Loading...
HomeMy WebLinkAbout25-181 Got Gophers, Inc. Service Order # 1 dated 6-1-26 for Outdoor Pest Control Services Mary Ave Bridge ServicesContract/Purchasing Action Personnel Information Name Jonathan Ferrante Department Public Works  Division Trees/ROW Date 05.28.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Mary’s Bridge GS Proposal 5-14-26.docx Service Order Amount $6,650.00 Master Agreement Number 2026-0008 Contract Start Date 10/27/2025 Contract End Date 06/30/2028 Firm Name Got Gophers Address PO Box 1541 Morgan Hill, CA 95038, USA Phone (408) 605-1655 Consultant/Contractor Name Got Gophers Consultant/Contractor Email georgia@gotgophers.co Project Name SO 1 Trees/ROW Marry Ave Bridge Services Project Location Marry Avenue Bridge North Cupertino Project Manager Name Jonathan Ferrante Cupertino Project Manager Email jonathanf@cupertino.org Master Agreement Maximum Compensation $90,000.00 Total Previously Encumbered to Date $0.00 Encumbrance this Service Order $6,650.00 Master Agreement Unencumbered Balance $83,350.00 SO GL #100-86-261 700-702 NWS Project Code Comments This is for a clean out and recurring service through 6-2028 (Contract term). Signature       05/29/2026 PDT  Consultant/Contractor Signature Date       05/29/2026 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       06/01/2026 PDT  Management Analyst Signature Date Email: georgia@gotgophers.co Date: 05/29/2026 PDT Email: jonathanf@cupertino.gov Date: 05/29/2026 PDT Email: PWMA@cupertino.gov Date: 06/01/2026 PDT May 14, 2026 RE: Ground Squirrel Control at Mary’s Bridge Scope of Work Initial Clean Out • Walk areas of concern twice weekly for four weeks. • All active ground squirrel burrows will be smoked out using our CO machine. • Each active burrow needs a 30-minuet CO treatment. • Set six ground squirrel stations in areas of high activity. • The areas may be used as normal between visits. • Please note that there was significant gopher activity as well as ground squirrel activity. Our proposal is only to control the ground squirrel activity. If a proposal is needed for gopher control, please let us know. Cost: $1,250.00, this includes all materials, labor, and work for the first four weeks. Monthly Maintenance (To begin after the Clean Out) • Walk the areas of concern twice per month and set an appropriate number of bait stations based on ground squirrel activity. • All active ground squirrel burrows will be smoked with CO. • Bait stations will be checked and refilled twice per month. • Areas may be used as normal between visits. • New critters will come from adjacent areas and will slowly re-inhabit the treated area over time. We recommend a year-round maintenance program. • You are always more than welcome to call us in between our visits, if there is new and concerning activity and someone will be out within 48 hours. Cost: Monthly maintenance is $225.00 for two visits per month. Bait Information: • The bait used is a multi-feed (Typically cholecalciferol-Vitamin D). • Multi-feed baits are low in secondary toxicity by design, so they are safe to use around pets and wildlife. • There will come a time where activity may look like it is increasing, but that means the ground squirrels are coming in from the surrounding areas to eat the bait and a decrease will be seen within 2-3 months. • The bait stations are tamper-resistant boxes that are staked into the ground. The bait inside is not easily accessible to pets, wildlife, or children. • Ground squirrels most often die within their burrow; so dead carcasses are not often seen above ground. • Got Gopher’s is licensed by the state of CA to apply this bait in accordance with the label. • All bait used must be reported to the county agricultural department, so they can monitor usage. Got Gophers is fully licensed and insured. All supporting documentation has been submitted to the city. Thank you again for your time and consideration, we look forward to hearing from you soon. Georgia Eaton Georgia Eaton | Owner | 408.605.1655 | PO Box 1541 Morgan Hill, CA 95038 SO 1 TreesROW Marry Ave Bridge Services - Service Request Created:05/29/2026 Status:Signed Transaction ID:3013ff15-04da-4c32-8461-79c2b172fba6 "SO 1 TreesROW Marry Ave Bridge Services - Service Request" history Jindy Gonzalez created the document 05/29/2026 7:56:13 AM PDT - IP address 71.198.170.154 Document was emailed to Got Gophers 05/29/2026 7:56:14 AM PDT Got Gophers opened the document 05/29/2026 9:24:27 AM PDT - IP address 134.16.47.215:61446 Got Gophers signed the document 05/29/2026 9:25:05 AM PDT - IP address 134.16.47.215:61446 Document was emailed to jonathanf@cupertino.gov 05/29/2026 9:25:06 AM PDT jonathanf@cupertino.gov opened the document 05/29/2026 11:24:18 AM PDT - IP address 64.165.34.3:8978 jonathanf@cupertino.gov signed the document 05/29/2026 11:24:38 AM PDT - IP address 64.165.34.3:8978 Document was emailed to Public Works Management Analyst 05/29/2026 11:24:39 AM PDT Public Works Management Analyst opened the document 06/01/2026 7:45:05 AM PDT - IP address 71.198.170.154:54428 Public Works Management Analyst signed the document 06/01/2026 7:45:15 AM PDT - IP address 71.198.170.154:54428 Document was successfully signed and filed 06/01/2026 7:45:15 AM PDT