HomeMy WebLinkAboutPC 02-23-76CITY OF CUPERTINO, STATE OF CALIFORNIA
10300 Torre Avenue, Cupertino, California 95014
Telephone: 252-4505
MINUTES OF THE REGULAR MEETING OF THE PLANNING COMMISSION
HELD ON FEBRUARY 23, 1976 IN THE COUNCIL CHAMBER, CITY HALL
CUPERTINO, CALIFORNIA
SALUTE TO THE FLAG
Chairman Gatto called the meeting to order at 7:40PM with the
Salute to the Flag.
ROLL CALL
Comm. present: Adams, Cooper, O'Keefe, Woodward, Chairman Gatto
Comm. absent: None
Staff present: Director of Planning and Development Sisk
Assistant Planning Director Cowan
Assistant City Attorney Kilian
Assistant City Engineer Whitten
APPROVAL OF MINUTES
Minutes of Adjourned Regular Meeting of January 15, 1976:
Page 6, add to the end of paragraph 3: "After further discussion
it was the concensus of the Planning Commission to direct the staff
to not investigate any further the full and half loops.
Moved by Comm. Adams, seconded by Comm. Woodward to approve the
Minutes of January 15, 1976, as amended.
Motion carried, 5-0
Minutes of Regular Meeting of January 26, 1976:
Page 3, paragraph 7, line 7 should read: "on a lot and common
area to be maintained by a . . . . ."
Page 4, paragraph 6, next to the bottom line: Change "Comm.
Woodward" to "Chairman Gatto".
Page 7, paragraph 5, last line: Add "control" after "activity".
PC -218
Page 1
Jan. 15th Minut(
approved
PC -218 MINUTES OF FEBRUARY 23, 1976, PLANNING COMMISSION MEETING
Page 2
;Page 8, first paragraph should read. "Comm. Woodward suggested that the
cost of having an engineering study of the safety of the dam structure
probably coutweighs the cost of fencing of the pond. He opted for the
!split rail fencing of the common areas fronting on Voss Avenue."
;Page 10, paragraph 5, line 4: Delete "to not encourage" and replace
;with "to discourage".
Jan 26 Minutes Moved by Comm. Adams, seconded by Comm. Woodward to approve the Minutes
approved ,of January 26, 1976, as amended.
Feb. 9 Minutes
approved
16-Z-76 cont'd
to Mar 8
Motion carried, 5-0
Minutes of Regular Meeting of February 9, 1976:
Page 11, last paragraph, line 9, delete "a similar number" and replace
with "approximately 1500".
Moved by Comm. Adams, seconded by Comm. O'Keefe to approve the Minutes
of February 9, 1976, as corrected.
Motion carried, 3-2
Comm. Woodward, Cooper abstained
POSTPONEMENTS
Item #9 - Application 16-Z--75 of EDMUND F. SCHNIEDERS, JR. to be
continued to March 8, 1976, per staff request.
loved by Comm. Adams, seconded by Comm. O'Keefe to continue application
!6-Z-75 to March 8, 1976.
Motion carried, 5-0
Item #2 - Application 16 -TM -75 of SAN CARLOS HOMES to be continued,
per staff request.
16 -TM -75 ;Since it was established that there is the need for a considerable amount
removed from of work on this proposal, it was moved by Comm. Adams, seconded by
calendar Comm. O'Keefe to remove_:a application 16 -TM -75 from the calendar and
to readvertise it at a later date.
Motion carried, 5-0
WRITTEN COMMUNICATIONS - None.
ORAL COMMUNICATIONS - None.
I
MINUTES OF FEBRUARY 23, 1976, PLANNING COMMISSION MEETING PC -218
Page 3
PUBLIC HEARINGS
1. Application 1 -Z-76 of CITY OF CUPERTINO: REZONING 20+ acres
from R3-2.2 (Residential, multiple, 2,200 sq. ft. per dwelling
unit) Zone to P (Planned Development with residential land use
intended with a density of 0 - 4 units per acre) or whatever
zone may deemed appropriate by the Planning Commission.
Said property is located adjacent to and westerly of Foothill
Blvd. opposite the intersection of Alpine Drive and Foothill
Blvd. First Hearing continued.
Attorney D. A. Barnett, 1625 The Alameda, San Jose, stated he was
representing the property owner (Taubman), who recently suffered
a heart attack. He expects to be back in the office shortly, and
requested a continuance of this public hearing.
Chairman Gatto asked if there were comments from the audience in
regard to application 1-Z-76. There were none.
Moved by Comm. Adams, seconded by Comm. Woodward to continue
application 1-Z-76 to March 22, 1976.
Motion carried, 5-0
2. Application 16 -TM -75 of SAN CARLOS HOMES & DEVELOPMENT.
TAKEN OFF CALENDAR
3. Application 12-U-75 of PHOTOTECHNOLOGY: USE PERMIT to allow
a photo kiosk in a CG (General Commercial) Zone. Said property]
is located at the southwest corner of the intersection of
Stevens Creek Blvd. and E. Estates Drive. First Hearing
continued.
It was noted that the applicant was not present at this meeting.
The staff stated he had been advised by mail and phone call of this!
hearing.
The Assistant City Attorney advised it would be more appropriate
for the Planning Commission to act upon this proposal rather than
take it off calendar.
The Assistant Planning Director reviewed the proposal again. He
stated the staff recommended denial because historically, the City
discourages freestanding structures in parking lots on main
thoroughfares. There could be a disruption of traffic flow, due
to cars waiting in line to be served. Air quality is another
determining factor. There are no other such uses within the City
of Upertlno.
1-Z-76 cont'd
to March 22nd
PC -218 MINUTES OF FEBRUARY 23, 1976, PLANNING COMMISSION MEETING
Page 4
Chairman Gatto asked for comments from the audience. There were none.
Moved by Comm. Adams, seconded by Comm. Cooper to close the Public
Rearing.
Motion carried, 5-0
12-U-75 ;Moved by Comm. Cooper, seconded by Comm. Woodward to deny application
denied 12-U-75, on the basis that it is not consistent with City policy.
AYES: Comm. Adams, Cooper, O'Keefe, Woodward, Chairman Gatto
NOES: None
Motion carried, 5-0
4. Application 2-U-76 of Vallco Park, LTD.; USE PERMIT to allow
construction of one building containing 10,700 sq. ft., one
building containing 13,217 sq. ft., the construction of six
tennis courts and the relocating of a 2,200 sq. ft. building
presently located at the southeast corner of Pruneridge Avenue
and Wolfe Road. Said property is generally located adjacent
to and westerly of Wolfe Road immediately southerly of the
Vallco Village Shopping Center. First Hearing continued.
;The Assistant Planning Director reviewed the February 6 and 20, 1976
staff memos and documents, and the memo handed out at this meeting.
The staff has had discussions with the applicant in regard to
resolving the traffic circulation pattern from Pruneridge, through
;this property and into the Vallco Village Shopping Center. He
!then reviewed the original and the alternate exhibits on the bulletin
`board. A third alternate was also explored. The Assistant Planning
Director stated that the staff would like a major roadway into the
project, and it may be necessary for the applicant to go back to the
drawing board with this proposal.
lir. Walter Ward, Vallco Park General Manager, stated it might be a
problem for the bank visitors to park by the handball courts and
cross this major roadway to the bank. He suggested more discussions
with the staff might be in order before a decision is made.
Architect Dick Griffiths, representing Cabac Associates, said this is
the first time he has seen this current proposal. He would like to
provide as much parking by the bank as possible. There are other
tenants in the bank building as well as the banking facility. He
answered Comm. Cooper that they anticipate 17 employees and 10-12
customers at one time.
MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING PC -218
' Page 5
Mr. Griffiths answered Chairman Gatto that the parking could be
changed from 60° to 90° angle in order to pick up some extra
parking spaces. However, more aisle width will be necessary if
it is changed. Another problem with 90° parking is there would be
the tendency for the cars to back out and go either direction,
whereas with 60° angle they would be inclined to go only one way.
Chairman Gatto offered the following suggestions: Provide a
simple, direct means of access from Pruneridge to a common melting
point in Vallco Village. An aisle, free of cars, for the main
travel aisle is an improvement. He recognized the desire to get
more cars near the bank building.
Comm. Adams observed that the present southeast corner of Vallco
Village Shopping Center is usually filled now. And the triangular
section is always filled. Mr. Ward said they will probably want
to have a crosswalk from the parking areas to the bank building.
It was the consensus of the Planning Commission to leave the detail
of the traffic circulation pattern to the staff.
Mr. Ward answered Comm. Woodward that they will probably put humps
in the parking lot to help reduce speeds. There will also probably
be a need for stop signs as the cars leave the bank.
Comm. Adams said at the time of the last public hearing on this
the question of driveup windows was explored. Only three members
were present at that meeting. He wondered whether it was appro-
priate to discuss this with a full Commission.
Mr. Walter Ward said City Council Resolution No. 4097, in regard
to driveup windows, would have no significant impact on this
proposal. Environmental problems were addressed at the time of
the hearing on Resolution No. 4097.
Mr. Ward said this application was first filed in December, 1973.
Three banks with driveup windows have come in since then and have
been approved.. We should strive for uniformity. It might not
be equitable for Cupertino to ban the driveup windows if our
neighbors do not. Dr. Myronek has stated that the environmental
problems are regional. :Be recommended deletion of Conditions 16
and 18.
Comm. Cooper suggested the landscaping along the bank be low
enough to prevent the canyon effect and allow better visibility.
She would like her feelings on this conveyed to the Architectural
and Site Approval Committee.
PC -218 MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING
Page 6
(Comm. Cooper said she has listened to the tape and read Dr. Myronek's
,report. She believes restriction of driveup windows is a step in the
!right direction. However, she believes driveup windows in this
!location are appropriate because this is an open area. She would be
in favor of an ordinance discouraging driveup facilities in the future.
Comm. -Woodward stated he also has listened to the tapes. He agreed
with Chairman Gatto that the driveup facility is part and parcel of
this proposal. He suggested the bank put up a sign for people to
please shut off their engines while waiting in'Iine. This was not
addressed in Dr. Myronek`s report,
Comm. Adams said he could appreciate this application was first filed
in 1963. He would be willing to bend on Condition 16 if it is changed
Ito request the bank install signs requesting engines be turned off
while_ waiting in line He asked if there ,i7. facilities ---p - - ca.c are any walkup 1-1;11-ltles on
this face of the building. 4Mr.yWard�said they are only on the south
!side.
Mr. Bob Holding, Properties Department of First National Bank of San
Jose, said walkup windows on the west side would not be good. Emissions
from the automobiles would be on that side. It would interfere with
the operations inside the bank. This is a standard system, with four
lanes operated by two tellers. They have nine of these operations
and they are all very efficient.
Chairman Gatto stated Dr. Myronekts report addressed: an isolated
case. This proposal is a very minor, localized condition. The air
quality problem is regional.
consensus vote to strike Condition 16 passed, 3-2, with
.. Adams and O`Keefe dissenting.
consensus vote to strike Condition 18 failed, with only
Woodward voting in favor of it.
The consensus vote to retain Condition 18 passed, 3-2, with
Chairman Gatto and Comm. Woodward dissenting.
I
,The Assistant Planning Director stated Dr. Myronek was not asked to
;explore the condition of cars starting and stopping.
Moved by Comm. Adams, seconded by Comm. Woodward to close the public
hearing.
! Motion carried, 5-0
The Assistant Planning Director modified the wording of Condition 15.
MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING
Moved by Comm, Cooper, seconded by Comm. Woodward to approve
application 2-U-76 with the 14 standard conditions, condition 15
as modified, condition 16 deleted, conditions 17, 18 and 19 as
in the staff report, and condition 20 which directs the Architec-
tural and Site Approval Committee to place landscaping in the
area by the driveup lane and road to the shopping center to be of
the type to not restrict air flow nor visibility of bank traffic.
AYES: Comm. Adams, Cooper, Woodward, Chairman Gatto
NOES: Comm. O'Keefe
Motion carried, 4-1
Chairman Gatto called a recess at 9:00 PM. The meeting reconvened
at 9;15 PM.
5. Application 3-Z-76 of GOOD SAMARITAN UNITED METHODIST CHURCH:
REZONING 1.6 acres from Al -43 (Agricultural -Residential,
single-family, 1 -acre lots) Zone to BQ (Quasi -Public Building)
Zone, or whatever zone may be deemed appropriate by the
Planning Commission. Said property is located at the south-
east corner of the intersection of Homestead Road and Linnet
Way. First Hearing.
The Planning Director reviewed the proposal, details of which can
be found in the February 20, 1976 staff memo. He noted this
Church was built prior to annexation to the City. The expansion
proposal is in three phases. Phase I includes the Sanctuary with
a seating capacity of 130 and classroom facilities. In 1966, the
Vallco Village use permit included purchase of a triangle piece
of property with the understanding the Church could utilize a
number of the shopping center's parking spaces. Phase II includes
addition of office facilities and fireside room. Phase III is the
ultimate development of the property, including a multipurpose
room. Based upon the present use of the shopping center, there
are 150 parking spaces available within 300' of the Church propert
The Planning Director stated the other issue is more aesthetic.
There is a 25' setback of the structures, but there is a wall some
8' in from the property line. Notices have been mailed to all
property owners within 300' of this property.
Architect Warren Gilbert stated he read the portion of the Agreement
pertaining to the excess of 20 parking stalls. With this Agreement.
we have a Church property hhat has a 200 —car parking lot already
built within 300'. He said the Church entered into this Agreement
in good faith. With this understanding, Phase III was designed
taking full advantage of the parking in the shopping center. The
big impact is on Sunday when the shopping center needstheleastnumber of parking spaces.
PC -218
Page 7
2-U-76
approved
PC -218 MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING
Page 8
Comm. Cooper asked the capacity of the multipurpose room. Mr. Gilbert
said it could seat 400 for dining purposes. The Church feels they act
as a family. It would be a rare occasion when they would have more than
one function at one time in more than one of the buildings. The
multipurpose room is designed for youth activities such as volleyball,
basketball, dancing, etc.
Chairman Gatto was answered that weddings usually occur on Saturdays
and no more than once a month except in June. The usual number of
people at weddings is 25.
Mr. Gilbert said they are willing to restudy the architecture to some
,degree. Present plans show stucco exterior, flat tile terra cotta
roof and concrete overhang. Heavy timber may be introduced here.
He said they are willing to reduce the height of the buildings. They
are back some 80from Homestead Road and some 60from Linnet Lane.
They are not surrounded by residential. Across the street is a
Irestaurant of railroad cars and a service station,
(Comm. Adams was answered the spire will be steel.
?Mr. Gilbert answered Chairman Gatto that, God willing, Phase I will be
completed with 18 months to two years; Phase II in four or five years;
:and another five years for Phase III; with a total time frame of
'eight to ten years.
Chairman Gatto asked for comments from the audience. There were none.
4The Planning Director preferred that the public hearing not be closed
!at this point. The staff wanted to sit down and discuss some of the
details with the applicant and Vallco Park.
'Mr. Walter Ward explained the rationale for the joint parking agreement.
4He said Vallco Village is still in agreement with the original Agreement.
.Comm. Adams was answered that this Agreement should probably be a part
of the zoning.
Comm. Cooper believes the present proposal for the Sanctuary is a bit
ioverpowering. She would like to see the design more compatible with
;the Vallco Village architecture. She would prefer to pass on all three
.phases at one time rather than in increments.
Comm. Woodward said churches are always designed to stand out rather
than blend in with the surrounding structures. If done in a nice manner,
:it could be very pleasing. He said he would opt to passing on all three
phases at once.
MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING PC -218
Page 9
Comm. O`Keefe said phasing is important. This is the culmination
of an excellent agreement made many years ago in terms of sharing
of parking and, thus, minimizing the "sea of asphalt".
Chairman Gatto said it is important to have an ultimate plan, for
both the City and for the Church. He suggested the Architectural
and Site Approval Committee consider whatever planting can take
place during the first phase.
Moved by Comm. Adams, seconded by Comm. O'Keefe to continue (3-Z-76
application 3-Z-76 to March 8, 1976. !cont'd to
March 8th
Motion carried, 5-0
Comm. O'Keefe left the meeting at 10:15 p.m.
6.
Application 2 TM -76 of MAY INVESTMENT COMPANY: TENTATIVE MAP
to subdivide.1.1 acres into four single-family residential lots;
Said property is located adjacent to and southerly of McClellan;
Road and approximately 350 feet westerly of Linda Vista Drive.
First Hearing.
The Assistant Planning Director introduced the proposal by first
identifying the property on the aerial photograph, adjacent to
McClellan Road, across from the Horse Ranch Park. He said the
staff is concerned about the condition requiring landscaping of
the bank along McClellan for erosion prevention and to soften the
effect of the bank. The new proposal is to subdivide the property
into four lots instead of the original plan for five lots. Direct
30' flag corridors to lots 2 and 3 are suggested conditions of
approval. Future fence lines will be constructed at the top of
the bank rather than at the toe of the bank, per another recommende
condition.
Chairman Gatto asked for comments from the audience.
Mr, Jason Chartier, General Partner of May Investment Corporation,
said the only question to be resolved here is maintenance of the
bank. It can be watered from the top with rainbirds. He wondered
how the property owner would be motivated to turn on the rainbirds
when his fence is at the top rather than the bottom of the bank.
Comm. Cooper was told the sidewalk will hook up with Linda Vista.
d
PC -218 MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING
Page 10
The Assistant City Engineer said it has been determined the City
must have control of the downhill slope easement. Erosion control
was placed on the property owner on the Williamson property. The
details can be worked out..
The Assistant City Attorney stated the City has a weed abatement ordi-
nance that can be enforced if such a problem occurs.
Mr. Acle Hicks said he is
across the street. He as',
was told that it will be.
a problem with alignment,
out to bid within a month
bridge will be widened.
a homeowner in the townhouse development
ced if the sidewalk will be completed. He
The Assistant City Engineer said there was
but it is being resolved now and should go
or so, all the way down to the bridge. The
Moved by Comm. Adams, seconded by Comm. Woodward to close the
public hearing.
Motion carried, 4-0
The Assistant Planning Director called attention to the fact that there
will be no vehicular access to McClellan Road.
The Assistant City Engineer felt the decision on this application
would be important to decisions in our hillsides in regard to maintenance
of the cut slopes. We should find some way to enforce the ordinance.
2-TM:76 Moved by Comm. Woodward, seconded by Comm. Adams, to approve application
approved 2:T -M-76 with the 14 standard conditions, conditions 15 and 16, modified
condition 17, 18, and 19, with no vehicular access to McClellan Road.
AYES: Comm. Adams, Cooper,
NOES; None
ABSENT: Comm. O'Keefe
Woodward, Chairman Gatto
Motion carried, 4-0
7. Application 3-GPA of CITY OF CUPERTINO: GENERAL PLAN AMENDMENT
amending current land use designation from an existing industrial/
residential mix to an industrial/commercial/residential mix for
approximately 75 acres located in the area easterly of North De Anza
Blvd. between Rt. 280 Freeway and St. Joseph's Church. First
Hearing.
The Planning Director reviewed the proposal per the February 20, 1976,
staff report. The issue of traffic is still to be resolved. There was
a negative declaration as to the EIR at this stage.
MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING ':PC -218
Page 11
Comm. Cooper was concerned that the traffic constraints on the
property might encourage fast food type businesses.
Chairman Gatto repeated the rationale for this proposal.
Since there were no comments from the audience, it was moved by
Comm. Cooper, seconded by Comm. Adams to close the public hearing.
Motion carried, 4-0
Moved by Comm. Woodward, seconded by Comm. Adams to recommend to 3-GPA-75
the City Council approval of application 3-GPA-75. ;approved
AYES: Comm. Adams, Cooper, Woodward, Chairman Gatto
NOES : None
ABSENT : Comm. O'Keefe
Motion carried, 4-0
8. Application 3-U-76 of BAY AREA FOODS, INC. (BURGER KING):
USE PERMIT to allow construction of a fast foods restaurant
to be located adjacent to and northerly of Stevens Creek Blvd.,;
approximately 79 feet westerly of the intersection of Stevens
Creek Blvd. and De Anza Blvd. First Hearing.
The Assistant Planning Director reviewed the proposal, details of
which can be found in the February 20, 1976 staff memo. In 1972
a 10 —lot, 5 —acre subdivision may for all but a few small lots
bordered by Stevens Creek Blvd., Bandley Drive, Alves Drive, and
De Anza Blvd. was filed. There are no traffic constraints on these
properties. The City is quite sensitive about fast food restaurants
that sell food to be taken out of the building. The staff felt
this use in this location would not be acceptable unless it is
designed in some manner to be integrated with its neighbors.
There is a requirement that the improvements be completed along
Bandley Drive and Stevens Creek Blvd. and the financial details
are to be worked out with Bank of America-.- and Home Savings and Loan.
Mr. Roger Griffin, 19660 Junipero Way, with Dick Finegan's Office,
the architect for this project, said there will be seating space
for 100 and outdoor dining for 20 people. He then reviewed the
plot plan and elevations. There will be no drive -up windows.
Comm. Adams was concerned there may be too many restaurants in
such close proximity. He would like to see some pedestrian
right-of-way to the north and to the west.
4
-218 MINUTES OF FEBRUARY 23, 1976 PLANNING COMMISSION MEETING
age 12
!The medians will be reviewed by the Architectural and Site Approval
'Committee.
-U-76 Moved by Comm. Adams, seconded by Comm. Woodward to accept the modification
pproved :to Condition 15; and to approve application 3-U-76, subject to Conditions
'1 through 18, with Condition 15 as modified changing "adjacent property"
;to "properties" and including extension to Bandley Drive subject to review
and approval of Architectural and Site Approval Committee. Add "any" to
Condition 16.
;AYES : Comm. Adams, Cooper, Woodward,Chairman Gatto
•MES : None
ABSENT: Comm. O'Keefe
Motion carried, 4-0
9. Application 16-Z-75 of EDMUND F. SCHNIEDERS, JR.
Continued to March 8, 1976.
,UNFINISHED BUSINESS; None.
NEW BUSINESS : None
REPORT OF PLANNING COMMISSION. None
REPORT OF PLANNING DIRECTOR
;The Planning Director said the Chamber of Commerce has requested "the Sign
;Ordinance review not be held on February 26th because they are too busy
;with. the election, etc. It was felt they would have ample opportunity to
(speak before the City Council when the Sign Ordinance goes forward, so
(the meetingis still scheduled for February 26th.
Stevens Creek Blvd. Plan Line meeting is scheduled for March 11, 1976.
hairman Gatto adjourned this meeting at 11:40 p.m. to 7:30 p.m. on
ebruary 26, 1976.
ATTEST: APPROVED:
1/s/ Wm. E. Ryder /s/ John M. Gatto
,City Clerk Chairman