Loading...
19. School safety incentivesOFFICE OF THE CITY CLERK CUPERTINO CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 950143255 TELEPHONE: (408) 777-3223 • FAX: (408) 777-3368 SUMMARY Agenda Item No. 1 MEETING DATE: June 2, 2009 SUBJECT: Approve the allocation of approximately $29,000 in unspent funds in the "Law Enforcement Santa Clara County Sheriff's Contract" account to f scat year 2009-10 for funding of school safety incentives. BACKGROUND: On May 20, 2008 Council addressed safety concer.~ns around the city by allocating $303,315 toward Safety Projects (see attachment A). There were four parts to the project of which I would like to provide a report back to Council on part 1 of the funding. 1. Traffic Safety Consultant study - $30, ~ 20 Motor Units provide direct enforcemelit - $49,000 2. Improvements to McClellan /Lincoln Elementary School area - $47,700 3. Additional Locations for safety improti~ements - $65,000 4. School Resource Officer - $110,895 STAFF REPORT: The Traffic Safety Consultant went to each of the schools located in the Ciry. He periodically evaluated the drop-off and pick-up times around each of the schools. He made contact with staff and citizens at the schools to address traffic and safety concerns. He staggered his times and days to assure that he was receiving an accurate picture oi'the problems. He provided a report back to me in January 2009, and then provided a presentation to the Public Safety Commission on February 12, 2009. His report included comments around 14 schools in the city. His report included the following suggestions: 1. Collins Elementary -place additional "NO PARKING" signs along NB Blaney, south of the bus loop entrance. 2. Eaton Elementary - Add an additional "QUEUE LANE ONLY" sign on Suisun. 3. Garden Gate Elementary - Place a "ST'OP SIGN" on SB Castine at Garden Gate. 4. Sedgwick Elementary -Increase the sc-lar panel size for the cross-walk lights and add a flashing amber signal overhead to alert. drivers in traffic of pedestrians in the cross-walk. 19-1 5. Hyde Middle School -Paint "KEEP CLEAR" in the WB Ianes of Bollinger in the intersection of Hyde Avenue. Add additional delineators on Bollinger just West of Hyde and at the bus loop exit. These suggestions were the easy fix solutions to address safety concerns noted around the schools. The remaining schools, although at times appeaz congested with traffic, had no significant safety concerns that were not already being addressed. Unfortunately, the Traffic Consultant was unable to provide the amount of time anticipated, and did not have the opportunity to complete much more than the initial analysis of the schools noted above. I have a complete report addressing all 14 schools available in hard copy, but have provided the suggested areas of concern that can be immediately addressed by Public Works at a very low cost. He did not get into an in-depth evaluation of significant changes needed to address safety concerns, not just around schools, but in other locations throughout the city as expected. He also did not have the opportunity to address the "Safe Routes to School Program" and the initial identification of a Task Force to implement a program as anticipated. We did complete the initial survey of the schools regarding current use of walk/bike%arpool at the end of the school year in June 2008. I have attached the results received as Attachment B. The Traffic Consultant Position did not accomplish many of the objectives that I had presented to Council on May 20, 2008, but he did provide a good evaluation of traffic/pedestrian safety around the schools in the city. The Motor Unit enforcement around the schools throughout the school year had a very positive effect on traffic and driver education. Their presence at both drop-off and pick-up times provided direction to assist with the flow of traffic, and help address the safety concerns for students and pedestrians in the area. I have received numerous comments about their effectiveness and demeanor with residents and parents throughout the year. The units have consistently made themselves available to work the additional hours around the schools in both mornings and afternoons. STAFF RECOMMENDATION: Since the Traffic Consultant did not have time to study and address the safety concems around schools and the city as expected, there is approximately $29,000 remaining from the original $30,720 allocated to his study. I have passed many of the remaining WalkBike/Carpool programs to be evaluated and implemented on to the Public Safety Commission. Many of the incentives to complete these programs and implement them will require funding. It is recommended that the remaining approximate $29,000 be rolled over to Fiscal Year 2009/2010 to fund these projects. Council has provided direction and support to continue with these programs, and Council has also suggested providing funding for incentives. The unused money will fund the incentives and programs for the upcoming Fiscal Year. FINANCIAL IMPACT• None. The money is already allocated, and can roll over. It will assist Council in not having to locate an amount to dedicate to the WalkBike/Carpool incentive program. 2 19-2 Submitted by: Approved for submission to the City Council: %c~. Terry Calderone, Sheriff's Office Davi W. Knapp, City Manager Attachment A: Funding allocation approved by Council May 20, 2009 Attachment B: School survey regarding current use of walkJbike/carpool 19-3 Attachment A Proposal Number Cost each Hours Total Cost Traffic Safety Consultant 1 $32 per hr 960 hrs $30,720 Motor Units on Overtime (2) 2 hrs per day $70 per hour 700 hours $49,000 subtotal $79,720 $79,720 I~ mprovements to McClellan 1 Lincoln Elem Move existing Crosswalk/Relocate 1 $32,000 this Crosswalk/develop curb lines Placement of no Right Turn sign 1 $300 Placement of no Left Turn Sign 1 $1,900 Striping of Roadways/Parking Lot Several areas DPW $4,500 Placement of Knockdown poles 10 $7,000 Placement of Crosswalk Knockdowns 3 $2,000 subtotal $47,700 $47,700 Flashing Crosswalk Lights- 2 $ 12,500.00 $20,000 Sedgewick Elementary* Installation 2 $ 12,500.00 $20,000 subtotal $40,000 $40,000 Flashing Crosswalk Lights- 1 $12,500 $12,500 Garden gate Elementary* Installation 1 $12,500 $12,500 subtotal $25,000 $25,000 Totallmprovements $192,420 *Refer to Diagram SRO -One Year $110,895 Grand Total $303,315 19-4 Attachment B Safe Routes To School Student~frrival and Departure Totals June 2008 Data School Number Walk Bike School Family Carpool Transit Other of Bus Vehicle (Skateboard, Students Scooter, Inline Skates, etc. Eaton 30 11 1 0 15 2 0 1 Elementary Collins 89 26 3 0 49 8 0 3 Elementary Hyde 154 39 8 1 71 32 2 1 Middle Garden 598 133 12 2 355 84 2 10 Gate Elementary Lincoln 401 76 11 15 238 54 0 7 Elementary Regnart 638 115 35 26 381 68 0 13 Elementary Sedgwick 536 113 12 43 335 25 0 8 Elementary Kennedy 433 98 34 4 264 20 0 13 Middle 19-5