Loading...
HomeMy WebLinkAbout25-023 Axis Mechanical_Service Order 1 dated 2-14-26 for Quinlan Community Center Chiller Repl. x2Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 02.04.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation CP-2 Replace Pumps w-New 7_5 HP Rev 3.pdf Service Order Amount $49,976.00 Master Agreement Number 2025-020 Contract Start Date 12/19/2024 Contract End Date 06/30/2027 Firm Name Axis Mechanical Address 908 Bern Ct, San Jose, CA 95112, USA Phone (408) 573-7400 Consultant/Contractor Name Jonathan Diaz Consultant/Contractor Email johnd@axismechanicalinc.com Project Name SO 1 Quinlan Community Center Chiller Repl. x2 Project Location QCC Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $0.00 Encumbrance this Service Order $49,976.00 Master Agreement Unencumbered Balance $10,024.00 SO GL #100-87-830 700-702 NWS Project Code Comments CP-2 - Change Order for QCC Chiller Replacement. Project # 2025-428 Signature       02/05/2026 PST  Consultant/Contractor Signature Date       02/06/2026 PST  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.  02/11/2026 PST  Email: johnd@axismechanicalinc.com Date: 02/05/2026 PST Email: nathanv@cupertino.gov Date: 02/06/2026 PST      Management Analyst Signature Date Email: PWMA@cupertino.gov Date: 02/11/2026 PST 908 Bern Court, San Jose CA. 95112 Phone (408) 573-7400 * Contractor License #974024 * Fax (408) 573-7900 MBE Certified Member of N.C.M.S.D.C. Date:February 4, 2026 City of Cupertino Attn:Nathan Vasquez Project Reference:Quinlan Community Center Chiller Repl. x2 Subject: CP-2 Replace Pumps w-New 7.5 HP Our Job # :24-074 Change Proposal # :CP-2 Customer Project # :2025-00000428 We have included the following into change proposal. As we have completed/If we are to Proceed, please add $49,976 to our contract amount. Our Change Proposal Includes the following scope: CHW Pump Scope of Work -Provide labor to support (2) facility shutdown & Drain CHW system -Provide & Install (4) new 4" Isolation Valves for (2) New 7.5 HP CHW Pumps -Provide & install (2) new 7.5 HP CHW Pumps -Provide labor to remove (2) Existing CHW Pump Electrical Disconnects -Provide & install (2) new 7.5 HP CHW Pump VFDs -Provide labor and electrical materials to install new VFDs -Provide labor and HVAC Piping materials to install new VFDs -Provide labor to support Facilities when reintroducing the CHW with Glycol. Glycol refill by facilities -Bond price included Exclusions/Clarification: -Premium time labor -Removal and disposal of hazardous materials -Permits and drawings -Cutting and patching of roof and walls Proposal is valid for 30 days from date above, and can be requested for extension, at customer request. Labor and materials is warrant up to one year, from completion date of work performed. Sincerely Jonathan Diaz Project Manager 408-638-1161 SO 1 Quinlan Community Center Chiller Repl. x2 - Service Request Created:02/05/2026 Status:Signed Transaction ID:144a609b-9d04-4c9c-b3ed-1b987c0e59d0 "SO 1 Quinlan Community Center Chiller Repl. x2 - Service Request" history Sundari Pilaka created the document 02/05/2026 12:04:14 PM PST - IP address 64.165.34.3 Document was emailed to Jonathan Diaz 02/05/2026 12:04:15 PM PST Jonathan Diaz opened the document 02/05/2026 6:32:46 PM PST - IP address 107.128.99.82:62247 Jonathan Diaz signed the document 02/05/2026 6:33:39 PM PST - IP address 107.128.99.82:62247 Document was emailed to nathanv@cupertino.gov 02/05/2026 6:33:40 PM PST nathanv@cupertino.gov opened the document 02/06/2026 7:23:41 AM PST - IP address 64.165.34.3:50657 nathanv@cupertino.gov signed the document 02/06/2026 7:24:11 AM PST - IP address 64.165.34.3:50657 Document was emailed to Public Works Management Analyst 02/06/2026 7:24:12 AM PST Public Works Management Analyst opened the document 02/11/2026 4:41:10 PM PST - IP address 64.165.34.3:15005 Public Works Management Analyst signed the document 02/11/2026 4:41:43 PM PST - IP address 64.165.34.3:15005 Document was successfully signed and filed 02/11/2026 4:41:43 PM PST