Loading...
HomeMy WebLinkAboutASAC Reso 695HC -51,51,385.1 RESOLUTION NO. 695 OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF MODIFICATION OF LANDSCAPING AND LIGHTING FOR A 106 -UNIT TOWNHOUSE PROJECT. PROPERTY OWNER: Edmund F. Schnieders APPLICANT: Edmund F. Schnieders ADDRESS: 405 South Beverly Boulevard, Beverly Hills, California 90212 LOCATION OF PROPERTY: Northwest corner of Homestead Road and North De Anza Boulevard The Architectural and Site Approval Committee makes the following findings with respect to this application: 1. On the basis of testimony received at the public hearing during which this application was considered, existing technology does not facilitate installation of grasscrete in those locations shown on the approved landscaping plans for this project. SUB CONCLUSIONS: (a) Testimony indicated that a minimum six (6) inch grasscrete form would be necessary in the subject locations. (b) That the use of Bomanite or Grasscrete in any area shown on Exhibit C-1 2nd Revision or C-4 2nd Revision will achieve the desired effect of enhancing the appearance of roadways within the subdivision 2. That the changes in lighting fixture type and location are acceptable provided that they are applied consistently throughout the remainder of the subdivision to be constructed under Phases 2 and 3. CONDITION OF APPROVAL: 1-7. Architectural and Site Approval Standard Conditions to the extent that they do not conflict with the special conditions enumerated herein. In the event a conflict does exist, the special conditions as enumerated herein shall apply. 8. That the recommendation of approval is based upon Exhibits C -1 2nd Revision C-4 2nd Revision and E 1st Revision except as modified by the additional conditions contained herein. 9. The applicant shall be permitted to substitute a stamped concrete (Bomanite) street paving material, or grasscrete in those areas denoted on the approved exhibits and throughout the remainder of the project in areas originally designated for grasscrete only. 10. The lighting plan as approved on Exhibit E 1st Revision shall be consistently applied throughout the remainder of the project area under Phase Two and Three and shall be subject to staff review and approval at the building permit stage. -1- HC -51,385.1 RESOLUTION NO. 695 (continued) PASSED AND ADOPTED this 24th day of February, 1977, at the regular meeting of the Architectural and Site Approval Commitee of the City of Cupertino, State of California, by the following roll call vote: AYES: Committee Members: Bond, Claudy, Irvine, Ripplinger, Chairwoman Sallan NAYS: " None ABSTAINING: " None ABSENT: " None ATTEST: APPROVED: / //L/ 4}L1 Mar Caughey C. Nancy Sallan, Chairwoman Senior Plan i Technician Architectural and Site Approval Committee -2-