Loading...
HomeMy WebLinkAbout26-055 Ghirardelli Associates, Inc_Service Order #1 dated 7-1-26 for Initial Plan Check AssistanceContract/Purchasing Action Personnel Information Name Jennifer Chu Department Public Works  Division Development Services Date 06.29.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Ghirardelli - Service Order No 1.pdf Service Order Amount $48,600.00 Master Agreement Number 2026-019 Contract Start Date 04/08/2026 Contract End Date 03/30/2031 Firm Name Ghirardelli Associates, Inc. Address 6801 Owens Dr suite 155, Pleasanton, CA 94588, USA Phone (925) 575-0417 Consultant/Contractor Name Frank Navarro Consultant/Contractor Email randy@ghirardelliassoc.com Project Name SO 1 Initial Plan Check Assistance Project Location Various Project Locations Cupertino Project Manager Name Jennifer Chu Cupertino Project Manager Email jenniferc@cupertino.org Master Agreement Maximum Compensation $210,000.00 Total Previously Encumbered to Date $0.00 Encumbrance this Service Order $48,600.00 Master Agreement Unencumbered Balance $161,400.00 SO GL #100-82-804 700-702 NWS Project Code Comments Ghirardelli requires the service order be routed/signed by the two following persons: Randall Bruner (randy@ghirardelliassoc.com) and Raewyn Butcher (raewyn@ghirardelliassoc.com) Signature       06/30/2026 PDT  Consultant/Contractor Signature Date       06/30/2026 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature. Email: randy@ghirardelliassoc.com Date: 06/30/2026 PDT Email: jenniferc@cupertino.gov Date: 06/30/2026 PDT       07/01/2026 PDT  Management Analyst Signature Date Email: PWMA@cupertino.gov Date: 07/01/2026 PDT Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) 435-5503 ghirardelliassoc.com File No. 23543.P02 May 26, 2026 Jennifer Chu, PE Senior Civil Engineer Public Works JenniferC@cupertino.gov RE: Service Order #1 - Proposal to Provide Plan Check Services Dear Ms. Chu, Ghirardelli Associates, Inc. (Ghirardelli) is pleased to submit this proposal to the City of Cupertino (City) to provide plan check services over an estimated three (3) month period. This work is proposed as Service Order #1 under our existing master agreement with the City. As discussed, Michelle Bocalan (Municipal Associate) will serve as the primary reviewer, with Roxana Corona, PE providing support on an as-needed basis. Services will be performed on a time-and-materials basis in accordance with our 2026 Hourly Rate Sheet (included on the following page), with a not-to-exceed amount of $48,600 based on the estimated level of effort and budget summarized below. Personnel Hours Hourly Rate Amount Associate Engineer 216 $225 $ 48,600 Total $ 48,600 As a principal of the firm, I am authorized to bind Ghirardelli Associates, Inc. Should you have any questions, please feel free to contact our Contract Manager, Frank Navarro, PE at (925) 575-0417 or via email at fnavarro@ghirardelliassoc.com. We appreciate the opportunity to continue supporting the City and look forward to working together on this effort. Sincerely, Ghirardelli Associates, Inc. Raewyn Lelo-Butcher Executive Vice President M| 510.708.7442 E| raewyn@ghirardelliassoc.com Ghirardelli Associates | 2055 Gateway Pl. Ste. 470, San Jose, CA 95110 | (480) 435-5503 ghirardelliassoc.com Municipal Engineering Services Hourly Rates Classification 2026 Hourly Rate Senior Principal Engineer $325 Principal Engineer $300 Senior Project Manager $283 Project Manager $267 Senior Engineer $255 Associate Engineer $225 Assistant Engineer $192 Senior Management Analyst $200 Management Analyst $174 Administrative Assistance $105 Engineering Trainee $93 1) Services are billed on a time-and-materials basis. All hourly rates include overhead costs. Overtime services provided outside of normal business hours will be billed at 1.5x the applicable rate. 2) Any extensive reproduction or delivery service charges shall be billed at actual. 3) Rates valid through 12/31/2026. Annual rate escalation is 5%. SO 1 Initial Plan Check Assistance - Service Request Created:06/29/2026 Status:Signed Transaction ID:759d1a5f-bbca-4cb8-9704-e6df12db551c "SO 1 Initial Plan Check Assistance - Service Request" history Jindy Gonzalez created the document 06/29/2026 3:31:29 PM PDT - IP address 64.165.34.3 Document was emailed to Frank Navarro 06/29/2026 3:31:30 PM PDT Frank Navarro opened the document 06/30/2026 9:17:16 AM PDT - IP address 99.72.153.107:56427 Frank Navarro signed the document 06/30/2026 9:18:14 AM PDT - IP address 99.72.153.107:56427 Document was emailed to jenniferc@cupertino.gov 06/30/2026 9:18:15 AM PDT jenniferc@cupertino.gov opened the document 06/30/2026 9:29:38 AM PDT - IP address 64.165.34.3:26341 jenniferc@cupertino.gov signed the document 06/30/2026 9:29:50 AM PDT - IP address 64.165.34.3:26341 Document was emailed to Public Works Management Analyst 06/30/2026 9:29:51 AM PDT Public Works Management Analyst opened the document 07/01/2026 9:29:22 AM PDT - IP address 71.198.170.154:59749 Public Works Management Analyst signed the document 07/01/2026 9:29:56 AM PDT - IP address 71.198.170.154:59749 Document was successfully signed and filed 07/01/2026 9:29:56 AM PDT