HomeMy WebLinkAboutPC 01-15-76CITY OF CUPERTINO, STATE OF CALIFORNIA 'PC -214
10300 Torre Avenue, Cupertino, California 95014 !Page 1
Telephone: 252-4505
MINUTES OF ADJOURNED REGULAR MEETING OF THE PLANNING COMMISSION
HELD ON JANUARY 15, 1976, IN THE COUNCIL CHAMBER, CITY HALL
CUPERTINO, CALIFORNIA
SALUTE TO THE FLAG "
Chairman Gatto called the meeting to order at 7:35 p.m. with the
Salute to the Flag.
ROLL CALL
Comm. present: Adams, Cooper, O'Keefe (8:23), Woodward
Chairman Gatto
Comm. absent: None
Staff present: Director of Planning and Development Sisk
Director of Public Works Viskovich
Assistant Planning Director Cowan
PUBLIC HEARING
Chairman Gatto announced this was a continuation of the Stevens
Creek Blvd. Plan Line Study and Land Use Goals of Old Monta Vista.,
That portion of Stevens Creek Blvd. from Freeway #85 to the west
City Limits will be discussed as to location of the road and
road width. This is to insure that as development occurs the
plan line will be protected. The economics will be discussed at
a later date. The Assistant Planning Director reviewed the
Schematic Diagram of the SCB planning process. Goals include
land use and road design. The next step would be to study alter-
native land uses and road designs. Then would come the technical
evaluation, including environmental, social and economic impacts.
Last would be the implementation of the plan. Traffic assumptions
are based upon 1995 traffic. As land develops adjacent to this
street the developer will be required to make dedications and
improvements, as they would anywhere else in town.
The Director of Public Works summarized the traffic projections
and how they were arrived at. He next reviewed the January 15,
1976 Appendix A Stevens Creek Blvd. Plan Line Study and Street
Design Primer, including the Glossary of Terms.
PC -214 MINUTES OF JANUARY 15, 1976, PLANNING COMMISSION MEETING
Page 2
The Director of Public Works next summarized his January 15, 1976,
paper entitled "Stevens Creek Boulevard Plan Lines", with answers to
the following three questions: 1) Why the four -lane requirement?
2) Will the Stevens Creek Blvd. widening serve as a shortcut to
bypass freeway congestion? and 3) Can Stevens Creek Blvd. remain
four lanes at the major intersections and be reduced to two lanes
at mid-blockZ He stated that traffic counts are being taken at this
time, results of which should be ready in two weeks. He did not believe
at this time that Stevens Creek Blvd. can be narrowed down through
Monta Vista.
Chairman Gatto announced that this was basically a workshop session
and no decisions were anticipated at this time. Certain basic data
is needed, as well as citizen input.
Mr. Louis B. Stocklmeir, Stevens Creek Blvd., gave his observations
of the traffic pattern in this study area. He is concerned about the
commuters using the secondary as well as the primary roads. He would
like to keep the through traffic off the residential streets. There
should be some control of the speeding cars and he also felt there
should be a traffic signal at Phar Lap Drive, which will give a gap
in the traffic to allow the cars to get out onto Stevens Creek Blvd. from
Carmen Road. There should not be too much traffic built up from Byrne
Avenue to Stevens Canyon Road.
The Director of Public Works said the City ,is working with the State
at the present time to provide douT5t_ right turns onto Bubb Road, double
left turns onto Bubb Road, and double left turns onto Freeway #85.
He then explained the use of the Caltrans computer model. He answered
Chairman Gatto that one of the assumptions is that Freeway #85 will
continue to De Anza Blvd. It is scheduled to commence in 1883 to the
extent of purchasing the right-of-way. It is estimated this stretch
would cost $6 million at freeway standards or $4 million at expressway
standards.
The Director of Public Works cautioned that once you start constructing
traffic signals you decrease flow of traffic and decrease the level
of service.
Since there were no more comments from the audience at this point, Chairman
-i
Gatto turned the discussion to the land use goals for Monta Vista: and
street design._goal-directiorthe- aud-ienee.
The Assistant Planning Director briefly described the Old Monta Vista
land use pattern west of Byrne Avenue, which is pretty much residential.
One argument against the feasibility of commercial development in Old
Monta Vista is that The Oaks Shopping Center has been built for 1.5 years
and only 3 shops are occupied. One reason may be because the owner
is very "picky".
MINUTES OF JANUARY 15, 1976 PLANNING COMMISSION MEETING PC -214
;Page 3
Mr. William Cox, of Cox and Dumont Commercial Builders, said it
is his contention that an expanded commercial development in
downtown Monta Vista can serve the area to Freeway 280 on the
north, Stelling or #85 on the east and Columbus Avenue to the
south. There are 5300 people in this area. He suggested a
grocery store, liquor store, drug store, dry cleaners, etc., for
3 or 3.5 acres on the south side of the street from Granada to
Byrne.
It was Comm. O'Keefe's contention that we would have to allow the
"little man" to remain little.
Chairman Gatto said he would like to know what kind of commercial;
the residents in the area would like to have; what kind of
streetscape; e.g., parking in front of the buildings. What about
small, independent buildings versus large, combined businesses.
Should there be some type of mass redevelopment here or should wei
let it gradually change.
Mr, Stocklmeir wanted to. include Monta Vista's historical positio
in these studies. He said that prior to 1880, this was a part of
the original Cupertino. Monta Vista is only a subdivision.
Chairman Gatto called a recess at 9:05 p.m. The meeting
reconvened at 9:25 p.m.
Mr. Wayne Swanfeld, 10120 Phar Lap Drive, wanted to speak to the
nature of the road and the traffic study. He and the people in
his neighborhood that he has spoken with are against changing the,
character of the area. They want to keep the right-of-way as
narrow as possible and do not encourage high speed design of the
road. The social effect of impacting Freeway 280 would be less
than impacting the residential neighborhood. He sees no incon-
venience in travelling to Foothill Plaza to shop. He felt the
type of shopping center Mr. Cox referred to would change the
character of the area. He would like to see some encouragement
of redevelopment to clean up some of the blighted areas. He asked
if there is some reason why truck traffic cannot be restricted.
The Director of Public Works said that stretch is not a truck
route now, but there is no way the City can prevent truck delivery
to residential and commercial in that area.
"Betty Boop" Hansen, Alcazar, Monta Vista, said she works at a
local restaurant. She hopes the senior citizens living in the
area will be considered. She believes any developer who wants
to come into the area should take into account the feelings of the
people already living there. Instead of widening the road, she
suggested saving that money toward public transportation.
PC -214 MINUTES OF JANUARY 15, 1976 PLANNING COMMISSION MEETING
Page 4
Mrs. Tomasello stated she bought property in this area 14 years ago,
which they rent out to college students. Their repair bills have been
astronomical and taxes have gone up. She said her new renters always
say how lovely the area is and then they misuse the place. She has
residential use on commercial property and with the uncertainty, their
hands are tied.
A show of hands indicated 20-25 people in the audience either rented or
owned their residences in Monta Vista.
Comm. Woodward explained the City wants to find out what is economically
viable for this area. What should the character of that particular
commercial be?
Another show of hands indicated about 20 people in the audience have
commercial interests in Mor1ta Vista.
Mr. Dennis Fau, Alcazar Avenue, Monta Vista, said making Stevens .Creek
Blvd. attractive to through traffic would be compounding their present
problems. He believes the emphasis should be on preservation.
Mr. Salvadore Tomasello stated he lives somewhere else but owns
commercial property in Monta Vista. He thinks the commercial area
should be developed because there are senior citizens in town and
this would make shopping easier for them.
Chairman Gatto was assured by those present that they would like some
plan line established for Stevens Creek Blvd. so they can proceed with
making plans.
Private development appeared to be more attractive to the members of
the audience than a redevelopment situation. Forced redevelopment
was not well received. It did not appear to be important to the
residents to preserve the existing commercial buildings. They felt the
Rifredi—type business should be encouraged.
Mr. Martin Hall suggested formation of a committee composed of the
people in the area to decide what they want and then come to the
Planning Commission with their ideas.
Mr, George Mangano`s interest is in the commercial corner east of
the railroad tracks. His hands are tied until this is resolved. He
said a food service business in here would be walking distance to
several hundred peoples. This is right across the street from Bubb Road.
He said he would like to encourage restoring existing commercial.
Chairman Gatto said the incentive is there to upgrade the property if
a person lives on his own property or if there were some economic gain.
MINUTES OF JANUARY 15, 1976 PLANNING COMMISSION MEETING PC -214
Page 5
Comm. O Keefe said he believes the homes have deteriorated by
necessity, not by choice. It is because of the uncertainty.
Once the plan line is established and zoning is established, he
believes the area will be upgraded.
Mr. Martin Hall said Stevens Creek Blvd. is a very important cog
in the development of Monta Vista. The property owners should
get together and have some kind of architectural control. He
would like to be one member of a committee to explore what the
people in Monta Vista want, commercially. Residentially, it will
happen by itself .
Comm. Woodward said deadend streets discourage through traffic.
This is what has preserved the small town atmosphere. If this
commercial gateway to the City is upgraded, then he feels the
residential will also become upgraded.
Mr. Hall asked if the City is planning to upgrade the water lines
The Director of Public Works said there will be some revision of
water lines to upgrade the water system.
Mr. Marvin Quirt said he was curious about the rundown commercial!
at Mann Drive and Stevens Creek Blvd. His wife has a successful
beauty shop there, but the remainder is not successful. He
suspects that shopping center was once a lot like the one Mr. Cox!
was describing. Mr. Hall said it is on septic tank and the Count
won't allow a restaurant there. He added that 1500 families have
moved into the area since that grocery store went out of business
Comm. Cooper wanted to know if redevelopment and a unified plan_ -t
was what the people want. One question was how wide a range of
commercial the people would like.
Comm. Adams summarized that at this point we are not changing
the plan line very much in the present commercial area.
Chairman Gatto asked whether it is more important to have a road
for relatively good traffic flow and safety than a roadway that
is less wide but takes less property. Mr. Ponseggi, resident in
the area, said a 74" street with 2 travel lanes on either side
of a 10' median should be adequate. They all seemed to want to
discourage commute traffic. Only 4 people in the audience were
in favor of a traffic light at Phar Lap Drive. About half the
people were in favor of leaving the middle stretch of Stevens
Creek Blvd. in two lanes.
PC -214
Page 6
MINUTES OF JANUARY 15, 1976 PLANNING COMMISSION MEETING
Chairman Gatto said we must now determine the impacts of 4 lanes
narrowing down to 2 lanes and then back up to 4 lanes again.
The Assistant Planning Director asked if the Commission was satisfied
with the number of alternatives so the staff can go to the consultants
and have them begin the more technical work. An added alternative
was signals at Phar Lap Drive. The full and half loop schemes were
considered. Comm. Adams saw some advantage to the proposals.
Moved by Comm. O'Keefe to not investigate any further the full and half
loops because, of' the cost involved. -'Motion failed for lack of a second.
After -further discussion it was the concensus of the Planning Commission
to direct the staff to not investigate any further the full and half loops.
It was decided the next meeting on. this subject would be March 11, 1976.
The Director of Public Works said it will be very important to decide
on the amenities wanted, such as medians, bike lanes, on -street or
off-street parking.
One question raised from the floor was how the school children would
be able to cross 4 lanes of Stevens Creek Blvd. to Monta Vista High
School.
A gentleman in the audience said he was on a committee for San Jose
that investigated the cost of water damage to the streets from the
watering of the landscaped medians.
ADJOURNMENT
Chairman Gatto adjourned this meeting at 11:02 p.m. to 7:30 p.m.,
March- 11, 1976.
ATTEST:
/s/ Wm. E. Ryder
City Clerk
APPROVED:
/s/ John M. Gatto
Chairman