HomeMy WebLinkAboutASAC Reso 670HC -51,392.1
RESOLUTION NO. 670
OF THE ARCHITECTURAL AND SITE APPROVAL COMMITTEE
OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF
LANDSCAPING DESIGN FOR THE EAST SIDE OF THE NORTH
DE ANZA BOULEVARD PARKWAY AREA AS SHOWN ON EXHIBITS
C, C-i, C-2, C-3, C-4, C-5, C-6, C-7, INFORMATIONAL -1,
INFORMATIONAL -2 AND INFORMATIONAL -3.
PROPERTY OWNER:
APPLICANT:
ADDRESS:
LOCATION OF PROPERTY:
CONDITIONS:
Sobrato-Berg
Sobrato-Berg
2775 Middlefield Road, Palo Alto, California 94306
Easterly of and adjacent to North De Anza Boulevard and
extending southerly from the intersection of North De Anza
Boulevard and Route 280 for a distance of approximately
2,500 ft.
1-7. Architectural and Site Approval Standard Conditions.
8. Selection and location of tree species to be installed within the parkway
area shall conform to recommendations of James Coleman and Associates as
stated in their letter to City staff dated November 15, 1976.
9. "Container size" of redwood and alder species in the parkway shall be mixed
at a ratio of two-thirds at fifteen g. c. to one-third at five g. c. at time
of installation.
10. Surface finish for sidewalks on the east side of the De Anza Boulevard
parkway area shall be as shown on Exhibit Informational -3.
11. Installation of lawn area on the east side of the North De Anza Boulevard
parkway area shall utilize a uniform seed mixture or sod type to ensure
coordination of color, texture and growth habit.
12. Installation on the east side of North De Anza Boulevard parkway area of
irrigation system components shall be standardized as to manufacturer
and type so as to minimize maintenance cost by simplifying spare part
inventory and repair procedures.
FURTHER FINDING:
The Architectural and Site Approval Committee recommends that procedures for the
construction of the North De Anza Boulevard parkway area include field inspection
by a landscape architect of all plantings prior to their acceptance and installation.
Such inspection is intended to ensure that plantings in the parkway area will be
of high quality and good health as detailed in Section 3.7.1 of the Landscaping
Guidelines of the North De Anza Boulevard Conceptual Plan.
-1-
HC -51,392.1
RESOLUTION NO. 670 (continued)
PASSED AND ADOPTED this 18th day of November, 1976, at the regular meeting
of the Architectural and Site Approval Committee of the City of Cupertino,
State of California, by the following roll call vote:
AYES: Committee Members: Bond, Claudy, Irvine, Ripplinger, Chairwoman Sallan
NAYS: " " None
ABSTAINING: " " None
ABSENT: " None
ATTEST.~ " APPROVED:
Mark°Caughey C. Nancy Sallan, Chairwoman
Senior Planning Technician Architectural and Site Approval Committee
-2-