Loading...
HomeMy WebLinkAboutASAC Reso 755HC -51,383.2 RESOLUTION NO. 755 OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF SITE MODIFICATION FOR PHASE ONE, AND ARCHITECTURE, LANDSCAPING, AND LIGHTING FOR PHASE TWO OF REMODELING FOR A CHURCH SANCTUARY AND RELATED STRUCTURES. PROPERTY OWNER: Good Samaritan United Methodist Church APPLICANT: Warren Gilbert Associates ADDRESS: 168 Jackson Street, San Jose, California 95112 LOCATION OF PROPERTY: Southeast Corner of the Intersection of Homestead Road and Linnet Way The Architectural and Site Approval Committee makes the following finding with respect to this application: 1. That the scope of this application, including reduction of on -site parking, building coverage and uses provided are consistent with Conditions of Approval and approved exhibits accompanying Planning Commission Resolution No. 1503 and Ordinance 732. CONDITIONS OF APPROVAL: 1-8. Architectural and Site Approval Standard Conditions to the extent that they do not conflict with the special conditions enumerated herein. In the event a conflict does exist, the special conditions as enumerated herein shall apply. 9. That the recommendation of approval is based upon Exhibits A, A 1st Revision, :B, B -1, B-2, and B-3 of this application except as may be amended by special conditions contained herein. 10. All conditions of approval specified in Architectural and Site Approval Resolution No.615 shall remain in effect as regards to this development. 11. Proposed bicycle parking facilities depicted on Exhibit A 1st Revision of this application shall be subject to review and approval of the Traffic Engineer, including the selection of bicycle racks and locking equipment. 12. The proposed landscaping plan for Phase One and Two of this development shall utilize drip -emitter irrigation equipment in shrubs, tree and ground cover areas. At least 50% of all plantings used shall be drought -tolerant and shall be so certified by a landscape architect prior to issuance of a building permit. Final landscaping plans shall be subject to staff approval at the building permit level. -1- HC -51,383.2 RESOLUTION NO. 755 PASSED AND ADOPTED this 22nd day of September, 1977, at the regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, State of California, by the following roll call vote: AYES: Committee Members: Bond, Irvine, Ripplinger, Sallan, Chairman Claudy NAYS: " None ABSTAINING: " None ABSENT: " " None ATTEST: /1 / APPROVED: Mar Caugh __ n Claudy, C rman Senior Planni g Technician Architectur and Site Approval Committee -2-