CITY OF CUPERTINO
GRACE SCHMIDT
10300 TORRE AVENUE
CUPERTINO, CA 95014
PROOF OF PUBLICATION
State of California
County of Santa Clara
FILE NO. Squarcia:Bid: McClellan Rd Sidewalk
Imp
I am a citizen of the United States. I am over the age of eighteen
years and I am not a party to or interested in the above entitled
matter. I am the Legal Advertising Clerk of the printer and
publisher of the Cupertino Courier, a newspaper published in the
English language in the City of Cupertino, County of Santa Clara,
State of California.
I declare that the Cupertino Courier is a newspaper of general
circulation as defined by the laws of the State of California as
determined by court decree dated November 13, 1956, Case
Number 100637. Said decree states that the Cupertino Courier is
adjudged to be a newspaper of general circulation for the City of
Cupertino, County of Santa Clara and State of California. Said
order has not been revoked.
I declare that the notice, of which the annexed is a printed copy,
has been published in each regular and entire issue of said
newspaper and not in any supplement thereof on the following
dates, to wit:
06/2212018
I certify (or declare) under penalty of perjury that the foregoing is
true and correct.
Dated: June 22, 2018
",cCA—
Public Notice Advertising Clerk
Legal No. 0006174822
CITY OF CUPERTINO
NOTICE INVITING BIDS
MCCLELLAN ROAD SIDEWALK IMPROVEMENTS -PHASE 2 PROJECT
1, Bid Acceptance. The City of Cupertino ("City'7 will accept sealed bids for its McClellan Road
Sidewalk Improvements -Phase 2 Prolect ("Prolect"), by or before July i7, 2018, at 2:00 p.m., at
the Cit Clerk's OfFce, located at 16300 Torre Avenue, Cupertino, California, 95014 at which time
the bids will be publicly opened in the Ci#y Hall lobby and read aloud. The City may, acting m its
sole discretion, reject any and all bids, and may waive any immaterial deviation from the hid re-
quirements to the full extent permitted by law.
2. Project Information.
2.1 Location and Description. The Project location is McClellan Road between Byrne Avenue
and San Leandro Avenue in the city of Cupertino, and is described as follows: Addition of side-
walk, curb, and gutter where gaps currently exist as well as drainage improvements and plant-
ing strips where possihie.
A2 Time for Completion. The planned timeframe for commencement and completion of con-
struction of the Project is: 75 calendar days.
2.3 Estimated Cost. The estimated construction cost is $500,000.00,
3. License and Registration Requirements.
3.1 License, This Project requires a valid California contractor's license for the following
classiflcation(s): Class A, General Engineering.
3.2 DIR Registration. City may not accept a Bid Proposal from or enter Into the Contract with a
bidder, without proof that the bidder is registered with the California Department of Industrial
Relations ("DIR") to perform public work under Labor Code section 1725.5, subject to limited le-
gal exceptions.
4, Contract Documents, The plans, specifications, bid forms and contract documents for the
Prolect, and any addenda thereto ("Contract Documents") are available In electronic farm only,
and may be downloaded from City's website under "Open Bids" at: http://www.cupertino.org/--i-
want-to/bid_orilopen-b'[ds and may also be available from a local or regional plan room or
trade journal.
5. Bid Security, The Bid Proposal must be accompanied by bid security of ten percent of the
maximum bid amount, in the form of a cashier's or certified check made payable to City, or a
bid bond executed by a surety licensed to do business in the State of California on the
Bid Bond form included with the Contract Documents. The bid security must guarantee that
within ten days after City Issues the Notice of Award, the successful bidder will execute the
Contract and submit the payment and performance bonds and insurance certificates and
endorsements and any other submittals as required by the Contract Documents and specified
in the Notice of Award.
5. Prevailing Wage Requirements.
&1 General, This Project is subject to the prevailing wage requirements applicable to the local-
ity in which the Work is to be performed for each craft, classification or type of worker needed
to perform the Work, including employer payments for health and welfare, pension, vacation,
apprenticesh€p and similar purposes.
$.2 Rates. These prevailing rates are on file with the City and available online at http://ww,
d E-ca gov/f)L$R. Each Contractor and subcontractor must pay no less than the specifiw
ed rates
to all workers employed to work on the Project. The schedule of per diem wages is based upon
a working day of eight hours. The rate for holiday and overtime work must be at least time and
one-half.
113 Compliance. The Contract will be subject to compliance monitoring and enforcement by
the DIR, under Labor Code section 1771.4.
7. Performance and Payment Bonds. The successful bidder will be required to provide per-
formance and payment bonds, each for 100%of the Contract Price.
8. Substitution of Securldes. Substitution of appropriate securities in lieu of retention
amounts from progress payments is permitted under Public Contract Code section 22300.
9. Subcontractor List. Each Subcontractor must be registered with the DIR to perform work on
public projects. Each bidder must submit a completed Subcontractor List form with Its Wd Pro-
posal, including the name, location of the place of business, California Contractor license num-
ber, DIR registration number, and percentage of the Work to be performed (based on the Base
Bid) for each Subcontractor that will perform work or service or fabricate or install work for the
prime contractor in excess of one-half of 1% of the bid price or, for construction of streets and
highways. $10,000 (whichever is greater), using the Subcontractor List form included with the
Contract Documents.
10. Subcontractor Limit. The prime contractor is required to self -perform at least 51% of the
Work on the Project, as further specified in the Instructions to Bidders.
11. Instructions to Bidders. All bidders should carefully review the Instructions to Bidders be-
fore submitting a Bid Proposal,
CITY OF CUPERTINO
/GRACE SCHMIDT/
CITY CLERK
PUBLISH 6/22/18
CD#6174822; June 22, 2018