Loading...
DRC 11-19-09Design Review Committee November 19, 2009 Cupertino, CA 95014 (408) 777-3308 APPROVED MINUTES OF THE REGULAR MEETING OF THE DESIGN REVIEW COMMITTEE HELD ON November 19, 2009 ROLL CALL Committee Members present: Committee Members absent Staff present: Staff absent: Pa,~l Brophy, Chairperson Winnie Lee, Commissioner None Leslie Gross None APPROVAL OF MINUTES: September 17, 2009 Minutes of the September 17, 2009 Design Review Committee meeting were approved WRITTEN COMMUNICATIONS: None POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: None CONSENT CALENDAR: None PUBLIC HEARING: 1. Application No.(s): ASA-2009-06, Tr:-2009-19 Applicant: Gary Murakami (Panattoni Development) Location: 18920 and 18922 Forge Drive Architectural and Site approval for exterior building modifications and landscaping improvements at an existing office building; Tree Removal permit to allow the removal and replacement of 12 trees Design Rez~iezo Committee decision final unless appealed. Staff member Gross explained that the applicant is proposing to make exterior changes to their building to "freshen ' and update the overall look of the existing building. There has been a lot of n~.w construction in the area and the applicants felt it was time to make changes to keep up and entice new tenants. The exterior changes include a new entry feature to define the main entrance to the building- They will be updating the landscaping which includes tree removals. The trees that are scheduled to be removed are not significant and have been 2 Design Review Committee November 19, 2009 recommended for removal by a certified arborist. The arborist has recommended that the trees be replaced with 13 trees in 35" box size and of a specie that is appropriate for the area. The applicant shall be required to incorporate tree protection measures during the landscaping project to ensure the health of the trees that will be remaining on site. ~~ommissioner Lee asked for clarification of where the large Ash tree was that was removed and replaced by a Japanese Maple to clarify that a new tree in that area is not appropriate for a tree. She wanted to know about the "catch basin ' features for drainage concerns. Chair Brophy wanted to know why the de~:ision was made to have the Design Review Committee review and approve this application. Staff member Gross explained that the Community Development Director felt that due to the scale and large area of the space being re-designed, she wanted the Design Review Committee to review for approval. The applican~~ spoke to reiterate Staff member Gross's explanation of the proposed project. They are just looking to update the architecture of the building by celebrating its strength and adding a define entry as it currently doesri t have one. The fin walls being added will enhance the front entrance feature along with an awning. These walls are being added to the secondary entrance of the building so that future tenants have the opportunity to create another main entrance area. T~~ satisfy Building Code requirements, a new handicap ramp and sidewalks are also being installed. The landscape architect said the goal was to install drought t~~lerant, more modern and colorful plantings around the site. They will be planti~zg Chinese Pistache and Purple Birch trees. Chair Brophy wanted to know whit the anticipated reduction in water usage was expected to be. The landscape architect approximated a 50% reduction in water consumption. Commissioner lee liked the proposed changes. She felt the finished project would be an improvement. Chair Brophy concurred with Commissioner Lee. He asked if the applicant was alright with the tree protection conditions listed in the resolutions- They stated that they were. MOTION: CoiYZtnissioner Lee moved to approve ASA-2009-06, TR-2009-19 SECOND: Chairperson Brophy ABSENT: none ABSTAIN: none VOTE: 2-O OLD BUSINESS: None NEW BUSINESS: None Re ectfully submitted: /C.. Beth Ebben Administrative Clerk g:ptunning/ORC Committee/Minutesl11909