HomeMy WebLinkAbout25-065 4 Point Power_Service Order #5 dated 3-24-26 for 4H Power Disconnect Installation - PO 2026-522Contract/Purchasing Action
Personnel Information
Name Nathan Vasquez Department Public Works
Division Facilities Date 03.06.2026
Service Order
Upload Quote
Quote, Description of Project,
Scope of Service, Schedule of
Performance and
Compensation
4PP REVISED Breaker install estimate 4H Building.pdf
Service Order Amount $3,000.00
Master Agreement
Number
2025-026 Contract
Start Date
04/24/2025 Contract End
Date
06/30/2027
Firm Name 4 Point Power, Inc.Address 1313 N Milpitas Blvd, Milpitas,
CA 95035, USA
Phone (408) 529-8250
Consultant/Contractor
Name
Louis Herrera Consultant/Contractor
Email
louis@4pointpowerinc.com
Project Name SO 5 4H Power
Disconnect Installation
Project Location McCellan Ranch
Cupertino Project
Manager Name
Nathan Vasquez Cupertino Project
Manager Email
nathanv@cupertino.org
Master Agreement
Maximum
Compensation
$135,000.00 Total Previously
Encumbered to Date
$83,800.00
Encumbrance this
Service Order
$3,000.00 Master Agreement
Unencumbered Balance
$48,200.00
SO GL #100-87-832 700-702 NWS Project Code
Signature
03/10/2026 PDT
Consultant/Contractor Signature Date
03/10/2026 PDT
Manager/Supervisor Signature Date
Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above
fund for the above contract as estimated and that fund are available as of this date of signature.
03/24/2026 PDT
Management Analyst Signature Date
Email: louis@4pointpowerinc.com
Date: 03/10/2026 PDT
Email: nathanv@cupertino.gov
Date: 03/10/2026 PDT
Email: jindyg@cupertino.org
Date: 03/24/2026 PDT
4 Point Power Inc.
1313 N Milpitas Blvd Ste 161
Milpitas, CA 95035
+3317617
Louis@4pointpowerinc.com
Estimate
ADDRESS
Facilities Nathan Vasquez
City of Cupertino
ESTIMATE #1845
DATE 02/24/2026
DIR CSLB
1000043890 1016759
ACTIVITY QTY RATE AMOUNT
change existing 100-amp breaker to wire size
appropriate amperage. Work to completed
during normal working hours.
main panel will need to be shut down, if after
hours is required, premium time will be added
provide 1-20 amp breaker for 4H sub panel
Services
Intercept existing feed , install 60 amp
disconnect to feed existing panel
Services 3,000.00
McCellan Ranch TOTAL $3,000.00
Accepted By Accepted Date
SO 5 4H Power Disconnect Installation - Service
Request
Created:03/10/2026
Status:Signed
Transaction ID:e475b9f1-be90-4115-ab52-0333e44a70f2
"SO 5 4H Power Disconnect Installation - Service Request" history
Sundari Pilaka created the document
03/10/2026 11:54:40 AM PDT - IP address 64.165.34.3
Document was emailed to Louis Herrera
03/10/2026 11:54:41 AM PDT
Louis Herrera opened the document
03/10/2026 11:56:35 AM PDT - IP address 67.170.196.165:56590
Louis Herrera signed the document
03/10/2026 11:56:51 AM PDT - IP address 67.170.196.165:56590
Document was emailed to nathanv@cupertino.gov
03/10/2026 11:56:52 AM PDT
nathanv@cupertino.gov opened the document
03/10/2026 1:07:14 PM PDT - IP address 64.165.34.3:4673
nathanv@cupertino.gov signed the document
03/10/2026 1:07:28 PM PDT - IP address 64.165.34.3:4673
Document was emailed to Public Works Management Analyst
03/10/2026 1:07:29 PM PDT
User Jindy Gonzalez delegated the document
03/24/2026 3:23:03 PM PDT - IP address 73.241.25.149
Document was emailed to Jindy Gonzalez
03/24/2026 3:23:04 PM PDT
Jindy Gonzalez opened the document
03/24/2026 3:23:07 PM PDT - IP address 73.241.25.149:56778
Jindy Gonzalez signed the document
03/24/2026 3:23:21 PM PDT - IP address 73.241.25.149:56778
Document was successfully signed and filed
03/24/2026 3:23:21 PM PDT