Loading...
HomeMy WebLinkAbout22-021 Alvernaz Construction Service Order #2 dated 03-24-26 Sidewalk Repair on Homestead Rd. near Safeway - PO 2026-529Contract/Purchasing Action Personnel Information Name Jimmy Tan Department Public Works  Division Administration Date 03.19.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Sidewalk Repair Job.pdf Service Order Amount $2,500.00 Master Agreement Number 2026-015 Contract Start Date 01/27/2026 Contract End Date 06/30/2029 Firm Name Alvernaz Construction Address P.O. Box 366, San Martin, CA 95046 Phone (408) 595-2817 Consultant/Contractor Name Michael Alvernaz Consultant/Contractor Email michaelalvernaz@alvernazconstruction.com Project Name SO 2 Sidewalk Repair on Homestead Rd. near Safeway Project Location Homestead Road near Safeway Cupertino Project Manager Name Jimmy Tan Cupertino Project Manager Email jimmyt@cupertino.org Master Agreement Maximum Compensation $75,000.00 Total Previously Encumbered to Date $14,300.00 Encumbrance this Service Order $2,500.00 Master Agreement Unencumbered Balance $58,200.00 SO GL #270-85-820 750-020 NWS Project Code Comments A huge sidewalk uplift occurred this week where there was a trip and fall. This work is to reconstruct the sidewalk. Signature       03/19/2026 PDT  Consultant/Contractor Signature Date       03/23/2026 PDT  Email: michaelalvernaz@alvernazconstruction.com Date: 03/19/2026 PDT Email: jimmyt@cupertino.gov Date: 03/23/2026 PDT Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       03/24/2026 PDT  Management Analyst Signature Date Email: PWMA@cupertino.gov Date: 03/24/2026 PDT Po Box 366 San Martin, CA 95046 (408) 595-2817 License #: 711435 Quote March 18,2026 Richard Alveraz Public Works Supervisor Date Activity Amount 03/18/2026 Demo & Prep Existing concrete approximately 11’ x 5’ 03/18/2026 Demo & Prep Existing soil add base rock and compact 03/18/2026 Install Forms 03/18/2026 Pour Concrete six sack mix TOTAL Cost Labor and Materials $2,500.00 Please Note: Alvernaz Construction will warranty the job for one year. Clean Up & Soil & Concrete on job. Any Unforeseen Damage Will be an Additional Cost. Accepted By: Accepted Date : SO 2 Sidewalk Repair on Homestead Rd. near Safeway - Service Request Created:03/19/2026 Status:Signed Transaction ID:2fc6de29-fad7-474d-9533-e0128d137d80 "SO 2 Sidewalk Repair on Homestead Rd. near Safeway - Service Request" history Sundari Pilaka created the document 03/19/2026 1:35:25 PM PDT - IP address 64.165.34.3 Document was emailed to Michael Alvernaz 03/19/2026 1:35:26 PM PDT Michael Alvernaz opened the document 03/19/2026 2:35:24 PM PDT - IP address 47.27.193.76:57064 Michael Alvernaz signed the document 03/19/2026 2:35:51 PM PDT - IP address 47.27.193.76:57064 Document was emailed to jimmyt@cupertino.gov 03/19/2026 2:35:52 PM PDT jimmyt@cupertino.gov opened the document 03/23/2026 6:12:45 AM PDT - IP address 64.165.34.3:4138 jimmyt@cupertino.gov signed the document 03/23/2026 6:12:55 AM PDT - IP address 64.165.34.3:6696 Document was emailed to Public Works Management Analyst 03/23/2026 6:12:56 AM PDT Public Works Management Analyst opened the document 03/24/2026 7:27:14 AM PDT - IP address 73.241.25.149:53739 Public Works Management Analyst signed the document 03/24/2026 7:28:16 AM PDT - IP address 73.241.25.149:53739 Document was successfully signed and filed 03/24/2026 7:28:16 AM PDT