Loading...
HomeMy WebLinkAbout24-023 Weatherproofing Technologies_Service Order #4 dated 4-1-26 for Sports Center New Roof - IR ScanContract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 03.12.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation IR Scan Proposal - Cupertino Sports Center (002).pdf Service Order Amount $1,776.93 Master Agreement Number 2024-057 Contract Start Date 02/23/2024 Contract End Date 01/31/2027 Firm Name Weatherproofing Technologies, Inc. Address 37350 Green Rd, Beachwood, OH 44122, USA Phone (209) 986-2698 Consultant/Contractor Name Coleman Wallace Consultant/Contractor Email cwallace@tremcoinc.com Project Name SO 4 Sports Center New Roof - IR Scan Project Location Sports Center Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $17,585.00 Encumbrance this Service Order $1,776.93 Master Agreement Unencumbered Balance $40,638.07 SO GL #570-87-836 700-702 NWS Project Code Signature         Consultant/Contractor Signature Date         Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.         Management Analyst Signature Date James McDonald/ss Mar 27, 2026 Nathan Vasquez Apr 01, 2026 jindy gonzalez Apr 1, 2026 Weatherproofing Technologies, Inc. 3735 Green Road, Beachwood, OH 44122 January 29, 2026 Jimmy Tan Assistant Director of Public Works City of Cupertino Re: Cupertino Sports Center - Roof Diagnostics Dear Mr. Tan, This proposal is for an Infrared Scan at the following project site: Cupertino Sports Center – 21111 Stevens Creek Blvd. Deliverables: Preliminary Infrared Scan as follows: 1. Project Size: Approx. 10,000 sq ft consisting of 1 building, 1 roof level. 2. Scan all accessible roof sections with a MID -WAVE Infrared Camera. 3. Take infrared pictures (thermograms) of suspected wet roof area(s) and dry overall(s) thermograms of roof sections if no suspected anomalies are present. 4. Mark out suspected wet areas (anomalies) with visible paint outlines. 5. NO physical verification of suspected areas will be identified by Diagnostic Technician. * All verification of suspected wet area(s) will be done at the responsibility of the Sales Representative. 6. Plot all thermogram locations on a roughly scaled GPS drawing with appropriate identifications to be drafted into a Tremco/WTI branded formal report. Proposed Total Cost: $1,776.93 Please let me know if there are any questions. To proceed with the survey, please have the City forward a Purchase Order made out to “Weatherproofing Technologies, Inc.” to my attention or return a signed copy of this proposal to me and I will proceed to get the work scheduled. Respectfully Submitted, Coleman Wallace Field Support Specialist Tremco Roofing & Building Maintenance 209-986-2698 (cell) cwallace@tremcoinc.com SO 4 Sports Center New Roof - IR Scan - Service Request Final Audit Report 2026-04-01 Created:2026-03-27 By:Sundari Pilaka (Sundarip@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAAuOSnwarZ8uK3pOYJbf4qHiO6vvE5frQH "SO 4 Sports Center New Roof - IR Scan - Service Request" His tory Document created by Sundari Pilaka (Sundarip@cupertino.org) 2026-03-27 - 0:57:00 AM GMT- IP address: 99.72.152.114 Document emailed to Thomas Cummings (contracts@tremcoinc.com) for signature 2026-03-27 - 1:02:24 AM GMT Email viewed by Thomas Cummings (contracts@tremcoinc.com) 2026-03-27 - 1:02:27 AM GMT- IP address: 34.239.14.59 Signer Thomas Cummings (contracts@tremcoinc.com) entered name at signing as James McDonald/ss 2026-03-27 - 1:19:20 PM GMT- IP address: 134.238.182.192 Document e-signed by James McDonald/ss (contracts@tremcoinc.com) Signature Date: 2026-03-27 - 1:19:22 PM GMT - Time Source: server- IP address: 134.238.182.192 Document emailed to nathanv@cupertino.gov for signature 2026-03-27 - 1:19:24 PM GMT Email viewed by nathanv@cupertino.gov 2026-03-27 - 1:19:34 PM GMT- IP address: 54.144.140.173 Signer nathanv@cupertino.gov entered name at signing as Nathan Vasquez 2026-04-01 - 12:24:31 PM GMT- IP address: 64.165.34.3 Document e-signed by Nathan Vasquez (nathanv@cupertino.gov) Signature Date: 2026-04-01 - 12:24:33 PM GMT - Time Source: server- IP address: 64.165.34.3 Document emailed to jindyg@cupertino.gov for signature 2026-04-01 - 12:24:34 PM GMT Email viewed by jindyg@cupertino.gov 2026-04-01 - 12:24:48 PM GMT- IP address: 18.206.151.152 Signer jindyg@cupertino.gov entered name at signing as jindy gonzalez 2026-04-01 - 4:08:23 PM GMT- IP address: 73.241.25.149 Document e-signed by jindy gonzalez (jindyg@cupertino.gov) Signature Date: 2026-04-01 - 4:08:25 PM GMT - Time Source: server- IP address: 73.241.25.149 Agreement completed. 2026-04-01 - 4:08:25 PM GMT