HomeMy WebLinkAbout26-013 Alvernaz Construction_Service Order #3 dated 6-29-26 for Repair of Recology Damage to Garbage EnclosureContract/Purchasing Action
Personnel Information
Name Ricardo Alvarez Department Public Works
Division Streets Division Date 06.25.2026
Service Order
Upload Quote
Quote, Description of
Project, Scope of Service,
Schedule of Performance
and Compensation
New Garbage Walls Job (1).pdf
Service Order Amount $20,000.00
Master Agreement
Number
2026-015 Contract
Start Date
01/27/2026 Contract End Date 06/30/2029
Firm Name Alvernaz
Construction
Address Po Box 366 City San Martin State CA
Phone (408) 595-2817
Consultant/Contractor
Name
Michael
Alvernaz
Consultant/Contractor
Email
michaelalvernaz@alvernazconstruction.com
Project Name SO#3 Repair
of Recology
Damage to
Garbage
Enclosure
Project Location Service Center
Cupertino Project
Manager Name
Ricardo
Alvarez
Cupertino Project
Manager Email
ricardoa@cupertino.org
Master Agreement
Maximum
Compensation
$75,000.00 Total Previously
Encumbered to Date
$16,800.00
Encumbrance this
Service Order
$20,000.00 Master Agreement
Unencumbered
Balance
$38,200.00
SO GL #100-87-829
700-702
NWS Project Code
Comments This is to replace the garbage walls in the back of the service center. City has
received payment from Recology.
Signature
06/26/2026 PDT
Consultant/Contractor Signature Date
06/29/2026 PDT
Manager/Supervisor Signature Date
Email: michaelalvernaz@alvernazconstruction.com
Date: 06/26/2026 PDT
Email: ricardoa@cupertino.gov
Date: 06/29/2026 PDT
Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above
fund for the above contract as estimated and that fund are available as of this date of signature.
06/29/2026 PDT
Management Analyst Signature Date
Email: PWMA@cupertino.gov
Date: 06/29/2026 PDT
Po Box 366
San Martin, CA 95046
(408) 595-2817
License #: 711435
June 24,2026
Ricardo Alvarez
Public Works Supervisor
City of Cupertino
10555 Mary ave
Cupertino, 95014
650-722-0254
New Concrete Wall for Garbage
At Facilities Department
Date Activity Amount
06/24/2026 Demo & Prep Existing walls approximately 4’tall x 52L
06/24/2026 Install new Walls 6FT. tall x 52LF.
06/24/2026 Install epoxy and new ½ rebar every 18 inches each way
06/24/2026 Install ¾ plywood forms
06/24/2026 Install 6-sack mix concrete.
TOTAL Cost Labor and Material $20,000.00
Please Note: Alvernaz Construction will warranty the job for one year.
Clean Up & Dump fees included Any Unforeseen Damage Will be an Additional Cost
Accepted By:
SO#3 Repair of Recology Damage to Garbage
Enclosure - Service Request
Created:06/25/2026
Status:Signed
Transaction ID:248ddb4d-2201-48ea-b028-b45d40488f5e
"SO#3 Repair of Recology Damage to Garbage Enclosure -
Service Request" history
Jindy Gonzalez created the document
06/25/2026 11:59:41 AM PDT - IP address 71.198.170.154
Document was emailed to Michael Alvernaz
06/25/2026 11:59:42 AM PDT
Michael Alvernaz opened the document
06/26/2026 5:51:46 AM PDT - IP address 47.27.193.76:53817
Michael Alvernaz signed the document
06/26/2026 5:53:39 AM PDT - IP address 47.27.193.76:53817
Document was emailed to ricardoa@cupertino.gov
06/26/2026 5:53:40 AM PDT
ricardoa@cupertino.gov opened the document
06/29/2026 5:36:17 AM PDT - IP address 64.165.34.3:49116
ricardoa@cupertino.gov signed the document
06/29/2026 5:37:07 AM PDT - IP address 64.165.34.3:49116
Document was emailed to Public Works Management Analyst
06/29/2026 5:37:08 AM PDT
Public Works Management Analyst opened the document
06/29/2026 11:11:43 AM PDT - IP address 64.165.34.3:3216
Public Works Management Analyst signed the document
06/29/2026 11:11:53 AM PDT - IP address 64.165.34.3:3216
Document was successfully signed and filed
06/29/2026 11:11:53 AM PDT