Loading...
ASA-2009-07bCUPERTINO January 27, 2010 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3251 FAX (408) 777-3333 Communihj Development Department Terry Brown 10491 Scenic Boulevard Cupertino, CA 95014 SUBJECT: PLANNING COMMISSION ACTION LETTER - U-2009-07, ASA-2009-07, TM-2009-05 This letter confirms the decision of the Planning Commission, given at the meeting of January 26, 2010, approving a Use Permit and Architectural and Site approval to allow the construction of two 2,317 square .feet single family homes on separate lots each with a 640 square foot detached second dwelling unit at the rear of the property and a Tentative Map to create two parcels of approximately 6,240 square feet each, located at 10216 Pasadena Avenue, according to Planning Coirunission Resolution No.(s) 6578, 6579 and 6580. Please be aware that if this Use Permit is not used within atwo-year period, it shall expire on January 26, 2012. Please be aware that if the Tentative Map permit is not used within athree-year period, it shall expire on January 26, 2013. Also, please note that an appeal of this decision can be made within 10 calendar days from the date of this decision. If this happens, you will be notified of a public hearing, which will be scheduled before the City Council. Sincerely, /~ / 1 Piu Ghosh, Associate Planner Planning Department Enclosures: Resolution 6578, 6579 and 6580 Cc: D&B Legacy, LLC, Mr. & Mrs. Adzich, 10164 Carmen Rd, Cupertio CA 95014 g:/planning/post lrearing/actionletterTM-2009-0, TR-2009-16 ASA-2009-07 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6579 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE REVIEW FOR TWO NEW 2,317 SQUARE FOOT SINGLE FAMILY RESIDENTIAL UNITS ON SEPARATE LOTS EACH WITH A 640 SQUARE FOOT DETACHED SECOND DWELLING UNIT AT 10216 PASADENA AVE SECTION I: FINDINGS WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and has satisfied the following requirements: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; 2. The proposal is consistent with the purposes of this chapter, the General Plan, and zoning ordinance; 3. The proposal will use materials and design elements such as horizontal siding, composition roof and simplified building forms that compliment the existing and neighboring structures; NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the design review application is hereby approved subject to the conditions which are enumerated in this Resolution beginning on page 2 thereof; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application ASA-2009-07 set forth in the Minutes of the Planning Commission meeting of January 26, 2010, and are incorporated by reference as though fully set forth herein. SECTION II: PROTECT DESCRIPTION Application No.: ASA-2009-07 Applicant: Terry Brown on behalf of D & B Legacy, LLC Location: 10216 Pasadena Ave (APN: 357-18-021) Resolution No. 6579 ASA-2009-07 January 26, 2010 Page 2 SECTION III. CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED PROTECT The approval is based on Exhibits prepared by: a. Bruno Marcelic, Architect AIA, dated October 30, 2009 and titled "10216 Pasadena Avenue Homes, 10216 Pasadena Avenue, Cupertino, CA 95014" consisting of 13 pages numbered, "A-1.0 - A-3.0"; "A-3.1-A-3.5"; "A-4.0-A-4.3"; "A-5.0"; b. LC Engineering, dated December 18, 2009 and titled "Grading and Drainage Plan for Lands of Adzich,10216 Pasadena Avenue, APN 357-18-021, Cupertino, California," consisting of 6 pages numbered "1 of 6 - 6 of 6"; and c. Reed Associates Landscape Architecture, dated December 10, 2009 and titled "Landscape Planting Plan' consisting of 1 page number numbered "L1"; and submitted by the applicant, except as may be amended by the Conditions contained i n this Resolution. 2. SETBACKS The setbacks for the homes will be consistent with those identified in the Grading, Drainage and Erosion Control Plan numbered Page 2 of 6. 3. FRONT YARD TREE The applicant shall plant a 24" tree in the front setback area instead of the 15 gallon tree indicated on the landscaping planting plan on page L1.0. 4. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 20 feet of residential property. 5. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any substantial exterior changes shall require a minor modification approval with neighborhood notification as determined by the Director of Community Development. 6. LANDSCAPE PLAN The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by the Director of Community Development prior to issuance of building permits. The landscape plan shall include water conservation and pesticide reduction measures as required by the City. 7. PROJECT AMENDMENTS The Planning Commission shall review amendments to the project considered major by the Director of Community Development. Resolution No. 6579 ASA-2009-07 January 26, 2010 Page 3 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 26th day of January 2010, at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Chairperson Brophy, Vice Chair Lee, Kaneda, Miller NOES: COMMISSIONERS: Giefer ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: none ATTEST: APPROVED: /s/Aarti Shrivastava Aarti Shrivastava Director of Community Development ~ s/Paul Brophy Paul Brophy, Chair Planning Commission G: ~ Plan Wing ~ PDREPORT ~ RES ~ 2009 ~ ASA-2009-07.doc Q' N i~ ai rn 0 O N N L ANGLE K 0. KNO<'KOUT AT N.P KICKP:ATE CL CENTER LINE O DIAMETER IAVS LAVATOWES g POUND OR NUMBER LAM. LAMINATED LIN LINEN A. B. ANCHOR BOLT L.P LOW POINT A C ASPHALTIC CONCRETE LT. LIGHT A/C AIR CONDITIONING ADJ. ADJUSTABLE MAT. MATERIAL A.F.S AUTOMATIC FIRE SPRINKLER MA)( MAXIMUM ALUM. ALUMINUM M.B. MACHINE BOLT APPROX APPROXIMATE MECH. MECHANICAL ARCH ARCHITECTURAL M.C. MEDICINE CABINET ANOD ANODIZED MET. METAL ASPH. ASPHALT MFR. MANUFACTURER AWG AWNING WINDOW M.H. MANHOLE MIN. MINIMUM BI BACK OF OR BOTTOM OF MISC. MISCELLANEOUS BD BOARD MTD. MOUNTED B. H.A. C.B. BETTER HEATING AND MULL. MULLION AIRCONDITIONINGGUREAU BLDG- BUILDING (N) NEW BLKG. BLOCKING N.I.C. NOT IN CONTRACT BM. BEAM NOIk NUMBER B.O.J. BOTTOM OF JOISTS N.S.F. NET SQUARE FEET BOTT. BOTTOM N.T.S. NOT TO SCALE B.U. BUILT-UP 0/ OVER C. CARPET O.C. ON CENTER CART. CABINET O.F.S. OUTSIDE FACE OF STUD C.B. CATCH BASIN OH. OVERHEAD CEM. CEMENT OPNG OPENING CNT. CENTER DPP. OPPOSITE C.T. CERAMIC TILE O.D. OVERFLOW DRAINarOUTSIDEDIAMETER C.I. CAST IRON C.J. CONSTRUCTION JOINT P.A. PUBLIC ADDRESS CLO. CLOSET P.B. PANIC BAR CLR. CLEAR P.C. PRE-CAST CLG. CEILING P.O.F. POWDER DRIVEN FASTENER C.M.U. CONCRETE MASONRY UNIT PL PLATE C.O. CLEANOUT PIL PROPERTY LINE COL. COLUMN PLAS PLASTER COMP. COMPOSITION PLAS. LAM. PLASTIC LAMINATE CONC. CONCRETE PLY, PLYWOOD CONN. CONNECTION PNL PANEL CONST. CONSTRUCTION POL. POLISHED CONT. CONTINUOUS PORC.ENAM. PORCELAIN ENAMEL CONTR. CONTRACTOR PT POINT CSK. COUNTERSUNK P.V.C. POLY VINYL CHLORIDE CSN1T. CASEMENT WINDOW PR. PAIR C.W. COLD WATER R. RISERS D. DRYER R.A. RETURN AIR DB. DOUBLE RAD. RADIUS D.B. DROPPED BEAM R.C.P. REINFORCED CONCRETE PIPE DET. DETAIL RD. ROUND D.F. DOUGLAS FIR R.D. ROOF DRAIN DH DOUBLE HUNG WINDOW REC. RECESSED DIM. DIMENSION REF. REFRIGERATOR DR, DOOR REINF. REINFORCEDIING D.S. DOWNSPOUT RES. RESILIENT D.W. DISHWASHER R.H. ROUNDHEAD DWG. DRAWING RM ROOM DWR. DRAWER R.O. ROUGH OPENING REQ. REQUIRED EA EACH R1W RIGHT OF WAY E.J. EXPANSION JOINT RWD. REDWOOD ELEC. ELECTRICAL R, W.L. RAIN WATER LEADER ELEV. ELEVATION ENCL. ENCLOSURE S8P SHELF AND POLE E.P.B. ELECTRIC PANEL BOARD SCHED. SCHEDULE i EQ. EQUAL S.C. SOLID CORE EXH. EXHAUST S.D. STORM DRAIN EXP. EXPANSION SECT. SECTION ~~~ EXIST. a (E) EXISTING S.F. SQUARE FOOT/FEET EXT. EXTERIOR SGD. SLIDING GLASS DOOR SGW. SLIDING GLASS WINDOW FBRGL FIBERGLASS S.H. SINGLE HUNG WINDOW F.D FLOOR DRAIN SHT. SHEET FDN, FOUNDATION SHTHG. SHEATHING F.E. FIRE EXTINGUISHER SHWR. SHOWER F.E.C. FIRE EXTINGUISHER CABINET SHVS. SHELVES F.H. FIREHYDRANiORFLATHEAD SIM. SIMILAR F.H.C. FIRE HOSE CABINET SK SINK OR SKETCH F.F. FINISH FLOOR SL. DRS. SLIDING DOORS F.G. FINISH GRADE S.M. SHEET METAL FIN. FL FINISH FLOOR S.M.S. SHEET METAL SCREW FLUOR. FLUORESCEM SPECS. SPECIFICATIONS FLSG. (LASHING SQ. SQUARE F.O. fINISHEDOPENING STD. STANDARD F.O.C. FACE OF CONCRETE STL. STEEL F.O.F. FACE OF FINISH STOR. STORAGE F.O.M. FACE OF MASONRY STRUCT. STRUCTURAL F.O.S. FACE OF STUD ST. STL. STAINLESS STEEL FR DR _ FRENCH DOOR _ SUSF SUSPENDED. _ FT. FOOT OR FEET SYM. SYMMETRICAL FTG. FOOTING fRP FIBERGLASS REINFORCED PLASTIC T. TILE FURR. FURRING T.B. TOWEL BAR FXD. FIXED T.C. TOP OF CURB TEL TELEPHONE GA. GAUGE TEMP. TEMPERED G.D. GARBAGE DISPOSAL THRESH. THRESHOLD GALV. GALVANIZE(D) T 8 G TONGUE AND GROOVE G.I. GALVANIZED IRON T.O.F. TOP OF FOOTING GFI. GROUND FAULT INTERRUPTER T.O. TOP OF GL GLASS T.O.P. TOP OF PLATE GRD. GROUNDORGRADE T.O.S. TOP OF SLAB G.S.F. GROSS SQUARE FEET TOSF TOP OF SUB FLOOR G.S.M. GALVANIZED SHEET METAL T.P, TOILET PAPER GYP. BD. GYPSUM BOARD TR. TREAD T.W. TOP OF WALL H.C. HOLLOW CORE TYP. TYPICAL H.D. HOLD DOWN HDR. HEADER U.N.O. UNLESS NOTED OTHERWISE HDWD. HARDWOOD U.O.N. UNLESS OTHERWISE NOTED HDWR. HARDWARE UR. URINAL H.M. HOLLOW METAL HORIZ. HORIZONTAL V VINYL H.P. HIGH POINT V.C.P. VITREOUS CLAY PIPE HR HOUR VERT. VERTICAL H.B. HOSE BIBB V.G.D.F. VERTICAL GRAIN DOUGLAS FIR HT. HEIGHT HC HANDICAP W. WINDOW OR WASHER HTG. HEATING W! WITH HVAC HEATING VENTILATING AND WAINS. WAINSCOT AIR CONDITIONING W.C. WATER CLOSET H.W. HOT WATER WD. WOOD H.W.D. HOT WATER DISPENSER WDW WINDOW W!0 WITHOUT I.D. INSIDE DIAMETER W.P. WORK POINT orWATERPR00F INV. INVERT W.R. WATER RESISTANTaWASTERECEPTACLE INSUL. INSULATION W.S. WEATHERSTRIPPINGwW00DSCREW INT. INTERIOR W.W.F. WELDED WIRE FABRIC J.B. JUNCTION BOX %0 SLIDING WINDOW WITH "X" BEING JST. JOIST OPENABLEAND"0" BEING FIXED WHEN JT. JOINT LOOKING FROM THE OUTSIDE XOX SLIDING WINDOW WITH'7(" BEING OPENABLE AND "0" BEING FIXED WHEN LOOKING FROM THE OUTSIDE, DIVIDED ROUGLY 114, 112, 114, RESPECTIVELY 10216 PASADENA AVENUE CUPERTINO, CA 95014 SYMBOLS X DETAIL NUMBER X.X SHEET WHERE DETAIL IS DRAWN. SAME DISCIPLINE U.N.O ~ WINDOW MARK X (SEE WINDOW SCHEDULE) DOOR MARK XXX (SEE DOORSCHEDULE( X SECTION NUMBER X.X SHEET WHERE SECTION IS DRAWN. SAME DISCIPLINE U.N.O ® WALL HVAC REGISTER ® FLOOR HVAC REGISTER X INTERIOR ELEVATION NUMBER X.X SHEET WHERE ELEVATION IS DRAWN. SAME DISCIPLINE U.N.O //,,~\ REVISION NUMBER ,' ^ ~ (SEE DESCRIPTION BLOCK ON SAME SHEET FOR DATE & DESCRIPTION) ~ HOSE 8188 HB ELEVATION ABOVE DATUM POINT NORTH ARROW (THIN LINE INDICATES TRUE NORTH) -N" GAS OUTLET VALVE HKI.I-II I tl, I UKHL JF1tt I J A-1.0 TITLL SHEET A-2.0 OVERALL SITE PLAN A-10 FIRST FLOOR PLANBBASEMENT PLAN-HOUSE-1 A-3.1 SECOND FLOOR PLAN 8 ROOF PLAN- HOUSE-1 A-3.2 FLOOR PLAN 8 ROOF PLAN ~ SECOND DWELLING UNI1.1 A-3.3 FIRST FLODR PLAN 8 BASEMENT PLAN -HOUSE-2 A-3.4 SECOND FLOOR PLAN 8 ROOF PLAN -HOUSE-2 A-3.6 FLOOR PLAN 8 ROOF PLAN -SECOND DWELLING UNIT-2 A-4.0 ELEVATIONS -HOUSE-1 A-4.1 ELEVATIONS-SECOND DWELLING UNIT-1 A-4.2 ELEVATIONS -HOUSE-2 A-4.3 A-5.0 ELEVATIONS-SECOND DWELLING UNIT-2 SECTIONS CIVIL SHEETS 1 TITLE SHEET 2 GRADING. DRAINAGE. AND EROSION CONTROL PLAN 3 BUILDING CROSS SECTIONS 4 CITY STANDARD DETAILS 5 EROSION CONTROL DETAILS 6 BEST MANAGEMENT PRACTICES PROJECT DATA SQUARE FOOTAGE DATA: LOT AREA: LOT1 6.2408.E (, 143AC.) LOT 2 6,240 S.F. (.143 AC.) MAIN HOUSE (PER LOT): FIRST FLOOR: 1,021 S.F. SECOND FLOOR: 872 S F. TOTAL LIVING: 1,893 S.F. GARAGE: 424 S.F. OVERALL TOTAL'. 2.917 S.F. 2ND DWELLING (PER LOT): FLOOR AREA: 640 S.F. FLOOR AREA RATIO (FART (PER LOT): 2,317 S.F. + 640 S.F. = 2,957 S.F.16,240 S.F. _ 41 RATIO OF 2ND FLOOR T01ST FLOOR (PER LOTI: 872 S.F.I 1,445 S.F. _ 60 VICINITY MAP ~~~ BRUNO MARCELIC ARCHITECT A.LA, 365 E. Campbell Ave. Campbell, CA 95006-2013 Phone 4081379-6500 Fax 4081379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Sheet Name: TITLE SHEET Project Number 0912 Date 10130109 Drawn By ~Rg Checked By gM ^ scale As indicated BRUNO 1ARCELII ARCHITECT A.I.A. 65 E. Campbell Ave Campbell, CA 95008-2013 Phone 4081379-6500 Fax 408/379-6110 Q N N N 0 O N N ++a+vrYr/e1 1 r gyn. cS r ~ ~ ~ o4r ( {f~ / ,~ 9r: +a (~rn.i.,...4~"ate S..Ga~ ~!i4t~~1'~N' 6FOOTTALLREDWOOD FENCEALONG PROPERTY LINES,TYP. Q .. b PROJECT SUMMARY TABLE `" '.• ~ :PORCH' :: •• •~ .~ . -', PORCH' . ~ . slrE AREA: LAND. I LAND. ~ LOT 1 Q240 S.F (.143 AC.) ' ' ' LOT 2 6,240 S.F. (.143 AC.) 20'-0" 14'•8" 14'fi 2 0'-8" BUILDING AREA: MAIN HOUSE 2,317 S.F. I 35'-0' ' 35'-0" ' 2ND DWELLING ¢OQ,~F TOTAL: 2,957S.F. ( DRIVEWAY > ~ > DRIVEWAY ~ fL00R AREA RATIO: 2,95716,240 - .47 LOT-2 Q LAND. 3 LAND. Q 3 LOT-1 .. ~ .. ~ .. ~ . .J• . ~ . .... J ~ .. . ~ .. ~ NUMBER OF STORIES: 2 ' " HEIGHT: MAIN HOUSE•1= 25'•9" 1s'-a" ~ 3 16 •0 MAIN HOUSE-2 = 25'-10" BUILDING PAD ELEVATION: SEE CIVIL DRAWINGS ~ Y (N) SIDEWALK CURB ELEVATION: SEE CIVIL DRAWINGS - PARKING (PER LOT): IN GARAGE • 2 ;, (N) PLANTER STRIP ON DRIVEWAY - 2 STREET 1 O N - N TDTAL•5 EXISTING USE: SINGLE FAMILY RESIDENCE CURB, GUTTER,ORIVEWAY. PROPOSED USE: SINGLE FAMILY RESIDENCE ANO SIDEWALK PER CITY WITH SECONDARY DWELLING UNIT STANDARDS, TYP. ZONING. P (RES I A•12) 0 GENERAL PLAN DESIGNATIDN: 1$ D U IAC b PAVING AREA (PER LOT): 1.257 S.F. (20%) LANDSCAPING AREA (PER LOT): 2,898 S.F (47%) NUMBER OF DWELLING UNITS (PER LOT): (1) 4•BEDROOM UNIT (1) 1-BEOROOMUNIT PASADENA AVENUE RECREATION AREA (PER LOT): 7;727SF.(28%) ----------------~------------------ ----------- OVERALL SITE PLAN __ __ Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 -- Revispn5ctie~le..._ .. Revision Revision Revision Number Oesuiptbn Dale Sheet Name: OVERALL SITE PLAN Project Number 0912 Daie 10130109 Drawn By gM Checked ay gM ^ Scale As indicated r -- ~ A-4.0 1 ~ A-50 p ~~ ~,. D. - - ~~ n° 15'-0" A-4 D ~- 2 39'0" BRUNO ARCEL RCHITEC A.I.A. E. Campbell A Campbell, CA 95008-2013 Phone 4081379-6500 Fax 408!379-6110 a 0 0 f0 Q> 0 0 N O M O A-4.0 3 4 -v a BASEMENT FLOOR PLAN - 114" =1'-0" 0 m a 4 A-4.0 A-4.0 3 -~ ~--~ ~ " ~O ~ ~~ 4 f;' ". 'y ~. ~ ~~ ~ ~ ~ ~ wf'~ a ~i'l:. . Y. Mme, ,y,, ~..1 `.fir _ ~:+t'a,D i?cin`..'ae' j i -, ,~ ~ .4 f.. .. M D ~}: ;! k C 3 k` ;ry 1 nIRSTFLC 14 A-4.0 4 A•4.0 A•4.0 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Sheei Name: FIRST FLOOR PLAN & BASEMENT PLAN, HOUSE-1 Project Number 0912 Date 10!30!09 Drawn By JRB Checked By BM ^ Scale 114" = 1'-0" A-0 0 3 a 0 0 of N N O 0 N i I I ' 4 A-0.0 i I I I I _ ____ I I ~ ___ - - .. ,~ - ~ i ., ~,. ~ O ~.~~`t b~~At~N~a I d ~ry rr3g ~ .l+a°~AN4 ~~ 4 I ~t l/ I ~,,,. Ict; k'.f ~ Cusc li,anx~cP ~~ 4 A-0.0 ~J~ BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 408/379-6500 Fax 408/379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Sheet Name: SECOND FLOOR PLAN & ROOF PLAN-- HOUSE-1 Project Number 0912 Date 1-7-10 Drawn By JRB Checked By BM ^ Sale 114" =1'-0" 2 ROOF PLAN -HOUSE-1 1 ,SECOND FLOOR PLAN -HOUSE-1 - - ~ G 114 =,~-0 1l4" - 1'-0" a rn M O io rn 0 0 N O C'1 O . , s p0 -0 .mod ~p ~ . by . p .,.,. .. /r~7/_ ~ /~ 2 ROOF PLAN - 2ND DWELLING UNIT-i 1I4" =1'-0" A~a i 3 A~4.1 2 4 A-4.1 (~FL_OOR PLAN - 2ND DWELLING UNIT-1 u 1I4" =1'-0" BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 4081379-6500 Fax 4081379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Sheet Name: FLOOR PLAN & ROOF PLAN - 2ND DWELLING UNIT-1 Project Number 0912 Date 10130!09 Drawn By ,jRg Checked By BM Scale 114" =1'-0" Aa2 ~ i ~, ~~ zr n' r i-0.2 3 F421 2 33'-0' 4 A-4.2 't BRUNO MARCELIC ARCHITECT A.LA. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 4081379-6500 Fax 4081379-6110 Project Name: 10216 ~, PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 ~~ ss~r Revision bsaip6o a io 0 0 0 N O M O A-4.2 aFIRST FLOOR PLAN - HOUSE•2 u4 - r-o° Sheet Name: FIRST FLOOR PLAN & BASEMENT PLAN, HOUSE-2 Project Number 0912 Daie 10130109 Drawn By JRB Checked By BM ^ Scale 114" =1'-0" i i i I I A-0.2 3 ' I 1 i 1 1 I a 0 0 a N 0 0 N I I ~~~ i _~ z,~ 4 A-0.2 ~J~r~ BRUNO MARCELIC ARCHITECT A.f.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 4081379-6500 Fax 4081379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Revision Schedule Revison Revision Revision Number Desaigia~ Dde Sheet Name: SECOND FLOOR PLAN & ROOF PLAN--HOUSE-2 Project Number 0912 Date 1-7-10 Drawn By JRB Checked By gM Scale 114" =1'-0" ROOF PLAN -HOUSE-2 ~:~ SECOND FLOOR PLAN -HOUSE-2 114" =1'•0" ~ 1/4" =1'-0" o_ a N n O m 0 0 N O c~ O .....~w~.~ Y _.~ -b0-0 0 ~ ~ P fi;.at; a:!: r rCG~S~: rt "7 '«~•arro • ~~D ~ r.Y ;r~ t.. f+. ,:.,,~~a• as ~ IF~:~a 6 1.i1~~iia~.ip' ~p3C ~ titprl~;Ct ROOF PLAN - 2ND DWELLING UNIT-2 114" =1'-0" A-4.3 3 35'-0" PRIVATE YARD BEDROOM 0 3•.r .. :. . • . • ;. 4 N ~Q O ... N N 4 A-4.3 A•4.3 2 0 ~ 3'-5 LINEN N FAMILY ROOM CLOSET BATH `~ ;~ DINING '4 3'-4" Y1 640 S.F. O Q TUBISHOWER KITCHEN ~ 0 _. _ . _ _. _ ___ __ _ _ . II _ II _ II _ _ ... p 4 N • FRONTPORCH: • •.`.-; • • .`. . , 0 ... E 15'-4" =LOOR PLAN - 2ND DWELLING UNIT-2 114" =1'-0" 14'-4" 35'-0" 1 A-4.3 5' 4" BRUNO ARCEL: RCHITEC' A.I.A. i E. Campbell A Campbell, CA 95008-2013 Phone 4081379-6500 Fax 4081379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Sheet Name: FLOOR PLAN & ROOF PLAN - 2ND DWELLING UNIT-2 Project Number 0912 Date 10!30109 Drawn BY JRB Checked By BM ^ Scale 114" =1'-0" a v N O 0 N 4 RIGHT SIDE ELEVATION -HOUSE-1 tl GH-DEFINITION COIv w. J /- HI 7POSITION SHINGLE Q ; ~r ~i;; r'.. J i.y ' t ,,. r _ . '_"7 u h tl i~~ ROOFING MATERIAL m . ,~ .- ~ . ,~, .A-4Cy~ T"~ .r• ar ,~ U . `4;G 'G t-.Y , r.i !; y~J. iuil'~i,4il i,~t ~~ , . ~ ~ ~ ~ . ~~ ' k, *1[,;`", u , a .~. ~. - '' '~" ~. WOOD CORBELS AND EXPOSED ~.~ ~^' k~ ,+.r, a .. , ~h',. V., . ,. ~. •4 . RAFTERS. TIP. ,~.r, ~. ~ ~-,• ~, .~ . -- _. .~r~ - _ .~ . , Roaf - - --- --19, 0., FIBRE-CEMENT SHINGLE SIDING MATERIAL I VINriWINDOWS,TYP ~ FIBRE-CEMENT WINDOW TRIM. / ~ ~ ,~ ~ TIPICAL ~, f tiu ~x v ~ 1 8 ~' - ~ ...... ~ ~ Second Fbor - - ~-- t0~ g N I PAINTED 8 I I INSULATED I ~ METAL ROLL-UP GARAGE DOOR 6' HORIZONTAL la b FIBRE-CEMENT o SIDING MATERIAL I 00 I I CULTURED STONE I ~ _ 1 First Flaor /~ I I 0 V I- - I I- '~- I •- I- I- ~-; ~-~ I-I i-~ I-I i-i I- '-I '-' i-'~ ~-' I-I - I--1 I .I-!: 11=1 I I-I I i=1, i-~ ~ l-! ~ I--1 I ~-1 I!=, ~ I-I : I-, . I-I ~ i-I ~ I-I 11-~ ;1-1,1=1 ~ 1-1 i 1-1 ~~ I--I ~~~ f=1 ~ I-1 11=1, I ~~-1 ~ FRONT ELEVATION -HOUSE-1 Roofer 9'-0" ~ FI~ 0 0 _Floor n 0 V 2 REAR ELEVATION -HOUSE-1 114" = t'-0" BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 4D8! 379-6500 Fax 408!379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Rsvieion Schedule Revision ReVSion Revisbn Number Dssaiplian Dde Sheet Name: ELEVATIONS HOUSE-1 Project Number 0912 Date 1-7-10 Drawn BY JRB Checked By gM ^ Sale 114" =1'-0" a a 0 rn 0 0 N O M O T.O.. P. ~ 7 4 V Floor -8 REAR ELEVATION -SECOND DWELLING 3 UNIT-1 • ~00~0~ I 7 ~1 .._. ,,a.__...,. .. .~. ,...... a .....ts-;.r... i ,. I ~;. ~~.~_~ .ti.: .v ~~ mod. ~~W~ 0./' RIGHT SIDE ELEVATION -SECOND DWELLING UNIT-1 114" =1'-0" _ _ T.O.P._ 74 _ _ Floor -8 FRONT ELEVATION -SECOND DWELLING UNIT-1 114" =1'-0" LEFT SIDE ELEVATION -SECOND DWELLING UNIT-1 114" =1'-0" T.O._ P• /~ T 4 V Floo~ -8 4 nor n ~,. i BRUNO MARCELIC ARCHITECT A.I.A. 365 E. Campbell Ave. Campbell, CA 95008-2013 Phone 4081379-6500 Fax 408!379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE Sheet Name: ELEVATIONS DWELLING-1 Project Number 0912 Date 10130109 Drawn BY JRB Checked By BM ^ Scale 114" =1'-0" )f r, )~/ ~r n ~~ or n o° 1 FRONT ELEVATION -HOUSE-2 114" =1'-0" BRUNO [ARCELI ~RCHITEC~ A.I.A. ~5 E. Campbell Av Campbell, CA 9500&2013 Phone 4081379-6500 Fax 4061379-6110 Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 a v a N 0 0 N _ V loo 0 DEFINITION POSITION SHINGLE 'ING MATERIAL ~ CORBELS AND SED RAFTERS, T1P _ R 19 0 .WINDOWS, T1P :-CEMENT OVJ TRIM, TW RIZONTAL :CEMENT G MATERIAL econd Floor L1 1010 0 v 'HORIZONTAL IBRE-CEMENT (DING MATERIAL AINTED,INSULATED, IETAL ROLL-UP ARAGE DOOR ULTURED STONE First Floor n p 1 i p« ~~ o" RIGHT SIDE ELEVATION -HOUSE-2 2 REAR ELEVATION -HOUSE-2 4 ~ 1/4« = i~~« 114• =1'-0" Revisim Schedub Revisbn Revisbn Revision Number Dsscripfbn Date Sheet Name: ELEVATIONS HOUSE-2 Project Number 0912 Date 1-7-10 Drawn BY JRB Checked By gM e~ ^ Scale 114" =1'-0" 3RUN0 ARCEL. RCHITEC A.I.A. REAR ELEVATION -SECOND DWELLING UNIT-2 114" =1'-0" i.O.P. n T 4 ~V E. Campbell A Campbell, CA 95008-2013 Phone 408!379-6500 fax 4081379-6110 a a 0 io rn 0 0 N O M O T.O.P. n 7 4 V FIooN -8 -f ti ~- - loQrd S ;.,~,~u.a a -o ~q~;.,~u i.askr ~~ ~1~(! ,,x.~ ~,.,.,,, i ~: ,~: ",:tom C~~~ ~~:+e~~~cr RIGHT SIDE ELEVATION -SECOND DWELLING UNIT-2 114" =1'-0" ~.P. n 4 loor 8 Floor -8 FRONT ELEVATION • SECOND DWELLING 1 UNIT-2 LEFT SIDE ELEVATION -SECOND DWELLING UNIT-2 114" =1'-0" TA.P. n 7' 4 Flao~ .g lI Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 +San. schscr Revisbn Iesc+iPtlo Sheet Name: ELEVATIONS DWELLING-2 Project Number 0912 Date 10!30!09 Drawn By ,jRg Checked By BM ^ Scale 114" =1'-0" - ~ ~DFING ~~, Pi ~,:OOD ~riEATHING ~ ~:-~, EVATI01:~ & P')OF FR.',I~11NG, SEE STRUCTURt~L PLANS -- ;G LB. FELT r. i ~~' i+E j i ~ `~ i ) GAIV. METAi f+IDGE _ _ _ R00(_~~~`. L _ FLASHING 1 - 19' _ ~" '_'\ ~ ~1I IK4 TRIM, SEF I _ I --- ELEVATION. I i 1 ~ I '_ I~ R ~; -- 1K10 RAKE.Cht ~.. ~ ~ L_.~ ~I ~ ~ --- ELEVATION.. J HALL STAIR AY `- 2x4 OUTRIGGERS U SEE PLANS cae'oc BEDROOM _ MASTER HoRlzoNrAL sIDINC ~ ~~~r, ~, : ~ ~,. #2 EDP ROOM BUILDING PAPER, SEE , ~`: .~ ~ . V ELEVATIONS ~ I - __ _ Second Floor - _ 10'-~ PLYw00D SHEATHING 2x STUDS @ 16" O.C \V _._ TYPICAL RAKE DETAIL - __ ~ I I n~ I n~ ~ I 3 1 v2" = r-o° j'~ STHlR AY ~ Y I I I I CL. ~ HALL ~ I FAMIL - ,' ~~ I~ I - ROOM - _ _ _ First Floor n 0 _I i ~~~_I i i-I ! I~-=1 I ~~ -1 I I-!~~ I I- - - - ---I~I I i - - ~--- ~--- - I; --1 i I-1 :- ._ I- _- I ._ - _ --I. ~. n cam. ~ ~ _ . _-~1 I I--1 I I- ~I- I I- ;1- I ME HANI A M LTI -I I- I I- I I- ; I C C L HALL U I ~ I_.._ I I- II ~: -1 ! I- : STORAGE ,STAIR A PURPOSE ! I - '~'= i I I =_ i =_ ~,_ -=..i (- I I- ~ ~ I I , -1I1-1I'-1I1-1I : ~ " -1I1-1I1- _ _ I I_.... I ~._..... ~ ~: ~, a'-0' z-6' -~ ~-I II. I-1 I i= i ' -1 ~ I=~ Basement - - ~ - t - e _...... - - .. ...... ; hl ~ -I i i III- i i i i=i t~:- ! ~ -- _-- -- -~ -! -1 ~'' Q" _ _ ~ ~- - -- ~ I - I ~ ----' - ~ - - -III-I! I-1! I-1 ~ i-~_I ~ ~ ~ __ I ~ 1-1 ~ 1-I ! I-1! I~ I_l-~ ~ 1-1 ~ 1-! I-1 ! I-i ~ 1-I! 1-1 ~ I I)-1 ~~ 1-~ 1-~ 1=~ 1-l ' I I~ 1-~ I ~-1! I--1 ~ I-~ ' ~' =1 I ;-I I ~-I I---I i'~~ - I ~ -I ~ 'i- ~ ,~-Iii- . ~- l i-i .-~ . I-i ~ - I'.-i i l-. I ''~~-i ' . I . I 'i-- I I I~~~- I ',- I I I ~i-! I I-III-i I I-~ 1I- ~ 3 o N m 1 MAIN HOUSE SECTION 1 114" =1'-0" 6' 6" (V 1 A-5.0 NOTE: THESE SECTIONS APPLY TO STRUCTURES ON BOTH LOi •1 AND LOT-2 3 yr ATTIC CORBEL DETAILS 4 1" =1'-0" .. ~ - --- - - - Roof M o DS ~-~ a ~ 19 0 ff (~~~'d~3~ ~+~~ f er O ~~ ""~'~°'~°"~``'~` TUDYlLOUNGE __ _ _ _ _ _ _ _ _ _ _ - _ ~~ _ _. _. _ ._ _ _. ._ WALK-IN-CLOSET.... REA ~ ~ s ~ r ~ j1~~'n ~~~y O # ~ N t-~te ~ STAIRWAY _ _ _ _ _ _ Second Flaor~ 10' o U7 ~/ A ~a~~ Ai- naLclr MUD KITCHEN ~ PANTR ROOM HALL U, `~ ~ STAIRWAY ` First Floor n ~ g ~ ~. -1 i- - I -i i \ - -T.O.P. I I i_ I I ~-' (I-; -- i -... ,_,_ T-4" _ L-~ STAIRWAY I - I ...__., ~_..: - 1 ~__., - I I i- I-i I -j !_- . MULTI-PURPOSE ~ ' _i' -!' ' LAU. HALL CL. BEDROOM I ;_ ; ~ ! ~-_I ! _; K C I I _ I!_.__ IT HEN - I ~ i .-..I, :•. I __~ I ~~ I U ~ I -I . -I -~ I ~ -.~_~......- ~ ° PROPERTY ~' ' ' -~' - a. ' " LINE I j i:. I, '..I i., -,~I a I s'-0" I ~ ~* _I ~ -I ! -I I- Basement~~ iJ 1 I Floof ~ 1 ~- I --- - ~ ~~,-.. - ~ . .~ ~' - - - - 'i=i I - - I I-~ I-~ I :-~'~,~ I I-: (~-~~'~, 'I-' -I -I - ; ~ ~'- I - - ~ - '- -I ~-~ ~ : - ~- i I ~ --~ ' '-- -, ~ ~-' '- -' '-- ~ '--• ~" I _ ; III ' I i -~ I I ' j i..- I I_; I .~ - . -_ _; I I I , I I : ! ~ ~ - _ _ - I I-_ I III- - I I II I _ I- - - - _ - - I _ i I I- ~ I ' ' I I - ' I - I-.I ~~ ~ ,1 i..._I II -j -;~ -~ I; I~~I I I I~I_I~ I I"._II, l I _,II ~I ;.I- ~;__ I I - II_~ i N '-_I I-~.~ I I -- ! I-_II~~_ I ~ I i!I__! I._. I-_ i t 'I- 'I-1 I--'II ,11__111- _ ~ _ ~_ I ~___~ - I _ '' _I I I_-, I ~ i - - - I- ~ ~ - _ ~ II I ~ I ~ ~~ III- I ~ I I .~ ~~-I 'I~='Ii__II ~-- I ; - 'ICI- - -II:1- 1,1 -~'~I --~ _ __ , ~ I ,_ I ~ I L I '~~~ /12ND DWELLING SECTION /~ MAIN HOUSE SECTION 2 ~' 114" =1'-0" 114" =1'-0" -- -~ BRUNO [ARCELI+ ARCHITECT A.1.A. ~5 E. Campbell Av1 Campbell, CA 95008-2013 Phone 4081379-6500 Fax 4081379-611 fl Project Name: 10216 PASADENA AVENUE HOMES 10216 PASADENA AVENUE CUPERTINO, CA 95014 Revision Schedule Revfabn Revisicn Revision Number Desaiptbn Dde Sheet Name: SECTIONS & DETAILS Project Number 0912 Date 1.7.10 Drawn BY JRB Checked By gM scale As indicated 1. All Work shall be In accordance with the State of Califsnia"'~ Standard Speciflcatlone (latent edition), Standard Plana (loteet edition), and Gty of Cupxtino Standard Plan. The Contractor shall perlorm the work described In the epeclflcation, and as shown on the drawings, and to the aatlefactlon of the City Englneer. 2. All underground utRltiee shall be installed and adequately backfRled before placement of the base material and 1 surface structures. Ii utlllRlee are to be Installed eubsequently, a written notlflcotlon from the affected utRlty company Indicating lte canmliment to boa s tunnel shall bs submitted to the City Engines hefse proceeding with the work. Underground utlllties, except storm and sanitary sewer, wRl not bs permitted In pavement sea, with the exception of etroei crossings, othawiee epeciflcolly approved and authorized by the Clty Enginex. 3. The contrasts shall haw all 01 the utilities underground maln0. and services that may conAlct with the project, located In the Reld, The Contracts shall contact underground Sivice Alert (USA) forty-eight (48) houro h adwnce of any work, fa location of the underground Toclllilu, at (800) 642-2444. 4. All trench backfRl, All areas, and base matxial shall attaln o minlmum 98% relative compaction as pa Standard Speclflcatlons. For typical trench uctlon4 rain to the City Standard Details, with the exception of sanitary eewero. 5. All trace, roots and foreign matte In ezlating or proposed Right of Way shall be romoved to a depth of two (2) feet bdow eubgrads and dispoud of. 6. All exleting pavement removed or damaged dull be replaced ore requlred be the city Englneer, 7. All cancnta used fa all structures must be Class "A" (8 Backs per cubic yard) ore per Standard Specifcatlana and shall attaln strength of 2200 p.e,l. In sewn (7) days. B. Drop Inlets Indalled shall be Clty of Cupertino Standard anise otherlse noted m the plane. The bozee shall be Installed at the same time the P.6C curb and quttx Is installed. Claae 'A' P.C.C shall be used. 9. A minlmum thlcknm of six (B) inches of P.C.C shall be requlrod for commercial driveway approaches and five (5) lnchea for reeidentlal. Locotlonn shall be determined prior to the installation of the curbs. The driveway shall he Installed at the name time as the curb, 10. All street curbs shall be vertical P.C,C curbs. 11. Install City of Gupertlno etroet name signs, four (4) blades each pa auembly as shown an the plane. 12 Install City of Cupertino dandard monument boa(s) and monument(s) o shown on the plena. 13. All grade etaku and laths required by the Clty Englnur shall be Installed by the Subdiddere Englnea as directed, Minimum off-seta fa cut stakes shall be five (5) feet. 14. Prior to wmmencing work, the Contractor shall haw cut sheets approved by the City Englnur, Notify the Clty Enginur twenty-four houre (24) prior to roqulring Inspection. 15. The contractor shall submit a written request for Anal Inspection. 16. One-hat} (1/2 pound of dieperoing black shall be mixed with each sable yard of eonorote at the hatch plant. 17. Grading o1 Iota outside of R/W ore per typical section and for sons-Ovation, shall be completed and approved by the City Englneer before proeeeding with preparatls of the aubgrade and plaament of the surface dructuru s Iota. All lots shall ba graded to the dreei elewtion, or ore sham on the plane, or u determined by the Clty Englnur. I& Notify the City Enginur forty eight (48) houre in adwnce of requlHng uMeee for checking field etakMq. At this time, thru (3) copies of the cut sheets will be famished. 19. All standard street monuments, lei corer pipes, and other permanent monumenh disturbed during conatructlon shall be replaced before accepters of the improvements by the Cliy of Cupertino 20. Manhole frames and cover shall bs brought to fln(ah grade before final paring. 21. The develops shall pay all coats for moisture-density curves (Calif. Tot No. 216E) and any othx tuts required by the Clty Englnea during street construction. 22. Approvd of these plane does not release the Contracts of the rorponelblllty for the corcectlons of mistaken, eras, a omlaalona contained theroln. If, during the tours of construction of lmprovemeni0. public Interest requlred a modlficatlon of/or a departure ham the Clty o1 Cupertino apeelfleatlon s then Improwmenta plena, the Clty Englneer shall haw the authority to requiro ouch modificatlan a departure and to specify the manner In which the acme Is to be completed. 23. Septic tanks shall be pumped and backfllled to the eathfacilon of Santa Gsa county Health Department prior to condruetlon. 24. Fa all flve(5) foot monollthk: aidewalke, all fire hydrants and electrollero shall he Installed behind sidewalk. 25, Each sheet of the construction/modiFlcatlon plane shall be Initialed by the Clty Englneer to be coneidied approved Anal plane. It shall be the rupondbillty of the contractor, and all Subeontracton to Inwre that' are furnished with approved plans or the loteet revised pions. 28. All watt Ilno, wives, hydrants, and appurienoneo thereto Installed within the City o} Cupertino Munkipol Wali UtRltyr nervlcee aroa, shall be the property of add water utRlty. 27, conatructlon signing shall he Indalled prior to beginning of wok. 28. Any and all dorm lira Indalled as part of the work on thur plena shall ba cleaned of all aced motatol, debris and obstruction. Storm Iinu shall be Rushed as directed by the City Engineer. 29. fie Civil Enginur a Shc Englnea to review all gradlnq and submit o final report to the Clty prla to occupancy. obaiructlon. Storm Ilnea shall be flushed as directed by the City Englneer. v~ ~ ~ i ~ ~R.Rr ~~ IO ~ 0 r O s a Yt: y c y ~ `..~ _.._ ~ .... .. wr~:4, z,; ,t i:..ra.,., .. ~ k.~~5 ~ fro b g , ,~ F: ~ >', v l;a,i R`' c . .~' , rJ .~ ~.~,w, ~ kr.,~ae;9 .ii',~ Ca Cra~~ 640 s>;agsr Sheet 1 -Title Sheet Shoat 2 -Grading , Drolnag0. and Erasion Control Plan Sheet 3 - BuRding Croce Sections Sheol 4 - Gty Standard Dotage Shut 5 -Erosion Control Detatla Sheet 6 -Bed Management Praticee 1, Regrade cut aroa to original ground condition. 2. Prior to gradlnq completion and rdeaae of bond, all graded area shall ba ruuded in conformance with the Clty of Cupxtino Grading Ordlnana io mMimiza the visual impacts of the graded dope and reduce the potential fa erosion on the subject alto. 3. A conatructlon oborwtlon letia from the roponeble Ceotechnlcal Englnur detalling eonsiruetion obeerwilona and citl}yinq that the work was done In accordance with the recommendatlona fn the Gsoiechnical repsta shall he submitted prior tp gradlnq eompletlon and releau of bond. 1. The Clvll Enginex a SoR Enginur to review all grading and submit a Anal report to the City prior to occupancy 2. Compaction roporte and pad elevotlon certiflcatlon le roqulred on all bullding pad work. 3. Contort Public Works at 4QB-777-3104 fs drainage and Dnal ryade Inspection, which Indudee drain Ilnee and roof drains/downapouta. 4. Contractor la rosponsible fa dual contrd and Insuring the aroa adjacent to the work le left in a clean condltlon. 5. Ths contracts shall review dondard detail 8-4 on tree protection prig to accomplish any work a remov(ng any trees. 6, All storm line Installation with dope lees than 2% shall be citified by a GMI Englneer. 7. All on-site eonltsy eswi Iinae and laterals shall be subject to bullding department approwl prior io Inatollotlon. B, UtRize Best Management Proctlcu (BMP'a), ore requlred by the State Water Resources Control Board fa any activity which disturb Boll. 9. A work schedule of gradlnq and lesion k udlment contrd plans shall be prodded to the Cliy Enginur by August 15. No hRlside gradng shall be perfsmed betwun October 1 and April 15. 10. All roof drains and/a downepouta shall be drained sheet Bow 2% away from the bullding and may be tdlected by drainage Inlet connected to public storm drain facility. If and only if the drainage Is In hRlaide area tan the water be dlroctly connected to the public storm drain facility. 11. Electrical aervlcu to be planed underground UANTITIES CUT 10 CUBIC YARDS FlLL 124 CUBIC YARDS IMPORT 114 CUBIC YARDS EXPORT 0 CUBIC YARDS .. .. FOR LANDS OF ADZICH 110216 PASADENA AVENUE APN 357-18-021 ~ CUPERTINO CALIFORNIA OCTOBER 1, 2009 I FOEN D & ABBREVIATIONS AB AGGREGATE BASE AC ASPHALT CONCRETE AD AREA DRAIN AE ANCHOR EASEMENT BLDG BUILDING BSL BUILDING SETBACK LINE BSMT BASEMENT BW BOTTOM OF WALL/BACK OF WALK CC CURB ~ CUTTER CL CENTERLINE/CHAIN LINK FENCE CO SANITARY SEWER CLEANOUT CSD CITY STANDARD DETAIL CONC CONCRETE DE DRAINAGE EMITTER DG DECOMPOSED GRANITE DI DRAINAGE INLET DS DOWNSPOUT DWY DRIVEWAY ELEV EIEVATION EM ELECTRIC METER E(OH) ELECTRIC OVERHEAD EP EDGE OF PAVEMENT EX E%ISTING FC FACE OF CURB FF FlNISH FLOOR FG GROUND FlNISH GRADE FH FlRE HYDRANT FL G FLOW UNE GARAGE SLAB ELEVATION/GAS UNE CPE GENERAL PUBLIC EASEMENT CSB GRADING SETBACK GM GAS METER HP HI POINT INY INVERT UP UP OF GUTTER LS UNDSCAPED AREA MAX MA%IMUM MH MANHOLE MIN MINIMUM N !r S NAIL AND SILVER NTS NOT TO SCALE OH OC OVERHEAD ORIGINAL GROUND p PAYr]AENT FlNISH GRADE PAD PAO ELEVATION PL PEE PROPERTY UNE PEDESTRIAN EQUESTRIAN EASEMENT PERF PERFORATED p0 PORCH pp POWER POLE PROP PSE PROPOSED PUBLIC SERNCE EASEMENT PUE PUBLIC UiIUTY EASEMENT PVMT PVC PAYETMENT POLYVINYL CHLORIDE R RADIUS RW RETAINING WALL REM REMOVE R/W RIGHT OF WAY SB SETBACK SD STORM DRAIN SDE STORM DRAIN EASEMENT SE SS SLOPE EASEMENT SANITARY SEWER/ LATERAL SSE SANITARY SEWER EASEMENT STA STATION SW SIDEWALK TB TC TOP OF BANK TOP OF CURB TEMP TEMPORARY TOC TOP OF COVER TG TOP OF CRATE TW TOP OF WALL TYP TYPICAL VG VALLEY GUTTER W WCE WATER WIRE CLEARANCE EASEMENT WLK WALKWAY WM WOE WY WATER METER WIRE OVERHANG EASEMENT WATER VALVE GRANADA AYE GRANADA AVE GRANADA AVE HERMOSA AVE LoMITA avE PROJEC SITE m LOMITA AYE ~ ~ _ ~eantlro> v ue 10 ,Cupertino- Yong\Cli g m L y D D r A ALMADEN A OLIVE AVE SAN FERNANDO AVE ~N f ~4 VICINITY MAP NT5 ~ CLEAN CHECK, ING-EXTENDABLE BACKWATER VALVE ' i TREE TO BE REMOVED 100. DESIGN GRADE • CHAISTY - V1 DRAIN BOX W/ GRATE O DRAINAGE EMITTER SUMP PUMP (DESIGN BUILD) +1D1.7 OR (101.70) EXIST ELEVATION ° CONCRETE ~ DOWNSPOUT WITH SPLASHBLOCK ~..,.,tr FLOW DIRECTION °Q ------ N -- EXISTING UTILITY POST CONS CT10N STORM WATER BMP POLW110N TROL MEASURE EXISTING ~ OUR -550- PROPOSED TOUR ~---~ - DRAINAGE SCALE ' ....... (~ CUY WIRE ANCHOR ~ RETAINING WALL ® INLET 8'x6' APPROVED BY: DATE CUPERTINO SANITATION DISTRICT APPROVED BY: RALPH A. QUALLS, JR, RCE 22046 10 O1 09 DATE DIRECTOR OF PUBLIC WORKS 12-31-11 O N 5 d 4 Q m ~ c $ o m o N N N e ~ e = w IQ o a o ~ z c=u Z ~~ W ~U~~5~ <J~~7S ~~ W ~~ ~~~~ ~~~~ cD is = r _ _ g ~ z ~ OWNER ROBERT ADZICH PHONE ADDRESS; 10216 PASADENA AVENUE 1, All work performed shall bo installed to manufocturxa npee111eatlone and all work shall comply with all curcent local, state and iaderol requlramub. 2. All work shall be constructed In accordance with these plane and the Standard Speclflcatbne of the Cupertino Sanitary Oletrlct 3. All excawtbn and backlRling within street right-of-way shall be done in accordance with the requirements of the Englnea of the public agency having Nrledletlon. Encroachment Pertnlte shall ba obtained and a copy shall be on the Job during conatructlon. 4, FIII material shall be canpacted to a minimum of two and one half (25) het abaw the top of pipe dewtlon by methods that will net damage the pipe a substituted wkh growl or one (i) slurry mix. Fill material must attaln o minlmum a} ninety five percent (951Q relative eompactlon, ore pa State of Califomla Standard Spaciflcat(ona. S. The Dletrict Enalnei shall be notNled two !21 worNlna dew Ina -nce of atartha eomtruetlon on this oroleet 20085 Stevens Crock Blvd. Building C, Cupertino, CA 95014 (408) 253-7071. At that tlm0. traffic Plana, encroachment permits and the uwi dlwrlon plans shall ba given to the Detrict Enginex. Sewer diwrelon plena shall include sewage bypass and emergency plena, Work shall net begin until the Dletrict Englnea hoe provided written occeptonce o1 these plane. 6. One (1) aanltary sewer lateral shall be Inatdled fa each lot or bulldhg. Location of lateral and property carere to be stoked in field at the wme time the sewer main la staked fa construction. Laterals shall rest be lokl on less than two picent (27Q grade and shall haw a minlmum cover of four and one halt (4.5) feat at property line a edge of sanitary eewi cerement. Laterals shall be dupe than lour and one half (4.5) feat when directed by Dletrict Englnur. Latiale shall not be extended beyond the atroet right-oi-way Ilne or eanltay revel easement line until the main hoe been tested. Lateral sewer constructed outside of the public duet a Cupertino Sanitary Dbtrlcl Easement shall be constructed in accordance with the requlrementa ot, and shall be inspected by the Clty of Cupertino Building Department. 7. The Contractor performing work on the sanitary sewers shall be required to raglatx with the Dletrict and provide Inwranca ore specified M Sections 1.38 and 1.40 of the District's Standard Speclflcatlons. 8, The Developer and Genid Contracts shall be ruponeible for protection o} all exleting Improvements Indudinq exleting aanltary sewer facilities that on to remain and li damaged during corotruction of the proposed Improvements, shall be repaired to the sat(afaeilan of the Cupertino Sanitary District and othi affected agenclu. 9. Channels of all Dkrtrlct manhdu within the conatructlon area shall be protected by plywood covers, placed (n the manhdu and manhole castings shall be adjusUd to final grade in acesdonee with the Standard Speclfleationn of the Cupertino Sanitay Dletrict s ore directed by the Dletrict Englnea. 10. The Devdopi and General Contractor shaft be roeponalble for the prewntlon of eondruetion debris entering the exleting sanitary newer syysdtem due to the conatructlon actlvltles aooclated with this project and the Dswlopi and Contracts shall pay all coats aeeocloied with the rdeaae of conatructlon debris Into the exhtinq sanitary uwi system due to the cadrucilon activltlu aeeoclaied with ihb proMct. 11. The Dewlopx and General Contractor shall b• roeponaible for the prowntbn of a sewage epRl ouoclated the Contractor aeilvltlu on this project and the Derolopi and Contractor shall pay all code auoelated with the rdeme of uwage Into aurfau drainage system and downstream aurfaa waters, 12 UtRlty Notiflcatlon (Contractor shall locate all uillitla prior to start of excawtion): a. Undxground Servlee Alxt 800-221-2600 b. Storm Dralna CNy of Cupertino c. Sanitary Sewer Cupertino Sanhary Dletrict 13. All Sanitary Sewer Ppu shall be PVC-SDR28 a approved equal, unleu otherwise apedAed by the Dlatrlet Engineer. 14, Access for pededriane and vehicles shall be provided at all times unleu approved In writing by the Dlatrlet Englneer. 15. Smitary Sawx Manhde0. Flushing Inleh and cleanats shall be marked with "SANITARY or SANITARY SEWER'. 18. Cloaad Circuli Video Inspection of property Ilne cleanout and lateral requlred prior to final plumbing inapectlon of owner expense, Wfien the uu of an exiatlnq latest la proposed, an addtltlonal video Inapectlon la requlred prior to construction to verify that it meta the cunent Didrlct Standards. Approwl of thus plane by Cupertino Sanitary District dau not rdleve the Installer of the reaponslbllity fa the croneetlon of mistake, error, or omhdone. If, during the course of construction of the sanitary sewaro the public Interut requiroa a modiAcatfon of, or a departure from the Dletrict Speelflcatlone of thue Improvement pbna, the Dletrict Englnea shall how the authority to require such modlflcatlone or departuro and to specify the manner In which the modiflcationa or departure is to be done, Approve as io Compliance with Dldrlct Requlnmenta , 2D09 CUPERTINO SANITARY DISTRICT District Englneer R(1Qf1 t\IDf,~F P~C~I1Ff\I~ D1/~~II I~ l`ITY III F I~I(1 ~PPI I~`Q~IT• ~f171(`N FlNISH GRADE DETAILS AT BUILDING FOUNDATION NTS -027 LOT F ' ' I z APN 357-18-024 ~; ' K~. 1~,,y„ iar~...., • .~ ~' 1Y I ;~, i .. ~~ ~_ a- t i I 1302.39 EP) ,I ~~ ,i I ....:, li N I _.,. '~ } :. 501.98 FL o CONNECT TO EX SS '^ ! ~: ~ I '<~ ~: I~~ 3 is ~ a I; W o ~ ~_ ;i~ aN ~~7[~. ., ~ ~' )]~ ~u p i a ~~~~ LA 1 O'.+ N~ ;I Z ff 3 ~~,, mw a8~: W ~~, . ~ ~ ~;~. ~~ ! ~ ~ ti. ! ~_ E '!A:1 I! ~ 209 FL N i ! N !E O ,4~ :1 ,: ~ ~ LOTH '~,I .I w i Q o BLOCK 9 II ~ iI Z ~ APN 357-18-025 " ~ ~ „ 3D2.z FL I. W n 3;02.24 INV -3' P SDI ? ~ :r ~ t $ ~ 30222 R SEE SD 3 E < F O` -3' P SDI I1 II ) ~ ~ N 2.28 INV (SEE SD J _ I _ , j Q w 3D2,23 Fl 1 z Ej 0 a '^ N/ f0 w a ~ ~ ~ ~ ~1 U `'' N ii'. vi,.. f ~ ~ ~ ~ o ;; ~ I E u a )' I N 302.29 R ,.. W?d ! + ' '1' ~i l . A.' irN <'.~~ ~ x E; ~ CfV ,j N t~f OU ~M<N i' ' :' ~. mw ~Z'. ~; ' N w C 02.4 FL I CONNECT TO E% SS i rn o, I ri r ,,, ' ~i ~ ! (302.84 EP) o ~ -. N (po3 O yj ~Gdri: fiU7i i ! \, t ~ ~~ ! I j I E ! -'-35' ,,~ 35' E ! i i ~ i y~~ K ~ ~. ! D E ~ ~ i j y „,.i1. ., .~, ~ •. LOT M ; ,~~ ' ' ' " - APN 357-18-037 ~. i } ~ rr ~ " O ., , r a r ., '•d I ;' . `~ wt, ~~ ~1'EI! ~E .cE i,. , +• ~d~le'Cf ~AE~. ~~ a ~ LOT E APN 357-18-022 TYP 302.66 FL 1 W 3D3.01 FL/HI PT 301.15 FL "" 300, FlBER ROLLS ( )~ ,~_._ S --~ S 695118' E 130.10' --~_...~ uz.~a r~ ~ K z ~ tni.in iu 301.a sW / 301,5 FG/SW I •~'~*•''^ / m '~i31 01.41 FG u 4' SS N 290.28 INV SSC ..... .__ _._......... _.. .:p , 1303.39 C 7: G I ~ IIIAINA~Ml11 ;I ' !` ~ 3 J.35 P II ! ~ ~ Oi i ~i 22,88• !, ° 4• SS LATERA~, ~~ N I =o I ~ 2' I, CONNECT TO BSMT ~' '" 'I ~ I ~ ~o SUMP x ~ !L_._ aK I ~ ~ ~ are PUMP I GARAGE ', I! m~ 2X MIN ~i i ' ~ DRIVEWAY a -2 I ~ ~ 2X MIN zX I! AIN HOUSE I I I ~~, "- `; 1,1 FF=304,5 ~I~, '-~~ ~~ t I ~ 302.35 FG I ce - ^.-' I ~ II 301.5 ~` I 2nd DWELLING I 302.27 P 302.35 P ~ ° 30 .09 FG ! I ~, LL N ~, UNIT-2 I'''; 303.39 c 303.79'~c ~ 'ti (~~ ~~! FF'~303.09 ~.- ' _. It'. ......__ .................~T.-V~ 1 _.._..... l_. ./ II 2X MIN ~--i_:, 2X MIN ~ ~ F; ! I { ~ ...__, a, 1 ~ _~, ;; . __.~ ~ l N ~ 6 ~ +Tr ~I ~, 1 ~~ i~` =--i FROM' L._....._.........1...1...........~ .~ -~i WALKWAY ~r~ ......... ~ I _-"-i-. p BSMT _' ~ 302.09 FG 1 ~~. ... ....i~~ ! .-.... ' I 30235 FC i , i CURB INLET "... ,^~ I W /SFF THIS SH ET I I _~i, I . ~ .__. . CURB INLET SEE THIS SHEET J03.4 P ~~ WALKWAY '~O 2X MIN 22.69' ( 1 ~` GARAGE DRIVEWAY E ~ t:A ~ 30J.67 P ! 3.71 G _. . y J.5 C 3 ! LOT J APN 357-18-020 S .4F ssi,os i~ allz~l \2• SDFM• $=1X `"` ~,~., ~!! 3 03.52 F I ON _ p. x ! 7 ~ FROM 303.2 FG ON~W 302, I -~ _- I 1 6SM ! -L.. TEMPORARY WALL ~ ' ~ I ~ i.. nr I ~ I -'~: INLET PROIECTI --`° ! ~ I ~ J~ ! 2X NIN md~N ~" -~--! ~ & R 20 I a ~~ ~ AIN H USE-11 FF=304.67 d ' 3oz. FLFL, y I 302.55 F i 3os.De Fc I. L--i ! NIN 2X ~-- I 1 ~N .. TTO BS 2X~IN I 1 a~ I MT CONNECT ,1% D'P _... 302 5 FG ., 3D3.87 FG/SW I .... ~~~ V300. FL / z ~f s 301.35 FC R A~ 2nd DWEWN 34 Fc 301 '`~~''~ " UNIT-1 ~ , `V FF= 303.55 1 ! _ 301.1 FL \,y , ~~• \ '-! ,/ 2X MIN ;AV ~N , \ a ~ SUMP n v. PUN W ,'~-;•~"~ ;" K p h 4 .\.~•\\~ ....._.... . 3. 303.57 FL/HI PT 61 301,1 SW N 02.15 FG N ~ ~ 301.43 S S 89.49.17' E 130.11 ` 301.6 FL 301 94 FL °~ LOT K C APN 357-18-019 6' I ~ ^, r ~, ~.~ h ` 1 K,^ !i. T 9 ~ a ~x k 2" SDFM in 1d c y ~ j ~ T ~ R , ~~ .r' K G`' ~ fe l ~' , ~l~ ~ PUNS' t,.~ ,, , t r:1 DRY NTS 12' DIAMETER INLET W/ GRATE FILTER FABRIC FG (1' MIN OVERLAP) 2' SDFM 3/4" DRAIN ROCK -~ ~~ 1 - tw . .- ~ ,.. . ~ . ` ._ ,., _t , i ~... _. . ~ ~ •_ _~ i : ~._~ _~I NTS a 60 80'S a_' PF_RFORATE PIPE DETAILS NTS NOTE: 1/4' HOLE PERFORATIONS AT 8" ON CENTER SECTION B-B CURB INL~ DETAIL NTS LOT F APN 357-18-007 .t , `\~ \`, . ~'. . ;~\' . . LOT H APN 357-18-009 LOT L APN 357-18-018 sEE FRAME ac GRar a a rte" 6 2•-2 3/4' 1'-8" N , m • SECTION A-A CLA55 A CONCRETE 2'-2' 1'-10' 5. O 5 w, 0 a a ~ o $ o mo_ ~ \ N N ~ ~ 0 8 I! w iQ o a o ~ z v n Z Q mU I W > -~ Qm WL .. Z m `- 3 ~, W J; -~ s U I d z U IZQY V ~ N. i = i i ~ `~ ~ ~ ~ R(lAl1 I~IAfs~F PA~Af1~~lA Al/~f~lll~ ~'ITY III F N(1 APPI I('ANT• A(171(~N N 5 ~' 0 } m $ < m o $ a m o N N N W ~ C 8 CZ7 II W O O d O ~ 2 U Z ~~ ~~ W ~~ ~ Z ~~~~ ~ ~~ Z , W ~~ ~~ r • v ~' ~oo • OS P t~9 ..~> >. •• ,irk ~cn~.t1~a!'h ~}u3n~a;,i' P ~ y 1. ,~ ' ' ' r..rrr~rr.+ la,~r: ti ff i1 r~~1 ZSAR~~' ~..ar v7 ~1s~~ Ilfl~s ~4er PL SAWCUT EM PNdT~ '~'~ ~pyMT rPVMT 2%MIMIN EX P' GARAGE SECTION B-B HOUSE FF=JD4.5 JD4 BASEMENT HOUSE FF=303.09 J03.05 FL PL ~1( C* NI. ~ ~Y F~ W * EXP. 12-31-11 'T'jf ~l V 1~ ~~ OF CA~~~ c~ d z U i a 0 Z r U (~ ~ ~ . ~ d = z F ~ ~ R(1 NAMF PA`;A~FNIA Al/FNI IF PITY FII F Nll ~'ANT• A1171~'H A11 APPI I z 0 tN 5 w 0 a a a 4 O } m R R 60' 76' 11' t 2' I 2z ~2X 12X, PARK 1 Slope PARK ' u,;v , ':a.'y STRIP I 5/W STRIP A.C surloce 6.5' 4.5' 6" 6" A.5' 6.5' cdurre Aqq, bme carte A.C. base coune Slandartl curb R~DENT11fi i1 nfG1 end gutter IIWI OLD SAN J05E AREA R Q 60' ~2X i 2X, :r ARK' 1X I Slope ., PA ,• I STRI I ,. ~ S/'N b' 4,5' k5' A C. A.C. aurtoce coune Aqg, tree course bme twree 4.5' 4.5' 6• . Standad curb and qutler re~es!uesseuelM ~E~~ 161Yf1OYtN1W~ 1. RESIOENIIAL -Sidewalk to M 4• P.C.C. over 4' qon II Aggreqatt Bee 0 90X Rdatiw CampecUon 2. COMk1EACIAL R 1NW51RIAL - Sidewdk la be 5• D.CC, owr ~• Oae n aggnqate Base 0 90X Rdoliw tompocrbn. 7. Mandlthic sldewolk ehdl be inalolkd only whm monaltlnlc tiderdk eielt. n~o~rrna~ CITY OF CUPEATINO AppROVEO BY: ti•~bATE: V 1-2 STANDARD DETAILS CITY EER ~I..`- 'T d j ~- ~ T ~eveTen: ~~s- T/ v •~ ~ o' mot' Cr vcriCCl° rvi:r g_ ._ R~t'2' C' a"~T' ~I -~- .. P=,%Z~ ,d ,4,• 'a ~ ~ ~,o • Oa B ~-_ ~c.. ~,G. 0 OD~pO °c~~ ~ 4" C~cs_ 'I Aag. Dose A1.6 A2.6 E, 2„ 6,. i 2 ., 2 q,. ~ T •! I ~ •,° T r , • Rr'/2° 6 2" ar variable P ~ iq^ I / c y •' i71 ~ i p9 6" .< o • R=• o • 0 000 -1-- ~ • o0 o a 00800 000 0 A~•6.8 q" Class II Agg. bese f1L~ Ir oa I I T2' I Zq I R=C.CB s=a~° l ~ 3„~ \\ / 0.33' }--`6^I ` Levu .n J R R=t7 ,~, i •/ 6" As1/2 12" a.r/x• o T 0 ooBpO~ TYPE E (MOUNTABLE DIID:) o 4" Gloss II Agg. has? TYPE E ~, 6" 1" • -L ~ 1 _L_ ' Eoc= to T Epoxy to 12° Ex. Surface ~ E~. Suridce 1/T longitudinal nor A.C. DIKE EIRRUDED CURB 1~2" dowel, minimum 6' length, 4' spac,nq ~ A3.6R A3.6D STANDARD CURB SECTIONS f.EYISED J, CITY OF C'JpERTIN!) APPROVED eY ATE'. 1-16 STANDARC CE~AILS CI NOINcc -,may v ~ ~' W.D r io ... ,~~ , 0 9 ~ ~ Y ,r 4 t. A,~e:Jc,, aru0 rdaesk~-t + er ~'O r,. c¢ ~.nJlt.Si ~ •=r. i ~ ibrt ~~ ~ 6 ~~ ~~'.A ,. . , Csa~~ ~~~nzs rsal '_• A,YIwNYI 9wr, Ww, lht, rwnN 1f 1Y w+rp, rI u' Ow .ey n, rrr cwwn.w ww za w~ 1r TF ]Y n1A N' YgwlAq M N ww Y ~.,1r ww. w P i WEAKENED PLANE - JONi OR CUT JOINT 1/6• W10E, 2• DEEP ON 8. O.C, NOTES: t. Canaele dAwwap not mandatory in indutlrial lone when sidewalks not constn,cted. 2. Score meks not to exeetl 4'-0" O.C. Vse mechankal separator al every other score murk. 7. Finish to be Coarte Brush Pinion, 4. Sidewalk to Oe replaced when new driwwdy is pared. 5. Edge of driveway shall be a minimum o} 4' ham property line. W - Wklth 2' 6" W 2 W 2 l,5' ar vabble Pnvenent to be Deep xore peepaacore 9ope:+1.5X la +eX 6• commercial ar ndualrial flush rich ltp of S reidMtial putter Owy approach j0inl or -I.S% 1° -4X to bt IWSh ~- -; '" rilh qutla •~ .~••. ~ ~t_4~ ~e, 400 base material '• Q g with o 95X relative ~ compoctbn • Commercid and Industrid driwwap shall haw atrpignt dope to (~ SECTION A • A DRIVEWAY DETAIL • DETACHED SIDEWALK REYISEO MAR 2003 CITY OF CUPER11N0 AppROyE DA i-20 STANDARD DETAILS CITY ENGINEER DRAINAGE DETAIL -Under sidewalk I I I I I Sidewalk 91 I I I A ~~ I A 1 1 I I Sawtu! I I 5aww1 I ~ I I Fan of Cub m Ye S' minimum Re o PLAN sddt:r=s Top of Crrb 2" 6" ro~• Flare ~ 1.. FACE OF CURB sdde:r=e .Q, e . . • •. • ••4"rant. ~. Via, '.D ...'a• ~q ,•°', n",v.' v v: ~ ; D' .~ p. • •,•4 •.~.a • 7q~. , ~ o • o ~ ° c'; ~Q; :•oyyoa oooppo do0 °o pp: o°o a ° ; 6- •: apOp ooae4' A.9,M. d ° peo,a poop 6-, ,'.1,"min. '~ o .'d ' oood0 DODO ood~ (~ po°eo G ~ ~ p~0 0 .eepepoQppeap o00°o°oa doooop 0 p e pp O° Op Opp °p po °oepoOp eaOee op0°o aDupaoeO ~o 00 °o ee ee°e°p00~~Op °Oa oDpOpOD~p aooo 0 a Dena o 00 0 op0 0o ep SECTION A-A Samerr CITY OF CUPERTINO APPROVED BY: DATE: •s Y 3-6 STANDARD DETAILS cl r ERCINEER' ~~~~ ~ M, ( ~ F~ y o. ~ IXP.12-31-11 `~ql C I V 1 ~ ~\! f OF CAV1~ E ~ c ~ o m ^ N H N b ~ B w o a o i rYi z v Z ~~ ~ ~< ~~ W «~ Z ~~~~ ~ ~LL Z 0 W I .. a ~~~ ~~ i r U Z U 6 (~ Z ~ . i = °z ~ ~ ~ a ~ ~ R~AfI I~IA~~F PA~AfI~~IA Al/FNI IF CITY III F N(1 APPI I~'ANT• Af171(~N 1. THIS PLAN IS INTENDED TO BE USED FOR INTERIM EROSION AND SEDIMENT CONTROL ONLY AND IS N01 TO BE USED FOR FINAL PLAN ELEVATIONS OR PERMANENT IMPROVEMENTS. THE COUNTY INSPECTOR MAY REOIIIRE INSTALLING ADDITIONAL EROSON CONTROL MEASURES DURING EARTHWORK OPERATION. 2. OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING EROSION AND SEDIMENT CONTROL MEASURES PRIOR, DURING, AND AFTER STORM EVENTS. 3. REASONABLE CARE SHALL BE TAKEN WHEN HAULING ANY EARTH, SAND, GRAVEL, STONE, DEBRIS, PAPER OR ANY OTHER SUBSTANCE OVER ANY PUBLIC STREET, ALLEY OR THER PUBLIC SIGN ELEVATION PLACE. SHOULD ANY BLOW, SPILL, OR TRACK OVER AND UPON SAID PUBLIC OR ADJACENT PRIVATE PROERTY, IMMEDIATE REMEDY SHALL OCCUR. 4. DURING THE RAINY SEASON, ALL PAYED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED 50 AS TO MINIMIZE SEDIMENT LADEN _, , RUNOFF TD ANY STORM DRAINAGE SYSTEM, INCLUDING ExISTING DRAINAGE SWALES AND WATER COURSES, S. CONTRACTOR SHALL PRONDE DUST CONTROL AS REDUIRED BY THE APPROPRIATE FEDERAL, STATE AND LOCAL AGENCY. 8. THE FAGLITIES SHOWN ON THIS PUN ARE DESIGNED TO CONTROL EROSION AND SEDIMENT DURING THE RAINY SEASON, OCTOBER 15 TO APRIL 15. GRADING OPERARONS DURING THE RAINY SEASON WHICH LEAVE DENUDED SLOPES SHALL BE PROTECTED WITH EROSION CONTROL MEASURES IMMEDIATELY FOLLOwNG GRADING ON THE SLOPES. 7. FINISHED SLOPES ON THE SITE SHALL BE STABILIZED USING SEED AND STRAW OR HYDROSEED TREATMENTS. I F1 ~ C RD1nWAY ARFAC CHALL IiF PRO ~ ~ ~9wwu~+n.~.aru~awr ~ ~ ERDSI AS 0 ON E ER ON CON L PLA A BALE Eta DWA IoM STE R THA PERCENT. A r; ~~ T ,~19 '^ O I'r. <.,.~. ti .. ~ O 4. ~ .. ,. , .. _... ~.,......!, ..e r" ....ax~ t .. t..ei. t , I PLAN ~ FIBER ROLLS I j ~`,• ~ ~ e" .• ~ ~~~~ •. ~~~~~~ L A'-~ ~~ ... , , ~ , D ,,. .,..~.; AINT METHOD ROPE RESTR y ~~ ) s. NOlE e The temporary equipment washing facllRy sign shall be Installed gg '"~ ^. ~'L`;:r,tt 1 ; ~ within 20 feet of the temporary concrete ~' ~ ! washout faulty. a ~~~a~ Ayl~ ~p;cr Wood Stake Flba Rdl Eecavated --, Material Slope SECTION FBER ROLLS IN FURROWS W c a i~ PERSPECTIVE FIBER ROLLS ROPE RESTRAINT METHOD Laq screws Wood poet OG= elev. 0.0 ~,~\ Rock bogs ore required Edge of plastic Ilninq Top of Cut Toe of Drahage ditch Bai r,,,.,..~T• Grading Conform / ~i Toe of elope FIDer Rdl Mhlmum 1' overlapped ie~ giu~e straps (2 each) loops (2 each) ent control bag orlon reetrolnt basin Drainage ditch sAetw sltx swa~lcs A9 CIGMAMA7fb HAY OF EGN4ftfM IIDCNT .url~Y Yllta ro AIWI MNEIIS A: AECESPIAr' - L rxrtA rAeer SECTION B-B AtlrE.• / srx[lAr rvsc s~Maalcx sAalw sots ae orr~AAW1PDIfD 1l7AgDs ,tII~, roawtncz~ro '~ !e ~ nal 1101 d o ~ °~ ob~e ~ O~a . ~a 8~~ ~ . q~0 B Ao ° B ~rs• Arxi~s+1F ~ ~ •o~ vo 1?' lllk 0 .4 .~ ~ o o o oQ o, a o, aM O~P~• c ~j o v n o AKIPSIAV RU4iE JD' ANIf PLAN TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT AKJIES.• 1. Rif £Ml2VVVrvf SIW.L Bf AdIMJTAtlrE'D /N A COIyDIRON I}NT wxL PREVENT ABtCKdYO OR RONMG Or• SfAtME)YT ONTO Pq&lC RlCM-A~-NHrS 1HRS Y4Y REWHRE TOW G~E551N& REPAIR M0/OR fYf.INOUT OF ANY AIFASUAES f1SED >n~~ 2 NN£N NfLESSIRY, w7#f2.S SHALL 8f PRWk4 ro EMRM'CE avTD Pf/8'k' RICHr-o>-~xr. 3 MHFN MfISIbAG IS R£WIR£D, R SINK Bf DAME oN AN AREA STABLlI£D IwrH CRUSHED STA1tE THAT a>irvNS Ixro AN APPROVED ~»~~~~. Fber rolls FLOW -. Curb a diNe In Inlet Roadway rdle FLOW ~-_ invent control baq I ~- Catch basin SECTION A-A A ~ ~ ~ Fiber rolls Oroin Inlet wHh Curb or dike sediment control baq Roadway A PLAN TEMPORARY DRAINAGE INLET PROTECTION For paved areas exposed to traffic ~~~ ~ M ~ (~Y F~ s W CC ~, IXP, 12-31-09 ~ ~~l C! V t~ ~~~ f o~ cAU~ to z 0 w 0 d d a Q Q ~ o m o m N N N 0 z ~ e ~ ~ o a a i/i ~ i U~ Z ~~~ Z ~~~ <d~ w ~~~~ ~~ z ~ w ~I .~ ~~~ ~~~a SECTION A-A 25 m Min PLAN TEMPORARY EQUIPMENT WASHING FACILITY (Below Grade) R(lQ~ ~IA~~F PflCOfl~t\I>, D1/~f~ll IF ('ITY FII F ~In • ~PPI If At\IT• Q1171(`N 2.5' .. .,,_ Tvo SECTION SEDIMENT CONTROL BAG EXISTING COMMERCUU. BUILDING f 1..111\ I ~' iG:Y DOfANICAL NAME COM"ION Here rm. el¢ P7EMNi~e Thee n TaH a uloTePi GuK ~ ro GAL BUIII-trulk n PlerauA ro w/r~ neTeckE a u raPmAlm LAY-OF-THE-WLF PU:J1 70 71 IGAL 6 GAl e3 e M PHOR7IU'I T.'AMAZRI4 N®' P8W SEALAND A yl Ve1tlEdATBD TOOIRA 27 ~ Gw4L e6 M. eI110Et37 YEW PIPE 4 6 GAL ~ D951Ee 61t:O10R APItlCATI tltle - 6 6AL e, Per'elaocaLLle EVEIAGIaEB+ YEUOID' DAn11Y e I GAL LAYeNDULA eT0EGP1A6 ePeNroH V D 6 M NeNDNA D. 'COP1PeGTA' PEAVENLT 6er000 adi 6 OAL 101lJPETALUM ~eAmeeelaa' NGlI z a y~,LOW p1EAPp1E GUAVA 7 E eG LMONMI PEIIlZII eEA LAY9dDE14 21 I TlNINaDLIUM NLN. MRl i' TALL 1 TkR G 'LKIMYri' I GAL 74' OL. b7 VINCA MMOR OU141F PERaIpdG1E •- FLATe I OAL G" OG 4' OL. ~ 8NlC MULCH IRL1'CL® MULG++ G" OG Ge PELediG011A11 PELTATUM PNC/RJI!°LE MDC' IY1' IUM -- I GAL 14" OL. `~.~..~" REED ASSOCIATES I LANDSCAPE ARCHITECTURE 477 SOUTH TAAFFE STREET i SUNNYVALE, CALIFORNIA W098 ~oe.~e1 ^otar~oe.~ei-oas:Fac I wb, .M^.ni.rw f ^nll: p.uerrana PASADENA AVE. HOMES 10216 PASADENA AVE. Cupertino, CA ISSUE QATE __ 12.10.1M PRIVACY SCREB~NG SCRUBS AT 5'-D" O.C. PRIVACY SCREfPNG - VEW LNES FROM 2ND STORI' pRNACY $CREBJNG 51-RUBS AT 5'-0' O.C. - PRIVACY SCREBrNG VEW LIPE5 F~20M 1N~ STORY f L.IY\ I ~ I GAT L THE CONTRACTOR SHAI1. VERIFY ~ FOR CONVENENCE OrIYL~~ PLA1d (XIANTIfL-$ $EIOWN IN TFE LEC~D 2 MOTFY TIC LANDSCAPE ARCHTECT N ~T~~ ~ ~ PLANTNG PLAN pISCREPANGES BETWEEN AC SfiE 3, PLANT t~tOUNDCOVER N SFRUB AREAS AS NOTED, U5E TRIANGULAR SPAGNG. 4. 5ff DETAL AND SPECRCATKNJ SFE~TS FOR ADDITIONAL INFORMATgN 5. T}~E WLL BE NO MATERIALS PL~~~ ALAS ~TTITUTIONS WITHOUT APPROVAL OF TAE ONTFR OR 6. ALL SLOPES PIANITIS7 WTIH LAWN NOT TO EXCE®A 3~1 SLOPE ALL SLOPES PIANTH) WITH GROUND COVER NOT TO EXCEED A 21 SLCPE 7. PROVIDE POSRIVE DRANAGE AWAY FROM ALL Bu.DNG5 fn Mw & N 1HE EVENT OF ANT DISCREPANCIES BE1W~IBE NOTE IMMEDIATt3.Y.~ CONDIT10N5~ THE LANDSCAPE ARCHTTEC IS 0 9. ENTRE SfiE 5 TO BE ROUGH GRADED BY T}E ~G A~D15 TO ~AG~T ~T~ 1~ FOOT OF FNSH GRADE LANDSCAPE CONTRA LANDSCAPE AREAS. b. ALL SfTE UTLIiES ARE TO BE PROTECTS DURINGT}E CONTRACTOR SHALL MOTFY OF CONRICT BETWEEN TFE PLANS AND UTLITES THE LANDSCAPE ARCHffECT. ANT DAMA~TO~UT~ESAPESCq ACTOR SHALL BE FEATURES TO REMAN.AND CAUSED B R~IAC® OR R~Ai~ BY TAE CONTRACTOR AT Nq EXPENSE TO THE OWNER. 1l T4~E WORK N TFESE pRAWNGS AND ~~ACTOR SHALL COORDNA T}ETE WORK WORK BT OTHEi~S. TFE LANDSCAPE CONlTR WITH OTI~2 CONTRACTORS. 12 REFER TO CIVL BB'S PLANS FOR OVERALL SITE GRADING AND DRANAGE 13. SOD LAWN SHALL BE DWARF ~__,f1F BLB~D. 14. PRIOR r0 ANY DIGC~,NG OR TRBJ(kWG~ CALL lrr1~G,DOLnD SFRH!CE ALBtT - Leooaz~zboo PLANT 3YI~BOL3 - -w -- - - - - r ~ ~ ~ ~ Q a ..~ I DILATES PLANT KfY ,Zd 1 1 I DILATES PIANi QUANTITY 800-227.2600 i 1 - ~~~ r, y... n r, .~~ ± • ~ ~ / /A~ '": • INafe ,~.--~ Ca11c; ~InnuLcr ~. 1 ~. -"F m PAUL,IAYREED No.2002 tt ow. vr.,on ~P ,~ ~ 11~ CJd. OWNERSFIIP AND usE DF Dot:uwEtdTS N do^Yrg4 Sp^dlledlar and wills tl^w^al NnrMd ~ Rrd A^sIa1M IaYKgy hdih~Wn mend Yell r^neYr b goprq. ,hq an to a wN ony ^Hh ~ b ar Proj^d and on nd to a u^k an any oN^r poj^ct Submiwlon or dWibutlan to m^d dlld^I r^aulotory r qulnm^rrt^ or Tor purpo^^^ In oann^etlon ^dlh tM ProNot b riot fo M aor^bwd o prBkoUan In hroldion d R^k A^^doY~ ladrmW AddUdur^, tamm Y^ mpl+IpM ar atMr n^Mrv^d naht^. APD~ DU Dram DS Aavle^ed pjr Proj^d Nw pe.64 Sml^ 1 X10 ~^^^ Dad 12.10.09 LANDSCAPE PLANTING PLAN L1.0 Shsd Of PASADENA AVENUE