Loading...
HomeMy WebLinkAboutClerkSharp-2_20260325_132244The Cupertino Courier c/o Bay Area News Group 4 N. 2nd Street, Suite 800 San Jose, CA 95113 2083307 CITY OF CUPERTINO GRACE SCHMIDT 10300 TORRE AVENUE CUPERTINO, CA 95014 PROOF OF PUBLICATION State of California County of Santa Clara FILE NO. Squarcia:Bid: McClellan Garden-No.2017-15 I am a citizen of the United States. I am over the age of eighteen years and I am not a party to or interested in the above entitled matter. I am the Legal Advertising Clerk of the printer and publisher of the Cupertino Courier, a newspaper published in the English language in the City of Cupertino, County of Santa Clara, State of California. declare that the Cupertino Courier is a newspaper of general circulation as defined by the laws of the State of California as determined by court decree dated November 13, 1956, Case Number 100637. Said decree states that the Cupertino Courier is adjudged to be a newspaper of general circulation for the City of Cupertino, County of Santa Clara and State of California. Said order has not been revoked. I declare that the notice, of which the annexed is a printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit: 08/3112018 certify (or declare) under penalty of perjury that the foregoing is true and correct. Dated: Augustl3l, 2018 Public Notice Advertising Clerk Legal No. 0006209412 CITY OF CUPERTINO NOTICE INVITING BIDS MCCLELLAN RANCH COMMUNITY GARDEN IMPROVEMENTS, PROJECT NO.2017.15 1 Bid Acceptance. The City of Cupertino ("City") will accept sealed bids for Its McClellan Ranch C_ommunity_Garden Impraveme_nts ("Project"), by or before September 18,_2019; at 2:o0 p.m.1 at the City Clerk's office, located at 10300 Torre Avenue, Cupertino, California, 95o14 at which time the bids will be publicly opened in the City Hall lobby and read aloud, The City may, acting in its sole discretion, reject any and all bids, and may waive any immaterial deviation from the bid requirements to the full extent permitted by law. 2. Project Information. 2.1 Location and Description. The Project is located at 22221 McClellan Rd., CupertinpCA 95014, and is described as follows Miscellaneous community garden improvements including. demolition earthwork and grading, aardeecrete . yemem decomposed granite pavement, concrete wor�C�wood chips.- surfacing, garden fu�mshh_mgs irri ation system�detiris hox screen aridassuciafedwork 2.2 Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: All work shall be complete by March 15, 2019. 2.3 Estimated Cost. The estimated construction cost is $.L,OpO,QOQ. 3, License and Registration Requirements, 3.1 License. This Project requires a valid California contractor's license for the following classiflcation(s): "A" (General Engineering), C-27 (Landscaping) 3.2 DIR Registration. City may not accept a Sid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of In. dustrial Relations ("DIR") to perform public work under Labor Code sectlon 1725.5, subject to limited legal exceptions. 4. Contract Documents. The plans, specifications, bid farms and contract documents for the Pro eCt, and any addenda thereto ("Contract Documents") are available in electronic form only, an� ma be downloaded from Clty's website under "Open Bids" at: https:�apps.Cupertino.org/"bidmanagement/index.aspx and may also be available from a local or regional plan room ar trade lourna€. 5. Bid Security. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond farm included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Award, the successful bidder will execute the Contract and submit the payment and performance bonds and insurance certificates and endorsements and any other submittals as required by the Contract Documents and specified in the Notice of Award, 6. Prevailing Wage Requirements, 6.1 General. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, va- cation, apprenticeship and similar purposes. 6.2 Rates. These prevailing rates are on file with the City and available online at http:// www.dir.ca.gov/DLSR. Each Contractor and Subcontractor musk pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. 6.3 Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code section 1771.4. 7. Performance and Payment Bonds. The successful bidder will be required to provide per- formance and payment bonds, each for 100% of the Contract Price. 8, Substitution of Securities. Substitution of appropriate securities in lieu of retention amounts from progress payments Is permitted under Public Contract Code section 22300. 9. Subcontractor List Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed subcontractor List form with Its Bid Proposaf, including the name, location of the place of business. California contractor license number, ),R registration number, and percentage of the Work to be performed (based on the Base Bid) for each Subcontractor that will perform work or service or fabricate or install work for the prime contractor in excess of one-half of 1% of the bid price or, for construction of streets and highways, 510,000 (whichever is greater), using the Subcontractor List form includ- ed with the Contract Documents. 10. Subcontractor Limit. The prime contractor is required to self -perform at least 25% of the Work on the Project, as further specified in the Instructions to Bidders. 11. Bidders' Conference. A bidders' conference will be held on Septamber.5, 2018 at 10.00 a.m., at 22221 McClellan Rd., _Cupertino, CA for the purpose of acquainting all prospective bid- ders with the Contract Documents and the Worksite. The bidders' conference is not mandatory. 12. Instructions to Bidders. All bidders should carefully, review the Instructions to Bidders be- fore submitting a Bid Proposal. CITY OF CUPERTINO /GRACE SCHMIDT/ CITY CLERK PUBLISH 8/31/18 CU#6209412; August 31, 2018 ,.13P31&0711 7111