Loading...
19. Fee Schedule D - photovoltaic feesCOMMUNITY DEVELOPMENT DEPARTMENT CUPERTINO CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) ;'77-3308 • FAX: (408) 777-3333 SUMMARY Agenda Item No. ~~ SUBJECT AND ISSUE Meeting Date: May 5, 2009 Consider adopting a resolution amending the fee schedule for 2009-10, Schedule D, Miscellaneous Items, photovoltaic fees. BACKGROUND All user fees are reviewed each year in conjunction with the preparation of the budget. Our goal is to ensure that to the extent possible fees cover the cost of providing services, or are competitive to market. Council adopted fee increases at their April 7, 2009 meeting. During this meeting, Council requested that staff research photovoltaic fees for commercial customers and bring back updated information. Under the previously approved 2009-10 fee schedule, commercial customers will be charged $633 for photovoltaic systems up to four kilowatts and $253 for each additional kilowatt. Customers with a typical multi-family residential or commercial building of ~!4 kilowatts would be charged over $5,600. Under the proposed amended fee, the same multi-family residential or commercial customer will be charged $505 for buildings up to eight kilowatts and $7 for each additional kilowatt. Therefore, a 24 kilowatt system would now cost only $617. It is also proposed that fees for quasi public buildings be eliminated and incorporated under the multi-family residential and commercial fee structure. Photovoltaic fees for quasi public buildings could be calculated using the proposed amended rate and therefore the cost for a typical 24 kilowatt building would be reduced to $617 rather than the previously approved fee of $1,162. Fees covered in this amendment would become effective on July 1 with the entire 2009-10 fee schedule. RECOMMENDATION Staff recommends Council adopt a resolution amending the fee schedule for 2009-10, Schedule D, Miscellaneous Items, photovoltaic fees. j ~ubmi'' ed by: ~.. ~ c~ Greg C ste 1 Buildin fficial Attachment A & B Approved for submission: ~~~~~ David W. Knapp City Manager ~9-~ Attachment A CITY OF CUPERTINO Resolution 09-051 & 09-070 Fees Effective July 1, 2009 Schedule D -Miscellaneous Items Work Item Unit Fee Standard Hourly Rate $ 126 Lighting pole each $ 380 each add'I pole each $ 380 Modular Structures each $ 760 Partition-Commercial, Interior (up to 30 I.f.) up to 30 I.f. $ 443 Additional partition each 30 I.f. $ 95 Partition-Residential, Interior (up to 30 I.f.) up to 30 I.f. $ 443 Additional partition each 30 I.f. $ __ 95 Patio Cover! Sun Room Wood frame up to 300 sf $ 633 Metal frame up to 300 sf $ 633 Other frame up to 300 sf $ 633 Additional patio each 300 sf $ 507 Enclosed, wood frame up to 300 sf $ 760 Enclosed, metal frame up to 300 sf $ 760 Enclosed, other frame up to 300 sf $ 760 Additional enclosed patio each 300 sf $ _ 633_ i Photovoltaic System Residential each $ 207 Multi-Family Res/Commercial, up tot- 8 kilowatts up too 8 kW $ 505 Multi-Family ReslCommercial, each additional 1 kilowatt each 1 kW $ _ 7 $ , ,ate Pile Foundation Cast in Place Concrete (first 10 piles) up to 10 $ 887 Additional Piles (increments of 10) each 10 $ 760 Driven (steel, pre-stressed concrete) up to 10 $ 887 Additional Piles (increments of 10) each 10 $ 760 Product Review per hour $ 126 Remodel-Residential Kitchen up to 300 sf $ 570 Bath up to 300 sf $ 570 Other Remodel up to 300 sf $ 380 Additional remodel each 300 sf $ 63 Other Remodel 1000 sf $ 3,823 Additional remodel each 300 sf $ 250 Other Remodel 2500 sf + $ 5,079 Additional remodel each 300 sf $ 181 Re-roof Residential each 100 sf $ 13 Multi-Family Dwelling each 100 sf $ 13 Commercial Commercial (first 5,000 sf) each $ 348 Commercial (each add'I 2,500 sf) each 2,500 sf $ _ 158 Retaining Wall (concrete or masonry) Standard (up to 50 If) up to 50 I.f. $ 760 Additional retaining wall each 50 I.f. $ 633 Special Design, 3-10' high (up to 50 If) up to 50 I.f. $ _ 887 Additional retaining wall each 50 I.f. $ 760 Special Design, over 10' high (up to 50 If) up to 50 I.f. $ 950 Additional retaining wall each 50 I.f. $ _ 823 Gravity/Crib Wall, 0-10' high (u to 50 If) up to 50 I.f. $ _ 950 Additional Gravity/Crib Wall each 50 I.f. $ 823 Gravity/Crib Wall, over 10' high (up to 50 ff) up to 501.f. $ 950 Additional GravitylCrib Wall _ each 50 I.f. $ 823 Revisions Commercial New each $ 760 Tenant Improvement each $ 760 SFDWL _ each $ _ 760 Addition each $ 633 Remodel each $ 633 Roof Structure Replacement _ up to 100 sf $ _ 633 Additional roof structure replacement _ each 100 sf $ 507 Sauna-steam each $ 697 19-2 Attachment B RESOLUTION NO: 09-070 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AMENDING RESOLUTION NO. 09-051, USER FEES SCHEDULE D, MISCELLANEOUS ITEMS, PHOTOVOLTAIC FEES WHEREAS, the State of California require;s fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: User fees, Schedule D, Miscellaneous Items, Photovoltaic fees for multi-family residential and commercial buildings, and quasi public buildings are hereby amended. 2. User fees are effective July 1, 2009. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 5`h day of May, 2009 by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAIN: ATTEST: APPROVED: City Clerk Mayor, City of Cupertino 19-3