:33:20.699 Community Hall: when you're considering a categorical exemption on CEQA. 232 00:33:21.330 --> 00:33:28.730 Community Hall: Was this project deemed… to have any sort of significant effects that would not allow for that CEQA exemption. 233 00:33:29.640 --> 00:33:32.340 Community Hall: Single-family homes are always categorically exempt. 234 00:33:34.130 --> 00:33:47.659 Community Hall: Sorry about that. Single-family homes are always presumed to be categorically exempt. Within the last decade, even very large homes on hillsides were the single-family homes. An example in Berkeley from about 10 years ago. 235 00:33:48.330 --> 00:33:57.880 Community Hall: there was a major case where you had a home on a slope with a 10-car subterranean garage, and that was found to be categorically exempt after the city had initially wanted to do any IR. 236 00:33:58.170 --> 00:34:06.230 Community Hall: So, while you could possibly have visual impacts from the public's view and environmental impact for a single-family home. 237 00:34:06.430 --> 00:34:14.299 Community Hall: that's gonna be an exempt project under CEQA. So, there's still a lot of latitude in terms of discretion on what you do with the permits. 238 00:34:14.909 --> 00:34:18.440 Community Hall: But a further CEQA analysis was not something we considered. 239 00:34:20.940 --> 00:34:28.299 Community Hall: But is it fair to say that this is not just an R1, but it is located next to a riparian corridor, and therefore there are unusual circumstances here? 240 00:34:29.760 --> 00:34:35.890 Community Hall: It's a single-family lot that already has a single-family home on it, and it would be getting replaced with a larger single-family home. 241 00:34:38.150 --> 00:34:40.300 Community Hall: Are there exceptions defined for that? 242 00:34:42.320 --> 00:34:48.280 Community Hall: you have always the exceptions to exemptions under CEQA. 243 00:34:48.780 --> 00:34:57.850 Community Hall: Which would very much require unique circumstances, like protected views from a public view shed, something like, say, a 17 Mile Drive in Monterey. 244 00:34:58.410 --> 00:35:03.919 Community Hall: This site admittedly has a public interest in that it's adjacent to a trail. 245 00:35:04.280 --> 00:35:07.829 Community Hall: But I don't think you could characterize it as unique circumstances. 246 00:35:09.500 --> 00:35:23.339 Community Hall: So a significant effect is basically defined as a categorical exemption that shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances. Would that qualify? 247 00:35:23.580 --> 00:35:24.860 Community Hall: I would say no. 248 00:35:26.100 --> 00:35:34.730 Community Hall: It's a single-family home replacing a single-family home on a lot that has the existing slope. Specifically referring to the tree removal and the grading. 249 00:35:36.370 --> 00:35:41.769 Community Hall: Tree removals alone would not trigger any type of a CEQA analysis. 250 00:35:42.960 --> 00:35:55.010 Community Hall: We're not talking about heritage trees or trees that would have special protection. So the tree removal permit is before you tonight, but again, we wouldn't be doing a CEQA document for tree removals on a lot like this. 251 00:35:56.410 --> 00:35:59.660 Community Hall: There is a cumulative impact, exception to… 252 00:36:00.130 --> 00:36:10.970 Community Hall: CEQA exemptions. Can you comment on whether this project would set a precedent for the neighboring homes to go likewise and remove trees and grade the hillside such that it leads to cumulative impact? 253 00:36:12.610 --> 00:36:17.270 Community Hall: You would look at cumulative impacts where you have foreseeable future projects. 254 00:36:17.580 --> 00:36:24.690 Community Hall: There's no permit that's before us on any of those homes that would lead us to have a cumulative impact. 255 00:36:29.080 --> 00:36:32.040 Community Hall: What would be the basis for when you would consider this? 256 00:36:33.950 --> 00:36:36.720 Community Hall: I'm not sure, I'd need a little more detail on what you're asking. 257 00:36:37.110 --> 00:36:41.730 Community Hall: I mean, the project before you is as… I mean, describe. 258 00:36:41.950 --> 00:36:44.530 Community Hall: you have 5 actions. Two exceptions. 259 00:36:44.750 --> 00:36:48.260 Community Hall: 3 of the 5 actions wouldn't even normally be coming to the Planning Commission. 260 00:36:50.460 --> 00:36:55.729 Community Hall: So, I mean, the… the CEQA discussion on single-family homes, I think, is pretty well settled. 261 00:36:55.970 --> 00:37:03.520 Community Hall: there have been larger homes that have involved more grading, and other areas in California found to be where the exemption is appropriate. 262 00:37:05.040 --> 00:37:05.870 Community Hall: Okay. 263 00:37:06.140 --> 00:37:06.890 Community Hall: Thank you. 264 00:37:07.500 --> 00:37:19.500 Community Hall: Any other questions? If I… could I follow on on that? Yes, absolutely. So I… just… just to maybe clarify, in terms of the things that could have a CEQA effect, the grading, for instance, might be, although 265 00:37:19.500 --> 00:37:32.740 Community Hall: In this case, that was viewed to not be an issue. Is that… is that correct? That is correct. Clearly, the grading, I think, jumps out as the issue associated with this project, and especially in relation to BlackBerry Farm. 266 00:37:33.360 --> 00:37:35.240 Community Hall: So, to… 267 00:37:35.890 --> 00:37:47.980 Community Hall: to say this would be exempt from CEQA is not to say it couldn't have a view impact or an impact from the public, as people have spoken to. The proximity to the trail is certainly an issue. 268 00:37:48.180 --> 00:37:52.940 Community Hall: It's just not an issue that would be examined under CEQA beyond an exemption. 269 00:37:53.320 --> 00:37:54.969 Community Hall: Great. Thank you. 270 00:37:56.460 --> 00:37:57.190 Community Hall: Quick. 271 00:37:58.010 --> 00:38:02.149 Community Hall: So, just to kind of wrap this up in a bow, 272 00:38:02.540 --> 00:38:11.089 Community Hall: We… we cannot deny the CEQA exemption, but we could deny every single one of those other permit requests, correct? 273 00:38:12.440 --> 00:38:16.000 Community Hall: there would be the possibility, I guess, if you felt that 274 00:38:16.470 --> 00:38:28.479 Community Hall: this warranted more than the exemption didn't apply, you could find that. And certainly the other five actions, as I said, these are all discretionary. Right. So, so we could do those and more. 275 00:38:28.590 --> 00:38:44.810 Community Hall: we just can't question the CEQA exemption, but… but we have a lot of latitude beyond that. Yeah, I'm just sort of offering my advice on CEQA. It's pretty clear on… for single-family home replacements, even for large homes, that involve grading. All right, thank you. 276 00:38:45.910 --> 00:38:49.850 Community Hall: Was a plan set submitted for this project for Commissioners to review? 277 00:38:51.260 --> 00:38:52.870 Community Hall: Do we have a detailed plan set? 278 00:38:53.050 --> 00:38:54.130 Community Hall: Yes. 279 00:38:54.380 --> 00:38:58.420 Community Hall: What was the comment from the member of the public that the project is not yet 280 00:38:58.510 --> 00:39:02.289 Community Hall: complete for review. I thought there was a member of the public that 281 00:39:02.290 --> 00:39:12.340 Community Hall: made a comment. I think that may have been taken from context of previous agendizing of the item. As you know, this was placed on the agenda and sent out a couple of times prior to this. 282 00:39:12.340 --> 00:39:24.740 Community Hall: And in the initial iteration, there were not updated plans to reflect staff's conditions. However, the most updated plan set that was sent to you and also included as part of this agenda 283 00:39:24.870 --> 00:39:29.479 Community Hall: Does show staff's recommendations included on those plans. Thank you. 284 00:39:31.100 --> 00:39:40.430 Community Hall: I just had one follow-up question on the sloped roof. So, if it was a flat roof, and you're saying that the massing needs to be reduced, how much would the massing need to be reduced by? 285 00:39:42.640 --> 00:40:02.399 Community Hall: within the condition, we stipulate that it would need to be reduced to fit within the first story building envelope. There's a portion of it currently that does exceed that because it's taken from a higher grade, so it would really just be about, I want to say, like, a one-foot difference in the first story. Okay, thank you. And I have a question for the applicant, again, sorry to make you come up. 286 00:40:02.820 --> 00:40:15.080 Community Hall: My question was just, from the applicant's… or from the resident's standpoint who lives here, would they rather have a sloped roof or a reduced flat roof? 287 00:40:16.790 --> 00:40:21.150 Community Hall: That, I would have to ask him, because we haven't really gone over that, but he would really like to keep… 288 00:40:21.610 --> 00:40:32.050 Community Hall: a flat roof. He's been very adamant about it the entire time, and we've kind of talked about this, because they've given us the option, too. Hey, if you go sloped, we get rid of one of these, it's going to be a lot easier to pass. 289 00:40:32.310 --> 00:40:39.969 Community Hall: And my client's like, let's go with flat, see what happens, and he's just gonna push that as hard as he can. If it doesn't work, then we'll… 290 00:40:40.700 --> 00:40:44.720 Community Hall: go back to a different route, and that's where he's at. Okay, thank you. Yep. 291 00:40:45.610 --> 00:40:49.609 Community Hall: Do we have any other questions? Yeah, I had one… I have one other. I'm curious, 292 00:40:50.120 --> 00:40:53.000 Community Hall: I don't… so there are actually many places… 293 00:40:53.980 --> 00:41:00.340 Community Hall: Please, go ahead. I'm sorry. Oh, you were talking to me? No, no, I wasn't. Oh, I'm sorry. Oh. Sorry. 294 00:41:02.970 --> 00:41:12.960 Community Hall: So I… there are actually many places in town that are… would be adjacent to, you know, Stevens Creek Trail, and, you know, the other application tonight has some adjacency. 295 00:41:13.240 --> 00:41:14.759 Community Hall: I'm just curious. 296 00:41:15.000 --> 00:41:22.700 Community Hall: So first of all, I suspect that if… had there been an objective standard for impact when you're adjacent to 297 00:41:22.980 --> 00:41:31.740 Community Hall: you know, a public space, that it would have been called out of the report already. So, even if there wasn't, I'm curious whether there could be any comment on the kinds of… 298 00:41:32.130 --> 00:41:37.719 Community Hall: Tons of things that have been considered in the past, with the understanding that 299 00:41:38.070 --> 00:41:43.359 Community Hall: That, you know, we are kind of focused on objective standards. 300 00:41:43.850 --> 00:42:02.530 Community Hall: Right, I think for the most part, in most projects, we are trying to look at just objective standards. As Luke laid out, though, this is a project where we can look at some of the more subjective standards. That being said, there aren't any standards, really, for this specific scenario, meaning grading adjacent to a trail and or a park. 301 00:42:02.830 --> 00:42:22.550 Community Hall: There are some policies, general plan policies, things that we want to kind of be in alignment with, that would preserve views from those locations, that would preserve the use of those, but again, they're not explicit enough for us to say that we don't need an interpretation by your commission as to how those are applied, and or… 302 00:42:22.560 --> 00:42:34.950 Community Hall: kind of how they would be applied in this case. Now, as for past projects, again, we haven't had a hillside exception. I… at least when I was doing research, it was 1998 that the last one of this kind came forward. 303 00:42:34.950 --> 00:42:49.589 Community Hall: And even within that, they allowed for some re-ard grading, but with an additional setback to the park to be considered. And I would say for all the other residences nearby, they, for the most part, they have tried to stick within the 5-foot 304 00:42:49.590 --> 00:43:03.459 Community Hall: retaining wall limitations, again, also with some setbacks. Some of them do go up to the property line, but for the most part, some setback. And then, as mentioned by one of the commenters here, there are quite a few wooden decks that are being built out to the property lines as well. Thank you, Em. 305 00:43:03.690 --> 00:43:08.139 Community Hall: Maybe… it's possible I missed it. Were there… were there, 306 00:43:09.060 --> 00:43:17.100 Community Hall: requirements or standards for the appearance of the retaining wall? Retaining walls there? Right, there is one requirement, it's, 307 00:43:17.360 --> 00:43:28.460 Community Hall: again, it's not objective, so it is one of the more subjective portions of our code, and that is through our RHS ordinance, and so that's a standard we pulled over from there. That is to ensure that they're clad. 308 00:43:28.460 --> 00:43:46.160 Community Hall: To have either screening in front of them, or to ensure that they're, you know, kind of a more pleasing material. And so, in this case, we are recommending that the material be the same as the rock wall that you see at the base of that trail, and then again, having the height limit and screening from the vegetation. 309 00:43:46.160 --> 00:43:51.780 Community Hall: So you wouldn't be… so we… we wouldn't be surprised with, you know, some sort of square concrete… 310 00:43:51.810 --> 00:43:56.020 Community Hall: Right. It wouldn't be like that. Yeah. Great. Thank you very much. 311 00:43:57.090 --> 00:44:02.069 Community Hall: So on the retaining walls, 312 00:44:02.620 --> 00:44:11.120 Community Hall: when I looked at the property, it looked like there would have to be fences on top of the retaining walls, is that true? Because otherwise, somebody could walk right off and… 313 00:44:11.750 --> 00:44:25.699 Community Hall: fall down to the next level. Right, so in this case, and also in some of the neighboring properties, they do kind of have these ledges created by these retaining walls, and for the most part, you're seeing railing go up, and that's about a 42-inch railing per our building code. 314 00:44:25.700 --> 00:44:32.209 Community Hall: And so, for the most part, what you see is that is an iron rail, so it's open, not too many of… 315 00:44:32.230 --> 00:44:38.140 Community Hall: those properties have any rear gates, because they are looking for the views from… from that property. Okay, thank you. 316 00:44:39.830 --> 00:44:44.909 Community Hall: I want to go back to the comment from the member of the public about the plan not being complete. 317 00:44:45.060 --> 00:44:55.150 Community Hall: I believe one of the conditions of approval is that there are further revisions to the plan required, and then a final approval by the Director of Community Development. Can you comment on why that is? 318 00:44:55.890 --> 00:45:00.670 Community Hall: Right, so some of the plans, not all of the plans have been updated. There are certain, 319 00:45:00.670 --> 00:45:25.019 Community Hall: structural plans that haven't been reviewed by us for the new design, so those would need to be looked at, the civil drawings, I believe, as well. And then the landscaping plans weren't updated as part of this to reflect, again, that new grading area. And then none of the plans were updated to reflect staff's recommendation for the sloped roof and reduced massing. Again, that's because the applicant is requesting that the… Is it commonplace to bring a hearing for 320 00:45:25.020 --> 00:45:27.479 Community Hall: to… the Planning Commission, when that… 321 00:45:27.600 --> 00:45:29.560 Community Hall: Level of completeness is not yet. 322 00:45:30.360 --> 00:45:31.390 Community Hall: been achieved. 323 00:45:31.950 --> 00:45:47.539 Community Hall: I think for the most part, we try to have complete plan sets when we try and work on that ahead of time, but I wouldn't say that it's unheard of to have conditions that aren't yet met, so long as they're clear conditions that we understand how they would impact the project design. 324 00:45:47.600 --> 00:45:58.930 Community Hall: So, is it fair, then, to say that commissioners have discretion to table this item until that is complete, and we see the final, final plan, so that it doesn't have to go back for more revisions? 325 00:45:59.540 --> 00:46:06.939 Community Hall: The answer to that is yes. You do. Okay, I'd like to make a motion to table this item until the plans are complete. Do I have a second? 326 00:46:11.510 --> 00:46:26.869 Community Hall: My concern with that is I think that there are items… there are components of this that we might want to address first, and so we would be forcing this project to go to completion, and then having to dial it back again. 327 00:46:27.550 --> 00:46:31.669 Community Hall: Or we could ask for a complete plan that we can review and then give that feedback. 328 00:46:32.640 --> 00:46:38.660 Community Hall: So… gonna comment on this. From my perspective, the… 329 00:46:38.740 --> 00:46:44.249 Community Hall: The things that are up for discussion and vote are not going to change. 330 00:46:44.250 --> 00:46:50.020 Community Hall: With the complete plans, so I think we have all the information we need to vote on it today. 331 00:46:50.020 --> 00:47:05.739 Community Hall: And I… I don't… I think it does a disservice to… to the owner, as well as the planning commission, as well as the community, if we don't go ahead and vote on it today. I don't see how having the complete plans will 332 00:47:06.090 --> 00:47:22.630 Community Hall: provide any new information, that will change anything specific about the decisions we're being asked to make today? Chairman, if I could interrupt, so there's a motion to table, and then we seek a second, and there's no debate on this motion. Yes, do we have a second? I'm not hearing we have a second. 333 00:47:23.610 --> 00:47:24.400 Community Hall: Okay. 334 00:47:24.560 --> 00:47:26.330 Community Hall: No second. Okay. 335 00:47:27.780 --> 00:47:38.839 Community Hall: Were there any other questions before we move to comments? Yes, so there is the riparian corridor setback requirement. What is the setback requirement? And the findings do not specify the exact distance from the riparian corridor. 336 00:47:41.390 --> 00:47:48.250 Community Hall: I'm not sure that I'm aware of the riparian corridor setback that you're referring to. Do you have a section or a policy that I could 337 00:47:48.830 --> 00:47:50.420 Community Hall: Try and relate it to. 338 00:47:51.790 --> 00:47:54.889 Community Hall: I believe policy is 514528. 339 00:47:56.010 --> 00:47:58.340 Community Hall: Let's keep the questions going, we can come back to that. 340 00:48:01.020 --> 00:48:05.590 Community Hall: Any other questions? Yes? I do have one, 341 00:48:06.520 --> 00:48:11.329 Community Hall: I hate to do this while you're trying to look something up, though. In response to… 342 00:48:11.710 --> 00:48:20.630 Community Hall: To one of the earlier questions, to Commissioner Linskog's question, you had actually mentioned that the massing would actually be larger if they 343 00:48:20.670 --> 00:48:38.959 Community Hall: if they had a slope and adopted the sloped elements that you had seen them. Can you explain that to me? Right, I'll clarify that it… we… we see it as a reduced mass, and that would not necessarily increase the massing to have the sloped roof. Again, we would want to decrease the height in conjunction with that to match, kind of, the neighborhood. 344 00:48:38.960 --> 00:48:40.790 Community Hall: Pattern as it exists today. 345 00:48:41.630 --> 00:48:47.980 Community Hall: Okay, great. I think… I felt like I heard that differently, when… the first time you mentioned that, that the… 346 00:48:47.980 --> 00:49:05.800 Community Hall: Apparent massing would be greater if it had the sloped roof. Oh, I must have misspoken then. I apologize for that, but generally, it would be reduced in our eyes with the sloped roof. Okay, great. So, sorry, just to clarify, because, like, now I'm confused. So, if… if they were to reduce the massing, but keep the flat roof. 347 00:49:06.230 --> 00:49:10.230 Community Hall: Option A, versus reduce the massing and add a sloping roof. 348 00:49:10.410 --> 00:49:13.590 Community Hall: Which one gives them more mass? 349 00:49:14.300 --> 00:49:28.650 Community Hall: I don't know that it's that objective, to be honest. And also, I'm not gonna say that I'm the expert on this. This is why we have our third-party reviewers for these. That being said, my understanding is that the recommendation is to have the sloped roof 350 00:49:28.650 --> 00:49:34.789 Community Hall: Again, to both match the neighborhood and reduce the apparent mass of the building, and then also to reduce the height 351 00:49:34.790 --> 00:49:44.869 Community Hall: to reduce the overall mass. Now, if you're saying just reducing the height, if that is good enough, I can't make a determination on that, necessarily. Got it, thank you. 352 00:49:46.890 --> 00:49:51.000 Community Hall: All right, thank you. Commissioner Rao, were you able to find the information? 353 00:49:51.800 --> 00:49:57.959 Community Hall: Let's not hold up this hearing for that. I do have a code here, but I'd rather… 354 00:49:58.770 --> 00:50:04.530 Community Hall: you know, keep the hearing going. Okay, then we will move on to comments. Any comments from the Commission? 355 00:50:09.000 --> 00:50:12.120 Community Hall: Commissioner Lenskogg, is that you wanting to speak, or… 356 00:50:12.390 --> 00:50:19.889 Community Hall: Sorry, I thought you were reaching. Okay. Who would like to go first? Commissioner? Okay, Commissioner Sharp, or sorry, Vice Chair. 357 00:50:20.900 --> 00:50:32.640 Community Hall: It's fine. So I kind of agree with the resident that contacted me that I took the tour with, and I don't think the application is complete. I would like to see 358 00:50:33.090 --> 00:50:38.930 Community Hall: the complete application, I don't want to be redesigning the project up here on the dais. 359 00:50:39.100 --> 00:50:41.750 Community Hall: I want the complete project brought to us. 360 00:50:41.960 --> 00:50:46.460 Community Hall: I'm disappointed that the attachment that the resident mentioned from the 361 00:50:46.610 --> 00:50:50.859 Community Hall: Santa Clara Valley Bird Alliance was somehow not included in the packet. 362 00:50:51.480 --> 00:50:57.299 Community Hall: And… The three retaining wall… 363 00:50:57.770 --> 00:51:01.060 Community Hall: the three walls are just not acceptable. I mean… 364 00:51:01.210 --> 00:51:07.880 Community Hall: It is true, you would… they would look like a single wall if you're looking up from… up from the trail. 365 00:51:08.200 --> 00:51:15.549 Community Hall: And… You know, the applicant knew when they bought the property of all these challenges, 366 00:51:15.730 --> 00:51:18.810 Community Hall: Other houses, they put in decks for backyards. 367 00:51:19.110 --> 00:51:22.050 Community Hall: And they haven't created these mass… these… 368 00:51:22.170 --> 00:51:26.039 Community Hall: Flat yards through massive grading and tree removal. 369 00:51:26.360 --> 00:51:29.979 Community Hall: Personally, I have no problem with the flat roof. 370 00:51:30.390 --> 00:51:38.259 Community Hall: And… The garage… prefer not to have the front-facing garage, but, you know, that's something… 371 00:51:38.770 --> 00:51:45.050 Community Hall: That is not a terrible big deal, either, because all the other houses have the front-facing garage. 372 00:51:45.410 --> 00:51:49.869 Community Hall: But, yeah, I would not support this project. 373 00:51:51.490 --> 00:51:53.239 Community Hall: Sorry, was that a motion, or… 374 00:51:53.570 --> 00:51:55.100 Community Hall: No, that was not a motion. 375 00:51:57.190 --> 00:51:58.140 Community Hall: Comments? 376 00:52:00.970 --> 00:52:02.589 Community Hall: Commissioner Fung? Sure. 377 00:52:02.740 --> 00:52:09.549 Community Hall: So, you know, in general, in general, I… 378 00:52:10.240 --> 00:52:16.349 Community Hall: We try to support the, the right of the landowner to do the things which are permitted. 379 00:52:16.610 --> 00:52:23.139 Community Hall: in the, you know, you know, by the zoning. 380 00:52:23.170 --> 00:52:39.069 Community Hall: I think that, you know, the big questions for me really were whether there were considerations that apply because of the adjacency to blackberry farming. I think that that's not the case, and I think that they have actually attempted to, 381 00:52:39.420 --> 00:52:44.050 Community Hall: You know, to address those, that concern. 382 00:52:44.420 --> 00:52:48.769 Community Hall: That concern in a reasonable manner, at least, you know, within the standard of how 383 00:52:49.000 --> 00:52:52.570 Community Hall: Of how they, you know, how we should view the approval. 384 00:52:52.860 --> 00:52:55.720 Community Hall: There are a couple things where… 385 00:52:55.900 --> 00:53:02.209 Community Hall: you know, it's a little bit taller than, I would also add, 386 00:53:02.380 --> 00:53:05.959 Community Hall: In conjunction with, Commissioner Schar's, 387 00:53:06.690 --> 00:53:11.170 Community Hall: comment, you know, I have no problem with a flat roof. I think that if it's a flat roof. 388 00:53:11.480 --> 00:53:23.479 Community Hall: which does cause more massing, I'm glad that we're clear on that. And it's a little bit… a little bit taller than what the standard stands at, and I think that that's worthy of consideration about whether, 389 00:53:23.680 --> 00:53:25.640 Community Hall: You know, whether that can be addressed. 390 00:53:27.610 --> 00:53:33.770 Community Hall: But other than that, you know, I didn't see an issue. I don't have an issue with a garage, particularly because of the cul-de- sac. 391 00:53:33.940 --> 00:53:38.299 Community Hall: Which I think was the big… for me at least, coming into this one, that was probably one of the bigger ones. 392 00:53:38.410 --> 00:53:43.320 Community Hall: the bigger asks here. So, you know, I think I'm, 393 00:53:43.590 --> 00:53:56.410 Community Hall: In general, you know, my recommendation would be to consider to try to address those places where it's a small amount out of the, you know, where you're looking for a small exception, and otherwise, I don't have a problem with this application. 394 00:53:58.700 --> 00:54:00.599 Community Hall: Comments? Commissioner Lenskog? 395 00:54:01.260 --> 00:54:08.239 Community Hall: Okay, so, yeah, I don't have a problem with the flat roof, either. I think… 396 00:54:08.790 --> 00:54:14.049 Community Hall: I think if you're a homeowner, you should have the right to build a modern home, if that's what you wish. 397 00:54:14.150 --> 00:54:24.799 Community Hall: I… I do think that reducing the massing, if it's a… if it's a significant issue, can be achieved any which way the owner wants to do it, whether they want to, 398 00:54:24.900 --> 00:54:31.899 Community Hall: Reduce the height of the flat roof by a foot, or, you know, put in the slope-roofed elements. 399 00:54:31.920 --> 00:54:45.539 Community Hall: I'm fine either way. I am fine with the garage design, fine with the design review permit for new-to-storey residents with second-story site setbacks, as listed in the application. 400 00:54:45.650 --> 00:54:53.850 Community Hall: fine with the minor residential permit for a balcony. I am not okay with the hillside exception, on the slope. 401 00:54:53.990 --> 00:55:11.689 Community Hall: this is, it's a riparian corridor, it's our… it's Blackberry Farm, it's, it's… it's a major green lung for our city. We are deficient in terms of our canopy as a city, and… and to… to then, you know. 402 00:55:11.690 --> 00:55:26.999 Community Hall: we should be looking at putting more trees, especially these are protected oak trees. The last thing we should be doing is looking at, getting rid of trees. So… yeah, I mean, the owner knew this when they bought this property, 403 00:55:27.840 --> 00:55:43.210 Community Hall: I mean, there's really to… to come… and they've seen the neighboring homes, to come back now, and to… to want to just kind of grade that, even with… with the setback, that… that they've agreed to, it's… it's still… 404 00:55:43.210 --> 00:55:51.599 Community Hall: it's still excessive and unjustifiable in my book, and same thing with all the tree removals. Anything over 12 inches. 405 00:55:51.600 --> 00:56:03.480 Community Hall: I would not agree to, any… the width of… of… diameter of, 12 inches and above, to create the flat yard areas. So, 406 00:56:04.380 --> 00:56:15.170 Community Hall: I mean, I'll wait to do the motions, but I would approve the residential design stuff, but I would not approve the hillside exception and the tree removal permit. 407 00:56:17.730 --> 00:56:19.679 Community Hall: Thank you. Any other comments? 408 00:56:20.680 --> 00:56:30.640 Community Hall: I think I have said my piece. I would not be supportive of the project in general, because the plans are not complete. I would not be supportive of the hillside grading, not be supportive of the train mall. 409 00:56:31.010 --> 00:56:39.370 Community Hall: And in general, I think we need to be respectful of Blackberry Farm. If you allow for these changes, it starts to creep through the neighborhood, it affects the… 410 00:56:39.830 --> 00:56:45.590 Community Hall: The, possibility of the rest of the hills starting to look at, grading and tree removals. 411 00:56:45.750 --> 00:56:50.339 Community Hall: I also think we need to apply the RHS a little bit further than what we have. 412 00:56:50.630 --> 00:56:57.219 Community Hall: It's… it's, at this point, not something I'm comfortable moving forward. I'm willing to reconsider if there's a… 413 00:56:57.490 --> 00:57:00.599 Community Hall: If there's a revised plan that would be brought to us with changes. 414 00:57:01.780 --> 00:57:12.679 Community Hall: Okay, I will make my comment then. So, from my standpoint, I very, I think I'm happy that the applicant is bringing this forward, and it's great that they are choosing their home in Cupertino. 415 00:57:12.680 --> 00:57:24.199 Community Hall: I am fine with most of the home remodel elements. I don't think that they impede upon BlackBerry Farm. I am a very frequent park goer at McClellan Ranch Park, and so I'm quite familiar with 416 00:57:24.200 --> 00:57:49.019 Community Hall: the oasis that it is, the green space, and the feeling that you have when you walk there is that you are in nature, because the homes are really not very visible from it. I went back and I looked again. It seemed like most of the homes in the area either had balconies or, at most, a 5-foot retaining wall, but not anything more than that. But I think to not let this applicant 417 00:57:49.020 --> 00:58:04.920 Community Hall: any form of yard, I think would be a little bit unreasonable and also not characteristic with the neighborhood. That said, I think that we set a really important precedent with the grading work that we do here, and if we do have one home that is grading all the way up to Blackberry Farm. 418 00:58:05.400 --> 00:58:27.370 Community Hall: who knows what other precedents we are then setting, and then next thing you know, Blackberry Farm is an entirely different park that feels more like a neighborhood rather than a nature oasis. So, you know, from my standpoint, I would definitely deny the hillside exception for grading. I think there's possibly a small amount of rear yard that could make sense for this home, but probably not the 15 feet of retaining wall that's currently proposed. 419 00:58:27.400 --> 00:58:38.499 Community Hall: Tree removal permit, same thing. I would not approve that, especially if we are reducing the grading. You should be able to keep a lot more of the trees on that property anyway. 420 00:58:38.790 --> 00:58:53.020 Community Hall: On the flat roof, I'm happy to hear that most of the Commission is okay with that, because from my standpoint, when we have architectural styles and we start to mix different elements of that, it no longer becomes that architectural style. So I think… 421 00:58:53.020 --> 00:59:00.800 Community Hall: And some cities even have this as… as part of their ordinance, is that you must be one architectural style, and I think for this to be modern. 422 00:59:00.800 --> 00:59:05.950 Community Hall: should have a flat roof. I've seen other flat roofs in Cupertino, so from my standpoint, I'm okay with that. 423 00:59:06.390 --> 00:59:08.789 Community Hall: So, those are my comments. Do we have a motion? 424 00:59:09.380 --> 00:59:19.920 Community Hall: I'll make a motion if I can get a second. I move to find the project exempt from CEQA and approve the R1 exception for the garage design, the design review permit for the 425 00:59:20.460 --> 00:59:34.900 Community Hall: Two-story residents with second-story site setbacks, a minor residential permit for the balcony, but do not approve the hillside exception or the tree removal permit, and do not require the staff- recommended conditions that the applicant revise the design to reduce their building mass. 426 00:59:37.520 --> 00:59:48.109 Community Hall: I'm sorry, can you repeat? So you would be denying the hillside and tree removal, correct? Yes, and saying they don't require… they don't need to, revise the design to reduce the building mass? 427 00:59:50.190 --> 00:59:51.230 Community Hall: I… 428 00:59:51.430 --> 00:59:57.860 Community Hall: Sorry, I don't… City Attorney, I don't know how we, is it okay for me to clarify at this point, or do we need a seconder on the motion? 429 00:59:59.760 --> 01:00:04.330 Community Hall: Excuse me, are we voting on all of these at once, or shouldn't we be doing them individually? 430 01:00:09.060 --> 01:00:14.110 Community Hall: I recommend probably receiving a second, and then you can make, suggest a friendly amendment. 431 01:00:16.400 --> 01:00:19.340 Community Hall: Do we have a second for the motion? I'll second it. 432 01:00:20.180 --> 01:00:20.920 Community Hall: Okay. 433 01:00:22.390 --> 01:00:41.370 Community Hall: From my standpoint, Commissioner Sharp, I'm fine with voting on the entire thing. Are there specific components that you wanted to pull out? No, so can you repeat your, motion? Sure. So the, move to find the project exempt from CEQLA and conditionally approve the 434 01:00:41.530 --> 01:00:57.259 Community Hall: R1 exception for the garage design, the design review permit for the two-story residence with second-story sites setbacks of less than 15 feet, and the second to first floor area ratio exceeding 66%, and the minor residential permit for the balcony. 435 01:00:57.320 --> 01:01:05.839 Community Hall: But do not approve the hillside exception or the tree removal permit for the removal and replacement of the oak trees. 436 01:01:06.020 --> 01:01:12.749 Community Hall: And also, do not require the staff recommended conditions that the applicant revise the design to reduce the building mass. 437 01:01:15.500 --> 01:01:18.430 Community Hall: Okay, so we have a motion and a second, is that right? 438 01:01:18.740 --> 01:01:25.999 Community Hall: So, I don't see why we would take an allowed 66% second to first floor area ratio to 81%. 439 01:01:26.630 --> 01:01:27.720 Community Hall: 81? 440 01:01:28.020 --> 01:01:29.300 Community Hall: Where'd you get 81? 441 01:01:30.030 --> 01:01:34.130 Community Hall: I think before we proceed, I think the chair wanted to make a friendly amendment. 442 01:01:34.620 --> 01:01:44.270 Community Hall: That might be the most orderly place to go next. I actually had a clarifying question for staff, on this. I… my understanding was the… 443 01:01:44.560 --> 01:01:52.949 Community Hall: The staff was proposing for the building massing to be reduced. Whether it was a flat or a sloped roof, it would still be reduced, correct? 444 01:01:53.430 --> 01:01:55.780 Community Hall: Right, our condition is to… 445 01:01:55.950 --> 01:02:08.549 Community Hall: bring the building into compliance with one of our building envelope requirements, and so that… that is the reduction that you see, that one foot reduction that we discussed before. So if… if you're striking both of those, that, I think, would be an exception as well to our code. 446 01:02:08.750 --> 01:02:19.210 Community Hall: Okay, yes, that would have been my friendly amendment, would be to have the flat roof in compliance with, you know, staff- recommended building massing. I'll accept that. 447 01:02:21.630 --> 01:02:25.149 Community Hall: In the secondary, you said that as well? Yes, absolutely. 448 01:02:26.770 --> 01:02:31.129 Community Hall: And Commissioner Rao, you had comments? Yes, I go back to this, 449 01:02:31.600 --> 01:02:35.420 Community Hall: Table of allowed versus proposed, and… 450 01:02:36.230 --> 01:02:41.430 Community Hall: This is a significant increase in what is proposed, right? For second to first floor area ratio. 451 01:02:41.570 --> 01:02:44.770 Community Hall: I think the justification does not, to me. 452 01:02:45.270 --> 01:02:48.430 Community Hall: Makes sense. I mean, all it says is… 453 01:02:48.610 --> 01:02:58.589 Community Hall: a design review permit is required, but why would we allow this? Why would we go from… I can understand if it is 66% to 68%, why would you go from 66% to 81%? Right, I… 454 01:02:58.590 --> 01:03:19.629 Community Hall: I'll maybe reframe this as the 66% is not a limitation, necessarily, but a threshold for when you would need to start doing an architectural review. And the reason for that is we typically are wanting to see tiering of the second floor, meaning that it's a little bit smaller than the first floor, and when we don't see that, that's when we want to make sure that it's following a design style, similar to this one, the contemporary style. 455 01:03:19.630 --> 01:03:22.340 Community Hall: And that all of those kind of points are being met. 456 01:03:22.640 --> 01:03:37.569 Community Hall: Along the way. And so, again, this is more of it just triggering the design review, it's just the threshold we have is the 66%. It's not necessarily saying that you can't have more than that. At what proposed threshold would it be unacceptable to staff? Would you allow 100%? 457 01:03:38.060 --> 01:03:39.629 Community Hall: I, I think that if we could… 458 01:03:39.930 --> 01:03:54.569 Community Hall: try and justify that. I feel like that is outside of the norm, and definitely not something that we would usually consider. But for the most part, I don't think that the 80% is, again, outside of the norm that I see when I review these permits. Again, since they are typically staff-level, I feel pretty comfortable saying that. 459 01:03:55.600 --> 01:04:09.650 Community Hall: Yeah, I think, as Emmy said, is it's really a threshold that if you stay under 66%, you avoid the design review process altogether. If you go above that, you now have gotten yourself into a discretionary design review. 460 01:04:10.080 --> 01:04:29.560 Community Hall: So that's really the threshold. I don't know what the maximum would be allowed, if there's ever been 100%. I don't know, but this is not uncommon to exceed 66%. It's really the applicant's choice, that if they want to go over that, they now go through a design review process they otherwise wouldn't. Is 80% common? 461 01:04:30.230 --> 01:04:37.370 Community Hall: I think so. I'd have to really go back and look at it, but that's just, you know, not much of an increase over 66. 462 01:04:37.550 --> 01:04:42.499 Community Hall: I think if somebody's going to want to go over, they're going to go over by more than just 2 or 3%. 463 01:04:42.670 --> 01:04:48.080 Community Hall: Otherwise, I think they would avoid the process. And what sort of visual impact does it have for the 464 01:04:48.610 --> 01:04:51.819 Community Hall: For the rare view seen from the BlackBerry farm. 465 01:04:53.580 --> 01:04:59.029 Community Hall: That's very difficult to say. I mean, this home is sitting up on the top of the flat area. 466 01:04:59.250 --> 01:05:03.449 Community Hall: I'm not even sure what the distance is from the trail, but it's quite a bit. 467 01:05:04.320 --> 01:05:10.029 Community Hall: So I think while the grading certainly has a potential view impact, from the trail. 468 01:05:10.520 --> 01:05:17.359 Community Hall: the house itself and the second-story setback, I think that would be minimal when viewed from the trail from Blackberry Farm. 469 01:05:17.730 --> 01:05:22.619 Community Hall: house is clearly going to be much bigger than the existing home. It's probably 3 times the size. 470 01:05:24.230 --> 01:05:39.640 Community Hall: I'll just add to that that there is a 40… a nearly 40- foot setback to the residence from the property line, and again, as the applicant mentioned, there is still about 30 feet to where you have the actual trail itself start, and so there's a pretty significant distance between the two. However. 471 01:05:39.640 --> 01:05:49.229 Community Hall: There's also tree canopy that we see that's existing there, again, that we've discussed as part of this, that we do expect to screen majority of the view of the residents from that trail. 472 01:05:49.290 --> 01:05:54.629 Community Hall: So, does staff agree that there is a need to protect the riparian corridor, given the 473 01:05:54.950 --> 01:06:00.999 Community Hall: Location of this property, and what… what considerations has staff taken into account, given the… 474 01:06:01.160 --> 01:06:03.250 Community Hall: proximity to the riparian corridor. 475 01:06:05.900 --> 01:06:13.859 Community Hall: When you say protection to the Riparian corridor, I'm not sure what exactly… Proximity to the Riparian corridor. But by protections. 476 01:06:14.500 --> 01:06:16.830 Community Hall: What would you have in mind? 477 01:06:17.480 --> 01:06:21.780 Community Hall: what… Approvals have you denied? 478 01:06:21.970 --> 01:06:24.329 Community Hall: That you would otherwise have allowed in an R1. 479 01:06:25.710 --> 01:06:33.750 Community Hall: I don't know. Again, we're dealing with a pretty atypical project. I have no direct experience in the city with anything like this. 480 01:06:34.450 --> 01:06:35.200 Community Hall: Thank you. 481 01:06:37.670 --> 01:06:39.280 Community Hall: That's true. So… 482 01:06:39.910 --> 01:06:50.999 Community Hall: You mentioned going from 66 to 81 was only a couple of a couple of percent. Maybe I misunderstood what you were saying. I didn't say a couple of percent. I said it's not… 483 01:06:51.320 --> 01:06:54.750 Community Hall: all that significant. If you… if you know 484 01:06:55.510 --> 01:07:04.950 Community Hall: You're gonna have to go through design review at 66%. I think it would be unlikely for somebody to want to go through that process at 68 or 69. Okay. They're probably going to exceed it by more. 485 01:07:05.170 --> 01:07:08.219 Community Hall: To want to go through the added cost and time. 486 01:07:12.580 --> 01:07:17.700 Community Hall: Alright, do we have any other comments on… this motion. 487 01:07:18.500 --> 01:07:21.800 Community Hall: Actually, I might… I might give one, just because I think this… 488 01:07:22.020 --> 01:07:30.319 Community Hall: This issue was something that, that did come up in this discussion, that perhaps for in the future there might be some consideration of formulating 489 01:07:30.580 --> 01:07:37.899 Community Hall: Formulating, perhaps, recommendations for standards for houses that are adjacent to 490 01:07:38.190 --> 01:07:40.549 Community Hall: You know, it's a kind of weird thing. 491 01:07:40.750 --> 01:07:47.270 Community Hall: I live near Hoover Park, but I don't think that that warrants the same level of, you know, review. 492 01:07:47.390 --> 01:07:53.449 Community Hall: That, you know, that would be true at Blackberry Farm or, you know, Stevens Creek Trail, that kind of thing. 493 01:07:53.660 --> 01:07:59.059 Community Hall: So, I think that I would just make that recommendation that's something to consider in the future. Maybe that's… 494 01:07:59.260 --> 01:08:04.369 Community Hall: Maybe that's not something, you know, it's too subjective, but probably worth considering. 495 01:08:07.620 --> 01:08:09.160 Community Hall: Any other comments? 496 01:08:10.090 --> 01:08:15.450 Community Hall: Nope, are we ready? Actually, I have one question for staff. Sorry, okay. 497 01:08:15.770 --> 01:08:18.780 Community Hall: If we, you know, in this motion. 498 01:08:18.950 --> 01:08:28.900 Community Hall: we reject the hillside grading, then what is the next step for the applicant? Would they return with a reduced grading plan, or would they return with nothing at all? Like, how does that work? 499 01:08:30.399 --> 01:08:48.229 Community Hall: If you deny this application, that would be… my assumption is the end of it, unless it's appealed. And so they could resubmit for a new application with a revised design, or even with the same design, and have it be re-heard by your commission, but again, that application itself would be completed. 500 01:08:48.910 --> 01:09:08.090 Community Hall: Well, I meant for just specifically the hillside component. So, that's specifically for the hillside exception. If you're talking about alternative designs that may come about, there is still an allowance for up to 500 square feet of grading on the 30% slope, so they may come for a revised design with that. Discussions of decks have 501 01:09:08.130 --> 01:09:16.429 Community Hall: happened, so maybe that would be something that they come back with. I'm not going to really speculate on what it would be, but there are alternatives that could potentially be pursued. Thank you. 502 01:09:17.080 --> 01:09:18.520 Community Hall: Vice Chair, did you have a question? 503 01:09:18.840 --> 01:09:20.069 Community Hall: Work comment? Okay. 504 01:09:20.520 --> 01:09:26.789 Community Hall: Are we ready? I think we're ready to entertain a vote on this? I don't see the seconded by in the, oh, there we go, okay. 505 01:09:27.990 --> 01:09:29.059 Community Hall: Are we boarding? 506 01:09:40.710 --> 01:09:44.420 Community Hall: Tracy? Oh, I thought it comes back. I hit it. 507 01:09:47.740 --> 01:09:52.389 Community Hall: The motion carries, with Vice Chair Sharp and Commissioner Ryle voting no. 508 01:09:53.979 --> 01:10:02.219 Community Hall: Okay, thank you very much. Would anyone be interested in a 5-minute break? Okay, we will take a 5-minute break before the next agenda item. Thank you. 509 01:17:18.260 --> 01:17:18.960 Community Hall: Okay, sorry. 510 01:17:19.160 --> 01:17:20.430 Community Hall: This time I'll try to close it. 511 01:17:47.520 --> 01:17:48.700 Community Hall: Amazing. 512 01:17:53.490 --> 01:17:54.860 Community Hall: Alright. 513 01:18:18.720 --> 01:18:19.880 Community Hall: Excellent. 514 01:18:22.610 --> 01:18:24.219 Community Hall: Oh, sorry, I thought you were saying wait, okay. 515 01:18:24.720 --> 01:18:42.240 Community Hall: Thank you very much to the community for your patience. We are now ready to move on to Agenda Item 3, which is to consider a tentative map, architectural and site approval, and tree removal permit for the construction of a 51-unit townhome condominium development on Housing Element Priority Housing Sites 25 through 28 with Summerhill Homes. 516 01:18:42.410 --> 01:18:58.479 Community Hall: The public hearing is now open, and do we have a staff report? Yes, thank you, Chair. Just want to have a few comments on this. You had just touched on it, though, that for people in attendance, this is a housing element priority housing site. 517 01:18:58.510 --> 01:19:08.189 Community Hall: We know there was a lot of community interest in this project. The site was put on the housing element in the summer of 2024. 518 01:19:08.610 --> 01:19:20.680 Community Hall: About a year later, this site had always been in a high fire hazard zone, but a year after that, in 2025, it was reclassified as a very high fire hazard zone site. 519 01:19:20.870 --> 01:19:34.299 Community Hall: Which the city in July of last year adopted the updated fire maps and updated its building code so we would be compliant with the change, which originated with CAL FIRE and state law. So… 520 01:19:34.500 --> 01:19:38.640 Community Hall: Those, I suspect, will be some of the competing comments we get tonight. 521 01:19:39.020 --> 01:19:49.720 Community Hall: This project, unlike the last project we talked about, being a multifamily project, is subject to density bonus, SB330, and a lot of the 522 01:19:49.840 --> 01:20:06.539 Community Hall: typical housing laws that we have seen that have placed more limitations on what discretionary bodies are able to do. So, with that, I will turn the meat of the presentation over to Emmy. I do know the developer and their team are here tonight as well, and we'll have a presentation 523 01:20:06.720 --> 01:20:11.389 Community Hall: And we also have one representative from Santa Clara County Fire. 524 01:20:11.520 --> 01:20:19.869 Community Hall: And, our team that prepared the CEQA document with David J. Powers. So, we got quite a few people here actually in person. 525 01:20:20.220 --> 01:20:33.379 Community Hall: Thank you very much. Excuse me, I forgot to do ex parte communications, so will you please do that disclosure now? We'll go left to right, starting with Commissioner Lunskog. I met with the developers who took me through the detail plans. 526 01:20:34.210 --> 01:20:36.090 Community Hall: I did not meet with the developer. 527 01:20:36.700 --> 01:20:41.509 Community Hall: I have met with the developer multiple times, as well as the community members. Thank you. 528 01:20:42.090 --> 01:20:45.470 Community Hall: Likewise, met with the developer, met with the community as well. 529 01:20:45.930 --> 01:20:49.820 Community Hall: And same for me. I met with the developers and have spoken with people in the community. 530 01:20:50.550 --> 01:20:51.600 Community Hall: Alright, thank you. 531 01:20:57.590 --> 01:20:58.390 Community Hall: Okay. 532 01:20:58.540 --> 01:21:07.840 Community Hall: Thank you again, Chair Kasulcheron and Commissioners, Emi Suyama, planning staff, here today, now to discuss the Summerhill Homes request for a housing development project. 533 01:21:11.610 --> 01:21:25.259 Community Hall: This property is located on Linda Vista Drive. It's within the Monta Vista neighborhood and adjacent to Deep Cliff Golf Course. The property is zoned R3TH for medium-high density multifamily with townhome allowances. 534 01:21:27.790 --> 01:21:44.380 Community Hall: The site currently has four single-family residences, one on each parcel. The City received a preliminary application under Senate Bill 330 in October of 2024, which vested the project standards to those that were in place at the time that that application was submitted. 535 01:21:45.210 --> 01:21:58.910 Community Hall: Additionally, the project site was identified as a priority housing site, sites number 25 through 28, and was rezoned for medium-high density housing through the city's sixth cycle housing element update. 536 01:22:01.980 --> 01:22:18.170 Community Hall: The project makes use of a number of state housing laws, including the Housing Accountability Act, which acts as a limit to the City's ability to deny or condition the project. Additionally, it stipulates that the City cannot apply non-objective standards to a housing development project. 537 01:22:18.520 --> 01:22:33.089 Community Hall: SB330, otherwise known as the Housing Crisis Act, streamlines the permitting process, and as previously noted, it allows the applicant to lock in or vest fees and standards that are in place at the time that they submit an application. 538 01:22:33.520 --> 01:22:42.170 Community Hall: The project also makes use of the state's density bonus law, which allows for additional units, waivers, concessions, and reduced parking standards. 539 01:22:42.300 --> 01:22:49.159 Community Hall: For this project, the application… the applicant is only proposing to make use of the allowed concessions and waivers. 540 01:22:50.410 --> 01:23:01.650 Community Hall: Finally, the City is subject to the requirements of the No Net Loss Law under Senate Bill 166, which requires that the City maintain a list of housing sites that can accommodate the required RENA. 541 01:23:02.000 --> 01:23:10.860 Community Hall: As noted in the staff report, the city is currently unable to meet the required RENA with the sites identified, and is working to identify additional sites for housing. 542 01:23:10.980 --> 01:23:20.509 Community Hall: The proposed, or the housing element, projected 84 units being provided on this site. The project proposed 51, fewer than the expected units. 543 01:23:20.970 --> 01:23:25.880 Community Hall: And will require that the City identify a new location for the units to meet RENA. 544 01:23:27.960 --> 01:23:28.830 Community Hall: Okay. 545 01:23:29.300 --> 01:23:46.050 Community Hall: Here you can see an overview of the project's consistency with typical development requirements. The project proposes to build at the lowest allowed density for the site. The applicant has also increased the side yard setbacks adjacent to neighboring residences, and the rear setback adjacent to Deep Cliff Golf Course. 546 01:23:46.240 --> 01:23:52.730 Community Hall: Additionally, the applicant is utilizing state density bonus law waivers to address some of these requirements. 547 01:23:53.010 --> 01:23:56.260 Community Hall: These waivers will be discussed in detail later in this presentation. 548 01:23:59.830 --> 01:24:10.160 Community Hall: Okay, the project consists of 51 townhome-style condominium units spread across 10 buildings, with 10 below market rate units and 41 market rate units. 549 01:24:10.280 --> 01:24:21.220 Community Hall: There is a mix of 3 to 6 units per building, with each building being 3 stories. The proposed units range from about 2,300 square feet to about 2,800 square feet. 550 01:24:22.840 --> 01:24:29.769 Community Hall: 50 new trees will be planted on-site, and 2 existing oak trees along shared property lines will be protected in place. 551 01:24:30.560 --> 01:24:34.650 Community Hall: And then the project also includes a vesting tentative map for condominium purposes. 552 01:24:37.580 --> 01:24:53.719 Community Hall: Here you can see the proposed site layout, with the 10 buildings oriented parallel to Linda Vista Drive, and the site divided by Abulich Court, which is an existing public right-of-way. The proposed BMR units are identified by the red dots, and it should also be noted that each unit has a two-car garage. 553 01:24:58.420 --> 01:25:03.309 Community Hall: Here you can see a rendering of the proposed project, showing a view of the buildings from Linda Vista Drive. 554 01:25:07.800 --> 01:25:27.049 Community Hall: The project has been found to be consistent with the applicable objective standards of the City's General Plan, below market rate housing manual, and municipal code, and the project includes one concession under the density bonus law to waive the requirements for BMR units to be comparable to market rate units in terms of the unit type. 555 01:25:28.830 --> 01:25:40.310 Community Hall: I'll note that concessions and waivers proposed under the density bonus law can only be denied under specific circumstances, including that they have an adverse impact on historic property, health, or safety. 556 01:25:41.090 --> 01:25:59.329 Community Hall: In addition to this concession, the applicant is also utilizing 5 density bonus waivers. For each of these waivers, the applicant has noted that imposing the standards could potentially result in the elimination of units, reduced floor areas, or substantial changes to the design of the buildings, which is not consistent with the project as proposed by the applicant. 557 01:26:01.760 --> 01:26:12.950 Community Hall: The first of the 5 waivers is to allow for a modification of the required 12-foot street side setback along Evil Edge Court to instead have a 3 foot 7 inch setback. 558 01:26:17.370 --> 01:26:28.630 Community Hall: The second waiver is to allow for a reduction of the required 6-foot clearance for private open space. The applicant is proposing varying dimensions, with the smallest dimension being 4.5 feet. 559 01:26:31.640 --> 01:26:42.170 Community Hall: The final three waivers would allow for an increase in the height of the buildings, from the 30-foot maximum to a total of 40 feet 7 inches. 560 01:26:42.400 --> 01:26:51.789 Community Hall: On the high end, an increase to the maximum floor area ratio from the allowed 85% to a 136% of the net lot area. 561 01:26:51.980 --> 01:26:59.299 Community Hall: And a reduction in the required size of parking spaces from 9.5 by 20 feet to 9.5 by 18.5 feet. 562 01:27:01.500 --> 01:27:09.519 Community Hall: It should also be noted that for purposes of planning, the maximum height is measured from the natural grade to the peak roof. 563 01:27:13.130 --> 01:27:19.760 Community Hall: And while not required as part of this planning entitlement, the project will be required to provide public art following project 564 01:27:20.040 --> 01:27:28.250 Community Hall: approval. At this time, the applicant is proposing to provide a public art plaza in the southern corner of the Evilage Court and Linda Vista intersection. 565 01:27:31.180 --> 01:27:34.540 Community Hall: Based on the site's characteristics, staff has recommended 566 01:27:34.750 --> 01:27:40.990 Community Hall: is recommending, and the applicant has requested, payment of the parkland in lieu fees consistent with the Quimby Act. 567 01:27:43.930 --> 01:27:58.899 Community Hall: The applicant is also proposing a pedestrian and bike trail connection between the project site and Stevens Creek Trail. Should it be approved, the applicant is requesting a credit towards park and lieu fees for the cost of construction to connect up to $377,000. 568 01:28:02.310 --> 01:28:13.560 Community Hall: The project was also reviewed against the City's BMR requirements, and staff found that the BMR units are generally comparable in size to the market rate units, with BMR units being an average of about 23 569 01:28:13.740 --> 01:28:18.339 Community Hall: 50, and the market rate units being about 2,700 square feet. 570 01:28:22.990 --> 01:28:32.040 Community Hall: The project has been found to qualify for the statutory exemption under the provisions of Assembly Bill 130. In the analysis for this exemption, the third 571 01:28:32.130 --> 01:28:44.260 Community Hall: party reviewers of the city reviewed the environmental reports that are listed here, and confirmed that the project would not have significant effects on the environment, and meets the criteria for the statutory exemption. 572 01:28:44.610 --> 01:28:53.250 Community Hall: The exemption outlined in AB130 also includes a number of processing timelines, which require the City to make a decision on this project by April 4th. 573 01:28:56.910 --> 01:29:04.580 Community Hall: As I previously noted, the site was included in the housing element update, which increased the allowed density in July of 2024. 574 01:29:04.750 --> 01:29:12.350 Community Hall: Following the rezoning of the site, the applicant submitted their SB330 preliminary application, vesting the standards that were in place at that time. 575 01:29:12.890 --> 01:29:22.060 Community Hall: Approximately 4 months later, CAL FIRE hazard maps were updated, which now indicate that the project site is in the very high fire hazard severity zone. 576 01:29:22.490 --> 01:29:33.750 Community Hall: Consistent with the requirements for the EB130 exemption, the project was reviewed under and found to be consistent with the current standards for development within very high fire hazard severity zones. 577 01:29:38.120 --> 01:29:57.950 Community Hall: The project has received a number of public inquiries and comments throughout its review. As such, in addition to the surround… or the standard noticing that would typically be sent to neighbors within 300 feet, the city sent mailed notices to an over 1,000 foot radius, and provided electronic notifications to those who had signed up to receive them. 578 01:29:58.290 --> 01:30:01.820 Community Hall: The majority of the public comments related to the concerns 579 01:30:02.070 --> 01:30:10.049 Community Hall: With projects density, anticipated traffic impacts, and a perceived increased risk for fire. 580 01:30:11.910 --> 01:30:20.719 Community Hall: And with that, staff recommends that you adopt the resolutions to approve the permits. This is based on the revised resolutions that were provided to you all. 581 01:30:20.830 --> 01:30:22.209 Community Hall: As a desk item 582 01:30:25.740 --> 01:30:30.240 Community Hall: And that concludes my presentation. Thank you very much. Do we have any questions from the Commission? 583 01:30:30.460 --> 01:30:31.849 Community Hall: Commissioner Rao. 584 01:30:32.290 --> 01:30:39.340 Community Hall: Thank you. Is it possible to project Attachment 7 with the AB130 exemption checklist? 585 01:30:40.850 --> 01:30:41.940 Community Hall: Yes, wonderful. Thank you. 586 01:30:44.700 --> 01:30:48.310 Community Hall: Any other questions from the Commission before we move on to the applicant? 587 01:30:49.840 --> 01:31:00.079 Community Hall: Okay, then I think we're ready to move on to the applicant presentation. Oh, we were taking questions, Osta? I, did anyway. Yeah, we have a question and we're pulling it up now. 588 01:31:13.840 --> 01:31:14.670 Community Hall: Okay. 589 01:31:23.440 --> 01:31:26.029 Community Hall: Okay, thank you for your patience with that. 590 01:31:26.200 --> 01:31:30.249 Community Hall: And then if I could have video share my screen, thank you. 591 01:31:30.370 --> 01:31:33.299 Community Hall: Thank you. If you might scroll down to the checklist… 592 01:31:38.020 --> 01:31:43.040 Community Hall: I guess we can zoom this, Debbie. I guess I can zoom this. Is there any way you can zoom this? 593 01:31:44.890 --> 01:31:47.429 Community Hall: So, if you scroll down to the next page. 594 01:31:50.470 --> 01:31:55.269 Community Hall: Alright, so there's, number 5, I mean, item number 4. Can you comment on… 595 01:31:57.460 --> 01:32:01.189 Community Hall: I guess it starts on the previous page, item number 4. Okay. Yeah. 596 01:32:01.440 --> 01:32:05.820 Community Hall: So, which of these… Categories does the project meet? 597 01:32:06.020 --> 01:32:12.739 Community Hall: Are we saying the existing four single-family residences qualified as an existing urban use? 598 01:32:16.330 --> 01:32:27.169 Community Hall: For this infill exemption, it's pretty similar to the Class 32 categorical exemption we've had. Pretty much any urbanized area, any incorporated city. 599 01:32:27.410 --> 01:32:30.990 Community Hall: is gonna meet the criteria for an infill development. So… 600 01:32:31.200 --> 01:32:45.029 Community Hall: this site is in a developed area, it has utilities. While it's adjacent to a golf course and single-family homes, those are development, so it would clearly meet the criteria. Okay, so it's the… probably the last 601 01:32:45.030 --> 01:32:52.790 Community Hall: bullet on that page, at least 75% within a quarter mile is open use. Correct, yes. Good, thank you. If you can scroll down a little bit further. 602 01:32:54.460 --> 01:33:00.199 Community Hall: There's… yeah, right there. The project is consistent with the existing general plan or zoning for the site. 603 01:33:00.350 --> 01:33:04.330 Community Hall: How should we understand the overlap between density bonus waivers? 604 01:33:04.580 --> 01:33:07.200 Community Hall: And consistency with the general plan when the… 605 01:33:07.440 --> 01:33:16.080 Community Hall: proposed project seeks density bonus waivers, is that for the purpose of this exemption, still considered consistent with the general plan? 606 01:33:16.400 --> 01:33:24.650 Community Hall: That's correct. Density bonus, the waivers do not take you out of, say, inconsistency with zoning or general plan. 607 01:33:26.210 --> 01:33:30.139 Community Hall: So you really… you're looking at the project. In this case, you have a project that… 608 01:33:30.840 --> 01:33:37.689 Community Hall: is coming in with the R3TH zone. It is a townhome development. It's within the 20 to 35 density range. 609 01:33:37.840 --> 01:33:44.559 Community Hall: And the density bonus waivers can't be used as a means to say it's now inconsistent with the general plan or zoning. 610 01:33:46.090 --> 01:33:52.830 Community Hall: Okay, and… Is there… I don't know if Attorney Wu has any guidance on this? Is this based on… 611 01:33:52.960 --> 01:34:00.380 Community Hall: Staff discretion and interpretation, or is there state law that talks about how the overlap of density bonus waivers occurs with 612 01:34:00.770 --> 01:34:07.900 Community Hall: the AB130 exemption criteria. Yeah, I think Assistant Director Connolly accurately described the status. 613 01:34:09.080 --> 01:34:12.210 Community Hall: Okay, so the, the state law itself? 614 01:34:12.480 --> 01:34:25.899 Community Hall: does not speak to this, does it? It does. Yeah, there is a stipulation specifically in AB130, or in the Public Resources Code, that states that we cannot use the waiver or concession or request thereof to 615 01:34:26.040 --> 01:34:30.890 Community Hall: say that it's no longer consistent with our general plan or zoning. Okay, thank you. 616 01:34:31.240 --> 01:34:37.989 Community Hall: There's the next item there, if you scroll down, I believe it talks about the fire hazard severity zone. 617 01:34:38.880 --> 01:34:42.099 Community Hall: Is there a question here on that? Yeah, there it is, number 7. 618 01:34:43.870 --> 01:34:53.139 Community Hall: So, just zoning in on the fire hazard severity zone, can you comment on what the AB130 exemption criteria is? I understand your 619 01:34:53.340 --> 01:34:54.840 Community Hall: you're listing… 620 01:34:54.960 --> 01:35:04.559 Community Hall: a fire mitigation strategy that suffices? What… who makes that determination? Is it planning, commission? Is it planning staff? Is it the fire department? 621 01:35:05.650 --> 01:35:14.929 Community Hall: The CEQA determination is always going to be the city's determination. We're the lead agency for CEQA, so we can't transfer that away, but… 622 01:35:15.170 --> 01:35:23.190 Community Hall: This is in a very high fire hazard zone, which, under AB130, is something that could disqualify you, except… 623 01:35:23.400 --> 01:35:30.140 Community Hall: If you read further on that, where it says, within a very high fire hazard zone. 624 01:35:30.450 --> 01:35:42.920 Community Hall: This subparagraph does not apply to sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development, which this project does. 625 01:35:43.060 --> 01:35:48.649 Community Hall: So, that is where… Essentially, if you had a project 626 01:35:48.890 --> 01:35:54.499 Community Hall: That was in a very high fire hazard zone, and it was not compliant with now the current 627 01:35:55.290 --> 01:36:01.689 Community Hall: Building standards that are required, say, for defensible space or, you know, anti-combustible materials. 628 01:36:01.860 --> 01:36:04.569 Community Hall: then you would not be able to apply AB130. 629 01:36:04.770 --> 01:36:10.560 Community Hall: Since this project does… it is compliant, and AB130 would be applicable. 630 01:36:12.230 --> 01:36:18.139 Community Hall: And specifically, I think if you scroll down, it talks about how this mitigation is met, is that… 631 01:36:18.520 --> 01:36:19.949 Community Hall: Is it on the next page? 632 01:36:20.070 --> 01:36:26.719 Community Hall: Yes, they are correct. I think that goes to the top of the next page. So it, yeah, it's like Chapter 7A of the building code. 633 01:36:26.850 --> 01:36:28.599 Community Hall: And so that… 634 01:36:29.980 --> 01:36:38.290 Community Hall: List that you have, which talks about the fire sprinklers within 30 feet, and using fire-resistant material within 30 feet, and so on. 635 01:36:39.060 --> 01:36:53.629 Community Hall: That matches the state law statutes and what would satisfy that fire hazard mitigation? Yes, that would be with the current standards for construction in a very high fire hazard zone. And again, who makes the determination? Is it fire, or is it… 636 01:36:53.630 --> 01:37:05.539 Community Hall: Planning Commission, planning staff? We rely on County Fire Review to make that determination, since they're the technical experts in this area. Okay, and is there any written evidence submitted by fire for this hearing? 637 01:37:05.760 --> 01:37:19.839 Community Hall: Well, we do have a representative here, and I know a memo was submitted indicating their approval of the project as designed. So, if I may, Chair, I think this section is reserved for questions from the presentation to the Senate commissioners. Have any? 638 01:37:19.840 --> 01:37:28.559 Community Hall: some of these questions, I wonder whether it's more appropriate for when we get to the discussion portion of this. Sounds good. I will hold further questions. Thank you. 639 01:37:29.160 --> 01:37:32.999 Community Hall: Okay, thank you. Any other questions from the Commission for staff? 640 01:37:34.820 --> 01:37:39.720 Community Hall: All right, I will withhold mine until after public comment. May we have the applicant presentation, please? 641 01:37:55.160 --> 01:37:57.090 Community Hall: Good evening, Planning Commissioners. 642 01:37:57.340 --> 01:37:59.440 Community Hall: Thank you for the opportunity to speak with you. 643 01:37:59.650 --> 01:38:03.129 Community Hall: My name is Austin Lin, Development Manager for Summerhill Homes. 644 01:38:03.610 --> 01:38:10.850 Community Hall: I'm joined tonight by Steve Bull, Vice President of Development for the project, Kevin Ebrahimi, our Senior Vice President of Development. 645 01:38:11.280 --> 01:38:18.170 Community Hall: Members of our design team, and our legal counsel, Margo Bradish from Cox Castle, who will say a few words after me. 646 01:38:19.170 --> 01:38:30.359 Community Hall: We're excited to bring a thoughtfully designed housing community to West Cupertino, which will create a rare opportunity for new housing for families within walking distance of Cupertino's award-winning schools. 647 01:38:31.350 --> 01:38:41.520 Community Hall: Before getting into the details, I'd like to sincerely thank City staff for their collaboration throughout this process. In particular, Emi Sugiyama, who has been exceptional to work with. 648 01:38:42.190 --> 01:38:53.170 Community Hall: We'd also like to thank Luke Conley from the Planning Department, Jennifer Chu from the Public Works Department, as well as Matthew McKenna and Kayla Flanagan from the Santa Clara County Fire Department. 649 01:38:53.270 --> 01:38:54.549 Community Hall: Next slide, please. 650 01:38:56.230 --> 01:39:01.559 Community Hall: We are proposing to build 51 townhomes, which is the minimum number of homes required for the site. 651 01:39:02.330 --> 01:39:11.720 Community Hall: The project consists exclusively of 4-bedroom townhome units to accommodate families with floor areas ranging from 1,700 to 2,300 square feet. 652 01:39:11.860 --> 01:39:14.290 Community Hall: And each home will have a two-car garage. 653 01:39:15.100 --> 01:39:25.240 Community Hall: All the homes will be offered for sale, and the majority will be for market rate homes, with 10 homes designated as below market rate, and sold through the City's affordable housing program. 654 01:39:25.890 --> 01:39:34.920 Community Hall: In addition, the project includes two private amenity spaces for the residents, featuring casual outdoor seating, as well as public art. 655 01:39:35.690 --> 01:39:42.030 Community Hall: As Emmy mentioned, the Linda Vista site is designated as a priority housing site in the city's housing element. 656 01:39:42.570 --> 01:39:48.370 Community Hall: Under current zoning, the project requires a density range of 20 to 35 units per acre. 657 01:39:48.600 --> 01:39:54.790 Community Hall: Which equates to a unit count range of 51 to 87 units for the 2.5 acre site. 658 01:39:55.660 --> 01:40:03.600 Community Hall: While state density bonus law could allow for up to 100 units, we are intentionally proposing the minimum allowable density of 51 units. 659 01:40:04.600 --> 01:40:14.330 Community Hall: For a brief history at the inclusion of the site into the housing element, the draft housing element originally assigned a minimum density of 30 units per acre to the site. 660 01:40:14.840 --> 01:40:27.529 Community Hall: The property owners formally objected to the 30 units per acre designation and requested the minimum density for the site be reduced to 20 units per acre, which the City Council voted to approve on September 9th, 2022. 661 01:40:28.380 --> 01:40:37.639 Community Hall: The property owner requested a lower minimum density to provide a choice for a better, well-thought-out integration of the proposed development with the existing neighborhood. 662 01:40:37.780 --> 01:40:39.060 Community Hall: Next slide, please. 663 01:40:40.580 --> 01:40:49.159 Community Hall: To maintain the walkability of the neighborhood, the homes along Lynn and Pista Drive all have front doors facing the street, with the garages hidden behind the homes. 664 01:40:49.690 --> 01:41:01.549 Community Hall: Additionally, the homes have been oriented so that the primary windows for the living areas and bedrooms face toward either Linda Vista Drive or the golf course to minimize the privacy impact to the neighbors. 665 01:41:01.930 --> 01:41:03.230 Community Hall: Next slide, please. 666 01:41:04.400 --> 01:41:23.820 Community Hall: In addition to standard fire sprinklers and non- combustible roof tiles and siding, we have worked closely with the fire department to add enhanced wildfire resiliency measures into the product's design in compliance with applicable laws and in compliance with AB130 very high fire hazard zone requirements. 667 01:41:25.030 --> 01:41:32.259 Community Hall: First, we are creating a defensible buffer by using non- combustible landscaping within the first 5 feet around every building. 668 01:41:32.720 --> 01:41:39.089 Community Hall: For the structures themselves, all units will have fire- rated eaves and ember-resistant vents and door openings. 669 01:41:39.400 --> 01:41:49.539 Community Hall: Additionally, the homes along the perimeter of the site will have added sprinklers within all covered porches and decks, and increased fire-resistant ratings for the exterior walls. 670 01:41:49.860 --> 01:41:51.120 Community Hall: Next slide, please. 671 01:41:52.680 --> 01:41:58.000 Community Hall: We submitted an SB330 preliminary application for the project in October of 2024, 672 01:41:58.420 --> 01:42:10.080 Community Hall: Hosted two neighborhood meetings in November of 2024, one with the immediate fence line neighbors, and another with a broader neighborhood and community, and submitted a formal application in December of 2024. 673 01:42:11.000 --> 01:42:21.880 Community Hall: After the application was deemed complete in March of 2025, we worked closely with city staff and the fire department through multiple rounds of detailed reviews of the plans and technical reports. 674 01:42:22.740 --> 01:42:29.590 Community Hall: During this process, we applied the new Assembly Bill 130 CEQA exemption to the project in September of 2025. 675 01:42:30.590 --> 01:42:39.620 Community Hall: This past month, we met again with the immediate fence line neighbors and hosted another large group community meeting with the neighborhood to provide an update regarding the project. 676 01:42:40.070 --> 01:42:47.850 Community Hall: Although we are complying with the City's general plan, zoning, and objective standards, we proactively engage with the neighborhood. 677 01:42:48.380 --> 01:42:55.659 Community Hall: Based on this input, we increased the side setbacks from 6 feet to 10 feet along the northern and southern property line. 678 01:42:55.810 --> 01:43:05.199 Community Hall: Added privacy-enhancing design measures of landscaping screening hedges along the northern and southern property lines, and opaque third floor windows where appropriate. 679 01:43:05.530 --> 01:43:06.770 Community Hall: Next slide, please. 680 01:43:08.290 --> 01:43:12.329 Community Hall: The project will provide several important public benefits for the community. 681 01:43:12.790 --> 01:43:26.879 Community Hall: First, the project will provide 51 new homes, contributing to the city's RENA obligations for the sixth housing cycle, and also gives families and aspiring first-time homebuyers a chance at home ownership in Cupertino. 682 01:43:27.620 --> 01:43:35.939 Community Hall: Second, the city designation of the project site as a priority housing site supports the city's goal of firmly furthering fair housing. 683 01:43:36.300 --> 01:43:40.379 Community Hall: The project site is the only priority housing site within this area of the city. 684 01:43:41.090 --> 01:43:45.700 Community Hall: Third, we're proposing to designate 10 of the units as low-market rate units. 685 01:43:46.930 --> 01:44:06.420 Community Hall: Finally, the project will contribute approximately $2 million in park fees, $569,000 in school fees, and a surplus of $48,000 annually to the City's general fund from estimated property tax, sales tax, and parcel transfer taxes as verified by the City's third-party consultant. 686 01:44:06.590 --> 01:44:07.820 Community Hall: Next slide, please. 687 01:44:08.710 --> 01:44:13.680 Community Hall: At this time, we would like to have Margo Bradish, our Land Use Council, say a few words. 688 01:44:16.750 --> 01:44:17.810 Community Hall: Thank you, Austin. 689 01:44:18.010 --> 01:44:31.129 Community Hall: Good evening, Commissioners. We did submit a letter in advance, so I'll be brief tonight, but I did just want to present a quick framework for your consideration of the project this evening. First of all, I want to talk about timeline, and then about substance. 690 01:44:31.240 --> 01:44:46.769 Community Hall: From a timing standpoint, both the Permit Streamlining Act and the Housing Accountability Act established three critical deadlines for your project consideration. The first was the consistent… excuse me, the completeness determination, which was issued by staff on March 19th, 2025. 691 01:44:47.130 --> 01:44:57.189 Community Hall: 30 days later is the determination of consistency comment deadline, which staff complied with, submitting comments on April 18th, 2025. 692 01:44:57.470 --> 01:45:11.429 Community Hall: And finally, and most importantly, is the deadline for the city to make a decision on the project, which in this case is 30 days after the completion of the AB130 process, subject to a one-time extension, which was granted here. 693 01:45:11.620 --> 01:45:18.909 Community Hall: which brings the date to April 4th, as staff indicated, for the City to take action on the project, or it will be deemed approved by Operation of Law. 694 01:45:19.340 --> 01:45:39.030 Community Hall: In considering whether to approve the project, it's important to note that the Housing Accountability Act places strict limits on a city's ability to disapprove a housing project that complies with objective standards. In particular, a city can only do so if there's a preponderance of evidence, so that's more likely than not that the 695 01:45:39.030 --> 01:45:51.290 Community Hall: The project will have a specific adverse impact on health and safety, defined in the health… excuse me, the Housing Accountability Act to require a conflict with an objective, written public health and safety standard. 696 01:45:51.560 --> 01:45:59.119 Community Hall: For this project, as noted in the staff report, the city does not have an objective health and safety standard related to evacuation routes. 697 01:45:59.470 --> 01:46:04.210 Community Hall: Let alone any policy that the project is inconsistent with. 698 01:46:04.570 --> 01:46:14.610 Community Hall: In fact, as indicated in the staff report, the fire department confirmed that the project complies with the fire code requirements and the AB30 130 requirements for the 699 01:46:15.140 --> 01:46:30.019 Community Hall: severity zone that the project is located in. As a result, as a matter of law, there is not a preponderance of evidence that the project would have a specific and adverse impact on health and safety, as indicated in the Housing Accountability Act, and therefore there is not a reason 700 01:46:30.050 --> 01:46:38.579 Community Hall: Consistent with the Housing Accountability Act for the City to disapprove the project. We encourage you to approve the project and provide much-needed housing in your community. Thank you. 701 01:46:43.820 --> 01:46:48.110 Community Hall: All right, thank you very much. Do we have any questions from the Commission for the applicant? 702 01:46:48.270 --> 01:46:49.220 Community Hall: Commissioner Rao. 703 01:46:49.740 --> 01:46:53.799 Community Hall: Yes, thank you to the applicant for your presentation. 704 01:46:54.110 --> 01:47:03.259 Community Hall: If you can talk a little bit about, you know, you've probably done many, many projects out here. We've had a lot of feedback around concerns of fire. 705 01:47:03.520 --> 01:47:07.160 Community Hall: Have there been any episodes of fire around your development during, or… 706 01:47:07.580 --> 01:47:22.969 Community Hall: Right, after the development, do you have any episodes involving fire and Summerhill Homes at the densities that we are looking at? First, thank you for the opportunity to be here. My name is Kevin Aberhini, I'm the Senior Vice President for Summerhill Homes. Steve Bull, he's also the Vice President for the company. 707 01:47:23.030 --> 01:47:36.680 Community Hall: So, no, none of our projects that I'm aware of, I've been with the company approximately 18 years, has had any fire issues. Primarily, new construction requires much more advanced 708 01:47:36.850 --> 01:47:53.820 Community Hall: products. We typically try to do stucco as much as possible, and have closed eaves, roof tiles, material that considerably reduce chances of buildings catching on fire. And just to answer your question, no, we haven't had any fires. 709 01:47:54.590 --> 01:48:06.160 Community Hall: And that is your experience in 18 years of development, as you have seen, no episodes of fire involving Summerhill homes? Certainly not, no, we haven't. Okay. Are you aware of any of your peers that have 710 01:48:07.090 --> 01:48:18.389 Community Hall: And again, this is not a binding question, but just anecdotally, are you aware of projects of this type running into fire situations commonly? I'm not aware of townhome-style product like this. 711 01:48:18.740 --> 01:48:33.570 Community Hall: having fire issues, but I am aware of podium projects, and our sister company does podium projects. From time to time, there's more chances of podium projects catching on fire. Have you had any projects in very high-severity fire zones? 712 01:48:36.380 --> 01:48:40.729 Community Hall: I believe… I'm not certain, but I believe our Moraga project 713 01:48:40.990 --> 01:48:46.770 Community Hall: has, I don't know if the designation was called High Fire Zone, but it was… 714 01:48:47.030 --> 01:48:51.820 Community Hall: Very similar to this, where we had to meet with the fire department and do all the mitigation measures. 715 01:48:52.230 --> 01:49:04.210 Community Hall: And any episodes of insurance denials because of your project? No. And we have met with insurance companies for this project, and obviously we have several different insurance companies that will insure the project. 716 01:49:04.850 --> 01:49:06.610 Community Hall: Thank you, that's my questions. 717 01:49:08.750 --> 01:49:09.990 Community Hall: Mr. Glenn. 718 01:49:11.330 --> 01:49:29.969 Community Hall: So I think I heard you say that you try to use stucco to reduce fire risk, is that a true statement that you said? Yeah, so stucco homes are much more resilient than wood siding homes for fire. Okay, so this project is using stucco? It's all stucco, that's correct. Okay, thank you. 719 01:49:31.840 --> 01:49:33.380 Community Hall: Commissioner Lenscott, go ahead. 720 01:49:33.490 --> 01:49:47.830 Community Hall: Yeah, can you… do you have any slides or presentations just to outline all of the fire, resistance, infrastructure changes you've made, like the roofing, the vents, the… 721 01:49:48.070 --> 01:49:52.140 Community Hall: the walls, yes, let's… 722 01:49:55.540 --> 01:49:58.059 Community Hall: So, what slide number is this? Awesome. 723 01:50:02.530 --> 01:50:09.420 Community Hall: I believe it's slide 4. It was one of the sheets that we went over, but we can walk through. Okay, yeah, if you could walk us through that, please. 724 01:50:11.120 --> 01:50:14.060 Community Hall: And I'll just ask that video share my screen. 725 01:50:18.600 --> 01:50:19.859 Community Hall: It's in our stature. 726 01:50:20.010 --> 01:50:28.249 Community Hall: Sure, again, Steve Bull, Summer Hill Homes, Vice President of Development. So the upgrades we've made are, the non… 727 01:50:29.310 --> 01:50:38.090 Community Hall: The non-combustible landscape, extended a 5-foot perimeter around the homes for what we call Zone 0. 728 01:50:39.360 --> 01:50:46.579 Community Hall: Also, added fire sprinkler heads within all the exterior covered porches and decks within 30 feet of the property line. 729 01:50:48.040 --> 01:50:57.529 Community Hall: One-hour fire-resistant ratings for the exist… Excuse me, the exterior wall elements and architectural projections surrounding… within 30 feet of the property lines. 730 01:50:59.030 --> 01:51:04.419 Community Hall: Also, the fire-rated eaves, ember-resistant vents, and door openings. 731 01:51:04.550 --> 01:51:12.100 Community Hall: So these are prescribed, elements that we had to incorporate into the project due to AB130. 732 01:51:12.100 --> 01:51:28.379 Community Hall: And being in the, if I pronounce it correctly, woohoo. Woo-ee, thank you, Hui. But in addition, for projects like this, we do all stucco, we do, closed leaves eaves, roof tiles, 733 01:51:28.470 --> 01:51:38.050 Community Hall: things that we know as builders are protective measures. What kind of roof tiles? Concrete roof tiles. And they're fire-retardant? They are, yeah, they're… 734 01:51:38.150 --> 01:51:39.819 Community Hall: They're rated for… 735 01:51:40.470 --> 01:51:55.559 Community Hall: I don't know. Non-combustible. Non-combustible, so they're… that's what they're for. So has anybody from the fire department reviewed these and offered any suggestions for, or did they say, this looks good, or did they offer any suggestions for making it even more fire, resistant? 736 01:51:55.560 --> 01:52:04.830 Community Hall: So, the complete plan set has been reviewed by the fire department and was approved by the fire department. There were no additional suggestions from the fire department. 737 01:52:05.060 --> 01:52:14.949 Community Hall: Than what we have provided. Obviously, what you're seeing now is the finished product, so we went through several iterations, and the final iteration is this, to be compliant. 738 01:52:16.410 --> 01:52:19.870 Community Hall: Great. I have one more question, or I can wait if… 739 01:52:20.160 --> 01:52:28.969 Community Hall: Okay, so my next question is about the height difference between the adjacent single-family homes and this. 740 01:52:28.970 --> 01:52:41.649 Community Hall: Can you talk about that? Have you done anything to try and address that high difference, and to address the privacy concerns of the residents? Yes, of course. Well, sure. 741 01:52:42.070 --> 01:52:54.260 Community Hall: Yes, a couple things. We are at the eaves of our homes 30 feet, so what we've done is we've altered the roof, or formed the roof to have hips, or sort of a flat level area. 742 01:52:54.650 --> 01:53:03.329 Community Hall: Adjacent to the edge, and then it kind of slopes up over the course of 20 feet plus before it gets to that full height, just to minimize the height adjacent. 743 01:53:03.440 --> 01:53:12.809 Community Hall: Also, on those third floor windows, again, the homes primarily live to the front and back, facing Linda Vista and also the golf course. But there are some 744 01:53:12.810 --> 01:53:23.459 Community Hall: secondary windows on the side, elevation, facing neighbors. So what we've done on the third floor, was we've sort of obscured those, or frosted them over so it can't be seen out of. 745 01:53:23.660 --> 01:53:33.529 Community Hall: Then finally, we added a landscape hedge along the fence. It should grow up at maturity 10 to 12 feet high to help add a little bit more privacy. 746 01:53:33.630 --> 01:53:46.310 Community Hall: Okay, so just to be clear, so you said… so it maxes out at 30 feet, you said? Yeah, so the elevation of the home, the side yard, from the grade to the eve is 30 feet. 747 01:53:46.430 --> 01:53:53.559 Community Hall: And then, a lot of times, we wind up having a gable element for the roof, which adds height, but in these cases, we… 748 01:53:53.740 --> 01:54:00.710 Community Hall: We, designed the homes to have, hips, which means at 30 feet. 749 01:54:00.790 --> 01:54:15.919 Community Hall: they'll go up at an angle towards the center of the building, so at all times that you're looking at, it's the 30 feet, and then the roofline goes away from you. And I think Steve mentioned the other thing that we tried to do is there was a minimum of 6-foot 750 01:54:16.020 --> 01:54:35.900 Community Hall: setback, and we worked with staff to reduce the setback on average court, and increase the setbacks from 6 to 10, and at some locations, 11 foot. So those are the things that we worked on incorporating to… Great, and I think you mentioned something about privacy screening as well for trees? Yes, there are… 751 01:54:35.950 --> 01:54:39.600 Community Hall: I don't know if they're called trees, they're shrubs that grow… 752 01:54:39.740 --> 01:54:48.680 Community Hall: We have several that we have suggested, some grow between 10 to 12 to 15 feet, and we have some other suggestions that can go as high as 20 feet. 753 01:54:49.240 --> 01:55:01.800 Community Hall: That would fit in that 10-foot setback. Yes, but those are shrubs, not really… I wouldn't call them trees. Okay, but… so, sorry, what was the highest height they could go? They could go as high as 20 feet. 20 feet. Okay, thank you. 754 01:55:03.320 --> 01:55:13.390 Community Hall: I just wanted to clarify, I did not see anywhere in the documents what class rating the fireproofing materials are. Are they Class A, or Class B, or just anything? 755 01:55:15.480 --> 01:55:18.289 Community Hall: Yeah, Jennifer, do you have any… 756 01:55:25.070 --> 01:55:31.390 Community Hall: Good evening, Commissioners. Jennifer Master with SDG Architects. Are you speaking of the roof, specifically? 757 01:55:31.750 --> 01:55:46.260 Community Hall: I was thinking about the roof, actually. I mean, if there are other materials that apply… So, I think it's just the roof. Okay. I mean, when you say a class reading, it's usually the roof? Yes. I believe they're a… I can double check and, like… Okay, thank you. Yeah. 758 01:55:46.480 --> 01:55:55.190 Community Hall: Concrete roof tiles. Correct. Clay, concrete roof tiles that are non-combustible. Okay, thank you, because that was not specified in the vesting tentative map, so thank you. 759 01:55:56.850 --> 01:56:03.219 Community Hall: Can either staff or the applicant comment on, is this going to be following the 2025 building codes? 760 01:56:03.970 --> 01:56:12.249 Community Hall: Yes. Oh, sorry. Okay, so this is going to be subject to the 2025 Building Code, and the 2025 Building Code has been upgraded to 761 01:56:12.480 --> 01:56:26.939 Community Hall: deal with the very high severity and high severity fire hazard zones and the upgraded… That is correct. The building permits for this have not been filed yet, so they'll be subject to the current code. And so, can staff briefly touch on what sort of, 762 01:56:27.920 --> 01:56:31.440 Community Hall: Again, very briefly touch on what sort of improvements 763 01:56:31.980 --> 01:56:44.729 Community Hall: come in because of those changes, very briefly. Not being the building official, I'm not going to venture out of my lane. And I will let the applicant comment if they have been following the upgraded building codes. 764 01:56:46.560 --> 01:56:49.959 Community Hall: So we do have a Director Fu at the back, if you'd like to join. 765 01:56:51.480 --> 01:56:58.460 Community Hall: So, from an architecture standpoint, there's not… No, just from a 2025 building code and fire safety. 766 01:56:58.620 --> 01:57:07.250 Community Hall: So, fire safety-wise, all the requirements that we are meeting, that we just went over again, 767 01:57:07.410 --> 01:57:23.500 Community Hall: we will meet those, and that's 2025 code-based. As far as other updates in regards to fire safety, there really isn't. It's that one code section. Is this maybe your first project with the 2025 building codes? 768 01:57:23.500 --> 01:57:36.290 Community Hall: Our office has submitted other projects. Okay. I don't know if we've had one in a very high fire safety zone, though, but we're aware of all the measures that need to be taken. Is this the first project with upgraded 769 01:57:36.350 --> 01:57:40.960 Community Hall: Building codes that reflect the new fire severity guidelines from the state. 770 01:57:41.270 --> 01:57:44.319 Community Hall: Probably so. Okay. But… 771 01:57:44.490 --> 01:57:57.870 Community Hall: I'll just add, we've done a lot of projects in WUI areas within the Bay Area, not specifically for Summerhill, but for other developers, so we are aware of what needs to be done and detailed in the set to comply. 772 01:57:58.180 --> 01:58:04.460 Community Hall: And I would say I have, built in a high fire hazard zone, and I've complied with all of these measures. 773 01:58:04.680 --> 01:58:13.110 Community Hall: So, is it fair to say these new codes, given the state guidelines and what the city had to incorporate for fire severity. 774 01:58:13.550 --> 01:58:21.040 Community Hall: considerations, the… the… Construction at this site is going to be of a significantly more… 775 01:58:21.510 --> 01:58:37.499 Community Hall: fire-aware quality compared to your past projects? Is that a fair statement? Absolutely. When you compare this to our Stevens Creek project that we had before the Commission several months back, all of the things that we're talking about are additional things that are being incorporated. Okay. 776 01:58:38.340 --> 01:58:48.540 Community Hall: I guess if there's one thing to note, too, the fire and building code compliance is really not optional. It's… you… you have to comply with them. It doesn't have the flexibility, say, of planning regulations. 777 01:58:49.850 --> 01:59:09.170 Community Hall: Okay, if we have any very quick questions, I'd like to take them, and then we can move to public comments. I do have a few more. But, you know, it's 8.45, and I think the public has been waiting here for 2 hours, so I would like to give them the opportunity to speak. So, anyone have quick questions? I have a quick question for staff. Okay, in looking at the plans. 778 01:59:09.520 --> 01:59:16.340 Community Hall: And looking at the International Fire Code, IFC Appendix D105, I noticed several 779 01:59:16.450 --> 01:59:23.379 Community Hall: areas where the plans don't comply, so how are they getting waivers to not comply with D105? 780 01:59:23.810 --> 01:59:31.500 Community Hall: I mean, the fire department can't just say, oh, don't bother. I mean, what is the procedure to get out of this? 781 01:59:35.490 --> 01:59:45.899 Community Hall: So, these plans were reviewed by our fire department, and we have a representative here who maybe can touch on specifics. Yeah, that was not my question, but anyway. Okay, thank you. Okay. 782 01:59:46.750 --> 01:59:53.459 Community Hall: Sorry, Commissioner Schott, did you want the fire department to comment? Because we do have a representative here. No, I'm asking the staff 783 01:59:54.040 --> 01:59:58.489 Community Hall: why they are allowed to not meet D105. 784 01:59:58.940 --> 02:00:08.300 Community Hall: I don't need the fire department to tell me what's in D105, it's perfectly clear. I'm just indicating I don't know what that is, so I would need them to respond to that. Okay, thank you anyway. 785 02:00:08.770 --> 02:00:14.600 Community Hall: City Attorney, would it be acceptable to have public comment and then have the fire department answer questions? 786 02:00:17.260 --> 02:00:18.809 Community Hall: Yes. Okay. 787 02:00:18.930 --> 02:00:35.330 Community Hall: Let's move to public comment, then. Actually, I have one other… Oh, I'm sorry. One other simple one while you're up here. So, I did want to confirm, it is actually in the report, the appliances here are all electric in this building. That is correct. There's no natural gas in this area, and I believe 788 02:00:35.330 --> 02:00:45.139 Community Hall: When we… when we discussed this, you said you were also undergrounding the current, that is correct. All the electric lines fronting the project are… is being undergrounded. Great, thank you. 789 02:00:45.260 --> 02:00:46.129 Community Hall: Thank you. 790 02:00:46.660 --> 02:00:55.179 Community Hall: Thank you very much. So, yeah, City Clerk, how many public comments do we have? We have 17 speakers in person, and no hands raised on Zoom, Chair. 791 02:00:55.640 --> 02:01:01.310 Community Hall: Okay, so it should be acceptable to allow everyone to speak the full 3 minutes? Okay, great. 792 02:01:02.090 --> 02:01:13.710 Community Hall: Okay, our first speaker is David Yang, followed by Dur Chang Kao, Frank Swanson, and Alice Lin, followed by Harvey Wooseng Jr. Welcome, David, and video, if you could please share my screen? 793 02:01:21.140 --> 02:01:23.180 Community Hall: I do have a presentation. 794 02:01:25.660 --> 02:01:38.239 Community Hall: Okay, go ahead. Thank you. Good evening, Planning Commissioners, and as well as planning staff. There are really two 30- foot standards that are going to govern this project. 795 02:01:38.610 --> 02:01:41.680 Community Hall: As well as justify the legitimacy. 796 02:01:41.850 --> 02:01:44.110 Community Hall: Of the proposal before you tonight. 797 02:01:44.600 --> 02:01:46.900 Community Hall: Let's go to the next slide, please. 798 02:01:47.410 --> 02:02:01.049 Community Hall: The first is D105. Some of it has already been discussed, and I actually want to thank Mr. Ibrahimi, the Senior VP at Summerhill, for acknowledging, just 10 minutes ago, that from the Great Plain. 799 02:02:01.140 --> 02:02:20.479 Community Hall: to the eave of the roof, that it is, in fact, 30 feet, because maybe I won't even have to present this slide. But there's a very clear, requirement here that from the… from the grade plane to the highest point of the roof, you guys can read it, I don't need to quote it, that if it's over 30 feet. 800 02:02:20.730 --> 02:02:30.309 Community Hall: that it triggers what's called an aerial access apparatus requirement. And what that will require is that the roads 801 02:02:30.610 --> 02:02:45.130 Community Hall: inside Evelage Court get expanded from 20 feet, as proposed, to 26 feet. So we're not just talking about minutiae, we're not talking about a nuance, this is a bright line rule, and it… 802 02:02:45.660 --> 02:02:50.439 Community Hall: Addresses squarely the geometry of the entire project. 803 02:02:50.910 --> 02:02:59.160 Community Hall: Okay? And so, to quote the attorney, it's more likely than not, based on this drawing that was provided to me from FIRE, 804 02:02:59.500 --> 02:03:18.910 Community Hall: that something is amiss. I encourage everybody to take a look at it. The code defines the measurement. It's not a preference, it's not a planning staff opinion of what is reasonable, and you cannot just defer to fire. You have a responsibility here, the planning staff has a responsibility to review it. 805 02:03:19.110 --> 02:03:20.419 Community Hall: Next slide, please. 806 02:03:21.180 --> 02:03:28.060 Community Hall: Okay, the second… 30-foot standard, which governs this project, is a horizontal setback. 807 02:03:28.260 --> 02:03:40.539 Community Hall: We talked about density bonus waivers and height waivers not, not necessarily conflicting with the general plan. That's… that's actually correct. However. 808 02:03:40.640 --> 02:03:43.720 Community Hall: AB130 says that there's a 30-foot 809 02:03:44.060 --> 02:03:52.049 Community Hall: I'm sorry, there's a 30-foot setback that has to take place, and they've reduced that down to 10 feet. 810 02:03:52.350 --> 02:03:57.049 Community Hall: That can only happen if you have have, 811 02:03:57.380 --> 02:04:03.249 Community Hall: Equivalent fire mitigating standards, equivalent to the existing standards. 812 02:04:04.490 --> 02:04:10.170 Community Hall: So, essentially, if you read the AB30 memo, they have waived 813 02:04:10.650 --> 02:04:21.569 Community Hall: they have proved compliance with the existing standard by waiving it, okay? And, what's… what the actual requirement is, is that you need an equivalence finding. 814 02:04:21.860 --> 02:04:24.939 Community Hall: Okay? To make it exactly the same. 815 02:04:25.380 --> 02:04:28.370 Community Hall: From a risk standpoint, as it would have been. 816 02:04:29.630 --> 02:04:39.560 Community Hall: Had you not reduced the setback. Thank you, David, that is your time. Our next speaker is Sir Chang Kao, Frank Swanson, and Alice Lin, followed by Harvey Wu Sang, Jr. 817 02:04:43.990 --> 02:04:54.190 Community Hall: Okay, good evening, Commissioners. My name's Duchen Cao, and… So, we are the residents of the Linda Vista corridor. 818 02:04:54.360 --> 02:04:58.430 Community Hall: As you can see on our second slides, if you can move to the second slides. 819 02:04:58.740 --> 02:05:05.730 Community Hall: The core issue is a fundamental shift in the safety data, okay? The parcel was rezoned, R3, based on 2007. 820 02:05:05.880 --> 02:05:17.510 Community Hall: the fire map. However, in March 2025, CAL FIRE updated a fundamental change. That is a fundamental change of the safety baseline, okay? We are now in a high-risk environment, and we're the spread. 821 02:05:17.910 --> 02:05:28.730 Community Hall: at the rate of the 200 acre in 20 minutes. This is the sovereign data that we, we learned from Pacific Palisade Fire. 822 02:05:29.320 --> 02:05:36.279 Community Hall: Okay? So, in this new reality, the 30 minutes evacuation window isn't a goal. 823 02:05:36.560 --> 02:05:38.900 Community Hall: It is a survival requirement. 824 02:05:40.210 --> 02:05:52.460 Community Hall: Having said that, the developer report from… developer's report on the Hazegon Transport, transportation consultant suggests that the project… Ed, if you can move to slides 5, 825 02:05:53.390 --> 02:05:57.849 Community Hall: Slides… Yeah, 5, okay? 826 02:05:58.320 --> 02:06:06.719 Community Hall: 5, number 5, okay? It's less than the, destined, has less than 1 second of the delay to our road. 827 02:06:07.020 --> 02:06:08.560 Community Hall: No, the next slides. 828 02:06:09.120 --> 02:06:14.770 Community Hall: But to look at the data on the slide's fine, Haskell's model 829 02:06:15.570 --> 02:06:21.789 Community Hall: They only provide a Tuesday morning commute with additional 30 cars per hour. 830 02:06:22.410 --> 02:06:23.230 Community Hall: Okay? 831 02:06:23.650 --> 02:06:33.229 Community Hall: In the wildfire, we are facing the emergency surge of the 250 vehicle attempting to exit a single access spine, Linda Vista Drive. 832 02:06:33.660 --> 02:06:42.139 Community Hall: in 30 minutes, again, the critical 30 minutes. Furthermore, the developed study ignored what happened when power goes out. 833 02:06:42.970 --> 02:06:47.209 Community Hall: In a disaster, all intersections default to four-way stops. 834 02:06:47.440 --> 02:06:51.100 Community Hall: This has dropped our road capacity another 50%. 835 02:06:51.300 --> 02:06:55.349 Community Hall: Okay? There's a critical factor that developed complete omitted. 836 02:06:56.860 --> 02:06:59.330 Community Hall: So, if you can go to slides 3, 837 02:06:59.710 --> 02:07:03.030 Community Hall: Using the standard traffic engineering principle. 838 02:07:03.370 --> 02:07:16.200 Community Hall: Okay? I'm an engineer, so I love numbers. I provide all the detailed number for the model. Using this, the, the principle, we model a utilization ratio for the project as shown in the slide 3. The R3 density 839 02:07:16.550 --> 02:07:24.419 Community Hall: push our road to 110% of the capacity. So what I mean? In the engineering, a ratio over 100% 840 02:07:24.730 --> 02:07:26.549 Community Hall: Means assistant failure. 841 02:07:26.940 --> 02:07:32.809 Community Hall: It creates a standing queue, where your car arrives faster than the intersection can process them. 842 02:07:32.940 --> 02:07:34.770 Community Hall: This is just another traffic jam. 843 02:07:35.260 --> 02:07:40.360 Community Hall: The model says it's 45 plus minutes of queuing delay. 844 02:07:40.650 --> 02:07:48.590 Community Hall: Plus, I think about coming out from the average court. You got a 51 units cart, one to kind of the, 845 02:07:49.440 --> 02:08:03.820 Community Hall: merging into the visa. This is too narrow… this is a narrow room. This creates another 28 minutes of the merging bottle. The result is a total order to safety time of 90-plus minutes. 846 02:08:04.620 --> 02:08:11.489 Community Hall: Okay? So you are asking 155 families to wait more than an hour and 30 minutes 847 02:08:11.810 --> 02:08:13.510 Community Hall: In the tunnel of fire. 848 02:08:13.870 --> 02:08:17.490 Community Hall: is an objective, Condifiable hazard. 849 02:08:17.760 --> 02:08:19.629 Community Hall: to human life. 850 02:08:20.890 --> 02:08:22.169 Community Hall: So, in summary. 851 02:08:22.420 --> 02:08:31.890 Community Hall: Under the SB333, the city must deny the proposal if there is specific adverse impact on public safety. 852 02:08:32.250 --> 02:08:35.250 Community Hall: We urge the Commission to reject the proposal. 853 02:08:35.430 --> 02:08:45.600 Community Hall: And instead, instead, consider a low-density alternative to maintain a safe Utilization ratio below 50%. 854 02:08:45.890 --> 02:08:49.069 Community Hall: Our model provides mathematical proof. 855 02:08:49.920 --> 02:09:04.639 Community Hall: of this impact, we strongly suggest you direct the developer to consult with a reputable Wi-Fi evaluation expert for a comprehensive, cumulative corridor study of evacuation. 856 02:09:04.830 --> 02:09:14.379 Community Hall: We must keep the evacuation window within the critical 30 minutes safety threshold. Please do not, please do not approve this project. 857 02:09:14.650 --> 02:09:18.860 Community Hall: Logically and mathematically guarantee a bottleneck. 858 02:09:18.960 --> 02:09:22.960 Community Hall: During our neighborhood's most desperate hour. 859 02:09:23.070 --> 02:09:24.299 Community Hall: Thank you very much. 860 02:09:28.560 --> 02:09:35.060 Community Hall: Thank you. Our next speaker is Harvey Wu-Seng Jr, followed by Al Spencer, followed by Patrick Sweeney. 861 02:09:36.650 --> 02:09:38.510 Community Hall: It's Henry, not Harvey. 862 02:09:38.720 --> 02:09:43.629 Community Hall: And do you have my slides, or shall I present them? 863 02:09:43.810 --> 02:09:45.739 Community Hall: Yes, we have your slides. 864 02:09:45.840 --> 02:09:46.700 Community Hall: Okay. 865 02:09:48.610 --> 02:09:49.749 Community Hall: Can you display them? 866 02:09:52.390 --> 02:09:53.750 Community Hall: Okay, great. 867 02:09:54.840 --> 02:10:05.549 Community Hall: So, my name is Henry Tsang, I'm a resident of 38 years, and I'm also working with a group of volunteers as an ad hoc resident wildfire committee. Next slide, please. 868 02:10:07.970 --> 02:10:26.360 Community Hall: The, the groups that are represented in that are shown in red on this map, and they're primarily HOAs and other housing units. We are conducting surveys, we're doing tours, we're going around inspection, we're writing a report on the issues, as well as doing an educational series. Next slide, please. 869 02:10:27.760 --> 02:10:30.719 Community Hall: We've seen this. Let's go to the next slide already. 870 02:10:31.980 --> 02:10:44.479 Community Hall: The, main thing that we're looking about is the red zone, the fact it's a very high danger zone. The Stevens Creek Trail that is directly next to this represents, actually, the wildfire to urban interface. 871 02:10:44.480 --> 02:10:52.979 Community Hall: And as many of you may know, about 20 years ago, Linda Vista Park had a wildfire event with, you know. 872 02:10:52.980 --> 02:11:06.829 Community Hall: red dropping stuff and helicopters and all that type of thing. And the fact that it's a multiplex, it defines a very heavy fuel load, that is problematic for radiant heat on our neighboring houses. 873 02:11:06.960 --> 02:11:11.410 Community Hall: And, because of that, we worry about a domino effect. So, next slide, please. 874 02:11:13.270 --> 02:11:31.520 Community Hall: Just to show you what the Stevens Creek Trail looked like about 2 weeks ago, there's a fairly significant, fuel burden along that trail that's very dangerous, and this is right at the end of where the canyon is going to blow embers, so we have a very high probability event there. Next slide, please. 875 02:11:32.460 --> 02:11:35.840 Community Hall: So, for recommendations, we would like to see all of the 876 02:11:35.920 --> 02:11:50.180 Community Hall: Decks and balconies made of Class A rated materials, not just that they be having sprinklers, that also the CCNRs for the AHOA forbid violations by the owners of Zone 0 and Zone 1 restrictions. 877 02:11:50.180 --> 02:11:56.079 Community Hall: And that we have a minimum provision for fire department access to the sides of approximately 20 feet. 878 02:11:56.140 --> 02:12:14.750 Community Hall: Also, all of the fences and walls should be built out of Class A materials, and that we will see where they have no flat roofs, but gutters, valleys, and everything with ember proofing. In addition to the doors being wildfire safe, we'd like to see all of the windows to be wildfire safe. 879 02:12:14.840 --> 02:12:28.689 Community Hall: And that the HOA consider providing, for fuel reduction and maintenance along that Stevens Creek Trail, and that any building heights that are higher than what the existing ladder trucks can handle 880 02:12:28.690 --> 02:12:39.139 Community Hall: that the HOA provides for fire equipment, or compatible and compatible buildings, or another solution of some sort, such as phone. Thank you very much. 881 02:12:40.430 --> 02:12:48.180 Community Hall: Thank you, Henry. Our next speaker is Al Spencer, followed by Patrick Sweeney, followed by Keith Craft. Welcome, Al. 882 02:12:54.170 --> 02:13:00.490 Community Hall: I just have a couple of comments. Looking at this thing, the existing neighborhood 883 02:13:00.960 --> 02:13:04.839 Community Hall: Contains a lot of 3-bedroom, single-story homes. 884 02:13:05.230 --> 02:13:11.260 Community Hall: It seems to me that we ought to be including a lot of 3- bedrooms home in this development. 885 02:13:11.860 --> 02:13:18.839 Community Hall: Quite possibly, if we put them on the ends next to adjacent buildings, you could lower the height in that area with it. 886 02:13:19.550 --> 02:13:25.900 Community Hall: The second thing is that with this many units and this many bedrooms, I expect there to be 887 02:13:26.600 --> 02:13:31.319 Community Hall: At least 100 children in this neighborhood that want a place to play. 888 02:13:32.130 --> 02:13:38.200 Community Hall: I don't see it in this development. I think the Planning Commission should find a way 889 02:13:38.800 --> 02:13:43.440 Community Hall: to provide recreation for these kids. I think there's going to be a problem there. 890 02:13:44.110 --> 02:13:48.710 Community Hall: The third thing is… At my end of the street. 891 02:13:48.980 --> 02:13:53.160 Community Hall: Fills up with cars when anybody… any single home has a party. 892 02:13:54.280 --> 02:13:57.650 Community Hall: Where are the people that are visiting these people gonna park? 893 02:13:58.200 --> 02:14:00.860 Community Hall: We need to make sure there's adequate provision. 894 02:14:01.040 --> 02:14:01.780 Community Hall: For that. 895 02:14:02.510 --> 02:14:03.460 Community Hall: Thank you. 896 02:14:04.950 --> 02:14:11.619 Community Hall: Thank you, Al. Our next speaker is Patrick Sweeney, followed by Keith Kraft, followed by Jennifer Griffin. Welcome, Patrick. 897 02:14:19.900 --> 02:14:22.390 Community Hall: Thank you for the opportunity to speak. 898 02:14:22.990 --> 02:14:26.619 Community Hall: I don't want to get into the facts of my previous 899 02:14:26.860 --> 02:14:29.829 Community Hall: speakers, but I do have some experience. 900 02:14:30.060 --> 02:14:34.599 Community Hall: on, On the, fire resistance. 901 02:14:35.110 --> 02:14:40.380 Community Hall: My brother-in-law lives in Forest Ranch. My… Sister along with him. 902 02:14:40.490 --> 02:14:45.740 Community Hall: Forest Ranch was a victim of the park fire this past fall. 903 02:14:45.930 --> 02:15:01.269 Community Hall: The park fire started in Bidwell Park in Chico, and worked its way up a canyon. There was plenty of time for my brother-in- law to evacuate, and he decided to 904 02:15:01.400 --> 02:15:03.679 Community Hall: Stick it out as long as he could. 905 02:15:03.960 --> 02:15:17.830 Community Hall: His house was fire-safe. He had a defensible perimeter, more than double of what is required. A single-family home with probably 50 feet between the homes. 906 02:15:18.040 --> 02:15:25.970 Community Hall: The fire was so hot, it melted his, windows in the back, it, 907 02:15:26.520 --> 02:15:32.620 Community Hall: It would have burned. He does have… he had a generator with a sprinkler running 24 hours. 908 02:15:32.840 --> 02:15:42.290 Community Hall: And, it didn't help. The only thing that saved the home was that there was time for fire crews from various areas 909 02:15:42.450 --> 02:15:47.900 Community Hall: a fire crew, from San Luis Obispo saved their home. 910 02:15:48.080 --> 02:15:54.270 Community Hall: By just, coming in the front door, and it made a mess, but they saved the home. 911 02:15:55.300 --> 02:16:04.920 Community Hall: And, in this development, a gated community of about 20- plus homes, 3 homes burned, the fire crews couldn't save them all. 912 02:16:05.020 --> 02:16:17.880 Community Hall: So I just wanted to point out that being defensible with non-combustible materials won't make any difference in a high-density development. Thank you. 913 02:16:19.990 --> 02:16:26.899 Community Hall: Thank you, Patrick. Our next speaker is Keith Kraft, followed by Jennifer Griffin, followed by PK. Welcome, Keith. 914 02:16:31.020 --> 02:16:41.519 Community Hall: This is my first Planning Commission meeting. I want to say thank you for your service. I can see your responsibilities are huge, and your decisions are not easy to make. 915 02:16:42.639 --> 02:16:46.149 Community Hall: Can you see this overhand? 916 02:16:47.469 --> 02:16:58.550 Community Hall: Yes, we can see it. Okay. I think most of you know the old Sesame Street jingle. One of these things is not like the others. One of these things just doesn't belong. 917 02:16:58.790 --> 02:17:09.140 Community Hall: I'm sure you can identify the anomaly in this picture. This proposed complex does not belong in a single-family residential neighborhood. 918 02:17:09.260 --> 02:17:18.869 Community Hall: Especially not in one that is already severely impacted, with limited access from only two directions, the north and the east. 919 02:17:18.980 --> 02:17:25.890 Community Hall: And impacted by heavily By heavy traffic generated by three residential schools. 920 02:17:26.639 --> 02:17:29.829 Community Hall: Zoning laws exist for a reason. 921 02:17:30.730 --> 02:17:32.190 Community Hall: Compatibility. 922 02:17:32.590 --> 02:17:39.219 Community Hall: The principle of zoning compatibility was established by the U.S. Supreme Court in 1926. 923 02:17:39.860 --> 02:17:59.509 Community Hall: It is the backbone of American land use law, built on the idea that like uses belong together. The Court explicitly upheld the right of municipalities to separate incompatible land uses in order to protect the character. 924 02:17:59.650 --> 02:18:07.189 Community Hall: design, health… Safety, and welfare of residential neighborhoods. 925 02:18:07.959 --> 02:18:11.339 Community Hall: Justice Sutherland put it perfectly. 926 02:18:11.770 --> 02:18:16.940 Community Hall: Paraphrasing here, the right thing in the wrong place is a nuisance. 927 02:18:17.660 --> 02:18:21.880 Community Hall: Like a pig in the parlor instead of in the barnyard. 928 02:18:23.389 --> 02:18:34.090 Community Hall: Courts have upheld these principles time and time again. We don't need another legal battle to prove what is already well established. 929 02:18:34.209 --> 02:18:41.669 Community Hall: We simply need to do the right thing, restore zoning of this property to what it was and what it should be. 930 02:18:42.760 --> 02:18:49.909 Community Hall: Find another area to build 40 homes, or a 40-unit complex, somewhere appropriate. 931 02:18:50.020 --> 02:18:55.550 Community Hall: But don't put a multi-unit complex in a single-family residential zone. 932 02:18:55.860 --> 02:19:03.669 Community Hall: And use this property for what it is suited for, a small development of roughly 10 single-family homes. 933 02:19:04.059 --> 02:19:05.110 Community Hall: Thank you. 934 02:19:06.209 --> 02:19:10.469 Community Hall: I do want to point out that, I attended 935 02:19:10.650 --> 02:19:14.480 Community Hall: All the meetings that were held by, 936 02:19:15.750 --> 02:19:23.280 Community Hall: these gentlemen here. And basically, they just said, you're stuck with this. So while they engaged the public, they just… 937 02:19:23.480 --> 02:19:37.880 Community Hall: weren't making any concessions. We… nobody… everybody was objecting to 51 homes in this small parcel, but they just basically said, this is… it's going to be this way. They also said that all the homes were going to have two driveway… two… 938 02:19:37.969 --> 02:19:48.960 Community Hall: garages, but there are no driveways. I did a poll in our neighborhood. The average number of cars that end up in a garage is 1. 939 02:19:48.960 --> 02:20:00.860 Community Hall: And the average number of cars is more than that. Thank you, Key. Okay, thank you very much for your time. Our next speaker is Jennifer Griffin, followed by PK, followed by Aman Yazdi. Welcome, Jennifer. 940 02:20:07.250 --> 02:20:26.480 Community Hall: Good evening, Planning Commission. I'm glad that you all are having this meeting. I'm glad to hear, from Summerhill speaking and from the neighbors. This is a very important area, important project. My husband grew up in Monta Vista, attended Monta Vista High School, and I believe it was Kennedy. 941 02:20:26.590 --> 02:20:38.020 Community Hall: And one of the remarks about this area is there's, like, one way in and one way out. And I respect the fact that the fire department 942 02:20:38.270 --> 02:20:44.959 Community Hall: has made suggestions about this. I was aware that it had been put into a high-fire zone. 943 02:20:45.170 --> 02:20:48.440 Community Hall: area last summer, and… 944 02:20:48.680 --> 02:20:59.120 Community Hall: I don't know if you all were aware, within the last two years, there were sections of Los Altos that were almost under mandatory evacuation from wildfire. 945 02:20:59.250 --> 02:21:11.499 Community Hall: I know someone who lives in that area near my church. I would… I'm appreciative that this project has a very nice… I like the Spanish style, it's… 946 02:21:11.680 --> 02:21:26.349 Community Hall: very, very refreshing from some of the other things that could have been planned in here. I am a bit worried about the density. I'm worried about evacuation routes. When the fire comes down, you just have to remember Lahaina. 947 02:21:26.600 --> 02:21:36.480 Community Hall: We have a family member that lost a house in the Pacific Palisades, and I know someone whose house was completely gone, in the CZU fire. 948 02:21:36.600 --> 02:21:39.760 Community Hall: The lot is stripped, empty, it's already sold. 949 02:21:39.930 --> 02:21:44.069 Community Hall: I just wanted to make a statement that 950 02:21:44.830 --> 02:21:48.669 Community Hall: Assemblymember David Alvarez from San Diego. 951 02:21:48.810 --> 02:21:56.200 Community Hall: has already submitted AB2433, last week to get the bill in. 952 02:21:56.580 --> 02:22:06.579 Community Hall: For the, 2026 Legislative session, and this bill is going to make major changes to the housing density 953 02:22:06.780 --> 02:22:13.689 Community Hall: I'm sorry, the, may not… he's calling it the Affordable 954 02:22:14.040 --> 02:22:17.510 Community Hall: Homes Bonus Program, and it would be changing 955 02:22:17.760 --> 02:22:23.079 Community Hall: the bonus density completely. I would like to have 956 02:22:23.370 --> 02:22:33.550 Community Hall: Assurances that this project will not be subject to this new law if it passes and comes into play. 957 02:22:33.580 --> 02:22:46.330 Community Hall: in January of 2027, because they are using Florida area ratio now, they are completely changing the density bonus. It is, 958 02:22:46.660 --> 02:22:54.290 Community Hall: it's spaghetti code, basically, like SB79. So, I would like some assurances that if this project 959 02:22:54.720 --> 02:22:59.660 Community Hall: Goes through, that they are… That they will stay with the current 960 02:22:59.980 --> 02:23:07.870 Community Hall: SB3… I'm sorry, the density bonus, and not go with Mr. Alvarez's new bill. Thank you. 961 02:23:08.630 --> 02:23:16.520 Community Hall: Thank you, Jennifer. Our next speaker is PK, followed by Amin Yazdi, followed by Mark Fantosi. Welcome, PK. Thank you. 962 02:23:16.590 --> 02:23:34.900 Community Hall: Good evening, Planning Commission, Emmy and Luke. Thank you for meeting with us several times, and our neighbors here, as well as our summer health colleagues. I live on Baxley Court, so for those who have not been to my home, I would like all of you to come and see what it's going to feel like 963 02:23:35.870 --> 02:23:43.810 Community Hall: 10 feet from my fence is going to be 3-story building, overlooking our bedroom, overlooking our family room. 964 02:23:43.950 --> 02:23:48.130 Community Hall: What we are asking is that 10 feet needs to go further. 965 02:23:48.160 --> 02:24:07.270 Community Hall: And three-story needs to come down. There's really possibility to reduce the number of square footage per home and get what they're looking for, but there is no reason for us to have three-story building right next to my fence. And what was… what I was also told is between that three-story 966 02:24:07.520 --> 02:24:26.530 Community Hall: tall wall, and our fence, there cannot be any trees, because there is only 10 feet, and fire insurance won't let them plant anything. So I think we really need to be cognizant of the fact that this is going to be reducing our privacy, it's going to be impacting our safety. 967 02:24:26.840 --> 02:24:37.500 Community Hall: And we request… I'm requesting that it reduced be two- story instead of three-story, and the setback be increased back to what was expected in the past. Thank you. 968 02:24:39.600 --> 02:24:47.330 Community Hall: Thank you, PK. Our next speaker is Amin Yazdi, followed by Mark Fantosi, followed by Vakram Saxim. Welcome, Amin. 969 02:24:48.420 --> 02:24:55.690 Community Hall: Actually, we're gonna use our… Okay. He's gonna use my time. Okay, thank you. 970 02:24:56.140 --> 02:24:58.010 Community Hall: Alright, you know, I don't need anything. 971 02:24:58.230 --> 02:25:08.650 Community Hall: My name is Mark Fantasi, and I submitted a written communication which evaluated the project against the general plan. 972 02:25:08.850 --> 02:25:18.200 Community Hall: and other life safety concerns at the airport. And I want to just basically summarize those, as quickly as possible with the limited time we have. 973 02:25:18.340 --> 02:25:23.750 Community Hall: First, a project exceeds the 30-foot height limit by about 10 foot at 7 inches. 974 02:25:23.810 --> 02:25:43.740 Community Hall: And this is in conflict with the Cupertino Municipal Code and the General Plan, which only allows buildings taller than 30 feet in… on arteries or major collectors. Linda Vista is not an arterial connector. Second, the project reduces the 12-foot street setback 975 02:25:43.760 --> 02:25:47.139 Community Hall: on Evulage Court to as little as 3 foot 7 inches. 976 02:25:47.340 --> 02:25:58.629 Community Hall: That's a reduction of about 8 feet. These are not small adjustments, these are major encroachments into required safety buffers and violates the Cupertino Municipal Code. 977 02:25:58.750 --> 02:26:02.790 Community Hall: Third, the project exceeds the allowable FAR ratio. 978 02:26:03.280 --> 02:26:05.790 Community Hall: With the proposed 136%. 979 02:26:06.200 --> 02:26:14.280 Community Hall: over 50% of the objective limit. That's a dramatic intensification of bulk and massing that no neighborhood planned envisioned. 980 02:26:14.740 --> 02:26:29.660 Community Hall: Fourth, the private open space dimension falls below the required 6-foot minimum, with patios smaller than 4 foot 6 inches, violating the Cupertino Municipal Code. Parking stalls are also undersized at 18 foot 6, 981 02:26:29.920 --> 02:26:32.849 Community Hall: Which require 20-foot minimums. 982 02:26:33.020 --> 02:26:38.260 Community Hall: These are all objective standards, not subjective ones, and they are not being met. 983 02:26:38.720 --> 02:26:44.950 Community Hall: Fifth, as your own staff report confirms, the site is now in a very high fazzard… 984 02:26:45.280 --> 02:26:59.070 Community Hall: fire hazards severity zone, yet no evacuation study was required. The city has no adopted evacuation standards, and emergency access with such narrow setbacks has been demonstrate… has not been demonstrated. 985 02:26:59.280 --> 02:27:11.099 Community Hall: Approving a 40-foot-tall, 51-unit project in a very high fire hazard safety zone without evacuation analysis is not consistent with the City's general plan safety policies. 986 02:27:11.330 --> 02:27:24.489 Community Hall: Finally, the staff's reliance on AB130 CEQA exemption is unsupported by substantial evidence. That exemption only applies if a project meets all applicable fire hazard and safety standards. 987 02:27:24.660 --> 02:27:29.510 Community Hall: The record does not demonstrate that, especially given the lack of evacuation analysis. 988 02:27:30.420 --> 02:27:41.680 Community Hall: In summary, this project fails to meet multiple objective zoning standards and conflicts with the general plan, and lacks the required life safety evidence for a CEQA exemption. 989 02:27:42.440 --> 02:27:59.179 Community Hall: Now, to put the following into some perspective, I'm an engineer, a registered civil engineer in California, and although I didn't have time to include my review of the transportation study, environmental study, and the biological study. 990 02:27:59.400 --> 02:28:13.679 Community Hall: I found significant errors and omissions in each of those reports, to the extent too much to explain here tonight in limited time, but I'm more than happy to meet with planning and go over those, those documents in detail with what I found out. 991 02:28:15.660 --> 02:28:29.969 Community Hall: Furthermore, there was… there was no reporting on fire flow demands and effect on the existing fire systems. There was no drainage study by converting the existing permeable material to nearly 90% impermeable. 992 02:28:30.380 --> 02:28:35.870 Community Hall: The bioretention is only designed to handle 85 percentile of a 24-hour rain event. 993 02:28:36.040 --> 02:28:49.949 Community Hall: This is 3 quarter to 1 inch of rain in a 24-hour period. Based on… on the past… last two storms, we've had 2 inches of rain in a 24-hour period. So that… that water's got to go somewhere. It's going to go on the storm. 994 02:28:50.700 --> 02:29:00.690 Community Hall: I respectfully urge the Commission to deny the project as proposed or require a substantial redesign that complies with our… Thank you, that is your time. 995 02:29:00.870 --> 02:29:02.669 Community Hall: I thought we had two people. 996 02:29:02.770 --> 02:29:05.680 Community Hall: Okay, so you had 4 minutes. Oh, okay. 997 02:29:10.130 --> 02:29:11.859 Community Hall: It's 2 minutes per person. 998 02:29:18.890 --> 02:29:36.920 Community Hall: I'm gonna start. Commissioner, I'm a resident of Linda vessel Bride. Since the housing element was adopted, there has been a material change in the safety conditions. As the city notice, this area has been designated as a very high fire hazard safety zone. 999 02:29:37.080 --> 02:29:42.800 Community Hall: at the wildlife-urban interface. This is a chain fact, but the Commission must weigh in. 1000 02:29:43.220 --> 02:29:45.010 Community Hall: My two asks. 1001 02:29:45.110 --> 02:29:49.689 Community Hall: Please do not find this project exempt from CEQA under AB130. 1002 02:29:49.850 --> 02:30:04.819 Community Hall: The statute explicitly excludes sites in a very higher fire hazard safety zone, and this site should not be exempt from CEQA. And the second one is place all fire safety communications in public records before the Commission votes. 1003 02:30:05.370 --> 02:30:08.719 Community Hall: Every exception, everywhere, signed and cited. 1004 02:30:08.850 --> 02:30:09.670 Community Hall: Why? 1005 02:30:10.770 --> 02:30:18.540 Community Hall: The residents have submitted how California Car Code is being applied by the Sacramento Metropolitan Fire District. 1006 02:30:19.360 --> 02:30:27.489 Community Hall: Sacramento makes the laws which govern our state, and the interpretation of the local fire district carries weight. 1007 02:30:28.530 --> 02:30:41.939 Community Hall: These guidelines meant to apply to all developments, and to not apply them in a very fire… very high fire hazard safety zone would be an abdication of your responsibility to the citizens and residents of Cupertino. 1008 02:30:43.230 --> 02:30:57.870 Community Hall: The couple of things. First thing is, as interpreted by Sacramento Fire District, any complex which has more than 39 units, multifamily, requires two exit roads. This one has 51, and it has only 1. 1009 02:30:58.000 --> 02:31:02.920 Community Hall: The second part is aerial access requirement for fire safety. 1010 02:31:03.270 --> 02:31:09.639 Community Hall: fire engines often use aerial ladders to go up to the third floor. 1011 02:31:09.820 --> 02:31:14.249 Community Hall: And the requirement, as clearly stated, is if the building is about 30 feet. 1012 02:31:14.790 --> 02:31:25.460 Community Hall: We know that the buildings are going up to 40 feet, and why those requirements are not being enforced in a very high fire resort zone is beyond my… I cannot understand why. 1013 02:31:26.720 --> 02:31:45.650 Community Hall: The third part is we did some analysis on whether 10-foot setbacks are good enough for even manual ladders, and even they are not enough. You need about 10 to 12 foot of space for a fireman to be able to operate a manual ladder and go up to the third story, and even that's not met by that. 1014 02:31:45.650 --> 02:31:55.100 Community Hall: All those findings have been shared and written comments, and it would be prudent for the Commission to go through all those things before you make any determination of this. 1015 02:31:55.500 --> 02:32:01.280 Community Hall: I think the other aspect is, Sacramento wants us to build housing. 1016 02:32:01.410 --> 02:32:09.750 Community Hall: But they don't say that you have to destroy all setbacks and build 2,700 square foot townhomes to meet affordable housing requirements. 1017 02:32:10.100 --> 02:32:22.469 Community Hall: If these townhomes are reduced to 1500 square foot, we can meet the 30-foot setback requirements required by code, and there is no reason why the city should jeopardize our safety just because some developer or something has to maximize the profits. 1018 02:32:22.530 --> 02:32:31.079 Community Hall: Thank you, that is your time. Our next speaker is Craig Cummings, followed by Serenevas Ravvondra, followed by Rhoda Fry. Welcome, Craig. 1019 02:32:35.680 --> 02:32:44.120 Community Hall: Good evening, I'm Craig Cummings. I live on Baxley Court. I've lived there about 25 years. It's right around the corner from the proposed development. 1020 02:32:44.320 --> 02:33:00.189 Community Hall: We've heard a lot of concerns, tonight, and I'm not going to try to get into any of the details of any of those. I just want to note that this project's been fraught with difficulties right back to the beginning with the housing element and the approval of the… or the change of the… of the… 1021 02:33:00.740 --> 02:33:19.349 Community Hall: the zoning, which seemed to happen without sufficient public, notification. But that's water under the bridge, you can't do anything about that. That's gone, I suppose. But what we can do is address the concerns that we've got. Things like the, the fires in the Palisades, I was reminded of, 1022 02:33:19.350 --> 02:33:23.609 Community Hall: Santana Row, when that burned, when it was all just under construction. 1023 02:33:23.610 --> 02:33:40.300 Community Hall: We talked about the, Linda Vista fire of 2007, and a photographer had given these, given me these pictures. And, just a reminder that fire danger in our neighborhood is real. This is right over my back fence, so this is something that can be very real. 1024 02:33:40.340 --> 02:33:54.389 Community Hall: So, my request is that you listen to all the concerns that have been brought out here, and clear them all before you push this thing forward, and make sure we know what we're doing, because there's some real high danger here. That's all I ask, thank you. One more picture. 1025 02:33:58.720 --> 02:34:07.309 Community Hall: Our next speaker is Srinivas Raghdvendra, followed by Rhoda Frye, followed by Dan Marshall. Welcome, Srinivas. 1026 02:34:07.690 --> 02:34:19.360 Community Hall: Thank you, Commissioners, thank you for your service. I have a very simple ask of you. You know, I have not… I do not understand SECA, do not understand R1 versus R3. I understand 1027 02:34:19.450 --> 02:34:39.120 Community Hall: wildfire. I understand what happened in Palisades. I understand that, you know, innocent people who were having their daily life got affected. It was affected because, you know, urban planning broke down in those places. Though there, the excuse was they did not anticipate such wildfires. 1028 02:34:39.230 --> 02:34:48.470 Community Hall: We are now… Seeing unprecedented things that never happened before. Wildfires the scale never seen before. 1029 02:34:48.620 --> 02:34:53.760 Community Hall: Juxtaposed with these new laws about housing density. 1030 02:34:53.940 --> 02:34:58.069 Community Hall: So people who made this housing density probably have not understood 1031 02:34:58.220 --> 02:35:00.320 Community Hall: The risk that we, folks, take. 1032 02:35:00.500 --> 02:35:05.880 Community Hall: You know, I also live on Backstreet Code, I also saw that The, the, the airplane… 1033 02:35:06.130 --> 02:35:10.799 Community Hall: dump fire retardant just behind our back door, just behind our backdrops. These are real… 1034 02:35:11.620 --> 02:35:19.660 Community Hall: problems. These are not hypothetical problems. We have 3 schools in our neighborhood. At 2 p.m, you can't take a bike through that, leave it on a car. 1035 02:35:20.020 --> 02:35:26.029 Community Hall: So, if at 2 p.m. you have a wildfire, imagine the evacuation backlog. 1036 02:35:26.280 --> 02:35:36.420 Community Hall: So here's what I ask a few folks. I know you're bound by legal advice, you're bound by staff advice, but I want to make the point to you that these are untested theories. 1037 02:35:37.360 --> 02:35:47.959 Community Hall: In the sense that I do not know of a case that's been litigated where high-density housing, high-density areas were forced to have 1038 02:35:48.330 --> 02:35:50.349 Community Hall: let me say it differently. High… 1039 02:35:50.420 --> 02:36:00.810 Community Hall: hazard… high fire hazard areas were forced to also have high-density housing. This almost seems so absurd on the face of it. I can't imagine any judiciary 1040 02:36:00.810 --> 02:36:11.800 Community Hall: any judge support that? So I… I asked a few of the following. I'm going beyond what my fellow is… I'm asking you to go beyond and be ready for… for, you know. 1041 02:36:12.020 --> 02:36:22.550 Community Hall: A legal battle, if necessary, because a lot of other communities would cheer us on and support us on, because what's out there is absurd. 1042 02:36:22.840 --> 02:36:28.679 Community Hall: You cannot have high-density housing in a high fire hazard zone. 1043 02:36:28.910 --> 02:36:33.539 Community Hall: There's nothing that, you know, people in Sacramento say they can make it right. 1044 02:36:33.620 --> 02:36:53.229 Community Hall: You heard Supreme Court opine on this a long time ago, that you cannot do stupid things. That's the law of the country, that nothing can override that. So, I ask of you, A, please push back and say no to this. These are nice gentlemen, nice people, but they do not understand, they don't live where we live. You're nice people, but you don't live where we live. 1045 02:36:53.260 --> 02:36:56.650 Community Hall: We live with the threat of a wildfire in our backyard. 1046 02:36:56.910 --> 02:37:00.700 Community Hall: And that is something you need to internalize, and so I ask a few. 1047 02:37:00.720 --> 02:37:07.409 Community Hall: Please push back on this, and if this becomes a matter of litigation, we'll support you, we'll blaze 1048 02:37:07.410 --> 02:37:23.499 Community Hall: new trial here that the rest of Cupertino, the rest of the country will do. Thank you very much. Thank you, that is your time. Our next speaker is Rhoda Frye, followed by Dan Marshall, followed by Connie Cunningham. Welcome, Rhoda. Hi, I feel a little bit challenged, following all of this 1049 02:37:23.710 --> 02:37:26.210 Community Hall: Compelling testimony this evening. 1050 02:37:26.500 --> 02:37:28.840 Community Hall: You know, in hindsight. 1051 02:37:29.250 --> 02:37:34.909 Community Hall: If we… if the state had come in with where we are with the fire at this point. 1052 02:37:35.970 --> 02:37:40.069 Community Hall: Would… would… would our housing element have come out different? 1053 02:37:41.250 --> 02:37:52.490 Community Hall: And I also… wonder about CEQA. I don't see how this project could possibly be 1054 02:37:52.860 --> 02:38:04.209 Community Hall: exempt from CEQA, and that seems… that is the overriding issue, because everything that you're asked to vote on tonight is predicated on CEQA exemption. 1055 02:38:05.130 --> 02:38:10.909 Community Hall: So… If it's possible that it isn't exempt from CEQA, then… 1056 02:38:11.350 --> 02:38:14.070 Community Hall: You don't have anything to vote on tonight. 1057 02:38:14.330 --> 02:38:22.410 Community Hall: So I'm wondering… I wonder about that. I wonder about how those individual homes, those new homes, could possibly get 1058 02:38:22.950 --> 02:38:24.320 Community Hall: home insurance. 1059 02:38:24.680 --> 02:38:25.700 Community Hall: You know, there's… 1060 02:38:25.730 --> 02:38:35.290 Community Hall: homes that are already built where people just can't afford their home insurance now. As a mitigation, if this project were to move forward. 1061 02:38:35.290 --> 02:38:53.330 Community Hall: I think that they should look into rock wool for their, for their, insulation assemblies. It's essentially… rock wool is kind of like what those fire logs are made out of in your… in fake fire logs for fireplaces, they don't burn. 1062 02:38:53.430 --> 02:38:55.210 Community Hall: So that would… that would help. 1063 02:38:55.710 --> 02:39:01.489 Community Hall: You know, you're… Your job is… is to protect 1064 02:39:01.860 --> 02:39:06.279 Community Hall: The residents, but also to protect the city. 1065 02:39:06.550 --> 02:39:13.200 Community Hall: And… I've seen the… I've seen the school traffic, I've lived through it. I don't live… 1066 02:39:13.310 --> 02:39:24.349 Community Hall: I'm not a neighbor of that… that property, by the way, so I'm not… it's sort of not exactly in my backyard. I've seen the traffic, I've been in the traffic on McClellan. 1067 02:39:24.620 --> 02:39:28.379 Community Hall: It's… it's… with the schools, it's… it's quite daunting. 1068 02:39:28.550 --> 02:39:29.780 Community Hall: And, 1069 02:39:31.390 --> 02:39:37.379 Community Hall: We need to make sure that we're doing due diligence on this, because if it gets built and there's issues. 1070 02:39:37.870 --> 02:39:40.519 Community Hall: And you've heard a compelling number of them. 1071 02:39:41.320 --> 02:39:43.640 Community Hall: Then the city is liable. 1072 02:39:44.410 --> 02:39:47.520 Community Hall: And I, you know, I want the city to spend money on 1073 02:39:48.300 --> 02:39:57.779 Community Hall: Parks, and things that make our lives great, and rather than lawsuits, and of course, having the potential of loss of life in our community. 1074 02:39:57.920 --> 02:39:58.920 Community Hall: Thank you. 1075 02:40:00.580 --> 02:40:06.620 Community Hall: Thank you, Rhoda. Our next speaker is Dan Marshall, followed by Connie Cunningham, followed by Lynn Y. 1076 02:40:08.090 --> 02:40:09.340 Community Hall: Welcome, Dan. 1077 02:40:21.950 --> 02:40:30.190 Community Hall: Okay, moving on to the next speaker, Connie Cunningham, followed by Lynn Ye, followed by Lisa Warren. Welcome, Connie. 1078 02:40:31.890 --> 02:40:47.600 Community Hall: Good evening, Chair and Commissioners. My name is Connie Cunningham, and I am on the Housing Commission, but speaking for myself only this evening, I do support this, 1079 02:40:48.130 --> 02:40:57.720 Community Hall: housing development. I never take fire lightly, so it's not that I haven't heard all of the issues that the people are concerned about. 1080 02:40:57.860 --> 02:41:11.070 Community Hall: I'm particularly supportive because this housing element is a priority site for the city, and it went through many iterations. I was involved in discussions of that. 1081 02:41:11.480 --> 02:41:20.829 Community Hall: I… I think it's a great site. It's close to schools, bike trails, and it allows more families to move into Cupertino. 1082 02:41:21.960 --> 02:41:26.640 Community Hall: It will help our local schools as well, by increasing the taxes here. 1083 02:41:28.110 --> 02:41:35.659 Community Hall: It is urban area, and so it's infill. So that is one of the big reasons I support it. It eliminates sprawl. 1084 02:41:36.860 --> 02:41:39.829 Community Hall: It includes below-market rate ohms. 1085 02:41:40.960 --> 02:41:48.039 Community Hall: For sale homes, and that's great, because there are not a lot of for-sale homes in the below market rate. 1086 02:41:48.280 --> 02:42:01.190 Community Hall: Category. I know about Summerhill Homes, and I think they can work with the city to answer the questions that are being raised by the 1087 02:42:01.320 --> 02:42:05.540 Community Hall: Citizens, and again, Nothing scares me worse than fire, so I… 1088 02:42:06.080 --> 02:42:13.719 Community Hall: not, at all dismissing the issues, but I think that the city planners can work with the… with the, 1089 02:42:14.600 --> 02:42:22.920 Community Hall: Summer Hill homes to answer those questions and build a livable, walkable apartment, I mean, complex. Thank you. 1090 02:42:23.410 --> 02:42:30.619 Community Hall: Thank you, Connie. Our next speaker is Lynn Wythe, followed by Lisa Warren, followed by Nicholas Cow. Welcome, Lynn. 1091 02:42:35.040 --> 02:42:36.290 Lin Y: Hello, can you hear me? 1092 02:42:37.780 --> 02:42:39.059 Community Hall: Yes, we can hear you. 1093 02:42:39.510 --> 02:42:40.380 Lin Y: Thank you. 1094 02:42:40.710 --> 02:42:47.029 Lin Y: So, I'm a resident of the neighborhood. First of all, I think this land, this partial, should be developed. 1095 02:42:47.860 --> 02:42:53.140 Lin Y: Based on what it is, like, semi-abandoned for decades, it doesn't really fit with the neighborhood. 1096 02:42:53.510 --> 02:42:58.110 Lin Y: But in the meantime, how the plan is drafted right now. 1097 02:42:58.220 --> 02:43:00.799 Lin Y: It's also not fit with the neighborhood. 1098 02:43:01.630 --> 02:43:07.830 Lin Y: I think what's really lacking on this whole thing is the transparency to the neighborhood, to the entire community. 1099 02:43:08.300 --> 02:43:20.580 Lin Y: When we first heard about this thing, we say, oh, we are building high-density homes, it was a surprise, because we've been thinking this one, again, abandoned by, you know, for several decades. 1100 02:43:20.980 --> 02:43:23.890 Lin Y: is a R1 zoning. 1101 02:43:24.100 --> 02:43:28.869 Lin Y: That, you know, if one day develop, should be the same as the conjunction neighborhood. 1102 02:43:29.760 --> 02:43:35.740 Lin Y: But what was surprising is, when we heard about this development, probably… Two years back? 1103 02:43:36.210 --> 02:43:39.649 Lin Y: And we were told that the zoning change was already done. 1104 02:43:40.180 --> 02:43:50.480 Lin Y: So this is after the fact, that, oh, it's already moving to the second stage, while even the first stage, there's a big lack of transparency to us, the neighbors. 1105 02:43:50.740 --> 02:44:06.550 Lin Y: And later on, I learned that, you know, there was hearings, there was some notice sent over to the residents, but many of us living right around this neighborhood, none of us got any notifications. There was no signages posted on the parcel. 1106 02:44:06.870 --> 02:44:12.699 Lin Y: And also, it seems like there was, like, say, 20,000 letters sent out to some other… 1107 02:44:12.860 --> 02:44:24.740 Lin Y: Cupertino resident areas. I guess one of the transparency I'm looking for is, when this big zoning change happens, what is the requirement, and what is the typical practice? 1108 02:44:25.100 --> 02:44:30.999 Lin Y: If none of us, you know, Direct neighborhood is even notified There may be something missing. 1109 02:44:31.720 --> 02:44:42.269 Lin Y: I also heard from other people that in those letters that people did get notified, there was only partial numbers. There was no map, there was no even address. 1110 02:44:42.550 --> 02:44:47.129 Lin Y: So I'd like to ask everybody here, who know your own home partial number? 1111 02:44:47.840 --> 02:44:53.999 Lin Y: Not to mention your neighbors. So there's definitely something missing, even from the Step 1, the zoning change. 1112 02:44:55.310 --> 02:44:57.780 Lin Y: The other thing I'm trying to say is, 1113 02:44:58.370 --> 02:45:02.230 Lin Y: Try to check on the site, try to check on the neighborhood. 1114 02:45:02.330 --> 02:45:07.099 Lin Y: It takes forever to get out of the neighborhood around 8 AM in the morning. 1115 02:45:07.200 --> 02:45:09.900 Lin Y: Around 2PM to 4pm in the afternoon. 1116 02:45:10.390 --> 02:45:21.510 Lin Y: Here, we have a lot of kids, a lot of, you know, senior people, working parents, everybody. You know, we need to get out of this place to do regular things. And not to mention the fire, you know, there is this… 1117 02:45:21.620 --> 02:45:26.569 Lin Y: Many people have mentioned, even on a regular day, it's taking forever to get out of this place. 1118 02:45:26.760 --> 02:45:31.590 Lin Y: So I'm trying to see if we can do a simulation. Just put, you know, 51 tenths. 1119 02:45:32.290 --> 02:45:40.659 Lin Y: plus, you know, 100 cars in this site, and see what's gonna happen. Do a simulation for a few weeks, and then come back with a better proposal. 1120 02:45:41.460 --> 02:45:45.859 Lin Y: That's my ask. I urge the committee to deny this proposal. 1121 02:45:47.280 --> 02:45:55.369 Community Hall: Thank you, Lynn. That is your time. Our next speaker is Lisa Warren, followed by Nicholas Cow, followed by Luis Maronte. Welcome, Lisa. 1122 02:46:05.460 --> 02:46:08.070 Lisa Warren: There we go, took the… can you hear me? 1123 02:46:09.180 --> 02:46:10.360 Community Hall: Yes, we can hear you. 1124 02:46:10.360 --> 02:46:14.430 Lisa Warren: Okay, it took a while for the unmute button to show up. So… 1125 02:46:14.670 --> 02:46:23.930 Lisa Warren: I've heard a lot of, so I don't live in the area. In fact, I live probably as far away as I can from where it is, or as anyone can. 1126 02:46:24.080 --> 02:46:25.900 Lisa Warren: And still be in the city? 1127 02:46:26.350 --> 02:46:28.959 Lisa Warren: But I feel for these neighbors, I'm… 1128 02:46:29.210 --> 02:46:35.869 Lisa Warren: Pleased that they all have varying arguments for why this is not good, and there hasn't been a lot of repetition. 1129 02:46:36.290 --> 02:46:55.890 Lisa Warren: I… I love the phrase, untested theories, from one speaker, because that, in my mind, is what all the state laws is all about, and has been. And they build on each other. And, oh, we forgot to do this, which will mess things up even more, so we'll just add it to the next bill. 1130 02:46:56.000 --> 02:47:00.089 Lisa Warren: So the city really doesn't have the control we all want them to have. 1131 02:47:01.420 --> 02:47:05.859 Lisa Warren: And we all… because I don't live there, I hope 1132 02:47:06.170 --> 02:47:10.610 Lisa Warren: That when there's something happening elsewhere in the city. 1133 02:47:10.900 --> 02:47:16.570 Lisa Warren: Everyone sticks up for their city, not just their neighborhood. We all need to pull together 1134 02:47:16.910 --> 02:47:34.190 Lisa Warren: And feel the pain, whatever it is, and however it relates to the neighborhood that these things are going into. And just remember, we are supposed to be a community, and we should care about other people's neighborhoods. There's been some of that going on, but sometimes people are so busy, you can't keep track of it all. 1135 02:47:34.190 --> 02:47:40.349 Lisa Warren: But it's painful, and this… staff can't do everything they want to do. 1136 02:47:40.630 --> 02:47:47.130 Lisa Warren: And we need to really pay attention to who we vote for at the state level. Really pay attention. 1137 02:47:47.890 --> 02:47:52.030 Lisa Warren: And spend money, spend time supporting who you think is going to do the right thing. 1138 02:47:52.860 --> 02:47:58.540 Lisa Warren: I… I want… and by the way, below market rate. 1139 02:47:59.230 --> 02:48:05.629 Lisa Warren: That's a joke. In ways. I mean, it's a good idea, but that's not affordable. 1140 02:48:07.000 --> 02:48:09.310 Lisa Warren: In many, many, many, many cases. 1141 02:48:09.610 --> 02:48:13.039 Lisa Warren: I would like the developer to confirm that 1142 02:48:13.900 --> 02:48:17.480 Lisa Warren: Or the city to confirm that this will be required. 1143 02:48:18.300 --> 02:48:22.059 Lisa Warren: The 10-foot setbacks and the shrubs being planted. 1144 02:48:24.160 --> 02:48:31.530 Lisa Warren: they're… those can be planted, they can grow, then they can die, da-da-da. Are these 10-foot spaces that… 1145 02:48:31.710 --> 02:48:35.030 Lisa Warren: Setbacks where the shrubs are going to be. 1146 02:48:35.550 --> 02:48:40.500 Lisa Warren: In yards of some of these dwellings, or are they in open… 1147 02:48:40.770 --> 02:48:53.980 Lisa Warren: shared space, who needs to maintain those so that they grow the way they are supposed to, and that they don't die, they don't get cut by a gardener? If it's not the developer taking care of that space. 1148 02:48:53.980 --> 02:49:01.159 Lisa Warren: That has to be written in clearly to whoever buys the units that are hosting the trees. So I think that… 1149 02:49:01.370 --> 02:49:07.789 Lisa Warren: I would appreciate hearing what that… expectation is. Thank you. 1150 02:49:09.570 --> 02:49:15.120 Community Hall: Thank you, Lisa. Our next speaker is Nicholas Cow, followed by Luis Marante. Welcome, Nicholas. 1151 02:49:15.990 --> 02:49:29.779 Nicholas Kau: Hi, I'm a resident on Linda Vista Drive as well, and I want to thank the gentleman before me that spoke about, you know, fitting things where they don't belong. Looking over the proposal, I noticed so many waivers given to the developmental housing 1152 02:49:29.940 --> 02:49:43.350 Nicholas Kau: almost seems to me like you're trying to jam a square block into a circular hole. For instance, not to sound like a broken record or anything, but talking about, you know, the 30-foot setbacks and why we can't do that. What is the issue, then, with 1153 02:49:43.510 --> 02:49:51.359 Nicholas Kau: not building 2,700 square foot lots. You know, reducing that and following the law, 1154 02:49:51.700 --> 02:49:57.290 Nicholas Kau: Why are we made so many concessions just for this development property? 1155 02:49:58.900 --> 02:49:59.760 Nicholas Kau: Thank you. 1156 02:50:03.120 --> 02:50:07.579 Community Hall: Thank you, Nicholas. And our next speaker is Luis Marante. Welcome, Louis. 1157 02:50:29.960 --> 02:50:33.129 Louis Mirante: Can you… are you able to hear me? Has my time started? 1158 02:50:33.850 --> 02:50:35.070 Community Hall: Yes, we can hear you. 1159 02:50:35.560 --> 02:50:36.200 Louis Mirante: Wonderful. 1160 02:50:37.160 --> 02:50:45.940 Louis Mirante: Thanks for allowing me to speak tonight. My name is Luis Marante. I'm the Senior Vice President of Public Policy for the Bay Area Council, and I focus on our housing policy. 1161 02:50:46.130 --> 02:50:51.739 Louis Mirante: I'm here to express our strong support for the proposed housing project on Linda Vista Drive. 1162 02:50:51.920 --> 02:51:03.739 Louis Mirante: As you all know, the Bay Area is in the midst of an unprecedented housing shortage that continues to drive up costs, deepen inequities, and make the Bay Area a worse place to live. 1163 02:51:03.740 --> 02:51:14.669 Louis Mirante: It threatens our region's long-term economic competitiveness, but projects like this one are exactly the kind of thoughtful, community-serving investments cities can be and should be making. 1164 02:51:14.680 --> 02:51:17.270 Louis Mirante: To resolve and assuage that problem. 1165 02:51:17.540 --> 02:51:29.549 Louis Mirante: You may have read in the news recently that the median home… I'm sorry, the median age of the… of a first-time home buyer in the United States just became 40 years old. 1166 02:51:29.620 --> 02:51:42.899 Louis Mirante: for the first time. That is the oldest median age for a first-time home buyer in American history, and it's symptomatic of the high cost of housing in California and across the country. 1167 02:51:43.190 --> 02:51:45.960 Louis Mirante: That projects like this are intended to solve. 1168 02:51:46.120 --> 02:51:57.990 Louis Mirante: This project would deliver 51 townhome-style condominium units, which are the starter home of the future, and they include family- sized 4-bedroom floor plates, among others. 1169 02:51:58.080 --> 02:52:12.760 Louis Mirante: Home ownership-oriented housing at this scale is increasingly rare in today's market, particularly in high-opportunity areas like Cupertino. If we want teachers, engineers, nurses, and young families to be able to put down roots here, we need more opportunities like this. 1170 02:52:12.970 --> 02:52:24.570 Louis Mirante: The people who are going to live in these houses often already work in our communities, and this will give them an opportunity to spend more time with their families and be more well-rooted in the communities they already serve. 1171 02:52:25.160 --> 02:52:43.919 Louis Mirante: This project also delivers meaningful fiscal and civic benefits, approximately $2.2 million of park fees, about $570,000 in school impact fees, and estimated $50,000 in annual net benefit to the city's general fund, along with the commitment to incorporate public art along the frontage. 1172 02:52:44.270 --> 02:52:54.269 Louis Mirante: In short, this is a well-designed project that advances your housing element goals, supports your regional housing needs allocation, and provides tangible community benefits. 1173 02:52:54.330 --> 02:53:04.630 Louis Mirante: I urge you to approve the Linda Vista Drive project and make an important step towards addressing our housing crisis while expanding homeownership opportunities in the Bay Area. Thanks for your time and consideration. 1174 02:53:05.670 --> 02:53:10.229 Community Hall: Thank you, Louis. We have no speaker cards in person, and no hands raised on Zoom, Chair. 1175 02:53:10.400 --> 02:53:12.750 Community Hall: Thank you very much, City Clerk. 1176 02:53:12.880 --> 02:53:18.240 Community Hall: Now we have an opportunity for the applicant to respond to public comments. Thank you. 1177 02:53:19.420 --> 02:53:33.070 Community Hall: Thank you again. Yeah, there are just a few items that I wanted to address. I think there was a question in respect to how the shrubs will be maintained. So, the shrubs are, going to be landscaped within the common 1178 02:53:33.540 --> 02:53:41.720 Community Hall: Open space within the development along the two property lines, and they are going to be maintained by the 1179 02:53:41.910 --> 02:53:53.349 Community Hall: HOAs, landscape company, and the CCNRs will stipulate that the project is responsible to maintain 1180 02:53:53.740 --> 02:54:00.509 Community Hall: the shrub buffer landscaping in perpetuity for the project. I hope that addresses that question. 1181 02:54:00.860 --> 02:54:07.089 Community Hall: I guess, Emmy, could you bring up the slides? 1182 02:54:08.020 --> 02:54:15.369 Community Hall: I want to address the D105, I believe that was the question. It's at the end of the presentation. 1183 02:54:22.960 --> 02:54:24.050 Community Hall: Yeah, perfect. 1184 02:54:24.690 --> 02:54:25.410 Community Hall: Perfect. 1185 02:54:25.850 --> 02:54:33.919 Community Hall: So, I believe this was the question in respect to the height, the 30-foot height. 1186 02:54:34.120 --> 02:54:43.079 Community Hall: This is common in almost every development that we do in the Bay Area. This is the same detail that was used for 1187 02:54:43.210 --> 02:54:45.129 Community Hall: the Stevens Creek Project. 1188 02:54:45.270 --> 02:54:46.950 Community Hall: The… 1189 02:54:47.200 --> 02:55:05.339 Community Hall: dimension from the eve to the grade is 29 and 9 and 3 quarters of an inch. So it's below the 30-foot threshold. That's what the fire departments ask you to do, to comply with their requirements. That's what is being proposed for this project. 1190 02:55:05.810 --> 02:55:08.979 Community Hall: We did meet several times with the fire department. 1191 02:55:09.500 --> 02:55:14.820 Community Hall: to, have this approved. Again, this is very common amongst 1192 02:55:14.970 --> 02:55:21.820 Community Hall: all of our projects to standard detail. Okay, so that was that question regarding the 105. 1193 02:55:22.310 --> 02:55:36.959 Community Hall: Do you want to address the 30-foot? Sure. Yeah, I think one of the community members mentioned sort of a 30-foot setback. I just want to mention the governing codes that are part of AB130, there's three of them. 1194 02:55:37.400 --> 02:55:40.550 Community Hall: 4290, 4291. 1195 02:55:40.830 --> 02:55:43.980 Community Hall: And Chapter 7A of the Building Code. 1196 02:55:44.410 --> 02:55:50.220 Community Hall: Those have numerous cross-references, and it took us a while to get down to this one. 1197 02:55:50.370 --> 02:55:55.280 Community Hall: So bear with me, and I'm happy to send this information, because it's going to be a long code citation. 1198 02:55:55.680 --> 02:56:01.510 Community Hall: It's California Code of Regulations, Title 14, Division 1.5, 1199 02:56:01.690 --> 02:56:07.940 Community Hall: Chapter 7, Subchapter 2, Article 5. You don't have to… I can send that to anyone. 1200 02:56:08.990 --> 02:56:18.659 Community Hall: What that is, is that's the 30-foot horizontal setback to the property line. It actually has a second component to the center line of the street, which we are in compliance with. 1201 02:56:18.970 --> 02:56:25.110 Community Hall: But that's Section A of that code. Section B Continues and says. 1202 02:56:25.580 --> 02:56:35.060 Community Hall: If there are, I'm gonna paraphrase a little bit, because the code citation basically says if there are various constraints, such as density. 1203 02:56:35.540 --> 02:56:38.469 Community Hall: There may be a reduction in this setback. 1204 02:56:38.920 --> 02:56:55.059 Community Hall: And I'm gonna loosely paraphrase, if you can, demonstrate or have a number of features, one of which is the, non-combustible materials within 5 feet of the homes, which we comply with, that's what we call also known as Zone Zero. 1205 02:56:55.450 --> 02:56:59.970 Community Hall: There are some other measures that are really intended to, 1206 02:57:00.490 --> 02:57:06.000 Community Hall: Mitigate or prevent structure to spreading a fire from structure to structure. 1207 02:57:06.350 --> 02:57:22.459 Community Hall: So, what we did was we added… that's where we added the exterior, fire sprinklers, to the exterior balconies, and we increased the ratings of the exterior walls, to 1-hour ratings. Those were the mitigation measures, and those were, 1208 02:57:22.950 --> 02:57:27.979 Community Hall: Sort of summarized in what's called an alternate materials in compliance with this code. 1209 02:57:27.990 --> 02:57:43.550 Community Hall: that the fire department reviewed and approved. So I think those are part of the application documents. So those are, in essence, prescribed mitigation measures within the code to comply with that section, and that was reviewed by staff and the fire department. 1210 02:57:43.780 --> 02:57:55.470 Community Hall: Okay, so I'm going to continue, and obviously I can come back to any questions that you have. So one of the reasons we had the neighborhood meetings, we were required to have one, we elected to have two, wasn't 1211 02:57:55.730 --> 02:58:07.069 Community Hall: to tell the neighbors, this is… this is just what it is, and you don't have a choice. Essentially, we wanted to meet with the neighborhood to not only hear them, but also to… 1212 02:58:07.330 --> 02:58:19.450 Community Hall: explain what the project is, and answer any questions outside of this kind of a forum, so they had the opportunity to ask where we could go into detail and answer the questions. So I just wanted to say. 1213 02:58:19.730 --> 02:58:24.170 Community Hall: the rationale why we had two neighborhood meetings. 1214 02:58:25.900 --> 02:58:36.509 Community Hall: Let's see, you want to address the, one-way head? Oh, yeah, and again, I don't pretend to know these neighborhood streets like any of the folks in this room. 1215 02:58:36.570 --> 02:58:47.640 Community Hall: Mr. Drew Chang was kind enough, actually, to share his study with me in advance, and had a little bit of an email exchange, and I said… I just kind of asked the question. I think the point was that 1216 02:58:47.760 --> 02:58:50.910 Community Hall: He said Linda Vista Drive was the only way out. 1217 02:58:51.040 --> 02:59:01.579 Community Hall: Just my simple looking at a map, it just looked like there were other ways out as well, such as Hyannis Port, Columbus, and Terrace. 1218 02:59:01.580 --> 02:59:21.450 Community Hall: which go down to Bubb Road, which seems to lead to, I think, Rainbow, which gets over the highway or the tracks. I think there's another way… Bubb Road, or to McClellan, which goes over, and it continued on to Bubb Road over Stevens Creek. So, those were just what I saw in my simple look at the math. I don't pretend to know all the back roads of this neighborhood like the folks here. 1219 02:59:26.270 --> 02:59:29.350 Community Hall: So, there were a lot of comments regarding 1220 02:59:29.620 --> 02:59:49.310 Community Hall: the reports that were generated for this project, whether it was civil reports or, architectural details. What I can say is all of our reports were provided by professional consultants on our part, but then they go to staff, staff reviews them, comments. 1221 02:59:49.710 --> 03:00:03.330 Community Hall: And after they've reviewed them, they send them to a third-party consultant outside of the city to plancheck. We spent 14 months having all of the reports that were generated for this project be third-party reviewed. 1222 03:00:04.400 --> 03:00:16.560 Community Hall: not only by staff, but by outside consultants that staff had hired. Obviously, we paid for that, but, what I… what I would say is it's… it's very easy to stand up here and say, well, this is Sybil… 1223 03:00:16.640 --> 03:00:32.019 Community Hall: flow rate doesn't work, or in my opinion, you know, I have experience in this, and I don't think the report analyzes this correctly. I think that would be valid if we submitted reports. 1224 03:00:32.030 --> 03:00:41.430 Community Hall: And you had to take the reports based on our assertion, but that's not the case. Everything has been third-party reviewed. I just wanted to point that out. 1225 03:00:43.950 --> 03:01:03.160 Community Hall: Okay, there was a, there was a comment that the project is required to have two access points, so that's not the code, the fire code. If you're over 100 units, you're required to provide two access points. I've had many projects where I've been up to 90 units, and 1226 03:01:03.160 --> 03:01:13.130 Community Hall: We've been required to only provide one access point. Over 100 units, you have to provide the two dual access points. I just finished a project in Los Gatas, 155 units. 1227 03:01:13.400 --> 03:01:18.190 Community Hall: we were required to provide 2 access points, because it's over 100 units, that's just a fire code. 1228 03:01:26.590 --> 03:01:31.830 Community Hall: I think there was a couple comments, and I'm not sure if the, 1229 03:01:32.050 --> 03:01:36.780 Community Hall: The… the person who made the comment was aware that Damn. 1230 03:01:37.130 --> 03:01:44.270 Community Hall: The waivers that were requested on this project were requested in order to make the project work. 1231 03:01:44.430 --> 03:01:53.880 Community Hall: These projects subsidize a considerable amount of affordable housing, and to make that work, the state has allowed 1232 03:01:54.250 --> 03:01:59.150 Community Hall: Waivers and concessions to be applied in order for a whole project to be 1233 03:01:59.360 --> 03:02:12.709 Community Hall: To be feasible. So, that's why those waivers and concessions, when applied, still provide the project to be consistent with the objective standards that the city has. 1234 03:02:13.380 --> 03:02:27.330 Community Hall: I think that's all I had. Did I skip anything that… I wasn't sure if you wanted to mention, sort of, the distribution housing element. Yeah, please, if you could do that, then… Yeah, and this predates us, of course, but I think, as Austin mentioned in the introduction, 1235 03:02:27.580 --> 03:02:36.299 Community Hall: This house is… this one is the only, housing element site in this sort of quadrant of the city, and I think, it was just to sort of distribute 1236 03:02:36.610 --> 03:02:46.010 Community Hall: the, I guess, housing element sites throughout the city, and that's… that's all I wanted to say, and I think the code is affirmatively furthering Fair Action. 1237 03:02:46.180 --> 03:02:57.070 Community Hall: Firmly Furthering Fair Housing, sorry. Thank you. And that's why the density is what it is. And I think Margo wanted to make one additional comment on this. 1238 03:03:02.810 --> 03:03:22.060 Community Hall: Hi, I just wanted to touch on three quick points. One, as staff correctly pointed out, is that the use of concessions and waivers under the density bonus as a matter of state law does not render a project inconsistent with objective standards, so that is established in state law. The city does not have discretion. 1239 03:03:22.100 --> 03:03:40.430 Community Hall: Around that. The second is, on the CEQA question, in terms of whether the project complies with the requirements for high fire hazard severity zones under that CEQA exemption. There are specific objective standards that are laid out by reference to SB35 and other state housing law. 1240 03:03:40.430 --> 03:03:48.520 Community Hall: that projects have to meet, and in this case, as indicated on your… I think it's page 8 of your staff report, the fire department did, 1241 03:03:48.520 --> 03:04:01.700 Community Hall: make a finding that the project has demonstrated consistency with all of those requirements. So the SQL requirement is met, and there is evidence in the record to that effect. And then the last was just to reiterate the point I made earlier about, 1242 03:04:01.920 --> 03:04:05.929 Community Hall: the… What it means to have a, 1243 03:04:06.080 --> 03:04:10.439 Community Hall: specific adverse impact on health and safety under the Housing Accountability Act. 1244 03:04:10.450 --> 03:04:25.830 Community Hall: I didn't have time before, but I'm just going to quickly read you the language, which requires a significant, quantifiable, direct, and unavoidable impact based upon objective, identified, written public health and safety standards, policies, or conditions. 1245 03:04:25.830 --> 03:04:42.889 Community Hall: as they existed on the date of the preliminary application. And again, on page 8 of your staff report, staff indicates, and I'm just reading here, the city does not have any adopted objective standards pertaining to evacuation in the event of a major fire or other environmental emergency. So. 1246 03:04:42.890 --> 03:04:46.790 Community Hall: By definition, you don't have a standard against which you can 1247 03:04:46.940 --> 03:04:58.630 Community Hall: measure, emergency evacuation compliance, and therefore, under the Housing Accountability Act, you do not have a health and safety basis based on emergency access that would justify disapproval. 1248 03:04:58.960 --> 03:05:06.510 Community Hall: So, just wanted to clarify those points. I know the lot can be complicated, and it's a lot you guys are going to learn quickly. I'm happy to answer any questions. 1249 03:05:09.330 --> 03:05:24.379 Community Hall: Great, thank you very much to the applicant for answering so many of the community questions. It definitely saves us a little bit of time. So I… the public hearing portion of this is now closed, and I'll bring this back to the Commission for questions. Who would like to start? Actually, were you gonna have the… 1250 03:05:24.500 --> 03:05:25.989 Community Hall: Fire department speak? 1251 03:05:26.360 --> 03:05:35.120 Community Hall: I think that… I'm not sure whether that was how we, how we do that. We do have a representative here, so, I mean, I… 1252 03:05:35.780 --> 03:05:52.779 Community Hall: I would think if they could consolidate FIRE questions, sort of answer them as a whole, I think some have been touched on, but it might be more efficient to do that. Sorry, through the chair, could you reopen the public hearing so we may hear from FIR, but also if commissioners have questions or follow-up questions? 1253 03:05:53.420 --> 03:05:56.709 Community Hall: Okay, reopening public hearing for, the fire. 1254 03:05:56.950 --> 03:06:03.709 Community Hall: Marshall to come up. Thank you. His name is Brad Fox, by the way, sorry about not making that clear. Thank you. 1255 03:06:11.540 --> 03:06:22.450 Community Hall: Good evening, thank you, Commission. My name is Brad Fox. I'm the Assistant Fire Marshal with County Fire. I don't have a presentation for you tonight, so I'm happy to answer any questions that you have. 1256 03:06:22.600 --> 03:06:37.850 Community Hall: But I don't have a presentation as… as it relates to the public hearing. Is the City Clerk able to put up, the member of the public slide? I believe it was David Yan, who had a slide on the D105. Are we able to put up that slide, please? 1257 03:06:44.910 --> 03:06:47.999 Community Hall: And while the slide is coming up, I believe there were some… 1258 03:06:48.480 --> 03:06:52.579 Community Hall: mails that the member of the public sent with the Planning Commission copied that 1259 03:06:52.860 --> 03:06:57.449 Community Hall: Indicated there was an error in the classification of the height. 1260 03:06:57.680 --> 03:07:00.720 Community Hall: If you may wish to comment on that, or… 1261 03:07:00.820 --> 03:07:12.580 Community Hall: add anything? I can… I can clear that up. There were, members of the community that were asking us if the project was complying with the requirement for aerial act… 1262 03:07:13.020 --> 03:07:22.649 Community Hall: Aerial access… aerial apparatus access, sorry. Let me back up a step and explain why that requirement exists. So… 1263 03:07:22.860 --> 03:07:25.029 Community Hall: If, 1264 03:07:25.590 --> 03:07:34.730 Community Hall: We want to make sure that we can access the roofs of buildings, obviously for ventilation and other operational, 1265 03:07:34.840 --> 03:07:52.520 Community Hall: procedures. So, we do that through one of two ways, either with a ground ladder, or with the ladder on an aerial apparatus. And so, the ground ladders that we carry, which are similar to fire departments across the country, are 35 feet long. 1266 03:07:52.700 --> 03:07:58.950 Community Hall: So that's where you see that requirement come from of… 1267 03:07:58.950 --> 03:08:12.789 Community Hall: measuring 30 feet to the east. So, if we can, get a ground ladder to the roof and access the roof that way, then we don't need to use an aerial apparatus. So that's the… 1268 03:08:12.790 --> 03:08:25.800 Community Hall: what we're testing against to see if we need aerial apparatus access. And so, the community asked about this, requirement, and if it was met. 1269 03:08:25.940 --> 03:08:30.500 Community Hall: And, I personally responded, and I… 1270 03:08:30.870 --> 03:08:37.660 Community Hall: apologize, because I don't think I did myself any favors. I… responded, 1271 03:08:37.670 --> 03:08:55.770 Community Hall: With that dimension that's shown in that slide of 29 foot 1 and 3 quarters. And an astute member of the community correctly pointed out that, hey, this is measuring to the top of the slab, not to the grade plane, as the code requires. 1272 03:08:55.770 --> 03:09:06.040 Community Hall: But thankfully, my plan reviewers are more detail- oriented than I am, and they did correctly review the project, and so… 1273 03:09:06.040 --> 03:09:12.989 Community Hall: What that detail doesn't show is that the proposed grade plane is 8 inches lower than the top of slab. 1274 03:09:12.990 --> 03:09:21.329 Community Hall: So if you add 8 inches to that dimension, the total dimension from the EV to the grade plane 1275 03:09:21.340 --> 03:09:28.730 Community Hall: is 29 feet 9 and 3 quarters inches, so it is still under the 30-foot threshold. 1276 03:09:32.590 --> 03:09:40.149 Community Hall: And that 8-inch dimension, that is consistent among all of the proposed 10 buildings. 1277 03:09:41.100 --> 03:09:48.979 Community Hall: Could you comment on other fire reviews that you have had for projects, I assume, that we have had in Cupertino? I know the applicant has one more. 1278 03:09:49.260 --> 03:09:52.660 Community Hall: And there have been a few other on Stevens Creek, if you are able to 1279 03:09:52.850 --> 03:09:56.040 Community Hall: If you're able to comment on whether Aerial apparatus 1280 03:09:56.730 --> 03:10:00.729 Community Hall: Access is any different in this project versus any of the others you've reviewed? 1281 03:10:01.070 --> 03:10:14.710 Community Hall: at similar, we measure… we measure for the requirement the same from project to project, so there would be no variation in the way that we, look at that requirement. I don't recall, I think I do… 1282 03:10:14.790 --> 03:10:27.409 Community Hall: know the project that you're talking about off of Stevens Creek. Those are also townhomes. I don't recall off the top of my head if those met the requirement or not, but, we do… 1283 03:10:27.500 --> 03:10:30.970 Community Hall: Measure in the same way every time, consistently. 1284 03:10:31.230 --> 03:10:36.890 Community Hall: And in terms of access road width, can you talk about Is this project any different? 1285 03:10:37.080 --> 03:10:39.680 Community Hall: In the access road width compared to… 1286 03:10:40.850 --> 03:10:54.069 Community Hall: what you would require for a comparable project in… No, again, that's consistent, and it really depends on this requirement for aerial apparatus access. As was pointed out earlier. 1287 03:10:54.070 --> 03:11:01.710 Community Hall: Our standard road width requirement, if aerial access is not required, is 20 feet. 1288 03:11:01.910 --> 03:11:11.080 Community Hall: If aerial access is required, that winds out to 26 feet, because there are outriggers that go out. And, 1289 03:11:11.200 --> 03:11:24.189 Community Hall: the aerial access… the aerial apparatus takes up more width, and we still want traffic and other apparatus to be able to pass. So it's either 20 feet or 26 feet, depending on this requirement. 1290 03:11:24.830 --> 03:11:25.810 Community Hall: Thank you. 1291 03:11:28.280 --> 03:11:33.510 Community Hall: I wonder if I could. Oh, sorry, go ahead. So I'm curious, 1292 03:11:34.170 --> 03:11:44.869 Community Hall: Have you participated in other evaluations of projects, proposed projects, in high fire danger zones? 1293 03:11:45.010 --> 03:11:51.900 Community Hall: Recently, Or is this… is this unusual? I guess maybe that's really what the question I'm asking. 1294 03:11:52.490 --> 03:12:01.029 Community Hall: in… Cupertino, none come to mind, but in some of the other jurisdictions that we serve, we… 1295 03:12:01.630 --> 03:12:09.330 Community Hall: Have several… Sb330 projects that have been proposed in, 1296 03:12:09.920 --> 03:12:16.180 Community Hall: In various fire hazard severity zones, including very high fire hazard severity. 1297 03:12:17.510 --> 03:12:18.220 Community Hall: And… 1298 03:12:18.370 --> 03:12:33.609 Community Hall: Are the… it sounds like the standards are very consistent for your evaluation. Is that… is that true in this case as well? The kinds of mitigations, are they similar in this project to your experiences with some of these others? 1299 03:12:34.770 --> 03:12:51.979 Community Hall: as it relates to compliance with the fire code, or with public resource code 4290, which is the code that very high fire hazard severity zones are subject to, yes, our reviews are consistent. Great. Thank you. 1300 03:12:54.580 --> 03:12:57.660 Community Hall: Hi there. Quick question about the… 1301 03:12:57.690 --> 03:13:17.549 Community Hall: we talked about potentially putting screening bushes or trees in that 10-foot, space. So, like, closer to the fence, obviously. Is that, does that pass fire code? Is that allowed based on the fire code, or is that… is that creating a risk for those homes? 1302 03:13:19.410 --> 03:13:22.790 Community Hall: Yeah, when we talk about defensible space, 1303 03:13:23.720 --> 03:13:42.139 Community Hall: currently and historically, we have talked about Zone 1 and Zone 2, and Zone 1 has historically been from 0 feet to 30 feet, and Zone 2 is 30 feet to 100 feet. And so the… the newer 1304 03:13:42.180 --> 03:13:54.589 Community Hall: Zone that the state proposed that the governor issued an executive order for last year was for a zone 0, which, most people have heard about now, and that's really for that first 0 to 5. 1305 03:13:54.630 --> 03:14:06.489 Community Hall: Those new Zone Zero requirements were supposed to be sorted out by the beginning of this year, of January 2026. Unfortunately, that got… 1306 03:14:06.570 --> 03:14:25.450 Community Hall: delayed, and so we don't have clear guidance yet from the state on what those Zone Zero requirements will be, so I can't speak to, you know, in the future, if there are bushes and shrubs that are within what we will call that Zone 0. 1307 03:14:25.620 --> 03:14:36.820 Community Hall: I don't know at this time if those would be compliant with future regulations. As it is today, talking about Zone 1, 1308 03:14:36.940 --> 03:14:41.630 Community Hall: You can have, vegetation within that… 1309 03:14:41.740 --> 03:14:47.150 Community Hall: Area that you're talking about, 0 to 10 feet between the building and the… and the property line. 1310 03:14:50.230 --> 03:15:06.419 Community Hall: I had two questions coming from the community, actually. One is, are you able to access all of the windows via ground ladder? Because I'm aware that some areas of the property have bioretention zones that may impede setting down the ladder properly. 1311 03:15:09.910 --> 03:15:21.840 Community Hall: I believe a ladder pad exhibit was submitted to us for review, and we did review and approve that ladder pad exhibit, and 1312 03:15:21.950 --> 03:15:27.850 Community Hall: For the type of construction of this house. 1313 03:15:29.880 --> 03:15:30.680 Community Hall: Jeez. 1314 03:15:31.020 --> 03:15:36.689 Community Hall: Products, emergency escape and rescue windows are required. 1315 03:15:37.290 --> 03:15:46.450 Community Hall: So that's the threshold that we look at for being able to ladder. Okay, thank you. And then my second question is, are the mitigations 1316 03:15:46.700 --> 03:15:59.520 Community Hall: in the 30-foot setback waiver, so mostly around materials and, like, one-hour fire-rated walls. Are these equivalent to a 30-foot setback? And if they are, do you have research or analysis that you could share with the public? 1317 03:16:00.340 --> 03:16:01.140 Community Hall: Okay. 1318 03:16:01.290 --> 03:16:08.419 Community Hall: So, on the 30-foot setback, I think the applicant stole a little bit of my thunder because they referenced the… 1319 03:16:08.530 --> 03:16:12.479 Community Hall: the section in, Title 14. 1320 03:16:12.590 --> 03:16:14.460 Community Hall: And… so… 1321 03:16:14.740 --> 03:16:28.070 Community Hall: the base code does allow for, exceptions to that base requirement of 30 feet, and it lists off a bunch of examples, as the applicant said. In addition to that. 1322 03:16:28.180 --> 03:16:34.530 Community Hall: If you look at PRC 4290, Public Resource Code 4290, 1323 03:16:34.530 --> 03:16:49.220 Community Hall: In the beginning of that administrative section of code, it's section 1270.07, there's a… that outlines the exceptions to the standards, and there is a… 1324 03:16:49.360 --> 03:16:58.070 Community Hall: clear process for an applicant applying for an exception to a particular standard. And, 1325 03:16:58.300 --> 03:17:04.249 Community Hall: That is the process that we followed for granting this exception. 1326 03:17:04.620 --> 03:17:21.570 Community Hall: Right, oh, sorry, go. Yep, sorry, I'm getting… I'm getting your… your question. So, what the… the… the charge of that section is to provide the same practical effect as these regulations towards providing defensible space. So. 1327 03:17:21.700 --> 03:17:28.700 Community Hall: the burden is on the applicant to prove that they're providing the same practical effect. So the approach that 1328 03:17:28.760 --> 03:17:42.779 Community Hall: The applicant took towards mitigation was a combination of both passive and active fire protection, through hardening of the structure and additional sprinkler protection. 1329 03:17:44.220 --> 03:17:59.820 Community Hall: In addition to the defensible space through vegetation management that they cited. So, when we look at adding, passive fire protection, I think that is well documented as a basis in both the… 1330 03:17:59.830 --> 03:18:11.679 Community Hall: building and residential codes, because if we just look at the California Building Code or the California Residential Code, as structures get closer to property lines, and normally that's less than 5 feet. 1331 03:18:11.740 --> 03:18:26.010 Community Hall: the building code or the residential code starts to require ratings of exterior walls or projections or penetrations. So, I think that 1332 03:18:26.200 --> 03:18:37.469 Community Hall: the mitigation is well-rooted in what we already have established in other building codes. And so… and I also want to clarify that 1333 03:18:37.820 --> 03:18:50.189 Community Hall: these are mitigations, and the exception process is clearly outlined, and so this is not considered a waiver. We don't issue any waivers to the requirements. 1334 03:18:50.720 --> 03:19:05.749 Community Hall: Thank you. So, you know, as you could hear tonight, there's a lot of concern from the public as this area has sustained fires before. How do we ensure that the combination of mitigation measures selected by the applicant are equivalent to 30 feet? 1335 03:19:07.930 --> 03:19:09.760 Community Hall: Like, what if they're equivalent to 10 feet? 1336 03:19:11.050 --> 03:19:16.720 Community Hall: Right, good question. 1337 03:19:17.900 --> 03:19:19.000 Community Hall: So… 1338 03:19:31.810 --> 03:19:34.060 Community Hall: I'm trying to think of, 1339 03:19:39.160 --> 03:19:50.759 Community Hall: And that's okay, if you don't have an immediate answer, I mean, we can have some other commissioners ask questions and get back to you as well. Yeah, if you give me a moment to think about that one, I'll try to get back to it. Okay, thank you. 1340 03:19:53.990 --> 03:19:58.560 Community Hall: Hi, so I was reading, Section D05.1, 1341 03:19:59.270 --> 03:20:05.530 Community Hall: about the highest roof service… roof surface exceeding 30 feet. And I keep hearing… 1342 03:20:05.950 --> 03:20:14.199 Community Hall: oh, don't worry, the eaves are slightly less than 30 feet, but that's not what that standard says. That standard says 1343 03:20:14.450 --> 03:20:19.599 Community Hall: The highest roof service shall be determined by the measurement to the eave of a pitched roof, which this is. 1344 03:20:19.870 --> 03:20:25.699 Community Hall: or the intersection of the roof to the exterior wall. So what is the height 1345 03:20:26.220 --> 03:20:29.819 Community Hall: From the ground plane to the intersection 1346 03:20:30.630 --> 03:20:36.120 Community Hall: with the roof of the exterior wall, I never heard that mentioned, because the… 1347 03:20:36.320 --> 03:20:40.550 Community Hall: the eave tilts down, right? I mean, you could make an eave tilt down. 1348 03:20:40.790 --> 03:20:46.619 Community Hall: You know, multiple feet in order to get that height less than 30 feet, but you can't really… 1349 03:20:46.790 --> 03:20:57.139 Community Hall: reduce the height of the exterior wall where it touches the roof. So I'm just wondering, and if you don't know, it's fine. Maybe the applicant knows what the height 1350 03:20:57.310 --> 03:21:02.730 Community Hall: Of the exterior wall from the ground plane, To the roof is. 1351 03:21:03.860 --> 03:21:09.889 Community Hall: So if the applicant can answer that, how many feet is that? Is it more than 30? Is it less than 30? 1352 03:21:10.610 --> 03:21:19.010 Community Hall: And I'll just say before the applicant answers, again, we're looking to make sure that we can get that 35-foot ground ladder 1353 03:21:19.070 --> 03:21:31.069 Community Hall: onto the roof so we can get on top of the roof. So, in the sloped roof detail that we… that this product has, we would be… 1354 03:21:31.100 --> 03:21:45.120 Community Hall: putting a ladder up to the Eve. Yeah, I understand the motivation, yeah. Yeah, I understand that. I'm just wondering if this is actually meeting D105.1 or not. Yeah, it does meet at the… 1355 03:21:45.440 --> 03:21:47.070 Community Hall: We are 29… 1356 03:21:47.320 --> 03:21:59.689 Community Hall: 9 and 3 quarters, it's the same. To that location that you're talking about. To the eave? No, to the… it's both. They're one and the same, they're equivalent. So the eave does not tilt down at all, is what you're saying? 1357 03:22:00.260 --> 03:22:04.719 Community Hall: Yeah. It was explained to me by one of your staff members. 1358 03:22:04.990 --> 03:22:09.189 Community Hall: So what we're describing, Is the wall in the intersection 1359 03:22:09.640 --> 03:22:11.549 Community Hall: With the roof coming down. Right. 1360 03:22:11.940 --> 03:22:16.360 Community Hall: So, the reason is you want that structural integrity of that point. 1361 03:22:16.970 --> 03:22:23.689 Community Hall: And so, yes, the eve, as my architect explains to me, and that point are roughly the same. 1362 03:22:24.020 --> 03:22:43.800 Community Hall: same height, so we get the same measurement to that 29, 9, and 3 quarters. Okay, so the eave does not tilt down at all from the… It's tilted down, but it's, like… But less than 1 inch. Very short horizontal distance, so yes, I'll defer to my architect, but… Oh, so what is that horizontal distance? Because I didn't see it in the plans. 1363 03:22:46.480 --> 03:22:47.250 Community Hall: generally. 1364 03:22:54.550 --> 03:22:58.079 Community Hall: The eaves on this project extend about 12 inches out. 1365 03:22:58.200 --> 03:23:08.680 Community Hall: And with the roof slope, there's a slight… it's about a 3-inch different… er… it's a 3-inch… sorry. So the… the E… 4 and 12 roof. 1366 03:23:09.200 --> 03:23:16.410 Community Hall: Let me… can I come and show you a section? It kind of shows… Yeah, yeah, just a drawing to show that the… 1367 03:23:17.020 --> 03:23:20.489 Community Hall: Eve is not. 1368 03:23:23.220 --> 03:23:28.029 Community Hall: More than, like, 1 inch below the… Top of the exterior wall. 1369 03:23:30.740 --> 03:23:34.000 Community Hall: Oh, are we able to put it on the screen? Thank you. 1370 03:23:43.960 --> 03:23:51.599 Community Hall: So, this location right here, Is… is… I know it's tiny, probably hard to tell, but were the EVE… 1371 03:23:53.020 --> 03:23:55.189 Community Hall: It projects out the foot. 1372 03:23:56.580 --> 03:24:02.529 Community Hall: And the wall plane And the eave… or, I'm sorry, the roof. 1373 03:24:02.820 --> 03:24:07.230 Community Hall: Where it meets the wall, it's, like, a half inch difference between the two. 1374 03:24:08.550 --> 03:24:13.089 Community Hall: Okay, so what is… Great, so what is that total distance, then? 1375 03:24:13.870 --> 03:24:19.190 Community Hall: 29… 9, or 29, 10, and a quarter? 1376 03:24:20.250 --> 03:24:33.040 Community Hall: 29, 9, and 3 quarters, versus the eave height of… So the eave would be 29.9 and 3 quarters, and the intersection at the wall and the roof would be approximately 29.10 and a quarter. 1377 03:24:34.230 --> 03:24:36.549 Community Hall: Okay, thank you. 1378 03:24:38.650 --> 03:24:39.980 Community Hall: Through the chair, yeah. 1379 03:24:41.110 --> 03:24:47.410 Community Hall: So I had questions for the applicant and for fire while we have fire up there. Maybe I'll start with fire first. 1380 03:24:47.900 --> 03:25:03.959 Community Hall: Have there been any best practices that fire has put in place for active projects under construction, you know, Ember petrols during the phase of actual, you know, dry lumber during construction? Do you guys go out and do some petrols, or any other best practices that fire has 1381 03:25:04.170 --> 03:25:06.700 Community Hall: Learned from, and put in place. 1382 03:25:10.170 --> 03:25:13.579 Community Hall: So there is a section, 1383 03:25:13.750 --> 03:25:29.689 Community Hall: in the California Fire Code that the city adopts, and actually we make a few amendments to that section. I believe it's Chapter 33 of the Fire Code that outlines, safety during… fire safety during construction. 1384 03:25:29.690 --> 03:25:42.529 Community Hall: And so, I don't recall, what the threshold of the square footage is that requires it, but I believe this project would qualify that during the building permit application, they would have to submit 1385 03:25:42.530 --> 03:25:47.220 Community Hall: a fire safety construction plan, so they would outline 1386 03:25:47.320 --> 03:26:06.169 Community Hall: Details like, how they would provide access roads for us during construction, where they would stage different, building materials, how they provide, water for us during construction, and we would 1387 03:26:06.180 --> 03:26:12.170 Community Hall: would review their, site safety construction plan, and, 1388 03:26:12.300 --> 03:26:22.719 Community Hall: with approval of that, then the applicant would follow that during construction. And is that something that FHI reviews, or is that building and planning, or both, or… 1389 03:26:23.460 --> 03:26:24.849 Community Hall: Question to staff. 1390 03:26:27.220 --> 03:26:35.810 Community Hall: Fire safety plan. If you can pardon me for a second, I was looking for a charger, my computer was… Yeah, the question was, is there a fire safety plan that 1391 03:26:36.060 --> 03:27:00.080 Community Hall: is, part of building or planning reviews? Yes. Building is obviously even more involved post-approvement of the project, and would be reviewing essentially everything fire would be reviewing as well. And is that a condition of approval, or is that something that you can comment on, whether it should be a condition of approval, or anything like that? Generally, those are all code required, so things that are part of the law wouldn't need to be conditions. 1392 03:27:00.870 --> 03:27:08.720 Community Hall: I'm not familiar with all 80 of the conditions that are already attached to this resolution, but very often things related to building permits 1393 03:27:09.100 --> 03:27:20.099 Community Hall: are not restated as conditions of approval, because they're not… there's no flexibility. You need to get a building permit. Okay, sounds good. Thank you. Any other best practices? Any thermal monitoring that you're aware of? I know. 1394 03:27:20.770 --> 03:27:34.760 Community Hall: And again, that's an open question to the applicant as well, if you're aware of thermal monitoring on these sites during construction. Generally, our construction team handles that. It's usually part of the process they go through with the building department, so… Thank you. 1395 03:27:35.000 --> 03:27:41.430 Community Hall: It's not something that I'm aware of to discuss. If you might speak into the mic? So generally, that's something that our construction team 1396 03:27:41.540 --> 03:27:56.079 Community Hall: handles with the building department, so it's not really something I have information here to pass on. So, I guess, open question to staff and fire and the applicant. Has thermal monitoring been a condition of approval from either fire or the building code, or… 1397 03:27:57.010 --> 03:27:58.700 Community Hall: thermal monitoring? Yeah. 1398 03:27:59.770 --> 03:28:01.259 Community Hall: Yeah, not that I'm aware of. 1399 03:28:01.760 --> 03:28:09.389 Community Hall: I… are you asking, like, during hot work operations, like welding on site? Yeah, any kind of… 1400 03:28:10.130 --> 03:28:17.129 Community Hall: Mechanisms that would monitor for heat sources that may expose the property to 1401 03:28:17.710 --> 03:28:30.449 Community Hall: There is no requirement that I'm aware of in any of our projects. Okay, and then just to reconfirm with the applicant, all of the roofs are Fire A… I mean, Class A fire retardant roofs. 1402 03:28:30.680 --> 03:28:39.999 Community Hall: And the building is stuccoed, so that is a fire-retardant siding. That's correct. Has staff had a chance to comment on whether Baxley Court is all forms with stucco? 1403 03:28:40.250 --> 03:28:44.549 Community Hall: Are there any non-streco homes on Baxley, or should we ask the residents that? 1404 03:28:45.180 --> 03:28:47.329 Community Hall: No, no review was conducted. Okay, alright. 1405 03:28:47.790 --> 03:28:53.150 Community Hall: So, at this point, I'm not really seeing any further fire-related questions. I don't have anything else, yeah. 1406 03:28:56.420 --> 03:29:05.959 Community Hall: This is for both the applicant and the fire person. If… can we put up, Mr. Henry Tsang's last slide, his recommendations? 1407 03:29:08.300 --> 03:29:11.699 Community Hall: And as you… as you do that, I did want to point 1408 03:29:11.950 --> 03:29:16.480 Community Hall: You know, we work with the fire department, planning, and building. 1409 03:29:16.670 --> 03:29:32.199 Community Hall: We believe that the plans were reviewed and were consistent with the height from the grade to the eve, but if there was ever a comment that you're not, we would just simply drop the roofline by an inch or two, whatever was required, but in this case, as they were reviewed. 1410 03:29:32.200 --> 03:29:41.269 Community Hall: We were deemed consistent, but again, if at any point something came up that it wasn't, at times during building plan check review. 1411 03:29:41.990 --> 03:29:56.800 Community Hall: questions like this… I don't believe this one, but questions come up, and we just simply comply with what the requirement is. Something like this would be just to drop the plate height by an inch or two in working drives. That's great, we appreciate your flexibility. 1412 03:29:57.080 --> 03:30:03.440 Community Hall: Can… there's something in front of that slide. Oh, there we go. So, 1413 03:30:03.700 --> 03:30:09.730 Community Hall: Can we… can we ask the gentleman to come back up to the podium for… yes, please? 1414 03:30:15.170 --> 03:30:19.799 Community Hall: able to engage the public. Are we… am I able to ask him a question? 1415 03:30:23.670 --> 03:30:26.069 Community Hall: I'd defer that to the chair. 1416 03:30:28.000 --> 03:30:32.120 Community Hall: Yeah, let's make this quick, please. Okay. Yes, thank you. 1417 03:30:32.200 --> 03:30:39.529 Community Hall: I know you said you worked with a bunch of HOAs, 1418 03:30:39.530 --> 03:30:55.420 Community Hall: How did you come up with these recommendations? Are they, like, are they vetted by a fire department? These are not vetted by a fire department. We were looking through the literature and talking to various different groups. As you know that, for, my house is in a yellow zone. 1419 03:30:55.420 --> 03:31:08.440 Community Hall: So we're looking at things by what do we need to do to ensure safety, given what happened in the LA. So while a Class B material a lot of times can be used for decks now, that's probably going to change to a Class A very, very soon. 1420 03:31:08.490 --> 03:31:26.919 Community Hall: So this is kind of your… your research. We're looking at where things are going. I'm not trying to say don't build these things, I'm just trying to say what additional things can we do to make them safe? Got it. Also, things like the Zone 1, you know, the privacy bushes. You know, in Zone 1, you're supposed to have everything up 10 feet, so… 1421 03:31:27.090 --> 03:31:36.079 Community Hall: I don't know how that's gonna work. Thank you. Is that it? Yep. So, looking at this list, is there anything, sorry, Miss… 1422 03:31:36.540 --> 03:31:44.029 Community Hall: Fire Chief Fox? How do I address you? I'm not sure. That's fine. Or Brad. Brad. 1423 03:31:46.290 --> 03:32:00.390 Community Hall: Do you see anything here that you think would improve the fire safety of these… of this development? Yeah, so there are certainly undead, undead decks and balconies. 1424 03:32:01.150 --> 03:32:18.290 Community Hall: Yeah, certainly on the decks and balconies, we follow what the requirements are fire hazard zone, so that there's… there's stringent requirements, and that's how the decks and balconies are built. So are they classy? I don't know what those requirements are. Maybe, Jennifer, you may be able to… 1425 03:32:19.640 --> 03:32:20.330 Community Hall: Interesting. 1426 03:32:20.870 --> 03:32:37.150 Community Hall: I'm sorry? Okay, she's checking on that. Okay. As far as the HOA monitoring the… all the open space areas, they do that. That's… that's, written in the CCNRs that the management company is responsible to make sure that all the shrubs and the trees 1427 03:32:37.150 --> 03:32:41.839 Community Hall: are, trimmed so that we do have that fire safety. 1428 03:32:42.230 --> 03:32:49.790 Community Hall: We talked about the access? Yeah, sure. As far as the access, that… really, the site access has already been reviewed by the fire department as the… Right. 1429 03:32:49.900 --> 03:33:00.580 Community Hall: Fences and privacy walls shall be Class A material… they're not Class A materials. They're not required to be Class A materials. But would it help, is the question. 1430 03:33:00.660 --> 03:33:15.419 Community Hall: It may, but again, it's not a standard or required. Yeah, I understand it's not the minimum required, I'm just asking if it would strengthen the fire resistance of the paper. I think anything that you make Class A would strengthen. Okay, alright. No flat. 1431 03:33:15.440 --> 03:33:29.370 Community Hall: I think it means roofs. Roofs, yeah. We don't have any flat roofs. Gutters are protected by amber proofing? Yes, they are. Okay. Windows and doors should be wildfire safe, yes, they are. They're dual pane with one glass that's tempered, that's required. 1432 03:33:29.440 --> 03:33:42.470 Community Hall: HOA provides fuel reduction and maintenance along the street, so the HOA will provide fuel reduction and maintenance on its private property. We can't… DRE wouldn't allow us for them to do outside work off their property. 1433 03:33:42.470 --> 03:33:49.729 Community Hall: And building heights below what existing ladder trucks can cover. Yeah, we talked about that. That's been covered. Okay. Thank you. Thank you. 1434 03:33:50.320 --> 03:33:55.140 Community Hall: Through the chair, I'd like to switch focus a little bit. I have a different question for… 1435 03:33:55.320 --> 03:33:58.740 Community Hall: maybe staff and the applicant. I'm looking at Google Maps, and 1436 03:34:00.010 --> 03:34:03.129 Community Hall: It is a question that'll come back to the far topic, but… 1437 03:34:03.370 --> 03:34:09.069 Community Hall: I'm looking at a Google map in Evelidge Court. Is that a city-owned public right-of-way? 1438 03:34:09.240 --> 03:34:19.549 Community Hall: Yes, I believe since 1969 it was dedicated, but not improved. Okay, and I'm looking at Google Map, and Evelich Court is actually a two… 1439 03:34:20.250 --> 03:34:25.950 Community Hall: 2… egress, ingress into the parcel. So there's a northern side. 1440 03:34:26.110 --> 03:34:30.490 Community Hall: by the Coptino Hills Swim and Racket, and then there's the… 1441 03:34:30.780 --> 03:34:37.799 Community Hall: the, egress in the middle of the parcel, I guess, which is what the… Proposed project shows. 1442 03:34:37.930 --> 03:34:50.270 Community Hall: Is that your understanding? The village court that is the city right-of-way is literally just the cul-de-sac that goes in, pretty much what you're seeing on the site plan. That's what was dedicated, not the… 1443 03:34:50.930 --> 03:34:59.219 Community Hall: the sort of… it looks like a U-shape on Google, where it cuts to the north and then comes back out. There's only the one entry point that goes into the site. 1444 03:34:59.850 --> 03:35:08.250 Community Hall: So we're seeing… what we're seeing on a Google Map with the average egress at 2 points out of the parcel is inaccurate? 1445 03:35:08.780 --> 03:35:15.310 Community Hall: Yeah, I'm uncertain where Google got that, because it was just dedicated as a cul-de-sac, really, one way in and out. 1446 03:35:15.810 --> 03:35:26.109 Community Hall: I think it's fair to say that the development as proposed is taking what was dedicated and improving it. Are there any attachments from staff that would confirm that? 1447 03:35:28.610 --> 03:35:34.060 Community Hall: None in tonight's presentation, but we did look into this as we went through the housing element. 1448 03:35:34.830 --> 03:35:39.280 Community Hall: I… I would want to make sure is that a public right-of- way at 1449 03:35:39.540 --> 03:35:47.140 Community Hall: I understand you're saying there may not be an egress there, but is that a public right-of-way in that northern part of the parcel? No, there's no public right-of-way there. 1450 03:35:49.920 --> 03:35:51.449 Community Hall: Okay, so there's no… 1451 03:35:52.170 --> 03:36:00.140 Community Hall: vacation required? No, we're not going to be going through that process again anytime soon on this. 1452 03:36:00.240 --> 03:36:12.249 Community Hall: I can't really explain why Google shows it the way it does, but the dedication for the street, again, goes back to 1969, and it was just kind of a classic cul-de-sac. Okay. 1453 03:36:12.730 --> 03:36:16.930 Community Hall: I'd like to segue to a different line of questioning. Are we able to do that? 1454 03:36:17.460 --> 03:36:18.780 Community Hall: Okay, thank you. 1455 03:36:19.240 --> 03:36:30.829 Community Hall: I had one more question for the fire marshal. Thank you for your patience. So, were you able to come to an answer on the mitigations and whether they cumulatively bring us back to 30 feet? 1456 03:36:32.220 --> 03:36:35.849 Community Hall: And or, you know, research around that would be really helpful. 1457 03:36:38.020 --> 03:36:48.500 Community Hall: Yeah, so again, using the building and residential codes as a reference based on the type of construction for these homes, 1458 03:36:48.700 --> 03:37:06.970 Community Hall: a one-hour exterior is consistent with what is required for, going down all the way to a zero lot line, essentially. So the proposal by the applicant would be consistent with that. In addition to 1459 03:37:07.050 --> 03:37:15.440 Community Hall: All of the other, home hardening features that were already mentioned that are required under 1460 03:37:15.590 --> 03:37:23.140 Community Hall: what was formerly Chapter 7A, now it's in the Wildland Urban Interface Code. So we… 1461 03:37:23.470 --> 03:37:25.860 Community Hall: Feel that, 1462 03:37:26.130 --> 03:37:39.080 Community Hall: in combination with both passive and active fire protection, and all of the WUI requirements, that the structures are resilient to, 1463 03:37:39.920 --> 03:37:41.170 Community Hall: to Wildfire. 1464 03:37:41.470 --> 03:37:46.030 Community Hall: Okay, thank you. Is there research around that that is publicly available? 1465 03:37:47.110 --> 03:37:52.410 Community Hall: The, you know, the zero feet… For a one-hour rated wall. 1466 03:37:53.180 --> 03:37:56.100 Community Hall: So, I am, 1467 03:37:56.370 --> 03:38:11.600 Community Hall: You can look at the building code or residential code, and there's specific sections in there that specify when you have to rate the walls, based on separation from property line and based on the type of construction. 1468 03:38:13.010 --> 03:38:13.740 Community Hall: Okay. 1469 03:38:13.920 --> 03:38:14.960 Community Hall: Alright, thank you. 1470 03:38:16.800 --> 03:38:22.560 Community Hall: All right, Commissioner Rao, you wanted to… Yeah, I'd like to segue out of the fire discussion into a different topic really quickly. 1471 03:38:23.040 --> 03:38:26.989 Community Hall: Is there any sort of, 1472 03:38:27.310 --> 03:38:33.890 Community Hall: understanding about the egress through the Cupertino Hills, is that an option? Has staff looked at that? 1473 03:38:35.120 --> 03:38:38.899 Community Hall: You were referring to the trail connection that was offered? 1474 03:38:40.290 --> 03:38:45.650 Community Hall: Well, emergency egress would need to be… Automotive? 1475 03:38:48.360 --> 03:38:57.780 Community Hall: I'm not familiar with the emergency egress on this. I don't know if that's something you could speak to, or if that would be… I realize Brad just sat down. 1476 03:38:58.470 --> 03:39:01.639 Community Hall: Okay. Okay, very good. We won't have Brad come back. 1477 03:39:02.970 --> 03:39:07.629 Community Hall: I'm gonna segue to a different part here. So, have the tribal consultations occurred? 1478 03:39:08.470 --> 03:39:11.489 Community Hall: Yes, they have occurred. Any feedback or anything else? 1479 03:39:12.140 --> 03:39:13.060 Community Hall: Defer to you. 1480 03:39:14.110 --> 03:39:29.810 Community Hall: So, we had consultation with one of the local tribes, and they indicated that they did have some concerns relating to monitoring as well as education of the workers regarding the sensitive cultural resources that may not be on site. 1481 03:39:29.810 --> 03:39:43.149 Community Hall: However, we were not able to come to a decision on the wording of certain conditions to reflect that prior to the end of that consultation period, and so the standard language, which does include requirements for monitoring 1482 03:39:43.150 --> 03:39:55.660 Community Hall: during project construction, was included as part of this resolution that you have. And then the city also does have requirements for education of workers prior to commencement of any work on the site. 1483 03:39:56.000 --> 03:40:00.980 Community Hall: So, does the AP130 deadline extend if the tribal consultation is still pending? 1484 03:40:02.180 --> 03:40:12.859 Community Hall: So, the tribal consultation isn't pending because the consultation period ended. AB130 outlines very specific deadlines that they would also need to meet when participating in consultation. 1485 03:40:12.940 --> 03:40:24.810 Community Hall: And as that has concluded, we then move on to the kind of approval and or decision-making process for that. Yeah, and so I just want to clarify, so the tribes themselves get 60 days, is that right? 1486 03:40:25.710 --> 03:40:32.629 Community Hall: Right, so they get, they get a 45-day consultation period with a 15-day extension. And when did their notification start? 1487 03:40:33.420 --> 03:40:38.389 Community Hall: I would have to look back at my notes to check when that also… When did the tribal consultation end? 1488 03:40:39.050 --> 03:40:46.239 Community Hall: I believe it ended… in… January? I'm trying to think back here, yeah, early January. 1489 03:40:47.340 --> 03:40:50.749 Community Hall: Either January 4th or 6th, if I'm remembering correctly. 1490 03:40:52.530 --> 03:41:01.599 Community Hall: Okay, switching to a different… January 6th. Just to confirm, January 6th was it, when the period ended? When the tribal consultation ended, with no feedback. 1491 03:41:03.440 --> 03:41:09.460 Community Hall: Well, I think we had the feedback. Again, with no, with no decided upon or agreed to conditions. Okay, thank you. 1492 03:41:09.640 --> 03:41:13.740 Community Hall: And then… Has there been any incomplete 1493 03:41:13.900 --> 03:41:19.640 Community Hall: notifications to the applicant so far on the application? Has anything… Is that any… 1494 03:41:20.210 --> 03:41:24.469 Community Hall: So, the… the project was reviewed for its completeness, meaning it… it's… 1495 03:41:24.650 --> 03:41:40.779 Community Hall: had provided all of the items listed on our application, and that happened within the first 30 days of us receiving the application. We then reviewed a second submission that did address all of the items that are on our application checklist, and then it moved into a consistency review. 1496 03:41:40.810 --> 03:41:45.250 Community Hall: And that identifies the objective standards within our general plan. 1497 03:41:45.530 --> 03:42:04.079 Community Hall: BMR housing manual, as well as our zoning code that applied to the project, and so we went through multiple rounds of review for that, and by the end of it, we found that the project was consistent, and I believe that that matrix that we used to identify all those objective standards was included as, I want to say, attachment… So staff have not had any 1498 03:42:04.080 --> 03:42:06.169 Community Hall: Application incompleteness in this. 1499 03:42:06.350 --> 03:42:15.860 Community Hall: project. So again, the… it was determined incomplete when it first came in, but then they provided all the information to make it a complete application. Has the application been materially revised? 1500 03:42:17.110 --> 03:42:24.030 Community Hall: Has there been a material… Revision of the application that would reopen the AB130 window. 1501 03:42:24.520 --> 03:42:27.009 Community Hall: Oh, so not, not from when we… 1502 03:42:27.140 --> 03:42:32.439 Community Hall: assessed the project under the AB130 criteria. No, no changes have been made. 1503 03:42:33.830 --> 03:42:34.640 Community Hall: Okay. 1504 03:42:34.840 --> 03:42:39.079 Community Hall: So, at this point, what… so April 4th is the deadline for… 1505 03:42:39.350 --> 03:42:48.800 Community Hall: approval, and this goes to City Council on… March 17th. Okay, and so… Effectively, we are looking at 1506 03:42:49.320 --> 03:42:54.490 Community Hall: Either we are done with Planning Commission today, or we're gonna have to have special meetings if… 1507 03:42:54.650 --> 03:42:58.720 Community Hall: If it came to that, if we needed another hearing for Planning Commission, is that fair? 1508 03:42:59.470 --> 03:43:05.409 Community Hall: That would be fair, because I believe that's the last regular City Council meeting prior to April 4th. Okay. 1509 03:43:06.970 --> 03:43:08.729 Community Hall: I'll pause there, yield my time. 1510 03:43:09.400 --> 03:43:18.639 Community Hall: Okay, are there any other questions for either the fire marshal or the applicant? Oh, yeah, I have one. Yeah, I'm looking at the CEQA exemption memo. 1511 03:43:18.930 --> 03:43:22.180 Community Hall: And it says, to accommodate the design of the project. 1512 03:43:22.690 --> 03:43:33.029 Community Hall: The project received approval of alternative means or methods from the fire department to reduce the 30-foot setback from adjacent buildings. 1513 03:43:33.200 --> 03:43:34.780 Community Hall: Is there a document? 1514 03:43:35.530 --> 03:43:38.449 Community Hall: That says what those mitigation measures were. 1515 03:43:39.530 --> 03:43:50.990 Community Hall: Do we have it in front of us? There was an approved alternative means and methods request, and Brad can speak to the specifics of that, but it does outline how they were able to meet all of those requirements. 1516 03:43:51.450 --> 03:43:56.419 Community Hall: Okay, so that's in our packet, right? That's not included within the packet, but it can be provided. 1517 03:43:57.360 --> 03:44:02.120 Community Hall: So, why do we not see it? I mean, it seems pretty important. 1518 03:44:02.510 --> 03:44:04.489 Community Hall: I mean, why was it not included? 1519 03:44:04.990 --> 03:44:09.039 Community Hall: It just wasn't included, unfortunately, but I definitely can hand that over to you. 1520 03:44:10.090 --> 03:44:13.829 Community Hall: Right, but we're supposed to vote on this tonight, right? 1521 03:44:14.930 --> 03:44:16.490 Community Hall: Okay, thank you. 1522 03:44:17.710 --> 03:44:19.140 Community Hall: It is in the packet. 1523 03:44:19.700 --> 03:44:36.620 Community Hall: Yeah, I thought there was a page in the restricted plan set, but I don't know if that's the same thing as what you're referring to? That's the same information, it just wasn't included in the agenda packet as a separate attachment. It is part of the plan set, so the information is there. 1524 03:44:36.930 --> 03:44:41.549 Community Hall: So the public did not see it then, right? Okay. 1525 03:44:41.820 --> 03:44:44.140 Community Hall: Sorry. Thanks. 1526 03:44:46.460 --> 03:44:52.790 Community Hall: Yeah, this is… this is a summary of the measures we've been… a summary of the measures we've been describing. It's… 1527 03:44:53.660 --> 03:44:57.859 Community Hall: in the plan set, I think that was posted, on the city website. 1528 03:45:01.440 --> 03:45:07.449 Community Hall: It's okay. We can't read that small print here anyway, so it's fine. 1529 03:45:07.820 --> 03:45:09.349 Community Hall: Fine. Okay. 1530 03:45:09.470 --> 03:45:10.900 Community Hall: Yeah, Commissioner Lenscogg? 1531 03:45:11.320 --> 03:45:14.430 Community Hall: Okay, so, 1532 03:45:15.090 --> 03:45:25.730 Community Hall: The trail that you have offered, could that be considered a secondary evacuation route? Not really. I mean, that is a pedestrian bicycle, 1533 03:45:26.470 --> 03:45:42.900 Community Hall: access to the trail, and we're not really offering it. I think what happened is, in some of our meetings with the neighborhood, there were several people that expressed interest. It's not an objective standard by the city to provide it, it's not part of the plans. 1534 03:45:42.900 --> 03:45:48.320 Community Hall: they said, can you please talk to staff to see whether there's interest? They had interest. We said. 1535 03:45:48.320 --> 03:46:05.659 Community Hall: Sure, we'll have that discussion. We talked with staff. Staff said, if you want, draw an exhibit, show us what you think would be done. We do the exhibit, we work with staff, and at all times, we're neutral on this. We're not advocating for it. 1536 03:46:05.660 --> 03:46:08.330 Community Hall: And we're not saying no, we're just saying if the city 1537 03:46:08.330 --> 03:46:21.710 Community Hall: chooses to have that connectivity, we're more than happy to include it in our plan sets. We would need to get reimbursed for the cost. Staff said, well, we need to know what the cost is, so we went out there and did some initial bids, and 1538 03:46:21.710 --> 03:46:39.709 Community Hall: the dollar amounts in there, so that's really for bicycle and pedestrian access, not any other… it's not really for evacuation. No, I understand it's not for evacuation, and I know it doesn't legally qualify as evacuation, but I did look up, you know, what qualifies as an evacuation route, and a secondary evacuation route can be a pedestrian route. 1539 03:46:39.710 --> 03:46:48.240 Community Hall: So it could be used as an evacuation route, even though it doesn't, you know, it's not legally required or qualified as such. Is that correct? 1540 03:46:48.600 --> 03:47:07.799 Community Hall: I can't… Okay, now I get it. I can't say it's… Sure. Because it needs to… there needs to be set standards for it to be called that. I get it, I get it. But again, we're… we're open to whatever the city decides that they want to do with that. Okay, awesome. Second question. So, looking at the… the plans, right, 1541 03:47:08.250 --> 03:47:25.710 Community Hall: would you be open to the five houses that are on the south side? Not necessarily the end one, but the other five, making those two-story homes? Sure, so we've had long discussions. The neighbors have, every time we've met, asked for that, and we understand 1542 03:47:26.220 --> 03:47:37.679 Community Hall: Why they're asking for it. Frankly, the project with a 20% affordable housing needs to be subsidized with a certain amount of square footage to make the project feasible. 1543 03:47:38.230 --> 03:47:55.959 Community Hall: if… if it could be feasible without reducing the site… with reducing the size to two stories, we would have done that. We looked at it many times. We're not able to do that. So they do need to stay as three stories. Even if you reduce some of the BMRs above the… on the north side? 1544 03:47:56.780 --> 03:48:11.710 Community Hall: You mean if we didn't have BMR units? Well, if you… if you basically just shifted the count of BMRs from the north side to maybe doing a row of BMRs on the… on the south edge. It… it doesn't change the pro forma for the project. 1545 03:48:12.250 --> 03:48:21.890 Community Hall: I'm sorry, why doesn't it… you're moving BMRs, right? By moving the BMRs from one location of the site to another, it won't change 1546 03:48:21.960 --> 03:48:38.889 Community Hall: you're still going to have to provide… the BMRs are, like, I believe around $500,000 or so. You're still going to have to provide the BMR units, the number of the BMR units. So, that doesn't change the equation for the feasibility of the project. They're smaller. So I guess I'm not sure I understand that. 1547 03:48:38.890 --> 03:48:56.050 Community Hall: So, if you still provide the same number of BMRs, right, but, instead of having some of them on the north side, or kind of north- ish side, right, in the middle there, if you put a row of them on the south edge, and make them, you know. 1548 03:48:56.250 --> 03:49:15.320 Community Hall: even less expensive BMRs, because now you go to two- story, right? We've had, you know, we've had a development, or a couple of developments that we've talked to where they have agreed to that, because they said that it actually benefits them to have a mix of different prices, price, you know, for the units that they're offering. 1549 03:49:15.430 --> 03:49:18.250 Community Hall: It's not a lot, it's 5. 1550 03:49:18.350 --> 03:49:26.770 Community Hall: You know, you guys are doing a lot of building in our area. You're gonna be a partner with us in our city for many decades to come. 1551 03:49:26.790 --> 03:49:39.899 Community Hall: Is this something that you would be willing to consider as a, you know, as a good faith to show your relationship with the city long-term? So the BMR units, you're gonna wind up with one- and two- bedroom BMR units? That's fine. 1552 03:49:40.140 --> 03:49:57.309 Community Hall: Yeah, I, so first… There is a demand for that, too. Yeah. Potentially, yes. You're substantially dropping the price of the BMR units when you remove bedrooms. So now you go from a $500,000 BMR unit to potentially a $250,000 BMR unit. 1553 03:49:57.410 --> 03:50:05.040 Community Hall: We've looked… bedroom counts do matter on how BMRs get priced. We have looked whether you can reduce the… 1554 03:50:05.440 --> 03:50:08.560 Community Hall: The bedroom count, and what… 1555 03:50:08.560 --> 03:50:27.579 Community Hall: impact that would have on the financial feasibility of a project, it still has a huge impact. So, just going to a two-bedroom BMR unit, I know the score footage is less, the sales price drops so substantially, you're gonna… even 5 units, you're gonna still have a… you're still gonna have a head on a project that's not feasible. 1556 03:50:27.790 --> 03:50:38.120 Community Hall: So, I understand the ask. We've looked at many different ways. What can we do with the BMRs, and what can we do with the site to see if we can reduce the square footage on the for-sale side. 1557 03:50:38.330 --> 03:50:41.830 Community Hall: By removing the score footage on the for sale side. 1558 03:50:42.050 --> 03:50:47.139 Community Hall: Because the for-sale market rate sales price is so much more 1559 03:50:47.350 --> 03:51:07.660 Community Hall: than the BMR, so every square footage that you remove from the for sale site has a much bigger impact than what you're doing. So the other option would be you keep your BMR at 3 stories, like you have right now, but you… but the BMR units, if I understand correctly, are 17 feet wide instead of the 21 feet wide that your regular units are, right? So that would give another 4 feet… 1560 03:51:07.660 --> 03:51:16.699 Community Hall: of buffer space, if you put BMR units on the south edge, would you be willing to do that? So, I think that was a question that we were asked earlier. We did look at it. 1561 03:51:16.720 --> 03:51:20.790 Community Hall: you can't fit those… if you move a BMR unit that's… 1562 03:51:20.820 --> 03:51:25.489 Community Hall: Smaller to the other side, and you moved a two-car garage 1563 03:51:25.550 --> 03:51:39.649 Community Hall: to the other side of the cul-de-sac, they won't fit, and Steve can probably address that better than I can, but we've looked at whether you can flip it. You won't be able to put the two-car garage on the other side and still make the setbacks, because of the amount of 1564 03:51:39.770 --> 03:51:46.879 Community Hall: With that you're adding. Right, so this is the exact scenario that I had gone through with the developer, and thank you for 1565 03:51:47.060 --> 03:51:50.379 Community Hall: entertaining my many scenarios that I've asked you, 1566 03:51:50.940 --> 03:52:10.339 Community Hall: as I mentioned in our conversation, the north side setback next to the tennis courts is less critical to the community. It's not facing anybody's home, and so, you know, if we were to do that swap of the smaller unit on the north with the larger unit on the south, and eat into the setback that's next to the tennis court. 1567 03:52:10.500 --> 03:52:14.689 Community Hall: There is no loss of money in this project for you. 1568 03:52:14.740 --> 03:52:31.170 Community Hall: So, I think that's what we're both asking, is can this be done? Through the chair, if I may, if I may comment on that, I believe there are units on the northern side, which is one of the members of the public there, and I also believe, having used the Cupertino Hills swimming racket, thanks to some of the members of the public here, I used the facility. 1569 03:52:31.170 --> 03:52:36.270 Community Hall: There is a swimming pool there, and there's a number of members of the community that regularly use the swimming pool. 1570 03:52:36.270 --> 03:52:48.900 Community Hall: So there is, in fact, a privacy issue on the northern side, because those homes will be looking right into the swimming pool, and the community is going to be in the swimming pool there, so it just needs to be… That's one component of it. I would also say, by pushing 1571 03:52:48.980 --> 03:52:53.110 Community Hall: By putting the two-story house, you're going to reduce… so… 1572 03:52:53.400 --> 03:53:11.110 Community Hall: that setback that we have on both sides also have all of the bioretention areas. You can't reduce it down to the 4 foot or the 5 foot that you're looking for, because the bioretention has to stay on both sides of the project. Yeah, I wasn't trying to reduce the setback. Well, if you introduce it 1573 03:53:11.180 --> 03:53:15.040 Community Hall: I've looked at it, that's because we've been asked that question. Yeah. 1574 03:53:15.230 --> 03:53:24.880 Community Hall: by not only planning commissioners, but also neighbors. If you move the side-by-side garage to the other side and bring the tandem to this side. 1575 03:53:25.370 --> 03:53:28.180 Community Hall: The amount of setback that you'll have 1576 03:53:29.660 --> 03:53:47.509 Community Hall: on the side-by-side garage where it's been added, it reduces the setback to the fence to a point where you can't use that as the bioretention that you need for that portion of the site. So you're reducing it so much where it's, it's not just… 1577 03:53:47.510 --> 03:53:54.629 Community Hall: that you're reducing it from 10 feet to 4 feet or 5 feet. You're removing the ability to do that bioretention on that side yard. 1578 03:53:55.020 --> 03:54:12.009 Community Hall: So, it's hard to try to explain to engineering-wise, what the impact is, but we have looked at it. It just… it was a good suggestion the first time that we got it looked at, and it couldn't flip the units. Through the chair, if I may? 1579 03:54:12.820 --> 03:54:14.100 Community Hall: Yes. 1580 03:54:14.400 --> 03:54:21.479 Community Hall: A question to start. If this property or project were to add an ADU, what is the setback for ADUs? 1581 03:54:24.900 --> 03:54:27.379 Community Hall: You can go to 4 feet of a property line. 1582 03:54:27.490 --> 03:54:28.160 Community Hall: Okay. 1583 03:54:28.480 --> 03:54:35.749 Community Hall: And so, if this project were to do 20 DU per acre using a combination of single-family home and 1584 03:54:35.870 --> 03:54:39.579 Community Hall: ADUs, is that considered a down zone for R3TH? 1585 03:54:40.820 --> 03:54:50.460 Community Hall: I'm gonna stick to the project we have at hand tonight on the agenda. Yes, I'm trying to walk through the members of the public's questions that we had, just for completeness of the 1586 03:54:50.610 --> 03:54:57.370 Community Hall: of the hearing, there is… maybe… let me rephrase the question. State law prohibits downzoning, is that correct? 1587 03:54:58.250 --> 03:55:03.769 Community Hall: State law prohibits downzoning if there's not a simultaneous upzoning somewhere else. 1588 03:55:04.320 --> 03:55:11.779 Community Hall: Simultaneous upzoning would mean applicant has to agree to a down zone on a vested application, is that correct? 1589 03:55:12.260 --> 03:55:23.359 Community Hall: That would be the other complication here, though, is they have a vested application. Okay. So that locks the standards in at the time the application was submitted. So just to clarify here. 1590 03:55:23.620 --> 03:55:37.699 Community Hall: We have a state law that prohibits downzoning unless you do an upzoning at the same time at another location, which would still require the current parcel owner and applicant to consent to that. 1591 03:55:37.810 --> 03:55:38.819 Community Hall: Is that fair? 1592 03:55:39.390 --> 03:55:55.080 Community Hall: Yes, given that there's an existing vested application, yes. Would the applicant care to comment on any constraints you might have in doing that, or is that something that you've considered? Yeah, at this point, the property owner or Summerhill are not entertaining changing the project as proposed. 1593 03:55:56.130 --> 03:56:00.309 Community Hall: Is that a decision the applicant makes, or is that a decision the partial owner makes? 1594 03:56:00.950 --> 03:56:10.210 Community Hall: at this point… at this point, both the property owner and Summer Hill are not changing the proposed project as it's been submitted. 1595 03:56:10.360 --> 03:56:12.000 Community Hall: So, 1596 03:56:12.240 --> 03:56:19.659 Community Hall: I think your question is, would we consider doing that? And now, no, we're not considering changing what we have proposed. Okay, thank you. 1597 03:56:20.810 --> 03:56:26.850 Community Hall: And a final question on the, on the units here. So, do ADUs count as units? 1598 03:56:29.530 --> 03:56:39.739 Community Hall: depends how you look at it. We get credit for them when they're built as counting towards our arena, but they don't count towards the density of a project. I see. Thank you, that's an important clarification, thank you. 1599 03:56:40.810 --> 03:56:45.670 Community Hall: Sorry, City Attorney, as we approach 11, do we need to have a vote to extend, or does it matter? 1600 03:56:46.470 --> 03:56:55.730 Community Hall: Yeah, that was a good question. The rules for the Council Precision Man don't apply here, so it's up to your discretion, but just give them the layout, or ask me one of them, but 1601 03:56:55.870 --> 03:56:59.949 Community Hall: a cap on… Time at this point for each of the commissioners? 1602 03:57:00.430 --> 03:57:12.609 Community Hall: Yes, so quick questions left from anybody, Vice Chair. One quick question, because I recall the developers using a waiver or concession to make the 1603 03:57:13.000 --> 03:57:14.730 Community Hall: BMR units. 1604 03:57:14.980 --> 03:57:26.959 Community Hall: different than the market rate, which is fine, but then when the staff mentioned the BMR units are comparable to the market rate units, so I just wonder which… which of those statements is true. 1605 03:57:27.210 --> 03:57:37.100 Community Hall: Right, so the concession is actually for a mix of types. Usually we would ask, because this has four different types of units being proposed, that the BMR units be each of the four. 1606 03:57:37.100 --> 03:57:52.399 Community Hall: they are providing just one type of unit, one design, one layout, basically, but the sizes of the units are comparable, and that's what we're comparing through that. Oh, I… because I thought they said the BMR units were smaller, so I must… They are… they are smaller, but we're still within the… 1607 03:57:52.400 --> 03:58:00.660 Community Hall: again, comparable is kind of… Okay, so comparable… Yeah. They're comparable, but smaller, okay. Right, thank you. 1608 03:58:02.230 --> 03:58:09.110 Community Hall: Quick question through the chair. So, I'm looking at the table on page 18, I think, of the staff report. 1609 03:58:09.440 --> 03:58:12.460 Community Hall: Is it correct that this further reduces our… 1610 03:58:13.050 --> 03:58:18.469 Community Hall: Lower income units by 31 plus 8, 39. 1611 03:58:19.260 --> 03:58:23.880 Community Hall: Yes, if you're looking at what the housing element anticipated, you… 1612 03:58:24.380 --> 03:58:28.190 Community Hall: The estimate was 84 total units, and… 1613 03:58:29.540 --> 03:58:47.969 Community Hall: Let me look what we had… 31 low and 18 moderate. How do we arrive at those projections? Because I'm assuming the applicant had a preliminary app that was about ready to go, given the May zoning versus October preliminary application. How did their projections get so far off? No, these are worked out 1614 03:58:48.330 --> 03:58:54.310 Community Hall: with staff and HCD, and this was well in advance. I don't know when we finally landed on those numbers, but it… 1615 03:58:54.410 --> 03:58:56.910 Community Hall: 2023, 2024, sometime. 1616 03:58:58.170 --> 03:58:59.289 Community Hall: Okay, thank you. 1617 03:58:59.520 --> 03:59:01.040 Community Hall: No further questions, thank you. 1618 03:59:01.500 --> 03:59:03.750 Community Hall: Any other questions from the Commission? 1619 03:59:05.220 --> 03:59:11.409 Community Hall: All right, the public hearing is actually closed now. Let's move on to comments from the Commission. 1620 03:59:12.280 --> 03:59:19.879 Community Hall: Yeah, I'm happy to quickly wrap this up. I think we have exhausted what we've been able to go through here. We have talked through the fire scenarios. 1621 03:59:20.130 --> 03:59:23.529 Community Hall: I believe FIR finds the project to be compliant. 1622 03:59:24.190 --> 03:59:27.839 Community Hall: We have talked through The track record of fires, and… 1623 03:59:28.250 --> 03:59:41.010 Community Hall: appears like Summerhill has a track record of safety with the projects that they've had, and they will continue to look for measures and best practices between what they're doing and what the fire department requires and what staff require for a fire safety plan. 1624 03:59:41.140 --> 03:59:42.949 Community Hall: To meet those requirements. 1625 03:59:43.220 --> 03:59:47.069 Community Hall: We have talked through the best practices for 1626 03:59:47.550 --> 03:59:53.340 Community Hall: privacy, and I don't have a good sense of whether the neighborhood really wants sprees and hedges, because I keep 1627 03:59:53.940 --> 03:59:58.299 Community Hall: Hearing the ask is for setback and two floor, which… 1628 03:59:58.920 --> 04:00:03.530 Community Hall: we have discussed at length. I do not see an ask for privacy edges. 1629 04:00:03.670 --> 04:00:10.770 Community Hall: But I'm willing to… Put a motion that amends the conditions of approval to consider, including privacy hedges. 1630 04:00:11.240 --> 04:00:14.179 Community Hall: If commissioners want to support that and let the… 1631 04:00:14.690 --> 04:00:18.019 Community Hall: Applicant work that with the community and staff, if that's something… 1632 04:00:18.230 --> 04:00:29.519 Community Hall: And then finally, I believe there is a condition in the Mooney Code that limits the passage of trucks during school hours, and so I'd like to just ask that we amend the 1633 04:00:29.710 --> 04:00:38.380 Community Hall: Staff recommendation to include The, hours of restriction for trucks to be 7.30 to 9.30, 1634 04:00:38.490 --> 04:00:40.939 Community Hall: And 2 to 4 p.m, per the Money Code. 1635 04:00:41.050 --> 04:00:45.249 Community Hall: on streets that… about the project, specifically McClellan. 1636 04:00:46.120 --> 04:00:47.430 Community Hall: Set a Tennesaw. 1637 04:00:47.980 --> 04:00:49.939 Community Hall: Linda, Mr. Highness Port. 1638 04:00:50.600 --> 04:00:54.770 Community Hall: With that, I'd like to move that motion, if I have a second. 1639 04:00:59.980 --> 04:01:01.110 Community Hall: No seconds. 1640 04:01:01.590 --> 04:01:08.490 Community Hall: I'll second it. I'll second it for the purposes of discussion. Any further comments from… Commission? 1641 04:01:11.610 --> 04:01:16.269 Community Hall: Yeah, I don't know if it's from the amendment or what, but I would prefer… 1642 04:01:16.780 --> 04:01:21.880 Community Hall: that we don't waive the park in Luffy in order to get the connection to… 1643 04:01:22.220 --> 04:01:28.820 Community Hall: Stevens Creek Trail, just because I think they would put that in anyway. I will accept the trendy amendment. 1644 04:01:29.860 --> 04:01:32.000 Community Hall: Would the seconder accept the friendly amendment? 1645 04:01:35.500 --> 04:01:46.380 Community Hall: I'm not sure, because there is probably an additional cost incurred upon the developer. Would Commissioner Scharf second the motion, if I accepted your friendly amendment? 1646 04:01:47.210 --> 04:01:49.970 Community Hall: Sure. Okay, we have a motion and a second. 1647 04:01:50.600 --> 04:01:59.209 Community Hall: Can you clarify what you mean by you think they're gonna build it anyway? Right, I mean, if you look at the parcel, it's a big benefit to the residents of those 1648 04:01:59.450 --> 04:02:07.160 Community Hall: 51 units, it's a big selling point, and yet they're asking for this huge amount. 1649 04:02:07.400 --> 04:02:12.179 Community Hall: reduction in the park in Luffy's, and I… I don't… I don't like that idea. 1650 04:02:14.070 --> 04:02:16.450 Community Hall: So, just so the record is clear, 1651 04:02:16.770 --> 04:02:28.410 Community Hall: Commissioner Rob, perhaps you can withdraw your motion, and rescind your motion, and then make a new one, and then Chair Sharp can second it, because right now, the pending motion is seconded by the Chair. 1652 04:02:30.300 --> 04:02:37.820 Community Hall: I see, so I would resend the original motion, I would make a new motion, that… 1653 04:02:38.190 --> 04:02:41.729 Community Hall: Moves the staff recommendation with the following amendments. 1654 04:02:41.970 --> 04:02:44.910 Community Hall: We will not waive the parking lot fee. 1655 04:02:46.070 --> 04:02:48.760 Community Hall: As a second condition of approval. 1656 04:02:49.280 --> 04:02:53.029 Community Hall: The hours of operation for trucks shall be limited. 1657 04:02:53.150 --> 04:02:58.499 Community Hall: to not operate during 7.30 to 9.30 and 2 to 4 p.m, as per the Monique code. 1658 04:02:59.070 --> 04:03:05.870 Community Hall: for the streets surrounding the project, namely Linda Vista Drive, Highness Port, Bob? 1659 04:03:06.400 --> 04:03:07.510 Community Hall: And McClellan? 1660 04:03:08.920 --> 04:03:10.190 Community Hall: And there was one more. 1661 04:03:12.530 --> 04:03:19.260 Community Hall: And a consideration to include privacy shrubs if the applicant and the residents find that to be amenable. 1662 04:03:19.720 --> 04:03:21.010 Community Hall: Those are the three. 1663 04:03:21.370 --> 04:03:22.430 Community Hall: conditions. 1664 04:03:23.350 --> 04:03:25.770 Community Hall: Commissioner Schroff, do you approve? What do you second? 1665 04:03:25.950 --> 04:03:28.820 Community Hall: Sure, I'll second it. Weissharf, I'm sorry. 1666 04:03:29.280 --> 04:03:31.009 Community Hall: Yes, I still second it. 1667 04:03:32.910 --> 04:03:35.210 Community Hall: Can I ask a clarifying question? 1668 04:03:35.340 --> 04:03:37.770 Community Hall: So, to the developer. 1669 04:03:38.000 --> 04:03:50.630 Community Hall: What are your thoughts on if we don't approve the… the waiver of the indoor park fees up to $370,000 for the trail access? Yeah, we would not be building that trail. We… 1670 04:03:50.630 --> 04:03:58.360 Community Hall: That's not part of the project. Can you speak in the mic, please? Yeah. We would not be building that trail if the city does not want to… 1671 04:03:58.450 --> 04:04:00.590 Community Hall: Pay for the construction of it. 1672 04:04:00.680 --> 04:04:14.020 Community Hall: You know, there's a good portion of our company that believes that trail is non-beneficial to the project for the amount of people that are going to be going in and out of the project, so they would prefer not to have it. 1673 04:04:14.290 --> 04:04:18.999 Community Hall: But I stood here and said we want to be neutral because we want to provide what 1674 04:04:19.500 --> 04:04:38.880 Community Hall: planning commissioners and council members would want to have for their city, but we would not want it for the expense of that trail, because we don't believe that's beneficial for the project. Through the chair, I have a little experience in this space, in that in the neighborhood I am in, we have a trail that egresses through my neighborhood, and we have had a number of burglaries where burglars will 1675 04:04:38.970 --> 04:04:45.639 Community Hall: Ingress and egress through those exit points, and that's been a source of constant nuisance for the neighborhood. 1676 04:04:45.860 --> 04:04:58.249 Community Hall: And so, just want to point out that these routes can be pathways for buglars to get in and out, just a public safety aspect to consider as well. Thank you. It's public safety, and it does become a nuisance for that neighborhood. 1677 04:04:58.250 --> 04:05:15.299 Community Hall: So again, we don't want to build it, but we're just trying to be accommodating. We certainly couldn't build it with the project as proposed and pay for it. So will there be a fence that prevents access to the trail from… Yeah, there's our plans, so there's an exhibit for the trail, but 1678 04:05:15.350 --> 04:05:23.420 Community Hall: Which is separate from our plans, but our plans shows a continuous open view fencing at the back of the project. 1679 04:05:23.610 --> 04:05:30.959 Community Hall: I see. Seems like it's the same as the… So, I'll just point… Right, I think we had the same discussion on that one, yeah. 1680 04:05:32.420 --> 04:05:38.310 Community Hall: Sorry, what was that? I was just saying, I believe we had the same discussion on the Fontana project, yeah. 1681 04:05:38.490 --> 04:05:42.840 Community Hall: So, I'm just gonna point out a couple of things. One is, 1682 04:05:43.180 --> 04:06:01.960 Community Hall: the residents of Cupertino over and over and over again keep saying that connectivity to trails is really important to them. That's one of the highest, points of agreement in all the city surveys that are done. If… also, if you look at, 1683 04:06:02.030 --> 04:06:20.329 Community Hall: the best, best practices for city planning, having a access to nature within a 5-minute walk is considered optimal in city planning. It's the 330-300 rule, so having access to nature within 300 meters, which is about a 5-minute walk. 1684 04:06:20.410 --> 04:06:28.209 Community Hall: I do think this would be beneficial to the neighborhood, especially since this would be public access, so… 1685 04:06:28.340 --> 04:06:33.060 Community Hall: I am a strong supporter of this, 1686 04:06:33.430 --> 04:06:44.179 Community Hall: And I… I think this is something we should invest in, because we're not going to get the chance to do this again. So… it's… it's… and if it's at cost, it's… it seems like a… and I've… 1687 04:06:44.450 --> 04:06:55.160 Community Hall: I've spent a lot of time looking at trail costs. I know this is a very reasonable cost as it goes, so I would suggest a friendly amendment to include, the trail. 1688 04:06:55.310 --> 04:06:58.059 Community Hall: In, in this, in the motion. 1689 04:07:01.070 --> 04:07:07.820 Community Hall: through the chair, I would not be able to accept that for the reasons of public safety, but also the fact that the 1690 04:07:08.080 --> 04:07:19.279 Community Hall: City is facing fiscal constraints, and a waiver of parking lot fees is significant at this point. Finally, the public has access to the trail through Linda Vista Park, I believe, as well as 1691 04:07:19.390 --> 04:07:26.610 Community Hall: ample access to parkland through Linda Vista Park, so I really am hesitant for all of those reasons, and particularly public safety, because I think 1692 04:07:26.770 --> 04:07:35.560 Community Hall: we ought to be very conscious of, you know, these new developments tend to be more prone to burglaries. They look at people that are newly moved in as sort of 1693 04:07:35.810 --> 04:07:53.049 Community Hall: less on the guard, and just a lot of cases where new projects tend to get burglarized, or the homes around new projects get burglarized, so this isn't just the Evelich Court project itself, but the homes on Linda Western Drive need to maintain public safety, and we just want to keep public safety in mind, so I would not accept that. Thank you. 1694 04:07:53.610 --> 04:08:09.830 Community Hall: So I'll just point out that the homes along all the trails in the city have no safety issues, that there's no data to show that there's been any increase in burglaries or any kind of safety issues along Ragnar Creek Trail, for example, which is the highest traffic trail in the city. 1695 04:08:09.830 --> 04:08:18.319 Community Hall: So, I don't think there's any data to back up the safety issue. Commissioner Linskop, may I suggest, perhaps, you want to make a substitute motion? 1696 04:08:20.320 --> 04:08:31.210 Community Hall: Okay, I'll make a substitute motion to, accept the staff. Well, basically everything, Commissioner Rao said, but also include the trail. 1697 04:08:32.250 --> 04:08:33.300 Community Hall: I'll second it. 1698 04:08:35.580 --> 04:08:38.960 Community Hall: Alright, did we have any further comments from Commission? 1699 04:08:39.250 --> 04:08:43.790 Community Hall: I will go ahead and comment. From my end, I… 1700 04:08:43.850 --> 04:08:50.730 Community Hall: I thank the community for coming tonight. I think you have every right to be frustrated about this. I, you know. 1701 04:08:50.740 --> 04:09:11.650 Community Hall: the applicant knows how many times I've asked how this project could be redone, and it's… it's very disappointing to me that we were not able to give more setback or lower buildings, and, you know, I take the decisions that we make here on Planning Commission very seriously, and in order to be able to reject a setback waiver, I have to be able to prove that it is 1702 04:09:11.650 --> 04:09:24.219 Community Hall: detrimental to public safety or public health somehow. And while I could technically just reject something and send it to Council without giving them, you know, any good reason, I'm just putting the burden of proof on them. And so. 1703 04:09:24.220 --> 04:09:30.839 Community Hall: It's… it's just very difficult for me to make any… I have no findings, showing that we are hurting 1704 04:09:30.840 --> 04:09:33.759 Community Hall: Public health at the moment, and so, 1705 04:09:33.760 --> 04:09:48.699 Community Hall: But it is disappointing. I think. I fully agree, this doesn't fit with the neighborhood. The zoning does not fit. It should not have been R3, and, you know, the commissioners that sit here, there's little we could have done about it. 1706 04:09:49.670 --> 04:09:50.740 Community Hall: So… 1707 04:09:50.770 --> 04:10:02.639 Community Hall: you know, I think we're in the difficult place of having no legal choice. We have done our best to answer the questions that have come to us, and 1708 04:10:02.640 --> 04:10:08.679 Community Hall: The answers consistently seem to be that, everything is in compliance with 1709 04:10:08.680 --> 04:10:25.009 Community Hall: fire and, you know, city is deferring to the fire department to make the rulings that they can… they do think that this development is defensible in the event of a fire. And, you know, as we are not fire experts, we must also defer to that. 1710 04:10:25.060 --> 04:10:36.779 Community Hall: ruling. So, I have disappointment, but this is… this is where I'm at. Thank you. Commissioner Rao. So, through the chair, we are now voting on a substitute motion that 1711 04:10:37.680 --> 04:10:41.489 Community Hall: Yes, what would waive parking low fees? 1712 04:10:41.840 --> 04:10:43.110 Community Hall: I had a no vote. 1713 04:10:43.860 --> 04:10:50.380 Community Hall: Or… fail the substitute motion, effectively, we would go back to the original motion on the table. Thank you. 1714 04:10:52.830 --> 04:10:55.869 Community Hall: Are we ready to vote, or are there any further comments? 1715 04:10:57.130 --> 04:11:01.659 Community Hall: This is just on the… on this particular amendment, right? 1716 04:11:01.860 --> 04:11:17.710 Community Hall: Yes. I mean, I have a summary comment as well. Okay, go ahead. Go ahead with that, yeah, okay. I think that, you know, coming into this, it was clear that the… whether the fire issues are addressed were… whether the fire issues were going to be addressed appropriately, I feel. 1717 04:11:17.880 --> 04:11:27.249 Community Hall: Comfortable that they… they have been to the standards to which… to which you, you know, you could ask… you know, the community can ask… can hold you to to… to, resolve this issue. 1718 04:11:28.290 --> 04:11:34.629 Community Hall: I think that, I think that there's been thought in the design 1719 04:11:34.780 --> 04:11:54.289 Community Hall: you know, with regard to the setback issue, there's been thought to design about how the, you know, the frosted windows and the direction that they face kind of addresses the problem of people staring into other people's homes. I think it didn't address the height that the people on the south side 1720 04:11:54.320 --> 04:12:02.940 Community Hall: would see, so I would encourage you to just try to be creative there. Short of necessarily taking a floor out, you know, is there a way you can modify 1721 04:12:03.060 --> 04:12:04.900 Community Hall: The profile of the building. 1722 04:12:05.080 --> 04:12:13.499 Community Hall: So that it's… so that it doesn't seem as tall on that side. I don't think that's… I think that's the only place where that's an issue, where there's a very short setback. 1723 04:12:13.950 --> 04:12:16.670 Community Hall: One area I was surprised to, 1724 04:12:16.840 --> 04:12:20.159 Community Hall: There was one mention about the school districts, 1725 04:12:20.480 --> 04:12:27.419 Community Hall: There was one mention in there about the, you know, about some of the revenues that would come to the schools, and I think that's good. 1726 04:12:27.550 --> 04:12:32.599 Community Hall: You know, I was a very active parent. My son went to Regnard, which would… 1727 04:12:32.870 --> 04:12:39.420 Community Hall: not be in… not be in this zone. I think… I think this particular… kids who were living here at that time would have went to Lincoln. 1728 04:12:39.590 --> 04:12:59.130 Community Hall: But, went to a Ragnard Kennedy in Monta Vista. You know, Ragnar just closed because… because nobody can afford to live in our community anymore that has kids. And, you know, I think that this actually helps. At the time, there was a new, relatively new… when… when he was young, there was a relatively new, 1729 04:13:00.450 --> 04:13:01.939 Community Hall: developmental. 1730 04:13:02.450 --> 04:13:04.019 Community Hall: project of Murano. 1731 04:13:04.160 --> 04:13:12.430 Community Hall: That's kind of… it's more toward the center, you know, right off Danza Boulevard, but actually, I remember spending a lot of time going there with, you know, to… 1732 04:13:12.460 --> 04:13:24.509 Community Hall: to visit with him, you know, to take him over to visit with his friends. I think that there's a very good chance that your place will be like that for this part of the community, and I think that that, that is something that's a plus. 1733 04:13:24.720 --> 04:13:35.959 Community Hall: something not to forget. You know, that's one way… one way to support the schools is by making an environment where it's more possible for there to be families. I think this actually addresses that pretty well. 1734 04:13:36.150 --> 04:13:51.960 Community Hall: I would actually say, though, please reach out. You know, I think in my earlier term on the Planning Commission, it would have been unusual for somebody not to talk about, you know, their discussions they had with the districts. I would encourage you to reach out to them. 1735 04:13:52.230 --> 04:13:59.799 Community Hall: To understand the ways that, you know, are there things that may not cost you anything that actually help, 1736 04:14:00.070 --> 04:14:04.099 Community Hall: Help the way that, the schools operate. 1737 04:14:04.190 --> 04:14:20.490 Community Hall: the fact that… the fact that a project like this could be built is actually a windfall, you know, because of the way Prop 13 works. This will really be a huge windfall for the district. So, you know, that may be sufficient for, you know, they would be thankful for that. There were, of course, a lot of discussions when people were building apartments. 1738 04:14:20.490 --> 04:14:33.230 Community Hall: It's not your business, but when people are building apartments, you know, whether they would be paying parcel taxes, and you know, this automatically kind of solves that problem. So I think there's a lot of pluses, a lot of community pluses. 1739 04:14:33.280 --> 04:14:43.059 Community Hall: you know, the fact that these are new places, that they'll be efficient and, efficient and safe. I think those are all, you know, all pluses, and 1740 04:14:43.600 --> 04:14:46.680 Community Hall: you know, so I… I'm supportive of the… I'm supportive of the project. 1741 04:14:46.950 --> 04:14:47.730 Community Hall: Thank you. 1742 04:14:49.810 --> 04:14:56.860 Community Hall: Okay, thank you. Any more comments? Can the chair clarify again what the yes vote would mean and the no vote? 1743 04:14:59.640 --> 04:15:12.179 Community Hall: So, I believe we're voting on your substitute motion, correct? So, yes, the yes vote would mean that you would want… the only difference between that and your motion, which… So, yes vote would waive parking lot fees? 1744 04:15:12.310 --> 04:15:18.400 Community Hall: Yes, would have the trail connection, but would also include the… 1745 04:15:18.440 --> 04:15:34.950 Community Hall: hours of restriction for construction from 7.30 to 9.30 and 2 to 4 p.m, right? That is in both motions. That's in both motions. Yeah. Yeah, exactly. So the only difference is we are voting on a motion that waives parking fees. Right, and the privacy hedges would also still be included. Everything else is the same. 1746 04:15:40.780 --> 04:15:41.600 Community Hall: Unbelievable. 1747 04:15:41.930 --> 04:15:43.650 Community Hall: Are we voting? Revoting? 1748 04:16:10.350 --> 04:16:14.680 Community Hall: The motion carries, with Commissioner Rao and Vice Chair Sharp voting no. 1749 04:16:18.240 --> 04:16:22.490 Community Hall: Alright, thank you very much. We will now move on to… 1750 04:16:22.870 --> 04:16:25.949 Community Hall: Do we have any old business? Or new business? 1751 04:16:26.700 --> 04:16:29.519 Community Hall: None. Any staff and commission reports? 1752 04:16:34.720 --> 04:16:43.849 Community Hall: Staff does not have any report other than to say the next meeting will be on March 9th. If there's any members of the public that normally attend, that is on a Monday. 1753 04:16:43.950 --> 04:16:47.730 Community Hall: There is a Planning Commission academy that 1754 04:16:47.880 --> 04:16:53.720 Community Hall: Most of the commissioners are going to, so that date was moved, and we will be discussing the… 1755 04:16:54.440 --> 04:17:04.699 Community Hall: the annual general plan update that goes to Sacramento on April 1st, so this is more informational, but that item will be going. 1756 04:17:05.860 --> 04:17:08.799 Community Hall: And now I am blanking on the second item that we have. 1757 04:17:09.400 --> 04:17:24.899 Community Hall: What about the housing element, inventory, the net… no net loss makeup? That is not going… that is going to City Council next week, though, on the 3rd. So it would not come to Planning Commission? We are planning to come to Planning Commission on that. We just don't have a date certain on that yet. 1758 04:17:26.550 --> 04:17:28.970 Community Hall: And any update on harvest properties here? 1759 04:17:29.300 --> 04:17:34.570 Community Hall: Harvest Properties should be coming to the subsequent meeting on March 24th. 1760 04:17:35.610 --> 04:17:45.449 Community Hall: And I understand Eden Properties, or Eden Housing, is that Eden? That is doing the teacher housing? Eden is doing the teacher housing site just north of Valco. 1761 04:17:45.470 --> 04:17:59.409 Community Hall: they volunteered to do a study session for the City Council, even though the permit for that project will only come to the Planning Commission as the final decision-making body, because it is… if it's 100%, I believe it is 100% affordable. 1762 04:17:59.550 --> 04:18:02.749 Community Hall: to different income categories. 1763 04:18:04.300 --> 04:18:07.579 Community Hall: Great. Well, thank you very much. Any future agenda setting? 1764 04:18:08.540 --> 04:18:11.000 Community Hall: No? Then the meeting is adjourned.