Loading...
HomeMy WebLinkAbout23-006 One Day Construction_Service Order#11 dated 02-24-26 for Computer Lab Projector UpgradeContract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 02.05.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Senior Center Computer Lab Projector Estimate 10926.pdf Service Order Amount $7,856.64 Master Agreement Number 2023-008 Contract Start Date 01/25/2023 Contract End Date 06/30/2030 Firm Name One Day Construction Address 450 Vía Vaquero Norte, San Juan Bautista, CA 95045, USA Phone (408) 205-4112 Consultant/Contractor Name Chris Valencia Consultant/Contractor Email onedayir@yahoo.com Project Name SO 11 Computer Lab Projector Upgrade Project Location Senior Center Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $170,000.00 Total Previously Encumbered to Date $125,223.00 Encumbrance this Service Order $7,856.64 Master Agreement Unencumbered Balance $36,920.36 SO GL #100-87-831 700-702 NWS Project Code Comments Another SO will be submitted for 4 Point Electric, Inc. for the same project. Signature       02/19/2026 PST  Consultant/Contractor Signature Date       02/20/2026 PST  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       02/24/2026 PST  Email: onedayir@yahoo.com Date: 02/19/2026 PST Email: nathanv@cupertino.gov Date: 02/20/2026 PST Email: jindyg@cupertino.org Date: 02/24/2026 PST Management Analyst Signature Date ODIR Construction 450 Via Vaquero Norte San Juan Bautista, CA 95045 4082054112 onedayir@yahoo.com ADDRESS SHIP TO City of Cupertino #2023-008 10300 Torre Avenue Cupertino, CA 95014 Senior Center City of Cupertino #2023-008 10300 Torre Avenue Cupertino, CA 95014 Senior Center Estimate 10926 DATE 02/02/2026 PROJECT MANAGER Chris Valencia DATE SERVICE QTY RATE AMOUNT LABOR Provide labor and materials to furnish and install a structural strut support system for a ceiling-mounted projector within a classroom. The support system will be attached to the existing roof structure above and extended down through the ceiling plenum to position the projector below the T-bar ceiling grid at the required elevation. Work includes supplying and installing metal strut, threaded rod, hardware, and attachment fasteners, field coordination for layout and elevation, and proper leveling and securing of the support assembly. Installation will be coordinated to avoid interference with existing ceiling grid, lighting, HVAC, and fire protection systems. EXCLUSIONS: Electrical/Low Voltage 1 7,856.64 7,856.64 SUBTOTAL 7,856.64 TAX 0.00 TOTAL $7,856.64 Accepted By Accepted Date SO 11 Computer Lab Projector Upgrade - Service Request Created:02/05/2026 Status:Signed Transaction ID:5c195cf6-f5c3-4538-9731-5b30148e495e "SO 11 Computer Lab Projector Upgrade - Service Request" history Sundari Pilaka created the document 02/05/2026 3:39:39 PM PST - IP address 64.165.34.3 Document was emailed to Chris Valencia 02/05/2026 3:39:40 PM PST Chris Valencia opened the document 02/19/2026 3:34:20 PM PST - IP address 24.176.174.26:54012 Chris Valencia signed the document 02/19/2026 3:35:04 PM PST - IP address 24.176.174.26:54012 Document was emailed to nathanv@cupertino.gov 02/19/2026 3:35:05 PM PST nathanv@cupertino.gov opened the document 02/20/2026 8:50:03 AM PST - IP address 64.165.34.3:16202 nathanv@cupertino.gov signed the document 02/20/2026 8:50:15 AM PST - IP address 64.165.34.3:16202 Document was emailed to Public Works Management Analyst 02/20/2026 8:50:16 AM PST User Jindy Gonzalez delegated the document 02/24/2026 4:32:58 PM PST - IP address 64.165.34.3 Document was emailed to Jindy Gonzalez 02/24/2026 4:32:59 PM PST Jindy Gonzalez opened the document 02/24/2026 4:33:02 PM PST - IP address 64.165.34.3:45271 Jindy Gonzalez signed the document 02/24/2026 4:33:17 PM PST - IP address 64.165.34.3:45271 Document was successfully signed and filed 02/24/2026 4:33:17 PM PST