HomeMy WebLinkAboutPC 07-14-2026 PresentationsPC 07-14-2026
#2
Study session on Permit
Streamlining and Simplification
for Small Home
Upgrades City Work Program
item
Presentations
PLANNING & ZONING COMMISSION STUDY SESSION
CITY OF CUPERTINO
FY 25 –FY 27 City Work Program Goal:
Permit Streamlining and Simplification for Small Home
Upgrades
July 14, 2026
FY 25 – FY 27 City Work Program Quality of Life Goal:
Permit Streamlining and Simplification for Small Home
Upgrades
Develop a suite of improvements to (1) improve access to, and (2) speed the
processing of permits for small home upgrades to;
•Enhance compliance and improve overall efficiency.
•Improve turnaround times.
•Set Service Level Agreements (SLAs) for staff and outsourced reviewers.
•Set customer service Key Performance Indicators (KPI’s).
•Create templates to reduce back and forth.
•Improve internal staff expertise to reduce consulting expenses.
What Are Small Home Upgrades?
Types of permits/projects that are considered small home
upgrades in Cupertino are:
•Small additions (<250 sq ft)
•Kitchen and bathroom in-place replacements or new or
relocated appliances and fixtures
•Equipment upgrades including;
•EV charging
•Heat pump installation
•Furnace or water heater replacement
•HVAC
•Whole house or partial re-pipe
Timeline of Activity
•March 2025: The City Council approved FY 2025-
2027 City Work Program priority items.
•FY 2025: CDD Staff began work on this CWP item.
•February 2026: An outreach survey was distributed
to 12 local CBO’s, in which we received a 50%
response rate.
•Today staff is ready to report on findings, progress,
receive feedback, and discuss next steps.
Benchmarking Methodology
Survey responses received from six of twelve outreached Chief
Building Officials in cities throughout Santa Clara County focused on
the following categories;
•Permitting Programs Used and Metric Reporting
•Turnaround Times - Expected vs. Actual
•Permit and Staffing Volumes
•Review Process and Business Support Features
•Response Times - Applicant and Staff
•Service Level Agreements (SLA) & Key Performance Indicators
(KPI)
•Efficiency Factors
•All peer jurisdictions provide detailed checklists and handouts for small
home remodel permits.
•Only one peer city publicly reports key performance indicators (KPIs).
•Permitting system platforms vary across cities, though three jurisdictions
use Accela (Cupertino’s permit programming platform).
•The most common causes of repeat submittals are incomplete
applications and the applicant’s unfamiliarity with code requirements.
•All cities experienced a decline in small home remodel permits between
FY23 and FY24.
•Cupertino experienced an increase in permit submissions during the
same period.
Survey Findings Overview
Benchmarking Data with Peer Cities:
Volume, Staffing, & Review Times
City Total Small Home
Remodel Permits
(FY24-25)
Total Full
Time
Employee
Reviewers
Consultant
Support for
the Building
Division
Actual Avg First
Round Review
(Days)
Cupertino 2144 2 Yes 19
City 2 60 2 No 21
City 3 3115 7 Yes 40
City 4 419 9 Yes 21
City 5 152 5 Yes 30
City 6 179 5 No 20
City 7 737 11 No 20
1908 1941
2302 2324
2828
0
500
1000
1500
2000
2500
3000
2021 2022 2023 2024 2025
Cupertino’s Total Residential
Building Permits from 2021 - 2025
Total Building Permits
2021 2022 2023 2024 2025
Building 7.78 11.72 11.66 10.96 16.9
Planning 11.07 16.85 23.03 24 27.2
Fire 8.27 13.64 14.76 15.56 22.07
Cupertino Sanitary 10.74 16.95 15.015 18.18 19.56
Public Works 9.72 16.25 12.95 15.64 24.23
0
5
10
15
20
25
30
Cupertino’s Average Building Permit
Turnaround Time (Days) by Division
Building Planning Fire Cupertino Sanitary Public Works
•Over-the-counter same-day plan review
•Options to schedule a pre-submittal meeting to help reduce review
cycles for building permit applications
•Detailed checklists and handouts
•Permitting system guides for navigating permitting programs
•Email notification and permit status features
•Walk-in counter services
•Electronic plan review and submittal
•A responsive and reachable staff
•Use of Zendesk, a customer service accountability platform
Current Available Service Features
Exploring AI-supported
prescreening and plan review (in
coordination with IT) to identify
issues earlier
Expand staff training and use of
Microsoft Copilot to improve
efficiency and consistency
Develop clear, standardized
checklists for all small residential
remodel permits
Continue to offer instant online
permits for common residential
projects (e.g., solar, reroof, EV
chargers, water heaters)
Current Streamlining Efforts Underway
Expanding instant permits to
additional minor projects (e.g.,
kitchen/bath remodels, HVAC,
heat pumps)
Upgrading the online permit
portal to improve usability and
support all permit types in
collaboration with IT
Implementing the e-check
payment options for permit fees
Discussion, Questions, & Next Steps
PC 07-14-2026
#3
Review of the Draft Active
Transportation Plan and Provide
a
Recommendation to the City
Council.
Presentations
Active Transportation Plan
City Of Cupertino
Planning Commission Meeting
July 14, 2026
Latest Commission Comments
The Draft Project List was presented to the Bicycle Pedestrian
Commission and Planning Commission following Phase 2.
•Planning Commission –February 10, 2026
•Bicycle Pedestrian Commission –February 18, 2026
Areas of Consensus
•Safety should be prioritized for the Vision Zero HIN.
•School scoring is overweighted and should be reduced.
Recommended Adjustment
•Subtract 10 points from Schools and apply 10 to Vizion Zero HIN.
Council Direction
The Planning Commission and Bicycle Pedestrian Commission
recommendations were presented to City Council on April 7, 2026.
•After reviewing all Phase 2 materials, Council conducted a straw
poll, instructing staff only to rescore projects using the proposed
scoring adjustment.
•Chapter 7 of the Draft ATP reflects the Council’s direction.
•The rankings in Chapter 7 serve only as guidance for future project
selection. Project selection will be determined through future
Council CIP approval, in consideration of available funding,
staffing, resource availability, priorities, among other factors.
What’s in the Plan?
The work completed in Phases 1 and 2
makes up the Draft Active
Transportation Plan.
•The Draft Active Transportation Plan
incorporates all materials previously
reviewed by the City Council, the
Bicycle Pedestrian Commission, and
the Planning Commission.
•Its content reflects the direction
provided by the City Council to staff
throughout the project.
Phase 1
Mar – Jun 2025
Policy review
Technical analysis
Initial outreach
Phase 2
Aug – Nov 2025
Phase 3
2026
Draft Plan development
Public review
Draft network recsAdditional outreachCommission/Council review
Draft Plan Comments
What we Heard from the Community
•Minor clarifications or document
presentation edits
•Suggestions already considered as
part of Phases 1 and 2
•Items outside the ATP scope
Draft Plan Revision
•Staff added minor language in
Chapter 1 to further emphasize
youth e-bike safety, supplementing
what’s included in Chapter 6
What Comes Next
Upcoming Meetings
•Bicycle Pedestrian Commission
•July 15, 2026
•City Council
•September 14, 2026