HomeMy WebLinkAboutRM-2025-025 - A0.1 SITE PLANROLL CURB
WM
HANNA DRIVE (50' R/W)
CO
AP
N
3
7
5
-
2
9
-
1
5
AP
N
3
7
5
-
2
9
-
1
3
APN
3
7
5
-
2
9
-
1
4
CONCRETE SIDEWALK
47
'
-
7
"
5'
5'
6'
-
9
"
15
'
11
'
-
1
1
"
9'
-
1
0
"
5'PU
E
17
'
-
1
0
"
7'
14 SF
2'
3'
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
5'-9"
6'-0" MIN.
18'
18'-0" MAX.
W
S
GARAGE
450.95 SF 1ST FLOOR LIVING
1207.83 SF
CO
ADU
741.36 SF
2ND FLOOR LIVING
1038.71 SF
1ST FLOOR PATIO
285.2 SF
2ND FLOOR DECK
196.9 SF
17
'
-
7
"
MI
N
.
1
7
'
-
0
"
5'
20
'
FR
O
N
T
S
E
T
B
A
C
K
L
I
N
E
20
'
-
4
"
1S
T
F
L
O
O
R
S
E
T
B
A
C
K
25
'
2N
D
F
L
O
O
R
S
E
T
B
A
C
K
15'
2ND FLR. SETBACK
34'-6"
ADU SETBACK
9'-11"
5'-
8
"
25
'
-
1
1
"
PA
T
I
O
&
D
E
C
K
S
E
T
B
A
C
K
32
'
-
6
"
2N
D
F
L
R
.
S
E
T
B
A
C
K
64.92 SF
13 SF
13 SF
15'
2ND FLR. SETBACK
4'
3'-9"
3'
22
'
-
4
"
10'
SHEET NO.
SITE PLAN
A0.1
SHEET TITLE:
DATE:
SIGNATURE:
SUBMITTAL DATE:
DRAWING BY:
PROJECT NO:
REVISION:
PROJECT:
ACHITECT:
LILY LNV LLC
PO BOX 471
CUPERTINO, CA, 95015
(408)-797-4948
SMART LILY LLC
NEW CUSTOMER HOUSE
18761 HANNA DR
CUPERTINO, CA, 95014
APPLICANT/OWNER:
MS. LI WEI
PO BOX 471
CUPERTINO, CA, 95015
(408)-797-4948
N
Scale: 1:1/8
SITE PLAN1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
14
14
14
14
14
14
14
15
18 18
20
21
23
24
25
26
28
29
30
31
32
33
34
SITE KEY NOTE:
1.NEW DRIVE WAY APPROACH W/ 6' TRANSITION ON EACH SIDE. PER
CUPERTINO STANDARD DETAIL 1-21. OWNER CONTRACTOR TO APPLY
FOR ENCROACHMENT PERMIT PRIOR TO DO ANY WORK IN THE PUBLIC
RIGHT OF WAY. ONSITE DRIVEWAY SHALL MATCH NEW GRADES AT
BACK OF SIDEWALK.
2.(N) IMPERVIOUS CONC. PAVER DRIVE WAY LESS THAN 50% FRONT
YARD AREA.
3.24" ROOF OVER HANG, TOTAL AREA IS (509 SF)
4.STEP LANDING (NOT A PORCH OR PATIO STRUTURE) LESS THAN 18"
FROM NATURAL GRADE, STEP LANDING WITH 18" HIGH FROM GRADE
SHALL HAVE 10'-0" MIN. SET BACK
5.(N) TREE, SEE PRIVACY PLAN ON A0.2
6.(N) ELECTRICAL MAIN PANEL, MIN. 400A PER PG&E RECOMENDATION
7.(N) OVER HEAD UTILITIES LINE.
8.FIRST FLOOR LIN OF FIRST FLOOR SIDE SET BACK
9.ADU CONDENSER AC UNIT WITH 62 dBA. MANUFACTURE CARRIER,
MODEL 38MARBQ24AA3, INSTALL (1) UNIT MIN. 7FT FROM PROPERTY
LINE. SEE "SR-WORKSHEET-ADU.PDF" SEE ALSO CUT SHEET IN PAGE
A0.4
10.PROVIDE FOR MAIN HOUSE FIRST FLOOR (1) CONDENSER AC UNIT WITH
60 dBA MANUFACTURE BLUERIDGE, MODEL BMM27C. INSTALL (1) UNIT
MIN. 9FT FROM PROPERTY LINE. SEE "SR-WORKSHEET-MDU.PDF" SEE
ALSO CUT SHEET ON PAGE A0.4
11.MAIN HOUSE SECOND FLOOR CONDENSER AC UNIT WITH 61.5 dBA.
MANUFACTURE CARRIER, MODEL 38MARBQ30AA3. INSTALL (1) UNIT MIN.
9FT FROM PROPERTY LINE. SEE "SR-WORKSHEET-MDU.PDF" SEE ALSO
CUT SHEET ON PAGE A0.4
12.PUE SHALL BE KEPT OPEN AND FREE FROM BUILDINGS AND
STRUCTURES OF ANY KIND.
13.PROJECTING BAY WINDOWS WILL MEET ALL OF THE FOLLOWING
CRITERIA:
a. THE BAY WINDOW WILL NOT CREATE ADDITIONAL USEABLE SPACE
FOR SEATING OR OTHER PURPOSES AND SHALL BE CANTILEVERED
b. THE BAY WINDOW WILL NOT CREATE A PROJECTION OF THE FLOOR
c. THE BAY WINDOW WALLS WILL NOT PROJECT MORE THAN 24 INCHES
FROM AN EXTERIOR WALL
d. THE BAY WINDOW WILL BE AT LEAST 24 INCHES FROM FINISHED
FLOOR
14.WALL LIGHT, MANUFACTURE MAXIMA, MODEL MEL-14125W - SEE
PRODUCT CUT SHEET ON PAGE A0.4
15.PRIOR TO ISSUANCE OF BUILDING PERMIT, PROPERTY OWNER CAN
APPLY FOR A REVOCABLE ENCROACHMENT PERMIT FOR THE
PROPOSED PRIVATE IMPROVEMENTS. BY SIGNING THE REVOCABLE
ENCROACHMENT PERMIT, THE OWNER AGREES AND SHALL MAINTAIN
ALL PRIVATE AND NON-STANDARD IMPROVEMENTS WITHIN THE PUBLIC
RIGHT-OF-WAY. FURTHERMORE, UPON CITY'S REQUEST, THE OWNER
AGREES TO REMOVE, RELOCATE AND/OR MODIFY THESE
IMPROVEMENTS AT OWNER'S SOLE EXPENSE. IF AND WHEN UTILITY
COMPANIES ARE REQUIRED TO PERFORM WORK WITHIN THE AREA,
THE CITY MAY REQUIRE UTILITY COMPANIES TO REMOVE OR REPLACE
THESE IMPROVEMENTS IN KIND. HOWEVER, CITY AND UTILITY
COMPANIES WILL NOT PROVIDE WARRANTIES ON THE REPLACED
IMPROVEMENTS. THE OWER ACCEPTS ALL LIABILITY FOR THESE
IMPROVEMENTS AND AGREES TO DISCLOSE THE NATURE OF THIS
ENCROACHMENT PERMIT WITH POTENTIAL BUYERS OF PROPERTY.
16.(E) TREE TO REMAIN AND PROTECTED DURING CONSTRUCTION PER
CITY STANDARD DETAIL 6-4 ON PAGE A0.3
17.REMOVE (E) TREE - SEE PLANTING PLAN L1
18.PROVIDE (2) 10'W x 20'D PARKING ON DRIVEWAY AND (2) 10'W x 20'D
INSIDE GARAGE - SEE KEY NOTE 3 ON PAGE A2.1
19.REMOVE (E) TREE, SEE PAGE L1
20.ADU PEDESTRIAN ACCESS - SEE L1
21.DRIVEWAYS SHALL HAVE A MIN. CLEARANCE OF TWO FEET FROM
PROPERTY LINE - SEE PAGE L1
22.ADU ROOF OVERHANG SHALL HAVE MIN. 4'-0" SET BACK FROM THE SIDE
PROPERTY LINE.
23.REQ. FRONT YARD TREE - SEE PLANTING PLAN L1
24.FRONT YARD PAVER - SEE L1
25.REPLACE (E) 3
4 " WATER METER WITH (N) WATER METER PER FIRE
SPRINKLER PLAN
26.(N) 11
4 " WATER LINE
27.WATER PIPE SPLIT FROM OUT SIDE ONE CONNECT TO MAIN HOUSE
AND ONE CONNECT TO ADU. ALL WATER PIPE SHALL BE COPPER OR
SCHEDULE 40.
28.INSTALL NEW C.O. AT PROPERTY LINE PER CITY OF SUNNYVALE
STANDARD DETAIL 15A
29.(N) 4" CLEAN OUT, MAX. 24" FROM BUILDING FOOT PRINT. SHALL BE AS
SAME SIZE OF THE SEWER LATERAL
30.(N) 4" ABS SEWER LINE
31.3" ABS LATERAL LEADING TO ADU CONNECTED TO SEWER LATERAL
FROM THE FRONT YARD.
32.DRIVE WAY PAVERS TO EXTEND INTO THE PUBLIC RIGHT OF WAY.
33.SAW CUT 1' MIN. OF (E) AC PACEMENT ALONG THE CURB & GUTTER (OR
DRIVEWAY ) TO BE REMOVED. REPLACE ASPHALT WITH A MIN. 12" AC
DEEP LIFT PLUG.
34.ANCHOR HEAT PUMP CONDENSER UNIT TO A CONC. PAD PER CMC
110.26. A COMPRESSOR OR PORTION OF A CONDENSING UNIT
SUPPORTED FROM THE GROUND SHALL REST ON A CONCRETE OR
OTHER APPROVED BASE EXTENDING NOT LESS THAN 3 INCHES ABOVE
THE ADJOINING GROUND LEVEL.
35.(N) 6'-0" MAX. HIGH REDWOOD FENCE AND/OR GATE.
36.DEMONSTRATE COMPLIANCE WITH 19.124.030A(D), THE UNCOVERED
PARKING STALL ON THE LEFT APPEARS TO BE WITHIN THE
NON-PERVIOUS AREA.
13
17
19
27
09.29.2025
JS
09.29.2025
2510HD
5
5
1
1
1
NO.REVISION DATE
1 PLAN CHECK COMMENT NOV.19.2025
2 PLAN CHECK COMMENT JAN. 06.2026
2
REQ. DURING CONSTRUCTION
1.FUGITIVE DUST CONTROL: SEE TABLE 5-2 BASIC BEST MANAGEMENT PRACTICES FOR CONSTRUCTION-RELATED FUGITIVE DUST EMISSIONS DURING DEMOLITION, GROUND DISTURBING ACTIVITIES AND/OR CONSTRUCTION.
2.VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT INCLUDE A NOTE ON ALL PLANS WHERE PAINT SPECIFICATIONS OR OTHER DESIGN SPECIFICATIONS ARE LISTED, THAT THE PROJECT DESIGN WILL INCORPORATE ONLY
LOW-VOC PAINT (I.E., 50 GRAMS PER LITER [G/L] OR LESS) FOR INTERIOR AND EXTERIOR WALL ARCHITECTURAL COATINGS.
3.AVOID NESTING BIRDS DURING CONSTRUCTION SHOULD GROUND DISTURBING ACTIVITIES OCCUR BETWEEN FEBRUARY 1 AND AUGUST 31, A PRECONSTRUCTION SURVEY, COMPLETED NO MORE THAN SEVEN DAYS BEFORE THE
START OF ACTIVITIES, WILL BE SUBMITTED TO THE CITY IN COMPLIANCE WITH CITY CODE SECTION 17.04.050. ADDITIONALLY, IF FEASIBLE, TREE REMOVAL AND/OR PRUNING WILL BE COMPLETED BEFORE THE START OF THE NESTING
SEASON (FEBRUARY 1 TO AUGUST 31) TO HELP PRECLUDE NESTING.
4.ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES: THE PROJECT APPLICANT SHALL PROVIDE WRITTEN VERIFICATION, INCLUDING THE MATERIALS PROVIDED TO CONTRACTORS AND CONSTRUCTION CREWS, TO THE
CITY CONFIRMING THAT CONTRACTORS AND CONSTRUCTION CREWS HAVE BEEN NOTIFIED OF BASIC ARCHAEOLOGICAL SITE INDICATORS, THE POTENTIAL FOR DISCOVERY OF ARCHAEOLOGICAL RESOURCES, LAWS PERTAINING TO
THESE RESOURCES, AND PROCEDURES FOR PROTECTING THESE RESOURCES AS FOLLOWS:
a.BASIC ARCHAEOLOGICAL SITE INDICATORS THAT MAY INCLUDE, BUT ARE NOT LIMITED TO, DARKER THAN SURROUNDING SOILS OF A FRIABLE NATURE; EVIDENCE OF FIRES (ASH, CHARCOAL, FIRE AFFECTED ROCK OR EARTH);
CONCENTRATIONS OF STONE, BONE, OR SHELLFISH; ARTIFACTS OF STONE, BONE, OR SHELLFISH; EVIDENCE OF LIVING SURFACRES (E.G., FLOORS); AND BURIALS, EITHER HUMAN OR ANIMAL.
b.THE POTENTIAL FOR UNDISCOVERED ARCHAEOLOGICAL RESOURCES OR TRIBAL CULTURAL RESOURCES ON SITE.
c.THE LAWS PROTECTING THESE RESOURCES AND ASSOCIATED PENALTIES, INCLUDING, BUT NOT LIMITED TO, THE NATIVE AMERICAN GRAVES PROTECTION AND REPATRIATION ACT OF 1990, PUBLIC RESOURCES CODE SECTION
5097, AND CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050 AND SECTION 7052.
d.THE PROTECTION PROCEDURES TO FOLLOW SHOULD CONSTRUCTION CREWS DISCOVER CULTURAL RESOURCES DURING PROJECT-RELATED EARTHWORK, INCLUDE THE FOLLOWING:
d.a.ALL SOIL DISTURBING WORK WITHIN 25 FEET OF THE FIND SHALL CEASE.
d.b. THE PROJECT APPLICANT SHALL RETAIN A QUALIFIED ARCHAEOLOGIST TO PROVIDE AND IMPLEMENT A PLAN FOR SURVEY, SUBSURFACE INVESTIGATION, AS NEEDED, TO DEFINE THE DEPOSIT, AND ASSESSMENT OF THE
REMAINDER OF THE SITE WITHIN THE PROJECT AREA TO DETERMINE WHETHER THE RESOURCE IS SIGNIFICANT AND WOULD BE AFFECTED BY THE PROJECT.
d.c.ANY POTENTIAL ARCHAEOLOGICAL OR TRIBAL CULTURAL RESOURCES FOUND DURING CONSTRUCTION ACTIMTIES SHALL BE RECORDED ON APPROPRIATE CALIFORNIA DEPARTMENT OF PARKS AND RECREATION FORMS BY A
QUALIFIED ARCHAEOLOGIST. IF THE RESOURCE IS A TRIBAL CULTURAL RESOURCE, THE CONSULTING ARCHAEOLOGIST SHALL CONSULT WITH THE APPROPRIATE TRIBE, AS DETERMINED BY THE NATIVE AMERICAN HERITAGE
COMMISSION, TO EVALUATE THE SIGNIFICANCE OF THE RESOURCE AND TO RECOMMEND APPROPRIATE AND FEASIBLE AVOIDANCE, TESTING, PRESERVATION OR MITIGATION MEASURES, IN LIGHT OF FACTORS SUCH AS THE
SIGNIFICANCE OF THE FIND, PROPOSED PROJECT DESIGN, COSTS, AND OTHER CONSIDERATIONS. THE ARCHEOLOGIST SHALL PERFORM THIS EVALUATION IN CONSULTATION WITH THE TRIBE.
5.HUMAN REMAINS AND NATIVE AMERICAN BURIALS: DURING PROJECT CONSTRUCTION, THE PROJECT APLICANT SHALL COMPLY WITH CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050.5 AND CALIFORNIA PULIC RESOURCES.
a.IN THE EVENT OF DISVOERING HUMAN REMAINS DURING CONSTRUCTION ACTIVITIES, THERE SHALL BE NO FURTHER EXCAVATION OR DISTURBANCE OF THE SITE WITH A 100-FOOT RADIUS OF THE REMAINS, OR ANY NEARBY AREA
REASONABLE SUSPECTED TO OVERLIE ADJACENT REMAINS.
b.THE SATA CLARA COUNTY CORONER SHALL BE NOTIFIED IMMEDIATELY AND SHALL MAKE A DETERMINATION AS THE WHETHER THE REMAINS ARE NATIVE AMERICAN.
c.IF THE SANTA CLARA COUNTY CORONER DETERMINES THAT THE REMAINS ARE NOT SUBJECT TO HIS AUTHORITY, HE SHALL NOTIFY THE NATIVE AMERICAN HERITAGE COMMISSION (NAHC) WITHIN 24 HOURS.
d.THE NAHC SHALL ATTEMPT TO IDENTIFY DESCENDANTS (MOST LIKELY DESCENDANT) OF THE DECEASED NATIVE AMERICAN.
e.THE MOST LIKELY DESCENDANT HAS 48 HOURS FOLLOWING ACCESS TO THE PROJECT SITE TO MAKE RECOMMENDATIONS OR PREFERENCES REGARDING THE DISPOSITIOON OF THE REMAINS. IF THE MOST LIKELY DESCENDANT
DOES NOT MAKE RECOMMENDATIONS WITH 48 HOURS AFTER BEING ALLOWED ACCESS TO THE PROJECT SITE, THE OWENER SHALL, WITH APPROPRIATE DIGINTY, REINTER THE REMAINS IN AN AREA OF THE PROPERTY SECURE
FROM FURTHER DISTURBANCE AND PROVIDE DOCUMENTATION ABOUT THIS DETERMINATION AND THE LOCATION OF THE REMAINS TO THE NAHC AND THE CITY OF CUPERITNO. ALTERNATIVE, IF THE OWENER DOES NOT ACCEPT
THE MOST LIKELY DESCENDANT’S RECOMMENDATIONS, THE OWNER OR THE DESCENDENT MAY REQUEST MEDIATION BY THE NAHC, CONSTRUCTION SHALL HALT UNITL THE MEDIATION HAS CONCLUDED.
6.NOISE AND VIBRATION NOTICE: AT LEAST 10 DAYS PIROR TO THE START OF ANY DEMOLITION, GROUND DISTURBING, OR CONSTRUCTION ACTIVITES, TH PROJECT APPLICANT/CONTRACTOR SHALL SEND NOTIVES OF THE PLANNED
ACTIVITY BY FIRST CLASS MAIL SEE UPLOADED “NOTICE OF CONSTRUCTION ACTIVITIES.PDF”.
7.NOISE AND VIBRATION SIGNAGE: CONTRACTOR TO PROVIDE A DRAFT SIGN THAT, AT LEAST 10 DAYS PRIOR TO THE START OF ANY DEMOLITION, GROUND DISTURBING, OR CONSTRUCTION ACTIVITYS, THE PROJECT
APPLICANT/CONTRACTOR SHALL ENSURE THAT A SIGN MEASURING AT LEAST TWO FEET BY THREE FEET SHALL BE POSTED ON CONSTRUCTION FENCING AT THE ENTERANCE(S) TO THE JOB SITE, CLEARLY VISIBLE TO THE PUBLIC,
AND INCLUDE THE FOLLOWING:
a.PERMITEED CONSTRCUTION DAYS AND HOURS;
b.A DESCRIPTION OF PROPOSED CONSTRCTION ACTIVITIES;
c.TELEPHONE NUMBERS OF THE CITY’S AND CONTRACTOR’S AUTHORIZED REPRESENTATIVES THAT ARE ASSIGNED TO RESPOND IN THE EVENT OF A COMPLAINT RELATED TO FUGITIVE DUST, PURSUANT TO THE REQUIREMENTS
FOR COMPLIANCE WITH BAAQMD’S CEQA AIR QUALITY GUIDELINES.
IF THE AUTHORIZED CONTRACTOR’S REPRESENTATIVE RECEIVES A COMPLAINT, THEY SHALL INVESTIGATE, TAKE APPROPRIATE CORRECTIVE ACTION, AND REPORT THE COMPLAINT AND THE ACTION TAKEN TO THE CITY WITHIN THREE
BUSINESS DAYS OF RECEIVING THE COMPLAINT.
8.NOISE DURING CONSTRUCTION: DURING PROJECT CONSTRCTION, THE PROJECT APPLICANT SHALL INCORPORATE THE FOLLOWING MEASURES THE REDUCE NOISE DURING CONSTRUCTION AND DEMOLITION ACTIVITY:
a.THE PROJECT APPLICANT AND CONTRACTORS SHALL PREPARE AND SUBMIT A CONSTRUCTION NOISE CONTROL PLAN TO THE CITY'S PLANNING DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO ISSUANCE OF THE FIRST
PERMIT. THE CONSTRUCTION NOISE PLAN SHALL DEMONSTRATE COMPLIANCE WITH DAYTIME AND NIGHTTIME DECIBEL LIMITS PURSUANT TO CHAPTER 10.48 (COMMUNITY NOISE CONTROL) OF CUPERTINO MUNICIPAL CODE. THE
DETAILS OF THE CONSTRUCTION NOISE CONTROL PLAN SHALL BE INCLUDED IN THE APPLICABLE CONSTRUCTION DOCUMENTS AND IMPLEMENTED BY THE ON-SITE CONSTRUCTION MANAGER. NOISE REDUCTION MEASURES
SELECTED AND IMPLEMENTED SHALL BE BASED ON THE TYPE OF CONSTRUCTION EQUIPMENT USED ON THE SITE, DISTANCE OF CONSTRUCTION ACTIVTIES FROM SENSITIVE RECEPTORS), SITE TERRAIN, AND OTHER FEATURES
ON AND SURROUNDING THE SITE (E.G., TREES, BUILT ENVIRONMENT) AND MAY INCLUDE, BUT NOT BE LIMITED TO, TEMPORARY CONSTRUCTION NOISE ATTENUATION WALLS, HIGH QUALITY MUFFLERS. DURING THE ENTIRE ACTIVE
CONSTRUCTION PERIOD, THE CONSTRUCTION NOISE CONTROL PLAN SHALL DEMONSTRATE THAT COMPLIANCE WITH THE SPECIFIED NOISE CONTROL REQUIREMENTS FOR CONSTRUCTION EQUIPMENT AND TOOLS WILL REDUCE
CONSTRUCTION NOISE IN COMPLIANCE WITH THE CITY'S DAYTIME AND NIGHTTIME DECIBEL LIMITS.
b.SELECT HAUL ROUTES THAT AVOID THE GREATEST AMOUNT OF SENSITIVE USE AREAS AND SUBMIT TO THE CITY OF CUPERTINO PUBLIC WORKS DEPARTMENT FOR APPROVAL PRIOR TO THE START OF THE CONSTRUCTION PHASE.
c.SIGNS WILL BE POSTED AT THE JOB SITE ENTRANCE(S), WITHIN THE ON-SITE CONSTRUCTION ZONES, AND ALONG QUEUEING LANES (IF ANY) TO REINFORCE THE PROHIBITION OF UNNECESSARY ENGINE IDLING. ALL OTHER
EQUIPMENT WILL BE TURNED OFF IF NOT IN USE FOR MORE THAN 5 MINUTES.
d.DURING THE ENTER ACTIVE CONSTRCUTION PERIOD AND TO THE EXTENT FEASIBLE, THE USE OF NOISE PRODUCING SIGNALS, INCLUDING HORNS, WHISTLES, ALARMS, AND BELLS WILL BE FOR SAFETY WARNING PURPOSED ONLY.
THE CONSTRUCTION MANAGER WILL USE MART BACK-UP ALARMS, WHICH AUTOMATICALLY ADJUST THE ALARM LEVEL BASED ON THE BACKGROUND NOISE LEVEL OR SWITH OFF BACK-UP ALARMS AND REPLACE WITH HUMAN
SPOTTERS IN COMPLIANCE WITH ALL SAFETY REQUIREMENTS AND LAW.
9.PALEONTOLOGICAL RESOURCES: DURING PROJECT CONSTRUCTION, THE PROJECT APPLICANT SHALL IMPLEMENT THE FOLLOWING MEASURES:
a.IF PALEONTOLOGICAL RESOURCES ARE ENCOUNTERED DURING GROUND DISTURBING AND/OR OTHER CONSTRUCTION ACTIVITES, ALL CONSTRUCTION SHALL BE TEMPORARILY HALTED OR REDIRECTED TO ALLOW A QUALIFIED
PALEONTOLOGIST, WHICH SHALL BE RETAINED BY THE PROJECT APPLICANT, TO ASSESS THE FIND FOR SIGNIFICANCE AND THE APPLICANT SHALL NOTIFY THE CITY.
b.IF PALENOTOLOGICAL RESOURCES ARE FOUND TO BE SIGNIFICANT, THE PALEONTOLOGICAL MONITOR SHALL DETERMINE APPROPRIATE ACTIONS, IN COORDINATION WITH A QUALIFIED PALEONTOLOGIST, CITY STAFF, AND
PROPERTY OWNER, APPROPRIATE ACTIONS MAY INCLUDE, BUT ARE NOT LIMITED TO, SALVAGE OF UNEARTHED FOSSIL REMAINS AND/OR TRACES (E.G., TRACKS, TRAIL. BURROW); SCREEN WASHING TO RECOVER SMALL
SPECIMENS; PREPARATION OF SALVAGED FOSSILES TO A POINT OF BEING READY FOR CURATION (E.G., REMOVAL OF ENCLOSING MATRIX, STABILIZATION AND REPAIR OF SPECIMENS, AND CONSTRUCTION OF REINFORCED
SUPPORT CRADLES); AND INDENTIFICATION, CATALOGING, CURATION, AND PROVISION FOR REPOSITORY STORAGE OF PREPARED FOSSIL SPECIMENS.
LEGEND:
MDU INTERIOR WALL LINE
3
3 PLAN CHECK COMMENT FEB. 06.2026
3
GARAGE INTERIOR WALL LINE ADU INTERIOR WALL LINE