HomeMy WebLinkAboutClerkSharp-2_20260325_132135The Cupertino Courier
c/o Bay Area News Group
4 N. 2nd Street, Suite 800
San Jose, CA 95113
2083307
CITY OF CUPERTINO
GRACE SCHMIDT
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROOF OF PUBLICATION
State of California
County of Santa Clara
FILE NO, Squarcia:Bid:Rev.McClellan
Rd -Bikeways
am a citizen of the United States. I am over the age of eighteen
years and I am not a party to or interested in the above entitled
matter. I am the Legal Advertising Clerk of the printer and publisher
of the Cupertino Courier, a newspaper published in the English
language in the City of Cupertino, County of Santa Clara, State of
California.
I declare that the Cupertino Courier is a newspaper of general
circulation as defined by the laws of the State of California as
determined by court decree dated November 13, 1956, Case
Number 100637. Said decree states that the Cupertino Courier is
adjudged to be a newspaper of general circulation for the City of
Cupertino, County of Santa Clara and State of California. Said
order has not been revoked.
declare that the notice, of which the annexed is a printed copy,
has been published in each regular and entire issue of said
newspaper and not in any supplement thereof on the following
dates, to wit:
07/2712018
I certify (or declare) under penalty of perjury that the foregoing is
true and correct.
Dated: July 27, 018
Public Notice Advertising Clerk
Legal No. 0006193612
CITY OF CU PERTINO
REVISED NOTICE INVITING BIDS
MCCLELLAN ROAD SEPARATED BIKEWAYS -PHASE AA PROJECT
A. Bid Acceptance. The City of Cupertino ("City") will accept sealed bids for its McClellan
Road Separated Bikeways -Phase la Project ("Project"), by or before August 14. 2018, at 2:00
p.m., at the City Clerk's Office, located at 10300 Torre Avenue, Cupertino, California, 95014, at
which time the bids will be publicly opened in the City hall lobby and read aloud. The city may,
acting in its sole discretion, reject any and all bids, and may waive any immaterial deviation
from the bid requirements to the full extent permitted by law.
2. Project Information.
2.1 Location and Description. The Project is located on McClellan Road between South
Stelling Road and imperial Avenue, and Is described as follows: Enhancement of existing bike
lanes including roadway widening, construction of curb, gutter, and sidewalk, installation of bi-
cycle curbs, retaining wall modifications, intersection reconfiguration, median island construc-
tion and modification, and roadway striping and signing.
2.2 Time for Completion. The planned timeframe for commencement and completion of
construction of the Project Is: 75 calendar days from the date of the Notice to Proceed.
2.3 Estimated Cost. The estimated construction cost is $2.000,000.00.
3. License and Registration Requirements.
3.1 License. This Project requires a valid Ca€ifornia contractor's license for the following
classification(s):Class A, General Engineering.
3.2 DIR Registration. City ma not accept a Bid Proposal from or enter into the Contract
with a bidder, without proof that the bidder is registered with the California Department of In-
dustrial Relations ("DIR") to perform public work under Labor code section 1725.5, subject to
limited legal exceptions.
4. Contract Documents. The plans, specifications, bid forms and contract documents for the
Project, and any addenda thereto ("Contract Documents") are available in electronic form only,
and may be downloaded from City's website under "Open Bids" at: https://apps.cupertino:gEg/
bidmanagement/Index.aspx and may also be available from a local or regional plan room or
trade journal.
5. Bid Security. The Bid Proposal must be accompanied by bid security of ten percent of the
maximum bid amount, in the form of a cashier's or certified check made payable to City, or a
bid bond executed by a surety licensed to do business in the State of California on the Bid Bond
form included with the Contract Documents. The bid security must guarantee that within ten
days after City issues the Notice of Award, the successful bidder will execute the Contract and
submit the payment and performance bonds and insurance certificates and endorsements and
any other submittals as required by the Contract Documents and specified in the Notice of
Award.
6. Prevailing Wage Requirements,
6.1 General. This Project is subject to the prevailing wage re ulrements applicable to the to-
callty in which the Work s to be performed for each craft, classification or type of worker need-
ed to perform the Work, including employer payments for health and welfare, pension, vaca-
tion, apprenticeship and similar purposes.
6.2 .Rates. These prevailing rates are an file with the City and available online at http://
ww-w.&r,ca.gov/DLSR.. Each Contractor and Subcontractor must pay no less than the specified
rates to all workers employed to work on the Project. The schedule of per diem wages is based
upon a working day of eight hours. The rate for holiday and overtime work must be at least
time and one-half.
6.3 Compliance. The Contract will be subject to compliance monitoring and enforcement
by the DIR, under Labor Code section 1771.4.
7. Performance and Payment Bonds. The successful bidder will be required to provide per-
formance and payment bonds, each for IOIJ% of the Contract Price.
e. Substitution of Securities. Substitution of appropriate securities in lieu of retention
amounts from progress payments is permitted under Public Contract Code section 22300.
9. Subcontractor List Each Subcontractor must be registered with the DIR to perform work
on public projects. Each bidder must submit a completed Subcontractor List form with Its Bid
Proposal, including the name, location of the place of business. California contractor license
number, DIR registration number, and percentage of the Work to he performed (based on the
Base Bid) for each Subcontractor that will perform work or service or fabricate or install work
for the primecontractor in excess of one -halt of 1% of the bid price or, for construction of
streets and highways, $10.000 (whichever is greater), using the Subcontractor List form includ-
ed with the Contract Documents.
10. Subcontractor Limit. The prime contractor is required to self -perform at least 51% of the
Work on the Project, as further specified in the Instructions to Bidders.
11. Bidders' Conference. A bidders' conference will be held on August 7, 2018 at 10:00 a.m., at
the intersection of McClellan Road and Bubb Avenue for the purpose of acquainting all prospec-
tive bidders with the Contract Documents and the Worksite. The bidders' conference is not
mandatary.
12. Instructions to Bidders. All bidders should carefully review the Instructions to Bidders be-
fore submitting a Bid Proposal.
CITY OF CUPERTINO
/GRACE SCHMIDT/
CITY CLERK
PUBLISH 7/27/18
CU#6193612, July 27, 2018