RESOLUTION NO. 157
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO TO REPLACE AN EXISTING DUPLEX WITH A NEW 3,099
SQUARE FOOT DUPLEX LOCATED AT 22620 ALCALDE ROAD (A.P.N.
342-16-102)
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2025-010
Applicant: Chi Tat Law & Wanchi So and GKW Architects, Inc.
Location: 22620 Alcalde Road; APN(s): 342-16-102
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for a Minor Architectural and
Site Approval to consider a 3,099 square foot duplex development; and
WHEREAS, the project is categorically exempt under the California Environmental
Quality Act (CEQA) Class 3, Section 15303(b) – New Construction or Conversion of Small
Structures; and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds that:
A. Minor Architectural and Site Approval Findings
1. The proposal, at the proposed location, will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare, or convenience.
The proposed development complies with the land use and zoning associated with the parcel and
does not intensify the use of the existing duplex. The design of the project is consistent with the
building development regulations of Chapter 19.32 of the Cupertino Municipal Code with no
exceptions or exemptions requested. Therefore, proposal, at the proposed location, will not be
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 2
detrimental or injurious to property or improvements in the vicinity, and will not be
detrimental to the public health, safety, general welfare, or convenience.
2. The proposal is consistent with the purposes of this chapter, the General Plan, any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
The proposal complies with the General Plan. The proposal, with the modifications that are
required as conditions of approval, will comply with the City’s adopted standards and
Municipal Code.
a. Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The proposal will not create an abrupt change in building height or scale as existing two-
story homes are located to the northwest, northeast, west, and southeast. The proposal
complies with the first and second story setbacks requirements established by Chapter
19.32 of the Cupertino Municipal Code. Several existing trees and new shrubs will be
implemented to further mass the scale of the structure. Considering the existing two-
story developments in the neighborhood and the project’s compliance with the
aforementioned development regulations, the project will not disrupt the scale or
character of the neighborhood. Therefore, the proposal will not create an abrupt change to
the neighborhood building scale and will achieve a gradual transition related to height
and bulk.
b. In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new buildings should harmonize with adjacent development by being consistent
or compatible with design and color schemes, and with the future character of the
neighborhood and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility installations
and unsightly elements of parking lots should be concealed. The planting of ground
cover or various types of pavements should be used to prevent dust and erosion,
and the unnecessary destruction of existing healthy trees should be avoided.
Lighting for development should be adequate to meet safety requirements as
specified by the engineering and building departments, and provide shielding to
prevent spill-over light to adjoining property owners.
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 3
The proposal utilizes a neutral color scheme for its stucco exterior and clay roof tiles. The
street facing elevation implements several arched and casement windows with muntins and
exterior shutters to reduce the mass of the structure. Existing trees will be maintained and
implemented, along with new shrubs, for a landscape plan that harmonizes with existing
neighborhood development. The project will implement Dark Sky light fixtures that are
compliant with Cupertino Municipal Code Chapter 19.102.040. Therefore, the will not
conflict with the design harmony of the existing neighborhood.
c. The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures shall minimize traffic hazards and shall positively
affect the general appearance of the neighborhood and harmonize with adjacent
development.
The project does not propose any outdoor advertising signs or structures, therefore no traffic
hazards or neighborhood conflicts are anticipated.
d. With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures.
The proposal does not increase the use of the existing duplex development. Potential noise,
traffic and light impacts to neighboring parcels have been mitigated through setbacks,
landscaping, the Cupertino Municipal Code, and General Plan. Therefore, the proposal,
with the modifications that are required as conditions of approval, will not expose
neighboring residence to adverse impacts from noise, traffic, light and visually intrusive
effects.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony, and other evidence
submitted in this matter, the Hearing Officer of the Administrative Hearing does
determine that Application No.(s) ASA-2025-010 is categorically exempt from CEQA and
approves said application; and
That the subconclusions upon which the findings and conditions specified in Section III
of this Resolution are based and contained in the public meeting record concerning
Application No.(s) ASA-2025-010 as set forth in the Minutes of the Administrative
Hearing Meeting of February 5, 2026, and are incorporated by reference herein.
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 4
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled, “New Construction Duplex” drawn by
GKW Architects, Inc. dated December 11, 2025, consisting of sixteen (16) sheets
labeled A1.0 through A6.0, E1.0, G1.0 through G1.3, LS1.0, and M1.0; except as may
be amended by conditions in this resolution.
2. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
3. BUILDING PERMITS
The applicant shall consult with the City Building Division to obtain the necessary
building permits prior to commencement of work.
4. FLOOR AREA RATIO
The total square footage of both units shall not exceed 45% of net lot area, excluding
development in accordance with California Government Code Sections 66310-66342.
5. SQUARE FOOTAGE RATIO
As a duplex development, the square footage of the two units shall remain within 20%
of each other.
6. ARBORIST REVIEW REQUIRED
Prior to issuance of Building Permits, the building permit and construction details for
installation of the parking pad and improvements near the existing 22-inch DBH pine
tree on the neighboring property at 22632 Alcalde Road, to the south of the project
site, shall be submitted to the City for review by a third-party Arborist review, paid
for by the applicant, to review any potential development-related impacts to the tree.
The consulting arborist’s recommendations to mitigate any adverse impacts to the
existing tree and its root system shall be incorporated into the plans and implemented
during construction.
7. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible for verifying all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements, and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 5
8. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible for consulting with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate any approval by the
Community Development Department.
9. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m.
and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Nighttime
construction is allowed if compliant with the nighttime standards of Section 10.48
of the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
g. The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated.
10. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit final
plans in compliance with the approved lighting plans to comply with development
standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting
Requirements. In the event changes are proposed from the approved plans, said
changes must be reviewed and approved by the Director of Community Development
or their designee. The applicant shall provide all documentation required to
determine compliance with the Municipal Code.
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 6
11. FUGITIVE DUST CONTROL
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District’s
Basic Control Measures from the latest version of BAAQMD’s CEQA Air Quality
Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing
activities and/or construction.
12. VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT
Prior to issuance of the first building permit, the Applicant shall include a note on all
plans where paint specifications or other design specifications are listed, that the
project design will incorporate only low-VOC paint (i.e., 50 grams per liter [g/L] or
less) for interior and exterior wall architectural coatings.
13. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground-disturbing, and tree removal/pruning activities
shall be scheduled to be completed prior to nesting season (February 1 through
August 31), if feasible.
b. If demolition, construction, ground-disturbing, or tree removal/pruning activities
occur during the nesting season (February 1 and August 31), preconstruction
surveys shall be conducted as follows:
i. No more than 7 days prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities, in order to identify any active
nests with eggs or young birds on the site and surrounding area within 100
feet of construction or tree removal activities.
ii. Preconstruction surveys shall be repeated at 14-day intervals until
demolition, construction, ground-disturbing, or tree removal/pruning
activities have been initiated in the area, after which surveys can be stopped.
As part of the preconstruction survey(s), the surveyor shall inspect all trees
and other possible nesting habitats in, and immediately adjacent to, the
construction areas for active nests, while ensuring that they do not disturb
the nests as follows:
1) For projects that require the demolition or construction one single-family
residence, ground disturbing activities affecting areas of up to 500 square
feet, or the removal of up to three trees, the property owner or a tree
removal contractor, if necessary, is permitted to conduct the
preconstruction surveys to identify if there are any active nests. If any
active nests with eggs or young birds are identified, the project applicant
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 7
shall retain a qualified ornithologist or biologist to identify protective
measures.
2) For any other demolition, construction and ground disturbing activity or
the removal of four or more trees, a qualified ornithologist or biologist
shall be retained by the project applicant to conduct the preconstruction
surveys.
iii. If the preconstruction survey does not identify any active nests with eggs or
young birds that would be affected by demolition, construction, ground-
disturbing or tree removal/pruning activities, no further mitigating action is
required. If an active nest containing eggs or young birds is found sufficiently
close to work areas to be disturbed by these activities, their locations shall be
documented, and the qualified ornithologist or biologist shall identify
protective measures to be implemented under their direction until the nests
no longer contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of
clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,
such as orange construction fencing or equivalent) around each nest location
as determined by the qualified ornithologist or biologist, taking into account
the species of birds nesting, their tolerance for disturbance and proximity to
existing development. In general, exclusion zones shall be a minimum of 300
feet for raptors and 75 feet for passerines and other birds. The active nest
within an exclusion zone shall be monitored on a weekly basis throughout
the nesting season to identify signs of disturbance and confirm nesting status.
The radius of an exclusion zone may be increased by the qualified
ornithologist or biologist, if project activities are determined to be adversely
affecting the nesting birds. Exclusion zones may be reduced by the qualified
ornithologist or biologist only in consultation with California Department of
Fish and Wildlife. The protection measures and buffers shall remain in effect
until the young have left the nest and are foraging independently or the nest
is no longer active.
v. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection
measures (if required), shall be prepared by the qualified ornithologist or
biologist and submitted to the Director of Community Development or his or
her designee, through the appropriate permit review process (e.g.,
demolition, construction, tree removal, etc.), and be completed to the
satisfaction of the Community Development Director prior to the start of
demolition, construction, ground-disturbing, or tree removal/pruning
activities.
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 8
14. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit involving soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming that
contractors and construction crews have been notified of basic archaeological site
indicators, the potential for discovery of archaeological resources, laws pertaining to
these resources, and procedures for protecting these resources as follows:
a. Basic archaeological site indicators that may include, but are not limited to, darker
than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire
affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone,
bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either
human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
c. The laws protecting these resources and associated penalties, including, but not
limited to, the Native American Graves Protection and Repatriation Act of 1990,
Public Resources Code Section 5097, and California Health and Safety Code
Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover cultural
resources during project-related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define the
deposit, and assessment of the remainder of the site within the project area to
determine whether the resource is significant and would be affected by the
project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California Department
of Parks and Recreation forms by a qualified archaeologist. If the resource is a
tribal cultural resource, the consulting archaeologist shall consult with the
appropriate tribe, as determined by the Native American Heritage
Commission, to evaluate the significance of the resource and to recommend
appropriate and feasible avoidance, testing, preservation or mitigation
measures, in light of factors such as the significance of the find, proposed
project design, costs, and other considerations. The archeologist shall perform
this evaluation in consultation with the tribe.
15. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of any demolition, grading and building permits that involve soil
disturbance, include on plans a note that, during project construction, the project
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 9
applicant shall comply with California Health and Safety Code Section 7050.5 and
California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100-foot radius of
the remains, or any nearby area reasonably suspected to overlie adjacent remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make a
determination as to whether the remains are Native American.
c. If the Santa Clara County Coroner determines that the remains are not subject to
his authority, he shall notify the Native American Heritage Commission (NAHC)
within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the
deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the remains.
If the Most Likely Descendant does not make recommendations within 48 hours
after being allowed access to the project site, the owner shall, with appropriate
dignity, reinter the remains in an area of the property secure from further
disturbance and provide documentation about this determination and the location
of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner
does not accept the Most Likely Descendant’s recommendations, the owner or the
descendent may request mediation by the NAHC. Construction shall halt until the
mediation has concluded.
16. STORMWATER RUNOFF CONTAMINATION
Prior to issuance of any grading or building permits, the project applicant shall
demonstrate compliance with Chapter 9.18 (Stormwater Pollution Prevention and
Watershed Protection) of the Cupertino Municipal Code, to the satisfaction of the City
Engineer or his or her designee. All identified stormwater runoff control measures
shall be included in the applicable construction documents.
17. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall send notices of the
planned activity by first class mail as follows:
a. For projects on sites that are more than 0.5 acres or four or more residential units
the notices shall be sent to off-site businesses and residents within 500 feet of the
project site;
b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not
including Accessory Dwelling Units) notices shall be sent to off-site businesses and
residents within 250 feet of the project site; or
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 10
c. For projects on sites less than 0.25 acres or one residential unit, the notices shall be
sent to off-site businesses and residents within 100 feet of the project site.
The notification shall include a brief description of the project, the activities that
would occur, the hours when activity would occur, and the construction period’s
overall duration. The notification should include the telephone numbers of the
contractor’s authorized representatives that are assigned to respond in the event of a
noise or vibration complaint. The City will provide mailing addresses for the
Applicant’s use. The project applicant shall provide the City with evidence of mailing
of the notice, upon request. If pile driving, see additional noticing requirements below.
18. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City’s and contractor’s authorized representatives that
are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City’s and contractor’s authorized representatives that are
assigned to respond in the event of a complaint related to fugitive dust, pursuant
to the requirements for compliance with BAAQMD’s CEQA Air Quality
Guidelines.
If the authorized contractor’s representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
19. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City’s Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall demonstrate
compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48
(Community Noise Control) of Cupertino Municipal Code. The details of the
Construction Noise Control Plan shall be included in the applicable construction
documents and implemented by the on-site Construction Manager. Noise
reduction measures selected and implemented shall be based on the type of
construction equipment used on the site, distance of construction activities from
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 11
sensitive receptor(s), site terrain, and other features on and surrounding the site
(e.g., trees, built environment) and may include, but not be limited to, temporary
construction noise attenuation walls, high quality mufflers. During the entire
active construction period, the Construction Noise Control Plan shall demonstrate
that compliance with the specified noise control requirements for construction
equipment and tools will reduce construction noise in compliance with the City’s
daytime and nighttime decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and submit
to the City of Cupertino Public Works Department for approval prior to the start
of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on-site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use for
more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use of
noise producing signals, including horns, whistles, alarms, and bells will be for
safety warning purposes only. The construction manager will use smart back-up
alarms, which automatically adjust the alarm level based on the background noise
level or switch off back-up alarms and replace with human spotters in compliance
with all safety requirements and law.
20. PALEONTOLOGICAL RESOURCES
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall implement the
following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
redirected to allow a qualified paleontologist, which shall be retained by the
project applicant, to assess the find for significance and the Applicant shall notify
the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner. Appropriate actions may include,
but are not limited to, a mitigation plan formulated pursuant to guidelines
developed by the Society of Vertebrate Paleontology and implemented to
appropriately protect the significance of the resource by preservation,
documentation, and/or removal, prior to recommencing activities. Measures
may include, but are not limited to, salvage of unearthed fossil remains and/or
traces (e.g., tracks, trails, burrows); screen washing to recover small specimens;
preparation of salvaged fossils to a point of being ready for curation (e.g.,
Resolution No. 157 ASA-2025-010 February 5, 2026
Page 12
removal of enclosing matrix, stabilization and repair of specimens, and
construction of reinforced support cradles); and identification, cataloging,
curation, and provision for repository storage of prepared fossil specimens.
21. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
“indemnified parties”) from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
“proceeding”) brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and
costs shall include amounts paid to the City’s outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.