Loading...
HomeMy WebLinkAbout25-065 4 Point Power_Service Order #5 dated 3-24-26 for 4H Power Disconnect Installation - PO 2026-522Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 03.06.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation 4PP REVISED Breaker install estimate 4H Building.pdf Service Order Amount $3,000.00 Master Agreement Number 2025-026 Contract Start Date 04/24/2025 Contract End Date 06/30/2027 Firm Name 4 Point Power, Inc.Address 1313 N Milpitas Blvd, Milpitas, CA 95035, USA Phone (408) 529-8250 Consultant/Contractor Name Louis Herrera Consultant/Contractor Email louis@4pointpowerinc.com Project Name SO 5 4H Power Disconnect Installation Project Location McCellan Ranch Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $135,000.00 Total Previously Encumbered to Date $83,800.00 Encumbrance this Service Order $3,000.00 Master Agreement Unencumbered Balance $48,200.00 SO GL #100-87-832 700-702 NWS Project Code Signature       03/10/2026 PDT  Consultant/Contractor Signature Date       03/10/2026 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       03/24/2026 PDT  Management Analyst Signature Date Email: louis@4pointpowerinc.com Date: 03/10/2026 PDT Email: nathanv@cupertino.gov Date: 03/10/2026 PDT Email: jindyg@cupertino.org Date: 03/24/2026 PDT 4 Point Power Inc. 1313 N Milpitas Blvd Ste 161 Milpitas, CA 95035 +3317617 Louis@4pointpowerinc.com Estimate ADDRESS Facilities Nathan Vasquez City of Cupertino ESTIMATE #1845 DATE 02/24/2026 DIR CSLB 1000043890 1016759 ACTIVITY QTY RATE AMOUNT change existing 100-amp breaker to wire size appropriate amperage. Work to completed during normal working hours. main panel will need to be shut down, if after hours is required, premium time will be added provide 1-20 amp breaker for 4H sub panel Services Intercept existing feed , install 60 amp disconnect to feed existing panel Services 3,000.00 McCellan Ranch TOTAL $3,000.00 Accepted By Accepted Date SO 5 4H Power Disconnect Installation - Service Request Created:03/10/2026 Status:Signed Transaction ID:e475b9f1-be90-4115-ab52-0333e44a70f2 "SO 5 4H Power Disconnect Installation - Service Request" history Sundari Pilaka created the document 03/10/2026 11:54:40 AM PDT - IP address 64.165.34.3 Document was emailed to Louis Herrera 03/10/2026 11:54:41 AM PDT Louis Herrera opened the document 03/10/2026 11:56:35 AM PDT - IP address 67.170.196.165:56590 Louis Herrera signed the document 03/10/2026 11:56:51 AM PDT - IP address 67.170.196.165:56590 Document was emailed to nathanv@cupertino.gov 03/10/2026 11:56:52 AM PDT nathanv@cupertino.gov opened the document 03/10/2026 1:07:14 PM PDT - IP address 64.165.34.3:4673 nathanv@cupertino.gov signed the document 03/10/2026 1:07:28 PM PDT - IP address 64.165.34.3:4673 Document was emailed to Public Works Management Analyst 03/10/2026 1:07:29 PM PDT User Jindy Gonzalez delegated the document 03/24/2026 3:23:03 PM PDT - IP address 73.241.25.149 Document was emailed to Jindy Gonzalez 03/24/2026 3:23:04 PM PDT Jindy Gonzalez opened the document 03/24/2026 3:23:07 PM PDT - IP address 73.241.25.149:56778 Jindy Gonzalez signed the document 03/24/2026 3:23:21 PM PDT - IP address 73.241.25.149:56778 Document was successfully signed and filed 03/24/2026 3:23:21 PM PDT