HomeMy WebLinkAboutDIR-2025-013 - Signed Action LetterCITY OF CUPERTINO
10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308
To: Mayor and City Council Members
Chairperson and Planning Commissioners
From: Luke Connolly, Assistant Director of Community Development
Prepared by: Jelani Mora, Associate Planner
Date: April 13, 2026
Subject: Director's Minor Modification, DIR-2025-013, to a Use Permit (16-U-77) to
allow for an internal conversion of attic space creating a 692 square foot
second story addition single-family home in a P(R1 0-2) zone at 10398
Heney Creek Place, APN 342-48-036.
Chapter 19.164 of the Cupertino Municipal Code allows for administrative
approval of minor changes in a project. The Director reports his decision to the
City Council and Planning Commission in time to allow an appeal of the decision
within 14 -calendar days.
DISCUSSION
The applicant, Priyanka Bendre, representing
the property owners, Sena & Moiz Mian, is
proposing the conversion of 692 square feet
of existing attic space in a Planned
Development zoning district with Residential
Hillside densities. The property is located in
a planned single-family residential
development located on either side of Alpine
Drive west of N. Foothill Blvd originally
approved by the City in 1983 (16-U-77).
The parcel is located approximately 100 feet
south of the intersection of Heney Creek
Place and Alpine Drive and is 16,540 square
feet in area, with a 5,574 square foot
landscape easement along the rear (east)
property line, which abuts N. Foothill Blvd.
1
The applicant proposes to make the following improvements to accommodate the
internal conversion of attic space:
• Add a staircase from the first floor to the converted attic space;
• Create a bedroom, bathroom, walk-in closet, and loft area in the former attic space;
• Add one new second story window (4'-2" by 7'-1 1/4") on the east elevation, facing N.
Foothill Blvd, with no privacy impacts to neighbors.
The floor area ratio (F.A.R.) of the existing home will remain unchanged at 29.2% of the
net lot area. The proposed interior conversion will not increase the floor area ratio, reduce
building setbacks, or alter the existing roof line and building envelope.
ACTION
The Director of Community Development deems the project categorically exempt from
environmental review under CEQA Guidelines, Article 19, Section 15301: Existing
Facilities and further deems the modification minor and approves the project with the
following conditions of approval:
1. APPROVED EXHIBITS
Approval is based on exhibits titled "Sena & Moiz Mian Residence", prepared by
Priyanka Bendre, consisting of 15 sheets labeled A0.01 through A3.02, dated January
7, 2026, except as may be amended by the conditions contained in this resolution.
2. ACCURACY OF THE PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. PREVIOUS CONDITIONS OF APPROVAL
All prior conditions of approval through past approvals shall remain in effect unless
superseded by or in conflict with subsequent conditions of approval and as
specifically amended by this Director's Minor Modification approval.
4. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible for consulting other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
2
5. DARK SKY COMPLIANCE
If outdoor lighting is proposed, prior to issuance of Building Permits, the
applicant/property owner shall submit final plans in compliance with the approved
lighting plans to comply with development standards of Cupertino Municipal Code
Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed
from the approved plans, said changes must be reviewed and approved by the
Director of Community Development or their designee. The applicant shall provide
all documentation required to determine compliance with the Municipal Code.
6. BIRD SAFE REQUIREMENTS
Prior to issuance of Building Permits, the applicant/property owner shall submit final
plans in accordance with the approved window plans to comply with development
standards of Cupertino Municipal Code Chapter 19.102 including product
specifications for the proposed windows. In the event changes are proposed from the
approved plans, said changes must be reviewed and approved by the Director of
Community Development or their designee. The applicant shall provide all
documentation required to determine compliance with the Municipal Code.
7. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles,
graded areas, and unpaved access roads) at least twice daily and more often
during windy periods to prevent visible dust from leaving the site; active areas
adjacent to windy periods; active areas adjacent to existing land uses shall be kept
damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives.
b. All haul trucks transporting soil, sand, or other loose material off -site shall be
covered.
c. All visible mud or dirt track -out onto adjacent public roads shall be removed using
wet power vacuum street sweepers at least once per day. The use of dry power
sweeping is prohibited.
d. All vehicle speeds on unpaved roads shall be limited to 15 mph.
e. All roadways, driveways, and sidewalks to be paved shall be completed as soon
as possible. Building pads shall be laid as soon as possible after grading unless
seeding or soil binders are used.
f. Idling times shall be minimized either by shutting equipment off when not in use
or reducing the maximum idling time to 5 minutes (as required by the California
airborne toxics control measure Title 13, Section 2485 of California Code of
3
Regulations [CCR]). Clear signage shall be provided for construction workers at
all access points.
g. All construction equipment shall be maintained and properly tuned in accordance
with manufacturer's specifications. All equipment shall be checked by a certified
mechanic and determined to be running in proper condition prior to operation.
h. Post a publicly visible sign with the telephone number and person to contact at the
Lead Agency regarding dust complaints. This person shall respond and take
corrective action within 48 hours. The Air District's phone number shall also be
visible to ensure compliance with applicable regulations.
i. The applicant shall incorporate the City's construction best management practices
into the building permit plan set.
8. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m.
and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
g. The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated.
9. FUGITIVE DUST CONTROL
C!
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District's
Basic Control Measures from the latest version of BAAQMD's CEOA Air Quality
Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing
activities and/or construction.
10. VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT
Prior to issuance of the first building permit, the Applicant shall include a note on all
plans where paint specifications or other design specifications are listed, that the
project design will incorporate only low-VOC paint (i.e., 50 grams per liter [g/L] or
less) for interior and exterior wall architectural coatings.
11. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of the any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground -disturbing, and tree removal/pruning activities
shall be scheduled to be completed prior to nesting season (February 1 through
August 31), if feasible.
b. If demolition, construction, ground -disturbing, or tree removal/pruning activities
occur during the nesting season (February 1 and August 31), preconstruction
surveys shall be conducted as follows:
i. No more than 7 days prior to the start of demolition, construction, ground -
disturbing, or tree removal/pruning activities, in order to identify any active
nests with eggs or young birds on the site and surrounding area within 100
feet of construction or tree removal activities.
ii. Preconstruction surveys shall be repeated at 14 -day intervals until
demolition, construction, ground -disturbing, or tree removal/pruning
activities have been initiated in the area, after which surveys can be stopped.
As part of the preconstruction survey(s), the surveyor shall inspect all trees
and other possible nesting habitats in, and immediately adjacent to, the
construction areas for active nests, while ensuring that they do not disturb
the nests as follows:
1. For projects that require the demolition or construction one single-family
residence, ground disturbing activities affecting areas of up to 500 square
feet, or the removal of up to three trees, the property owner or a tree
removal contractor, if necessary, is permitted to conduct the
5
preconstruction surveys to identify if there are any active nests. If any
active nests with eggs or young birds are identified, the project applicant
shall retain a qualified ornithologist or biologist to identify protective
measures.
2. For any other demolition, construction and ground disturbing activity or
the removal of four or more trees, a qualified ornithologist or biologist
shall be retained by the project applicant to conduct the preconstruction
surveys.
iii. If the preconstruction survey does not identify any active nests with eggs or
young birds that would be affected by demolition, construction, ground -
disturbing or tree removal/pruning activities, no further mitigating action is
required. If an active nest containing eggs or young birds is found sufficiently
close to work areas to be disturbed by these activities, their locations shall be
documented, and the qualified ornithologist or biologist shall identify
protective measures to be implemented under their direction until the nests
no longer contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of
clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,
such as orange construction fencing or equivalent) around each nest location
as determined by the qualified ornithologist or biologist, taking into account
the species of birds nesting, their tolerance for disturbance and proximity to
existing development. In general, exclusion zones shall be a minimum of 300
feet for raptors and 75 feet for passerines and other birds. The active nest
within an exclusion zone shall be monitored on a weekly basis throughout
the nesting season to identify signs of disturbance and confirm nesting status.
The radius of an exclusion zone may be increased by the qualified
ornithologist or biologist, if project activities are determined to be adversely
affecting the nesting birds. Exclusion zones may be reduced by the qualified
ornithologist or biologist only in consultation with California Department of
Fish and Wildlife. The protection measures and buffers shall remain in effect
until the young have left the nest and are foraging independently or the nest
is no longer active.
v. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection
measures (if required), shall be prepared by the qualified ornithologist or
biologist and submitted to the Director of Community Development or his or
her designee, through the appropriate permit review process (e.g.,
demolition, construction, tree removal, etc.), and be completed to the
satisfaction of the Community Development Director prior to the start of
demolition, construction, ground -disturbing, or tree removal/pruning
activities.
12. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit that involves soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming that
contractors and construction crews have been notified of basic archaeological site
indicators, the potential for discovery of archaeological resources, laws pertaining to
these resources, and procedures for protecting these resources as follows:
a. Basic archaeological site indicators that may include, but are not limited to, darker
than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire
affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone,
bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either
human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
c. The laws protecting these resources and associated penalties, including, but not
limited to, the Native American Graves Protection and Repatriation Act of 1990,
Public Resources Code Section 5097, and California Health and Safety Code
Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover cultural
resources during project -related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define
the deposit, and assessment of the remainder of the site within the project
area to determine whether the resource is significant and would be affected
by the project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California
Department of Parks and Recreation forms by a qualified archaeologist. If
the resource is a tribal cultural resource, the consulting archaeologist shall
consult with the appropriate tribe, as determined by the Native American
Heritage Commission, to evaluate the significance of the resource and to
7
recommend appropriate and feasible avoidance, testing, preservation or
mitigation measures, in light of factors such as the significance of the find,
proposed project design, costs, and other considerations. The archeologist
shall perform this evaluation in consultation with the tribe.
13. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of the any demolition, grading and building permits that involves
soil disturbance, include on plans a note that, during project construction, the project
applicant shall comply with California Health and Safety Code Section 7050.5 and
California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100 -foot radius of
the remains, or any nearby area reasonably suspected to overlie adjacent remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make a
determination as to whether the remains are Native American.
c. If the Santa Clara County Coroner determines that the remains are not subject to
his authority, he shall notify the Native American Heritage Commission (NAHC)
within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the
deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the remains.
If the Most Likely Descendant does not make recommendations within 48 hours
after being allowed access to the project site, the owner shall, with appropriate
dignity, reinter the remains in an area of the property secure from further
disturbance and provide documentation about this determination and the location
of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner
does not accept the Most Likely Descendant's recommendations, the owner or the
descendent may request mediation by the NAHC. Construction shall halt until the
mediation has concluded.
14. STORM WATER RUNOFF CONTAMINATION
Prior to issuance of any grading or building permits, the project applicant shall
demonstrate compliance with Chapter 9.18 (Stormwater Pollution Prevention and
Watershed Protection) of the Cupertino Municipal Code, to the satisfaction of the City
Engineer or his or her designee. All identified stormwater runoff control measures
shall be included in the applicable construction documents.
15. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City's and contractor's authorized representatives that
are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City's and contractor's authorized representatives that are
assigned to respond in the event of a complaint related to fugitive dust, pursuant
to the requirements for compliance with BAAOMD's CEOA Air Quality
Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
16. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City's and contractor's authorized representatives that
are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City's and contractor's authorized representatives that are
assigned to respond in the event of a complaint related to fugitive dust, pursuant
to the requirements for compliance with BAAQMD's CEOA Air Quality
Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
17. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
L•�
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City's Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall demonstrate
compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48
(Community Noise Control) of Cupertino Municipal Code. The details of the
Construction Noise Control Plan shall be included in the applicable construction
documents and implemented by the on -site Construction Manager. Noise
reduction measures selected and implemented shall be based on the type of
construction equipment used on the site, distance of construction activities from
sensitive receptor(s), site terrain, and other features on and surrounding the site
(e.g., trees, built environment) and may include, but not be limited to, temporary
construction noise attenuation walls, high quality mufflers. During the entire
active construction period, the Construction Noise Control Plan shall demonstrate
that compliance with the specified noise control requirements for construction
equipment and tools will reduce construction noise in compliance with the City's
daytime and nighttime decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and submit
to the City of Cupertino Public Works Department for approval prior to the start
of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on -site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use for
more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use of
noise producing signals, including horns, whistles, alarms, and bells will be for
safety warning purposes only. The construction manager will use smart back-up
alarms, which automatically adjust the alarm level based on the background noise
level or switch off back-up alarms and replace with human spotters in compliance
with all safety requirements and law.
18. PALEONTOLOGICAL RESOURCES
Prior to issuance of the any demolition, grading or building permit that involves soil
disturbance, include on plans a note that, during project construction, the project
applicant shall implement the following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
redirected to allow a qualified paleontologist, which shall be retained by the
10
project applicant, to assess the find for significance and the Applicant shall notify
the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner. Appropriate actions may include,
but are not limited to, a mitigation plan formulated pursuant to guidelines
developed by the Society of Vertebrate Paleontology and implemented to
appropriately protect the significance of the resource by preservation,
documentation, and/or removal, prior to recommencing activities. Measures may
include, but are not limited to, salvage of unearthed fossil remains and/or traces
(e.g., tracks, trails, burrows); screen washing to recover small specimens;
preparation of salvaged fossils to a point of being ready for curation (e.g., removal
of enclosing matrix, stabilization and repair of specimens, and construction of
reinforced support cradles); and identification, cataloging, curation, and provision
for repository storage of prepared fossil specimens.
19. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City's choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
"indemnified parties") from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
"proceeding") brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys'
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and
costs shall include amounts paid to the City's outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys' fees, or costs awards, including attorneys' fees
11
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail
to file a protest within this 90 -day period complying with all of the requirements of
Section 66020, you will be legally barred from later challenging such exactions.
This Director's approval is effective until April 13, 2028. The 14 -calendar -day appeal
period will expire on April 27, 2026.
Enclosures:
Attachment A: Plan Set
12