Loading...
HomeMy WebLinkAbout26-013 Alvernaz Construction_Service Order #3 dated 6-29-26 for Repair of Recology Damage to Garbage EnclosureContract/Purchasing Action Personnel Information Name Ricardo Alvarez Department Public Works  Division Streets Division Date 06.25.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation New Garbage Walls Job (1).pdf Service Order Amount $20,000.00 Master Agreement Number 2026-015 Contract Start Date 01/27/2026 Contract End Date 06/30/2029 Firm Name Alvernaz Construction Address Po Box 366 City San Martin State CA Phone (408) 595-2817 Consultant/Contractor Name Michael Alvernaz Consultant/Contractor Email michaelalvernaz@alvernazconstruction.com Project Name SO#3 Repair of Recology Damage to Garbage Enclosure Project Location Service Center Cupertino Project Manager Name Ricardo Alvarez Cupertino Project Manager Email ricardoa@cupertino.org Master Agreement Maximum Compensation $75,000.00 Total Previously Encumbered to Date $16,800.00 Encumbrance this Service Order $20,000.00 Master Agreement Unencumbered Balance $38,200.00 SO GL #100-87-829 700-702 NWS Project Code Comments This is to replace the garbage walls in the back of the service center. City has received payment from Recology. Signature       06/26/2026 PDT  Consultant/Contractor Signature Date       06/29/2026 PDT  Manager/Supervisor Signature Date Email: michaelalvernaz@alvernazconstruction.com Date: 06/26/2026 PDT Email: ricardoa@cupertino.gov Date: 06/29/2026 PDT Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       06/29/2026 PDT  Management Analyst Signature Date Email: PWMA@cupertino.gov Date: 06/29/2026 PDT Po Box 366 San Martin, CA 95046 (408) 595-2817 License #: 711435 June 24,2026 Ricardo Alvarez Public Works Supervisor City of Cupertino 10555 Mary ave Cupertino, 95014 650-722-0254 New Concrete Wall for Garbage At Facilities Department Date Activity Amount 06/24/2026 Demo & Prep Existing walls approximately 4’tall x 52L 06/24/2026 Install new Walls 6FT. tall x 52LF. 06/24/2026 Install epoxy and new ½ rebar every 18 inches each way 06/24/2026 Install ¾ plywood forms 06/24/2026 Install 6-sack mix concrete. TOTAL Cost Labor and Material $20,000.00 Please Note: Alvernaz Construction will warranty the job for one year. Clean Up & Dump fees included Any Unforeseen Damage Will be an Additional Cost Accepted By: SO#3 Repair of Recology Damage to Garbage Enclosure - Service Request Created:06/25/2026 Status:Signed Transaction ID:248ddb4d-2201-48ea-b028-b45d40488f5e "SO#3 Repair of Recology Damage to Garbage Enclosure - Service Request" history Jindy Gonzalez created the document 06/25/2026 11:59:41 AM PDT - IP address 71.198.170.154 Document was emailed to Michael Alvernaz 06/25/2026 11:59:42 AM PDT Michael Alvernaz opened the document 06/26/2026 5:51:46 AM PDT - IP address 47.27.193.76:53817 Michael Alvernaz signed the document 06/26/2026 5:53:39 AM PDT - IP address 47.27.193.76:53817 Document was emailed to ricardoa@cupertino.gov 06/26/2026 5:53:40 AM PDT ricardoa@cupertino.gov opened the document 06/29/2026 5:36:17 AM PDT - IP address 64.165.34.3:49116 ricardoa@cupertino.gov signed the document 06/29/2026 5:37:07 AM PDT - IP address 64.165.34.3:49116 Document was emailed to Public Works Management Analyst 06/29/2026 5:37:08 AM PDT Public Works Management Analyst opened the document 06/29/2026 11:11:43 AM PDT - IP address 64.165.34.3:3216 Public Works Management Analyst signed the document 06/29/2026 11:11:53 AM PDT - IP address 64.165.34.3:3216 Document was successfully signed and filed 06/29/2026 11:11:53 AM PDT